1 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID HAM-IR Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract Awarded To: JOHN R JURGENSEN COMPANY Award Amount: $53,649, Engineer's Estimate: $59,960, Bidder 1 JOHN R JURGENSEN COMPANY MOSTELLER RD Hamilton CINCINNATI, OH Bid $53,649, Bidder 2 GREAT LAKES CONSTRUCTION CO 2608 GREAT LAKES WAY Medina HINCKLEY, OH Bid $54,018, Bidder 3 KOKOSING CONSTRUCTION COMPANY INC 886 MC KINLEY AVE Franklin COLUMBUS, OH Bid $56,393, Page 1

2 Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $97, $97, $460, $460, $197, $197, Ref #2 202E20010 HEADWALL REMOVED (WT: NR), (5 EACH) Awd $ $3, $ $ $ $1, Ref #3 202E23000 PAVEMENT REMOVED (WT: NR), (96919 SY) Awd $5.47 $530, $6.50 $629, $8.80 $852, Ref #4 202E30000 WALK REMOVED, (21451 SF) Awd $0.49 $10, $0.60 $12, $1.50 $32, Ref #5 202E30600 CONCRETE MEDIAN REMOVED, (358 SY) Awd $4.93 $1, $5.50 $1, $5.25 $1, Ref #6 202E30700 CONCRETE BARRIER REMOVED (WT: NR), (14295 FT) Awd $10.23 $146, $12.50 $178, $12.00 $171, Ref #7 202E32000 CURB REMOVED, (3942 FT) Awd $3.06 $12, $1.00 $3, $2.40 $9, Ref #8 202E32600 GUTTER REMOVED (WT: NR), (3602 FT) Awd $6.20 $22, $4.00 $14, $3.00 $10, Ref #9 202E35100 PIPE REMOVED, 24" AND UNDER (WT: NR), (6147 FT) Awd $11.74 $72, $14.00 $86, $17.00 $104, Ref #10 202E35200 PIPE REMOVED, OVER 24" (WT: NR), (131 FT) Awd $49.06 $6, $60.00 $7, $45.00 $5, Ref #11 202E38000 GUARDRAIL REMOVED (WT: NR), (7010 FT) Awd $1.25 $8, $1.25 $8, $1.27 $8, Ref #12 202E42206 ANCHOR ASSEMBLY REMOVED (WT: NR), (14 EACH) Awd $ $1, $ $1, $ $1, Page 2

3 Ref #13 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED (WT: NR), (15 EACH) Awd $ $2, $ $2, $ $2, Ref #14 202E58000 MANHOLE REMOVED (WT: NR), (6 EACH) Awd $ $3, $ $2, $ $2, Ref #15 202E58100 CATCH BASIN REMOVED (WT: NR), (39 EACH) Awd $ $13, $ $23, $ $12, Ref #16 202E58200 INLET REMOVED (WT: NR), (20 EACH) Awd $ $8, $ $10, $ $9, Ref #17 202E58500 CATCH BASIN ABANDONED (WT: NR), (9 EACH) Awd $1, $16, $ $4, $ $4, Ref #18 202E58700 MANHOLE ABANDONED, (1 EACH) Awd $1, $1, $1, $1, $ $ Ref #19 202E58701 MANHOLE ABANDONED, AS PER PLAN, (1 EACH) Awd $1, $1, $ $ $1, $1, Ref #20 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (WT: NR), (112 FT) Awd $27.54 $3, $12.00 $1, $8.00 $ Ref #21 202E75000 FENCE REMOVED (WT: NR), (5571 FT) Awd $3.40 $18, $3.40 $18, $3.45 $19, Ref #22 202E75250 GATE REMOVED, (1 EACH) Awd $60.00 $ $60.00 $ $60.91 $60.91 Ref #23 202E98100 REMOVAL MISC.:STONE GATE PILLAR, (4 EACH) Awd $ $1, $ $2, $ $1, Ref #24 202E98200 REMOVAL MISC.:RETAINING WALL, (1614 FT) Awd $11.12 $17, $22.00 $35, $30.00 $48, Page 3

4 Ref #25 202E98200 REMOVAL MISC.:TRENCH DRAIN, (30 FT) Awd $36.50 $1, $10.00 $ $25.00 $ Ref #26 202E98300 REMOVAL MISC.:PAVED CHANNEL WALL (WT: NR), (14 SY) Awd $62.43 $ $ $1, $35.00 $ Ref #27 203E10000 EXCAVATION (WT: 04), ( CY) Awd $2.82 $456, $13.00 $2,103, $16.75 $2,709, Ref #28 203E20000 EMBANKMENT (WT: 04), ( CY) Awd $7.15 $1,447, $7.00 $1,417, $3.50 $708, Ref #29 203E22000 EMBANKMENT, USING NATURAL SOILS, A (WT: 04, (552 CY) Awd $15.88 $8, $20.00 $11, $4.00 $2, Ref #30 203E35001 GRANULAR EMBANKMENT, AS PER PLAN (WT: 04), (224 CY) Awd $50.73 $11, $30.00 $6, $32.50 $7, Ref #31 203E98200 ROADWAY, MISC.:SPECIAL - EXCAVATION OF CONTAMINATE, (43202 TON) Awd $23.97 $1,035, $19.50 $842, $25.00 $1,080, Ref #32 204E10000 SUBGRADE COMPACTION, (8925 SY) Awd $1.88 $16, $1.00 $8, $2.00 $17, Ref #33 204E45000 PROOF ROLLING (WT: 04), (68 HOUR) Awd $96.05 $6, $ $8, $ $11, Ref #34 206E10500 CEMENT (WT: 07), (5082 TON) Awd $87.00 $442, $94.00 $477, $89.23 $453, Ref #35 206E11001 CURING COAT, AS PER PLAN (WT: 07), ( SY) Awd $0.72 $92, $0.70 $89, $0.75 $96, Ref #36 206E15030 CEMENT STABILIZED SUBGRADE, 16 INCHES DEEP (WT: 0, ( SY) Awd $4.66 $597, $3.60 $461, $5.00 $641, Page 4

5 Ref #37 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS, (LUMP SUM) Awd $25, $25, $31, $31, $25, $25, Ref #38 530E01100 SPECIAL - STRUCTURE, MISC.:ENGINEERED FILL (WT: N, (1623 CY) Awd $83.58 $135, $80.00 $129, $93.45 $151, Ref #39 604E38500 MONUMENT ASSEMBLY (WT: NR), (32 EACH) Awd $ $22, $ $16, $ $19, Ref #40 606E13000 GUARDRAIL, TYPE 5 (WT: 36), (13775 FT) Awd $12.50 $172, $12.50 $172, $12.69 $174, Ref #41 606E13050 GUARDRAIL, TYPE 5A (WT: 36), (50 FT) Awd $17.90 $ $17.90 $ $18.17 $ Ref #42 606E22000 ANCHOR ASSEMBLY, TYPE B-98, (1 EACH) Awd $1, $1, $1, $1, $1, $1, Ref #43 606E22010 ANCHOR ASSEMBLY, TYPE E-98, (4 EACH) Awd $1, $7, $1, $7, $1, $7, Ref #44 606E26500 ANCHOR ASSEMBLY, TYPE T (WT: 36), (6 EACH) Awd $ $3, $ $3, $ $3, Ref #45 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 (WT: 36), (10 EACH) Awd $1, $10, $1, $10, $1, $11, Ref #46 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 (WT: 36), (7 EACH) Awd $ $ $ $ $ $ Ref #47 606E60020 IMPACT ATTENUATOR, TYPE 2-98 (UNIDIRECTIONAL), 60, (2 EACH) Awd $14, $29, $14, $29, $14, $29, Ref #48 607E23000 FENCE, TYPE CLT (WT: 37), (3432 FT) Awd $14.95 $51, $14.95 $51, $15.18 $52, Page 5

