1 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID SCI-US Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date: 10/31/2018 Contract Awarded To: SHELLY COMPANY Award Amount: $1,429, Engineer's Estimate: $1,371, Bidder 1 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH Bid $1,429, Page 1

2 Ref #1 202E23010 PAVEMENT REMOVED, ASPHALT, (90 SY) Awd $16.00 $1, Ref #2 202E30000 WALK REMOVED, (5099 SF) Awd $8.00 $40, Ref #3 202E32000 CURB REMOVED, (1752 FT) Awd $27.00 $47, Ref #4 202E32500 CURB AND GUTTER REMOVED, (20 FT) Awd $ $3, Ref #5 608E " CONCRETE WALK, (99 SF) Awd $18.00 $1, Ref #6 608E52000 CURB RAMP, (5419 SF) Awd $10.50 $56, Section 1 - ROADWAY - Totals Awd $151, Ref #7 616E10000 WATER, (3 MGAL) Awd $1.00 $3.00 Ref #8 659E10000 SEEDING AND MULCHING, (250 SY) Awd $10.00 $2, Ref #9 832E30000 EROSION CONTROL, (1000 EACH) Awd $1.00 $1, Section 2 - EROSION CONTROL - Totals Awd $3, Ref #10 611E98630 CATCH BASIN ADJUSTED TO GRADE, (10 EACH) Awd $ $7, Ref #11 611E99150 INLET ADJUSTED TO GRADE, (10 EACH) Awd $ $7, Ref #12 611E99654 MANHOLE ADJUSTED TO GRADE, (10 EACH) Awd $ $7, Section 3 - DRAINAGE - Totals Awd $21, Ref #13 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN, (801 SY) Awd $46.00 $36, Ref #14 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN 1., (95597 SY) Awd $1.30 $124, Ref #15 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN 3., (3262 SY) Awd $5.25 $17, Ref #16 254E01601 PATCHING PLANED SURFACE, AS PER PLAN, (9559 SY) Awd $2.00 $19, Ref #17 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (516 SY) Awd $ $118, Page 2

3 Ref #18 255E20000 FULL DEPTH PAVEMENT SAWING, (1056 FT) Awd $3.85 $4, Ref #19 407E13900 TACK COAT, , (245 GAL) Awd $2.50 $ Ref #20 407E20000 NON-TRACKING TACK COAT, (7170 GAL) Awd $3.45 $24, Ref #21 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (3860 CY) Awd $ $598, Ref #22 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE, (159 CY) Awd $ $27, Ref #23 609E24511 CURB, TYPE 4-C, AS PER PLAN, (1278 FT) Awd $33.00 $42, Ref # E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (207 CY) Awd $ $32, Section 4 - PAVEMENT - Totals Awd $1,045, Ref #24 644E00104 EDGE LINE, 6", (0.48 MILE) Awd $2, $1, Ref #25 644E00204 LANE LINE, 6", (4.06 MILE) Awd $1, $5, Ref #26 644E00400 CHANNELIZING LINE, 8", (1065 FT) Awd $1.65 $1, Ref #27 644E00500 STOP LINE, (603 FT) Awd $5.15 $3, Ref #28 644E00600 CROSSWALK LINE, (4834 FT) Awd $3.15 $15, Ref #29 644E01300 LANE ARROW, (12 EACH) Awd $75.00 $ Ref #30 644E01410 WORD ON PAVEMENT, 96", (8 EACH) Awd $ $ Section 5 - TRAFFIC CONTROL - Totals Awd $28, Ref #31 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR) Awd $65.00 $5, Ref #32 614E12460 WORK ZONE MARKING SIGN, (76 EACH) Awd $95.00 $7, Ref #33 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (14 SNMT) Awd $1, $23, Ref #34 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT, (3.92 MILE) Awd $1, $6, Ref #35 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA, (590 FT) Awd $0.55 $ Page 3

4 Ref #36 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (503 FT) Awd $2.50 $1, Ref #37 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (4684 FT) Awd $1.50 $7, Ref #38 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (8 EACH) Awd $45.00 $ Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $50, Ref #39 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $8, $8, Ref #40 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $75, $75, Ref #41 619E16000 FIELD OFFICE, TYPE A, (4 MNTH) Awd $1, $5, Ref #42 624E10000 MOBILIZATION, (LUMP SUM) Awd $40, $40, Section 7 - INCIDENTALS - Totals Awd $128, Page 4

5 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID ALL-SR 65/SR /11.34 Federal Type: MINOR WIDENING Letting Date: 11/2/2017 Completion Date: 11/2/2018 Contract Awarded To: SHELLY COMPANY Award Amount: $4,064, Engineer's Estimate: $3,798, Bidder 1 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH Bid $4,064, Bidder 3 HELMS AND SONS EXCAVATING 1753 LIMA AVE Hancock FINDLAY, OH Bid $4,186, Bidder 5 VERNON NAGEL INC O154 CO RD 11-C Henry NAPOLEON, OH Bid $4,315, Bidder 2 MILLER BROS CONST INC 1613 S DEFIANCE ST P O BOX 30 Fulton ARCHBOLD, OH Bid $4,098, Bidder 4 R D JONES EXCAVATING INC ALGER RD P O BOX 127 Allen HARROD, OH Bid $4,271, Bidder 6 VTF EXCAVATION LLC 8398 CELINA-MENDON RD Mercer CELINA, OH Bid $4,385, Page 5

6 Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $60, $60, $50, $50, $7, $7, $150, $150, $5, $5, $21, $21, Ref #2 202E23000 PAVEMENT REMOVED, (12929 SY) Awd $7.50 $96, $9.50 $122, $17.31 $223, $7.75 $100, $18.00 $232, $3.19 $41, Ref #3 202E23500 WEARING COURSE REMOVED, (5610 SY) Awd $5.75 $32, $6.00 $33, $5.50 $30, $6.50 $36, $6.50 $36, $6.61 $37, Ref #4 202E30000 WALK REMOVED, (4315 SF) Awd $1.30 $5, $1.25 $5, $1.56 $6, $1.25 $5, $2.00 $8, $1.38 $5, Ref #5 202E32000 CURB REMOVED, (1100 FT) Awd $10.00 $11, $5.50 $6, $7.60 $8, $2.75 $3, $4.00 $4, $4.14 $4, Ref #6 202E32500 CURB AND GUTTER REMOVED, (204 FT) Awd $13.00 $2, $7.25 $1, $7.84 $1, $3.50 $ $3.00 $ $4.14 $ Ref #7 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (7 SY) Awd $50.00 $ $51.00 $ $81.38 $ $17.00 $ $50.00 $ $41.38 $ Page 6

