Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director
|
|
- Lucas Hudson
- 5 years ago
- Views:
Transcription
1 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID LOR- SR Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016 Contract Awarded To: KARVO PAVING COMPANY Award Amount: $20,538, Engineer's Estimate: $19,230, Bidder 1 KARVO PAVING COMPANY 4524 HUDSON DR STOW, OH Bid $20,538, Bidder 3 ANTHONY ALLEGA CEMENT CONTRACTOR INC 5585 CANAL RD Cuyahoga VALLEY VIEW, OH Bid $20,912, Bidder 2 KOKOSING CONSTRUCTION COMPANY INC 886 MC KINLEY AVE Franklin COLUMBUS, OH Bid $20,757, Bidder 4 GREAT LAKES CONSTRUCTION CO 2608 GREAT LAKES WAY Medina HINCKLEY, OH Bid $21,581, Page 1
2 Ref #1 201E11000 CLEARING AND GRUBBING (WT: 01), (LUMP SUM) Awd $100, $100, $50, $50, $121, $121, $77, $77, Ref #2 202E20010 HEADWALL REMOVED (WT: NR), (4 EACH) Awd $ $1, $ $ $ $1, $75.00 $ Ref #3 202E23000 PAVEMENT REMOVED (WT: NR), (76501 SY) Awd $7.00 $535, $10.00 $765, $17.37 $1,328, $8.00 $612, Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT (WT: NR), (9799 SY) Awd $5.65 $55, $10.00 $97, $19.20 $188, $4.50 $44, Ref #5 202E30000 WALK REMOVED (WT: NR), (8652 SF) Awd $0.55 $4, $2.00 $17, $0.88 $7, $0.75 $6, Ref #6 202E30500 CONCRETE MEDIAN REMOVED (WT: NR), (55 FT) Awd $8.00 $ $8.00 $ $5.85 $ $13.00 $ Ref #7 202E30700 CONCRETE BARRIER REMOVED (WT: NR), (2263 FT) Awd $15.50 $35, $18.00 $40, $5.95 $13, $13.00 $29, Ref #8 202E30800 TRAFFIC ISLAND REMOVED (WT: NR), (213 SY) Awd $11.00 $2, $10.00 $2, $9.41 $2, $16.00 $3, Ref #9 202E32000 CURB REMOVED (WT: NR), (910 FT) Awd $3.00 $2, $4.00 $3, $3.74 $3, $2.00 $1, Ref #10 202E32500 CURB AND GUTTER REMOVED (WT: NR), (19631 FT) Awd $3.00 $58, $4.00 $78, $4.25 $83, $1.75 $34, Page 2
3 Ref #11 202E32800 CONCRETE SLOPE PROTECTION REMOVED (WT: NR), (1 SY) Awd $ $ $ $ $ $ $ $ Ref #12 202E35100 PIPE REMOVED, 24" AND UNDER (WT: NR), (7641 FT) Awd $22.00 $168, $15.00 $114, $17.67 $135, $12.00 $91, Ref #13 202E35200 PIPE REMOVED, OVER 24" (WT: NR), (239 FT) Awd $35.00 $8, $25.00 $5, $27.90 $6, $32.00 $7, Ref #14 202E38000 GUARDRAIL REMOVED (WT: NR), (10123 FT) Awd $1.20 $12, $1.20 $12, $1.34 $13, $1.20 $12, Ref #15 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN (WT: NR), (732 FT) Awd $1.50 $1, $1.50 $1, $1.68 $1, $1.50 $1, Ref #16 202E53100 MAILBOX REMOVED (WT: NR), (1 EACH) Awd $12.00 $ $35.00 $ $76.79 $ $ $ Ref #17 202E58000 MANHOLE REMOVED (WT: NR), (18 EACH) Awd $ $10, $ $9, $1, $19, $ $14, Ref #18 202E58100 CATCH BASIN REMOVED (WT: NR), (86 EACH) Awd $ $30, $ $43, $ $61, $ $55, Ref #19 202E58200 INLET REMOVED (WT: NR), (1 EACH) Awd $ $ $ $ $1, $1, $ $ Ref #21 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (WT: NR), (500 FT) Awd $7.50 $3, $18.00 $9, $20.16 $10, $15.00 $7, Page 3
4 Ref #22 202E75000 FENCE REMOVED (WT: NR), (2446 FT) Awd $1.85 $4, $1.85 $4, $2.07 $5, $1.85 $4, Ref #23 202E75250 GATE REMOVED (WT: NR), (1 EACH) Awd $95.00 $ $95.00 $ $ $ $95.00 $95.00 Ref #24 202E98100 REMOVAL MISC.: IMPACT ATTENUATOR (WT: NR), (3 EACH) Awd $ $ $ $ $ $ $ $ Ref #25 203E10000 EXCAVATION (WT: 04), ( CY) Awd $13.00 $1,344, $17.50 $1,810, $6.75 $698, $14.50 $1,500, Ref #26 203E20000 EMBANKMENT (WT: 04), (18939 CY) Awd $3.85 $72, $3.00 $56, $8.72 $165, $10.00 $189, Ref #27 204E10000 SUBGRADE COMPACTION (WT: 04), (33585 SY) Awd $1.00 $33, $2.50 $83, $0.64 $21, $1.20 $40, Ref #28 204E13000 EXCAVATION OF SUBGRADE (WT: 04), (11137 CY) Awd $10.00 $111, $15.00 $167, $17.73 $197, $15.00 $167, Ref #29 204E30000 GRANULAR MATERIAL, TYPE A (WT: 04), (11137 CY) Awd $35.00 $389, $30.00 $334, $36.94 $411, $21.00 $233, Ref #30 204E30010 GRANULAR MATERIAL, TYPE B (WT: 04), (1125 CY) Awd $42.50 $47, $35.00 $39, $40.27 $45, $28.00 $31, Ref #31 204E45000 PROOF ROLLING (WT: 04), (63 HOUR) Awd $ $9, $ $9, $ $18, $ $18, Page 4
5 Ref #32 204E50000 GEOTEXTILE FABRIC (WT: 07), (33410 SY) Awd $1.05 $35, $0.50 $16, $1.19 $39, $0.65 $21, Ref #33 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (WT: 13), (29903 SY) Awd $1.25 $37, $2.30 $68, $2.58 $77, $1.40 $41, Ref #34 255E20000 FULL DEPTH PAVEMENT SAWING (WT: 15), (1381 FT) Awd $1.25 $1, $1.50 $2, $3.77 $5, $1.45 $2, Ref #35 606E15050 GUARDRAIL, TYPE MGS (WT: 36), (2125 FT) Awd $13.20 $28, $13.20 $28, $14.78 $31, $13.20 $28, Ref #36 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING (WT: 36), (25 FT) Awd $21.20 $ $21.20 $ $23.74 $ $21.20 $ Ref #37 606E15400 MGS GUARDRAIL, TYPE 8 (WT: 36), (125 FT) Awd $18.80 $2, $18.80 $2, $21.06 $2, $18.80 $2, Ref #38 606E17500 POST END ANCHOR (OR CONCRETE BLOCK END ANCHOR) (WT, (1 EACH) Awd $ $ $ $ $1, $1, $ $ Ref #39 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (WT: 36), (9 EACH) Awd $1, $16, $1, $16, $2, $18, $1, $16, Ref #40 606E27820 ANCHOR ASSEMBLY, MGS TYPE T (WT: 36), (9 EACH) Awd $ $7, $ $7, $ $7, $ $7, Ref #41 606E35050 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 (WT: 36), (5 EACH) Awd $1, $9, $1, $9, $2, $10, $1, $9, Page 5
