Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director
|
|
- Sherilyn Pitts
- 5 years ago
- Views:
Transcription
1 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID SCI-US Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date: 10/31/2018 Contract Awarded To: SHELLY COMPANY Award Amount: $1,429, Engineer's Estimate: $1,371, Bidder 1 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH Bid $1,429, Page 1
2 Ref #1 202E23010 PAVEMENT REMOVED, ASPHALT, (90 SY) Awd $16.00 $1, Ref #2 202E30000 WALK REMOVED, (5099 SF) Awd $8.00 $40, Ref #3 202E32000 CURB REMOVED, (1752 FT) Awd $27.00 $47, Ref #4 202E32500 CURB AND GUTTER REMOVED, (20 FT) Awd $ $3, Ref #5 608E " CONCRETE WALK, (99 SF) Awd $18.00 $1, Ref #6 608E52000 CURB RAMP, (5419 SF) Awd $10.50 $56, Section 1 - ROADWAY - Totals Awd $151, Ref #7 616E10000 WATER, (3 MGAL) Awd $1.00 $3.00 Ref #8 659E10000 SEEDING AND MULCHING, (250 SY) Awd $10.00 $2, Ref #9 832E30000 EROSION CONTROL, (1000 EACH) Awd $1.00 $1, Section 2 - EROSION CONTROL - Totals Awd $3, Ref #10 611E98630 CATCH BASIN ADJUSTED TO GRADE, (10 EACH) Awd $ $7, Ref #11 611E99150 INLET ADJUSTED TO GRADE, (10 EACH) Awd $ $7, Ref #12 611E99654 MANHOLE ADJUSTED TO GRADE, (10 EACH) Awd $ $7, Section 3 - DRAINAGE - Totals Awd $21, Ref #13 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN, (801 SY) Awd $46.00 $36, Ref #14 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN 1., (95597 SY) Awd $1.30 $124, Ref #15 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN 3., (3262 SY) Awd $5.25 $17, Ref #16 254E01601 PATCHING PLANED SURFACE, AS PER PLAN, (9559 SY) Awd $2.00 $19, Ref #17 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (516 SY) Awd $ $118, Page 2
3 Ref #18 255E20000 FULL DEPTH PAVEMENT SAWING, (1056 FT) Awd $3.85 $4, Ref #19 407E13900 TACK COAT, , (245 GAL) Awd $2.50 $ Ref #20 407E20000 NON-TRACKING TACK COAT, (7170 GAL) Awd $3.45 $24, Ref #21 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (3860 CY) Awd $ $598, Ref #22 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE, (159 CY) Awd $ $27, Ref #23 609E24511 CURB, TYPE 4-C, AS PER PLAN, (1278 FT) Awd $33.00 $42, Ref # E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (207 CY) Awd $ $32, Section 4 - PAVEMENT - Totals Awd $1,045, Ref #24 644E00104 EDGE LINE, 6", (0.48 MILE) Awd $2, $1, Ref #25 644E00204 LANE LINE, 6", (4.06 MILE) Awd $1, $5, Ref #26 644E00400 CHANNELIZING LINE, 8", (1065 FT) Awd $1.65 $1, Ref #27 644E00500 STOP LINE, (603 FT) Awd $5.15 $3, Ref #28 644E00600 CROSSWALK LINE, (4834 FT) Awd $3.15 $15, Ref #29 644E01300 LANE ARROW, (12 EACH) Awd $75.00 $ Ref #30 644E01410 WORD ON PAVEMENT, 96", (8 EACH) Awd $ $ Section 5 - TRAFFIC CONTROL - Totals Awd $28, Ref #31 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR) Awd $65.00 $5, Ref #32 614E12460 WORK ZONE MARKING SIGN, (76 EACH) Awd $95.00 $7, Ref #33 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (14 SNMT) Awd $1, $23, Ref #34 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT, (3.92 MILE) Awd $1, $6, Ref #35 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA, (590 FT) Awd $0.55 $ Page 3
4 Ref #36 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (503 FT) Awd $2.50 $1, Ref #37 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (4684 FT) Awd $1.50 $7, Ref #38 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (8 EACH) Awd $45.00 $ Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $50, Ref #39 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $8, $8, Ref #40 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $75, $75, Ref #41 619E16000 FIELD OFFICE, TYPE A, (4 MNTH) Awd $1, $5, Ref #42 624E10000 MOBILIZATION, (LUMP SUM) Awd $40, $40, Section 7 - INCIDENTALS - Totals Awd $128, Page 4
5 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID ALL-SR 65/SR /11.34 Federal Type: MINOR WIDENING Letting Date: 11/2/2017 Completion Date: 11/2/2018 Contract Awarded To: SHELLY COMPANY Award Amount: $4,064, Engineer's Estimate: $3,798, Bidder 1 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH Bid $4,064, Bidder 3 HELMS AND SONS EXCAVATING 1753 LIMA AVE Hancock FINDLAY, OH Bid $4,186, Bidder 5 VERNON NAGEL INC O154 CO RD 11-C Henry NAPOLEON, OH Bid $4,315, Bidder 2 MILLER BROS CONST INC 1613 S DEFIANCE ST P O BOX 30 Fulton ARCHBOLD, OH Bid $4,098, Bidder 4 R D JONES EXCAVATING INC ALGER RD P O BOX 127 Allen HARROD, OH Bid $4,271, Bidder 6 VTF EXCAVATION LLC 8398 CELINA-MENDON RD Mercer CELINA, OH Bid $4,385, Page 5
