1 ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # TRACS No. Project No. County District Gross Length Net Length Prepared By: 084 PN 175 H879001C 084-A-(204)T PINAL SOUTHCENT 2 Jalal Kamal Highway Termini Location Work Description GILA BEND TO CASA GRANDE HIGHWAY (SR-84) BURRIS RD TO FIVE POINT INTERS PAVEMENT REHABILITATION
2 Printed: 9/20/2017 Page 1 of 16 BID RESULTS FOR Bid Opening Date : 8/25/2017, Prequalification Required, Engineer Specialist : Jalal Kamal Completion Date: 120 Calendar Days The proposed project is located in Pinal County, on SR 84 from Milepost to Milepost and on SR 287 from Milepost to Milepost The proposed work consists of milling the existing asphaltic concrete and replacing it with asphaltic concrete end product, constructing sidewalk, curb and gutter, replacing pavement markings, installing fence, constructing traffic signals and other related work. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s 1-6.1% $1,747, % $1,773, % $1,860, GREY MOUNTAIN CONSTRUCTION, LLC 3190 SOUTH GILBERT ROAD SUITE #5 CHANDLER, AZ NESBITT CONTRACTING CO., INC. 100 SOUTH PRICE ROAD TEMPE, AZ DEPARTMENT ESTIMATE $1,747, $1,773, $1,860, % $1,875, PAVECO, INC S. 49TH AVE, SUITE B PHOENIX, AZ $1,875, Winning Bidder is 6.1% Under Department Estimate (Difference = ($112,610.02))
3 Printed: 9/20/2017 Page 2 of 16 Measure Description Quantity Unit Price Extended Amount CU.YD. REMOVAL OF STRUCTURAL CONCRETE Bid Rank Department Estimate $ $5, GREY MOUNTAIN CONSTRUCTION, LLC $ $4, % 2 NESBITT CONTRACTING CO., INC. $ $7, % 3 PAVECO, INC. $ $2, % L.FT. REMOVAL OF CONCRETE CURB Bid Rank Department Estimate $5.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $9.000 $ % L.FT. REMOVAL OF CONCRETE CURB AND GUTTER Bid Rank Department Estimate 1, $7.000 $10, GREY MOUNTAIN CONSTRUCTION, LLC $9.000 $13, % 2 NESBITT CONTRACTING CO., INC. $7.000 $10, % 3 PAVECO, INC. $ $14, % SQ.FT. REMOVAL OF CONCRETE SIDEWALKS, DRIVEWAYS AND SLABS Bid Rank Department Estimate 9, $2.000 $19, GREY MOUNTAIN CONSTRUCTION, LLC $2.500 $23, % 2 NESBITT CONTRACTING CO., INC. $1.010 $9, % 3 PAVECO, INC. $4.500 $43, % SQ.YD. REMOVAL OF ASPHALTIC CONCRETE PAVEMENT Bid Rank Department Estimate $ $17, GREY MOUNTAIN CONSTRUCTION, LLC $7.000 $4, % 2 NESBITT CONTRACTING CO., INC. $ $8, % 3 PAVECO, INC. $ $18, % EACH REMOVAL OF SIGNS Bid Rank Department Estimate $ $3, GREY MOUNTAIN CONSTRUCTION, LLC $ $16, % 2 NESBITT CONTRACTING CO., INC. $ $9, % 3 PAVECO, INC. $ $2, % EACH REMOVE (PULL BOX) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (VARIES 4"-0") Bid Rank Department Estimate $4.500 $ GREY MOUNTAIN CONSTRUCTION, LLC $ $1, %
4 Printed: 9/20/2017 Page 3 of 16 Measure Description Quantity Unit Price Extended Amount SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (VARIES 4"-0") Bid Rank Department Estimate $4.500 $ NESBITT CONTRACTING CO., INC. $2.700 $ % 3 PAVECO, INC. $ $1, % SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (2 1/2") Bid Rank Department Estimate 66, $2.000 $133, GREY MOUNTAIN CONSTRUCTION, LLC $1.750 $116, % 2 NESBITT CONTRACTING CO., INC. $1.100 $73, % 3 PAVECO, INC. $1.500 $99, % SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (3") Bid Rank Department Estimate 11, $3.000 $35, GREY MOUNTAIN CONSTRUCTION, LLC $2.500 $29, % 2 NESBITT CONTRACTING CO., INC. $1.700 $20, % 3 PAVECO, INC. $1.650 $19, % L.FT. REMOVE FENCE (FABRIC AND HARDWARE ONLY) Bid Rank Department Estimate 2, $2.000 $5, GREY MOUNTAIN CONSTRUCTION, LLC $2.000 $5, % 2 NESBITT CONTRACTING CO., INC. $2.200 $6, % 3 PAVECO, INC. $0.400 $1, % L.SUM REMOVE (WOODY VEGETATION) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $2, $2, % 2 NESBITT CONTRACTING CO., INC. $4, $4, % 3 PAVECO, INC. $10, $10, % SQ.YD. REMOVE (MEDIAN PAVING) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $2, % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % L.FT. REMOVE (CHAIN LINK FENCE) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $3.300 $ % 3 PAVECO, INC. $ $ % L.FT. SHOULDER BUILD-UP (MILLED AC) Bid Rank Department Estimate 1, $1.000 $1, GREY MOUNTAIN CONSTRUCTION, LLC $1.500 $2, % 2 NESBITT CONTRACTING CO., INC. $0.300 $ %
5 Printed: 9/20/2017 Page 4 of 16 Measure Description Quantity Unit Price Extended Amount L.FT. SHOULDER BUILD-UP (MILLED AC) Bid Rank Department Estimate 1, $1.000 $1, PAVECO, INC. $0.260 $ % HOUR SHOULDER BUILD-UP (COMPACTION) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % TON EMULSIFIED ASPHALT (SS-1) Bid Rank Department Estimate $1, $1, GREY MOUNTAIN CONSTRUCTION, LLC $1, $1, % 2 NESBITT CONTRACTING CO., INC. $1, $1, % 3 PAVECO, INC. $1, $1, % TON BITUMINOUS TACK COAT Bid Rank Department Estimate $ $17, GREY MOUNTAIN CONSTRUCTION, LLC $ $9, % 2 NESBITT CONTRACTING CO., INC. $ $6, % 3 PAVECO, INC. $ $8, % HOUR APPLY BITUMINOUS TACK COAT Bid Rank Department Estimate $ $8, GREY MOUNTAIN CONSTRUCTION, LLC $ $8, % 2 NESBITT CONTRACTING CO., INC. $ $9, % 3 PAVECO, INC. $ $9, % TON ASPHALT BINDER (PG 76-16) Bid Rank Department Estimate $ $232, GREY MOUNTAIN CONSTRUCTION, LLC $ $194, % 2 NESBITT CONTRACTING CO., INC. $ $203, % 3 PAVECO, INC. $ $217, % TON ASPHALTIC CONCRETE (3/4" MIX) (END PRODUCT) Bid Rank Department Estimate 11, $ $464, GREY MOUNTAIN CONSTRUCTION, LLC $ $441, % 2 NESBITT CONTRACTING CO., INC. $ $464, % 3 PAVECO, INC. $ $522, % TON MINERAL ADMIXTURE Bid Rank Department Estimate $ $9, GREY MOUNTAIN CONSTRUCTION, LLC $ $9, % 2 NESBITT CONTRACTING CO., INC. $ $9, % 3 PAVECO, INC. $ $9, %
6 Printed: 9/20/2017 Page 5 of 16 Measure Description Quantity Unit Price Extended Amount EACH RESET FRAME AND COVER FOR MANHOLE Bid Rank Department Estimate $ $3, GREY MOUNTAIN CONSTRUCTION, LLC $ $2, % 2 NESBITT CONTRACTING CO., INC. $ $1, % 3 PAVECO, INC. $ $2, % CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 5,000) Bid Rank Department Estimate $ $6, GREY MOUNTAIN CONSTRUCTION, LLC $ $7, % 2 NESBITT CONTRACTING CO., INC. $4, $44, % 3 PAVECO, INC. $ $7, % LB. REINFORCING STEEL Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $2.500 $1, % 2 NESBITT CONTRACTING CO., INC. $3.300 $1, % 3 PAVECO, INC. $2.250 $1, % EACH PLACE DOWELS Bid Rank Department Estimate $ $4, GREY MOUNTAIN CONSTRUCTION, LLC $ $1, % 2 NESBITT CONTRACTING CO., INC. $ $2, % 3 PAVECO, INC. $ $1, % L.FT. SIGN POST (PERFORATED) (2 S) Bid Rank Department Estimate $ $1, GREY MOUNTAIN CONSTRUCTION, LLC $ $2, % 2 NESBITT CONTRACTING CO., INC. $ $1, % 3 PAVECO, INC. $5.000 $ % EACH FOUNDATION FOR SIGN POST (CONCRETE) Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $1, % 2 NESBITT CONTRACTING CO., INC. $ $1, % 3 PAVECO, INC. $ $2, % SQ.FT. WARNING, MARKER, OR REGULATORY SIGN PANEL Bid Rank Department Estimate $ $24, GREY MOUNTAIN CONSTRUCTION, LLC $ $13, % 2 NESBITT CONTRACTING CO., INC. $ $17, % 3 PAVECO, INC. $ $12, % SQ.FT. FLAT SHEET ALUMINUM SIGN PANEL Bid Rank Department Estimate $ $4, GREY MOUNTAIN CONSTRUCTION, LLC $ $2, %