6 Ref #49 607E23001 FENCE, TYPE CLT, AS PER PLAN (WT: 37), (604 FT) Awd $18.15 $10, $18.15 $10, $18.43 $11, Ref #50 608E " CONCRETE WALK, (21400 SF) Awd $3.31 $70, $4.00 $85, $3.75 $80, Ref #51 608E52130 CURB RAMP, TYPE B1, (12 EACH) Awd $ $5, $ $9, $ $3, Ref #52 608E52140 CURB RAMP, TYPE B2, (3 EACH) Awd $ $1, $1, $3, $ $1, Ref #53 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 (WT: 38), (997 FT) Awd $55.00 $54, $75.00 $74, $55.00 $54, Ref #54 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 (WT: 38), (4594 FT) Awd $63.00 $289, $55.00 $252, $50.00 $229, Ref #55 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D (WT: 38), (2771 FT) Awd $58.36 $161, $45.00 $124, $49.00 $135, Ref #56 622E10200 BARRIER TRANSITION (WT: 38), (2 EACH) Awd $3, $6, $6, $12, $3, $6, Ref #57 622E23504 CONCRETE BARRIER, TYPE C1 (WT: 38), (80 FT) Awd $ $8, $ $24, $ $15, Ref #58 622E25000 CONCRETE BARRIER END SECTION, TYPE D (WT: 38), (16 EACH) Awd $3, $59, $2, $40, $1, $30, Ref #59 622E25020 CONCRETE BARRIER, END ANCHORAGE, REINFORCED (WT:, (68 EACH) Awd $ $57, $1, $74, $ $61, Ref #60 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE, (25 EACH) Awd $1, $31, $3, $75, $1, $30, Page 6

7 Ref #61 690E98400 SPECIAL - MISC.:CONSULTANT FOR CONCRETE QUALITY CO, (LUMP SUM) Awd $141, $141, $200, $200, $106, $106, Ref #62 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM) Awd $165, $165, $350, $350, $167, $167, Ref # E65020 SPECIAL - WORK INVOLVING WATER, ( GAL) Awd $0.20 $60, $0.15 $45, $0.17 $51, Ref # E65024 SPECIAL - WORK INVOLVING REGULATED WATER, (30000 GAL) Awd $0.50 $15, $0.70 $21, $1.35 $40, Section 1 - ROADWAY - Totals Awd $6,718, $8,794, $8,734, Ref #63 601E21000 CONCRETE SLOPE PROTECTION (WT: 35), (2733 SY) Awd $68.00 $185, $55.00 $150, $60.00 $163, Ref #64 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 (WT: 35), (16 SY) Awd $ $2, $ $4, $75.00 $1, Ref #65 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (28 CY) Awd $96.57 $2, $ $2, $57.00 $1, Ref #66 601E37500 PAVED GUTTER, TYPE 1-2 (WT: 35), (2391 FT) Awd $36.93 $88, $40.00 $95, $30.00 $71, Ref #67 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN (WT: 35), (22 FT) Awd $97.72 $2, $70.00 $1, $68.00 $1, Ref #68 601E38000 PAVED GUTTER, TYPE 1-4, (1777 FT) Awd $39.40 $70, $45.00 $79, $38.00 $67, Ref #69 601E38001 PAVED GUTTER, TYPE 1-4, AS PER PLAN (WT: 35), (98 FT) Awd $54.86 $5, $40.00 $3, $52.00 $5, Page 7

8 Ref #70 601E40000 PAVED GUTTER, MISC.:MODIFIED PAVED GUTTER, TYPE 1, (357 FT) Awd $63.36 $22, $55.00 $19, $71.00 $25, Ref #71 601E40050 PAVED GUTTER, MISC.:MODIFIED PAVED GUTTER, TYPE 1, (144 SY) Awd $69.00 $9, $85.00 $12, $70.00 $10, Ref #72 659E00100 SOIL ANALYSIS TEST (WT: NR), (2 EACH) Awd $25.00 $ $50.00 $ $25.64 $51.28 Ref #73 659E00300 TOPSOIL (WT: 46), (13510 CY) Awd $6.16 $83, $18.00 $243, $10.00 $135, Ref #74 659E10000 SEEDING AND MULCHING (WT: 46), ( SY) Awd $0.30 $30, $0.30 $30, $0.31 $31, Ref #75 659E14000 REPAIR SEEDING AND MULCHING (WT: 46), (5056 SY) Awd $0.28 $1, $0.30 $1, $0.29 $1, Ref #76 659E15000 INTER-SEEDING (WT: 46), (5056 SY) Awd $0.24 $1, $0.25 $1, $0.25 $1, Ref #77 659E20000 COMMERCIAL FERTILIZER (WT: 46), (14.11 TON) Awd $ $3, $ $3, $ $3, Ref #78 659E31000 LIME (WT: 46), (20.89 ACRE) Awd $30.00 $ $30.00 $ $30.77 $ Ref #79 659E35000 WATER (WT: 46), (560 MGAL) Awd $1.00 $ $1.00 $ $1.03 $ Ref #80 659E40000 MOWING (WT: 46), (228 MSF) Awd $2.10 $ $2.10 $ $2.15 $ Ref #81 660E20000 SODDING REINFORCED (WT: 46), (202 SY) Awd $10.25 $2, $10.25 $2, $10.51 $2, Page 8

9 Ref #82 670E00700 DITCH EROSION PROTECTION (WT: 46), (5260 SY) Awd $1.30 $6, $1.30 $6, $1.33 $6, Ref #83 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM) Awd $3, $3, $50, $50, $18, $18, Ref #84 832E30000 EROSION CONTROL, ( EACH) Awd $1.00 $360, $1.00 $360, $1.00 $360, Section 2 - EROSION CONTROL - Totals Awd $883, $1,070, $910, Ref #85 202E58700 MANHOLE ABANDONED, (4 EACH) Awd $ $1, $2, $8, $6, $24, Ref #86 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 12", (67 FT) Awd $12.39 $ $10.00 $ $10.00 $ Ref #87 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 72", (634 FT) Awd $ $64, $75.00 $47, $80.00 $50, Ref #88 304E20000 AGGREGATE BASE, (140 CY) Awd $55.03 $7, $65.00 $9, $55.00 $7, Ref #89 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM) Awd $78, $78, $2, $2, $160, $160, Ref #90 602E20000 CONCRETE MASONRY (WT: 35), (17.1 CY) Awd $1, $22, $1, $17, $ $14, Ref #91 603E " CONDUIT, TYPE F, , NON-PERFORATED, FOR DR, (100 FT) Awd $10.96 $1, $20.00 $2, $13.00 $1, Ref #92 603E " CONDUIT, TYPE F FOR UNDERDRAIN OUTLET (WT: 35), (883 FT) Awd $20.50 $18, $15.00 $13, $13.00 $11, Page 9