6 Ref #42 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) (55 MPH/, (11 EACH) Awd $15, $166, $15, $166, $16, $186, $16, $176, Ref #43 607E23000 FENCE, TYPE CLT (WT: 37), (2311 FT) Awd $14.00 $32, $13.90 $32, $15.57 $35, $13.90 $32, Ref #44 608E " CONCRETE WALK (WT: 38), (23831 SF) Awd $3.50 $83, $4.00 $95, $3.40 $81, $4.00 $95, Ref #45 608E52110 CURB RAMP, TYPE A1 (WT: 38), (17 EACH) Awd $ $9, $ $3, $1, $24, $ $12, Ref #46 608E52170 CURB RAMP, TYPE D (WT: 38), (1 EACH) Awd $ $ $ $ $1, $1, $ $ Ref #47 622E10060 CONCRETE BARRIER, SINGLE SLOPE, TYPE B (WT: 38), (134 FT) Awd $ $17, $80.00 $10, $ $13, $48.00 $6, Ref #48 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 (WT: 38), (651 FT) Awd $78.00 $50, $60.00 $39, $73.30 $47, $52.50 $34, Ref #49 622E10120 CONCRETE BARRIER, SINGLE SLOPE, TYPE C (WT: 38), ( FT) Awd $65.00 $331, $40.00 $204, $56.72 $289, $60.00 $306, Ref #50 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D (WT: 38), (611 FT) Awd $ $74, $45.00 $27, $58.97 $36, $42.00 $25, Ref #51 622E10200 BARRIER TRANSITION (WT: 38), (1 EACH) Awd $3, $3, $1, $1, $ $ $4, $4, Page 6
7 Ref #52 622E24850 CONCRETE BARRIER END SECTION, TYPE B1 (WT: 38), (11 EACH) Awd $5, $61, $5, $55, $3, $37, $7, $79, Ref #53 622E25000 CONCRETE BARRIER END SECTION, TYPE D (WT: 38), (5 EACH) Awd $3, $19, $2, $10, $2, $10, $3, $18, Ref #54 623E38500 MONUMENT ASSEMBLY (WT: NR), (24 EACH) Awd $ $18, $ $12, $1, $27, $ $12, Ref #55 623E40520 RIGHT-OF-WAY MONUMENT (WT: NR), (37 EACH) Awd $75.00 $2, $30.00 $1, $ $18, $ $6, Ref #56 626E00100 BARRIER REFLECTOR (WT: NR), (191 EACH) Awd $6.40 $1, $6.40 $1, $7.17 $1, $6.40 $1, Ref #57 690E50000 SPECIAL - MAILBOX SUPPORT (WT: NR), (1 EACH) Awd $ $ $ $ $ $ $ $ Ref #58 690E71000 SPECIAL - ASBESTOS ABATEMENT, GREY BOLT COVER MATE, (LUMP SUM) Awd $8, $8, $4, $4, $5, $5, $ $ Ref # E25008 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE, (12 EACH) Awd $2, $33, $2, $24, $1, $22, $3, $44, Section 1 - ROADWAY - Totals Awd $4,103, $4,599, $4,597, $4,174, Ref #59 659E00100 SOIL ANALYSIS TEST (WT: NR), (2 EACH) Awd $ $ $25.00 $ $ $ $ $ Page 7
8 Ref #60 659E00300 TOPSOIL (WT: 46), (11123 CY) Awd $22.50 $250, $9.50 $105, $12.32 $137, $22.50 $250, Ref #61 659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN (WT: 46, (1335 SY) Awd $0.60 $ $0.32 $ $0.67 $ $0.60 $ Ref #62 659E10000 SEEDING AND MULCHING (WT: 46), (98918 SY) Awd $0.63 $62, $0.36 $35, $0.71 $70, $0.63 $62, Ref #63 659E14000 REPAIR SEEDING AND MULCHING (WT: 46), (5010 SY) Awd $0.63 $3, $0.20 $1, $0.71 $3, $0.63 $3, Ref #64 659E15000 INTER-SEEDING (WT: 46), (5010 SY) Awd $0.01 $ $0.15 $ $0.01 $ $0.01 $50.10 Ref #65 659E20000 COMMERCIAL FERTILIZER (WT: 46), (14 TON) Awd $ $9, $ $6, $ $10, $ $9, Ref #66 659E31000 LIME (WT: 46), (19 ACRE) Awd $0.05 $ $10.00 $ $0.01 $ $5.00 $95.00 Ref #67 659E35000 WATER (WT: 46), (555 MGAL) Awd $0.01 $ $0.01 $ $0.01 $ $0.50 $ Ref #68 659E40000 MOWING (WT: 46), (225 MSF) Awd $3.00 $ $6.00 $1, $3.36 $ $3.00 $ Ref #69 832E15000 STORM WATER POLLUTION PREVENTION PLAN (WT: NR), (LUMP SUM) Awd $35, $35, $7, $7, $33, $33, $5, $5, Page 8
9 Ref #70 832E30000 EROSION CONTROL (WT: 08), (24000 EACH) Awd $1.00 $24, $1.00 $24, $1.00 $24, $1.00 $24, Section 2 - EROSION CONTROL - Totals Awd $386, $182, $281, $356, Ref #73 511E46610 CLASS QC1 CONCRETE, HEADWALL (WT: 35), (0.2 CY) Awd $5, $1, $2, $ $3, $ $3, $ Ref #74 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 (WT: 35), (7 SY) Awd $ $1, $ $1, $ $1, $ $1, Ref #75 602E20000 CONCRETE MASONRY (WT: 35), (4.8 CY) Awd $1, $7, $ $3, $1, $6, $1, $8, Ref #76 605E " SHALLOW PIPE UNDERDRAINS (WT: 35), (63780 FT) Awd $6.85 $436, $7.50 $478, $9.04 $576, $8.40 $535, Ref #77 605E " UNCLASSIFIED PIPE UNDERDRAINS (WT: 35), (1483 FT) Awd $17.00 $25, $10.00 $14, $9.09 $13, $8.00 $11, Ref #78 611E " CONDUIT, TYPE F (WT: 35), (200 FT) Awd $8.00 $1, $6.00 $1, $14.08 $2, $20.00 $4, Ref #79 611E " CONDUIT, TYPE B (WT: 35), (508 FT) Awd $20.00 $10, $12.00 $6, $21.42 $10, $30.00 $15, Ref #80 611E " CONDUIT, TYPE C (WT: 35), (500 FT) Awd $10.00 $5, $10.00 $5, $20.35 $10, $25.00 $12, Page 9
10 Ref #81 611E " CONDUIT, TYPE E (WT: 35), (500 FT) Awd $8.00 $4, $7.00 $3, $20.35 $10, $20.00 $10, Ref #82 611E " CONDUIT, TYPE F (WT: 35), (2386 FT) Awd $15.00 $35, $7.00 $16, $18.73 $44, $16.00 $38, Ref #83 611E " CONDUIT, TYPE C (WT: 35), (24 FT) Awd $50.00 $1, $62.00 $1, $94.92 $2, $ $2, Ref #84 611E " CONDUIT, TYPE B (WT: 35), (1515 FT) Awd $70.00 $106, $75.00 $113, $66.50 $100, $70.00 $106, Ref #85 611E " CONDUIT, TYPE C (WT: 35), (590 FT) Awd $46.00 $27, $85.00 $50, $54.60 $32, $60.00 $35, Ref #86 611E " CONDUIT, TYPE B (WT: 35), (935 FT) Awd $ $126, $ $102, $62.57 $58, $80.00 $74, Ref #87 611E " CONDUIT, TYPE C (WT: 35), (77 FT) Awd $90.00 $6, $70.00 $5, $68.80 $5, $80.00 $6, Ref #88 611E " CONDUIT, TYPE C, (WT: 35), (92 FT) Awd $68.00 $6, $70.00 $6, $69.27 $6, $75.00 $6, Ref #89 611E " CONDUIT, TYPE B (WT: 35), (189 FT) Awd $97.00 $18, $ $22, $90.61 $17, $ $18, Ref #90 611E " CONDUIT, TYPE B, (WT: 35), (8 FT) Awd $ $2, $ $1, $ $2, $ $1, Page 10