6 Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $60, $60, $50, $50, $7, $7, $150, $150, $5, $5, $21, $21, Ref #2 202E23000 PAVEMENT REMOVED, (12929 SY) Awd $7.50 $96, $9.50 $122, $17.31 $223, $7.75 $100, $18.00 $232, $3.19 $41, Ref #3 202E23500 WEARING COURSE REMOVED, (5610 SY) Awd $5.75 $32, $6.00 $33, $5.50 $30, $6.50 $36, $6.50 $36, $6.61 $37, Ref #4 202E30000 WALK REMOVED, (4315 SF) Awd $1.30 $5, $1.25 $5, $1.56 $6, $1.25 $5, $2.00 $8, $1.38 $5, Ref #5 202E32000 CURB REMOVED, (1100 FT) Awd $10.00 $11, $5.50 $6, $7.60 $8, $2.75 $3, $4.00 $4, $4.14 $4, Ref #6 202E32500 CURB AND GUTTER REMOVED, (204 FT) Awd $13.00 $2, $7.25 $1, $7.84 $1, $3.50 $ $3.00 $ $4.14 $ Ref #7 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (7 SY) Awd $50.00 $ $51.00 $ $81.38 $ $17.00 $ $50.00 $ $41.38 $ Page 6
7 Ref #8 202E35100 PIPE REMOVED, 24" AND UNDER, (2757 FT) Awd $9.00 $24, $11.00 $30, $11.08 $30, $6.00 $16, $10.00 $27, $5.67 $15, Ref #9 202E38000 GUARDRAIL REMOVED, (29 FT) Awd $28.00 $ $10.00 $ $12.25 $ $3.50 $ $8.00 $ $4.80 $ Ref #10 202E52990 SPECIAL - PARKING BLOCK REMOVED, (70 EACH) Awd $5.00 $ $5.00 $ $29.61 $2, $10.00 $ $20.00 $1, $41.14 $2, Ref #11 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET, (8 EACH) Awd $55.00 $ $25.00 $ $62.79 $ $14.00 $ $50.00 $ $ $ Ref #12 202E58100 CATCH BASIN REMOVED, (23 EACH) Awd $ $12, $ $6, $ $6, $ $6, $ $6, $ $6, Ref #13 202E60010 MONUMENT ASSEMBLY REMOVED, (1 EACH) Awd $ $ $ $ $91.83 $ $75.00 $ $ $ $ $ Ref #14 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (231 FT) Awd $35.00 $8, $35.00 $8, $9.93 $2, $11.00 $2, $12.00 $2, $14.77 $3, Page 7
8 Ref #15 202E75000 FENCE REMOVED, (144 FT) Awd $7.00 $1, $6.25 $ $8.88 $1, $4.00 $ $5.00 $ $1.48 $ Ref #16 202E98100 REMOVAL MISC.: BUSINESS SIGN REMOVED, (5 EACH) Awd $ $2, $ $1, $ $1, $ $1, $ $1, $ $ Ref #17 202E98100 REMOVAL MISC.: CONCRETE FOUNDATION REMOVED, (11 EACH) Awd $ $3, $ $3, $ $1, $ $7, $ $5, $ $2, Ref #18 202E98100 REMOVAL MISC.: CONCRETE POST REMOVED, (2 EACH) Awd $ $ $ $ $35.43 $ $ $ $ $ $ $ Ref #19 202E98100 REMOVAL MISC.: FLAG POLE REMOVED, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref #20 202E98100 REMOVAL MISC.: LIGHT POLE REMOVED, (2 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref #21 202E98100 REMOVAL MISC.: SIGN POST REMOVED, (5 EACH) Awd $ $ $ $ $35.60 $ $ $ $ $ $ $ Page 8
9 Ref #22 202E98100 REMOVAL MISC.: STEEL POST REMOVED, (10 EACH) Awd $50.00 $ $90.00 $ $ $1, $ $1, $ $1, $ $1, Ref #23 202E98100 REMOVAL MISC.: WOOD POST REMOVED, (1 EACH) Awd $ $ $ $ $36.30 $ $25.00 $ $ $ $82.76 $82.76 Ref #24 202E98200 REMOVAL MISC.: LANDSCAPING BRICK REMOVED, (20 FT) Awd $15.00 $ $15.00 $ $2.68 $ $2.50 $ $4.00 $ $2.64 $52.80 Ref #25 203E10000 EXCAVATION, (3691 CY) Awd $21.50 $79, $18.00 $66, $16.71 $61, $17.50 $64, $20.00 $73, $20.52 $75, Ref #26 203E20000 EMBANKMENT, (2137 CY) Awd $25.00 $53, $18.00 $38, $13.46 $28, $10.00 $21, $13.00 $27, $14.27 $30, Ref #27 203E98100 ROADWAY, MISC.: DECORATIVE STONE, (1010 SY) Awd $24.00 $24, $28.00 $28, $14.50 $14, $15.00 $15, $60.00 $60, $10.23 $10, Ref #28 204E10000 SUBGRADE COMPACTION, (12085 SY) Awd $1.00 $12, $1.65 $19, $1.61 $19, $2.25 $27, $1.00 $12, $0.91 $10, Page 9
10 Ref #29 204E45000 PROOF ROLLING, (4 HOUR) Awd $ $ $85.00 $ $ $ $ $ $ $ $96.21 $ Ref #30 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING, (6.13 STA) Awd $30.00 $ $ $1, $ $1, $ $5, $ $1, $ $1, Ref #31 608E " CONCRETE WALK, (12314 SF) Awd $5.50 $67, $5.21 $64, $4.56 $56, $6.50 $80, $6.50 $80, $5.65 $69, Ref #32 608E " CONCRETE WALK, (17844 SF) Awd $6.50 $115, $6.06 $108, $5.36 $95, $7.75 $138, $7.75 $138, $6.85 $122, Ref #33 608E52001 CURB RAMP, AS PER PLAN, (3680 SF) Awd $7.45 $27, $8.80 $32, $13.36 $49, $13.00 $47, $12.00 $44, $11.03 $40, Ref #34 608E53020 DETECTABLE WARNING, (40 SF) Awd $24.00 $ $24.00 $ $40.00 $1, $40.00 $1, $24.00 $ $28.86 $1, Ref #35 623E38501 MONUMENT ASSEMBLY, AS PER PLAN, (3 EACH) Awd $1, $3, $ $1, $ $2, $ $ $1, $4, $ $2, Page 10
11 Ref #36 690E50000 SPECIAL - MAILBOX SUPPORT, (10 EACH) Awd $ $2, $ $2, $ $1, $80.00 $ $ $2, $ $3, Ref #37 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (10 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Section 1 - ROADWAY - Totals Awd $655, $641, $662, $740, $785, $517, Ref #38 659E00300 TOPSOIL, (274 CY) Awd $40.00 $10, $65.00 $17, $52.58 $14, $33.00 $9, $50.00 $13, $36.00 $9, Ref #39 659E10000 SEEDING AND MULCHING, (11691 SY) Awd $0.80 $9, $0.80 $9, $0.80 $9, $1.75 $20, $0.80 $9, $2.44 $28, Ref #40 659E20000 COMMERCIAL FERTILIZER, (1.57 TON) Awd $ $ $ $ $ $ $ $1, $ $ $ $1, Ref #41 659E35000 WATER, (64 MGAL) Awd $1.00 $ $1.00 $ $1.00 $ $20.00 $1, $1.00 $ $12.03 $ Page 11
12 Ref #42 670E00500 SLOPE EROSION PROTECTION, (2458 SY) Awd $1.90 $4, $1.90 $4, $1.90 $4, $2.25 $5, $3.00 $7, $3.01 $7, Ref #43 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM) Awd $2, $2, $30, $30, $40, $40, $44, $44, $35, $35, $5, $5, Ref #44 832E30000 EROSION CONTROL, (50000 EACH) Awd $1.00 $50, $1.00 $50, $1.00 $50, $1.00 $50, $1.00 $50, $1.00 $50, Ref # E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM) Awd $3, $3, $2, $2, $ $ $2, $2, $1, $1, $1, $1, Section 2 - EROSION CONTROL - Totals Awd $81, $114, $121, $133, $117, $104, Ref #45 605E " BASE PIPE UNDERDRAINS, (6867 FT) Awd $10.00 $68, $8.00 $54, $7.30 $50, $8.50 $58, $12.00 $82, $8.35 $57, Ref #46 611E " CONDUIT, TYPE F FOR UNDERDRAIN OUTLET, (301 FT) Awd $18.00 $5, $22.25 $6, $7.30 $2, $7.30 $2, $20.00 $6, $12.60 $3, Page 12