7 Printed: 9/20/2017 Page 6 of 16 Measure Description Quantity Unit Price Extended Amount SQ.FT. FLAT SHEET ALUMINUM SIGN PANEL Bid Rank Department Estimate $ $4, NESBITT CONTRACTING CO., INC. $ $3, % 3 PAVECO, INC. $ $2, % L.FT. METAL HANDRAIL Bid Rank Department Estimate $ $8, GREY MOUNTAIN CONSTRUCTION, LLC $ $16, % 2 NESBITT CONTRACTING CO., INC. $ $16, % 3 PAVECO, INC. $ $8, % L.FT. OBLITERATE PAVEMENT MARKING (STRIPE) Bid Rank Department Estimate 1, $1.000 $1, GREY MOUNTAIN CONSTRUCTION, LLC $2.000 $2, % 2 NESBITT CONTRACTING CO., INC. $0.450 $ % 3 PAVECO, INC. $0.500 $ % EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate 38, $0.250 $9, GREY MOUNTAIN CONSTRUCTION, LLC $0.250 $9, % 2 NESBITT CONTRACTING CO., INC. $0.200 $7, % 3 PAVECO, INC. $0.200 $7, % EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $0.500 $ % 2 NESBITT CONTRACTING CO., INC. $0.800 $ % 3 PAVECO, INC. $0.300 $ % EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE) Bid Rank Department Estimate 3, $1.000 $3, GREY MOUNTAIN CONSTRUCTION, LLC $0.500 $1, % 2 NESBITT CONTRACTING CO., INC. $0.950 $2, % 3 PAVECO, INC. $0.300 $ % EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 3, $0.300 $1, GREY MOUNTAIN CONSTRUCTION, LLC $0.150 $ % 2 NESBITT CONTRACTING CO., INC. $0.200 $ % 3 PAVECO, INC. $0.200 $ % EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 38, $0.300 $11, GREY MOUNTAIN CONSTRUCTION, LLC $0.100 $3, % 2 NESBITT CONTRACTING CO., INC. $0.200 $7, %
8 Printed: 9/20/2017 Page 7 of 16 Measure Description Quantity Unit Price Extended Amount EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 38, $0.300 $11, PAVECO, INC. $0.200 $7, % EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.) Bid Rank Department Estimate 2, $1.000 $2, GREY MOUNTAIN CONSTRUCTION, LLC $0.250 $ % 2 NESBITT CONTRACTING CO., INC. $0.750 $2, % 3 PAVECO, INC. $0.200 $ % EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE) Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $0.500 $ % 2 NESBITT CONTRACTING CO., INC. $1.000 $ % 3 PAVECO, INC. $0.200 $ % EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $1, % 2 NESBITT CONTRACTING CO., INC. $ $1, % 3 PAVECO, INC. $ $1, % EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate $ $6, GREY MOUNTAIN CONSTRUCTION, LLC $ $3, % 2 NESBITT CONTRACTING CO., INC. $ $3, % 3 PAVECO, INC. $ $3, % HOUR PILOT VEHICLE WITH DRIVER Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $1, % 2 NESBITT CONTRACTING CO., INC. $ $1, % 3 PAVECO, INC. $ $3, % HOUR FLAGGING SERVICES (CIVILIAN) Bid Rank Department Estimate $ $9, GREY MOUNTAIN CONSTRUCTION, LLC $ $7, % 2 NESBITT CONTRACTING CO., INC. $ $8, % 3 PAVECO, INC. $ $14, % HOUR FLAGGING SERVICES (LOCAL ENFORCEMENT OFFICER) Bid Rank Department Estimate $ $19, GREY MOUNTAIN CONSTRUCTION, LLC $ $18, % 2 NESBITT CONTRACTING CO., INC. $ $15, % 3 PAVECO, INC. $ $16, %
9 Printed: 9/20/2017 Page 8 of 16 Measure Description Quantity Unit Price Extended Amount HOUR FLAGGING SERVICES (DPS) Bid Rank Department Estimate $ $9, GREY MOUNTAIN CONSTRUCTION, LLC $ $9, % 2 NESBITT CONTRACTING CO., INC. $ $9, % 3 PAVECO, INC. $ $9, % L.FT. PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate 15, $0.400 $6, GREY MOUNTAIN CONSTRUCTION, LLC $0.380 $5, % 2 NESBITT CONTRACTING CO., INC. $0.350 $5, % 3 PAVECO, INC. $0.370 $5, % L.FT. PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate 39, $0.400 $15, GREY MOUNTAIN CONSTRUCTION, LLC $0.380 $15, % 2 NESBITT CONTRACTING CO., INC. $0.350 $13, % 3 PAVECO, INC. $0.370 $14, % L.FT. PAVEMENT MARKING (TRANSVERSE) (THERMOPLASTIC) (ALKYD) (0.090") Bid Rank Department Estimate 9, $0.500 $4, GREY MOUNTAIN CONSTRUCTION, LLC $0.650 $5, % 2 NESBITT CONTRACTING CO., INC. $0.500 $4, % 3 PAVECO, INC. $0.500 $4, % EACH PAVEMENT SYMBOL (EXTRUDED THERMOPLASTIC) (ALKYD) (0.090") Bid Rank Department Estimate $ $5, GREY MOUNTAIN CONSTRUCTION, LLC $ $6, % 2 NESBITT CONTRACTING CO., INC. $ $3, % 3 PAVECO, INC. $ $3, % L.FT. PRIMER-SEALER FOR PCCP THERMOPLASTIC STRIPING Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $1.000 $ % 2 NESBITT CONTRACTING CO., INC. $0.400 $ % 3 PAVECO, INC. $0.400 $ % L.FT. REMOVAL OF CURING COMPOUND FOR PCCP STRIPING Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $1.000 $ % 2 NESBITT CONTRACTING CO., INC. $0.500 $ % 3 PAVECO, INC. $0.500 $ % EACH PAVEMENT MARKING, PREFORMED, TYPE I, LEGEND (ONLY) Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $6, %
10 Printed: 9/20/2017 Page 9 of 16 Measure Description Quantity Unit Price Extended Amount EACH PAVEMENT MARKING, PREFORMED, TYPE I, LEGEND (ONLY) Bid Rank Department Estimate $ $2, NESBITT CONTRACTING CO., INC. $ $3, % 3 PAVECO, INC. $ $3, % EACH PAVEMENT MARKER, RAISED, TYPE D Bid Rank Department Estimate $2.000 $1, GREY MOUNTAIN CONSTRUCTION, LLC $3.500 $2, % 2 NESBITT CONTRACTING CO., INC. $2.400 $1, % 3 PAVECO, INC. $2.500 $1, % EACH PAVEMENT MARKER, RAISED, TYPE G Bid Rank Department Estimate $3.000 $1, GREY MOUNTAIN CONSTRUCTION, LLC $3.500 $2, % 2 NESBITT CONTRACTING CO., INC. $2.400 $1, % 3 PAVECO, INC. $2.500 $1, % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE) Bid Rank Department Estimate 11, $0.200 $2, GREY MOUNTAIN CONSTRUCTION, LLC $0.200 $2, % 2 NESBITT CONTRACTING CO., INC. $0.100 $1, % 3 PAVECO, INC. $0.150 $1, % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (YELLOW) Bid Rank Department Estimate 24, $0.150 $3, GREY MOUNTAIN CONSTRUCTION, LLC $0.200 $4, % 2 NESBITT CONTRACTING CO., INC. $0.100 $2, % 3 PAVECO, INC. $0.150 $3, % EACH PAINT BULL NOSE Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % EACH POLE (TYPE G) (STANDARD BASE) Bid Rank Department Estimate $2, $18, GREY MOUNTAIN CONSTRUCTION, LLC $1, $15, % 2 NESBITT CONTRACTING CO., INC. $3, $28, % 3 PAVECO, INC. $3, $30, % EACH POST (PEDESTRIAN PUSH BUTTON) Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $1, % 2 NESBITT CONTRACTING CO., INC. $ $1, %
11 Printed: 9/20/2017 Page 10 of 16 Measure Description Quantity Unit Price Extended Amount EACH POST (PEDESTRIAN PUSH BUTTON) Bid Rank Department Estimate $ $2, PAVECO, INC. $ $1, % EACH BREAKAWAY BASE FOR LIGHTING POLE OR SIGNAL FLASHER Bid Rank Department Estimate $ $6, GREY MOUNTAIN CONSTRUCTION, LLC $ $4, % 2 NESBITT CONTRACTING CO., INC. $ $5, % 3 PAVECO, INC. $ $5, % EACH POLE FOUNDATION (TYPE G) (STANDARD BASE) Bid Rank Department Estimate $2, $2, GREY MOUNTAIN CONSTRUCTION, LLC $1, $1, % 2 NESBITT CONTRACTING CO., INC. $1, $1, % 3 PAVECO, INC. $1, $1, % EACH PEDESTRIAN PUSH BUTTON POST FOUNDATION Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $2, % 2 NESBITT CONTRACTING CO., INC. $ $2, % 3 PAVECO, INC. $ $2, % EACH MAST ARM (6 FT.) (TAPERED) Bid Rank Department Estimate $ $6, GREY MOUNTAIN CONSTRUCTION, LLC $ $3, % 2 NESBITT CONTRACTING CO., INC. $ $5, % 3 PAVECO, INC. $ $5, % EACH MAST ARM (40 FT.) (TAPERED) Bid Rank Department Estimate $2, $2, GREY MOUNTAIN CONSTRUCTION, LLC $1, $1, % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $4, $4, % EACH REMOVE EXISTING FOUNDATIONS Bid Rank Department Estimate $1, $2, GREY MOUNTAIN CONSTRUCTION, LLC $3, $6, % 2 NESBITT CONTRACTING CO., INC. $ $1, % 3 PAVECO, INC. $ $1, % L.FT. ELECTRICAL CONDUIT (2") (PVC) Bid Rank Department Estimate $ $1, GREY MOUNTAIN CONSTRUCTION, LLC $9.000 $ % 2 NESBITT CONTRACTING CO., INC. $ $2, % 3 PAVECO, INC. $ $3, %