7 Ref #8 202E35100 PIPE REMOVED, 24" AND UNDER, (2757 FT) Awd $9.00 $24, $11.00 $30, $11.08 $30, $6.00 $16, $10.00 $27, $5.67 $15, Ref #9 202E38000 GUARDRAIL REMOVED, (29 FT) Awd $28.00 $ $10.00 $ $12.25 $ $3.50 $ $8.00 $ $4.80 $ Ref #10 202E52990 SPECIAL - PARKING BLOCK REMOVED, (70 EACH) Awd $5.00 $ $5.00 $ $29.61 $2, $10.00 $ $20.00 $1, $41.14 $2, Ref #11 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET, (8 EACH) Awd $55.00 $ $25.00 $ $62.79 $ $14.00 $ $50.00 $ $ $ Ref #12 202E58100 CATCH BASIN REMOVED, (23 EACH) Awd $ $12, $ $6, $ $6, $ $6, $ $6, $ $6, Ref #13 202E60010 MONUMENT ASSEMBLY REMOVED, (1 EACH) Awd $ $ $ $ $91.83 $ $75.00 $ $ $ $ $ Ref #14 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (231 FT) Awd $35.00 $8, $35.00 $8, $9.93 $2, $11.00 $2, $12.00 $2, $14.77 $3, Page 7

8 Ref #15 202E75000 FENCE REMOVED, (144 FT) Awd $7.00 $1, $6.25 $ $8.88 $1, $4.00 $ $5.00 $ $1.48 $ Ref #16 202E98100 REMOVAL MISC.: BUSINESS SIGN REMOVED, (5 EACH) Awd $ $2, $ $1, $ $1, $ $1, $ $1, $ $ Ref #17 202E98100 REMOVAL MISC.: CONCRETE FOUNDATION REMOVED, (11 EACH) Awd $ $3, $ $3, $ $1, $ $7, $ $5, $ $2, Ref #18 202E98100 REMOVAL MISC.: CONCRETE POST REMOVED, (2 EACH) Awd $ $ $ $ $35.43 $ $ $ $ $ $ $ Ref #19 202E98100 REMOVAL MISC.: FLAG POLE REMOVED, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref #20 202E98100 REMOVAL MISC.: LIGHT POLE REMOVED, (2 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref #21 202E98100 REMOVAL MISC.: SIGN POST REMOVED, (5 EACH) Awd $ $ $ $ $35.60 $ $ $ $ $ $ $ Page 8

9 Ref #22 202E98100 REMOVAL MISC.: STEEL POST REMOVED, (10 EACH) Awd $50.00 $ $90.00 $ $ $1, $ $1, $ $1, $ $1, Ref #23 202E98100 REMOVAL MISC.: WOOD POST REMOVED, (1 EACH) Awd $ $ $ $ $36.30 $ $25.00 $ $ $ $82.76 $82.76 Ref #24 202E98200 REMOVAL MISC.: LANDSCAPING BRICK REMOVED, (20 FT) Awd $15.00 $ $15.00 $ $2.68 $ $2.50 $ $4.00 $ $2.64 $52.80 Ref #25 203E10000 EXCAVATION, (3691 CY) Awd $21.50 $79, $18.00 $66, $16.71 $61, $17.50 $64, $20.00 $73, $20.52 $75, Ref #26 203E20000 EMBANKMENT, (2137 CY) Awd $25.00 $53, $18.00 $38, $13.46 $28, $10.00 $21, $13.00 $27, $14.27 $30, Ref #27 203E98100 ROADWAY, MISC.: DECORATIVE STONE, (1010 SY) Awd $24.00 $24, $28.00 $28, $14.50 $14, $15.00 $15, $60.00 $60, $10.23 $10, Ref #28 204E10000 SUBGRADE COMPACTION, (12085 SY) Awd $1.00 $12, $1.65 $19, $1.61 $19, $2.25 $27, $1.00 $12, $0.91 $10, Page 9

10 Ref #29 204E45000 PROOF ROLLING, (4 HOUR) Awd $ $ $85.00 $ $ $ $ $ $ $ $96.21 $ Ref #30 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING, (6.13 STA) Awd $30.00 $ $ $1, $ $1, $ $5, $ $1, $ $1, Ref #31 608E " CONCRETE WALK, (12314 SF) Awd $5.50 $67, $5.21 $64, $4.56 $56, $6.50 $80, $6.50 $80, $5.65 $69, Ref #32 608E " CONCRETE WALK, (17844 SF) Awd $6.50 $115, $6.06 $108, $5.36 $95, $7.75 $138, $7.75 $138, $6.85 $122, Ref #33 608E52001 CURB RAMP, AS PER PLAN, (3680 SF) Awd $7.45 $27, $8.80 $32, $13.36 $49, $13.00 $47, $12.00 $44, $11.03 $40, Ref #34 608E53020 DETECTABLE WARNING, (40 SF) Awd $24.00 $ $24.00 $ $40.00 $1, $40.00 $1, $24.00 $ $28.86 $1, Ref #35 623E38501 MONUMENT ASSEMBLY, AS PER PLAN, (3 EACH) Awd $1, $3, $ $1, $ $2, $ $ $1, $4, $ $2, Page 10

