CP Factory / CP Lab. Manual application module idrilling. Festo Didactic

Size: px
Start display at page:

Download "CP Factory / CP Lab. Manual application module idrilling. Festo Didactic"

Transcription

1 CP Factory / CP Lab Manual application module idrilling Festo Didactic CP Factory / CP Lab 06/2017

2 Order-No.: Date: 06/2017 Layout: 06/2017, Schober Filename: CP-AM-iDRILL-GB-A001.doc Festo Didactic SE, Denkendorf, Germany, 2017 Internet: Note Where only pronouns such as he and him are used in this manual, these pronouns are of course intended to refer to both male and female persons. The use of a single gender should not be construed as gender discrimination; it s intended solely to make the manual easier to read and the formulations easier to understand. Intended use This installation was developed and manufactured for use in basic and further training in the fields of automation and communications. The training company and/or the training staff must ensure that the trainees observe the safety precautions. Festo Didactic accepts no liability for injury or harm to trainees, the training company and/or any third parties occurring when the installation is used for any purpose apart from training, except Festo Didactic has caused such injury or harm intentionally or by grossly negligence. At CP factory installations, it is not permissible to experiment with hazardous live voltages. Reproduction, distribution and utilisation of this document, as well as the communication of its contents to others without explicit authorisation, are prohibited. Offenders shall be held liable for payment of damages. All rights reserved, in particular the right to file patent, utility model and registered design applications. Furthermore this manual describes setup and possible uses of the singular stations. It contains all information and data required for commissioning, maintenance and operation. 2 Festo Didactic CP Factory / CP Lab application module drilling

3 Content Content 1 General safety instructions Pictograms Safety sockets Note to electrical access of facility Handling the system Dangers in handling the machine Safety precautions in standard operation Dangers due to electric current Dangers due to pneumatic energy Maintenance Servicing Malfunction removal Organizational measures Personnel Notes on personnel Training operations Outside training operations Obligations of the operating company Obligations of the trainees 9 2 Introduction Warranty and liability Important notes 10 3 Technical data 11 4 Design and function Transport Set up General information The application module idrilling Function Process description Electrical Connections CECC I/O assignment 17 5 Start up Workstation Mechanical Setup Connection of application module Pneumatic port of application module Electrical connection of application modules Adjusting the sensors Through-beam sensor (Workpiece detection) Proximity Switch (X-axis cylinder) Proximity switch (Z-axis) Adjusting the one-way flow control valves Visual inspection 30 6 Operation General operating instructions 31 Festo Didactic CP Factory / CP Lab application module drilling 3

4 Content Conduct instructions Operating instructions Sequence description of the application module drilling Setting the application module drilling at HMI Transitions of the application module Parameter of application 38 4 Festo Didactic CP Factory / CP Lab application module drilling

5 General safety instructions 1 General safety instructions The laboratory or the classroom must be equipped in accordance with EN 50191: An emergency off device must be provided. At least one emergency off device must be located within, and one outside of the test area. The test area must be secured against unauthorised start-up. For example with a key switch The test area must be protected by residual current devices (RCDs). Type B residual current circuit breaker with a residual current rating of 30 ma The test area must be protected by overcurrent protection devices. Fuses or circuit breakers The test area must be overseen by a supervisor. A supervisor is a qualified electrician or a person who has received appropriate instruction, has knowledge of the respective safety requirements and safety regulations and whose training has been accordingly documented. No damaged or defective devices may be used. Damaged devices must be barred from further use and removed from the test area. General requirements for safe operation of the devices: Do not lay cables over hot surfaces. Hot surfaces are identified with a corresponding warning symbol. Maximum permissible current loads for cables and devices must not be exceeded. Always compare the current ratings of the device, the cable and the fuse. In the event that these are not the same, use a separate upstream fuse in order to provide appropriate overcurrent protection. Devices with an earth terminal must always be grounded. If an earth connection (green-yellow laboratory socket) is available, it must always be connected to protective earth. Protective earth must always be connected first (before voltage), and must always be disconnected last (after voltage). If not otherwise specified in the technical data, the device is not equipped with an integrated fuse. Festo Didactic CP Factory / CP Lab application module drilling 5

6 General safety instructions 1.1 Pictograms This document and the described hardware include warnings concerning possible hazards which may arise if the system is used incorrectly. The following pictograms are used: Warning Non-observance of this pictogram may result in serious personal injury or damage to property. Caution Non-observance of this pictogram may result in personal injury or damage to property. Warning This pictogram indicates that the device must be switched off and its mains plug must be removed from the electrical outlet before installation, repair, maintenance and cleaning work. Observe the manual, in particular all safety instructions. Nonobservance may result in severe personal injury or damage to property. Warning This pictogram indicates danger of being burned if hot surfaces (up to roughly 85 C) are touched. Important This symbol emphasizes important information for correct machine handling. Failure to pay attention to this symbol may result in damages to the machine or to its surroundings. i Information This symbol indicates operational tips and especially useful directions. This symbol assists you to make optimal use of all of your machine s functions. 6 Festo Didactic CP Factory / CP Lab application module drilling

7 General safety instructions 1.2 Safety sockets If not otherwise specified in the technical data, the following colour codes apply to the power supply and signal connections for components included in Festo Didactic s learning system for automation and technology. Colour Function Colour Function Voltage greater than SELV e.g. line voltage of 90 to 400 V AC per conductor (grey) Neutral conductor (grey/blue) Protective conductor (green-yellow) 24 V DC (red) 0 V DC (blue) Safety extra-low voltage, signal input/output (black) The specified protection class and safe use can only be assured if laboratory safety cables supplied by Festo Didactic are used. Damaged laboratory safety cables must be immediately barred from further use and removed from the test area. 1.3 Note to electrical access of facility According to EN (VDE ) part 8.2.8, a supply cable with an additional protective conductor is required for the supply of the CP factory installations. Since a leakage current of >10mA can flow depending on the configuration, an additional protective conductor with 10mm² is necessary. Please see also DIN EN Festo Didactic CP Factory / CP Lab application module drilling 7

8 General safety instructions 1.4 Handling the system Dangers in handling the machine The installation has been constructed technologically up to date and in conformance with the recognized rules of safety engineering. Nevertheless, during operation it is possible that harm might be caused to the user or third parties or that the installation or other property might get damaged. Therefore, the installation has to be handled according to specified operational use in perfect technical condition only. Safety endangering malfunctions cannot be tolerated during training and have to be removed immediately. The system is to be used only: for its intended purpose and In absolutely safe conditions. Faults impairing safety must be rectified immediately! Safety precautions in standard operation Put the installation into operation only, once all of the protection settings are completely functional. At least, before starting operation, check the installation for externally visible damages and for the reliability of the safety devices. Do not grip into the installation while in operation. Before circuit construction, circuit disassembly and circuit modification: switch off air pressure and power supply. General safety regulations are to be observed: DIN and VDE Dangers due to electric current As soon as maintenance is completed, check the function reliability of the safety devices. Only trained experts in electric or electronic engineering are permitted to carry out work on the electric supply system. The terminal boxes are to be kept closed at all times. Access must be permitted only under supervision of a member of the training staff. Do not activate electric limit switches manually during fault search. Tools are to be used. Only low voltage 24VDC is to be used Dangers due to pneumatic energy Accidents might occur due to bouncing off tubes, caused by air pressure. Interrupt air pressure supply immediately. Caution! When the air pressure supply is activated, cylinders may move in or out. Do not uncouple any tubes under air pressure supply. Exception: Fault finding. In this case, keep on holding the end of the tube. Do not exceed the permitted operating pressure. See data sheets Maintenance Servicing Malfunction removal Carry out adjustments and inspections as instructed, in accordance with the specified intervals. (see Datasheets) Secure the compressed air and electricity supplies to prevent unintentional start-up. During inspections, maintenance and repair work, the machine must be de-energized, de-pressurized and secured against unexpected restart. All screw connections released during maintenance, inspection or repair work must be checked to ensure correct re-tightening. 8 Festo Didactic CP Factory / CP Lab application module drilling