10 Ref #93 603E " CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS (WT: 35, (3838 FT) Awd $21.18 $81, $14.00 $53, $15.00 $57, Ref #94 603E " CONDUIT, TYPE E, FOR DRAINAGE CONNECTION (WT:, (100 FT) Awd $11.45 $1, $20.00 $2, $14.00 $1, Ref #95 603E " CONDUIT, TYPE B (WT: 35), (181 FT) Awd $67.72 $12, $45.00 $8, $45.00 $8, Ref #96 603E " CONDUIT, TYPE B, (WT: 35), (728 FT) Awd $85.50 $62, $65.00 $47, $70.00 $50, Ref #97 603E " CONDUIT, TYPE B, FOR DRAINAGE CONNECTION (WT:, (100 FT) Awd $49.00 $4, $60.00 $6, $45.00 $4, Ref #98 603E " CONDUIT, TYPE C, , (328 FT) Awd $59.62 $19, $45.00 $14, $80.00 $26, Ref #99 603E " CONDUIT, TYPE C, FOR DRAINAGE CONNECTION (WT:, (100 FT) Awd $54.37 $5, $60.00 $6, $40.00 $4, Ref # E " CONDUIT, TYPE C, AS PER PLAN, (37 FT) Awd $ $7, $ $6, $ $6, Ref # E " CONDUIT, TYPE F, TYPE C OR , (31 FT) Awd $ $4, $55.00 $1, $70.00 $2, Ref # E " CONDUIT, TYPE B (WT: 35), (655 FT) Awd $64.62 $42, $60.00 $39, $55.00 $36, Ref # E " CONDUIT, TYPE B, , (628 FT) Awd $ $66, $75.00 $47, $ $62, Ref # E " CONDUIT, TYPE B, BORED OR JACKED (WT: 35), (272 FT) Awd $ $64, $ $95, $ $58, Page 10

11 Ref # E " CONDUIT, TYPE C (WT: 35), (1309 FT) Awd $41.29 $54, $50.00 $65, $40.00 $52, Ref # E " CONDUIT, TYPE F, TYPE C OR (WT:, (166 FT) Awd $67.99 $11, $60.00 $9, $70.00 $11, Ref # E " CONDUIT, TYPE B (WT: 35), (77 FT) Awd $60.90 $4, $90.00 $6, $65.00 $5, Ref # E " CONDUIT, TYPE B, , (359 FT) Awd $84.91 $30, $80.00 $28, $70.00 $25, Ref # E " CONDUIT, TYPE B, BORED OR JACKED (WT: 35), (93 FT) Awd $ $24, $ $27, $ $22, Ref # E " CONDUIT, TYPE C (WT: 35), (234 FT) Awd $92.87 $21, $60.00 $14, $80.00 $18, Ref # E " CONDUIT, TYPE B (WT: 35), (174 FT) Awd $60.85 $10, $80.00 $13, $75.00 $13, Ref # E " CONDUIT, TYPE B, , (103 FT) Awd $ $11, $ $10, $75.00 $7, Ref # E " CONDUIT, TYPE B, BORED OR JACKED (WT: 35), (84 FT) Awd $ $26, $ $25, $ $23, Ref # E " CONDUIT, TYPE C (WT: 35), (184 FT) Awd $47.88 $8, $75.00 $13, $60.00 $11, Ref # E " CONDUIT, TYPE B (WT: 35), (486 FT) Awd $72.60 $35, $75.00 $36, $70.00 $34, Ref # E " CONDUIT, TYPE B, , (75 FT) Awd $ $8, $ $15, $ $7, Page 11

12 Ref # E " CONDUIT, TYPE B, BORED OR JACKED (WT: 35), (186 FT) Awd $ $56, $ $55, $ $51, Ref # E " CONDUIT, TYPE C (WT: 35), (709 FT) Awd $57.21 $40, $60.00 $42, $70.00 $49, Ref # E " CONDUIT, TYPE B (WT: 35), (507 FT) Awd $68.41 $34, $ $50, $ $50, Ref # E " CONDUIT, TYPE B, , (134 FT) Awd $ $14, $ $14, $ $13, Ref # E " CONDUIT, TYPE B, (1500 D-LOAD), ,, (48 FT) Awd $ $6, $90.00 $4, $80.00 $3, Ref # E " CONDUIT, TYPE C (WT: 35), (122 FT) Awd $60.72 $7, $70.00 $8, $80.00 $9, Ref # E " CONDUIT, TYPE B (WT: 35), (895 FT) Awd $71.14 $63, $95.00 $85, $95.00 $85, Ref # E " CONDUIT, TYPE B, , (132 FT) Awd $ $29, $ $21, $ $33, Ref # E " CONDUIT, TYPE C (WT: 35), (162 FT) Awd $72.44 $11, $80.00 $12, $90.00 $14, Ref # E " CONDUIT, TYPE B (WT: 35), (1135 FT) Awd $76.45 $86, $ $113, $ $130, Ref # E " CONDUIT, TYPE B, , (521 FT) Awd $ $66, $ $78, $ $88, Ref # E " CONDUIT, TYPE B, BORED OR JACKED (WT: 35), (93 FT) Awd $ $39, $ $46, $ $36, Page 12

13 Ref # E " CONDUIT, TYPE C (WT: 35), (116 FT) Awd $72.89 $8, $80.00 $9, $ $11, Ref # E " CONDUIT, TYPE B (WT: 35), (77 FT) Awd $ $14, $ $11, $ $11, Ref # E " CONDUIT, TYPE B, (WT: 35), (507 FT) Awd $ $117, $ $106, $ $121, Ref # E " CONDUIT, TYPE C (WT: 35), (161 FT) Awd $90.05 $14, $ $22, $ $16, Ref # E " CONDUIT, TYPE C, , (83 FT) Awd $ $11, $ $15, $ $14, Ref # E " CONDUIT, TYPE A, (WT: 35), (205 FT) Awd $ $85, $ $71, $ $102, Ref # E " CONDUIT, TYPE A, (2500D-LOAD)OR72" 707.0, (116 FT) Awd $ $40, $ $37, $ $30, Ref # E " CONDUIT, TYPE C, AS PER PLAN, (621 FT) Awd $ $602, $ $341, $ $558, Ref # E97010 SLOTTED DRAIN, TYPE 2, 12" (WT: 35), (775 FT) Awd $ $79, $80.00 $62, $70.00 $54, Ref # E00400 CATCH BASIN, NO. 3, (18 EACH) Awd $2, $43, $2, $45, $3, $59, Ref # E00800 CATCH BASIN, NO. 3A (WT: 35), (16 EACH) Awd $1, $27, $2, $36, $2, $43, Ref # E01200 CATCH BASIN, NO. 4 (WT: 35), (8 EACH) Awd $2, $21, $3, $28, $4, $36, Page 13