11 Ref #36 690E50000 SPECIAL - MAILBOX SUPPORT, (10 EACH) Awd $ $2, $ $2, $ $1, $80.00 $ $ $2, $ $3, Ref #37 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (10 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Section 1 - ROADWAY - Totals Awd $655, $641, $662, $740, $785, $517, Ref #38 659E00300 TOPSOIL, (274 CY) Awd $40.00 $10, $65.00 $17, $52.58 $14, $33.00 $9, $50.00 $13, $36.00 $9, Ref #39 659E10000 SEEDING AND MULCHING, (11691 SY) Awd $0.80 $9, $0.80 $9, $0.80 $9, $1.75 $20, $0.80 $9, $2.44 $28, Ref #40 659E20000 COMMERCIAL FERTILIZER, (1.57 TON) Awd $ $ $ $ $ $ $ $1, $ $ $ $1, Ref #41 659E35000 WATER, (64 MGAL) Awd $1.00 $ $1.00 $ $1.00 $ $20.00 $1, $1.00 $ $12.03 $ Page 11

12 Ref #42 670E00500 SLOPE EROSION PROTECTION, (2458 SY) Awd $1.90 $4, $1.90 $4, $1.90 $4, $2.25 $5, $3.00 $7, $3.01 $7, Ref #43 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM) Awd $2, $2, $30, $30, $40, $40, $44, $44, $35, $35, $5, $5, Ref #44 832E30000 EROSION CONTROL, (50000 EACH) Awd $1.00 $50, $1.00 $50, $1.00 $50, $1.00 $50, $1.00 $50, $1.00 $50, Ref # E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM) Awd $3, $3, $2, $2, $ $ $2, $2, $1, $1, $1, $1, Section 2 - EROSION CONTROL - Totals Awd $81, $114, $121, $133, $117, $104, Ref #45 605E " BASE PIPE UNDERDRAINS, (6867 FT) Awd $10.00 $68, $8.00 $54, $7.30 $50, $8.50 $58, $12.00 $82, $8.35 $57, Ref #46 611E " CONDUIT, TYPE F FOR UNDERDRAIN OUTLET, (301 FT) Awd $18.00 $5, $22.25 $6, $7.30 $2, $7.30 $2, $20.00 $6, $12.60 $3, Page 12

13 Ref #47 611E " CONDUIT, TYPE C, (115 FT) Awd $15.00 $1, $17.00 $1, $14.14 $1, $14.50 $1, $45.00 $5, $13.82 $1, Ref #48 611E " CONDUIT, TYPE B, (80 FT) Awd $25.00 $2, $23.50 $1, $17.07 $1, $30.00 $2, $65.00 $5, $30.97 $2, Ref #49 611E " CONDUIT, TYPE C, (52 FT) Awd $30.00 $1, $29.00 $1, $49.03 $2, $23.00 $1, $32.00 $1, $31.23 $1, Ref #50 611E " CONDUIT, TYPE C, (10 FT) Awd $80.00 $ $51.00 $ $88.32 $ $24.00 $ $35.00 $ $55.07 $ Ref #51 611E " CONDUIT, TYPE B, (2586 FT) Awd $58.00 $149, $71.50 $184, $78.17 $202, $48.00 $124, $75.00 $193, $55.51 $143, Ref #52 611E " CONDUIT, TYPE C, (1987 FT) Awd $48.00 $95, $47.00 $93, $60.25 $119, $38.00 $75, $36.00 $71, $45.26 $89, Ref #53 611E " CONDUIT, TYPE B, (293 FT) Awd $68.00 $19, $ $30, $86.73 $25, $53.00 $15, $80.00 $23, $56.44 $16, Page 13

14 Ref #54 611E " CONDUIT, TYPE C, (586 FT) Awd $55.00 $32, $65.00 $38, $55.35 $32, $40.00 $23, $40.00 $23, $44.67 $26, Ref #55 611E " CONDUIT, TYPE B, (278 FT) Awd $73.00 $20, $86.00 $23, $64.60 $17, $65.00 $18, $85.00 $23, $59.14 $16, Ref #56 611E " CONDUIT, TYPE C, (139 FT) Awd $68.00 $9, $66.00 $9, $56.26 $7, $44.00 $6, $45.00 $6, $38.97 $5, Ref #57 611E " CONDUIT, TYPE B, (222 FT) Awd $82.00 $18, $ $28, $ $23, $85.00 $18, $ $22, $86.15 $19, Ref #58 611E " CONDUIT, TYPE C, (29 FT) Awd $ $4, $ $4, $ $3, $78.00 $2, $60.00 $1, $ $3, Ref #59 611E " CONDUIT, TYPE B, (360 FT) Awd $ $54, $ $56, $ $48, $ $49, $ $61, $ $44, Ref #60 611E " CONDUIT, TYPE C, (173 FT) Awd $ $25, $ $27, $ $22, $ $22, $ $19, $ $21, Page 14

15 Ref #61 611E96600 CONDUIT, BORED OR JACKED, 12" TYPE B, (47 FT) Awd $ $19, $ $14, $ $18, $ $17, $ $14, $ $18, Ref #62 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN, 15" TYPE B, (38 FT) Awd $ $17, $ $13, $ $18, $ $12, $ $14, $ $22, Ref #63 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN, 18" TYPE B, (45 FT) Awd $ $20, $ $15, $ $20, $ $14, $ $15, $ $25, Ref #64 611E97200 CONDUIT, MISC.: CONCRETE SADDLE, (2 EACH) Awd $2, $4, $1, $2, $ $ $ $ $ $1, $ $ Ref #65 611E97400 CONDUIT, MISC.: SANITARY SEWER SERVICE CONNECTIONS, (100 FT) Awd $50.00 $5, $20.00 $2, $17.08 $1, $35.00 $3, $80.00 $8, $16.60 $1, Ref #66 611E98190 CATCH BASIN, NO. 3A WITH DIAGONAL GRATE, (7 EACH) Awd $2, $16, $2, $18, $1, $12, $2, $18, $3, $22, $2, $17, Ref #67 611E98191 CATCH BASIN, NO. 3A WITH DIAGONAL GRATE, AS PER PL, (21 EACH) Awd $2, $58, $3, $69, $1, $38, $2, $55, $3, $63, $2, $53, Page 15

