1 The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals

2 The Tulalip Tribes of Washington ADDENDUM NO. 3 November 7, 2017 Sealed bid proposals will be received by the Tulalip Tribes of Washington, at the Consolidated Borough of Quil Ceda Villages Office located at th Avenue NE, Tulalip, WA for the following Project: Project No I-5/116th Street NE Interchange Improvements Phase 4 Ramps Tulalip, Washington Related to Request for Bid Proposals Bid Package I-5/116 th Street NE Interchange Improvements Phase 4 Ramps until Wednesday, November 15, 2017 at 1:30 p.m., at which time all bids will be opened and read aloud. All required bid documentation shall be submitted to the front desk receptionist at the QCV Administrative Office located at th Avenue NE, Tulalip, WA by the scheduled bid date and times. ORAL, TELEPHONIC, FAXED OR TELEGRAPHIC BIDS WILL NOT BE ACCEPTED. BID DATE AND TIME REMAIN UNCHANGED. This Addendum is being issue to provide clarifications to certain Bid Document related issues and or questions received from potential Bidders related to the above Project(s). Submitted Request for Bid Proposals shall conform to the requirements of this Addendum. Unless specifically changed and or amended by this Addendum all other requirements, terms and conditions of the Bid Documents and any previous addenda shall remain unchanged. 1. The following changes, additions, and or deletions to the Bid Documents dated September 13, 2017 hereby become a part of the Bid Documents. 2. Notify all Subcontractors affected by this Addendum. 3. It is essential that prospective Bidders note the contents of this Addendum and the Tulalip Tribes of Washington be made aware the Addendum has been received. Therefore, Bidder shall acknowledge receipt of this Addendum on the Request for Bid Proposal form. CLARIFICATIONS 1. BIDDER QUESTION: Weight of Award reference inconsistencies found in Sections I, II, III, and IV of the Bid Proposal Form. RESPONSE: The Sections were corrected and the entire Bid Proposal Form was updated and included with this Addendum. 2. WSDOT COMMENT: Two bid items are missing from the Schedule Tables November 7, 2017 The Tulalip Tribes of Washington ADD No

3 RESPONSE: The bid items were added. Revised schedule tables are updated in both the Bid Proposal and Contract Forms. SPECIFICATIONS 1. Add Section to the Contract Special Provisions as follows: Measurement Section is supplemented with the following: (NWR) January 3, 2006) No unit of measurement shall apply to the lump sum price for herbicide applications prior to clearing and grubbing 2. Replace Section of the Contract Special Provisions with the following: Payment Section is supplemented with the following: (******) Herbicide Application Prior to Clearing and Grubbing, lump sum (NWR November 10, 2014) Roadside Restoration is incidental to the contract according to the requirements of Section (1). 3. Replace Section (5) of the Contract Special Provisions with the following: (5) Planting Area Preparation Section (5) is supplemented with the following No cultivation shall occur in areas within the drip line of existing vegetation scheduled to remain. (******) Soil Decompaction For areas underneath the existing on and off ramp roadways that are to be removed (all four quadrants of the interchange) as designated in the plans, the Contractor shall uniformly decompact the soil to a depth of 18 inches such that a soil penetrometer can be inserted to a minimum depth of 12 inches with no more than 200 PSI of pressure using a ½ inch tip. Soil decompaction operations shall be scheduled between April 1 and September 30. The Contractor shall notify the Engineer a minimum of five working days prior to the start of soil decompaction work. The Contractor shall select a soil decompaction method that has the ability to fracture and shatter compacted soil to the specified depth with uniformity and without negative consequences to the soil structure in three or fewer passes. The soil decompaction will be accepted by the Engineer based on a field inspection of soil penetration measurements within the designated soil decompaction area. The Engineer will select random locations to measure soil decompaction using a Dickey- November 7, 2017 The Tulalip Tribes of Washington ADD No

4 JOHN soil penetrometer or approved equivalent. Acceptance is based upon at least 75% of the soil decompaction readings meeting the PSI requirements. Following soil decompaction operations, the area shall be graded smooth. Topsoil placement shall not proceed until the Engineer accepted the soil decompaction. No cultivation shall occur in areas within the drip line of existing vegetation scheduled to remain. 4. Replace Section of the Contract Special Provisions with the following: Measurement Section is supplemented with the following: (******) Topsoil and fine compost will be measured per cubic yard in the haul conveyance at the point of delivery. Water bags shall be measure per each, installed. Soil Decompaction will be measured per acre along the ground slope line of surface area loosened and accepted. BID PROPOSAL FORM 1. All Schedules are replaced as indicated below. Adding two bid items: Herbicide Application Prior to Clearing and Grubbing Compost Sock CONTRACT FORM 1. All Schedules are replaced as indicated below. Adding two bid items: Herbicide Application Prior to Clearing and Grubbing Compost Sock ATTACHMENTS 1. Bid Proposal Form pages BPF-1 through BPF Revised Contract Agreement Form pages K-2 to K-25. END OF ADDENDUM NO. 3 November 7, 2017 The Tulalip Tribes of Washington ADD No

5 The Tulalip Tribes of Washington BID PROPOSAL FORM Project Name: I-5/116th Street NE Date of Bid: Interchange Improvements Phase 4 Ramps Location of Project: th Ave NE Tulalip, WA COMPANY NAME OF BIDDER: CERTIFIED NATIVE AMERICAN OWNED BUSINESS: YES If Yes, Percentage (%) of Indian Ownership: NO Having read and examined the Contract Documents, including without limitation the Drawings and Specifications, prepared by the Engineer and the Tulalip Tribes of Washington for the abovereferenced Project, and the following Addenda: ADDENDA ACKNOWLEDGED (Enter Addenda Number and Date of Addenda below): The undersigned Bidder proposes to perform all Work for the applicable Contract, in accordance with the Contract Documents, for the following sums: BASE BID FOR PACKAGE I-5/116th Street NE Interchange Improvements Phase 4 Ramps Refer to Division 0, TERO Code, and Special Provisions, Section State Taxes, for application of TERO and Taxes on all schedules November 2017 The Tulalip Tribes of Washington BPF-1

6 Bid Schedules BID Schedule A Work within the Tribal Reservation Boundary20 PRICE SECTION 1: PREPARATION L.S. MOBILIZATION ACRE CLEARING AND GRUBBING L.S. HERBICIDE APPLICATIONS PRIOR TO CLEARING EACH REMOVING DRAINAGE STRUCTURE L.S EST. REMOVAL OF STRUCTURES AND OBSTRUCTIONS REMOVING SIGN STRUCTURE SHAFT OBSTRUCTIONS S.Y. REMOVING ASPHALT CONC. PAVEMENT 12, L.F. REMOVING CONC. BARRIER 2, L.F. REMOVING GUARDRAIL 2, EACH REMOVING GUARDRAIL ANCHOR L.F. REMOVING DRAINAGE PIPE 1,002 SECTION 2: GRADING C.Y. ROADWAY EXCAVATION INCL. HAUL 3, C.Y. COMMON BORROW INCL. HAUL TON GRAVEL BORROW INCL. HAUL 113, C.Y. EMBANKMENT COMPACTION 47, C.Y. POND EXCAVATION INCL. HAUL 2, C.Y. COMPACTED TILL 551 SECTION 4: DRAINAGE C.Y. DITCH EXCAVATION INCL. HAUL EACH GRATE INLET TYPE TON QUARRY SPALLS L.F. SCHEDULE A CULV. PIPE 18 IN. DIAM L.F. SCHEDULE B CULV. PIPE 12 IN. DIAM L.F. CL. V REINF. CONC. CULV. PIPE 18 IN. DIAM. 34 SECTION 5: STORM SEWER EACH CATCH BASIN TYPE 1L EACH CATCH BASIN TYPE $ 9,500 $ 9,500 November 2017 The Tulalip Tribes of Washington BPF-2

7 Schedule A Work within the Tribal Reservation Boundary20 26 EACH TEMPORARY CATCH BASIN TYPE PRICE EACH CATCH BASIN TYPE 2 48 IN. DIAM EACH CATCH BASIN TYPE 2 48 IN. DIAM. W/ DEBRIS CAGE L.F. TESTING STORM SEWER PIPE 2, L.F. CL. V REINF. CONC. STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 12 IN. DIAM. 1, L.F. SCHEDULE A STORM SEWER PIPE 18 IN. DIAM L.F. SCHEDULE B STORM SEWER PIPE 12 IN. DIAM L.F. SECTION 6: SANITARY SEWER 8 IN. SANITARY SEWER FORCE MAIN ON BRIDGE 35 EACH 2" COMBINATION AIR RELEASE VALVE SECTION 7: WATER LINES 36 L.F. 8 IN. WATER LINE ON BRIDGE 37 EACH 1" COMBINATION AIR RELEASE VALVE C.Y. SECTION 8: STRUCTURE STRUCTURE EXCAVATION CLASS A INCL. HAUL LB. EPOXY-COATED ST. REINF. BAR 10, C.Y. LEAN CONCRETE C.Y. CONC. CLASS 4000 FOR TRAFFIC ISLAND L.F. PEDESTRIAN BARRIER L.F. SEW TRAFFIC BARRIER L.F. GEOSYNTHETIC WALL SINGLE SLOPE TRAFFIC BARRIER S.Y. SCARIFYING CONC. SURFACE S.F. STRUCTURAL EARTH WALL 7, EACH CORE DRILLED BRIDGE DECK 48 C.Y. TEXTURED CEMENT CONCRETE PAVEMENT CLASS 4000 SECTION 9: SURFACING TON CRUSHED SURFACING BASE COURSE 8030 SECTION 14: HOT MIX ASPHALT November 2017 The Tulalip Tribes of Washington BPF-3