11 Ref #91 611E " CONDUIT, TYPE C (WT: 35), (373 FT) Awd $65.00 $24, $ $37, $71.66 $26, $90.00 $33, Ref #92 611E " CONDUIT, TYPE B (WT: 35), (457 FT) Awd $97.00 $44, $ $62, $87.91 $40, $90.00 $41, Ref #93 611E " CONDUIT, TYPE C (WT: 35), (16 FT) Awd $ $4, $ $4, $ $2, $ $3, Ref #94 611E " CONDUIT, TYPE A (WT: 35), (91 FT) Awd $91.00 $8, $ $15, $92.46 $8, $ $10, Ref #95 611E " CONDUIT, TYPE B (WT: 35), (375 FT) Awd $88.00 $33, $ $46, $90.20 $33, $ $41, Ref #96 611E " CONDUIT, TYPE B, (WT: 35), (17 FT) Awd $ $7, $ $4, $ $5, $ $4, Ref #97 611E " CONDUIT, TYPE B (WT: 35), (4 FT) Awd $ $3, $ $1, $ $1, $ $2, Ref #98 611E " CONDUIT, TYPE C (WT: 35), (4 FT) Awd $ $3, $ $1, $ $1, $ $2, Ref #99 611E " CONDUIT, TYPE B (WT: 35), (8 FT) Awd $ $3, $ $2, $ $2, $ $3, Ref # E " CONDUIT, TYPE B (WT: 35), (202 FT) Awd $ $36, $ $45, $ $36, $ $30, Page 11
12 Ref # E " CONDUIT, TYPE C (WT: 35), (22 FT) Awd $ $9, $ $8, $ $8, $ $6, Ref # E " CONDUIT, TYPE B (WT: 35), (16 FT) Awd $ $9, $ $9, $ $7, $ $8, Ref # E " CONDUIT, TYPE C (WT: 35), (20 FT) Awd $ $13, $1, $20, $ $18, $ $13, Ref # E98150 CATCH BASIN, NO. 3 (WT: 35), (23 EACH) Awd $3, $78, $2, $46, $4, $97, $2, $59, Ref # E98180 CATCH BASIN, NO. 3A (WT: 35), (14 EACH) Awd $2, $28, $2, $28, $3, $45, $2, $30, Ref # E98370 CATCH BASIN, NO. 6 (WT: 35), (3 EACH) Awd $2, $6, $3, $9, $3, $9, $2, $6, Ref # E98470 CATCH BASIN, NO. 2-2B (WT: 35), (6 EACH) Awd $1, $6, $1, $9, $1, $7, $1, $9, Ref # E98510 CATCH BASIN, NO. 2-3 (WT: 35), (6 EACH) Awd $1, $7, $1, $10, $1, $11, $1, $9, Ref # E98540 CATCH BASIN, NO. 2-4 (WT: 35), (1 EACH) Awd $2, $2, $2, $2, $2, $2, $3, $3, Ref # E98630 CATCH BASIN ADJUSTED TO GRADE (WT: 35), (3 EACH) Awd $ $1, $ $1, $ $2, $ $2, Page 12
13 Ref # E98634 CATCH BASIN RECONSTRUCTED TO GRADE (WT: 35), (9 EACH) Awd $ $7, $1, $10, $1, $12, $1, $9, Ref # E98700 INLET, SIDE DITCH (WT: 35), (1 EACH) Awd $1, $1, $1, $1, $1, $1, $1, $1, Ref # E99654 MANHOLE ADJUSTED TO GRADE (WT: 35), (2 EACH) Awd $ $1, $ $1, $ $1, $ $1, Ref # E99660 MANHOLE RECONSTRUCTED TO GRADE (WT: 35), (8 EACH) Awd $1, $8, $1, $9, $2, $16, $2, $16, Ref # E99710 PRECAST REINFORCED CONCRETE OUTLET (WT: 35), (7 EACH) Awd $ $2, $75.00 $ $ $1, $ $4, Ref # E99104 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C (WT:, (6 EACH) Awd $5, $33, $8, $48, $8, $50, $6, $37, Ref # E99574 MANHOLE, NO. 3 (WT: 35), (24 EACH) Awd $3, $87, $4, $115, $4, $114, $3, $81, Section 3 - DRAINAGE - Totals Awd $1,294, $1,389, $1,471, $1,360, Ref # E10500 CEMENT (WT: 07), (2640 TON) Awd $ $287, $ $279, $ $298, $ $287, Ref # E11000 CURING COAT (WT: 07), (88612 SY) Awd $0.30 $26, $0.24 $21, $0.20 $17, $0.30 $26, Page 13
14 Ref # E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP (WT: 07, (87788 SY) Awd $3.25 $285, $4.25 $373, $3.03 $265, $4.70 $412, Ref # E15030 CEMENT STABILIZED SUBGRADE, 16 INCHES DEEP (WT: 07, (824 SY) Awd $3.25 $2, $4.93 $4, $6.85 $5, $6.25 $5, Ref # E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS (WT, (LUMP SUM) Awd $24, $24, $23, $23, $43, $43, $22, $22, Ref # E46000 ASPHALT CONCRETE BASE, PG64-22 (WT: 10), (13 CY) Awd $ $4, $ $3, $ $2, $ $3, Ref # E46000 ASPHALT CONCRETE BASE, PG64-22 (WT: 10), (565 CY) Awd $ $70, $ $64, $ $75, $ $62, Ref # E20000 AGGREGATE BASE (WT: 09), (20184 CY) Awd $47.00 $948, $42.00 $847, $48.99 $988, $46.00 $928, Ref # E20000 SPECIAL - TACK COAT, TRACKLESS TACK, INTERMEDIATE, (5440 GAL) Awd $3.50 $19, $4.50 $24, $5.60 $30, $3.50 $19, Ref # E20100 SPECIAL - TACK COAT, TRACKLESS TACK, SURFACE COURS, (12301 GAL) Awd $3.50 $43, $4.50 $55, $5.60 $68, $3.50 $43, Ref # E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (4170 CY) Awd $ $713, $ $804, $ $793, $ $708, Ref # E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE, (6945 CY) Awd $ $979, $ $1,062, $ $1,135, $ $972, Page 14
15 Ref # E46024 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (39 CY) Awd $ $10, $ $16, $ $9, $ $9, Ref # E48020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (28 CY) Awd $ $9, $ $16, $ $7, $ $8, Ref # E " NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 (WT, (31445 SY) Awd $36.00 $1,132, $42.00 $1,320, $33.51 $1,053, $48.00 $1,509, Ref # E " NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 (WT, (83313 SY) Awd $40.00 $3,332, $43.00 $3,582, $36.61 $3,050, $54.00 $4,498, Ref # E12000 COMBINATION CURB AND GUTTER, TYPE 2 (WT: 38), (12106 FT) Awd $14.00 $169, $20.00 $242, $20.89 $252, $11.40 $138, Ref # E24000 CURB, TYPE 4-A (WT: 38), (100 FT) Awd $17.00 $1, $36.00 $3, $16.77 $1, $31.15 $3, Ref # E26000 CURB, TYPE 6 (WT: 38), (244 FT) Awd $18.00 $4, $26.00 $6, $39.10 $9, $13.00 $3, Ref # E30000 CURB, TYPE 8 (WT: 38), (1075 FT) Awd $20.00 $21, $26.00 $27, $24.43 $26, $11.50 $12, Ref # E " CONCRETE TRAFFIC ISLAND (WT: 38), (24 SY) Awd $85.00 $2, $80.00 $1, $90.92 $2, $50.00 $1, Ref # E40100 RUMBLE STRIPS, (ASPHALT CONCRETE) (WT: NR), (4598 FT) Awd $2.00 $9, $0.89 $4, $1.49 $6, $1.00 $4, Page 15