16 Ref #68 611E98371 CATCH BASIN, NO. 6, AS PER PLAN, (2 EACH) Awd $2, $5, $2, $4, $2, $4, $2, $4, $2, $5, $3, $6, Ref #69 611E98470 CATCH BASIN, NO. 2-2B, (5 EACH) Awd $1, $6, $1, $7, $1, $6, $1, $8, $1, $7, $1, $7, Ref #70 611E98510 CATCH BASIN, NO. 2-3, (3 EACH) Awd $1, $5, $1, $5, $1, $3, $2, $6, $2, $6, $1, $4, Ref #71 611E98700 INLET, SIDE DITCH, (9 EACH) Awd $ $8, $1, $9, $1, $13, $1, $15, $1, $16, $1, $13, Ref #72 611E98701 INLET, SIDE DITCH, AS PER PLAN, (3 EACH) Awd $ $2, $1, $5, $1, $4, $1, $5, $1, $5, $1, $4, Ref #73 611E99574 MANHOLE, NO. 3, (20 EACH) Awd $2, $50, $3, $68, $4, $83, $2, $50, $6, $120, $5, $101, Ref #74 611E99575 MANHOLE, NO. 3, AS PER PLAN, (1 EACH) Awd $3, $3, $3, $3, $3, $3, $2, $2, $6, $6, $5, $5, Page 16

17 Ref #75 611E99654 MANHOLE ADJUSTED TO GRADE, (7 EACH) Awd $1, $8, $ $6, $ $3, $ $5, $ $5, $1, $10, Ref #76 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (5 EACH) Awd $1, $7, $1, $7, $ $2, $ $4, $1, $7, $1, $9, Ref #77 611E99720 INSPECTION WELL, (4 EACH) Awd $ $3, $ $ $ $3, $ $2, $ $1, $ $3, Section 3 - DRAINAGE - Totals Awd $753, $817, $800, $649, $868, $759, Ref #78 253E02000 PAVEMENT REPAIR, (380 CY) Awd $ $96, $ $136, $ $134, $ $106, $ $152, $ $119, Ref #79 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/2" DEPTH, (57366 SY) Awd $0.90 $51, $1.25 $71, $1.25 $71, $1.40 $80, $0.95 $54, $1.50 $86, Ref #80 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/4" DEPTH, (527 SY) Awd $1.05 $ $1.35 $ $1.35 $ $1.85 $ $1.30 $ $1.62 $ Page 17

18 Ref #81 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2-1/4" DEPTH, (37570 SY) Awd $0.80 $30, $1.40 $52, $1.40 $52, $1.60 $60, $1.30 $48, $1.68 $63, Ref #82 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V, (9433 SY) Awd $2.35 $22, $3.35 $31, $3.35 $31, $3.80 $35, $3.25 $30, $4.03 $38, Ref #83 254E01600 PATCHING PLANED SURFACE, (1908 SY) Awd $10.00 $19, $3.00 $5, $10.63 $20, $3.50 $6, $3.00 $5, $12.03 $22, Ref #84 301E46000 ASPHALT CONCRETE BASE, PG64-22, (1467 CY) Awd $ $220, $ $236, $ $233, $ $227, $ $256, $ $268, Ref #85 304E20000 AGGREGATE BASE, (2830 CY) Awd $50.00 $141, $58.00 $164, $54.39 $153, $32.00 $90, $50.00 $141, $46.19 $130, Ref #86 407E20000 NON-TRACKING TACK COAT, (12867 GAL) Awd $1.95 $25, $1.90 $24, $2.07 $26, $2.00 $25, $1.90 $24, $2.35 $30, Ref #87 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (446, (713 CY) Awd $ $99, $ $101, $ $106, $ $110, $ $103, $ $120, Page 18

19 Ref #88 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (1695 CY) Awd $ $296, $ $296, $ $315, $ $288, $ $296, $ $356, Ref #89 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (1044 CY) Awd $ $148, $ $149, $ $157, $ $161, $ $149, $ $178, Ref #90 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (3026 CY) Awd $ $490, $ $469, $ $520, $ $544, $ $453, $ $589, Ref #91 451E " REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS PER, (159 SY) Awd $69.55 $11, $68.00 $10, $83.78 $13, $88.00 $13, $95.00 $15, $95.99 $15, Ref #92 452E " NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (267 SY) Awd $46.20 $12, $56.00 $14, $57.62 $15, $63.00 $16, $68.00 $18, $64.68 $17, Ref #93 452E " NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (794 SY) Awd $55.60 $44, $56.00 $44, $64.87 $51, $73.25 $58, $78.00 $61, $76.36 $60, Ref #94 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (5464 FT) Awd $18.50 $101, $17.50 $95, $19.05 $104, $21.50 $117, $17.50 $95, $21.74 $118, Page 19

20 Ref #95 609E26000 CURB, TYPE 6, (2269 FT) Awd $16.25 $36, $15.25 $34, $18.60 $42, $22.35 $50, $19.00 $43, $18.59 $42, Ref #96 609E " CONCRETE TRAFFIC ISLAND, (20 SY) Awd $54.00 $1, $66.50 $1, $81.78 $1, $ $2, $70.00 $1, $92.52 $1, Ref #97 617E10100 COMPACTED AGGREGATE, (400 CY) Awd $57.00 $22, $55.00 $22, $54.39 $21, $65.00 $26, $65.00 $26, $41.25 $16, Section 4 - PAVEMENT - Totals Awd $1,870, $1,964, $2,075, $2,024, $1,979, $2,276, Ref #98 625E25900 CONDUIT, JACKED OR DRILLED, 1", (60 FT) Awd $23.00 $1, $10.00 $ $29.85 $1, $29.00 $1, $35.00 $2, $17.72 $1, Ref #99 625E25900 CONDUIT, JACKED OR DRILLED, 2", (120 FT) Awd $23.00 $2, $10.00 $1, $38.57 $4, $26.75 $3, $35.00 $4, $22.15 $2, Ref # E25900 CONDUIT, JACKED OR DRILLED, 3/4", (720 FT) Awd $23.00 $16, $10.00 $7, $28.63 $20, $6.25 $4, $25.00 $18, $22.15 $15, Page 20