9 General safety instructions Organizational measures All existing safety devices must be checked at regular intervals. 1.5 Personnel Notes on personnel Basically two situations have to be considered, concerning matters on personnel. Activities during training operations Activities outside training operations Training operations Trainees are permitted to work with the machine only under strict supervision of an experienced person or an instructor. Activities of trouble-shooting and fault correction are to be checked by the instructor. Special care should be taken regarding safety aspects Outside training operations Activities in the areas of maintenance, service and repair are to be carried out by only persons with appropriate technical qualifications. 1.6 Obligations of the operating company The operating company undertakes to allow only those persons to work with the system who: Are familiar with the basic regulations regarding work safety and accident prevention and have been instructed in the use of the system Have read and understood the chapter concerning safety and the warnings in this manual Personnel should be tested at regular intervals for safety-conscious work habits. 1.7 Obligations of the trainees All persons who have been entrusted to work with the system undertake to complete the following steps before beginning work: Read the chapter concerning safety and the warnings in this manual Observe the basic regulations on occupational safety and accident prevention. Festo Didactic CP Factory / CP Lab application module drilling 9

10 Introduction 2 Introduction 2.1 Warranty and liability In principle all our Terms and Conditions of Sale apply. These are available to the operating authority upon conclusion of the contract at the latest. Warranty and liability claims for persons or material damage are excluded if these can be traced back to one or several of the following causes: Use of the system not in accordance with its intended purpose Incorrect assembly, commissioning, operation and maintenance of the system Operation of the system using faulty safety equipment or incorrectly fitted or non-operational safety or protective devices Non observance of notes in the manual regarding transport, storage, assembly, commissioning, operation, maintenance and setting up of the system Unlawful constructional modifications on the system Inadequate monitoring of components subject to wear Incorrectly carried out repairs Catastrophes as a result of foreign bodies and vis major. Festo Didactic herewith rules out any liability for damage or injury to trainees, the training company and/or other third parties which may occur during the use/operation of the system other than purely in a training situation, unless such damage has been caused intentionally or due to gross negligence by Festo Didactic. 2.2 Important notes The basic requirement for safe use and trouble-free operation of the system is to observe the fundamental safety recommendations and regulations. This manual contains important notes concerning the safe operation of the system. The safety recommendations in particular must be observed by anyone working on the system. Furthermore, the rules and regulations for the prevention of accidents applicable to the place of use must be observed. 10 Festo Didactic CP Factory / CP Lab application module drilling

11 Introduction 3 Technical data Parameter Operating pressure Power supply L x W x H Weight Value 600 kpa ( 6 bar) 24 V DC, 4.5 A 382 x 215 x 574 mm approx 5 kg Digital inputs 7 Digital output 7 Festo Didactic CP Factory / CP Lab application module drilling 11

12 Design and function 4 Design and function 4.1 Transport Care is to be taken that the transport of the stations is to be executed only by a suitable transport vehicle. The weight amounts up to 500 kg, depending on the station. The route of transport is to be cleared in advance, to be accessible to the transport vehicle. Installation of warning signs or barriers may be required. The transport boxes are to be opened with care, as additional components, such as computers may be contained in the delivery, which are to be protected from falling out. i Once the transport box has been opened and the possibly contained additional components removed, the station can be taken out to be transported to its destination by means of two fork-lifts or one fork-lift truck. Please check the stability of all of the profile connectors by means of an Allen key size 6. The connectors may have come loose during transport, due to inevitable vibration. Once the transport box has been opened and the possibly contained additional components removed, the station can be taken out to be transported to its destination by means of two fork-lifts or one fork-lift truck. Please check the stability of all of the profile connectors by means of an Allen key size 6. The connectors may have come loose during transport, due to inevitable vibration. Pay special attention to all overhanging components. Sensors and similar small parts are very easily damaged in case of improper transport. The stations are not to be picked up by or even under the mounted feet increased risk of becoming trapped or contused. Check the station for any possible damaged once unpacked. The carrier and Festo Didactic are to be notified immediately of any damage. 4.2 Set up General information The installation is to be set up in a frost-free room with maximum relative air humidity of 70%. In countries with an atmospheric humidity over 70% and temperatures above 25 degrees Celsius are the premises to provide an air-conditioning system for constant surroundings conditions. To comply with the regulatory guidelines, sources of electrical interference such as welding plants, large motors and contactors are to be checked for electromagnetic compatibility in advance and screened where necessary. To ensure fault-free operation a load-bearing floor is required to avoid settling. Allow sufficient distance between the installation and the wall of the room. Any dust originating from construction work has to be kept off the installation (by covering). 12 Festo Didactic CP Factory / CP Lab application module drilling

13 Design and function 4.3 The application module idrilling The application module idrilling is designed for Providing a housing lower part with 4 drilled holes. During this, it is queried whether it is placed correctly without cover. The drilling unit will make 2 drilled holes into the left part of the housing lower part. Then the drilling unit will be moved to the right by an X-axis, and the additional 2 holes will be drilled. Festo Didactic CP Factory / CP Lab application module drilling 13

14 Design and function Position Description Part name Order number 1 PLC CECC-LK Valve terminal 80P-10-1LIH-PB-N-SLC-4JK-T Start-up current limiter guiding X-axis DGC KF-YSR-A Z-axis DGSL E3-Y3A Z-axis clamping DGSL E3-Y3A X-axis driven DGC KF-YSR-A Workpiece request (lower part in correct position) SOEZ-LLK-SE-2,0-M Workpiece request (no upper part available) SOEZ-LLK-SE-2,0-M Workpiece request (workpiece available) SOEZ-LLK-SE-2,0-M Start-up current limiter Drill 2 drill construction kit Drill 1 drill construction kit Festo Didactic CP Factory / CP Lab application module drilling

15 Design and function 4.4 Function The application module idrilling drills 4 drilling holes into the lower part of the housing. The workpieces are recognized by the first light barrier when moving into the application module idrilling and the carrier will be stopped. When the carrier has been stopped, the workpiece will be checked. The workpiece request (3) checks if there is a front cover on the carrier. The workpiece request in the middle (2) checks if there is a back cover on the lower part. The left request (1) checks if the front cover is in its correct position on the carrier. When the front cover is in its correct position and there is no back cover on it, the first two drilling holes are drilled into the left side of the front cover. Then the X-axis moves to the right position and the two right drilling holes are drilled. After that, the carrier leaves the application module idrilling. Festo Didactic CP Factory / CP Lab application module drilling 15

16 Design and function 4.5 Process description Start Conditions All connections have been made properly Starting position The cylinder of the drilling unit must be in its upper end position The workpiece queries must be set correctly. The cylinder of the sliding unit must be in the left end position Procedure 1. If a goods carrier with a workpiece is transported up to the stopper when the application is activated, the goods carrier is stopped and an automatic sequence is started 2. The workpiece is interrogated, there must be a front shell on the goods carrier, there must be no back shell on the front shell, the position of the front shell must be correct in the goods carrier 3. The drilling machines are switched on. Depending on the drill program, the X axis moves to the left. 4. The drilling unit moves downwards and drills two holes into the lower housing part 5. The drilling unit moves up again 6. The X axis moves to the right position, depending on the drill program. 7. The drilling unit moves downwards and drills the holes 3 and 4 into the lower housing part 8. The drilling unit moves up again and the drilling machines are switched off 9. Depending on the drill program, the X axis returns to its initial position 10. The application program is finished, the stopper switches downwards and the goods carrier leaves the station. For parameters for the sequence, see chapter Operation. 16 Festo Didactic CP Factory / CP Lab application module drilling