14 Ref # E01400 CATCH BASIN, NO. 4A, (1 EACH) Awd $3, $3, $5, $5, $5, $5, Ref # E01600 CATCH BASIN, NO. 5, (1 EACH) Awd $2, $2, $3, $3, $4, $4, Ref # E02800 CATCH BASIN, NO. 8 (WT: 35), (12 EACH) Awd $2, $25, $3, $36, $3, $39, Ref # E02906 CATCH BASIN, NO. 8A (WT: 35), (4 EACH) Awd $4, $17, $6, $24, $7, $30, Ref # E04500 CATCH BASIN, NO. 2-2B, (3 EACH) Awd $ $2, $1, $3, $1, $4, Ref # E04900 CATCH BASIN, NO. 2-3, (4 EACH) Awd $ $3, $1, $6, $2, $9, Ref # E05301 CATCH BASIN, NO. 2-4, AS PER PLAN, (1 EACH) Awd $1, $1, $2, $2, $2, $2, Ref # E09000 CATCH BASIN ADJUSTED TO GRADE (WT: 35), (2 EACH) Awd $ $ $ $1, $ $1, Ref # E09500 CATCH BASIN RECONSTRUCTED TO GRADE (WT: 35), (2 EACH) Awd $1, $2, $1, $2, $1, $2, Ref # E20514 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1 (WT, (4 EACH) Awd $7, $28, $5, $20, $8, $32, Ref # E20515 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1, AS, (3 EACH) Awd $6, $20, $4, $13, $7, $23, Ref # E20524 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C1 (WT, (9 EACH) Awd $7, $64, $5, $49, $8, $74, Page 14

15 Ref # E20530 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D (WT:, (11 EACH) Awd $6, $72, $4, $49, $7, $79, Ref # E20531 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D, AS, (1 EACH) Awd $7, $7, $5, $5, $4, $4, Ref # E20801 INLET RECONSTRUCTED TO GRADE, AS PER PLAN (WT: 35, (3 EACH) Awd $2, $7, $1, $4, $2, $6, Ref # E31500 MANHOLE, NO. 3 (WT: 35), (45 EACH) Awd $3, $135, $4, $180, $4, $180, Ref # E31500 MANHOLE, NO. 3, WITH 72" BASE, (1 EACH) Awd $5, $5, $4, $4, $5, $5, Ref # E34500 MANHOLE ADJUSTED TO GRADE, (19 EACH) Awd $ $8, $ $11, $ $10, Ref # E35500 MANHOLE RECONSTRUCTED TO GRADE, (1 EACH) Awd $1, $1, $6, $6, $1, $1, Ref # E36600 PRECAST REINFORCED CONCRETE OUTLET (WT: 35), (18 EACH) Awd $ $3, $ $4, $ $3, Ref # E50000 SPECIAL - MISCELLANEOUS METAL (WT: 35), (1000 LB) Awd $3.97 $3, $0.75 $ $1.64 $1, Ref # E98000 DRAINAGE STRUCTURE, MISC.:CB-3M (MODIFIED) CATCH B, (17 EACH) Awd $2, $46, $4, $68, $5, $85, Ref # E98000 DRAINAGE STRUCTURE, MISC.:PRECAST MANHOLE NO. 4, (1 EACH) Awd $9, $9, $35, $35, $65, $65, Ref # E98000 DRAINAGE STRUCTURE, MISC.:STANDARD MANHOLE PER MSD, (1 EACH) Awd $5, $5, $15, $15, $18, $18, Page 15

16 Ref # E98000 DRAINAGE STRUCTURE, MISC.:STANDARD MANHOLE RISER P, (2 EACH) Awd $3, $6, $5, $10, $3, $7, Ref # E98200 DRAINAGE STRUCTURE, MISC.:48" FLAP VALVE, (LUMP SUM) Awd $25, $25, $15, $15, $18, $18, Ref # E98200 DRAINAGE STRUCTURE, MISC.:CSO CHAMBER 3 (21 CY CON, (LUMP SUM) Awd $44, $44, $75, $75, $40, $40, Ref # E98200 DRAINAGE STRUCTURE, MISC.:JUNCTION CHAMBER 1 (120, (LUMP SUM) Awd $142, $142, $375, $375, $152, $152, Ref # E98200 DRAINAGE STRUCTURE, MISC.:JUNCTION CHAMBER 2 (140, (LUMP SUM) Awd $150, $150, $375, $375, $165, $165, Ref # E98200 DRAINAGE STRUCTURE, MISC.:MODIFY EXISTING CSO 30 (, (LUMP SUM) Awd $1, $1, $10, $10, $1, $1, Ref # E " UNCLASSIFIED PIPE UNDERDRAINS (WT: 35), (216 FT) Awd $10.40 $2, $15.00 $3, $9.25 $1, Ref # E " BASE PIPE UNDERDRAINS (WT: 35), (9300 FT) Awd $4.81 $44, $6.00 $55, $6.50 $60, Ref # E " SHALLOW PIPE UNDERDRAINS (WT: 35), (45960 FT) Awd $5.20 $238, $7.00 $321, $5.00 $229, Ref # E " UNCLASSIFIED PIPE UNDERDRAINS (WT: 35), (152 FT) Awd $13.44 $2, $15.00 $2, $12.00 $1, Ref # E " SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, (2931 FT) Awd $9.69 $28, $6.00 $17, $12.00 $35, Section 3 - DRAINAGE - Totals Awd $3,503, $3,829, $3,850, Page 16

17 Ref # E01000 PAVEMENT PLANING, ASPHALT CONCRETE (WT: 13), (44212 SY) Awd $0.96 $42, $0.90 $39, $0.91 $40, Ref # E46000 ASPHALT CONCRETE BASE, PG64-22, (2874 CY) Awd $97.27 $279, $98.00 $281, $99.57 $286, Ref # E46000 ASPHALT CONCRETE BASE, PG64-22 (WT: 10), (38595 CY) Awd $84.79 $3,272, $90.00 $3,473, $91.52 $3,532, Ref # E20000 AGGREGATE BASE (WT: 09), (22700 CY) Awd $36.30 $824, $50.00 $1,135, $50.00 $1,135, Ref # E20001 AGGREGATE BASE, AS PER PLAN (WT: 09), (64 CY) Awd $86.25 $5, $ $8, $72.00 $4, Ref # E10000 TACK COAT (WT: 10), (3480 GAL) Awd $2.00 $6, $2.00 $6, $2.03 $7, Ref # E14000 TACK COAT FOR INTERMEDIATE COURSE (WT: 10), (6476 GAL) Awd $2.00 $12, $2.00 $12, $2.03 $13, Ref # E10000 PRIME COAT, (137 GAL) Awd $3.38 $ $3.50 $ $3.55 $ Ref # E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (4469 CY) Awd $ $661, $ $661, $ $670, Ref # E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (5243 CY) Awd $ $602, $ $597, $ $605, Ref # E46024 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (14 CY) Awd $ $3, $ $3, $ $3, Ref # E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (674 CY) Awd $ $75, $ $75, $ $76, Page 17