21 Ref # E10800 VALVE BOX ADJUSTED TO GRADE, (7 EACH) Awd $ $5, $ $2, $ $1, $57.25 $ $ $1, $ $4, Ref # E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (9 EACH) Awd $ $6, $ $7, $ $1, $66.75 $ $ $5, $ $5, Ref # E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN, (20 EACH) Awd $ $8, $ $5, $ $4, $59.00 $1, $60.00 $1, $75.93 $1, Ref # E20766 SPECIAL - 3/4" COPPER WATER SERVICE LINE (LIMA-GEN, (720 FT) Awd $6.75 $4, $11.00 $7, $15.05 $10, $13.25 $9, $27.00 $19, $4.25 $3, Ref # E20770 SPECIAL - 1" COPPER WATER SERVICE LINE (LIMA-GENER, (60 FT) Awd $8.00 $ $13.50 $ $15.89 $ $24.50 $1, $30.00 $1, $5.52 $ Ref # E20778 SPECIAL - 2" COPPER WATER SERVICE LINE (LIMA-GENER, (120 FT) Awd $16.00 $1, $19.50 $2, $25.15 $3, $23.50 $2, $43.00 $5, $13.95 $1, Ref # E98000 WATER WORK, MISC.: CURB METER SET (LIMA-GENERAL SP, (13 EACH) Awd $ $9, $ $9, $ $8, $1, $13, $1, $15, $ $11, Page 21

22 Section 5 - WATER WORK - Totals Awd $57, $43, $58, $39, $74, $47, Ref # E00100 RPM, (316 EACH) Awd $27.00 $8, $26.25 $8, $27.52 $8, $31.55 $9, $23.00 $7, $27.84 $8, Ref # E54000 RAISED PAVEMENT MARKER REMOVED, (155 EACH) Awd $5.00 $ $5.00 $ $5.00 $ $6.00 $ $12.50 $1, $6.01 $ Ref # E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (542 FT) Awd $9.00 $4, $10.00 $5, $9.40 $5, $11.25 $6, $10.50 $5, $12.03 $6, Ref # E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (68 FT) Awd $10.25 $ $12.00 $ $10.70 $ $24.00 $1, $12.50 $ $14.43 $ Ref # E08600 SIGN POST REFLECTOR, (5 EACH) Awd $35.00 $ $40.00 $ $36.54 $ $39.00 $ $85.00 $ $14.43 $72.15 Ref # E80100 SIGN, FLAT SHEET, (167 SF) Awd $15.00 $2, $18.00 $3, $15.66 $2, $20.75 $3, $18.00 $3, $21.65 $3, Page 22

23 Ref # E80500 SIGN, DOUBLE FACED, STREET NAME, (10 EACH) Awd $85.00 $ $ $1, $88.73 $ $94.00 $ $ $1, $ $1, Ref # E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (33 EACH) Awd $10.00 $ $15.00 $ $35.71 $1, $19.00 $ $15.00 $ $18.04 $ Ref # E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (7 EACH) Awd $45.00 $ $65.00 $ $71.34 $ $74.00 $ $50.00 $ $78.17 $ Ref # E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (43 EACH) Awd $10.00 $ $20.00 $ $35.72 $1, $15.00 $ $15.00 $ $24.05 $1, Ref # E00094 EDGE LINE, 6", (8.35 MILE) Awd $ $5, $ $6, $ $5, $ $6, $ $5, $ $7, Ref # E00290 CENTER LINE, (5.57 MILE) Awd $ $4, $ $5, $1, $6, $ $4, $1, $6, $1, $6, Ref # E00400 CHANNELIZING LINE, 8", (1408 FT) Awd $2.00 $2, $1.15 $1, $1.60 $2, $2.25 $3, $2.10 $2, $1.38 $1, Page 23

24 Ref # E00500 STOP LINE, (364 FT) Awd $6.00 $2, $4.65 $1, $5.95 $2, $6.65 $2, $8.25 $3, $5.59 $2, Ref # E00600 CROSSWALK LINE, (1273 FT) Awd $5.00 $6, $2.55 $3, $3.00 $3, $5.55 $7, $3.00 $3, $3.07 $3, Ref # E00700 TRANSVERSE/DIAGONAL LINE, (426 FT) Awd $6.00 $2, $4.50 $1, $5.85 $2, $6.65 $2, $6.00 $2, $5.41 $2, Ref # E00900 ISLAND MARKING, (56 SF) Awd $4.00 $ $2.50 $ $2.95 $ $4.45 $ $4.00 $ $3.01 $ Ref # E01100 SCHOOL SYMBOL MARKING, 72", (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E01300 LANE ARROW, (32 EACH) Awd $90.00 $2, $75.00 $2, $84.00 $2, $95.00 $3, $98.00 $3, $90.19 $2, Section 6 - TRAFFIC CONTROL - Totals Awd $46, $44, $48, $55, $50, $52, Page 24

25 Ref # E25300 CONDUIT, 1-1/2", , (100 FT) Awd $2.77 $ $2.77 $ $2.77 $ $3.00 $ $2.75 $ $3.33 $ Ref # E25400 CONDUIT, 2", , (6 FT) Awd $10.66 $ $10.06 $ $10.06 $ $11.15 $ $10.00 $ $12.10 $72.60 Ref # E25506 CONDUIT, 3", , (17 FT) Awd $20.70 $ $20.70 $ $20.70 $ $23.00 $ $20.50 $ $24.89 $ Ref # E25910 CONDUIT CLEANED AND CABLES REMOVED, (75 FT) Awd $10.35 $ $10.35 $ $10.35 $ $11.50 $ $10.35 $ $12.45 $ Ref # E29002 TRENCH, 24" DEEP, (123 FT) Awd $6.90 $ $6.90 $ $6.90 $ $7.75 $ $7.00 $ $8.30 $1, Ref # E30700 PULL BOX, , 18", (2 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $1, $2, Ref # E30706 PULL BOX, , 24", (1 EACH) Awd $ $ $ $ $ $ $1, $1, $ $ $1, $1, Page 25