16 Ref # E10000 GEOGRID FOR SUBGRADE STABILIZATION (WT: 07), (33410 SY) Awd $1.15 $38, $1.00 $33, $1.86 $62, $1.20 $40, Section 4 - PAVEMENT - Totals Awd $8,134, $8,820, $8,209, $9,720, Ref # E " FIRE HYDRANT, AS PER PLAN (WT: 35), (6 EACH) Awd $6, $39, $6, $39, $6, $37, $6, $36, Ref # E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE (WT: 3, (1 EACH) Awd $3, $3, $4, $4, $5, $5, $2, $2, Ref # E10481 FIRE HYDRANT REMOVED, AS PER PLAN (WT: 35), (6 EACH) Awd $ $2, $1, $8, $1, $10, $ $3, Ref # E10800 VALVE BOX ADJUSTED TO GRADE (WT: 35), (7 EACH) Awd $ $1, $ $1, $ $1, $ $1, Ref # E10900 SERVICE BOX ADJUSTED TO GRADE (WT: 35), (11 EACH) Awd $ $1, $75.00 $ $ $1, $70.00 $ Ref # E98000 WATER WORK, MISC.: 20"X6" TAPPING SLEEVE AND 6" VA, (3 EACH) Awd $22, $66, $20, $60, $23, $69, $25, $75, Ref # E98000 WATER WORK, MISC.: WATER MANHOLE ADJUSTED TO GRADE, (3 EACH) Awd $11, $33, $ $1, $1, $3, $ $1, Page 16
17 Section 5 - WATER WORK - Totals Awd $146, $114, $129, $120, Ref # E99654 MANHOLE ADJUSTED TO GRADE (WT: 35), (15 EACH) Awd $ $8, $ $6, $1, $17, $ $13, Section 6 - SANITARY SEWER - Totals Awd $8, $6, $17, $13, Ref # E98000 REMOVAL MISC.: LIGHT POLES, BASES & LIGHTING SYSTE, (LUMP SUM) Awd $8, $8, $8, $8, $1, $1, $2, $2, Ref # E " CONDUIT, TYPE E (WT: 44), (300 FT) Awd $1.80 $ $1.80 $ $3.48 $1, $7.99 $2, Ref # E00450 CONNECTION, FUSED PULL APART (WT: 43), (88 EACH) Awd $85.00 $7, $85.00 $7, $73.47 $6, $81.75 $7, Ref # E00481 CONNECTION, UNFUSED PERMANENT, AS PER PLAN (WT: 43, (66 EACH) Awd $85.00 $5, $85.00 $5, $79.63 $5, $76.50 $5, Ref # E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT12B32.5 (WT: 43, (5 EACH) Awd $1, $7, $1, $7, $1, $9, $1, $8, Ref # E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT15B50 (WT: 43), (10 EACH) Awd $2, $25, $2, $25, $3, $30, $2, $25, Page 17
18 Ref # E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT20B50 (WT: 43), (24 EACH) Awd $2, $52, $2, $52, $3, $77, $2, $65, Ref # E10490 LIGHT POLE, CONVENTIONAL, DESIGN A15B50 (WT: 43), (5 EACH) Awd $2, $10, $2, $10, $2, $13, $2, $11, Ref # E13400 LIGHT TOWER, BBBBBB100 (WT: 43), (21 EACH) Awd $12, $265, $12, $265, $14, $310, $12, $258, Ref # E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP (WT: 43), (5 EACH) Awd $1, $5, $1, $5, $ $4, $ $4, Ref # E14200 LIGHT POLE FOUNDATION, 24" X 10' DEEP (WT: 43), (39 EACH) Awd $1, $57, $1, $57, $1, $49, $1, $40, Ref # E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP (WT: 43), (21 EACH) Awd $6, $131, $6, $131, $6, $140, $5, $108, Ref # E22900 NO. 1/0 AWG 5000 VOLT DISTRIBUTION CABLE (WT: 43), (3900 FT) Awd $3.95 $15, $3.95 $15, $4.59 $17, $2.94 $11, Ref # E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE (WT: 43), (32535 FT) Awd $2.52 $81, $2.52 $81, $2.48 $80, $2.12 $68, Ref # E23300 NO. 2 AWG 5000 VOLT DISTRIBUTION CABLE (WT: 43), (552 FT) Awd $3.00 $1, $3.00 $1, $2.95 $1, $2.31 $1, Ref # E23400 NO. 10 AWG POLE AND BRACKET CABLE (WT: 43), (6745 FT) Awd $0.70 $4, $0.70 $4, $1.43 $9, $1.36 $9, Page 18
19 Ref # E /2" DUCT CABLE WITH THREE NO. 1/0 AWG 5000 VOLT, (2510 FT) Awd $11.00 $27, $11.00 $27, $11.38 $28, $9.59 $24, Ref # E /2" DUCT CABLE WITH THREE NO. 4 AWG 5000 VOLT C, (4498 FT) Awd $6.00 $26, $6.00 $26, $5.46 $24, $4.87 $21, Ref # E /2" DUCT CABLE WITH THREE NO. 2 AWG 5000 VOLT C, (1838 FT) Awd $7.25 $13, $7.25 $13, $7.25 $13, $6.78 $12, Ref # E24400 DUCT CABLE, MISC.: TURNPIKE MULTI-CONDUCTOR CABLE, (562 FT) Awd $6.75 $3, $6.75 $3, $7.33 $4, $3.89 $2, Ref # E25400 CONDUIT, 2", (WT: 43), (7663 FT) Awd $9.00 $68, $9.00 $68, $7.18 $55, $5.52 $42, Ref # E25500 CONDUIT, 3", (WT: 44), (1825 FT) Awd $14.00 $25, $14.00 $25, $13.66 $24, $10.03 $18, Ref # E25902 CONDUIT, JACKED OR DRILLED, : 3" (WT: 43), (436 FT) Awd $37.00 $16, $37.00 $16, $35.45 $15, $26.32 $11, Ref # E25910 CONDUIT CLEANED AND CABLES REMOVED (WT: 43), (403 FT) Awd $0.20 $ $0.20 $ $1.62 $ $1.79 $ Ref # E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN (WT: 43), (44 EACH) Awd $ $12, $ $12, $ $19, $ $11, Ref # E26261 LUMINAIRE, HIGH MAST, AS PER PLAN (WT: 43), (126 EACH) Awd $ $85, $ $85, $ $95, $ $75, Page 19
20 Ref # E29002 TRENCH, 24" DEEP (WT: 44), (18054 FT) Awd $4.00 $72, $4.00 $72, $5.71 $103, $4.50 $81, Ref # E30700 PULL BOX, , 18" (WT: 44), (26 EACH) Awd $ $14, $ $14, $ $14, $ $14, Ref # E30706 PULL BOX, , 24" (WT: 44), (3 EACH) Awd $ $2, $ $2, $ $2, $ $1, Ref # E31510 PULL BOX REMOVED (WT: 43), (54 EACH) Awd $75.00 $4, $75.00 $4, $ $14, $ $15, Ref # E32000 GROUND ROD (WT: 44), (86 EACH) Awd $ $10, $ $10, $ $13, $ $9, Ref # E34001 POWER SERVICE, AS PER PLAN (WT: 43), (3 EACH) Awd $7, $23, $7, $23, $5, $16, $5, $15, Ref # E35011 REMOVE AND REERECT EXISTING LIGHT POLE, AS PER PLA, (3 EACH) Awd $ $1, $ $1, $1, $4, $1, $3, Ref # E39520 PULL BOX CLEANED (WT: 43), (3 EACH) Awd $20.00 $ $20.00 $ $93.37 $ $ $ Ref # E40000 SPECIAL - MAINTAIN EXISTING LIGHTING (WT: 43), (LUMP SUM) Awd $62, $62, $62, $62, $22, $22, $13, $13, Ref # E75350 LIGHT TOWER REMOVED (WT: NR), (14 EACH) Awd $ $8, $ $8, $ $13, $1, $22, Page 20