12 Printed: 9/20/2017 Page 11 of 16 Measure Description Quantity Unit Price Extended Amount L.FT. CONDUCTOR (NO. 14) Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $5.000 $ % 2 NESBITT CONTRACTING CO., INC. $0.500 $ % 3 PAVECO, INC. $0.500 $ % L.FT. CONDUCTOR (NO. 8) Bid Rank Department Estimate $0.800 $ GREY MOUNTAIN CONSTRUCTION, LLC $5.000 $ % 2 NESBITT CONTRACTING CO., INC. $1.350 $ % 3 PAVECO, INC. $1.400 $ % L.SUM CONDUCTORS Bid Rank Department Estimate $1, $1, GREY MOUNTAIN CONSTRUCTION, LLC $2, $2, % 2 NESBITT CONTRACTING CO., INC. $29, $29, % 3 PAVECO, INC. $30, $30, % L.FT. REMOVAL OF EXISTING CONDUCTORS Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $4.000 $ % 2 NESBITT CONTRACTING CO., INC. $0.300 $ % 3 PAVECO, INC. $0.280 $ % EACH TRAFFIC SIGNAL FACE (TYPE F) Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $1, % 2 NESBITT CONTRACTING CO., INC. $ $1, % 3 PAVECO, INC. $ $1, % EACH TRAFFIC SIGNAL FACE (TYPE R) Bid Rank Department Estimate $1, $1, GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE II) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE V) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ %
13 Printed: 9/20/2017 Page 12 of 16 Measure Description Quantity Unit Price Extended Amount EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE V) Bid Rank Department Estimate $ $ NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % EACH LOOP DETECTOR (COUNTER) Bid Rank Department Estimate $1, $2, GREY MOUNTAIN CONSTRUCTION, LLC $1, $3, % 2 NESBITT CONTRACTING CO., INC. $3, $7, % 3 PAVECO, INC. $4, $8, % EACH LOOP DETECTOR (COUNTER) (FULL REPLACEMENT) Bid Rank Department Estimate $1, $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $1, % 2 NESBITT CONTRACTING CO., INC. $4, $9, % 3 PAVECO, INC. $4, $9, % EACH PEDESTRIAN PUSH BUTTON Bid Rank Department Estimate $ $3, GREY MOUNTAIN CONSTRUCTION, LLC $ $4, % 2 NESBITT CONTRACTING CO., INC. $ $4, % 3 PAVECO, INC. $ $4, % EACH LOOP DETECTOR FOR TRAFFIC SIGNALS (6' X 70') Bid Rank Department Estimate $2, $16, GREY MOUNTAIN CONSTRUCTION, LLC $3, $28, % 2 NESBITT CONTRACTING CO., INC. $1, $12, % 3 PAVECO, INC. $1, $12, % EACH LOOP DETECTOR FOR TRAFFIC SIGNALS (6' X 50') Bid Rank Department Estimate $1, $10, GREY MOUNTAIN CONSTRUCTION, LLC $2, $15, % 2 NESBITT CONTRACTING CO., INC. $1, $8, % 3 PAVECO, INC. $1, $8, % EACH LOOP DETECTOR FOR TRAFFIC SIGNALS (6' X 6') Bid Rank Department Estimate $ $3, GREY MOUNTAIN CONSTRUCTION, LLC $1, $9, % 2 NESBITT CONTRACTING CO., INC. $ $2, % 3 PAVECO, INC. $ $3, % EACH LUMINAIRE (HORIZONTAL MOUNT) (LED) Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $1, $11, % 2 NESBITT CONTRACTING CO., INC. $ $4, %
14 Printed: 9/20/2017 Page 13 of 16 Measure Description Quantity Unit Price Extended Amount EACH LUMINAIRE (HORIZONTAL MOUNT) (LED) Bid Rank Department Estimate $ $2, PAVECO, INC. $ $4, % EACH LUMINAIRE (LED)-UNDER DECK (RECESSED) Bid Rank Department Estimate $2, $6, GREY MOUNTAIN CONSTRUCTION, LLC $1, $5, % 2 NESBITT CONTRACTING CO., INC. $3, $9, % 3 PAVECO, INC. $3, $9, % SQ.YD. GRANITE MULCH (1-1/4 INCH MINUS) Bid Rank Department Estimate 1, $3.500 $4, GREY MOUNTAIN CONSTRUCTION, LLC $5.500 $6, % 2 NESBITT CONTRACTING CO., INC. $8.250 $9, % 3 PAVECO, INC. $ $18, % L.SUM MOBILIZATION Bid Rank Department Estimate $180, $180, GREY MOUNTAIN CONSTRUCTION, LLC $208, $208, % 2 NESBITT CONTRACTING CO., INC. $130, $130, % 3 PAVECO, INC. $229, $229, % L.FT. CHAIN LINK FENCE, TYPE 1 (72") Bid Rank Department Estimate 2, $ $47, GREY MOUNTAIN CONSTRUCTION, LLC $ $41, % 2 NESBITT CONTRACTING CO., INC. $ $32, % 3 PAVECO, INC. $ $32, % EACH CHAIN LINK FENCE GATE, TYPE 1 (72") (UP TO 4' WIDE) (DETAIL J) Bid Rank Department Estimate $ $6, GREY MOUNTAIN CONSTRUCTION, LLC $ $2, % 2 NESBITT CONTRACTING CO., INC. $1, $11, % 3 PAVECO, INC. $ $4, % L.FT. CONCRETE CURB (C-05.10) (TYPE G) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % L.FT. CONCRETE CURB AND GUTTER (C-05.10) (TYPE D) Bid Rank Department Estimate 1, $ $20, GREY MOUNTAIN CONSTRUCTION, LLC $ $36, % 2 NESBITT CONTRACTING CO., INC. $ $44, % 3 PAVECO, INC. $ $27, %