13 Ref #47 611E " CONDUIT, TYPE C, (115 FT) Awd $15.00 $1, $17.00 $1, $14.14 $1, $14.50 $1, $45.00 $5, $13.82 $1, Ref #48 611E " CONDUIT, TYPE B, (80 FT) Awd $25.00 $2, $23.50 $1, $17.07 $1, $30.00 $2, $65.00 $5, $30.97 $2, Ref #49 611E " CONDUIT, TYPE C, (52 FT) Awd $30.00 $1, $29.00 $1, $49.03 $2, $23.00 $1, $32.00 $1, $31.23 $1, Ref #50 611E " CONDUIT, TYPE C, (10 FT) Awd $80.00 $ $51.00 $ $88.32 $ $24.00 $ $35.00 $ $55.07 $ Ref #51 611E " CONDUIT, TYPE B, (2586 FT) Awd $58.00 $149, $71.50 $184, $78.17 $202, $48.00 $124, $75.00 $193, $55.51 $143, Ref #52 611E " CONDUIT, TYPE C, (1987 FT) Awd $48.00 $95, $47.00 $93, $60.25 $119, $38.00 $75, $36.00 $71, $45.26 $89, Ref #53 611E " CONDUIT, TYPE B, (293 FT) Awd $68.00 $19, $ $30, $86.73 $25, $53.00 $15, $80.00 $23, $56.44 $16, Page 13
14 Ref #54 611E " CONDUIT, TYPE C, (586 FT) Awd $55.00 $32, $65.00 $38, $55.35 $32, $40.00 $23, $40.00 $23, $44.67 $26, Ref #55 611E " CONDUIT, TYPE B, (278 FT) Awd $73.00 $20, $86.00 $23, $64.60 $17, $65.00 $18, $85.00 $23, $59.14 $16, Ref #56 611E " CONDUIT, TYPE C, (139 FT) Awd $68.00 $9, $66.00 $9, $56.26 $7, $44.00 $6, $45.00 $6, $38.97 $5, Ref #57 611E " CONDUIT, TYPE B, (222 FT) Awd $82.00 $18, $ $28, $ $23, $85.00 $18, $ $22, $86.15 $19, Ref #58 611E " CONDUIT, TYPE C, (29 FT) Awd $ $4, $ $4, $ $3, $78.00 $2, $60.00 $1, $ $3, Ref #59 611E " CONDUIT, TYPE B, (360 FT) Awd $ $54, $ $56, $ $48, $ $49, $ $61, $ $44, Ref #60 611E " CONDUIT, TYPE C, (173 FT) Awd $ $25, $ $27, $ $22, $ $22, $ $19, $ $21, Page 14
15 Ref #61 611E96600 CONDUIT, BORED OR JACKED, 12" TYPE B, (47 FT) Awd $ $19, $ $14, $ $18, $ $17, $ $14, $ $18, Ref #62 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN, 15" TYPE B, (38 FT) Awd $ $17, $ $13, $ $18, $ $12, $ $14, $ $22, Ref #63 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN, 18" TYPE B, (45 FT) Awd $ $20, $ $15, $ $20, $ $14, $ $15, $ $25, Ref #64 611E97200 CONDUIT, MISC.: CONCRETE SADDLE, (2 EACH) Awd $2, $4, $1, $2, $ $ $ $ $ $1, $ $ Ref #65 611E97400 CONDUIT, MISC.: SANITARY SEWER SERVICE CONNECTIONS, (100 FT) Awd $50.00 $5, $20.00 $2, $17.08 $1, $35.00 $3, $80.00 $8, $16.60 $1, Ref #66 611E98190 CATCH BASIN, NO. 3A WITH DIAGONAL GRATE, (7 EACH) Awd $2, $16, $2, $18, $1, $12, $2, $18, $3, $22, $2, $17, Ref #67 611E98191 CATCH BASIN, NO. 3A WITH DIAGONAL GRATE, AS PER PL, (21 EACH) Awd $2, $58, $3, $69, $1, $38, $2, $55, $3, $63, $2, $53, Page 15
16 Ref #68 611E98371 CATCH BASIN, NO. 6, AS PER PLAN, (2 EACH) Awd $2, $5, $2, $4, $2, $4, $2, $4, $2, $5, $3, $6, Ref #69 611E98470 CATCH BASIN, NO. 2-2B, (5 EACH) Awd $1, $6, $1, $7, $1, $6, $1, $8, $1, $7, $1, $7, Ref #70 611E98510 CATCH BASIN, NO. 2-3, (3 EACH) Awd $1, $5, $1, $5, $1, $3, $2, $6, $2, $6, $1, $4, Ref #71 611E98700 INLET, SIDE DITCH, (9 EACH) Awd $ $8, $1, $9, $1, $13, $1, $15, $1, $16, $1, $13, Ref #72 611E98701 INLET, SIDE DITCH, AS PER PLAN, (3 EACH) Awd $ $2, $1, $5, $1, $4, $1, $5, $1, $5, $1, $4, Ref #73 611E99574 MANHOLE, NO. 3, (20 EACH) Awd $2, $50, $3, $68, $4, $83, $2, $50, $6, $120, $5, $101, Ref #74 611E99575 MANHOLE, NO. 3, AS PER PLAN, (1 EACH) Awd $3, $3, $3, $3, $3, $3, $2, $2, $6, $6, $5, $5, Page 16
17 Ref #75 611E99654 MANHOLE ADJUSTED TO GRADE, (7 EACH) Awd $1, $8, $ $6, $ $3, $ $5, $ $5, $1, $10, Ref #76 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (5 EACH) Awd $1, $7, $1, $7, $ $2, $ $4, $1, $7, $1, $9, Ref #77 611E99720 INSPECTION WELL, (4 EACH) Awd $ $3, $ $ $ $3, $ $2, $ $1, $ $3, Section 3 - DRAINAGE - Totals Awd $753, $817, $800, $649, $868, $759, Ref #78 253E02000 PAVEMENT REPAIR, (380 CY) Awd $ $96, $ $136, $ $134, $ $106, $ $152, $ $119, Ref #79 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/2" DEPTH, (57366 SY) Awd $0.90 $51, $1.25 $71, $1.25 $71, $1.40 $80, $0.95 $54, $1.50 $86, Ref #80 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/4" DEPTH, (527 SY) Awd $1.05 $ $1.35 $ $1.35 $ $1.85 $ $1.30 $ $1.62 $ Page 17
18 Ref #81 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2-1/4" DEPTH, (37570 SY) Awd $0.80 $30, $1.40 $52, $1.40 $52, $1.60 $60, $1.30 $48, $1.68 $63, Ref #82 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V, (9433 SY) Awd $2.35 $22, $3.35 $31, $3.35 $31, $3.80 $35, $3.25 $30, $4.03 $38, Ref #83 254E01600 PATCHING PLANED SURFACE, (1908 SY) Awd $10.00 $19, $3.00 $5, $10.63 $20, $3.50 $6, $3.00 $5, $12.03 $22, Ref #84 301E46000 ASPHALT CONCRETE BASE, PG64-22, (1467 CY) Awd $ $220, $ $236, $ $233, $ $227, $ $256, $ $268, Ref #85 304E20000 AGGREGATE BASE, (2830 CY) Awd $50.00 $141, $58.00 $164, $54.39 $153, $32.00 $90, $50.00 $141, $46.19 $130, Ref #86 407E20000 NON-TRACKING TACK COAT, (12867 GAL) Awd $1.95 $25, $1.90 $24, $2.07 $26, $2.00 $25, $1.90 $24, $2.35 $30, Ref #87 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (446, (713 CY) Awd $ $99, $ $101, $ $106, $ $110, $ $103, $ $120, Page 18