8 Schedule A Work within the Tribal Reservation Boundary S.Y. PLANING BITUMINOUS PAVEMENT 8, TON HMA FOR PRELEVELING CL. 1/2 IN. PG TON HMA CL. 1/2 IN. PG ,795 PRICE CALC JOB MIX COMPLIANCE PRICE ADJUSTMENT 1.0 $ 28, $ 28, CALC COMPACTION PRICE ADJUSTMENT 1.0 $ 18, $ 18, CALC ASPHALT PRICE ADJUSTMENT 1.0 $ $ SECTION 17: EROSION CNTL AND ROADSIDE RESTORATION DAY ESC LEAD S.Y. COMPOST BLANKET L.F. CHECK DAM EACH INLET PROTECTION S.Y. STABILIZED CONSTRUCTION ENTRANCE 1, HR STREET CLEANING L.F. WATTLE L.F. COMPOST SOCK EST. EROSION/WATER POLLUTION CONTROL 1.0 $218, $218, ACRE SEEDING, FERTILIZING, AND MULCHING C.Y. TOPSOIL TYPE A 1, EST. WEED AND PEST CONTROL 1.0 $ 4,200 $ 4, EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (2 CONT/ 24" HT) EACH PSIPE-THUJA PLICATA/WESTERN REDCEDAR (2 CONT/ 24" HT) EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (1 CONT / 16" HT) EACH PSIPE-RHAMNUS PURSHIANA/CASCARA (1 CONT / 30" HT) EACH PSIPE-THUJA PLICATA/WESTERN RED CEDAR (1 CONT / 16" HT) EACH PSIPE-ACER CIRCINATUM/VINE MAPLE (1 CONT / 12" HT) EACH PSIPE-CORYLUS CORNUTA/BEAKED HAZELNUT (1 CONT / 12" HT) EACH PSIPE-MAHONIA AQUIFOLIUM/TALL OREGON GRAPE (1 CONT / 12" HT) EACH PSIPE-PHILADELPHUS LEWISII/MOCK ORANGE (1 CONT / 12" HT) EACH PSIPE-ROSA NUTKANA/NOOTKA ROSE (1 CONT / 12" HT) 661 November 2017 The Tulalip Tribes of Washington BPF-4

9 EACH Schedule A Work within the Tribal Reservation Boundary20 PSIPE-SYMPHORICARPOS ALBUS/SNOWBERRY (1 CONT / 12" HT) 79 C.Y. FINE COMPOST EACH WATER BAGS ACRE SOIL DECOMPACTION ACRE SOIL AMENDMENT ACRE WOOD CHIP MULCH 1.7 1, L.F. HIGH VISIBILITY FENCE 2, L.F. HIGH VISIBILITY SILT FENCE 1, S.Y. BIODEGRADABLE EROSION CONTROL BLANKET 1, L.F. SECTION 18: TRAFFIC CEMENT CONC. TRAFFIC CURB AND GUTTER 1, L.F. CEMENT CONC. TRAFFIC CURB 1, L.F. EXTRUDED CURB L.F. PRECAST SLOPED MOUNTABLE CURB 1, L.F. PRECAST DUAL FACED SLOPED MOUNTABLE CURB L.F. BEAM GUARDRAIL TYPE 31 2, EACH BEAM GUARDRAIL TRANSITION SECTION TYPE EACH BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINAL EACH BEAM GUARDRAIL ANCHOR TYPE EACH CAST-IN-PLACE CONC. BARRIER LIGHT STANDARD SECTION EACH PERMANENT IMPACT ATTENUATOR EACH FLEXIBLE GUIDE POST EACH BARRIER DELINEATOR L.F. PLASTIC LINE 11, L.F. PROFILED PLASTIC LINE 8, L.F. PROFILED PLASTIC WIDE LANE LINE 5, L.F. PLASTIC WIDE LINE 2, S.F. PLASTIC CROSSWALK LINE L.F. PLASTIC STOP LINE EACH PLASTIC TRAFFIC ARROW PRICE November 2017 The Tulalip Tribes of Washington BPF-5

10 Schedule A Work within the Tribal Reservation Boundary EACH PLASTIC TRAFFIC LETTER EACH PLASTIC DRAINAGE MARKING 47 PRICE EACH PLASTIC YIELD LINE SYMBOL HUND RAISED PAVEMENT MARKER TYPE L.S. PERMANENT SIGNING L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. ILLUMINATION SYSTEM L.S. TRAFFIC SIGNAL SYSTEM L.S. ITS L.S. PROJECT TEMPORARY TRAFFIC CONTROL 1.0 SECTION 19: OTHER S L.S. TYPE B PROGRESS SCHEDULE C.Y. STRUCTURE EXCAVATION CLASS B INCL. HAUL S.F. SHORING OR EXTRA EXCAVATION CLASS B 5, EACH PLUGGING EXISTING PIPE L.S. STRUCTURE SURVEYING L.S. ROADWAY SURVEYING EST. LICENSED SURVEYING 1.0 $ 15, $ 15, L.S. ADA FEATURES SURVEYING EACH CEMENT CONC. CURB RAMP TYPE A EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION MODIFIED L.F. CABLE FENCE L.F. COATED CHAIN LINK FENCE TYPE EACH COATED END, GATE, CORNER, PULLPOST FOR CHAIN LINK FENCE EACH DOUBLE 20 FT. COATED CHAIN LINK GATE EACH CONNECTION TO DRAINAGE STRUCTURE EACH ADJUST CATCH BASIN EACH LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN 1.0 November 2017 The Tulalip Tribes of Washington BPF-6

11 L.S. Schedule A Work within the Tribal Reservation Boundary20 CLEANING EXISTING DRAINAGE STRUCTURE HR TRAINING 1, PRICE EST. ROADSIDE CLEANUP 1.0 $ 24, $ 24, EST. REIMBURSEMENT FOR THIRD PARTY DAMAGE 1.0 $ 10, $ 10, EST. MINOR CHANGE 1.0 $ 50, $ 50, L.S. SPCC PLAN S.Y. CONSTRUCTION GEOTEXTILE FOR DITCH LINING S.Y. CONSTRUCTION GEOTEXTILE FOR UNDERGROUND DRAINAGE C.Y. GRAVEL BORROW FOR STRUCTURAL EARTH WALL INCL. HAUL 3, S.F. TEMPORARY GEOSYNTHETIC RETAINING WALL 9, EACH INSTALL RECTANGULAR VANED GRATE 9.0 Sub Schedule A TERO Fee 1.75% Schedule A November 2017 The Tulalip Tribes of Washington BPF-7

12 Schedule B Work within the WSDOT Right of Way, Outside the Tribal Reservation Boundary SECTION 1: PREPARATION PRICE L.S. MOBILIZATION ACRE CLEARING AND GRUBBING L.S. HERBICIDE APPLICATIONS PRIOR TO CLEARING EACH REMOVING DRAINAGE STRUCTURE L.S EST. REMOVAL OF STRUCTURES AND OBSTRUCTIONS REMOVING SIGN STRUCTURE SHAFT OBSTRUCTIONS S.Y. REMOVING ASPHALT CONC. PAVEMENT 3, L.F. REMOVING CONC. BARRIER L.F. REMOVING GUARDRAIL EACH REMOVING GUARDRAIL ANCHOR 11 L.F. REMOVING DRAINAGE PIPE 129 SECTION 2: GRADING C.Y. ROADWAY EXCAVATION INCL. HAUL C.Y. COMMON BORROW INCL. HAUL TON GRAVEL BORROW INCL. HAUL C.Y. EMBANKMENT COMPACTION 1, C.Y. POND EXCAVATION INCL. HAUL 10, C.Y. COMPACTED TILL 1,143 SECTION 4: DRAINAGE C.Y. DITCH EXCAVATION INCL. HAUL EACH GRATE INLET TYPE TON QUARRY SPALLS L.F. SCHEDULE A CULV. PIPE 18 IN. DIAM L.F. SCHEDULE B CULV. PIPE 12 IN. DIAM L.F. CL. V REINF. CONC. CULV. PIPE 18 IN. DIAM. SECTION 5: STORM SEWER EACH CATCH BASIN TYPE 1L EACH CATCH BASIN TYPE 1 26 EACH TEMPORARY CATCH BASIN TYPE 1 November 2017 The Tulalip Tribes of Washington BPF-8