17 Design and function 4.6 Electrical Connections CECC I/O assignment Inputs Designation Equipment identifier Application Application SysLink X-axis left +VN-BG1 KF1 / X2:0 I0.0 X-axis right +VN-BG2 KF1 / X2:1 I0.1 0= Front cover right orientation +VN-BG3 KF1 / X2:2 I0.2 0= Front cover available +VN-BG4 KF1 / X2:3 I0.3 Z-axis top +VN-BG5 KF1 / X2:4 I0.4 Z-axis down +VN-BG6 KF1 / X2:5 I0.5 Reserve I0.6 0= Back cover already available +VN-BG7 KF1 / X2:7 I0.7 Not used I1.0 Not used I1.1 Not used I1.2 Not used I1.3 Not used I1.4 Emergency stop active +VN-XD1:24NA I1.5 Festo Didactic CP Factory / CP Lab application module drilling 17

18 Design and function Outputs Designation Equipment identifier Application Application SysLink X-axis to left +VN-MB1 KF1 / X4:0 Q0.0 X-axis to right +VN-MB2 KF1 / X4:1 Q0.1 Drill 1 via start-up current limiter 52Q1 +VN-QA3:IN KF1 / X4:2 Q0.2 Drill 2 via start-up current limiter 52Q2 +VN-QA4:IN KF1 / X4:3 Q0.3 Z-axis upward +VN-MB5 KF1 / X4:4 Q0.4 Z-axis downward +VN-MB6 KF1 / X4:5 Q0.5 Z-axis clamping open +VN-MB7 KF1 / X4:6 Q0.6 Reserve 18 Festo Didactic CP Factory / CP Lab application module drilling

19 Start up 5 Start up The application module idrilling is delivered pre-assembled. You will receive the application module and all its additional parts All components, pipe connections and wirings are marked clearly in order to guarantee an unproblematic reestablishment of all connections. 5.1 Workstation For starting up the application module idrilling, you need the application module idrilling a basic module (linear, shunt, bypass) for the assembly of the module a connection cable with Syslink plugs for the I/O box to the I/O terminal 5.2 Mechanical Setup All components, pipe connections and wirings are marked clearly in order to guarantee an unproblematic reestablishment of all connections. The graphics for the pneumatic and the electric connections are described exemplarily as follows. Festo Didactic CP Factory / CP Lab application module drilling 19

20 Start up Connection of application module The mounting of an application module is very easy. At first, 2 slot nuts M5 are put into the front slot of the front cross profile. Then two other slot nuts are put into the back slot of the profile. Afterwards the slot nuts have to be adjusted to the distance of the application module profiles. Put in slot nuts Then you install the application module. The slot nuts must be placed now under the mounting brackets so that the screws can be fixed. 20 Festo Didactic CP Factory / CP Lab application module drilling

21 Start up Mounting of the application module With fillister-head screws M5x8, the mounting brackets of the application module are now connected to the cross profiles, but not fastened yet. When all screws are placed, the application module can still be moved to the position required. Please make sure that the workpieces can be transferred correctly like here at the application module magazine. Once the position has been fixed, you only have to tighten the screws and to put the covers on the mounting brackets. Festo Didactic CP Factory / CP Lab application module drilling 21

22 Start up Pneumatic port of application module Pneumatic port is done on the principle of the following sketch. The application module is connected from the valve terminal to the on-off valve at the conveyor. You only have to plug the tube (nominal size 4) into the QS plug. Pneumatic connection of the application module Electrical connection of application modules See design and Function 22 Festo Didactic CP Factory / CP Lab application module drilling

23 Start up 5.3 Adjusting the sensors Through-beam sensor (Workpiece detection) Position Designation 1 fibre-optic unit (3x available) (SOEG-L-Q30-P-A-S-2L) 2 Locking screw for clamping/adjusting the sensor socket vertically 3 Sensor socket with sensor and light deflection/ (SOEZ-LLK-SE-2,0-M4) 4 Sensor holder / request inserted correctly 5 Sensor holder/ request cover available 6 Sensor holder / request basic body available Festo Didactic CP Factory / CP Lab application module drilling 23

24 Start up The through-beam sensor is used for detecting workpieces. Flexible fibre-optics are connected to a fibreoptic unit. The fibre-optic unit works with visible infrared. The workpiece interrupts the light barrier. Requirements Fibre-optic unit has been attached. Electrical connection of the fibre-optic unit has been made. Power supply is available. Procedure Please attach the fibre-optic heads towards each other to the application. Align the transmitter- and receiver fibre optics. Attach the fibre-optics to the fibre-optic unit. You might have to turn the adjusting screw with a small screwdriver until the switching status display (LED) appears. Remark The maximum permissible number of turns of the adjusting screw is 12. Please put a workpiece into the sensing range of the light barrier. The switching status display will disappear. You have to do this with all 3 light barriers. Please pay special attention to the corresponding function. Documents Data sheets / Operating instructions Fibre-optic unit SOEG_L (165327) and through-beam sensor SOEZ-LLK-SE-2,0-M4 (165360) 24 Festo Didactic CP Factory / CP Lab application module drilling

25 Start up Proximity Switch (X-axis cylinder) Position Designation 1 X-axis on the left / (SME-10-KL-LED-24) 2 X-axis on the right / (SME-10-KL-LED-24) The proximity switches are used for checking the end position of the cylinder for the X-axis. The proximity switches react to a permanent magnet on the piston of the cylinder. Festo Didactic CP Factory / CP Lab application module drilling 25

26 Start up Requirements Cylinder for X-axis has been attached. Pneumatic port of the cylinder has been made. Compressed air supply is switched on. Electrical connection of the proximity switches has been made. Power supply is available. Procedure 1. The cylinder is in the position to be queried. 2. Move the proximity switch as far as the switching status display (LED) appears. 3. Move the proximity switch into the same direction by a few millimetres as far as the switching status display disappears. 4. Move the proximity switch halfway between the switch on and the switch off position. 5. Tighten the locking screw of the proximity switch with an Allen key SW Please check the position of the proximity switch by repeated test runs of the cylinder. Documents Data sheets / operating instructions Proximity switch SME-10 (173210) 26 Festo Didactic CP Factory / CP Lab application module drilling

27 Start up Proximity switch (Z-axis) Position Designation 1 Z-axis top / (SME-10-KL-LED-24) 2 Z-axis bottom / (SME-10-KL-LED-24) The proximity switches are used for checking the end position of the Z-axis. The proximity switches react to a permanent magnet on the piston of the cylinder. Festo Didactic CP Factory / CP Lab application module drilling 27

28 Start up Requirements Z-axis has been attached. Pneumatic port of the cylinder has been made. Electrical connection of the proximity switches has been made. Power supply unit is switched on. Procedure 1. The cylinder is in the end position to be queried. 2. Move the proximity switch as far as the switching status display (LED) appears. 3. Move the proximity switch into the same direction by a few millimetres as far as the switching status display disappears. 4. Move the proximity switch halfway between the switch on and the switch off position. 5. Tighten the locking screw of the proximity switch with an Allen key SW Please check the position of the proximity switch by repeated test runs of the cylinder. Documents Data sheets / operating instructions Proximity switch SME-10-KL-LED-24 (173210) 28 Festo Didactic CP Factory / CP Lab application module drilling