15 Printed: 9/20/2017 Page 14 of 16 Measure Description Quantity Unit Price Extended Amount EACH CONCRETE CURB AND GUTTER (DETAIL K) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % SQ.FT. CONCRETE SIDEWALK (C-05.20) Bid Rank Department Estimate 23, $6.000 $142, GREY MOUNTAIN CONSTRUCTION, LLC $5.000 $118, % 2 NESBITT CONTRACTING CO., INC. $7.000 $166, % 3 PAVECO, INC. $3.500 $83, % SQ.FT. CONCRETE SIDEWALK RAMP Bid Rank Department Estimate 1, $ $35, GREY MOUNTAIN CONSTRUCTION, LLC $ $21, % 2 NESBITT CONTRACTING CO., INC. $ $45, % 3 PAVECO, INC. $7.000 $12, % SQ.FT. CONCRETE DRIVEWAY ((DETAIL B) Bid Rank Department Estimate 6, $ $66, GREY MOUNTAIN CONSTRUCTION, LLC $6.000 $39, % 2 NESBITT CONTRACTING CO., INC. $9.950 $66, % 3 PAVECO, INC. $5.650 $37, % EACH RESET FRAME AND COVER FOR SURVEY MONUMENT (C-21.10) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % EACH RESET FRAME AND COVER FOR VALVE BOX Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % SQ.YD. MEDIAN PAVING Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $2, % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $1, % HOUR CONTRACTOR BASED ON-THE-JOB TRAINING Bid Rank Department Estimate $3.000 $1, GREY MOUNTAIN CONSTRUCTION, LLC $3.000 $1, %
16 Printed: 9/20/2017 Page 15 of 16 Measure Description Quantity Unit Price Extended Amount HOUR CONTRACTOR BASED ON-THE-JOB TRAINING Bid Rank Department Estimate $3.000 $1, NESBITT CONTRACTING CO., INC. $3.000 $1, % 3 PAVECO, INC. $3.000 $1, % L.SUM FORCE ACCOUNT WORK (BIOLOGIST) Bid Rank Department Estimate $5, $5, GREY MOUNTAIN CONSTRUCTION, LLC $5, $5, % 2 NESBITT CONTRACTING CO., INC. $5, $5, % 3 PAVECO, INC. $5, $5, % L.SUM FORCE ACCOUNT WORK (RAILROAD FLAGGING SERVICES) Bid Rank Department Estimate $8, $8, GREY MOUNTAIN CONSTRUCTION, LLC $8, $8, % 2 NESBITT CONTRACTING CO., INC. $8, $8, % 3 PAVECO, INC. $8, $8, % L.SUM MISCELLANEOUS WORK (REMOVE TRAFFIC SIGNAL LOOP DETECTORS) Bid Rank Department Estimate $1, $1, GREY MOUNTAIN CONSTRUCTION, LLC $1, $1, % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $2, $2, % L.SUM MISCELLANEOUS WORK (REMOVE AND REPLACE RETICULINE GRATES) Bid Rank Department Estimate $25, $25, GREY MOUNTAIN CONSTRUCTION, LLC $7, $7, % 2 NESBITT CONTRACTING CO., INC. $16, $16, % 3 PAVECO, INC. $9, $9, % L.SUM MISCELLANEOUS WORK (PARAPET WALL CUT OUTS) (DETAIL L) Bid Rank Department Estimate $2, $2, GREY MOUNTAIN CONSTRUCTION, LLC $3, $3, % 2 NESBITT CONTRACTING CO., INC. $6, $6, % 3 PAVECO, INC. $6, $6, % SQ.FT. MISCELLANEOUS WORK (DETECTABLE WARNING STRIP) Bid Rank Department Estimate $ $ GREY MOUNTAIN CONSTRUCTION, LLC $ $ % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $ $ % EACH MISCELLANEOUS WORK (REMOVE & SALVAGE TRAFFIC SIGNALS) Bid Rank Department Estimate $1, $2, GREY MOUNTAIN CONSTRUCTION, LLC $2, $4, % 2 NESBITT CONTRACTING CO., INC. $1, $3, %