13 Schedule B Work within the WSDOT Right of Way, Outside the Tribal Reservation Boundary PRICE EACH CATCH BASIN TYPE 2 48 IN. DIAM. 28 EACH CATCH BASIN TYPE 2 48 IN. DIAM. W/ DEBRIS CAGE L.F. TESTING STORM SEWER PIPE L.F. CL. V REINF. CONC. STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 18 IN. DIAM L.F. SCHEDULE B STORM SEWER PIPE 12 IN. DIAM L.F. SECTION 6: SANITARY SEWER 8 IN. SANITARY SEWER FORCE MAIN ON BRIDGE EACH 2" COMBINATION AIR RELEASE VALVE SECTION 7: WATER LINES 36 L.F. 8 IN. WATER LINE ON BRIDGE 37 EACH 1" COMBINATION AIR RELEASE VALVE C.Y. SECTION 8: STRUCTURE STRUCTURE EXCAVATION CLASS A INCL. HAUL LB. EPOXY-COATED ST. REINF. BAR C.Y. LEAN CONCRETE C.Y. CONC. CLASS 4000 FOR TRAFFIC ISLAND L.F. PEDESTRIAN BARRIER L.F. SEW TRAFFIC BARRIER L.F. GEOSYNTHETIC WALL SINGLE SLOPE TRAFFIC BARRIER S.Y. SCARIFYING CONC. SURFACE S.F. STRUCTURAL EARTH WALL 47 EACH CORE DRILLED BRIDGE DECK 48 C.Y. TEXTURED CEMENT CONCRETE PAVEMENT CLASS 4000 SECTION 9: SURFACING TON CRUSHED SURFACING BASE COURSE 290 SECTION 14: HOT MIX ASPHALT S.Y. PLANING BITUMINOUS PAVEMENT 2, November 2017 The Tulalip Tribes of Washington BPF-9

14 Schedule B Work within the WSDOT Right of Way, Outside the Tribal Reservation Boundary TON HMA FOR PRELEVELING CL. 1/2 IN. PG TON HMA CL. 1/2 IN. PG PRICE CALC JOB MIX COMPLIANCE PRICE ADJUSTMENT 1.0 $ 1, $ 1, CALC COMPACTION PRICE ADJUSTMENT 1.0 $ $ CALC ASPHALT PRICE ADJUSTMENT 1.0 $ $ SECTION 17: EROSION CNTL AND ROADSIDE RESTORATION DAY ESC LEAD S.Y. COMPOST BLANKET L.F. CHECK DAM EACH INLET PROTECTION S.Y. STABILIZED CONSTRUCTION ENTRANCE 1, HR STREET CLEANING L.F. WATTLE L.F. COMPOST SOCK EST. EROSION/WATER POLLUTION CONTROL 1.0 $ 40, $ 40, ACRE SEEDING, FERTILIZING, AND MULCHING C.Y. TOPSOIL TYPE A EST. WEED AND PEST CONTROL 1.0 $ 2, $ 2, EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (2 CONT/ 24" HT) EACH PSIPE-THUJA PLICATA/WESTERN REDCEDAR (2 CONT/ 24" HT) EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (1 CONT / 16" HT) EACH PSIPE-RHAMNUS PURSHIANA/CASCARA (1 CONT / 30" HT) EACH PSIPE-THUJA PLICATA/WESTERN RED CEDAR (1 CONT / 16" HT) EACH PSIPE-ACER CIRCINATUM/VINE MAPLE (1 CONT / 12" HT) EACH PSIPE-CORYLUS CORNUTA/BEAKED HAZELNUT (1 CONT / 12" HT) EACH PSIPE-MAHONIA AQUIFOLIUM/TALL OREGON GRAPE (1 CONT / 12" HT) EACH PSIPE-PHILADELPHUS LEWISII/MOCK ORANGE (1 CONT / 12" HT) EACH PSIPE-ROSA NUTKANA/NOOTKA ROSE (1 CONT / 12" HT) EACH PSIPE-SYMPHORICARPOS ALBUS/SNOWBERRY (1 CONT / 12" HT) 678 November 2017 The Tulalip Tribes of Washington BPF-10

15 Schedule B Work within the WSDOT Right of Way, Outside the Tribal Reservation Boundary 79 C.Y. FINE COMPOST EACH WATER BAGS ACRE SOIL DECOMPACTION ACRE SOIL AMENDMENT ACRE WOOD CHIP MULCH L.F. HIGH VISIBILITY FENCE 360 PRICE L.F. HIGH VISIBILITY SILT FENCE S.Y. BIODEGRADABLE EROSION CONTROL BLANKET L.F. SECTION 18: TRAFFIC CEMENT CONC. TRAFFIC CURB AND GUTTER L.F. CEMENT CONC. TRAFFIC CURB L.F. EXTRUDED CURB L.F. PRECAST SLOPED MOUNTABLE CURB L.F. PRECAST DUAL FACED SLOPED MOUNTABLE CURB L.F. BEAM GUARDRAIL TYPE EACH BEAM GUARDRAIL TRANSITION SECTION TYPE EACH BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINAL EACH BEAM GUARDRAIL ANCHOR TYPE EACH CAST-IN-PLACE CONC. BARRIER LIGHT STANDARD SECTION EACH PERMANENT IMPACT ATTENUATOR EACH FLEXIBLE GUIDE POST EACH BARRIER DELINEATOR L.F. PLASTIC LINE L.F. PROFILED PLASTIC LINE L.F. PROFILED PLASTIC WIDE LANE LINE L.F. PLASTIC WIDE LINE S.F. PLASTIC CROSSWALK LINE L.F. PLASTIC STOP LINE EACH PLASTIC TRAFFIC ARROW EACH PLASTIC TRAFFIC LETTER 272 November 2017 The Tulalip Tribes of Washington BPF-11

16 Schedule B Work within the WSDOT Right of Way, Outside the Tribal Reservation Boundary EACH PLASTIC DRAINAGE MARKING EACH PLASTIC YIELD LINE SYMBOL HUND RAISED PAVEMENT MARKER TYPE L.S. PERMANENT SIGNING 1.0 PRICE L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. ILLUMINATION SYSTEM L.S. TRAFFIC SIGNAL SYSTEM L.S. ITS L.S. PROJECT TEMPORARY TRAFFIC CONTROL 1.0 SECTION 19: OTHER S L.S. TYPE B PROGRESS SCHEDULE C.Y. STRUCTURE EXCAVATION CLASS B INCL. HAUL S.F. SHORING OR EXTRA EXCAVATION CLASS B 1, EACH PLUGGING EXISTING PIPE L.S. STRUCTURE SURVEYING L.S. ROADWAY SURVEYING EST. LICENSED SURVEYING 126 L.S. ADA FEATURES SURVEYING EACH CEMENT CONC. CURB RAMP TYPE A EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION MODIFIED L.F. CABLE FENCE L.F. COATED CHAIN LINK FENCE TYPE EACH COATED END, GATE, CORNER, PULLPOST FOR CHAIN LINK FENCE EACH DOUBLE 20 FT. COATED CHAIN LINK GATE EACH CONNECTION TO DRAINAGE STRUCTURE EACH ADJUST CATCH BASIN EACH L.S. LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN CLEANING EXISTING DRAINAGE STRUCTURE November 2017 The Tulalip Tribes of Washington BPF-12

17 Schedule B Work within the WSDOT Right of Way, Outside the Tribal Reservation Boundary PRICE HR TRAINING EST. ROADSIDE CLEANUP 1.0 $ 4, $ 4, EST. REIMBURSEMENT FOR THIRD PARTY DAMAGE 1.0 $ 5, $ 5, EST. MINOR CHANGE 1.0 $ 25, $ 25, L.S. SPCC PLAN S.Y S.Y C.Y S.F. CONSTRUCTION GEOTEXTILE FOR DITCH LINING CONSTRUCTION GEOTEXTILE FOR UNDERGROUND DRAINAGE GRAVEL BORROW FOR STRUCTURAL EARTH WALL INCL. HAUL TEMPORARY GEOSYNTHETIC RETAINING WALL 146 EACH INSTALL RECTANGULAR VANED GRATE 5.0 Sub Schedule B TERO Fee 1.75% Schedule B November 2017 The Tulalip Tribes of Washington BPF-13

18 Schedule C Work within the City of Marysville, Outside WSDOT Right of Way PRICE SECTION 1: PREPARATION L.S. MOBILIZATION ACRE CLEARING AND GRUBBING L.S. HERBICIDE APPLICATIONS PRIOR TO CLEARING EACH REMOVING DRAINAGE STRUCTURE L.S. REMOVAL OF STRUCTURES AND OBSTRUCTIONS EST. REMOVING SIGN STRUCTURE SHAFT OBSTRUCTIONS S.Y. REMOVING ASPHALT CONC. PAVEMENT L.F. REMOVING CONC. BARRIER L.F. REMOVING GUARDRAIL EACH REMOVING GUARDRAIL ANCHOR 11 L.F. REMOVING DRAINAGE PIPE SECTION 2: GRADING C.Y. ROADWAY EXCAVATION INCL. HAUL C.Y. COMMON BORROW INCL. HAUL TON GRAVEL BORROW INCL. HAUL C.Y. EMBANKMENT COMPACTION 16 C.Y. POND EXCAVATION INCL. HAUL 17 C.Y. COMPACTED TILL SECTION 4: DRAINAGE C.Y. DITCH EXCAVATION INCL. HAUL EACH GRATE INLET TYPE TON QUARRY SPALLS L.F. SCHEDULE A CULV. PIPE 18 IN. DIAM L.F. SCHEDULE B CULV. PIPE 12 IN. DIAM L.F. CL. V REINF. CONC. CULV. PIPE 18 IN. DIAM. SECTION 5: STORM SEWER EACH CATCH BASIN TYPE 1L EACH CATCH BASIN TYPE 1 26 EACH TEMPORARY CATCH BASIN TYPE 1 November 2017 The Tulalip Tribes of Washington BPF-14