26 Ref # E31511 PULL BOX REMOVED, AS PER PLAN, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E32000 GROUND ROD, (3 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E03900 VEHICULAR SIGNAL HEAD, INSTALLATION ONLY, (2 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Ref # E25000 COVERING OF VEHICULAR SIGNAL HEAD, (6 EACH) Awd $60.95 $ $60.95 $ $60.95 $ $67.00 $ $60.00 $ $73.30 $ Ref # E26500 DETECTOR LOOP, (3 EACH) Awd $1, $4, $1, $4, $1, $4, $1, $4, $1, $4, $1, $5, Ref # E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES, (92 FT) Awd $12.94 $1, $12.94 $1, $12.94 $1, $14.00 $1, $13.00 $1, $15.56 $1, Ref # E30500 MESSENGER WIRE, MISC.: UNLASH AND RELASH MESSENGER, (92 FT) Awd $18.40 $1, $18.40 $1, $18.40 $1, $20.00 $1, $18.50 $1, $22.13 $2, Page 26

27 Ref # E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (180 FT) Awd $2.47 $ $2.47 $ $2.47 $ $2.75 $ $2.50 $ $2.97 $ Ref # E64000 STRAIN POLE FOUNDATION, (1 EACH) Awd $2, $2, $2, $2, $2, $2, $3, $3, $2, $2, $3, $3, Ref # E64010 SIGNAL SUPPORT FOUNDATION, (1 EACH) Awd $2, $2, $2, $2, $2, $2, $3, $3, $3, $3, $3, $3, Ref # E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A, (403 FT) Awd $2.02 $ $2.02 $ $2.02 $ $2.25 $ $2.00 $ $2.43 $ Ref # E67200 POWER CABLE, 2 CONDUCTOR, NO. 8 AWG, (31 FT) Awd $6.33 $ $6.33 $ $6.33 $ $7.00 $ $6.40 $ $7.61 $ Ref # E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG, (101 FT) Awd $6.61 $ $6.61 $ $6.61 $ $7.00 $ $6.60 $ $7.95 $ Ref # E70001 POWER SERVICE, AS PER PLAN, (1 EACH) Awd $2, $2, $2, $2, $2, $2, $2, $2, $2, $2, $2, $2, Page 27

28 Ref # E70401 CONDUIT RISER, 2" DIAMETER, AS PER PLAN, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E82600 STRAIN POLE, TYPE TC-81.10, DESIGN 6, (1 EACH) Awd $4, $4, $4, $4, $4, $4, $4, $4, $4, $4, $5, $5, Ref # E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, (1 EACH) Awd $3, $3, $3, $3, $3, $3, $3, $3, $3, $3, $4, $4, Ref # E90206 REUSE OF SIGNAL SUPPORT, (1 EACH) Awd $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, Ref # E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH) Awd $17, $17, $17, $17, $17, $17, $19, $19, $17, $17, $21, $21, Ref # E67200 CONTROLLER WORK PAD, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E31600 PULL BOX, MISC.:ADJUST TO GRADE, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Page 28

29 Ref # E39520 PULL BOX CLEANED, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Section 7 - TRAFFIC SIGNALS - Totals Awd $53, $53, $53, $59, $53, $64, Ref # E40080 DECIDUOUS TREE, 2" CALIPER, SKYCOLE-SKYLINE HONEYL, (3 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Ref # E40080 DECIDUOUS TREE, 2" CALIPER, ULMUS-PATRIOT ELM, BAL, (4 EACH) Awd $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, Section 8 - LANDSCAPING - Totals Awd $3, $3, $3, $4, $3, $3, Ref # E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (44 HOUR) Awd $60.00 $2, $65.00 $2, $50.00 $2, $93.00 $4, $65.00 $2, $ $6, Ref # E12460 WORK ZONE MARKING SIGN, (49 EACH) Awd $95.00 $4, $ $5, $ $6, $ $6, $95.00 $4, $ $6, Page 29

30 Ref # E12500 REPLACEMENT SIGN, (5 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E12600 REPLACEMENT DRUM, (20 EACH) Awd $60.00 $1, $50.00 $1, $ $2, $65.00 $1, $60.00 $1, $60.13 $1, Ref # E21400 WORK ZONE CENTER LINE, CLASS II, (5.75 MILE) Awd $ $4, $ $4, $ $4, $ $1, $ $5, $ $5, Ref # E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT, (2.4 MILE) Awd $3, $7, $ $2, $ $2, $3, $8, $1, $3, $1, $2, Ref # E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER, (28 SY) Awd $ $5, $ $7, $ $3, $ $3, $ $7, $ $3, Ref # E10000 WATER, (24 MGAL) Awd $45.00 $1, $80.00 $1, $1.10 $ $5.00 $ $1.00 $ $1.20 $28.80 Section 9 - MAINTENANCE OF TRAFFIC - Totals Awd $27, $25, $20, $25, $26, $25, Page 30

31 Ref # E65000 SPECIAL - WORK INVOLVING NON-REGULATED MATERIALS, (1500 TON) Awd $13.50 $20, $30.00 $45, $7.53 $11, $15.00 $22, $42.00 $63, $21.25 $31, Ref # E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (1500 TON) Awd $69.03 $103, $35.00 $52, $59.38 $89, $78.00 $117, $42.00 $63, $88.03 $132, Ref # E65022 SPECIAL - WORK INVOLVING NON-REGULATED WATER, (150 GAL) Awd $3.10 $ $35.00 $5, $13.43 $2, $6.00 $ $6.00 $ $6.26 $ Ref # E65024 SPECIAL - WORK INVOLVING REGULATED WATER, (150 GAL) Awd $5.15 $ $50.00 $7, $9.60 $1, $8.00 $1, $6.00 $ $8.71 $1, Section 10 - ENVIRONMENTAL / REMEDIATION - Totals Awd $125, $110, $103, $141, $127, $166, Ref # E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $15, $15, $20, $20, $26, $26, $31, $31, $30, $30, $21, $21, Ref # E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS, (LUMP SUM) Awd $2, $2, $1, $1, $7, $7, $40, $40, $1, $1, $3, $3, Page 31

32 Ref # E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM) Awd $130, $130, $100, $100, $51, $51, $210, $210, $75, $75, $168, $168, Ref # E16010 FIELD OFFICE, TYPE B, (9 MNTH) Awd $2, $22, $1, $13, $1, $16, $4, $39, $2, $18, $1, $17, Ref # E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM) Awd $45, $45, $45, $45, $20, $20, $47, $47, $28, $28, $58, $58, Ref # E10000 MOBILIZATION, (LUMP SUM) Awd $175, $175, $100, $100, $114, $114, $30, $30, $75, $75, $99, $99, Section 11 - INCIDENTALS - Totals Awd $390, $279, $236, $397, $227, $367, Page 32