18 Ref # E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (209 CY) Awd $ $25, $ $25, $ $25, Ref # E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (1650 CY) Awd $ $211, $ $209, $ $212, Ref # E48020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (26 CY) Awd $ $7, $ $7, $ $7, Ref # E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H, (674 CY) Awd $ $105, $ $103, $ $105, Ref # E " NON-REINFORCED CONCRETE PAVEMENT, (204 SY) Awd $57.98 $11, $55.00 $11, $49.00 $9, Ref # E " NON-REINFORCED CONCRETE PAVEMENT, (241 SY) Awd $54.02 $13, $50.00 $12, $68.00 $16, Ref # E " NON-REINFORCED CONCRETE PAVEMENT, AS PER PLAN, (19108 SY) Awd $72.32 $1,381, $70.00 $1,337, $70.00 $1,337, Ref # E14000 CURB, TYPE 2-A, (534 FT) Awd $4.00 $2, $3.50 $1, $8.00 $4, Ref # E24000 CURB, TYPE 4-A, (290 FT) Awd $3.25 $ $20.00 $5, $7.00 $2, Ref # E24510 CURB, TYPE 4-C (WT: 38), (681 FT) Awd $26.24 $17, $25.00 $17, $11.00 $7, Ref # E26000 CURB, TYPE 6, (252 FT) Awd $22.74 $5, $23.00 $5, $24.00 $6, Ref # E26001 CURB, TYPE 6, AS PER PLAN, (3087 FT) Awd $12.24 $37, $14.00 $43, $13.00 $40, Page 18

19 Ref # E " CONCRETE TRAFFIC ISLAND, (205 SY) Awd $50.00 $10, $45.00 $9, $41.00 $8, Ref # E40601 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN, (7.1 MILE) Awd $1, $10, $ $3, $ $5, Section 4 - PAVEMENT - Totals Awd $7,629, $8,090, $8,163, Ref # E25000 REINFORCING STEEL, (236 LB) Awd $2.49 $ $2.75 $ $3.00 $ Ref # E34500 MANHOLE ADJUSTED TO GRADE, (3 EACH) Awd $ $1, $ $1, $ $1, Ref # E80500 SPECIAL - FURNISHING AND LAYING 4" DUCTILE IRON PI, (135 FT) Awd $ $28, $ $16, $ $15, Ref # E80600 SPECIAL - FURNISHING AND LAYING 6" DUCTILE IRON PI, (75 FT) Awd $ $15, $ $15, $ $12, Ref # E81000 SPECIAL - FURNISHING AND LAYING 16" DUCTILE IRON P, (58 FT) Awd $ $36, $ $34, $ $34, Ref # E84500 SPECIAL - CONCRETE, CLASS C (CIN. 1110), (3 CY) Awd $ $1, $75.00 $ $ $2, Ref # E85800 SPECIAL - FURNISHING AND INSTALLING FIRE HYDRANT (, (1 EACH) Awd $2, $2, $2, $2, $3, $3, Ref # E85900 SPECIAL - RELOCATING EXISTING FIRE HYDRANT (CIN. 1, (2 EACH) Awd $3, $6, $1, $2, $1, $3, Ref # E86000 SPECIAL - REMOVING FIRE HYDRANT (CIN. 1114), (1 EACH) Awd $1, $1, $2, $2, $ $ Page 19

20 Ref # E86100 SPECIAL - FURNISHING AND INSTALLING FIRE HYDRANT E, (3 EACH) Awd $ $2, $ $ $1, $3, Ref # E86200 SPECIAL - INSTALLING VALVE BOX, COMPLETE (CIN. 111, (4 EACH) Awd $1, $6, $ $ $ $2, Ref # E86400 SPECIAL - ADDITIONAL EXCAVATION (CIN. 1119), (5 CY) Awd $37.05 $ $ $ $45.00 $ Ref # E86404 SPECIAL - EXPLORATORY EXCAVATION (CIN. 1120), (5 CY) Awd $37.05 $ $ $1, $ $ Ref # E86600 SPECIAL - REMOVING EXISTING MANHOLE CURB AND COVER, (1 EACH) Awd $ $ $ $ $ $ Ref # E86700 SPECIAL - REMOVING EXISTING VALVE BOX (CIN. 1122), (2 EACH) Awd $ $ $30.00 $ $ $ Ref # E87100 SPECIAL - RESETTING EXISTING VALVE BOX, COMPLETE (, (6 EACH) Awd $ $4, $ $ $ $1, Ref # E88500 SPECIAL - DISCONNECTING EXISTING SERVICE BRANCH (C, (2 EACH) Awd $ $1, $ $1, $1, $2, Ref # E88800 SPECIAL - RESETTING EXISTING CURB AND ROADWAY BOX, (2 EACH) Awd $ $1, $60.00 $ $ $ Ref # E89650 SPECIAL - RESETTING EXISTING 5/8" FROST PROOF METE, (1 EACH) Awd $1, $1, $ $ $2, $2, Ref # E98000 WATER WORK, MISC.:RELOCATING EXISTING METER SETTIN, (1 EACH) Awd $30, $30, $15, $15, $10, $10, Section 5 - WATER WORK - Totals Awd $143, $96, $97, Page 20

21 Ref # E58700 MANHOLE ABANDONED, (1 EACH) Awd $1, $1, $6, $6, $1, $1, Ref # E " CONDUIT, TYPE B, FOR SANITARY (WT: 35), (280 FT) Awd $85.18 $23, $45.00 $12, $60.00 $16, Ref # E34500 MANHOLE ADJUSTED TO GRADE, (3 EACH) Awd $ $1, $2, $6, $ $1, Section 6 - SANITARY SEWER - Totals Awd $26, $24, $20, Ref # E75700 CONTROL CENTER REMOVED, (LUMP SUM) Awd $ $ $ $ $ $ Ref # E75800 DISCONNECT EXISTING CIRCUIT (WT: NR), (4 EACH) Awd $ $ $ $ $ $ Ref # E31510 PULL BOX REMOVED (WT: 43), (29 EACH) Awd $75.00 $2, $75.00 $2, $75.76 $2, Ref # E75350 LIGHT TOWER REMOVED, (6 EACH) Awd $ $3, $ $3, $ $3, Ref # E75400 LIGHT POLE REMOVED (WT: NR), (44 EACH) Awd $ $22, $ $22, $ $22, Ref # E75500 LIGHT POLE FOUNDATION REMOVED (WT: NR), (30 EACH) Awd $ $3, $ $3, $ $3, Ref # E75506 LUMINAIRE REMOVED (WT: NR), (62 EACH) Awd $ $15, $ $15, $ $15, Ref # E75511 POWER SERVICE REMOVED, AS PER PLAN (WT: NR), (2 EACH) Awd $ $1, $ $1, $ $1, Page 21