19 Schedule C Work within the City of Marysville, Outside WSDOT Right of Way PRICE EACH CATCH BASIN TYPE 2 48 IN. DIAM. 28 EACH CATCH BASIN TYPE 2 48 IN. DIAM. W/ DEBRIS CAGE L.F. TESTING STORM SEWER PIPE L.F. CL. V REINF. CONC. STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 18 IN. DIAM L.F. SCHEDULE B STORM SEWER PIPE 12 IN. DIAM. 34 L.F. SECTION 6: SANITARY SEWER 8 IN. SANITARY SEWER FORCE MAIN ON BRIDGE 35 EACH 2" COMBINATION AIR RELEASE VALVE SECTION 7: WATER LINES 36 L.F. 8 IN. WATER LINE ON BRIDGE 37 EACH 1" COMBINATION AIR RELEASE VALVE C.Y. SECTION 8: STRUCTURE STRUCTURE EXCAVATION CLASS A INCL. HAUL LB. EPOXY-COATED ST. REINF. BAR C.Y. LEAN CONCRETE C.Y. CONC. CLASS 4000 FOR TRAFFIC ISLAND L.F. PEDESTRIAN BARRIER L.F. SEW TRAFFIC BARRIER L.F. GEOSYNTHETIC WALL SINGLE SLOPE TRAFFIC BARRIER S.Y. SCARIFYING CONC. SURFACE S.F. STRUCTURAL EARTH WALL 47 EACH CORE DRILLED BRIDGE DECK 48 C.Y. TEXTURED CEMENT CONCRETE PAVEMENT CLASS 4000 SECTION 9: SURFACING TON CRUSHED SURFACING BASE COURSE 130 SECTION 14: HOT MIX ASPHALT S.Y. PLANING BITUMINOUS PAVEMENT 970 November 2017 The Tulalip Tribes of Washington BPF-15

20 Schedule C Work within the City of Marysville, Outside WSDOT Right of Way TON HMA FOR PRELEVELING CL. 1/2 IN. PG PRICE TON HMA CL. 1/2 IN. PG CALC JOB MIX COMPLIANCE PRICE ADJUSTMENT 1.0 $ $ CALC COMPACTION PRICE ADJUSTMENT 1.0 $ $ CALC ASPHALT PRICE ADJUSTMENT 1.0 $ $ SECTION 17: EROSION CNTL AND ROADSIDE RESTORATION DAY ESC LEAD S.Y. COMPOST BLANKET L.F. CHECK DAM EACH INLET PROTECTION S.Y. STABILIZED CONSTRUCTION ENTRANCE HR STREET CLEANING L.F. WATTLE L.F. COMPOST SOCK EST. EROSION/WATER POLLUTION CONTROL 1.0 $ 13, $ 13, ACRE SEEDING, FERTILIZING, AND MULCHING C.Y. TOPSOIL TYPE A EST. WEED AND PEST CONTROL 1.0 $ $ EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (2 CONT/ 24" HT) EACH PSIPE-THUJA PLICATA/WESTERN REDCEDAR (2 CONT/ 24" HT) EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (1 CONT / 16" HT) EACH PSIPE-RHAMNUS PURSHIANA/CASCARA (1 CONT / 30" HT) EACH PSIPE-THUJA PLICATA/WESTERN RED CEDAR (1 CONT / 16" HT) EACH PSIPE-ACER CIRCINATUM/VINE MAPLE (1 CONT / 12" HT) EACH PSIPE-CORYLUS CORNUTA/BEAKED HAZELNUT (1 CONT / 12" HT) EACH PSIPE-MAHONIA AQUIFOLIUM/TALL OREGON GRAPE (1 CONT / 12" HT) EACH PSIPE-PHILADELPHUS LEWISII/MOCK ORANGE (1 CONT / 12" HT) EACH PSIPE-ROSA NUTKANA/NOOTKA ROSE (1 CONT / 12" HT) EACH PSIPE-SYMPHORICARPOS ALBUS/SNOWBERRY (1 CONT / 12" HT) 103 November 2017 The Tulalip Tribes of Washington BPF-16

21 Schedule C Work within the City of Marysville, Outside WSDOT Right of Way PRICE 79 C.Y. FINE COMPOST 80 EACH WATER BAGS 81 ACRE SOIL DECOMPACTION ACRE SOIL AMENDMENT ACRE WOOD CHIP MULCH L.F. HIGH VISIBILITY FENCE L.F. HIGH VISIBILITY SILT FENCE S.Y. BIODEGRADABLE EROSION CONTROL BLANKET 216 SECTION 18: TRAFFIC L.F. CEMENT CONC. TRAFFIC CURB AND GUTTER L.F. CEMENT CONC. TRAFFIC CURB L.F. EXTRUDED CURB L.F. PRECAST SLOPED MOUNTABLE CURB L.F. PRECAST DUAL FACED SLOPED MOUNTABLE CURB L.F. BEAM GUARDRAIL TYPE EACH BEAM GUARDRAIL TRANSITION SECTION TYPE EACH BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINAL EACH BEAM GUARDRAIL ANCHOR TYPE EACH CAST-IN-PLACE CONC. BARRIER LIGHT STANDARD SECTION EACH PERMANENT IMPACT ATTENUATOR EACH FLEXIBLE GUIDE POST EACH BARRIER DELINEATOR L.F. PLASTIC LINE 1, L.F. PROFILED PLASTIC LINE L.F. PROFILED PLASTIC WIDE LANE LINE L.F. PLASTIC WIDE LINE S.F. PLASTIC CROSSWALK LINE L.F. PLASTIC STOP LINE EACH PLASTIC TRAFFIC ARROW EACH PLASTIC TRAFFIC LETTER November 2017 The Tulalip Tribes of Washington BPF-17

22 Schedule C Work within the City of Marysville, Outside WSDOT Right of Way EACH PLASTIC DRAINAGE MARKING 1.0 PRICE EACH PLASTIC YIELD LINE SYMBOL HUND RAISED PAVEMENT MARKER TYPE L.S. PERMANENT SIGNING L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. ILLUMINATION SYSTEM L.S. TRAFFIC SIGNAL SYSTEM L.S. ITS L.S. PROJECT TEMPORARY TRAFFIC CONTROL 1.0 SECTION 19: OTHER S L.S. TYPE B PROGRESS SCHEDULE C.Y. STRUCTURE EXCAVATION CLASS B INCL. HAUL S.F. SHORING OR EXTRA EXCAVATION CLASS B EACH PLUGGING EXISTING PIPE L.S. STRUCTURE SURVEYING L.S. ROADWAY SURVEYING EST. LICENSED SURVEYING 126 L.S. ADA FEATURES SURVEYING EACH CEMENT CONC. CURB RAMP TYPE A EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION MODIFIED L.F. CABLE FENCE L.F. COATED CHAIN LINK FENCE TYPE EACH COATED END, GATE, CORNER, PULLPOST FOR CHAIN LINK FENCE EACH DOUBLE 20 FT. COATED CHAIN LINK GATE EACH CONNECTION TO DRAINAGE STRUCTURE EACH ADJUST CATCH BASIN EACH LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN L.S. CLEANING EXISTING DRAINAGE STRUCTURE November 2017 The Tulalip Tribes of Washington BPF-18

23 Schedule C Work within the City of Marysville, Outside WSDOT Right of Way PRICE HR TRAINING EST. ROADSIDE CLEANUP 1.0 $ 1, $ 1, EST. REIMBURSEMENT FOR THIRD PARTY DAMAGE 1.0 $ 5, $ 5, EST. MINOR CHANGE L.S. SPCC PLAN S.Y S.Y C.Y S.F. CONSTRUCTION GEOTEXTILE FOR DITCH LINING CONSTRUCTION GEOTEXTILE FOR UNDERGROUND DRAINAGE GRAVEL BORROW FOR STRUCTURAL EARTH WALL INCL. HAUL TEMPORARY GEOSYNTHETIC RETAINING WALL 146 EACH INSTALL RECTANGULAR VANED GRATE 1.0 Sub Schedule C TERO Fee 1.75% Schedule C November 2017 The Tulalip Tribes of Washington BPF-19