29 Start up 5.4 Adjusting the one-way flow control valves One-way flow control valves Position Designation 1 One-way flow control valves GRLA for Z-axis cylinder 2 One-way flow control valve GRLA for Z-axis cylinder 3 One-way flow control valves GRLA for X-axis cylinder 4 One-way flow control valves GRLA for X-axis cylinder One-way flow control valves are used for regulating the exhaust air volume of double-acting drive units. In the opposite direction, the air flows through the flow control valve having a full cross-sectional flow. The piston is clamped between air cushions by free supply air and throttled exhaust air (improvement of the operating behaviour even if the load changes). Festo Didactic CP Factory / CP Lab application module drilling 29

30 Start up Requirements Pneumatic port of the cylinders has been made. Compressed air supply is switched on. Procedure 1. At first, turn off the two one-way control valves completely. Then turn them on again by about one rotation. 2. Start a test run. 3. Turn on the one-way flow control valves slowly until the required piston speed has been reached. Documents Data sheets One-way flow control valve (193138) 5.5 Visual inspection Visual inspection must always be carried out before starting up! Before starting the application module, please check: the electrical connections the correct fit and the condition of the compressed air supplies the mechanic components regarding visible faults (cracks, loose connections etc.) the function of the Emergency-Stop settings Please make sure that all damages discovered are removed before starting the application module! 30 Festo Didactic CP Factory / CP Lab application module drilling

31 Operation 6 Operation Any customer can use the application module at his own discretion. Since the application modules do not have any control elements, this is done with the respective basic modules installed. If the application module is mounted on a CP Lab transport system or on a CP Factory basic module, the general operation is described in these manuals. All application-specific information is described in the application module manual. The general operating parameters must be adhered to. 6.1 General operating instructions The operation requires some regulations which have to be observed strictly. If you don't observe the rules, there might occur faults in the process. Dangers to your physical health can also not be excluded. It is strongly recommended to stick to the following rules Conduct instructions During operation it is not allowed to interfere manually. With bigger groups it is necessary to install a mechanic barrier. You mustn't take off any cable connections on voltage. Water of any kind has to be kept away Operating instructions The basic modules may only be operated by authorized and instructed persons. Operation has to be effected according to the user manual. Any uncontrolled pressing on different switches/pushbuttons of all control units has to be prevented. 6.2 Sequence description of the application module drilling Adjusting sequence Festo Didactic CP Factory / CP Lab application module drilling 31

32 Operation Automatic Mode sequence step Festo Didactic CP Factory / CP Lab application module drilling

33 Operation Automatic Mode sequence step 7-12 Festo Didactic CP Factory / CP Lab application module drilling 33

34 Operation Automatic Mode sequence step Festo Didactic CP Factory / CP Lab application module drilling

35 Operation 6.3 Setting the application module drilling at HMI To set the application module, the application module must be set to setup mode. 1. On the Start screen, click Setup Change to setup page (1) and select application (2) Festo Didactic CP Factory / CP Lab application module drilling 35

36 Operation 2. Application is selected to set up the application module Position number Description 1 X axis Left: Move the X axis to the left (actuator VN_MB1 is activated, lights up blue when active) VN_BG1: Sensor VN_BG1 indicator (lights up green when X-axis is on the left) X-Axis: Display X-axis VN_BG2: Sensor VN_BG2 indicator (lights up green when X-axis is on the right) Right: Move the X axis to the right (actuator VN_MB2 is activated, lights up blue when active) 2 Z axis On: move Z axis up (actuator VN_MB5 is activated, lights up blue when active) VN_BG5: Sensor VN_BG5 indicator (lights up green when Z axis is up) Z-axis: Z axis display VN_BG6: Sensor VN_BG6 indicator (lights up green when Z axis is down) Down: Move the Z axis down (actuator VN_MB6 is activated, lights up blue when active) 3 Activate drill 1 Drill 1: Switch on drill 1 (actuator VN_MB3 is activated, lights up blue when active) DrillDrive1: Drilling machine indicator 1 4 Activate drill 2 Drill 2: Switch on drill 2 (actuator VN_MB4 is activated, lights up blue when active) DrillDrive2: Drilling machine indicator 2 5 Activate clamp Clamping: Switch on clamping (actuator VN_MB7 is activated, lights up blue when active) VN_BG7: Sensor VN_BG7 indicator (lights up green when clamping is clamped) Clamp: indicator clamp 6 Front cover correctly inserted: Sensor VN_BG3 indicator (lights up green when front panel is inserted correctly) Front cover available: Sensor VN_BG4 indicator (lights up green when front cover is present) Back cover available: Sensor VN_BG8 indicator (lights up green when rear cover is present) 36 Festo Didactic CP Factory / CP Lab application module drilling

37 Operation 6.4 Transitions of the application module The transitions are located in the Parameters submenu The transitions can be displayed or changed here. The transitions are used in the default mode, see also the following chapter. Festo Didactic CP Factory / CP Lab application module drilling 37

38 Operation 6.5 Parameter of application Default: Parameter-number Description 1 Program number [-] 1: Drilling on the left (as viewed in the transport direction) 2: Drill to the right (seen in the transport direction) 3: Drill both sides (as viewed in the transport direction) Limitation: No limit of the value in the transition table 2 Not used 3 Not used 4 Not used MES: Operation Parameter- Description Nr. Name Number 120 Drill right side 1 Program number [-] Limitation: 1-3, value: 2, constant 121 Drill left side 1 Program number [-] Limitation: 1-3, value: 1, constant 122 Drill both sides 1 Program number [-] Limitation: 1-3, value: 3, constant 123 Drill individually 1 Program number [-] Limitation: 1-3, value: 1, variable 38 Festo Didactic CP Factory / CP Lab application module drilling

39 Operation Festo Didactic SE Rechbergstraße Denkendorf Germany Internet: did@de.festo.com Festo Didactic CP Factory / CP Lab application module drilling 39

Sorting station Assembly Instructions

Sorting station Assembly Instructions Sorting station Assembly Instructions GB 10/02 Intended use This station has been developed and produced exclusively for vocational and further training in the field of automation and communication. The

More information

Assembly and Maintenance Manual Type ASNU

Assembly and Maintenance Manual Type ASNU Assembly and Maintenance Manual Type ASNU Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_ASNU.docx

More information

Assembly and Maintenance Manual Type AS

Assembly and Maintenance Manual Type AS Assembly and Maintenance Manual Type AS Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_AS.docx

More information

Assembly and Maintenance Manual Type RSBW

Assembly and Maintenance Manual Type RSBW Assembly and Maintenance Manual Type RSBW Hatschekstr. 36 69126 Heidelberg Germany Tel +49(0)6221 30470 Tel +49(0)6221 304731 info@stieber.de www.stieber.de Stieber Clutch Date of issue: 16/03/2017 GB

More information

Installation manual wall-mounted distributor

Installation manual wall-mounted distributor EN Installation manual wall-mounted distributor EN 60003233 Issue 11.2016 2016-14-11 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2

More information

Exchange of rollers from the XTS-Mover

Exchange of rollers from the XTS-Mover Service documentation for AT901-0050-0550 and AT9011-00x0-0550 Version: Date: 1.0 0.10.017 Table of contents Table of contents 1 Foreword... 5 1.1 Notes on the documentation... 5 1. Documentation issue

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 018 AC Pressure NPK 018 DC Pressure NPK 018 AC Vacuum NPK 018 DC Vacuum Operating and Installation Instructions Read and observe these Operating and Installation

More information

Operating instructions Switching cushion with safety function SSG-SK. 1. About this document. Content

Operating instructions Switching cushion with safety function SSG-SK. 1. About this document. Content 1. About this document Operating instructions.............pages 1 to 6 Original 1.1 Function This operating instructions manual provides all the information you need for the mounting, set-up and commissioning

More information

original operating manual Operating manual Translation of the Item-No.: ,

original operating manual Operating manual Translation of the Item-No.: , Translation of the original operating manual Operating manual Item-No.: 015 431 551, 015 431 581 Important! Copyright The operating manual is always to be read before commissioning the equipment. No warranty

More information

Toothed belt axis ELGC-TB-KF. Operating instruction [ ]

Toothed belt axis ELGC-TB-KF. Operating instruction [ ] Toothed belt axis ELGC-TB-KF en Operating instruction 8068220 2017-02 [8068222] Original instructions Identification of hazards and instructions on how to prevent them: Danger Immediate dangers which can

More information

Owner's/Installation Manual

Owner's/Installation Manual Owner's/Installation Manual Power Management Module (PMM) and Starter Kit NOTE: The starter kit must be purchased and installed prior to individual PMM usage. Model Numbers: 00686-0 PMM 00699-0 PMM WITH

More information

Instructions for Use Plain Trolley ULK Geared Trolley UHK

Instructions for Use Plain Trolley ULK Geared Trolley UHK Instructions for Use Plain Trolley Geared Trolley Item no. Load-carrying capacity (payload) Weight Trolley widths *special trolley widths* Device dimensions mm H / W / D Minimum curve radius mm -005 0,5

More information

Tension Meter. Edition FT 03.E. FT Series. Instruction Manual. Valid as of: Please keep the manual for future reference!

Tension Meter. Edition FT 03.E. FT Series. Instruction Manual. Valid as of: Please keep the manual for future reference! Tension Meter FT Series S C H M I D T c o n t r o l i n s t r u m e n t s Edition FT 03.E Model FT Instruction Manual Valid as of: 01.09.2011 Please keep the manual for future reference! Contents 1 Warranty

More information

Operating Instructions

Operating Instructions Operating Instructions Ex UPS Combination of > 8265/5 GUBox control panel > 8316 battery box Contents 1 Contents 1 Contents 2 2 General Information 2 3 Safety Instructions 2 4 Conformity to standards 3

More information

1. INTRODUCTION SYSTEM DESCRIPTION Front Panel CONNECTION AND OPERATION TROUBLESHOOTING...8

1. INTRODUCTION SYSTEM DESCRIPTION Front Panel CONNECTION AND OPERATION TROUBLESHOOTING...8 Contents : 1. INTRODUCTION...1 2. IMPORTANT SAFETY INSTRUCTIONS...2 3. SYSTEM DESCRIPTION...4 3.1 Front Panel...4 4. CONNECTION AND OPERATION...6 5. TROUBLESHOOTING...8 6. MAINTENANCE...9 6.1 Operation...9

More information

Double piston rotary drive DRQD-6/... / b [ ] (en) Operating instructions

Double piston rotary drive DRQD-6/... / b [ ] (en) Operating instructions Double piston rotary drive (en) Operating instructions 8068584 2017-05b [8068586] Original instructions Symbols: Warning, Caution Fitting and commissioning to be carried out by qualified personnel only

More information

Electropneumatic Converters i/p Converters Type 6111 Mounting and Operating Instructions EB 6111 EN

Electropneumatic Converters i/p Converters Type 6111 Mounting and Operating Instructions EB 6111 EN Electropneumatic Converters i/p Converters Type 6111 Fig. 1 Type 6111 in standard version Fig. Type 6111 mounted on a supply air manifold Fig. 3 Type 6111 in field enclosure Mounting and Operating Instructions

More information

HST-BL-2830MS & HST-BL-2830MS-USA

HST-BL-2830MS & HST-BL-2830MS-USA HST-BL-2830MS & HST-BL-2830MS-USA Release date: 02/2017 High - System - Technik Im Martelacker 12 D-79588 Efringen-Kirchen Phone 0 76 28-91 11-0 Fax 0 76 28-91 11-90 E-Mail: info@hs-technik.com Web: www.hs-technik.com

More information

Porte 150 Users Manual Swing Gate Opener 24V DC

Porte 150 Users Manual Swing Gate Opener 24V DC Porte 150 Users Manual Swing Gate Opener 24V DC for residential use only Signal Light Push-button Control Box 14 Contents 1. Important Safety Information 2. Product Description and Application 2.1 Application

More information

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3 EN Operating manual Motorised zone valve Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3 This manual ensures safe and efficient use of the 3PV2 or 3PV8 force-actuated three-way valve with spring-loaded return

More information

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA 5.52.714.00.1.0 Edition 03.2004 GB Operating and Maintenance Manual for HADEF overhead crane as jointed crane TA Subject to changes. 1 HADEF Table of Contents 1 General Page 3 2 Product description Page

More information

Electrohydraulics Basic Level Textbook TP 601

Electrohydraulics Basic Level Textbook TP 601 Electrohydraulics Basic Level Textbook TP 601 Festo Didactic 093611 en Order No.: 093611 Edition: 03/2006 Authors: C. Löffler, D. Merkle, G. Prede, K. Rupp, D. Scholz Graphics: Doris Schwarzenberger Layout:

More information

Festo Modular Production System (MPS)

Festo Modular Production System (MPS) ELEC E8114 Manufacturing Automation Systems Modelling Festo Modular Production System (MPS) Figure 1 Distribution station (left) and testing station (right) 1 Introduction The purpose of this document

More information

Tina 4A Connection block

Tina 4A Connection block Original instructions Tina 4A Connection block Instructions valid for versions of the product from ver. H ABB Jokab Safety Varlabergsvägen 11, SE-434 39 Kungsbacka, Sweden www.abb.com/jokabsafety Read

More information

Operation Manual for Torque Sensors

Operation Manual for Torque Sensors Operation Manual for Torque Sensors For below and similar Types DV-14 DH-15 D-2431 DFW-25 DFW-35 D-2223 D-2268 D-2209 DF-30 D-2553 Page 1 of 11 Imprint LORENZ MESSTECHNIK GmbH Manufacturer, Place Lorenz

More information

CPLab / CP Factory. Application module magazine. Data sheets

CPLab / CP Factory. Application module magazine. Data sheets CPLab / CP Factory Application module magazine Data sheets Data sheet: Push-in fitting QSM-M5-4 #153304 Size Mini Nominal size 2.2 mm Type of seal on screw-in stud Sealing ring Container size 10 Design

More information

Installation manual portable distributors

Installation manual portable distributors EN Installation manual portable distributors EN 60003206 Issue 11.2016 15/11/2016 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2 Intended

More information

Instruction manual and installation guide Traction sheave brake TSB TSB

Instruction manual and installation guide Traction sheave brake TSB TSB Instruction manual and installation guide Traction sheave brake TSB 2000-1 TSB 2000-2 Content Traction sheave brake Page 1. Safety 2 1.1 Explanation of symbols 2 1.2. General safety instructions 3 2. Product

More information

User Guide. Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC)

User Guide. Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC) User Guide Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC) version 04/2013 Content General Information 3 Warning 3 Scope of Supply 3 Overview 3 General safety details 4 Intended use 4

More information

Operating instructions Actuator and Emergency exit AZ/AZM 200-B30 AZ/AZM 201-B About this document. Content

Operating instructions Actuator and Emergency exit AZ/AZM 200-B30 AZ/AZM 201-B About this document. Content 1. About this document Operating instructions............pages 1 to 10 Original 1.1 Function This operating instructions manual provides all the information you need for the mounting, set-up and commissioning

More information

Assembly and maintenance manual Type FSO, FSO-GR, FS, HPI

Assembly and maintenance manual Type FSO, FSO-GR, FS, HPI Type FSO, FSO-GR, FS, HPI Hatschekstr.36 69126 Heidelberg Deutschland Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 23.08.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\M1124E_0_FSO_FSO-GR_FS_HPI.docx

More information

Service information. How to avoid equipment failures with preventive maintenance measures. 1. General information 08/2017