19 Ref #88 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (1695 CY) Awd $ $296, $ $296, $ $315, $ $288, $ $296, $ $356, Ref #89 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (1044 CY) Awd $ $148, $ $149, $ $157, $ $161, $ $149, $ $178, Ref #90 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (3026 CY) Awd $ $490, $ $469, $ $520, $ $544, $ $453, $ $589, Ref #91 451E " REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS PER, (159 SY) Awd $69.55 $11, $68.00 $10, $83.78 $13, $88.00 $13, $95.00 $15, $95.99 $15, Ref #92 452E " NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (267 SY) Awd $46.20 $12, $56.00 $14, $57.62 $15, $63.00 $16, $68.00 $18, $64.68 $17, Ref #93 452E " NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (794 SY) Awd $55.60 $44, $56.00 $44, $64.87 $51, $73.25 $58, $78.00 $61, $76.36 $60, Ref #94 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (5464 FT) Awd $18.50 $101, $17.50 $95, $19.05 $104, $21.50 $117, $17.50 $95, $21.74 $118, Page 19
20 Ref #95 609E26000 CURB, TYPE 6, (2269 FT) Awd $16.25 $36, $15.25 $34, $18.60 $42, $22.35 $50, $19.00 $43, $18.59 $42, Ref #96 609E " CONCRETE TRAFFIC ISLAND, (20 SY) Awd $54.00 $1, $66.50 $1, $81.78 $1, $ $2, $70.00 $1, $92.52 $1, Ref #97 617E10100 COMPACTED AGGREGATE, (400 CY) Awd $57.00 $22, $55.00 $22, $54.39 $21, $65.00 $26, $65.00 $26, $41.25 $16, Section 4 - PAVEMENT - Totals Awd $1,870, $1,964, $2,075, $2,024, $1,979, $2,276, Ref #98 625E25900 CONDUIT, JACKED OR DRILLED, 1", (60 FT) Awd $23.00 $1, $10.00 $ $29.85 $1, $29.00 $1, $35.00 $2, $17.72 $1, Ref #99 625E25900 CONDUIT, JACKED OR DRILLED, 2", (120 FT) Awd $23.00 $2, $10.00 $1, $38.57 $4, $26.75 $3, $35.00 $4, $22.15 $2, Ref # E25900 CONDUIT, JACKED OR DRILLED, 3/4", (720 FT) Awd $23.00 $16, $10.00 $7, $28.63 $20, $6.25 $4, $25.00 $18, $22.15 $15, Page 20
21 Ref # E10800 VALVE BOX ADJUSTED TO GRADE, (7 EACH) Awd $ $5, $ $2, $ $1, $57.25 $ $ $1, $ $4, Ref # E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (9 EACH) Awd $ $6, $ $7, $ $1, $66.75 $ $ $5, $ $5, Ref # E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN, (20 EACH) Awd $ $8, $ $5, $ $4, $59.00 $1, $60.00 $1, $75.93 $1, Ref # E20766 SPECIAL - 3/4" COPPER WATER SERVICE LINE (LIMA-GEN, (720 FT) Awd $6.75 $4, $11.00 $7, $15.05 $10, $13.25 $9, $27.00 $19, $4.25 $3, Ref # E20770 SPECIAL - 1" COPPER WATER SERVICE LINE (LIMA-GENER, (60 FT) Awd $8.00 $ $13.50 $ $15.89 $ $24.50 $1, $30.00 $1, $5.52 $ Ref # E20778 SPECIAL - 2" COPPER WATER SERVICE LINE (LIMA-GENER, (120 FT) Awd $16.00 $1, $19.50 $2, $25.15 $3, $23.50 $2, $43.00 $5, $13.95 $1, Ref # E98000 WATER WORK, MISC.: CURB METER SET (LIMA-GENERAL SP, (13 EACH) Awd $ $9, $ $9, $ $8, $1, $13, $1, $15, $ $11, Page 21
22 Section 5 - WATER WORK - Totals Awd $57, $43, $58, $39, $74, $47, Ref # E00100 RPM, (316 EACH) Awd $27.00 $8, $26.25 $8, $27.52 $8, $31.55 $9, $23.00 $7, $27.84 $8, Ref # E54000 RAISED PAVEMENT MARKER REMOVED, (155 EACH) Awd $5.00 $ $5.00 $ $5.00 $ $6.00 $ $12.50 $1, $6.01 $ Ref # E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (542 FT) Awd $9.00 $4, $10.00 $5, $9.40 $5, $11.25 $6, $10.50 $5, $12.03 $6, Ref # E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (68 FT) Awd $10.25 $ $12.00 $ $10.70 $ $24.00 $1, $12.50 $ $14.43 $ Ref # E08600 SIGN POST REFLECTOR, (5 EACH) Awd $35.00 $ $40.00 $ $36.54 $ $39.00 $ $85.00 $ $14.43 $72.15 Ref # E80100 SIGN, FLAT SHEET, (167 SF) Awd $15.00 $2, $18.00 $3, $15.66 $2, $20.75 $3, $18.00 $3, $21.65 $3, Page 22
23 Ref # E80500 SIGN, DOUBLE FACED, STREET NAME, (10 EACH) Awd $85.00 $ $ $1, $88.73 $ $94.00 $ $ $1, $ $1, Ref # E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (33 EACH) Awd $10.00 $ $15.00 $ $35.71 $1, $19.00 $ $15.00 $ $18.04 $ Ref # E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (7 EACH) Awd $45.00 $ $65.00 $ $71.34 $ $74.00 $ $50.00 $ $78.17 $ Ref # E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (43 EACH) Awd $10.00 $ $20.00 $ $35.72 $1, $15.00 $ $15.00 $ $24.05 $1, Ref # E00094 EDGE LINE, 6", (8.35 MILE) Awd $ $5, $ $6, $ $5, $ $6, $ $5, $ $7, Ref # E00290 CENTER LINE, (5.57 MILE) Awd $ $4, $ $5, $1, $6, $ $4, $1, $6, $1, $6, Ref # E00400 CHANNELIZING LINE, 8", (1408 FT) Awd $2.00 $2, $1.15 $1, $1.60 $2, $2.25 $3, $2.10 $2, $1.38 $1, Page 23
24 Ref # E00500 STOP LINE, (364 FT) Awd $6.00 $2, $4.65 $1, $5.95 $2, $6.65 $2, $8.25 $3, $5.59 $2, Ref # E00600 CROSSWALK LINE, (1273 FT) Awd $5.00 $6, $2.55 $3, $3.00 $3, $5.55 $7, $3.00 $3, $3.07 $3, Ref # E00700 TRANSVERSE/DIAGONAL LINE, (426 FT) Awd $6.00 $2, $4.50 $1, $5.85 $2, $6.65 $2, $6.00 $2, $5.41 $2, Ref # E00900 ISLAND MARKING, (56 SF) Awd $4.00 $ $2.50 $ $2.95 $ $4.45 $ $4.00 $ $3.01 $ Ref # E01100 SCHOOL SYMBOL MARKING, 72", (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E01300 LANE ARROW, (32 EACH) Awd $90.00 $2, $75.00 $2, $84.00 $2, $95.00 $3, $98.00 $3, $90.19 $2, Section 6 - TRAFFIC CONTROL - Totals Awd $46, $44, $48, $55, $50, $52, Page 24