17 Printed: 9/20/2017 Page 16 of 16 Measure Description Quantity Unit Price Extended Amount EACH MISCELLANEOUS WORK (REMOVE & SALVAGE TRAFFIC SIGNALS) Bid Rank Department Estimate $1, $2, PAVECO, INC. $1, $2, % EACH MISCELLANEOUS WORK (GALVANISING POLE) Bid Rank Department Estimate $2, $2, GREY MOUNTAIN CONSTRUCTION, LLC $8, $8, % 2 NESBITT CONTRACTING CO., INC. $ $ % 3 PAVECO, INC. $10, $10, % SQ.YD. MISCELLANEOUS WORK (PLACE MILLING ON BURRIS ROAD TURNOUT)(DETAIL I) Bid Rank Department Estimate $ $2, GREY MOUNTAIN CONSTRUCTION, LLC $ $3, % 2 NESBITT CONTRACTING CO., INC. $4.500 $1, % 3 PAVECO, INC. $8.000 $2, % L.SUM CONTRACTOR QUALITY CONTROL Bid Rank Department Estimate $25, $25, GREY MOUNTAIN CONSTRUCTION, LLC $30, $30, % 2 NESBITT CONTRACTING CO., INC. $26, $26, % 3 PAVECO, INC. $43, $43, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(MANUAL METHODS/MECHANICAL METHODS) Bid Rank Department Estimate $1.000 $ GREY MOUNTAIN CONSTRUCTION, LLC $1.000 $ % 2 NESBITT CONTRACTING CO., INC. $1.100 $ % 3 PAVECO, INC. $5.000 $2, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(HERBICIDE) Bid Rank Department Estimate $0.750 $ GREY MOUNTAIN CONSTRUCTION, LLC $0.500 $ % 2 NESBITT CONTRACTING CO., INC. $1.000 $ % 3 PAVECO, INC. $2.500 $1, % L.SUM CONSTRUCTION SURVEYING AND LAYOUT Bid Rank Department Estimate $35, $35, GREY MOUNTAIN CONSTRUCTION, LLC $21, $21, % 2 NESBITT CONTRACTING CO., INC. $16, $16, % 3 PAVECO, INC. $50, $50, %
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationBID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationItems Unit Quantity Unit Price Total Unit Price Total
Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH
More informationALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING
PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00
More information2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM
ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationMoDOT 2016 UNIT BID PRICES Northwest District
MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationRiverside County Transportation Department Summary of Bids
Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00
More informationMaine Turnpike Authority
Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationMacomb County Department of Roads Bid Comparison
Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:
More informationCT Consultants, Inc.
Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS
More information2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH
Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationOhio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director
Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More information2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH
Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationBARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY
IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationMaine Turnpike Authority
Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS
PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER
More informationPage 1 of KA
Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline
More informationAustin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724
National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.
More informationBID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.
BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010
More informationMISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER
DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All
More informationFederal Project No.: HSIP-5A27(567)
Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion
More informationSTATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS
STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationMcCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1
McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John
More informationIngham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15
COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion
More informationMaine Turnpike Authority
Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,
More informationMaine Turnpike Authority
Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING
More informationSt. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016
St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More information59-2 KA Page 1 of 16
59-2 KA 4812-01 Page 1 of 16 Area office to Page 2 of 16 Rock Wedge TYPICAL SECTION C 2.0 in. Overlay 2.0 in. Mill Rock Wedge 1:1 @ edge of Asphalt Match Existing Surface 30.0 ft wedge 2.0ft+ not to scale
More informationUnits Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationThe Traffi cade Way:
The Trafficade Way: To provide our customers with prompt, dependable and friendly service and to be recognized as the leaders and experts in the industries we serve. Index Sign Manufacturing Process...
More information2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00
1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More information2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)
106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33
More informationFederal Project No.: STP-5128(388)
Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.
ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois
More informationPN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least
More informationPARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS
PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16
More informationMaine Turnpike Authority
Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00
More informationLicensed Class C Virginia Contractor No.
month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors
More informationFederal Project No.: OC-095-1(348)
Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING
More informationCITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.
SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationDELETE first sentence of first paragraph that reads: REPLACE with the following:
To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More information2, total unit $ total unit $ total unit $ total $
BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;
More informationMaine Turnpike Authority
York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:
209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :
More informationOTTAWA COUNTY ROAD COMMISSION Bid Comparison
OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township
More informationCounty of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total)
County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total) 1 CONSTRUCTION SCHEDULE 1 $2,000.00 LS $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationGARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W
ROAD SIGNS, SIGN POSTS AND TRAFFIC CONTROL ITEMS - BID TABULATION IFB #15-012 (All Bids) Garden State Highway Products Contact: Joe McCracken 1740 E. Oak Road Vineland, NJ 08361 Phone: 856-692-7572 Fax:
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551
More informationSECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS
SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL...12.1 12-2 FLAGGING...12.1 12-2.01 Flaggers...12.1 12-2.02 Flagging Costs...12.1 12-3 TRAFFIC-HANDLING EQUIPMENT
More informationPN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW
More information