Service information. How to avoid equipment failures with preventive maintenance measures. 1. General information 08/2017 Service information 08/2017 How to avoid equipment failures with preventive maintenance measures Product line Tower pureenergy 1.1 Definitions - Qualified, trained and authorized service technician Qualified

More information

Wilo-Control SC-Fire Jockey

Wilo-Control SC-Fire Jockey Pioneering for You Wilo-Control SC-Fire Jockey de en fr Einbau- und Betriebsanleitung Installation and operating instructions Notice de montage et de mise en service nl Inbouw- en bedieningsvoorschriften

More information

Operating instructions Solenoid interlock AZM 161../.. 1. About this document. Content

Operating instructions Solenoid interlock AZM 161../.. 1. About this document. Content Solenoid interlock AZM 11../.. 1. About this document Operating instructions.............pages 1 to ranslation of the original operating instructions 1.1 Function his operating instructions manual provides

More information

User Manual Rittal PMC UPS 6kVA

User Manual Rittal PMC UPS 6kVA User Manual Rittal PMC UPS 6kVA Germany Rittal GmbH & Co. KG Auf dem Stützelberg D-35745 Herborn Tel.: ++49-27 72-5 05-0 Fax: ++49-27 72-5 05-23 19 Internet: www.rittal.de 26 Contents 1. Introduction...

More information

Technical Manual. DLM Module. This manual should remain with the unit.

Technical Manual. DLM Module. This manual should remain with the unit. Technical Manual DLM Module This manual should remain with the unit. Safety Rules SAVE THESE INSTRUCTIONS! Read the following information carefully before attempting to install, operate or service this

More information

Translation of the Original operating instructions Lifting device Z 70 /...

Translation of the Original operating instructions Lifting device Z 70 /... Translation of the Original operating instructions Lifting device Z 70 /... Content 1. Lifting device / Correct use according to regulations 2. Basic principles 3. General information 4. Special remarks

More information

MANUAL. Single charger

MANUAL. Single charger MANUAL Single charger HST-PR-2830 & HST-PR-2830USA for HS-Technik batteries HST-PR-18xx HST-PR-14xx issue date: November 2016 Table of contents Page 1. Basic information...3 1.1. Purpose of this document...3

More information

8.50 Kampmann Equestrian Solarium Perfect Enhances the Vital Functions and the Immune System Table of Contents.

8.50 Kampmann Equestrian Solarium Perfect Enhances the Vital Functions and the Immune System Table of Contents. 1.26 1.45 8.50 Kampmann Equestrian Solarium Perfect Table of Contents Table of Contents 1.26 1.46 1. Correct and Proper Use.......................................... 3 1.1 Personal Qualification 1.2 Limits

More information

Porte 300 Users Manual Swing Gate Opener 24V DC for residential use only

Porte 300 Users Manual Swing Gate Opener 24V DC for residential use only Porte 300 Users Manual Swing Gate Opener 24V DC for residential use only Signal Light Push-button Control Box Gate 2 Gate 1 Contents 1. Important Safety Information 2. Product Description and Application

More information

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z INSTRUCTION MANUAL I/P Converter DSG BXXY3Z DSG BXXY4Z Revision 2.0 3.626 016136 en Page 1/15 Should you have any questions concerning the I/P converter, please contact the Service Department of the Product

More information

Compensation unit AGE-XY 50-80

Compensation unit AGE-XY 50-80 Translation of the origninal manual Compensation unit AGE-XY 50-80 Assembly and operating manual Superior Clamping and Gripping Imprint Imprint Copyright: This manual remains the copyrighted property of

More information

Type 0283, Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Type 0283, Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Type 0283, 0293 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation Contents 1 The operating instructions...2 2 Intended

More information

Operating instructions Safety sensor BNS About this document. Content. 6 Disassembly and disposal 6.1 Disassembly Disposal...

Operating instructions Safety sensor BNS About this document. Content. 6 Disassembly and disposal 6.1 Disassembly Disposal... Safety sensor BNS Disassembly and disposal. Disassembly..... Disposal... EU Declaration of conformity Operating instructions.............pages to Original x.000 / 0.0 / v.a. - 09009- / J / 0-0-0 / AE-Nr.

More information

Inverter / Charger Accessory for Steca Solarix PLI Phase / Parallel Kit. Installation and operating instructions Z01 17.

Inverter / Charger Accessory for Steca Solarix PLI Phase / Parallel Kit. Installation and operating instructions Z01 17. Inverter / Charger Accessory for Steca Solarix PLI 5000-48 3-Phase / Parallel Kit Installation and operating instructions GB Z01 17.31 Table of Contents About this Manual... 2 Purpose... 2 Scope... 2 Keywords

More information

Operating Instructions

Operating Instructions Operating Instructions Lubricus Lubrication System LUB - M (24 VDC) Operating Instructions: LUB- M Table of Contents Contents 2 1) General Information 4 1.1 Warning 4 1.2 Scope of supply 4 1.3 Overview

More information

1 This instrument must only be used by a competent and trained person and operated in strict accordance with the instructions.

1 This instrument must only be used by a competent and trained person and operated in strict accordance with the instructions. 1 This instrument must only be used by a competent and trained person and operated in strict accordance with the instructions. KYORITSU will not accept liability for any damage or injury caused by misuse

More information

Operator s Manual. Fairbanks FH Series by Fairbanks Scales, Inc. All rights reserved. . Revision 1 06/2017

Operator s Manual. Fairbanks FH Series by Fairbanks Scales, Inc. All rights reserved. . Revision 1 06/2017 Operator s Manual Fairbanks FH Series 2017 by Fairbanks Scales, Inc. All rights reserved 51393. Revision 1 06/2017 Amendment Record Fairbanks FH Series Operator s Manual Operator s Manual Document 51393

More information

A company of ThyssenKrupp Elevator. ThyssenKrupp Aufzugswerke. Operating Manual. Oil buffer

A company of ThyssenKrupp Elevator. ThyssenKrupp Aufzugswerke. Operating Manual. Oil buffer A company of ThyssenKrupp Elevator ThyssenKrupp Aufzugswerke Operating Manual Oil buffer OPERATING MANUAL Printer s imprint All rights reserved. Copyright by: THYSSENKRUPP AUFZUGSWERKE GMBH P.O. box 23

More information

Important instructions

Important instructions Operation manual Please read this manual, before starting the unit. It contains important notes on commissioning and handling. Keep these instructions for future reference. Be careful even if you pass

More information

Shut-off valve type AVT and AVM

Shut-off valve type AVT and AVM Shut-off valve type AVT and AVM Product documentation Operating pressure pmax: Flow rate Qmax: 630 bar 50 lpm D 7690 05-2016-1.1 by HAWE Hydraulik SE. The reproduction and distribution of this document

More information

ASSEMBLY AND OPERATING MANUAL LTW PIPE GRAB TYPE GZ 5,0 t

ASSEMBLY AND OPERATING MANUAL LTW PIPE GRAB TYPE GZ 5,0 t manufacturer: LTW Tiefbauvertriebs GmbH Holter Weg 11 D 41836 Hückelhoven-Brachelen phone: +49 (0) 24 62 / 2009 0 fax: +49 (0) 24 62 / 2009 15 e-mail: info@ltw-verbau.de homepage: http:\ \ www.ltw-shoring.com

More information

Operating instructions Rotary actuators M135 M140 M150 M180. June 2012 / / EN

Operating instructions Rotary actuators M135 M140 M150 M180. June 2012 / / EN Operating instructions Rotary actuators M135 M140 M150 M180 June 2012 / 118614 / EN General information General information Proof of amendment Copyright Subject to alterations Manufacturer Version Date

More information

Operating instructions Solenoid interlock TKM/TKF. 1. About this document. Content

Operating instructions Solenoid interlock TKM/TKF. 1. About this document. Content 1. About this document Operating instructions.............pages 1 to 6 Original 1.1 Function This operating instructions manual provides all the information you need for the mounting, set-up and commissioning

More information

Instruction Manual. Revision no.: ENG-0001 FILON FUTUR S FILON FUTUR M

Instruction Manual. Revision no.: ENG-0001 FILON FUTUR S FILON FUTUR M Instruction Manual Revision no.: ENG-0001 FILON FUTUR S FILON FUTUR M Preamble Notes regarding this instruction manual This ORIGINAL INSTRUCTION MANUAL provides the knowledge required for the safe operation

More information

Installation and Operating Guidelines Battery Back-up Pump System

Installation and Operating Guidelines Battery Back-up Pump System Installation and Operating Guidelines Battery Back-up Pump System www.tritonsystems.co.uk 1 Contents 1.0 Product Summary... 3 2.0 Installation Guidelines... 3 3.0 Technical Specification... 4 4.0 Dimensions...

More information

Assembly and Operating Instructions

Assembly and Operating Instructions A35AE FU...A150AE FU en Assembly and Operating Instructions Plug-in drives Important information for: Fitters / Electricians / Users Please forward accordingly! These instructions must be kept safe for

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 050 NPK 0100 Operating and Installation Instructions Read and observe these Operating and Installation Instructions! KNF Neuberger GmbH Alter Weg 3 D-79112

More information

Free position locking flat and compact cylinder UFCD Series

Free position locking flat and compact cylinder UFCD Series Space-saving cylinder ensures safety during work in power failures or accidents. Free position locking flat and compact cylinder UFCD Series Free position locking flat and compact cylinder UFCD Series

More information

F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide

F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide 11451 Belcher Road South, Largo, FL 33773 USA Tel +1 (727) 447-6140 Fax +1 (727) 442-5699 1054-7 / 34405 www.onicon.com sales@onicon.com

More information

Ordering designation: G(Type) - (Stroke) - (Eye bolt) - (Cable length) - (Options) Legend:

Ordering designation: G(Type) - (Stroke) - (Eye bolt) - (Cable length) - (Options) Legend: General technical data: 1.) Anodised aluminium housing with a connecting rod made of aluminium (in the case of motor types G..B, G..C, G..D and G..E, the connecting rod is Ø18, for all other motor types

More information

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080 CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080 STI S.r.l has taken every care in collecting and verifying the documentation contained in this Instruction Manual. The information herein contained are

More information

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use!

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use! Operating instructions Pneumatic Crimper AC 100 Date of issue: 05/2010 Keep for future use! SAFETY SAFETY Basic information The basic prerequisite for ensuring safe use and continuous operation of the

More information

T8 Torque Sensor Operation Manual

T8 Torque Sensor Operation Manual T8 Torque Sensor Operation Manual Page 1 of 11 Imprint Valid for... Reprint Interdiction Modification Torque sensor type T8 Reprints, even in extracts, only with written authority. Technical changes reserved.

More information

PURE SINE WAVE DC TO AC POWER INVERTER

PURE SINE WAVE DC TO AC POWER INVERTER PURE SINE WAVE DC TO AC POWER INVERTER 60S-12A / 60S-24A 60S-12E / 60S-24E 100S-12A / 100S-24A 100S-12E / 100S-24E 150S-12A / 150S-24A 150S-12E / 150S-24E Instruction manual SINE WAVE INVERTER Please read

More information

ON SAFEGUARD S ON SAFEGUARD M

ON SAFEGUARD S ON SAFEGUARD M instructions Retrofit option GB ON SAFEGUARD S ON SAFEGUARD M Insulating protective cover Observe additional system documents! General instructions CAUTION Read the operating instructions! The operating

More information

INSTRUCTION & INSTALLATION

INSTRUCTION & INSTALLATION INSTRUCTION & INSTALLATION MANUAL MODELS: CCL-eHOME T1C16 CCL-eHOME T1C32 CCL-eHOME T2C16 CCL-eHOME T2C32 WALLBOX ehome SERIES WALLBOX ehome Instruction and Installation manual This document is copyrighted,

More information

General Installation Instructions for Valves and Gates

General Installation Instructions for Valves and Gates General Installation Instructions for Valves and Gates Thank you for your purchase of a Lorenz valve. We appreciate your business! Please read this installation manual and follow recommended safety precautions.

More information

Pressure relief valve

Pressure relief valve Pressure relief valve Operating manual Series DHV 712 Version BA-2015.10.20 EN Print-No. 300 510 TR MA DE Rev001 ASV Stübbe GmbH & Co. KG Hollwieser Straße 5 32602 Vlotho Germany Phone: +49 (0) 5733-799-0

More information

Type Operating Instructions. Bedienungsanleitung Manuel utilisateur

Type Operating Instructions. Bedienungsanleitung Manuel utilisateur Water flow rate transmitter Wasser-Durchfluss-Transmitter Transmetteur de débit d eau Operating Instructions Bedienungsanleitung Manuel utilisateur We reserve the right to make technical changes without

More information

Temposonics Magnetostrictive Linear Position Sensors. Temposonics GB-Series Brief Instructions

Temposonics Magnetostrictive Linear Position Sensors. Temposonics GB-Series Brief Instructions Temposonics Magnetostrictive Linear Position Sensors Table of contents. Introduction...3 2. Safety instructions...4 2. Intended use...4 2.2 Forseeable misuse...4 2.3 Installation, commissioning and operation...5

More information

RADEX -N Composite Operating/Assembly instructions

RADEX -N Composite Operating/Assembly instructions 1 of 14 RADEX -N is a torsionally stiff flexible steel lamina coupling. It is able to compensate for shaft misalignment, for example caused by thermal expansion, etc. note ISO 101. Drawn: 0.05.15 Kb/Wig

More information

Technical Manual Electrical Power Supply System T4002

Technical Manual Electrical Power Supply System T4002 Technical Manual Electrical Power Supply System T400 MOZELT GmbH & Co. KG Please observe the following safety information and recommendations before start-up! Copyright: MOZELT GmbH & Co. KG, D-4769 Duisburg

More information

Sinewave Inverters. SWING 150VA and 300VA. User s manual

Sinewave Inverters. SWING 150VA and 300VA. User s manual Sinewave Inverters SWING 150VA and 300VA User s manual 1 Warranty RIPEnergy is not manufacturer of these units. All technical information s, data s and dimension s rely on information s given by the manufacturer.

More information

Sectional and Tilting Door Opener

Sectional and Tilting Door Opener Sectional and Tilting Door Opener Installation Instructions and User Guide 600 800 1000 S/N WARNING Please read the manual carefully before installation and use. The installation of your new door opener

More information

WELDING INVERTER. PEGAS 160 E Smart PEGAS 200 E Smart OPERATING MANUAL. ALFA IN a.s. PEGAS E Smart Manual EN 04

WELDING INVERTER. PEGAS 160 E Smart PEGAS 200 E Smart OPERATING MANUAL. ALFA IN a.s.   PEGAS E Smart Manual EN 04 WELDING INVERTER PEGAS 160 E Smart PEGAS 200 E Smart OPERATING MANUAL PEGAS 160-200 E Smart Manual EN 04 2/12 CONTENT: 1. INTRODUCTION... 3 2. SAFETY INSTRUCTIONS AND WARNINGS... 4 3. TECHNICAL DATA...