21 Ref # E75401 LIGHT POLE REMOVED, AS PER PLAN (WT: NR), (26 EACH) Awd $85.00 $2, $85.00 $2, $ $6, $ $7, Ref # E75501 LIGHT POLE FOUNDATION REMOVED, AS PER PLAN (WT: NR, (43 EACH) Awd $50.00 $2, $50.00 $2, $ $15, $ $11, Ref # E75511 POWER SERVICE REMOVED, AS PER PLAN (WT: NR), (4 EACH) Awd $ $2, $ $2, $ $2, $ $1, Ref # E75801 DISCONNECT CIRCUIT, AS PER PLAN (WT: NR), (1 EACH) Awd $ $ $ $ $ $ $ $ Section 7 - LIGHTING - Totals Awd $1,166, $1,166, $1,273, $1,052, Ref # E00500 DELINEATOR, POST MOUNTED (WT: NR), (101 EACH) Awd $35.00 $3, $35.00 $3, $34.44 $3, $30.00 $3, Ref # E00100 RPM (WT: 41), (798 EACH) Awd $18.26 $14, $18.26 $14, $20.45 $16, $18.26 $14, Ref # E10010 RPM, LOW PROFILE, WHITE (WT: 41), (49 EACH) Awd $18.26 $ $18.26 $ $20.45 $1, $18.26 $ Ref # E10020 RPM, LOW PROFILE WHITE/RED (WT: 41), (81 EACH) Awd $18.26 $1, $18.26 $1, $20.45 $1, $18.26 $1, Ref # E10030 RPM, LOW PROFILE YELLOW/RED (WT: 41), (58 EACH) Awd $18.26 $1, $18.26 $1, $20.45 $1, $18.26 $1, Page 21
22 Ref # E54000 RAISED PAVEMENT MARKER REMOVED (WT: NR), (114 EACH) Awd $8.00 $ $15.27 $1, $7.42 $ $7.96 $ Ref # E32000 GROUND ROD (WT: 44), (8 EACH) Awd $ $1, $ $1, $ $1, $ $2, Ref # E02100 GROUND MOUNTED SUPPORT, NO. 2 POST (WT: 42), (315 FT) Awd $7.00 $2, $7.00 $2, $8.30 $2, $5.25 $1, Ref # E03100 GROUND MOUNTED SUPPORT, NO. 3 POST (WT: 42), (1099 FT) Awd $8.00 $8, $8.00 $8, $9.49 $10, $5.50 $6, Ref # E04100 GROUND MOUNTED SUPPORT, NO. 4 POST (WT: 42), (248.5 FT) Awd $10.00 $2, $10.00 $2, $11.86 $2, $7.50 $1, Ref # E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 (WT:, (91.1 FT) Awd $10.00 $ $10.00 $ $11.86 $1, $14.00 $1, Ref # E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 (WT:, (77 FT) Awd $12.00 $ $12.00 $ $14.23 $1, $25.50 $1, Ref # E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 (WT, (165 FT) Awd $15.50 $2, $15.50 $2, $18.38 $3, $28.00 $4, Ref # E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 (WT, (120.3 FT) Awd $15.00 $1, $15.00 $1, $17.79 $2, $17.00 $2, Ref # E08600 SIGN POST REFLECTOR (WT: 42), (3 EACH) Awd $35.00 $ $35.00 $ $41.50 $ $31.00 $ Page 22
23 Ref # E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION (WT: 42), (22 EACH) Awd $ $4, $ $4, $ $5, $ $7, Ref # E20800 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 8 (WT, (2 EACH) Awd $16, $32, $16, $32, $19, $38, $14, $29, Ref # E21000 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10 (W, (2 EACH) Awd $17, $34, $17, $34, $20, $40, $19, $39, Ref # E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8 (WT:, (2 EACH) Awd $35, $71, $35, $71, $42, $84, $32, $65, Ref # E75000 SIGN ATTACHMENT ASSEMBLY (WT: 42), (1 EACH) Awd $ $ $ $ $ $ $70.00 $70.00 Ref # E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED (WT: 42), (23 EACH) Awd $75.00 $1, $75.00 $1, $88.94 $2, $90.00 $2, Ref # E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED (WT: 42), (13 EACH) Awd $1, $19, $1, $19, $1, $23, $1, $16, Ref # E80100 SIGN, FLAT SHEET (WT: 42), (1132 SF) Awd $12.00 $13, $12.00 $13, $14.23 $16, $12.75 $14, Ref # E80200 SIGN, GROUND MOUNTED EXTRUSHEET (WT: 42), (970 SF) Awd $10.00 $9, $10.00 $9, $11.86 $11, $17.00 $16, Ref # E80224 SIGN, OVERHEAD EXTRUSHEET (WT: 42), (1868 SF) Awd $13.00 $24, $13.00 $24, $15.42 $28, $17.00 $31, Page 23
24 Ref # E82000 SIGN BACKING ASSEMBLY (WT: 42), (6 EACH) Awd $95.00 $ $95.00 $ $ $ $60.00 $ Ref # E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (22 EACH) Awd $ $6, $ $6, $ $7, $ $10, Ref # E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION (WT: 42), (8 EACH) Awd $3, $27, $3, $30, $4, $32, $3, $28, Ref # E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL (WT: N, (158 EACH) Awd $10.00 $1, $10.00 $1, $11.86 $1, $11.00 $1, Ref # E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (19 EACH) Awd $95.00 $1, $95.00 $1, $ $2, $ $1, Ref # E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (154 EACH) Awd $10.00 $1, $10.00 $1, $11.86 $1, $15.00 $2, Ref # E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT, (52 EACH) Awd $ $6, $ $6, $ $7, $ $5, Ref # E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL (WT, (3 EACH) Awd $ $ $ $ $ $ $ $ Ref # E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL (WT:, (28 EACH) Awd $ $3, $ $3, $ $4, $ $4, Ref # E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL (WT: NR), (38 EACH) Awd $25.00 $ $25.00 $ $29.65 $1, $20.00 $ Page 24
25 Ref # E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL (WT:, (6 EACH) Awd $1, $7, $1, $7, $1, $8, $1, $9, Ref # E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (2 EACH) Awd $1, $2, $1, $2, $1, $2, $1, $2, Ref # E97700 SIGNING, MISC.: REMOVAL OF PRIVATE SIGNS WITHIN TH, (6 EACH) Awd $ $1, $ $1, $ $2, $50.00 $ Ref # E10000 EDGE LINE, 4" (WT: 45), (4.33 MILE) Awd $2, $9, $1, $8, $2, $10, $1, $8, Ref # E10010 EDGE LINE, 6" (WT: 45), (3.81 MILE) Awd $2, $9, $2, $10, $2, $10, $2, $11, Ref # E10100 LANE LINE, 4" (WT: 45), (4.97 MILE) Awd $ $4, $1, $6, $1, $5, $1, $6, Ref # E10110 LANE LINE, 6" (WT: 45), (0.71 MILE) Awd $1, $ $1, $1, $1, $ $1, $1, Ref # E10200 CENTER LINE (WT: 45), (1.78 MILE) Awd $4, $8, $3, $6, $5, $9, $3, $6, Ref # E10300 CHANNELIZING LINE, 8" (WT: 45), (8598 FT) Awd $1.60 $13, $1.38 $11, $1.79 $15, $1.43 $12, Ref # E10310 CHANNELIZING LINE, 12" (WT: 45), (4429 FT) Awd $1.95 $8, $1.97 $8, $2.18 $9, $1.97 $8, Page 25