24 Schedule D TULALIP TRIBES Utilities PRICE SECTION 1: PREPARATION L.S. MOBILIZATION ACRE CLEARING AND GRUBBING 3 L.S. HERBICIDE APPLICATIONS PRIOR TO CLEARING EACH REMOVING DRAINAGE STRUCTURE L.S. REMOVAL OF STRUCTURES AND OBSTRUCTIONS EST. REMOVING SIGN STRUCTURE SHAFT OBSTRUCTIONS S.Y. REMOVING ASPHALT CONC. PAVEMENT L.F. REMOVING CONC. BARRIER L.F. REMOVING GUARDRAIL EACH REMOVING GUARDRAIL ANCHOR 11 L.F. REMOVING DRAINAGE PIPE SECTION 2: GRADING C.Y. ROADWAY EXCAVATION INCL. HAUL C.Y. COMMON BORROW INCL. HAUL TON GRAVEL BORROW INCL. HAUL C.Y. EMBANKMENT COMPACTION 16 C.Y. POND EXCAVATION INCL. HAUL 17 C.Y. COMPACTED TILL SECTION 4: DRAINAGE C.Y. DITCH EXCAVATION INCL. HAUL EACH GRATE INLET TYPE TON QUARRY SPALLS L.F. SCHEDULE A CULV. PIPE 18 IN. DIAM L.F. SCHEDULE B CULV. PIPE 12 IN. DIAM L.F. CL. V REINF. CONC. CULV. PIPE 18 IN. DIAM. SECTION 5: STORM SEWER EACH CATCH BASIN TYPE 1L EACH CATCH BASIN TYPE 1 26 EACH TEMPORARY CATCH BASIN TYPE EACH CATCH BASIN TYPE 2 48 IN. DIAM. November 2017 The Tulalip Tribes of Washington BPF-20

25 28 EACH Schedule D TULALIP TRIBES Utilities CATCH BASIN TYPE 2 48 IN. DIAM. W/ DEBRIS CAGE PRICE L.F. TESTING STORM SEWER PIPE L.F. CL. V REINF. CONC. STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 18 IN. DIAM L.F. SCHEDULE B STORM SEWER PIPE 12 IN. DIAM. 34 L.F. SECTION 6: SANITARY SEWER 8 IN. SANITARY SEWER FORCE MAIN ON BRIDGE 35 EACH 2" COMBINATION AIR RELEASE VALVE 1.0 SECTION 7: WATER LINES 36 L.F. 8 IN. WATER LINE ON BRIDGE EACH 1" COMBINATION AIR RELEASE VALVE C.Y. SECTION 8: STRUCTURE STRUCTURE EXCAVATION CLASS A INCL. HAUL LB. EPOXY-COATED ST. REINF. BAR C.Y. LEAN CONCRETE C.Y. CONC. CLASS 4000 FOR TRAFFIC ISLAND L.F. PEDESTRIAN BARRIER L.F. SEW TRAFFIC BARRIER L.F. GEOSYNTHETIC WALL SINGLE SLOPE TRAFFIC BARRIER S.Y. SCARIFYING CONC. SURFACE S.F. STRUCTURAL EARTH WALL 47 EACH CORE DRILLED BRIDGE DECK C.Y. TEXTURED CEMENT CONCRETE PAVEMENT CLASS 4000 SECTION 9: SURFACING TON CRUSHED SURFACING BASE COURSE SECTION 14: HOT MIX ASPHALT S.Y. PLANING BITUMINOUS PAVEMENT TON HMA FOR PRELEVELING CL. 1/2 IN. PG TON HMA CL. 1/2 IN. PG November 2017 The Tulalip Tribes of Washington BPF-21

26 CALC Schedule D TULALIP TRIBES Utilities JOB MIX COMPLIANCE PRICE ADJUSTMENT PRICE CALC COMPACTION PRICE ADJUSTMENT CALC ASPHALT PRICE ADJUSTMENT SECTION 17: EROSION CNTL AND ROADSIDE RESTORATION DAY ESC LEAD S.Y. COMPOST BLANKET L.F. CHECK DAM EACH INLET PROTECTION S.Y. STABILIZED CONSTRUCTION ENTRANCE HR STREET CLEANING L.F. WATTLE L.F. COMPOST SOCK EST. EROSION/WATER POLLUTION CONTROL ACRE SEEDING, FERTILIZING, AND MULCHING C.Y. TOPSOIL TYPE A EST. WEED AND PEST CONTROL EACH EACH EACH EACH EACH EACH EACH EACH EACH EACH EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (2 CONT/ 24" HT) PSIPE-THUJA PLICATA/WESTERN REDCEDAR (2 CONT/ 24" HT) PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (1 CONT / 16" HT) PSIPE-RHAMNUS PURSHIANA/CASCARA (1 CONT / 30" HT) PSIPE-THUJA PLICATA/WESTERN RED CEDAR (1 CONT / 16" HT) PSIPE-ACER CIRCINATUM/VINE MAPLE (1 CONT / 12" HT) PSIPE-CORYLUS CORNUTA/BEAKED HAZELNUT (1 CONT / 12" HT) PSIPE-MAHONIA AQUIFOLIUM/TALL OREGON GRAPE (1 CONT / 12" HT) PSIPE-PHILADELPHUS LEWISII/MOCK ORANGE (1 CONT / 12" HT) PSIPE-ROSA NUTKANA/NOOTKA ROSE (1 CONT / 12" HT) PSIPE-SYMPHORICARPOS ALBUS/SNOWBERRY (1 CONT / 12" HT) 79 C.Y. FINE COMPOST 80 EACH WATER BAGS November 2017 The Tulalip Tribes of Washington BPF-22

27 Schedule D TULALIP TRIBES Utilities PRICE 81 ACRE SOIL DECOMPACTION ACRE SOIL AMENDMENT ACRE WOOD CHIP MULCH L.F. HIGH VISIBILITY FENCE L.F. HIGH VISIBILITY SILT FENCE S.Y. BIODEGRADABLE EROSION CONTROL BLANKET L.F. SECTION 18: TRAFFIC CEMENT CONC. TRAFFIC CURB AND GUTTER L.F. CEMENT CONC. TRAFFIC CURB L.F. EXTRUDED CURB L.F. PRECAST SLOPED MOUNTABLE CURB L.F. PRECAST DUAL FACED SLOPED MOUNTABLE CURB L.F. BEAM GUARDRAIL TYPE EACH BEAM GUARDRAIL TRANSITION SECTION TYPE EACH BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINAL EACH BEAM GUARDRAIL ANCHOR TYPE EACH CAST-IN-PLACE CONC. BARRIER LIGHT STANDARD SECTION EACH PERMANENT IMPACT ATTENUATOR EACH FLEXIBLE GUIDE POST EACH BARRIER DELINEATOR L.F. PLASTIC LINE L.F. PROFILED PLASTIC LINE L.F. PROFILED PLASTIC WIDE LANE LINE L.F. PLASTIC WIDE LINE S.F. PLASTIC CROSSWALK LINE L.F. PLASTIC STOP LINE EACH PLASTIC TRAFFIC ARROW EACH PLASTIC TRAFFIC LETTER EACH PLASTIC DRAINAGE MARKING EACH PLASTIC YIELD LINE SYMBOL November 2017 The Tulalip Tribes of Washington BPF-23

28 Schedule D TULALIP TRIBES Utilities PRICE HUND RAISED PAVEMENT MARKER TYPE L.S. PERMANENT SIGNING L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. SIGN BRIDGE NO L.S. ILLUMINATION SYSTEM L.S. TRAFFIC SIGNAL SYSTEM L.S. ITS L.S. PROJECT TEMPORARY TRAFFIC CONTROL SECTION 19: OTHER S L.S. TYPE B PROGRESS SCHEDULE C.Y. STRUCTURE EXCAVATION CLASS B INCL. HAUL S.F. SHORING OR EXTRA EXCAVATION CLASS B EACH PLUGGING EXISTING PIPE L.S. STRUCTURE SURVEYING L.S. ROADWAY SURVEYING EST. LICENSED SURVEYING 126 L.S. ADA FEATURES SURVEYING EACH CEMENT CONC. CURB RAMP TYPE A EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION MODIFIED L.F. CABLE FENCE L.F. COATED CHAIN LINK FENCE TYPE EACH COATED END, GATE, CORNER, PULLPOST FOR CHAIN LINK FENCE EACH DOUBLE 20 FT. COATED CHAIN LINK GATE EACH CONNECTION TO DRAINAGE STRUCTURE EACH ADJUST CATCH BASIN EACH LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN L.S. CLEANING EXISTING DRAINAGE STRUCTURE HR TRAINING EST. ROADSIDE CLEANUP November 2017 The Tulalip Tribes of Washington BPF-24

29 EST. Schedule D TULALIP TRIBES Utilities REIMBURSEMENT FOR THIRD PARTY DAMAGE PRICE EST. MINOR CHANGE L.S. SPCC PLAN S.Y. CONSTRUCTION GEOTEXTILE FOR DITCH LINING S.Y. CONSTRUCTION GEOTEXTILE FOR UNDERGROUND DRAINAGE C.Y. GRAVEL BORROW FOR STRUCTURAL EARTH WALL INCL. HAUL S.F. TEMPORARY GEOSYNTHETIC RETAINING WALL 146 EACH INSTALL RECTANGULAR VANED GRATE Sub Schedule D TERO Fee 1.75% Schedule D November 2017 The Tulalip Tribes of Washington BPF-25

30 Schedule A : Schedule B : Schedule C : Schedule D : BID : BID AMOUNT: (Write in Words Above Base Bid Amount) Trench Excavation Safety Provisions (included in Base Bid Amount Above): $ (Write in Number Form Above) TRENCH EXCAVATION SAFETY PROVISIONS: If contracted work contains any work that requires trenching exceeding a depth of four (4) feet, all costs for trench safety shall be included in the Base Bid amount for adequate trench safety systems in compliance with Chapter RCW and WAC The purpose of this provision is to ensure that the bidder agrees to comply with all the relevant trench safety requirements of Chapter RCW. This bid amount shall be considered as part of the total Base Bid amount set forth above. If trench excavation safety provisions do not pertain to this contracted work, Bidder shall enter N.A. (not applicable) for the dollar amount. The following items shall also be considered in the review and award of this Contact. Bidder shall complete each section as applicable. By submission of this bid proposal, Bidder acknowledges their commitment to employ and or contract work to the parties identified below during the performance of Bidder s awarded Work. SECTION I KEY EMPLOYEES OF BIDDER (if required, attach additional sheets if needed) (Weight of Award 2 points) PREFERRED EMPLOYEE NAME POSITION Yes No November 2017 The Tulalip Tribes of Washington BPF-26

31 SECTION II PREFERRED TRADE EMPLOYEES (if required, attach additional sheets if needed) (Weight of Award 4 points) NUMBER OF PREFERRED TRADE EMPLOYEES NUMBER OF PREFERRED TRADE EMPLOYEES SECTION III PEAK WORK FORCE OF ALL EMPLOYEES ANTICIPATED TO BE EMPLOYED BY BIDDER AT THE PROJECT SITE IN THE PERFORMANCE OF THE WORK: (Insert Number of Employees) SECTION IV LIST OF LOWER TIERED SUBCONTRACTOR(S) AND OR SUPPLIER(S) ( of Sections IV.A and IV.B) (Weight of Award 25 points) (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) November 2017 The Tulalip Tribes of Washington BPF-27

32 SECTION IV A LIST OF TULALIP TRIBAL MEMBER NAOB SUBCONTRACTOR(S) AND OR SUPPLIER(S) (if required, attach additional sheets if needed) (Weight of Award 28 points) NAME OF SUBCONTRACTOR (SUB) OR SUPPLIER (SUP) TYPE OF WORK TO BE AWARDED DOLLAR VALUE OF WORK $ $ $ $ $ $ $ $ $ $ TYPE OF LOWER- TIER TULALIP NAOB SUB SUP Yes No SECTION IV B LIST OF NAOB SUBCONTRACTOR(S) AND OR SUPPLIER(S) (if required, attach additional sheets if needed) (Weight of Award 8 points) NAME OF SUBCONTRACTOR (SUB) OR SUPPLIER (SUP) TYPE OF WORK TO BE AWARDED DOLLAR VALUE OF WORK $ $ $ $ $ $ TYPE OF LOWER- TIER NAOB SUB SUP Yes No November 2017 The Tulalip Tribes of Washington BPF-28

33 Should Contractor fail to comply, to the fullest extent possible, with provisions for employment and or contracting as defined in The Tulalip Code, Chapter 9.05 TERO Code, Contractor may be found to be in breach of Contract. If it is determined that a breach has occurred, Contractor acknowledges that said breach will be grounds to terminate Contractor s Contract agreement without claim against The Tulalip Tribes of Washington or the Project for any additional compensation and or consideration. BIDDER'S CERTIFICATION The Bidder hereby acknowledges that the following representations in this bid are material and not mere recitals: 1. The Bidder has read and understands the Contract Documents and agrees to comply with all requirements of the Contract Documents, regardless of whether the Bidder has actual knowledge of the requirements and regardless of any statement or omission made by the Bidder which might indicate a contrary intention. 2. The Bidder represents that the bid is based upon the Standards specified by the Contract Documents. 3. The Bidder acknowledges that all Work shall be completed within the time established in the Contract Documents, and that each applicable portion of the Work shall be completed upon the respective milestone completion dates, unless an extension of time is granted in accordance with the Contract Documents. The Bidder understands that the award of separate contracts for the Project will require sequential, coordinated and interrelated operations which may involve interference, disruption, hindrance or delay in the progress of the Bidder's Work. The Bidder agrees that the Contract price, as amended from time to time by Change Order, shall cover all amounts due from the Tulalip Tribes of Washington resulting from interference, disruption, hindrance or delay caused by or between Contractors or their agents and employees. 4. The Bidder has visited the Project site, become familiar with local conditions and has correlated personal observations with the requirements of the Contract Documents. The Bidder has no outstanding questions regarding the interpretation or clarification of the Contract Documents. 5. The Bidder agrees to comply with The Tulalip Code, Chapter 9.05 TERO Code and give preference to Indians in hiring promotions, training and all other aspects of employment contracting and subcontracting. 6. The Bidder agrees to comply with The Tulalip Code, Chapter 9.05 TERO Code and give preference to certified Indian-owned enterprises and organizations in the award of contracts and subcontracts. 7. The Bidder and each person signing on behalf of the Bidder certifies, and in the case of a joint or combined bid, each party thereto certifies as to such party's entity, under penalty of perjury, that to the best of the undersigned's knowledge and belief: (a) the Base Bid, any Unit Prices and any Alternate Bid in the bid have been arrived at independently without collusion, consultation, communication or agreement, for the purpose of restricting competition as to any matter relating to such Base Bid, Unit Prices or Alternate bid with any other Bidder; (b) unless otherwise required by law, the Base Bid, any Unit Prices and any Alternate bid in the bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to the bid opening, directly or indirectly, to any other Bidder who would have any interest in the Base Bid, Unit Prices or Alternate bid; (c) no attempt has been made or will November 2017 The Tulalip Tribes of Washington BPF-29

34 be made by the Bidder to induce any other individual, partnership or corporation to submit or not to submit a bid for the purpose of restricting competition. 8. The Bidder will execute the Contract Form with the Tulalip Tribes of Washington, if a Contract is awarded on the basis of this bid, and if the Bidder does not execute the Contract Form for any reason, other than as authorized by law, the Bidder and the Bidder's Surety are liable to the Tulalip Tribes of Washington as provided in Article 6 of the Instructions to Bidders. 9. Bidder agrees to furnish any information requested by the Tulalip Tribes of Washington to evaluate the responsibility of the Bidder. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) November 2017 The Tulalip Tribes of Washington BPF-30

35 The Tulalip Tribes of Washington NON - COLLUSION DECLARATION November 2017 The Tulalip Tribes of Washington BPF-31

36 Any modification made to either the bid form or exception taken to the defined scope of work outlined in this bid package may result in the bid proposal being considered nonresponsive. Each bid shall contain the name of every person interested therein. If the Bidder is a corporation, partnership, sole proprietorship, or limited liability corporation, an officer, partner or principal of the Bidder, as applicable, shall print or type the legal name of the Bidder on the line provided and sign the Bid Form. If the Bidder is a joint venture, an officer, partner or principal, as applicable, of each member of the joint venture shall print or type the legal name of the applicable member on the line provided and signs the Bid Form. An unsigned Bid Form will render the Bid as nonresponsive. BIDDER S NAME (PRINT): Authorized Signature: Title: Company Name: Mailing Address: Telephone Number: ( ) Facsimile Number ( ) Where Incorporated: Type of Business (circle one): corporation partnership sole proprietorship limited liability corporation The Tulalip Tribes Business License Number: State of Washington Contractor s License Number: Federal ID Number: Contact Person for Contract processing: BIDDER S NAME (PRINT): Authorized Signature: Title: Company Name: Mailing Address: Telephone Number: ( ) Facsimile Number ( ) Where Incorporated: Type of Business (circle one): corporation partnership sole proprietorship limited liability corporation The Tulalip Tribes Business License Number: State of Washington Contractor s License Number: Federal ID Number: Contact Person for Contract processing: END OF BID FORM November 2017 The Tulalip Tribes of Washington BPF-32

37 Schedule A Work within the Tribal Reservation Boundary20 PRICE SECTION 1: PREPARATION L.S. MOBILIZATION ACRE CLEARING AND GRUBBING L.S. HERBICIDE APPLICATIONS PRIOR TO CLEARING EACH REMOVING DRAINAGE STRUCTURE L.S EST. REMOVAL OF STRUCTURES AND OBSTRUCTIONS REMOVING SIGN STRUCTURE SHAFT OBSTRUCTIONS S.Y. REMOVING ASPHALT CONC. PAVEMENT 12, L.F. REMOVING CONC. BARRIER 2, L.F. REMOVING GUARDRAIL 2, EACH REMOVING GUARDRAIL ANCHOR L.F. REMOVING DRAINAGE PIPE 1,002 SECTION 2: GRADING C.Y. ROADWAY EXCAVATION INCL. HAUL 3, C.Y. COMMON BORROW INCL. HAUL TON GRAVEL BORROW INCL. HAUL 113, C.Y. EMBANKMENT COMPACTION 47, C.Y. POND EXCAVATION INCL. HAUL 2, C.Y. COMPACTED TILL 551 SECTION 4: DRAINAGE C.Y. DITCH EXCAVATION INCL. HAUL EACH GRATE INLET TYPE TON QUARRY SPALLS L.F. SCHEDULE A CULV. PIPE 18 IN. DIAM L.F. SCHEDULE B CULV. PIPE 12 IN. DIAM L.F. CL. V REINF. CONC. CULV. PIPE 18 IN. DIAM. 34 SECTION 5: STORM SEWER EACH CATCH BASIN TYPE 1L EACH CATCH BASIN TYPE EACH TEMPORARY CATCH BASIN TYPE EACH CATCH BASIN TYPE 2 48 IN. DIAM $ 9,500 $ 9,500 Tulalip Tribes Bid Solicitation No ADD No. 3 CONTRACT AGREEMENT THE TULALIP TRIBES OF WASHINGTON K 2 of 38 NOVEMBER 2017

38 28 EACH Schedule A Work within the Tribal Reservation Boundary20 CATCH BASIN TYPE 2 48 IN. DIAM. W/ DEBRIS CAGE L.F. TESTING STORM SEWER PIPE 2, L.F. CL. V REINF. CONC. STORM SEWER PIPE 12 IN. DIAM L.F. SCHEDULE A STORM SEWER PIPE 12 IN. DIAM. 1, L.F. SCHEDULE A STORM SEWER PIPE 18 IN. DIAM L.F. SCHEDULE B STORM SEWER PIPE 12 IN. DIAM L.F. SECTION 6: SANITARY SEWER 8 IN. SANITARY SEWER FORCE MAIN ON BRIDGE 1.0 PRICE 35 EACH 2" COMBINATION AIR RELEASE VALVE SECTION 7: WATER LINES 36 L.F. 8 IN. WATER LINE ON BRIDGE 37 EACH 1" COMBINATION AIR RELEASE VALVE C.Y. SECTION 8: STRUCTURE STRUCTURE EXCAVATION CLASS A INCL. HAUL LB. EPOXY-COATED ST. REINF. BAR 10, C.Y. LEAN CONCRETE C.Y. CONC. CLASS 4000 FOR TRAFFIC ISLAND L.F. PEDESTRIAN BARRIER L.F. SEW TRAFFIC BARRIER L.F. GEOSYNTHETIC WALL SINGLE SLOPE TRAFFIC BARRIER S.Y. SCARIFYING CONC. SURFACE S.F. STRUCTURAL EARTH WALL 7, EACH CORE DRILLED BRIDGE DECK 48 C.Y. TEXTURED CEMENT CONCRETE PAVEMENT CLASS SECTION 9: SURFACING TON CRUSHED SURFACING BASE COURSE 8030 SECTION 14: HOT MIX ASPHALT S.Y. PLANING BITUMINOUS PAVEMENT 8, TON HMA FOR PRELEVELING CL. 1/2 IN. PG Tulalip Tribes Bid Solicitation No ADD No. 3 CONTRACT AGREEMENT THE TULALIP TRIBES OF WASHINGTON K 3 of 38 NOVEMBER 2017

39 Schedule A Work within the Tribal Reservation Boundary TON HMA CL. 1/2 IN. PG , CALC JOB MIX COMPLIANCE PRICE ADJUSTMENT PRICE 1.0 $ 28, $ 28, CALC COMPACTION PRICE ADJUSTMENT 1.0 $ 18, $ 18, CALC ASPHALT PRICE ADJUSTMENT 1.0 $ $ SECTION 17: EROSION CNTL AND ROADSIDE RESTORATION DAY ESC LEAD S.Y. COMPOST BLANKET L.F. CHECK DAM EACH INLET PROTECTION S.Y. STABILIZED CONSTRUCTION ENTRANCE 1, HR STREET CLEANING L.F. WATTLE L.F. COMPOST SOCK EST. EROSION/WATER POLLUTION CONTROL 1.0 $218, $218, ACRE SEEDING, FERTILIZING, AND MULCHING C.Y. TOPSOIL TYPE A 1, EST. WEED AND PEST CONTROL 1.0 $ 4,200 $ 4, EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (2 CONT/ 24" HT) EACH PSIPE-THUJA PLICATA/WESTERN REDCEDAR (2 CONT/ 24" HT) EACH PSIPE-PSEUDOTSUGA MENZIESII/DOUGLAS FIR (1 CONT / 16" HT) EACH PSIPE-RHAMNUS PURSHIANA/CASCARA (1 CONT / 30" HT) EACH PSIPE-THUJA PLICATA/WESTERN RED CEDAR (1 CONT / 16" HT) EACH PSIPE-ACER CIRCINATUM/VINE MAPLE (1 CONT / 12" HT) EACH PSIPE-CORYLUS CORNUTA/BEAKED HAZELNUT (1 CONT / 12" HT) EACH PSIPE-MAHONIA AQUIFOLIUM/TALL OREGON GRAPE (1 CONT / 12" HT) EACH PSIPE-PHILADELPHUS LEWISII/MOCK ORANGE (1 CONT / 12" HT) EACH PSIPE-ROSA NUTKANA/NOOTKA ROSE (1 CONT / 12" HT) EACH PSIPE-SYMPHORICARPOS ALBUS/SNOWBERRY (1 CONT / 12" HT) 1, C.Y. FINE COMPOST 18 Tulalip Tribes Bid Solicitation No ADD No. 3 CONTRACT AGREEMENT THE TULALIP TRIBES OF WASHINGTON K 4 of 38 NOVEMBER 2017

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

CITY OF PORTSMOUTH PURCHASING DEPARTMENT PORTSMOUTH, NEW HAMPSHIRE. Annual Fuel Bid - #01-18 INVITATION TO BID

CITY OF PORTSMOUTH PURCHASING DEPARTMENT PORTSMOUTH, NEW HAMPSHIRE. Annual Fuel Bid - #01-18 INVITATION TO BID CITY OF PORTSMOUTH PURCHASING DEPARTMENT PORTSMOUTH, NEW HAMPSHIRE Annual Fuel Bid - #01-18 INVITATION TO BID The City of Portsmouth is soliciting bids for our primary supply and emergency supply of fuel.

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications.

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications. ADDENDUM 2 PROJECT: POKAGONEK AWAT HARTFORD CLIENT: ISSUE DATE: JUL 1, 2015 The following clarifications and changes shall be included in the Plans and Specifications for the above referenced project,

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

PROPOSAL FORM 2014 FUEL BID

PROPOSAL FORM 2014 FUEL BID PROPOSAL FORM 2014 FUEL BID COUNTY OF SIBLEY, MINNESOTA BIDS CLOSE: NOVEMBER 22, 2013 AT 4:30 P.M. PROPOSAL TO: SIBLEY COUNTY PUBLIC WORKS TIMOTHY BECKER PUBLIC WORKS DIRECTOR 111 8 TH STREET PO BOX 897

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

City of Mobile. Recycling Equipment Rental & Hauling BID NUMBER: 5024

City of Mobile. Recycling Equipment Rental & Hauling BID NUMBER: 5024 Recycling Equipment Rental & Hauling BID NUMBER: 5024 BID DUE DATE MARCH 31, 2017 NEW BID DUE DATE APRIL 4, 2017 ADDENDUM #1 TO BID 5024 ISSUE DATE 03/28/2017 Notice to Contractors: Sealed bids for the

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

INDUSTRIAL HAUL AGREEMENT

INDUSTRIAL HAUL AGREEMENT INDUSTRIAL HAUL AGREEMENT PUBLIC WORKS MEMORANDUM OF AGREEMENT entered into this day of, A.D., 20(yr). BETWEEN: PARKLAND COUNTY a County incorporated under the laws of the Province of Alberta, (hereinafter

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way IONIA COUNTY ROAD COMMISSION 170 E. Riverside Drive; P.O. Box 76, Ionia MI 48846 (616) 527-1700 (office) or (616) 527-8848 (fax) APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

RFQ Fleet Vehicles. The City of Dawson Creek is requesting quotations for the supply and delivery of:

RFQ Fleet Vehicles. The City of Dawson Creek is requesting quotations for the supply and delivery of: RFQ 2016-23 Fleet Vehicles The City of Dawson Creek is requesting quotations for the supply and delivery of: One (1) 2016 Minimum GVW 4300kg, 4 Wheel Drive, Regular Cab, Long Box Truck. One (1) 2016 Minimum

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

CITY OF SHARON 155 W. CONNELLY BLVD SHARON, PENNSYLVANIA SPECIFICATIONS and FORM OF PROPOSAL

CITY OF SHARON 155 W. CONNELLY BLVD SHARON, PENNSYLVANIA SPECIFICATIONS and FORM OF PROPOSAL CITY OF SHARON 155 W. CONNELLY BLVD SHARON, PENNSYLVANIA 16146 SPECIFICATIONS and FORM OF PROPOSAL RENTAL OF CHIPSEAL EQUIPMENT WITH OPERATORS AND LABORERS 2014 CITY OF SHARON Notice to Bidders RENTAL

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:

More information

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul

More information

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES The City of Abbeville, South Carolina is soliciting sealed proposals for Fire Hydrant Maintenance Services. All proposals must be in writing and

More information

CONTRACT DOCUMENTS TOWING SERVICES BOROUGH OF CARLISLE 53 W. SOUTH STREET CARLISLE, PENNSYLVANIA (717)

CONTRACT DOCUMENTS TOWING SERVICES BOROUGH OF CARLISLE 53 W. SOUTH STREET CARLISLE, PENNSYLVANIA (717) CONTRACT DOCUMENTS TOWING SERVICES BOROUGH OF CARLISLE 53 W. SOUTH STREET CARLISLE, PENNSYLVANIA 17013 (717) 249-4422 BOROUGH OF CARLISLE BID DOCUMENTS TABLE OF CONTENTS Section 1 INFORMATION FOR BIDDERS

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

ELMORE COUNTY HIGHWAY DEPARTMENT

ELMORE COUNTY HIGHWAY DEPARTMENT Adopted 11/27/06 Effective 2/1/07 Amended 4/10/08 ELMORE COUNTY HIGHWAY DEPARTMENT 155 County Shop Road Wetumpka, Alabama 36092 Phone (334) 567-1162 Fax (334) 567-1100 Access Management Policy The Elmore

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

A summary of the vehicle to be purchased: Department Type of Vehicle Quantity Stormwater Department One Ton Dual Rear Wheel Dump Truck w/ Bed 1

A summary of the vehicle to be purchased: Department Type of Vehicle Quantity Stormwater Department One Ton Dual Rear Wheel Dump Truck w/ Bed 1 City of Cartersville P.O. Box 1390 1 North Erwin Street Cartersville, GA 30120 DATE: January 24, 2018 TO: FROM: RE: Automobile Dealers Fleet Sales Personnel Tom Rhinehart, Finance Director Vehicle Bids

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

THE CORPORATON OF THE TOWN OF MIDLAND VEHICLE TOWING AND POUND SERVICES 2018/2019 TENDER L

THE CORPORATON OF THE TOWN OF MIDLAND VEHICLE TOWING AND POUND SERVICES 2018/2019 TENDER L THE CORPORATON OF THE TOWN OF MIDLAND VEHICLE TOWING AND POUND SERVICES 2018/2019 TENDER L04-54474 MAY, 2018 TOWN OF MIDLAND TENDER VEHICLE TOWING AND POUND SERVICES SEALED TENDERS will be received until

More information

3. Application Fees, Certificate Of Insurance & Performance Bond

3. Application Fees, Certificate Of Insurance & Performance Bond SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner

More information

ADDENDUM 3. C. Bidders are requested to attach a copy of this Addendum to the Project Manual in their possession.

ADDENDUM 3. C. Bidders are requested to attach a copy of this Addendum to the Project Manual in their possession. Network Operations Center Renovation 62 Swamp Road Newtown, PA 18940 ADDENDUM 3 To: For: Prepared For: ALL BIDDERS Network Operation Center Renovation 62 Swamp Road Newtown, PA 18940 Council Rock School

More information

ADDENDUM No. 1. BID No /15 Chevrolet Silverado Work Trucks

ADDENDUM No. 1. BID No /15 Chevrolet Silverado Work Trucks Purchasing Department 530 Water Street Oakland, CA 94607 Date: November 17, 2017 ADDENDUM No. 1 BID No. 17-18/15 Chevrolet Silverado Work Trucks This Addendum modifies the original BID Documents for the

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD, 2017-2018 FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 39104 BIDS

More information

REQUEST FOR BIDS (RFB) # (1) NEW X4-3/4 TON EXTENDED CAB PICKUP TRUCK WITH LIFT GATE POSTING DATE: MARCH 7, 2018

REQUEST FOR BIDS (RFB) # (1) NEW X4-3/4 TON EXTENDED CAB PICKUP TRUCK WITH LIFT GATE POSTING DATE: MARCH 7, 2018 REQUEST FOR BIDS (RFB) #18-022-25 (1) NEW 2018 4X4-3/4 TON EXTENDED CAB PICKUP TRUCK WITH LIFT GATE POSTING DATE: MARCH 7, 2018 RESPONSE DEADLINE: MARCH 27, 2018 11:00 A.M. CENTRAL STANDARD TIME (CST)

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

CHAPTER 12 TOW TRUCKS

CHAPTER 12 TOW TRUCKS CHAPTER 12 TOW TRUCKS SOURCE: Chapter 12 added by P.L. 23-144:3 (Jan. 2, 1997). 12101 Definitions. 12102. Business Requirements. 12103. Department of Revenue and Taxation Duties. 12104. Notice Requirements.

More information

The attached pre-qualification application should be submitted with your bid, in a separate sealed envelope.

The attached pre-qualification application should be submitted with your bid, in a separate sealed envelope. BL098-17 October 9, 2017 INSPECTION, MAINTENANCE AND REPAIR OF HOISTS AND CRANES ON AN ANNUAL CONTRACT ADDENDUM #1 BL098-17 The following should be added to the above-referenced bid. The attached pre-qualification

More information

CUBA-RUSHFORD CENTRAL SCHOOL DISTRICT 5476 ROUTE 305 CUBA, NEW YORK ******** BID FORM FOR. Truck 2018 or Newer ********

CUBA-RUSHFORD CENTRAL SCHOOL DISTRICT 5476 ROUTE 305 CUBA, NEW YORK ******** BID FORM FOR. Truck 2018 or Newer ******** CUBA-RUSHFORD CENTRAL SCHOOL DISTRICT 5476 ROUTE 305 CUBA, NEW YORK 14727 ******** BID FORM FOR Truck 2018 or Newer ******** In accordance with the provisions of Section 103 of the General Municipal Law,

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

Page 1 of 7 UPPER MILFORD TOWNSHIP LEHIGH COUNTY P.O. Box 210, Old Zionsville, PA Phone (610) DRIVEWAY PERMIT APPLICATION

Page 1 of 7 UPPER MILFORD TOWNSHIP LEHIGH COUNTY P.O. Box 210, Old Zionsville, PA Phone (610) DRIVEWAY PERMIT APPLICATION Page 1 of 7 UPPER MILFORD TOWNSHIP LEHIGH COUNTY P.O. Box 210, Old Zionsville, PA 18068 Phone (610) 966-3223 DRIVEWAY PERMIT APPLICATION DRIVE AND/OR ACCESS PERMIT NO. DATE FEE $45.00 THIS CERTIFIES THAT

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: Joseph Ramon Date Issued: July 29, 2014 BID NO.: 14-5053 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR PUMP REPAIRS SUBMERSIBLE TRAINS AND CENTRIFUGAL

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

ADDENDUM NO. 1. April 6, Project: Gas and Diesel Bid for School System Stations

ADDENDUM NO. 1. April 6, Project: Gas and Diesel Bid for School System Stations Livingston Parish Public Schools Excellence in Education! 13909 Florida Boulevard P.O. Box 1130 Livingston, Louisiana 70754-1130 Phone: (225) 686-7044 Fax: (225) 686-3052 Website: www.lpsb.org John Watson

More information

Request For Bids Elko County Solid Waste Refuse Hauling and Disposal in the Midas Solid Waste Management Districts

Request For Bids Elko County Solid Waste Refuse Hauling and Disposal in the Midas Solid Waste Management Districts Request For Bids Solid Waste Refuse Hauling and Disposal in the Midas Solid Waste Management Districts is requesting bid proposals for the Solid Waste Refuse Hauling and Disposal for the Midas Solid Waste

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended

More information

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,

More information

County of Santa Cruz 0579

County of Santa Cruz 0579 County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

SECOND AMENDMENT AND ADDENDUM TO MASTER LICENSE AGREEMENT FOR REGULATION AND MAINTENANCE OF SIDEWALK FACILITIES IN THE MERIDIAN CITY CORE

SECOND AMENDMENT AND ADDENDUM TO MASTER LICENSE AGREEMENT FOR REGULATION AND MAINTENANCE OF SIDEWALK FACILITIES IN THE MERIDIAN CITY CORE SECOND AMENDMENT AND ADDENDUM TO MASTER LICENSE AGREEMENT FOR REGULATION AND MAINTENANCE OF SIDEWALK FACILITIES IN THE MERIDIAN CITY CORE THIS SECOND AMENDMENT AND ADDENDUM TO THE MASTER LICENSE AGREEMENT

More information

REQUEST FOR PROPOSAL TRUCK DRIVER TRAINING TRACTOR AND TRAILER LEASING FOR ILLINOIS VALLEY COMMUNITY COLLEGE PROPOSAL # RFP2016-P02

REQUEST FOR PROPOSAL TRUCK DRIVER TRAINING TRACTOR AND TRAILER LEASING FOR ILLINOIS VALLEY COMMUNITY COLLEGE PROPOSAL # RFP2016-P02 REQUEST FOR PROPOSAL TRUCK DRIVER TRAINING TRACTOR AND TRAILER LEASING FOR ILLINOIS VALLEY COMMUNITY COLLEGE PROPOSAL # RFP2016-P02 The Board of Trustees of Illinois Valley Community College (IVCC) District

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Town of Goshen Driveway Regulations

Town of Goshen Driveway Regulations Driveway Regulations 1. Authority These regulations are adopted by the Goshen Planning Board under the authority of New Hampshire RSA 236:13 236:14. They govern the construction and alteration of driveways,

More information

DOCUMENTATION WORKBOOK FY 2017

DOCUMENTATION WORKBOOK FY 2017 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information