22 Ref # E75540 LIGHT TOWER FOUNDATION REMOVED, (6 EACH) Awd $ $ $ $ $ $ Section 7 - LIGHTING DEMOLITION - Totals Awd $50, $50, $51, Ref # E00480 CONNECTION, UNFUSED PERMANENT, (42 EACH) Awd $45.00 $1, $45.00 $1, $45.45 $1, Ref # E00500 CONNECTOR KIT, TYPE II (WT: 43), (34 EACH) Awd $45.00 $1, $45.00 $1, $45.45 $1, Ref # E00950 CONNECTOR KIT, TYPE VII (WT: 43), (24 EACH) Awd $50.00 $1, $50.00 $1, $50.51 $1, Ref # E10490 LIGHT POLE, CONVENTIONAL: A18B40 (WT: 43), (2 EACH) Awd $2, $4, $2, $4, $2, $4, Ref # E10494 LIGHT POLE, LOW MAST: ALM40 (WT: 43), (15 EACH) Awd $1, $28, $1, $28, $1, $28, Ref # E10620 LIGHT POLE ANCHOR BOLTS, MISC.:SET FOR PILASTER MO, (8 EACH) Awd $ $1, $ $1, $ $1, Ref # E13200 LIGHT TOWER, BBBB100, (7 EACH) Awd $10, $70, $12, $87, $10, $70, Ref # E13400 LIGHT TOWER, BBBBBB100, (5 EACH) Awd $10, $50, $12, $62, $10, $50, Ref # E14306 MEDIAN LIGHT POLE FOUNDATION, 10' DEEP (WT: 43), (15 EACH) Awd $4, $71, $3, $57, $3, $54, Ref # E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP, (10 EACH) Awd $7, $75, $7, $75, $7, $75, Page 22

23 Ref # E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE (WT: 43), (13644 FT) Awd $2.45 $33, $2.45 $33, $2.47 $33, Ref # E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE, (2690 FT) Awd $1.35 $3, $1.35 $3, $1.36 $3, Ref # E23400 NO. 10 AWG POLE AND BRACKET CABLE (WT: 43), (1752 FT) Awd $1.05 $1, $1.05 $1, $1.06 $1, Ref # E /2" DUCT CABLE WITH THREE NO. 4 AWG 5000 VOLT C, (3895 FT) Awd $7.35 $28, $7.35 $28, $7.42 $28, Ref # E25200 CONDUIT, 1-1/4", , (850 FT) Awd $4.85 $4, $4.85 $4, $4.90 $4, Ref # E25900 CONDUIT, JACKED OR DRILLEDUNDER PAVEMENT, 3" (WT:, (1145 FT) Awd $35.00 $40, $35.00 $40, $35.35 $40, Ref # E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, 480V, 250W H, (2 EACH) Awd $ $ $ $ $ $ Ref # E26261 LUMINAIRE, HIGH MAST, AS PER PLAN, 400W, TYPE V, M, (73 EACH) Awd $ $45, $ $45, $ $45, Ref # E27501 LUMINAIRE, UNDERPASS, AS PER PLAN, 480V, 70W HPS, (22 EACH) Awd $ $13, $ $13, $ $14, Ref # E29002 TRENCH, 24" DEEP (WT: 43), (3795 FT) Awd $5.95 $22, $5.95 $22, $6.01 $22, Ref # E29910 TRANSITION JUNCTION BOX (WT: 43), (4 EACH) Awd $1, $5, $1, $5, $1, $5, Ref # E29920 STRUCTURE JUNCTION BOX (WT: 43), (25 EACH) Awd $1, $33, $1, $33, $1, $34, Page 23

24 Ref # E29940 BARRIER JUNCTION BOX (WT: 43), (3 EACH) Awd $3, $11, $1, $4, $1, $5, Ref # E30700 PULL BOX, , 18" (WT: 43), (15 EACH) Awd $ $7, $ $7, $ $7, Ref # E32000 GROUND ROD (WT: 43), (39 EACH) Awd $ $6, $ $6, $ $6, Ref # E33001 STRUCTURE GROUNDING SYSTEM, AS PER PLAN (WT: 43), (2 EACH) Awd $2, $5, $2, $5, $2, $5, Ref # E34001 POWER SERVICE, AS PER PLAN (WT: 43), (5 EACH) Awd $3, $17, $3, $17, $3, $17, Ref # E36000 PLASTIC CAUTION TAPE (WT: 43), (3790 FT) Awd $0.25 $ $0.25 $ $0.25 $ Ref # E38000 HIGH VOLTAGE TEST, (LUMP SUM) Awd $1, $1, $1, $1, $1, $1, Ref # E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM) Awd $45, $45, $95, $95, $45, $45, Ref # E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT, (1 EACH) Awd $ $ $ $ $ $ Ref # E98000 LIGHTING, MISC.:DISCONNECT SWITCH, (1 EACH) Awd $1, $1, $1, $1, $1, $1, Ref # E15700 LIGHT TOWER FOUNDATION, MISC.:MEDIAN LIGHT TOWER F, (2 EACH) Awd $9, $19, $9, $19, $9, $18, Section 8 - LIGHTING - Totals Awd $654, $712, $635, Page 24

25 Ref # E00500 DELINEATOR, POST MOUNTED (WT: NR), (51 EACH) Awd $40.00 $2, $40.00 $2, $40.61 $2, Ref # E11000 DELINEATOR, BRACKET MOUNTED (WT: NR), (31 EACH) Awd $ $3, $ $3, $ $3, Ref # E00100 RPM (WT: 41), (741 EACH) Awd $17.25 $12, $18.00 $13, $19.77 $14, Ref # E54000 RAISED PAVEMENT MARKER REMOVED (WT: NR), (155 EACH) Awd $7.57 $1, $7.50 $1, $10.99 $1, Ref # E32000 GROUND ROD (WT: 43), (11 EACH) Awd $ $1, $ $1, $ $1, Ref # E03100 GROUND MOUNTED SUPPORT, NO. 3 POST (WT: 42), (698 FT) Awd $7.25 $5, $7.25 $5, $7.36 $5, Ref # E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18, (100 FT) Awd $23.40 $2, $23.40 $2, $23.76 $2, Ref # E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 (WT, (52 FT) Awd $27.90 $1, $27.90 $1, $28.32 $1, Ref # E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 (WT, (40 FT) Awd $16.80 $ $16.80 $ $17.06 $ Ref # E08200 GROUND MOUNTED SUPPORT, PIPE, (2 EACH) Awd $ $1, $ $1, $ $1, Ref # E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (15 FT) Awd $9.00 $ $9.00 $ $9.14 $ Ref # E08600 SIGN POST REFLECTOR, (14 EACH) Awd $34.00 $ $34.00 $ $34.52 $ Page 25

26 Ref # E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION (WT: 42), (8 EACH) Awd $ $3, $ $3, $ $3, Ref # E09050 TRIANGULAR SLIP BASE CONNECTION, (2 EACH) Awd $ $ $ $ $ $ Ref # E20400 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 4, (2 EACH) Awd $8, $16, $8, $16, $8, $17, Ref # E20500 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 5 (WT, (2 EACH) Awd $10, $21, $10, $21, $10, $21, Ref # E20600 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 6 (WT, (4 EACH) Awd $11, $44, $11, $44, $11, $44, Ref # E20800 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 8 (WT, (3 EACH) Awd $11, $35, $11, $35, $12, $36, Ref # E75000 SIGN ATTACHMENT ASSEMBLY (WT: 42), (3 EACH) Awd $ $1, $ $1, $ $1, Ref # E77000 OVERPASS STRUCTURE MOUNTED SIGN SUPPORT, TYPE TC-1, (2 EACH) Awd $1, $2, $1, $2, $1, $2, Ref # E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED (WT: 42), (4 EACH) Awd $25.00 $ $25.00 $ $25.38 $ Ref # E79611 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED, AS PER PLA, (16 EACH) Awd $95.00 $1, $95.00 $1, $96.45 $1, Ref # E80100 SIGN, FLAT SHEET (WT: 42), (343 SF) Awd $13.90 $4, $13.90 $4, $14.11 $4, Ref # E80101 SIGN, FLAT SHEET, AS PER PLAN (WT: 42), (3 SF) Awd $75.00 $ $75.00 $ $76.14 $ Page 26

27 Ref # E80200 SIGN, GROUND MOUNTED EXTRUSHEET (WT: 42), (464 SF) Awd $15.60 $7, $15.60 $7, $15.84 $7, Ref # E80224 SIGN, OVERHEAD EXTRUSHEET (WT: 42), (1374 SF) Awd $16.30 $22, $16.30 $22, $16.55 $22, Ref # E80500 SIGN, DOUBLE FACED, STREET NAME, (2 EACH) Awd $70.00 $ $70.00 $ $71.07 $ Ref # E81000 MAINLINE REFERENCE MARKER (WT: 42), (30 EACH) Awd $93.00 $2, $93.00 $2, $94.42 $2, Ref # E81010 RAMP REFERENCE MARKER, (4 EACH) Awd $82.00 $ $82.00 $ $83.25 $ Ref # E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (8 EACH) Awd $ $3, $ $3, $ $4, Ref # E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION (WT: 42), (9 EACH) Awd $1, $10, $1, $10, $1, $10, Ref # E84600 GROUND MOUNTED PIPE SUPPORT FOUNDATION, (2 EACH) Awd $ $ $ $ $ $ Ref # E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL (WT:, (86 EACH) Awd $15.00 $1, $15.00 $1, $15.23 $1, Ref # E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (7 EACH) Awd $90.00 $ $90.00 $ $91.37 $ Ref # E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (55 EACH) Awd $15.00 $ $15.00 $ $15.23 $ Ref # E86007 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE, (15 EACH) Awd $30.00 $ $30.00 $ $30.46 $ Page 27

28 Ref # E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT, (12 EACH) Awd $95.00 $1, $95.00 $1, $96.45 $1, Ref # E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL (WT:, (26 EACH) Awd $ $3, $ $3, $ $3, Ref # E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL (WT: NR, (12 EACH) Awd $15.00 $ $15.00 $ $15.23 $ Ref # E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (10 EACH) Awd $ $9, $ $9, $ $9, Ref # E00100 EDGE LINE (WT: 45), (6.81 MILE) Awd $2, $18, $2, $18, $2, $18, Ref # E00200 LANE LINE (WT: 45), (8.32 MILE) Awd $1, $9, $1, $9, $1, $9, Ref # E00300 CENTER LINE, (0.51 MILE) Awd $4, $2, $4, $2, $4, $2, Ref # E00400 CHANNELIZING LINE (WT: 45), (6221 FT) Awd $1.35 $8, $1.35 $8, $1.35 $8, Ref # E00500 STOP LINE, (226 FT) Awd $4.85 $1, $4.85 $1, $4.85 $1, Ref # E00600 CROSSWALK LINE, (433 FT) Awd $2.85 $1, $2.85 $1, $2.85 $1, Ref # E00700 TRANSVERSE/DIAGONAL LINE, (544 FT) Awd $4.70 $2, $4.70 $2, $4.70 $2, Ref # E00900 ISLAND MARKING, (101 SF) Awd $2.70 $ $2.70 $ $2.70 $ Page 28

29 Ref # E01300 LANE ARROW, (25 EACH) Awd $ $2, $ $2, $ $2, Ref # E01514 DOTTED LINE, 8", (522 FT) Awd $1.70 $ $1.70 $ $1.70 $ Ref # E10000 EDGE LINE (WT: 45), (2.04 MILE) Awd $5, $11, $5, $11, $5, $11, Ref # E10100 LANE LINE (WT: 45), (0.92 MILE) Awd $4, $4, $4, $4, $4, $4, Ref # E10300 CHANNELIZING LINE (WT: 45), (1990 FT) Awd $2.00 $3, $2.00 $3, $2.00 $3, Ref # E10400 STOP LINE, (127 FT) Awd $11.00 $1, $11.00 $1, $11.00 $1, Ref # E10500 CROSSWALK LINE, (343 FT) Awd $6.00 $2, $6.00 $2, $6.00 $2, Ref # E20300 LANE ARROW, (31 EACH) Awd $ $5, $ $5, $ $5, Ref # E20410 WORD ON PAVEMENT, 96", (9 EACH) Awd $ $1, $ $1, $ $1, Section 9 - TRAFFIC CONTROL - Totals Awd $306, $306, $312, Ref # E25300 CONDUIT, 1-1/2", , (1695 FT) Awd $7.40 $12, $7.40 $12, $7.47 $12, Ref # E25400 CONDUIT, 2", , (660 FT) Awd $7.95 $5, $7.95 $5, $8.03 $5, Page 29

30 Ref # E25500 CONDUIT, 3", , (89 FT) Awd $15.40 $1, $15.40 $1, $15.56 $1, Ref # E25600 CONDUIT, 4", , (100 FT) Awd $20.50 $2, $20.50 $2, $20.71 $2, Ref # E29000 TRENCH, (1738 FT) Awd $5.95 $10, $5.95 $10, $6.01 $10, Ref # E30700 PULL BOX, , 18", (5 EACH) Awd $ $2, $ $2, $ $2, Ref # E30706 PULL BOX, , 24", (5 EACH) Awd $ $2, $ $2, $ $2, Ref # E32000 GROUND ROD, (8 EACH) Awd $ $1, $ $1, $ $1, Ref # E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (54 FT) Awd $7.25 $ $7.25 $ $9.47 $ Ref # E80100 SIGN, FLAT SHEET, (48 SF) Awd $14.40 $ $14.40 $ $14.73 $ Ref # E26500 DETECTOR LOOP, (12 EACH) Awd $ $10, $ $10, $ $10, Ref # E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (4300 FT) Awd $1.80 $7, $1.80 $7, $1.82 $7, Ref # E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A, (8020 FT) Awd $1.55 $12, $1.55 $12, $1.57 $12, Ref # E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (534 FT) Awd $2.65 $1, $2.65 $1, $2.68 $1, Page 30