More information

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B Users Manual Defender 1 8.0KW to 14.0KW Online Lighting Inverter Technical Manual #018-0102-01 Revision B Phone: 1.877.DSPM.POWER 1.877.377.6769 Fax: 909.930.3335 Website: www.dspmanufacturing.com E-Mail:

More information

Quick-Disconnect Coupling one-hand operation Push Pull ND 5, connecting thread G 1/4,max. operating pressure 500 bar

Quick-Disconnect Coupling one-hand operation Push Pull ND 5, connecting thread G 1/4,max. operating pressure 500 bar Issue 12-2013 Quick-Disconnect Coupling one-hand operation Push Pull ND 5, connecting thread G 1/4,max. operating pressure 500 bar Figure 1: Coupling complete Figure 4: Coded coupling, complete Table of

More information

Smile 11 RA/-B Smile 12 RF/-G Reset button

Smile 11 RA/-B Smile 12 RF/-G Reset button Original Instructions Smile 11 RA/-B Smile 12 RF/-G Reset button ABB Jokab Safety Varlabergsvägen 11, SE-434 39 Kungsbacka, Sweden www.abb.com/jokabsafety Read and understand this User Manual Please read

More information

Electrical operating instructions

Electrical operating instructions en Electrical operating instructions Reversing contactor universal 2 Contactor / 24V for three- and single- phase motor 51171134 - d 04.2009 OPERATING INSTRUCTIONS 52210115 consisting of: E : Electrical

More information

Tina 11A Connection block

Tina 11A Connection block Original instructions Tina 11A Connection block ABB Jokab Safety Varlabergsvägen 11, SE-434 39 Kungsbacka, Sweden www.abb.com/jokabsafety Read and understand this document Please read and understand this

More information

Cylinder with clamping unit / Clamping unit

Cylinder with clamping unit / Clamping unit Cylinder with clamping unit / Clamping unit DNCKE/KEC en Operating instructions 8074345 2017-10b [8074347] Original instructions Symbols: Warning The clamping unit KEC or the cylinder with clamping unit

More information

Smile 41 Push-button box with/without emergency stop

Smile 41 Push-button box with/without emergency stop Original instructions Smile 41 Push-button box with/without emergency stop ABB Jokab Safety Varlabergsvägen 11, 434 39 Kungsbacka www.abb.com/jokabsafety Read and understand this document Please read and

More information

Operation and Maintenance

Operation and Maintenance Operation and Maintenance Symmetra PX Battery Enclosure 80kW Contents Safety... 1 ON, OFF & STAND-BY switch symbols..................... 1 Overview... 2 System Components Overview..........................

More information

Rental Industry Safety Tester Safe Check 5s

Rental Industry Safety Tester Safe Check 5s Rental Industry Safety Tester Safe Check 5s Feb 2006 2006 Clare Instruments Inc. Issue 2.0 Firmware Version : 1.2a Limited Warranty & Limitation of Liability Clare Instruments Inc, guarantees this product

More information

Operating manual Separator

Operating manual Separator Operating manual Separator Sheet no. AS/4.1.141.1.1 issue 20.08.2014 Contents Section Title Page 0 Introduction... 1 1 Intended use......1 2 Marking of the fitting... 1 3 Safety instructions... 2 4 Transport

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 2 Float Switch EXERCISE OBJECTIVE Learn the working principle of float switches and how to use the float switch, Model 46935. DISCUSSION OUTLINE The Discussion of this exercise covers the following

More information

Operating instructions

Operating instructions Operating instructions Digital tank contents indicator DTA 10 DTA 10 DTA 10 0 4.0 m fuel oil 0 3.5 m water Read instructions before using device! Observe all safety information! Keep instructions for future

More information

ACROBAT SWING STAND MODEL

ACROBAT SWING STAND MODEL Mounting instructions Directions for use ACROBAT SWING STAND MODEL Dr. Mach GmbH u. Co.KG, Flossmannstrasse 28, D-85560 Ebersberg Tel.: +49 (0)8092 2093 0, Fax +49 (0)8092 2093 50 Internet: www.dr-mach.com,

More information

Instrucciones de instalación y funcionamiento Installation and operating instructions

Instrucciones de instalación y funcionamiento Installation and operating instructions Wilo-ElectronicControl D Einbau- und Betriebsanleitung E Instrucciones de instalación y funcionamiento GB Installation and operating instructions I Istruzioni di montaggio, uso e manutenzione F Notice

More information

Table of Contents. 95 IMS 25 flexible manufacturing line with 5 stations. 104 IMS 26 flexible manufacturing line with 6 stations

Table of Contents. 95 IMS 25 flexible manufacturing line with 5 stations. 104 IMS 26 flexible manufacturing line with 6 stations Table of Contents Table of Contents Automation Technology IMS Industrial mechatronics system Mechatronics Sub-Systems with UniTrain-I IMS 1.2: DC transport system IMS 1.3: AC transport system IMS 3 Sorting

More information

Mounting and Operating Instructions EB 3913 EN. Electropneumatic Converters i/p Converter Type

Mounting and Operating Instructions EB 3913 EN. Electropneumatic Converters i/p Converter Type Electropneumatic Converters i/p Converter Type 3913-0001 Fig. 1 Type 3913-0001 Electropneumatic Converter with pressure gauge and bracket Mounting and Operating Instructions EB 3913 EN Edition August 2011

More information

Differential Pressure Transmitter

Differential Pressure Transmitter Specifications/Instructions Differential Pressure Transmitter General Model PY9000D is a differential pressure transmitter that uses a ceramic cantilever sensor. Deflection of the ceramic cantilever caused

More information

Swiveling gripper finger GFS 16-40

Swiveling gripper finger GFS 16-40 Translation of the original manual Swiveling gripper finger GFS 16-40 Assembly and Operating Manual Superior Clamping and Gripping Imprint Imprint Copyright: This manual remains the copyrighted property

More information

KEWTECH. KT56 digital multi function tester. Instruction manual

KEWTECH. KT56 digital multi function tester. Instruction manual KEWTECH KT56 digital multi function tester Instruction manual Contents 1 Safety Notice 1 2 Features and Principles of Measurement 3 3 Introduction 6 4 Specifications 7 5 Instrument layout 9 6 Operating

More information

Safety Sensor CSS 180 Product Information

Safety Sensor CSS 180 Product Information Safety Sensor CSS 180 Product Information Safety Sensor CSS 180 CSS180CSS 180 PDF-M / EN 60947-5-3 EN 954-1 Control Category 4 IEC 61508, suitable for use in SIL 3 applications BG Type-Certification in

More information

Application Note EMC - Checklist

Application Note EMC - Checklist Application Note EMC - Checklist A checklist to avoid EMC trouble General 100151 Title... EMC - Checklist Version... 1.10 Document no.... 100151 Original...en Author... Festo Last saved... 08.08.2017 Copyright

More information

Hydrogen Fuel Cell Training System

Hydrogen Fuel Cell Training System 8010-80 Hydrogen Fuel Cell Training System LabVolt Series Datasheet Festo Didactic en 03/2018 Table of Contents General Description 2 Exercises 3 Features & Benefits 3 List of Equipment 4 List of Manuals

More information

PRO-TYP II. Single and 3-phase Test Adapter with Type 2 Plug for Testing Electric Charging Stations with PROFITEST MTECH+ and MXTRA

PRO-TYP II. Single and 3-phase Test Adapter with Type 2 Plug for Testing Electric Charging Stations with PROFITEST MTECH+ and MXTRA PRO-TYP II Single and 3-phase Test Adapter with Type 2 Plug for Testing Electric Charging Stations with PROFITEST MTECH+ and MXTRA 3-349-884-03 1/10.15 Opening of Equipment / Repair The equipment may be

More information

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z Installation and operating instructions Solar charge controller MPPT 10 A / 20 A EN 1 Contents 1. About these instructions... 3 1.1 Applicability... 3 1.2 Users... 3 1.3 Description of symbols... 3 2.

More information