26 Ref # E10400 STOP LINE (WT: 45), (1251 FT) Awd $10.00 $12, $9.00 $11, $11.20 $14, $9.70 $12, Ref # E10500 CROSSWALK LINE (WT: 45), (1020 FT) Awd $4.50 $4, $4.00 $4, $5.04 $5, $4.00 $4, Ref # E10600 TRANSVERSE/DIAGONAL LINE (WT: 45), (937 FT) Awd $5.75 $5, $5.30 $4, $6.44 $6, $5.30 $4, Ref # E10800 ISLAND MARKING (WT: 45), (48 SF) Awd $4.00 $ $5.00 $ $4.48 $ $5.00 $ Ref # E20300 LANE ARROW (WT: 45), (200 EACH) Awd $ $25, $ $27, $ $28, $ $27, Ref # E50100 REMOVAL OF PAVEMENT MARKING (WT: 45), (1577 FT) Awd $0.80 $1, $0.80 $1, $0.90 $1, $1.96 $3, Section 8 - TRAFFIC CONTROL - Totals Awd $422, $426, $491, $443, Ref # E " CONDUIT, TYPE E (WT: 44), (600 FT) Awd $1.80 $1, $1.80 $1, $3.48 $2, $7.99 $4, Ref # E25408 CONDUIT, 2", (WT: 44), (4530 FT) Awd $4.00 $18, $4.00 $18, $2.49 $11, $1.62 $7, Ref # E25500 CONDUIT, 3", (WT: 44), (532 FT) Awd $14.00 $7, $14.00 $7, $13.84 $7, $10.03 $5, Page 26
27 Ref # E25504 CONDUIT, 3", (WT: 44), (397 FT) Awd $5.50 $2, $5.50 $2, $4.25 $1, $2.61 $1, Ref # E25900 CONDUIT, JACKED OR DRILLED, 3" (WT: 44), (165 FT) Awd $25.00 $4, $25.00 $4, $35.63 $5, $26.32 $4, Ref # E29002 TRENCH, 24" DEEP (WT: 44), (5624 FT) Awd $4.00 $22, $4.00 $22, $5.71 $32, $4.95 $27, Ref # E30700 PULL BOX, , 18" (WT: 44), (2 EACH) Awd $ $1, $ $1, $ $1, $ $1, Ref # E30706 PULL BOX, , 24" (WT: 44), (1 EACH) Awd $ $ $ $ $ $ $ $ Ref # E31600 PULL BOX, MISC.: , 32" ROUND CONCRETE (WT: 4, (35 EACH) Awd $1, $64, $1, $64, $1, $46, $1, $35, Ref # E32000 GROUND ROD (WT: 44), (25 EACH) Awd $ $3, $ $3, $ $3, $ $2, Ref # E75000 SIGN ATTACHMENT ASSEMBLY (WT: 42), (16 EACH) Awd $ $2, $ $2, $ $3, $ $3, Ref # E80100 SIGN, FLAT SHEET (WT: 42), (42 SF) Awd $14.00 $ $14.00 $ $16.60 $ $13.00 $ Ref # E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL (WT:, (1 EACH) Awd $ $ $ $ $ $ $ $ Page 27
28 Ref # E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (51 EACH) Awd $ $35, $ $35, $ $35, $ $40, Ref # E05087 VEHICULAR SIGNAL HEAD, (LED), BLACK, 5-SECTION, 12, (10 EACH) Awd $1, $10, $1, $10, $1, $12, $1, $11, Ref # E20731 PEDESTRIAN SIGNAL HEAD (LED), (COUNTDOWN), TYPE D, (6 EACH) Awd $ $3, $ $3, $ $2, $ $3, Ref # E25000 COVERING OF VEHICULAR SIGNAL HEAD (WT: 44), (54 EACH) Awd $65.00 $3, $65.00 $3, $37.88 $2, $30.15 $1, Ref # E25010 COVERING OF PEDESTRIAN SIGNAL HEAD (WT: 44), (6 EACH) Awd $45.00 $ $45.00 $ $23.61 $ $30.15 $ Ref # E26000 PEDESTRIAN PUSHBUTTON (WT: 44), (6 EACH) Awd $ $ $ $ $ $ $ $1, Ref # E30400 MESSENGER WIRE, 7 STRAND, 1/2" DIAMETER WITH ACCES, (1763 FT) Awd $14.00 $24, $14.00 $24, $8.30 $14, $5.82 $10, Ref # E30600 TETHER WIRE, WITH ACCESSORIES (WT: 44), (1763 FT) Awd $14.00 $24, $14.00 $24, $7.07 $12, $5.44 $9, Ref # E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG (WT: 44), (8864 FT) Awd $2.60 $23, $2.60 $23, $2.02 $17, $2.14 $18, Ref # E64000 STRAIN POLE FOUNDATION (WT: 44), (16 EACH) Awd $4, $70, $4, $70, $2, $42, $2, $36, Page 28
29 Ref # E64010 SIGNAL SUPPORT FOUNDATION (WT: 44), (4 EACH) Awd $3, $13, $3, $13, $2, $10, $2, $9, Ref # E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG (WT: 44), (265 FT) Awd $2.00 $ $2.00 $ $2.45 $ $2.87 $ Ref # E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG (WT: 44), (490 FT) Awd $2.00 $ $2.00 $ $2.45 $1, $2.87 $1, Ref # E70001 POWER SERVICE, AS PER PLAN (WT: 44), (5 EACH) Awd $1, $8, $1, $8, $1, $8, $1, $8, Ref # E80202 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2 (WT: 44), (1 EACH) Awd $3, $3, $3, $3, $4, $4, $3, $3, Ref # E80402 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4 (WT: 44), (1 EACH) Awd $5, $5, $5, $5, $6, $6, $5, $5, Ref # E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11 (WT: 44), (1 EACH) Awd $6, $6, $6, $6, $7, $7, $6, $6, Ref # E80602 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 12 (WT: 44), (1 EACH) Awd $7, $7, $7, $7, $8, $8, $6, $6, Ref # E83200 STRAIN POLE, TYPE TC-81.10, DESIGN 12 (WT: 44), (4 EACH) Awd $5, $23, $5, $23, $7, $30, $5, $23, Ref # E83300 STRAIN POLE, TYPE TC-81.10, DESIGN 13 (WT: 44), (12 EACH) Awd $10, $121, $10, $121, $13, $156, $10, $124, Page 29
30 Ref # E89250 POLE ENTRANCE FITTING (WT: 44), (17 EACH) Awd $ $1, $ $1, $ $5, $ $3, Ref # E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION (WT: 44), (4 EACH) Awd $ $3, $ $3, $2, $10, $3, $14, Ref # E90103 REMOVAL OF TRAFFIC SIGNAL INSTALLATION FOR STORAGE, (4 EACH) Awd $ $1, $ $1, $2, $10, $4, $16, Ref # E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (6 EACH) Awd $19, $118, $19, $118, $24, $148, $21, $128, Ref # E67000 CABINET RISER (WT: 44), (5 EACH) Awd $ $3, $ $3, $ $4, $ $3, Ref # E67100 CABINET FOUNDATION (WT: 44), (5 EACH) Awd $2, $11, $2, $11, $1, $9, $1, $6, Ref # E67201 CONTROLLER WORK PAD, AS PER PLAN (WT: 44), (6 EACH) Awd $ $ $ $ $ $3, $ $2, Ref # E68000 REMOTE MONITORING STATION (WT: 44), (1 EACH) Awd $7, $7, $7, $7, $12, $12, $11, $11, Ref # E68510 COMMUNICATIONS (WT: 44), (2 EACH) Awd $1, $3, $1, $3, $2, $4, $1, $3, Ref # E72000 TRAINING (WT: 44), (LUMP SUM) Awd $1, $1, $1, $1, $4, $4, $3, $3, Page 30