25 Ref # E25300 CONDUIT, 1-1/2", , (100 FT) Awd $2.77 $ $2.77 $ $2.77 $ $3.00 $ $2.75 $ $3.33 $ Ref # E25400 CONDUIT, 2", , (6 FT) Awd $10.66 $ $10.06 $ $10.06 $ $11.15 $ $10.00 $ $12.10 $72.60 Ref # E25506 CONDUIT, 3", , (17 FT) Awd $20.70 $ $20.70 $ $20.70 $ $23.00 $ $20.50 $ $24.89 $ Ref # E25910 CONDUIT CLEANED AND CABLES REMOVED, (75 FT) Awd $10.35 $ $10.35 $ $10.35 $ $11.50 $ $10.35 $ $12.45 $ Ref # E29002 TRENCH, 24" DEEP, (123 FT) Awd $6.90 $ $6.90 $ $6.90 $ $7.75 $ $7.00 $ $8.30 $1, Ref # E30700 PULL BOX, , 18", (2 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $1, $2, Ref # E30706 PULL BOX, , 24", (1 EACH) Awd $ $ $ $ $ $ $1, $1, $ $ $1, $1, Page 25
26 Ref # E31511 PULL BOX REMOVED, AS PER PLAN, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E32000 GROUND ROD, (3 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E03900 VEHICULAR SIGNAL HEAD, INSTALLATION ONLY, (2 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Ref # E25000 COVERING OF VEHICULAR SIGNAL HEAD, (6 EACH) Awd $60.95 $ $60.95 $ $60.95 $ $67.00 $ $60.00 $ $73.30 $ Ref # E26500 DETECTOR LOOP, (3 EACH) Awd $1, $4, $1, $4, $1, $4, $1, $4, $1, $4, $1, $5, Ref # E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES, (92 FT) Awd $12.94 $1, $12.94 $1, $12.94 $1, $14.00 $1, $13.00 $1, $15.56 $1, Ref # E30500 MESSENGER WIRE, MISC.: UNLASH AND RELASH MESSENGER, (92 FT) Awd $18.40 $1, $18.40 $1, $18.40 $1, $20.00 $1, $18.50 $1, $22.13 $2, Page 26
27 Ref # E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (180 FT) Awd $2.47 $ $2.47 $ $2.47 $ $2.75 $ $2.50 $ $2.97 $ Ref # E64000 STRAIN POLE FOUNDATION, (1 EACH) Awd $2, $2, $2, $2, $2, $2, $3, $3, $2, $2, $3, $3, Ref # E64010 SIGNAL SUPPORT FOUNDATION, (1 EACH) Awd $2, $2, $2, $2, $2, $2, $3, $3, $3, $3, $3, $3, Ref # E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A, (403 FT) Awd $2.02 $ $2.02 $ $2.02 $ $2.25 $ $2.00 $ $2.43 $ Ref # E67200 POWER CABLE, 2 CONDUCTOR, NO. 8 AWG, (31 FT) Awd $6.33 $ $6.33 $ $6.33 $ $7.00 $ $6.40 $ $7.61 $ Ref # E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG, (101 FT) Awd $6.61 $ $6.61 $ $6.61 $ $7.00 $ $6.60 $ $7.95 $ Ref # E70001 POWER SERVICE, AS PER PLAN, (1 EACH) Awd $2, $2, $2, $2, $2, $2, $2, $2, $2, $2, $2, $2, Page 27
28 Ref # E70401 CONDUIT RISER, 2" DIAMETER, AS PER PLAN, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E82600 STRAIN POLE, TYPE TC-81.10, DESIGN 6, (1 EACH) Awd $4, $4, $4, $4, $4, $4, $4, $4, $4, $4, $5, $5, Ref # E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, (1 EACH) Awd $3, $3, $3, $3, $3, $3, $3, $3, $3, $3, $4, $4, Ref # E90206 REUSE OF SIGNAL SUPPORT, (1 EACH) Awd $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, Ref # E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH) Awd $17, $17, $17, $17, $17, $17, $19, $19, $17, $17, $21, $21, Ref # E67200 CONTROLLER WORK PAD, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E31600 PULL BOX, MISC.:ADJUST TO GRADE, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Page 28
29 Ref # E39520 PULL BOX CLEANED, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Section 7 - TRAFFIC SIGNALS - Totals Awd $53, $53, $53, $59, $53, $64, Ref # E40080 DECIDUOUS TREE, 2" CALIPER, SKYCOLE-SKYLINE HONEYL, (3 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Ref # E40080 DECIDUOUS TREE, 2" CALIPER, ULMUS-PATRIOT ELM, BAL, (4 EACH) Awd $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, Section 8 - LANDSCAPING - Totals Awd $3, $3, $3, $4, $3, $3, Ref # E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (44 HOUR) Awd $60.00 $2, $65.00 $2, $50.00 $2, $93.00 $4, $65.00 $2, $ $6, Ref # E12460 WORK ZONE MARKING SIGN, (49 EACH) Awd $95.00 $4, $ $5, $ $6, $ $6, $95.00 $4, $ $6, Page 29
30 Ref # E12500 REPLACEMENT SIGN, (5 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Ref # E12600 REPLACEMENT DRUM, (20 EACH) Awd $60.00 $1, $50.00 $1, $ $2, $65.00 $1, $60.00 $1, $60.13 $1, Ref # E21400 WORK ZONE CENTER LINE, CLASS II, (5.75 MILE) Awd $ $4, $ $4, $ $4, $ $1, $ $5, $ $5, Ref # E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT, (2.4 MILE) Awd $3, $7, $ $2, $ $2, $3, $8, $1, $3, $1, $2, Ref # E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER, (28 SY) Awd $ $5, $ $7, $ $3, $ $3, $ $7, $ $3, Ref # E10000 WATER, (24 MGAL) Awd $45.00 $1, $80.00 $1, $1.10 $ $5.00 $ $1.00 $ $1.20 $28.80 Section 9 - MAINTENANCE OF TRAFFIC - Totals Awd $27, $25, $20, $25, $26, $25, Page 30
31 Ref # E65000 SPECIAL - WORK INVOLVING NON-REGULATED MATERIALS, (1500 TON) Awd $13.50 $20, $30.00 $45, $7.53 $11, $15.00 $22, $42.00 $63, $21.25 $31, Ref # E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (1500 TON) Awd $69.03 $103, $35.00 $52, $59.38 $89, $78.00 $117, $42.00 $63, $88.03 $132, Ref # E65022 SPECIAL - WORK INVOLVING NON-REGULATED WATER, (150 GAL) Awd $3.10 $ $35.00 $5, $13.43 $2, $6.00 $ $6.00 $ $6.26 $ Ref # E65024 SPECIAL - WORK INVOLVING REGULATED WATER, (150 GAL) Awd $5.15 $ $50.00 $7, $9.60 $1, $8.00 $1, $6.00 $ $8.71 $1, Section 10 - ENVIRONMENTAL / REMEDIATION - Totals Awd $125, $110, $103, $141, $127, $166, Ref # E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $15, $15, $20, $20, $26, $26, $31, $31, $30, $30, $21, $21, Ref # E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS, (LUMP SUM) Awd $2, $2, $1, $1, $7, $7, $40, $40, $1, $1, $3, $3, Page 31
32 Ref # E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM) Awd $130, $130, $100, $100, $51, $51, $210, $210, $75, $75, $168, $168, Ref # E16010 FIELD OFFICE, TYPE B, (9 MNTH) Awd $2, $22, $1, $13, $1, $16, $4, $39, $2, $18, $1, $17, Ref # E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM) Awd $45, $45, $45, $45, $20, $20, $47, $47, $28, $28, $58, $58, Ref # E10000 MOBILIZATION, (LUMP SUM) Awd $175, $175, $100, $100, $114, $114, $30, $30, $75, $75, $99, $99, Section 11 - INCIDENTALS - Totals Awd $390, $279, $236, $397, $227, $367, Page 32
33 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID ASD-SR Federal Type: BRIDGE REPAIR Letting Date: 11/2/2017 Completion Date: 6/28/2018 Contract Awarded To: J D WILLIAMSON CONSTRUCTION CO INC Award Amount: $1,169, Engineer's Estimate: $1,235, Bidder 1 J D WILLIAMSON CONSTRUCTION CO INC 441 GENEVA AVE, PO BOX 113 Summit TALLMADGE, OH Bid $1,169, Bidder 3 MILLER BROS CONST INC 1613 S DEFIANCE ST P O BOX 30 Fulton ARCHBOLD, OH Bid $1,271, Bidder 5 GLOBAL OUTDOOR SOLUTIONS 5000 VAN EPPS RD Cuyahoga CLEVELAND, OH Bid $1,392, Bidder 2 SHELLY & SANDS INC 1515 HARMON AVE Franklin COLUMBUS, OH Bid $1,241, Bidder 4 COMPLETE GENERAL CONSTRUCTION COMPANY 1221 EAST FIFTH AVE Franklin COLUMBUS, OH Bid $1,381, Bidder 6 BCC OHIO INC P O BOX 229 Huron NEW LONDON, OH Bid $1,508, Bidder 7 STANLEY MILLER CONSTRUCTION COMPANY 2250 HOWENSTINE DR SE Stark EAST SPARTA, OH Bid $1,706, Page 33
34 Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $4, $4, $ $ $1, $1, $9, $9, $3, $3, $1, $1, $8, $8, Ref #2 202E30000 WALK REMOVED, (1278 SF) Awd $1.25 $1, $0.50 $ $1.75 $2, $2.00 $2, $5.00 $6, $1.00 $1, $2.40 $3, Ref #3 202E32000 CURB REMOVED, (155 FT) Awd $3.50 $ $4.00 $ $5.50 $ $5.00 $ $10.00 $1, $4.84 $ $10.00 $1, Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (60 FT) Awd $12.00 $ $11.00 $ $25.00 $1, $30.00 $1, $10.00 $ $60.15 $3, $25.00 $1, Ref #5 202E38000 GUARDRAIL REMOVED, (213 FT) Awd $2.00 $ $5.00 $1, $1.80 $ $1.84 $ $2.00 $ $1.89 $ $3.00 $ Ref #6 202E58200 INLET REMOVED, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $1, $1, $ $ Page 34
35 Ref #7 203E10000 EXCAVATION, (351 CY) Awd $17.50 $6, $16.00 $5, $40.00 $14, $20.00 $7, $45.00 $15, $13.27 $4, $25.00 $8, Ref #8 203E20000 EMBANKMENT, (2 CY) Awd $16.00 $ $20.00 $ $40.00 $ $50.00 $ $ $ $75.00 $ $ $ Ref #9 204E10000 SUBGRADE COMPACTION, (667 SY) Awd $3.25 $2, $2.00 $1, $1.50 $1, $8.00 $5, $8.00 $5, $2.34 $1, $1.00 $ Ref #10 606E15050 GUARDRAIL, TYPE MGS, (6.25 FT) Awd $24.00 $ $29.00 $ $23.20 $ $23.68 $ $24.00 $ $24.36 $ $25.78 $ Ref #11 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (3 EACH) Awd $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, Ref #12 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH) Awd $2, $4, $2, $4, $1, $3, $1, $3, $2, $4, $2, $4, $2, $4, Page 35
36 Ref #13 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH) Awd $ $1, $ $1, $ $ $ $ $ $ $ $ $ $1, Ref #14 608E " CONCRETE WALK, (861 SF) Awd $6.75 $5, $8.75 $7, $8.50 $7, $13.00 $11, $8.00 $6, $7.35 $6, $10.00 $8, Ref #15 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $ Section 1 - ROADWAY - Totals Awd $29, $26, $36, $46, $48, $29, $42, Ref #16 659E00100 SOIL ANALYSIS TEST, (2 EACH) Awd $ $ $ $ $ $ $ $ $ $1, $52.50 $ $ $ Ref #17 659E00300 TOPSOIL, (21 CY) Awd $31.00 $ $36.00 $ $30.00 $ $50.82 $1, $80.00 $1, $90.00 $1, $25.00 $ Page 36
37 Ref #18 659E10000 SEEDING AND MULCHING, (190 SY) Awd $9.00 $1, $10.00 $1, $8.25 $1, $9.85 $1, $8.00 $1, $8.66 $1, $8.00 $1, Ref #19 659E14000 REPAIR SEEDING AND MULCHING, (10 SY) Awd $0.55 $ $1.00 $ $0.50 $ $0.60 $ $20.00 $ $0.53 $ $1.00 $10.00 Ref #20 659E15000 INTER-SEEDING, (10 SY) Awd $1.00 $ $1.00 $ $0.10 $ $0.12 $ $20.00 $ $0.11 $ $1.00 $10.00 Ref #21 659E20000 COMMERCIAL FERTILIZER, (0.03 TON) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $21.00 Ref #22 659E31000 LIME, (0.04 ACRE) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $8.00 Ref #23 659E35000 WATER, (1 MGAL) Awd $1.00 $ $1.00 $ $1.00 $ $1.19 $ $5.00 $ $1.05 $ $1.00 $ Page 37
38 Ref #24 832E30000 EROSION CONTROL, (4000 EACH) Awd $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, $1.00 $4, Section 2 - EROSION CONTROL - Totals Awd $7, $7, $6, $7, $8, $7, $6, Ref #25 611E " CONDUIT, TYPE B, (40 FT) Awd $75.00 $3, $ $5, $65.00 $2, $ $6, $75.00 $3, $ $8, $ $4, Ref #26 611E " CONDUIT, TYPE C, (13 FT) Awd $32.50 $ $93.00 $1, $85.00 $1, $ $1, $95.00 $1, $ $1, $ $1, Ref #27 611E98840 INLET, NO. 2-A-6, (2 EACH) Awd $4, $9, $3, $7, $2, $5, $4, $8, $ $1, $5, $10, $2, $4, Section 3 - DRAINAGE - Totals Awd $12, $13, $8, $15, $5, $20, $10, Page 38
39 Ref #28 301E46000 ASPHALT CONCRETE BASE, PG64-22, (99 CY) Awd $ $16, $ $36, $ $15, $ $18, $ $33, $ $31, $ $17, Ref #29 304E20000 AGGREGATE BASE, (107 CY) Awd $52.00 $5, $95.00 $10, $80.00 $8, $70.00 $7, $65.00 $6, $99.07 $10, $ $10, Ref #30 407E10000 TACK COAT, (45 GAL) Awd $2.60 $ $2.00 $ $2.50 $ $5.00 $ $3.00 $ $1.05 $ $2.80 $ Ref #31 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (33 CY) Awd $ $24, $ $23, $ $23, $ $6, $ $23, $ $17, $ $26, Ref #32 609E26000 CURB, TYPE 6, (172 FT) Awd $31.00 $5, $29.00 $4, $24.00 $4, $29.86 $5, $25.00 $4, $23.10 $3, $40.00 $6, Section 4 - PAVEMENT - Totals Awd $51, $74, $52, $37, $68, $63, $61, Page 39
40 Ref #33 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (8 EACH) Awd $8.25 $ $8.00 $ $6.55 $ $6.69 $ $15.00 $ $6.88 $ $7.30 $58.40 Ref #34 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (32 FT) Awd $12.00 $ $21.00 $ $12.50 $ $12.76 $ $15.00 $ $13.13 $ $14.00 $ Ref #35 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (3 EACH) Awd $45.00 $ $49.00 $ $45.00 $ $45.93 $ $50.00 $ $47.25 $ $50.00 $ Ref #36 646E10200 CENTER LINE, (0.26 MILE) Awd $11, $2, $29, $7, $10, $2, $27, $7, $11, $2, $28, $7, $36, $9, Ref #37 646E10500 CROSSWALK LINE, (74 FT) Awd $5.25 $ $13.00 $ $5.00 $ $12.00 $ $7.00 $ $12.60 $ $10.67 $ Ref #38 646E20300 LANE ARROW, (2 EACH) Awd $ $ $ $ $ $ $ $ $25.00 $ $ $ $ $ Page 40
41 Section 5 - TRAFFIC CONTROL - Totals Awd $4, $10, $4, $9, $4, $9, $11, Ref #39 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) 24" WI, (4 EACH) Awd $1, $7, $2, $8, $1, $7, $1, $7, $2, $8, $1, $7, $4, $17, Ref #40 614E12420 DETOUR SIGNING, (LUMP SUM) Awd $4, $4, $4, $4, $4, $4, $4, $4, $6, $6, $4, $4, $4, $4, Ref #41 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (14 EACH) Awd $10.00 $ $8.00 $ $8.00 $ $10.00 $ $10.00 $ $29.14 $ $7.30 $ Ref #42 614E13360 OBJECT MARKER, TWO WAY, (14 EACH) Awd $25.00 $ $14.00 $ $17.00 $ $10.00 $ $18.00 $ $32.57 $ $12.00 $ Ref #43 614E22000 WORK ZONE EDGE LINE, CLASS I, 4", (0.18 MILE) Awd $8, $1, $6, $1, $9, $1, $9, $1, $10, $1, $9, $1, $10, $1, Page 41
42 Ref #44 614E26000 WORK ZONE STOP LINE, CLASS I, (24 FT) Awd $8.50 $ $8.50 $ $9.00 $ $9.00 $ $10.00 $ $9.45 $ $10.00 $ Ref #45 622E41000 PORTABLE BARRIER, 32", (220 FT) Awd $10.00 $2, $14.00 $3, $15.00 $3, $18.00 $3, $18.00 $3, $22.73 $5, $40.00 $8, Ref #46 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (300 FT) Awd $12.00 $3, $15.00 $4, $16.00 $4, $20.00 $6, $18.00 $5, $27.05 $8, $43.00 $12, Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $19, $22, $21, $23, $26, $27, $46, Ref #47 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN,, (LUMP SUM) Awd $155, $155, $65, $65, $175, $175, $170, $170, $165, $165, $285, $285, $228, $228, Ref #48 202E22900 APPROACH SLAB REMOVED, (211 SY) Awd $21.00 $4, $25.00 $5, $28.00 $5, $40.00 $8, $40.00 $8, $62.38 $13, $38.55 $8, Page 42
43 Ref #49 202E23500 WEARING COURSE REMOVED, (775 SY) Awd $17.00 $13, $18.00 $13, $9.15 $7, $16.00 $12, $19.00 $14, $14.90 $11, $10.20 $7, Ref #50 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM) Awd $45, $45, $29, $29, $15, $15, $40, $40, $7, $7, $32, $32, $58, $58, Ref #51 503E21100 UNCLASSIFIED EXCAVATION, (164 CY) Awd $87.00 $14, $82.00 $13, $ $16, $90.00 $14, $85.00 $13, $62.28 $10, $ $25, Ref #52 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (57750 LB) Awd $0.91 $52, $1.00 $57, $1.15 $66, $0.95 $54, $1.10 $63, $1.04 $60, $1.10 $63, Ref #53 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB) Awd $1.70 $ $1.00 $ $1.15 $ $1.00 $ $4.00 $1, $2.04 $ $1.10 $ Ref #54 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (200 EACH) Awd $18.00 $3, $21.00 $4, $18.00 $3, $10.00 $2, $17.00 $3, $25.46 $5, $68.00 $13, Page 43
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020
More informationOhio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director
Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationCT Consultants, Inc.
Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:
More informationBARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY
IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationFederal Project No.: OC-095-1(348)
Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP
More informationMaine Turnpike Authority
Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin
More informationMoDOT 2016 UNIT BID PRICES Northwest District
MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More informationALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING
PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and
More informationFederal Project No.: STP-5128(388)
Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationFederal Project No.: HSIP-5A27(567)
Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationMcCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1
McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John
More informationMaine Turnpike Authority
Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal
More information2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH
Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More information2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH
Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE
More informationMaine Turnpike Authority
Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,
More informationMacomb County Department of Roads Bid Comparison
Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &
More informationMaine Turnpike Authority
Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING
More informationItems Unit Quantity Unit Price Total Unit Price Total
Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH
More informationBID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL
More informationFederal Project No.: NHFP-081-1(346)
Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationMaine Turnpike Authority
York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS
PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationLicensed Class C Virginia Contractor No.
month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More information2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)
106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationMaine Turnpike Authority
Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00
More informationHOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND
1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More informationSUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71
BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All
More informationIngham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15
COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationRiverside County Transportation Department Summary of Bids
Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00
More informationFederal Project No.: STP-5A27(380), STP-5A27(381)
Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273
AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011
More informationADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18
November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed
More informationSPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates
Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line
More informationSchedule of Pay Items
Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross
More informationOTTAWA COUNTY ROAD COMMISSION Bid Comparison
OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationAustin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724
National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00
More informationCITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.
SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationThe Tulalip Tribes of Washington
The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of
More informationFederal Project No.: NHPP-967-7(083)
Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00
More information2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM
ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the
More information2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00
1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationSUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY
7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationTahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.
Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station
More informationPN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least
More information2, total unit $ total unit $ total unit $ total $
BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;
More informationBID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.
BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010
More informationBID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes
More informationUnits Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00
More informationCITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS
CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD
More informationPAGE 1 of 18 WEIGHTED AVERAGE
UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201
More information