33 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID ASD-SR Federal Type: BRIDGE REPAIR Letting Date: 11/2/2017 Completion Date: 6/28/2018 Contract Awarded To: J D WILLIAMSON CONSTRUCTION CO INC Award Amount: $1,169, Engineer's Estimate: $1,235, Bidder 1 J D WILLIAMSON CONSTRUCTION CO INC 441 GENEVA AVE, PO BOX 113 Summit TALLMADGE, OH Bid $1,169, Bidder 3 MILLER BROS CONST INC 1613 S DEFIANCE ST P O BOX 30 Fulton ARCHBOLD, OH Bid $1,271, Bidder 5 GLOBAL OUTDOOR SOLUTIONS 5000 VAN EPPS RD Cuyahoga CLEVELAND, OH Bid $1,392, Bidder 2 SHELLY & SANDS INC 1515 HARMON AVE Franklin COLUMBUS, OH Bid $1,241, Bidder 4 COMPLETE GENERAL CONSTRUCTION COMPANY 1221 EAST FIFTH AVE Franklin COLUMBUS, OH Bid $1,381, Bidder 6 BCC OHIO INC P O BOX 229 Huron NEW LONDON, OH Bid $1,508, Bidder 7 STANLEY MILLER CONSTRUCTION COMPANY 2250 HOWENSTINE DR SE Stark EAST SPARTA, OH Bid $1,706, Page 33

34 Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $4, $4, $ $ $1, $1, $9, $9, $3, $3, $1, $1, $8, $8, Ref #2 202E30000 WALK REMOVED, (1278 SF) Awd $1.25 $1, $0.50 $ $1.75 $2, $2.00 $2, $5.00 $6, $1.00 $1, $2.40 $3, Ref #3 202E32000 CURB REMOVED, (155 FT) Awd $3.50 $ $4.00 $ $5.50 $ $5.00 $ $10.00 $1, $4.84 $ $10.00 $1, Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (60 FT) Awd $12.00 $ $11.00 $ $25.00 $1, $30.00 $1, $10.00 $ $60.15 $3, $25.00 $1, Ref #5 202E38000 GUARDRAIL REMOVED, (213 FT) Awd $2.00 $ $5.00 $1, $1.80 $ $1.84 $ $2.00 $ $1.89 $ $3.00 $ Ref #6 202E58200 INLET REMOVED, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $1, $1, $ $ Page 34

35 Ref #7 203E10000 EXCAVATION, (351 CY) Awd $17.50 $6, $16.00 $5, $40.00 $14, $20.00 $7, $45.00 $15, $13.27 $4, $25.00 $8, Ref #8 203E20000 EMBANKMENT, (2 CY) Awd $16.00 $ $20.00 $ $40.00 $ $50.00 $ $ $ $75.00 $ $ $ Ref #9 204E10000 SUBGRADE COMPACTION, (667 SY) Awd $3.25 $2, $2.00 $1, $1.50 $1, $8.00 $5, $8.00 $5, $2.34 $1, $1.00 $ Ref #10 606E15050 GUARDRAIL, TYPE MGS, (6.25 FT) Awd $24.00 $ $29.00 $ $23.20 $ $23.68 $ $24.00 $ $24.36 $ $25.78 $ Ref #11 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (3 EACH) Awd $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, Ref #12 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH) Awd $2, $4, $2, $4, $1, $3, $1, $3, $2, $4, $2, $4, $2, $4, Page 35

36 Ref #13 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH) Awd $ $1, $ $1, $ $ $ $ $ $ $ $ $ $1, Ref #14 608E " CONCRETE WALK, (861 SF) Awd $6.75 $5, $8.75 $7, $8.50 $7, $13.00 $11, $8.00 $6, $7.35 $6, $10.00 $8, Ref #15 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $ Section 1 - ROADWAY - Totals Awd $29, $26, $36, $46, $48, $29, $42, Ref #16 659E00100 SOIL ANALYSIS TEST, (2 EACH) Awd $ $ $ $ $ $ $ $ $ $1, $52.50 $ $ $ Ref #17 659E00300 TOPSOIL, (21 CY) Awd $31.00 $ $36.00 $ $30.00 $ $50.82 $1, $80.00 $1, $90.00 $1, $25.00 $ Page 36

37 Ref #18 659E10000 SEEDING AND MULCHING, (190 SY) Awd $9.00 $1, $10.00 $1, $8.25 $1, $9.85 $1, $8.00 $1, $8.66 $1, $8.00 $1, Ref #19 659E14000 REPAIR SEEDING AND MULCHING, (10 SY) Awd $0.55 $ $1.00 $ $0.50 $ $0.60 $ $20.00 $ $0.53 $ $1.00 $10.00 Ref #20 659E15000 INTER-SEEDING, (10 SY) Awd $1.00 $ $1.00 $ $0.10 $ $0.12 $ $20.00 $ $0.11 $ $1.00 $10.00 Ref #21 659E20000 COMMERCIAL FERTILIZER, (0.03 TON) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $21.00 Ref #22 659E31000 LIME, (0.04 ACRE) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $8.00 Ref #23 659E35000 WATER, (1 MGAL) Awd $1.00 $ $1.00 $ $1.00 $ $1.19 $ $5.00 $ $1.05 $ $1.00 $ Page 37

38 Ref #24 832E30000 EROSION CONTROL, (4000 EACH) Awd $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, Section 2 - EROSION CONTROL - Totals Awd $7, $7, $6, $7, $8, $7, $6, Ref #25 611E " CONDUIT, TYPE B, (40 FT) Awd $75.00 $3, $ $5, $65.00 $2, $ $6, $75.00 $3, $ $8, $ $4, Ref #26 611E " CONDUIT, TYPE C, (13 FT) Awd $32.50 $ $93.00 $1, $85.00 $1, $ $1, $95.00 $1, $ $1, $ $1, Ref #27 611E98840 INLET, NO. 2-A-6, (2 EACH) Awd $4, $9, $3, $7, $2, $5, $4, $8, $ $1, $5, $10, $2, $4, Section 3 - DRAINAGE - Totals Awd $12, $13, $8, $15, $5, $20, $10, Page 38

39 Ref #28 301E46000 ASPHALT CONCRETE BASE, PG64-22, (99 CY) Awd $ $16, $ $36, $ $15, $ $18, $ $33, $ $31, $ $17, Ref #29 304E20000 AGGREGATE BASE, (107 CY) Awd $52.00 $5, $95.00 $10, $80.00 $8, $70.00 $7, $65.00 $6, $99.07 $10, $ $10, Ref #30 407E10000 TACK COAT, (45 GAL) Awd $2.60 $ $2.00 $ $2.50 $ $5.00 $ $3.00 $ $1.05 $ $2.80 $ Ref #31 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (33 CY) Awd $ $24, $ $23, $ $23, $ $6, $ $23, $ $17, $ $26, Ref #32 609E26000 CURB, TYPE 6, (172 FT) Awd $31.00 $5, $29.00 $4, $24.00 $4, $29.86 $5, $25.00 $4, $23.10 $3, $40.00 $6, Section 4 - PAVEMENT - Totals Awd $51, $74, $52, $37, $68, $63, $61, Page 39

40 Ref #33 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (8 EACH) Awd $8.25 $ $8.00 $ $6.55 $ $6.69 $ $15.00 $ $6.88 $ $7.30 $58.40 Ref #34 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (32 FT) Awd $12.00 $ $21.00 $ $12.50 $ $12.76 $ $15.00 $ $13.13 $ $14.00 $ Ref #35 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (3 EACH) Awd $45.00 $ $49.00 $ $45.00 $ $45.93 $ $50.00 $ $47.25 $ $50.00 $ Ref #36 646E10200 CENTER LINE, (0.26 MILE) Awd $11, $2, $29, $7, $10, $2, $27, $7, $11, $2, $28, $7, $36, $9, Ref #37 646E10500 CROSSWALK LINE, (74 FT) Awd $5.25 $ $13.00 $ $5.00 $ $12.00 $ $7.00 $ $12.60 $ $10.67 $ Ref #38 646E20300 LANE ARROW, (2 EACH) Awd $ $ $ $ $ $ $ $ $25.00 $ $ $ $ $ Page 40

41 Section 5 - TRAFFIC CONTROL - Totals Awd $4, $10, $4, $9, $4, $9, $11, Ref #39 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) 24" WI, (4 EACH) Awd $1, $7, $2, $8, $1, $7, $1, $7, $2, $8, $1, $7, $4, $17, Ref #40 614E12420 DETOUR SIGNING, (LUMP SUM) Awd $4, $4, $4, $4, $4, $4, $4, $4, $6, $6, $4, $4, $4, $4, Ref #41 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (14 EACH) Awd $10.00 $ $8.00 $ $8.00 $ $10.00 $ $10.00 $ $29.14 $ $7.30 $ Ref #42 614E13360 OBJECT MARKER, TWO WAY, (14 EACH) Awd $25.00 $ $14.00 $ $17.00 $ $10.00 $ $18.00 $ $32.57 $ $12.00 $ Ref #43 614E22000 WORK ZONE EDGE LINE, CLASS I, 4", (0.18 MILE) Awd $8, $1, $6, $1, $9, $1, $9, $1, $10, $1, $9, $1, $10, $1, Page 41

42 Ref #44 614E26000 WORK ZONE STOP LINE, CLASS I, (24 FT) Awd $8.50 $ $8.50 $ $9.00 $ $9.00 $ $10.00 $ $9.45 $ $10.00 $ Ref #45 622E41000 PORTABLE BARRIER, 32", (220 FT) Awd $10.00 $2, $14.00 $3, $15.00 $3, $18.00 $3, $18.00 $3, $22.73 $5, $40.00 $8, Ref #46 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (300 FT) Awd $12.00 $3, $15.00 $4, $16.00 $4, $20.00 $6, $18.00 $5, $27.05 $8, $43.00 $12, Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $19, $22, $21, $23, $26, $27, $46, Ref #47 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN,, (LUMP SUM) Awd $155, $155, $65, $65, $175, $175, $170, $170, $165, $165, $285, $285, $228, $228, Ref #48 202E22900 APPROACH SLAB REMOVED, (211 SY) Awd $21.00 $4, $25.00 $5, $28.00 $5, $40.00 $8, $40.00 $8, $62.38 $13, $38.55 $8, Page 42

43 Ref #49 202E23500 WEARING COURSE REMOVED, (775 SY) Awd $17.00 $13, $18.00 $13, $9.15 $7, $16.00 $12, $19.00 $14, $14.90 $11, $10.20 $7, Ref #50 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM) Awd $45, $45, $29, $29, $15, $15, $40, $40, $7, $7, $32, $32, $58, $58, Ref #51 503E21100 UNCLASSIFIED EXCAVATION, (164 CY) Awd $87.00 $14, $82.00 $13, $ $16, $90.00 $14, $85.00 $13, $62.28 $10, $ $25, Ref #52 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (57750 LB) Awd $0.91 $52, $1.00 $57, $1.15 $66, $0.95 $54, $1.10 $63, $1.04 $60, $1.10 $63, Ref #53 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB) Awd $1.70 $ $1.00 $ $1.15 $ $1.00 $ $4.00 $1, $2.04 $ $1.10 $ Ref #54 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (200 EACH) Awd $18.00 $3, $21.00 $4, $18.00 $3, $10.00 $2, $17.00 $3, $25.46 $5, $68.00 $13, Page 43

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND 1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All

More information

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15 COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

Schedule of Pay Items

Schedule of Pay Items Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross

More information

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

OTTAWA COUNTY ROAD COMMISSION Bid Comparison OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG. SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

The Tulalip Tribes of Washington

The Tulalip Tribes of Washington The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of

More information

Federal Project No.: NHPP-967-7(083)

Federal Project No.: NHPP-967-7(083) Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00

More information

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD

More information

PAGE 1 of 18 WEIGHTED AVERAGE

PAGE 1 of 18 WEIGHTED AVERAGE UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201

More information