31 Ref # E70000 POWER SERVICE, (2 EACH) Awd $1, $2, $1, $2, $1, $2, Ref # E72000 RAMP METER SIGNAL DISPLAY, (6 EACH) Awd $1, $8, $1, $8, $1, $8, Ref # E72010 RAMP METER SIGN, (2 EACH) Awd $ $1, $ $1, $ $1, Ref # E67100 CABINET FOUNDATION, (2 EACH) Awd $ $1, $ $1, $ $1, Ref # E67200 CONTROLLER WORK PAD, (2 EACH) Awd $ $ $ $ $ $ Ref # E67000 CABINET RISER, (1 EACH) Awd $ $ $ $ $ $ Ref #807 AA3 632E72020 RAMP METER CONTROLLER(ALTERNATE BID 2), (2 EACH) Awd $8, $17, $8, $17, $10, $21, Ref #810 AA3 632E90400 SIGNALIZATION, MISC.:RAMP METER SOFTWARE (ALTERNAT, (2 EACH) Awd $1, $3, $2, $5, $2, $4, Section 10 - TRAFFIC SURVEILLANCE - Totals Awd $106, $108, $112, Ref # E25403 CONDUIT, 2", , AS PER PLAN, (708 FT) Awd $2.20 $1, $2.20 $1, $2.22 $1, Ref # E25500 CONDUIT, 3", , (1473 FT) Awd $15.40 $22, $15.40 $22, $15.56 $22, Ref # E25503 CONDUIT, 3", , AS PER PLAN, (1769 FT) Awd $3.60 $6, $3.60 $6, $3.64 $6, Page 31

32 Ref # E25603 CONDUIT, 4", , AS PER PLAN, (14 FT) Awd $4.85 $ $4.85 $ $4.90 $68.60 Ref # E29000 TRENCH, (2455 FT) Awd $5.95 $14, $5.95 $14, $6.01 $14, Ref # E30701 PULL BOX, , 18", AS PER PLAN, (8 EACH) Awd $ $7, $ $7, $ $7, Ref # E30707 PULL BOX, , 24", AS PER PLAN, (16 EACH) Awd $ $15, $ $15, $ $15, Ref # E32000 GROUND ROD, (13 EACH) Awd $ $2, $ $2, $ $2, Ref # E79000 SIGN HANGER ASSEMBLY, SPAN WIRE, (23 EACH) Awd $ $2, $ $2, $85.86 $1, Ref # E80100 SIGN, FLAT SHEET, (143 SF) Awd $13.90 $1, $13.90 $1, $15.15 $2, Ref # E05001 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS,, (16 EACH) Awd $ $10, $ $10, $ $11, Ref # E05061 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS,, (4 EACH) Awd $ $3, $ $3, $ $3, Ref # E20601 PEDESTRIAN SIGNAL HEAD, TYPE D2, AS PER PLAN, (12 EACH) Awd $ $5, $ $5, $ $5, Ref # E26000 PEDESTRIAN PUSHBUTTON, (4 EACH) Awd $ $ $ $ $ $ Ref # E26500 DETECTOR LOOP, (23 EACH) Awd $ $20, $ $20, $ $20, Page 32

33 Ref # E28200 DISCONNECT SWITCH WITH ENCLOSURE, (1 EACH) Awd $ $ $ $ $ $ Ref # E30100 MESSENGER WIRE, 7 STRAND, 5/16" DIAMETER WITH ACCE, (800 FT) Awd $6.95 $5, $6.95 $5, $7.02 $5, Ref # E30600 TETHER WIRE, WITH ACCESSORIES, (800 FT) Awd $7.75 $6, $7.75 $6, $7.83 $6, Ref # E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (7000 FT) Awd $1.90 $13, $1.90 $13, $1.92 $13, Ref # E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN, (8 EACH) Awd $2, $23, $2, $23, $2, $23, Ref # E64021 PEDESTAL FOUNDATION, AS PER PLAN, (2 EACH) Awd $ $1, $ $1, $ $1, Ref # E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A, (8200 FT) Awd $1.55 $12, $1.55 $12, $1.57 $12, Ref # E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (360 FT) Awd $2.65 $ $2.65 $ $2.68 $ Ref # E70001 POWER SERVICE, AS PER PLAN, (1 EACH) Awd $1, $1, $1, $1, $1, $1, Ref # E83200 STRAIN POLE, TYPE TC-81.10, DESIGN 12, (8 EACH) Awd $6, $54, $6, $54, $6, $55, Ref # E90010 PEDESTAL, MISC.:PEDESTAL, (2 EACH) Awd $1, $2, $1, $2, $1, $2, Ref # E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, (2 EACH) Awd $3, $6, $3, $6, $3, $6, Page 33

34 Ref # E01681 CONTROLLER UNIT, TYPE 2070L, WITH CABINET, TYPE 33, (1 EACH) Awd $17, $17, $17, $17, $17, $17, Ref # E67100 CABINET FOUNDATION, (1 EACH) Awd $ $ $ $ $ $ Ref # E67200 CONTROLLER WORK PAD, (1 EACH) Awd $ $ $ $ $ $ Ref # E75000 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, (1 EACH) Awd $3, $3, $3, $3, $3, $3, Section 11 - TRAFFIC SIGNALS - Totals Awd $266, $266, $269, Ref # E10000 EXCAVATION, (2115 CY) Awd $6.26 $13, $15.00 $31, $14.50 $30, Ref # E10001 EXCAVATION, AS PER PLAN, (909 CY) Awd $8.91 $8, $12.00 $10, $18.00 $16, Ref # E20000 EMBANKMENT, (469 CY) Awd $5.18 $2, $10.00 $4, $1.75 $ Ref # E20001 EMBANKMENT, AS PER PLAN, (909 CY) Awd $29.78 $27, $35.00 $31, $51.00 $46, Ref # E " CONDUIT, TYPE C, (148 FT) Awd $70.67 $10, $75.00 $11, $ $16, Ref # E04100 CATCH BASIN, NO. 2-2A, (1 EACH) Awd $ $ $1, $1, $2, $2, Ref # E " UNCLASSIFIED PIPE UNDERDRAINS, AS PER PLAN, (552 FT) Awd $17.07 $9, $3.00 $1, $3.50 $1, Page 34

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

Federal Project No.: NHPP-967-7(083)

Federal Project No.: NHPP-967-7(083) Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND 1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

The Tulalip Tribes of Washington

The Tulalip Tribes of Washington The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

PAGE 1 of 18 WEIGHTED AVERAGE

PAGE 1 of 18 WEIGHTED AVERAGE UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

Schedule of Pay Items

Schedule of Pay Items Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation

More information

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15 COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

Volume Contents for NRA Manual of Contract Documents for Road Works

Volume Contents for NRA Manual of Contract Documents for Road Works Volume Contents for Manual of Contract s for Road Works GE-GEN-01002 January 2016 General Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information