31 Ref # E72501 SYSTEM ANALYSIS, AS PER PLAN (WT: 44), (LUMP SUM) Awd $11, $11, $11, $11, $39, $39, $33, $33, Ref # E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS, (6 EACH) Awd $3, $21, $3, $21, $4, $28, $4, $25, Ref # E99000 CONTROLLER ITEM, MISC.: STOP BAR DETECTION RADAR (, (6 EACH) Awd $5, $31, $5, $31, $6, $40, $8, $50, Ref # E20000 FIBER OPTIC CABLE, 18 FIBER (WT: 44), (16536 FT) Awd $2.50 $41, $2.50 $41, $2.00 $33, $1.84 $30, Ref # E33001 FIBER OPTIC PATCH CORD, 4 FIBER, AS PER PLAN (WT:, (12 EACH) Awd $ $4, $ $4, $50.66 $ $54.75 $ Ref # E34013 TERMINATION PANEL, 12 FIBER, AS PER PLAN (NEMA CAB, (10 EACH) Awd $ $5, $ $5, $ $9, $ $9, Ref # E37501 FIBER OPTIC CONNECTOR, AS PER PLAN (WT: 44), (120 EACH) Awd $90.00 $10, $90.00 $10, $27.48 $3, $43.77 $5, Ref # E37701 FIBER OPTIC CABLE TESTING, AS PER PLAN (WT: 44), (LUMP SUM) Awd $1, $1, $1, $1, $1, $1, $ $ Ref # E38000 FIBER OPTIC CABLE MODEM, AS PER PLAN, (ETHERNET SW, (6 EACH) Awd $2, $12, $2, $12, $3, $18, $3, $20, Section 9 - TRAFFIC SIGNALS - Totals Awd $806, $806, $880, $790, Page 31
32 Ref #298 AA2 633E67300 PREEMPTION (SONEM) ALTERNATE BID (WT: 44), (1 EACH) Awd $1, $1, $1, $1, $1, $1, $2, $2, Ref #299 AA2 633E67310 PREEMPTION RECEIVING UNIT(SONEM ALTERNATE B, (24 EACH) Awd $ $15, $ $15, $ $15, $1, $24, Ref #300 AA2 633E67320 PREEMPTION DETECTOR CABLE (TRAFFIC SYSTEMS, LLC. -, (5112 FT) Awd $1.85 $9, $1.85 $9, $1.59 $8, $2.00 $10, Ref #301 AA2 633E67350 PREEMPTION PHASE SELECTOR (SONEM ALTERNATE, (6 EACH) Awd $3, $18, $3, $18, $3, $20, $4, $24, Ref #302 AA2 633E67401 PREEMPTION CONFIRMATION LIGHT, AS PER PLAN(LED) (T, (21 EACH) Awd $ $9, $ $9, $ $8, $ $12, Ref #304 AB2 633E99000 CONTROLLER ITEM, MISC.:NIVERSAL TRAFFIC MANAGEMENT, (15 EACH) Awd $5, $81, $5, $81, $6, $103, $6, $90, Section 10 - TRAFFIC SIGNALS (ALTERNATES) - Totals Awd $135, $135, $157, $162, Ref # E20041 DECIDUOUS SHRUB, 2' HEIGHT, AS PER PLAN (WT: 46), (147 EACH) Awd $60.00 $8, $90.00 $13, $67.20 $9, $60.00 $8, Ref # E31000 LANDSCAPE WATERING (WT: 46), (588 GAL) Awd $2.00 $1, $0.25 $ $2.24 $1, $2.00 $1, Page 32
33 Section 11 - LANDSCAPING - Totals Awd $9, $13, $11, $9, Ref # E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B (WT: NR), (100 CY) Awd $65.00 $6, $50.00 $5, $ $11, $50.00 $5, Ref # E13000 TRAFFIC COMPACTED SURFACE, TYPE C (WT: NR), (100 CY) Awd $65.00 $6, $60.00 $6, $ $10, $55.00 $5, Ref # E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (240 HOUR) Awd $60.00 $14, $65.00 $15, $90.40 $21, $60.00 $14, Ref # E11500 WORKSITE TRAFFIC SUPERVISOR (WT: 39), (12 MNTH) Awd $1, $12, $6, $72, $10, $120, $3, $36, Ref # E11620 LINEAR DELINEATION (WT: 39), (1000 FT) Awd $2.40 $2, $0.40 $ $0.39 $ $1.20 $1, Ref # E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) (WT: 3, (29 EACH) Awd $1, $53, $1, $43, $1, $33, $1, $47, Ref # E12440 WORK ZONE SIGN SUPPORT (WT: 39), (50 EACH) Awd $ $8, $ $7, $92.44 $4, $32.00 $1, Ref # E12460 WORK ZONE MARKING SIGN (WT: 39), (50 EACH) Awd $ $5, $ $6, $ $6, $63.00 $3, Ref # E12500 REPLACEMENT SIGN (WT: 39), (100 EACH) Awd $ $10, $ $22, $ $12, $55.00 $5, Page 33
34 Ref # E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC (WT: 10), (200 CY) Awd $ $55, $ $60, $ $67, $ $60, Ref # E13300 BARRIER REFLECTOR, TYPE B (WT: NR), (797 EACH) Awd $7.50 $5, $5.00 $3, $4.76 $3, $5.30 $4, Ref # E13360 OBJECT MARKER, TWO WAY (WT: NR), (797 EACH) Awd $7.50 $5, $12.00 $9, $8.51 $6, $12.00 $9, Ref # E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN (WT:, (840 DAY) Awd $30.00 $25, $20.00 $16, $29.51 $24, $18.00 $15, Ref # E20200 WORK ZONE LANE LINE, CLASS I, , TYPE I (WT:, (6.46 MILE) Awd $1, $11, $1, $11, $2, $13, $1, $9, Ref # E21200 WORK ZONE CENTER LINE, CLASS I, , TYPE I (WT, (2.1 MILE) Awd $9, $19, $9, $19, $10, $22, $9, $20, Ref # E22200 WORK ZONE EDGE LINE, CLASS I, , TYPE I (WT:, (22.85 MILE) Awd $4, $109, $4, $109, $5, $122, $4, $103, Ref # E23400 WORK ZONE CHANNELIZING LINE, CLASS I, , TYPE, (9365 FT) Awd $1.80 $16, $1.80 $16, $2.02 $18, $1.60 $14, Ref # E24400 WORK ZONE DOTTED LINE, CLASS I, , TYPE I (WT, (3072 FT) Awd $2.00 $6, $2.00 $6, $2.24 $6, $1.25 $3, Ref # E26000 WORK ZONE STOP LINE, CLASS I (WT: 39), (726 FT) Awd $3.50 $2, $3.50 $2, $3.92 $2, $4.00 $2, Page 34
35 Ref # E30000 WORK ZONE ARROW, CLASS I (WT: 39), (36 EACH) Awd $75.00 $2, $75.00 $2, $84.00 $3, $ $3, Ref # E10000 ROADS FOR MAINTAINING TRAFFIC (WT: 06), (LUMP SUM) Awd $250, $250, $100, $100, $159, $159, $65, $65, Ref # E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B (WT: 10), ( SY) Awd $22.00 $186, $40.00 $338, $26.30 $222, $30.00 $254, Ref # E10000 WATER (WT: NR), (100 MGAL) Awd $10.00 $1, $45.00 $4, $ $14, $50.00 $5, Ref # E41011 PORTABLE BARRIER, 50", AS PER PLAN (WT: 39), (37442 FT) Awd $9.75 $365, $8.00 $299, $12.08 $452, $13.50 $505, Ref # E97700 SIGNING, MISC.: REGULATORY SIGN FOR MAINTAINING TR, (12 EACH) Awd $ $3, $ $2, $74.15 $ $ $1, Ref # E25000 COVERING OF VEHICULAR SIGNAL HEAD (WT: 44), (8 EACH) Awd $65.00 $ $65.00 $ $37.88 $ $ $ Ref # E30000 REMOVAL OF PAVEMENT MARKING (WT: NR), ( FT) Awd $0.45 $56, $0.45 $56, $0.50 $63, $0.39 $49, Ref # E30020 REMOVAL OF PAVEMENT MARKING (WT: 45), (37 EACH) Awd $85.00 $3, $85.00 $3, $95.20 $3, $70.00 $2, Section 12 - MAINTENANCE OF TRAFFIC - Totals Awd $1,246, $1,243, $1,429, $1,251, Page 35
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion
More informationOhio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director
Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion
More informationCT Consultants, Inc.
Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014
More informationBARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY
IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationMaine Turnpike Authority
Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationFederal Project No.: OC-095-1(348)
Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP
More informationFederal Project No.: STP-5128(388)
Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationMoDOT 2016 UNIT BID PRICES Northwest District
MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationFederal Project No.: HSIP-5A27(567)
Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More informationMaine Turnpike Authority
Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationMaine Turnpike Authority
Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM
More informationMaine Turnpike Authority
Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00
More information2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH
Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More information2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH
Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationBID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More information2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)
106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal
More informationMaine Turnpike Authority
Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING
PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and
More informationMaine Turnpike Authority
York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationLicensed Class C Virginia Contractor No.
month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS
PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationFederal Project No.: NHPP-967-7(083)
Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY
More informationMcCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1
McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John
More informationFederal Project No.: NHFP-081-1(346)
Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationHOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND
1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273
AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More informationMacomb County Department of Roads Bid Comparison
Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationItems Unit Quantity Unit Price Total Unit Price Total
Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH
More informationFederal Project No.: STP-5A27(380), STP-5A27(381)
Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationThe Tulalip Tribes of Washington
The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationAustin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724
National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00
More informationPAGE 1 of 18 WEIGHTED AVERAGE
UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551
More informationIngham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15
COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All
More informationSUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71
BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationSchedule of Pay Items
Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW
More information2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM
ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the
More informationSUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY
7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO
More informationBid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC
, IA - 2017 DIVISION 1 - GENERAL 1.01 TRAFFIC CONTROL LS 1 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 DIVISION 2 - EARTHWORK 2.01 CLEARING
More informationADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18
November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationTahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.
Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station
More information2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00
1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron
More informationSPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates
Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationCITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS
CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD
More informationBID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.
BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010
More informationUnits Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00
More informationOaks Commerce Center
Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing
More informationPN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least
More informationBID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes
More informationRiverside County Transportation Department Summary of Bids
Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE