STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

Size: px
Start display at page:

Download "STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:"

Transcription

1 Letting: Letting Dt: January 27, :30 A.M. State Proj.: Contract ID: Contract Description: Contract Location: Recommendation: STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS District(s): 8 Route: 22=22 Start Dt: 05/08/17 Comp. Dt: Counties: Bridge Span: MC LEOD, MEEKER No Contract Time: 45 Working Days Min: Max: (TH 22 = 22), (TH 22 = 22) STPF 8817 (103) In Meeker and McLeod Counties on TH 22 from Pleasure Drive in Litchfield to 1320 Feet N of TH 7 Grading and Bituminous Paving Miles LOCATED ON TH 22 FROM PLEASURE DR TO 1320' NORTH OF TH 7. Award To Low Bidder I, the undersigned certify that this abstract is a correct tabulation of all bids received on this (these) Project(s), and that the legal requirements have been complied with relating to competitive bidding. Approved: Rick Beckes Mike Leegard Digitally signed by Rick Beckes DN: cn=rick Beckes Date: :43:24-06'00' Digitally signed by Mike Leegard DN: cn=mike Leegard Date: :17:55-06'00' Construction Engineer Contract Administration Engineer Award Date: 02/22/2017 Rank Vendor ID Vendor Name Total Bid % Over Low Bid % Over Estimate 0 -EST- Engineer's Estimate $6,270, % % Knife River Corporation - North Central $5,153, % 82.19% Duininck, Inc. $5,382, % 85.84% Central Specialties, Inc. $5,614, % 89.54% HARDRIVES, INC. $5,744, % 91.61%

2 Tabulation of Bids Page 1 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , , , , , QUALITY MANAGEMENT / , , , , , , QUALITY MANAGEMENT SPECIAL / , , , , , , MOBILIZATION / , , , , , , FIELD LABORATORY TYPE D / MAINT AND RESTORATION OF HAUL ROADS / , , , , , , CLEARING / , , , , , , GRUBBING / , , REMOVE PIPE DRAIN / , , , , REMOVE PERFORATED PIPE / , , , REMOVE PIPE CULVERTS / , , , REMOVE FENCE / , , , REMOVE RC CATTLE PASS

3 Tabulation of Bids Page 2 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , , REMOVE PAVEMENT / , , , REMOVE CONCRETE PAVEMENT / , , , , REMOVE BITUMINOUS PAVEMENT / , , , , REMOVE BITUMINOUS SHOULDER PAVEMENT / , , , REMOVE RC CATTLE PASS APRON / REMOVE CONCRETE HEADWALL / REMOVE SIGN TYPE C / REMOVE SIGN TYPE D / SAWING CONCRETE PAVEMENT (FULL DEPTH) / , , SAWING BITUMINOUS PAVEMENT (FULL DEPTH) / , , , SALVAGE PIPE CULVERT / SALVAGE MARKER

4 Tabulation of Bids Page 3 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , , SALVAGE PIPE APRON / , SALVAGE PRECAST CONCRETE HEADWALL / SALVAGE SIGN TYPE C / SALVAGE SIGN TYPE D / , , , , DEWATERING / , , , , , CONSTRUCT ENTRANCE / , , , DITCH CLEANING / , , , , GEOTEXTILE FABRIC TYPE V / , , , , EXCAVATION - COMMON / , , , , EXCAVATION - SUBGRADE / , , , , SELECT GRANULAR EMBANKMENT (CV) / , , , , COMMON EMBANKMENT (CV)

5 Tabulation of Bids Page 4 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , , , AGGREGATE SURFACING CLASS 1 TON / , , , TRACTOR MOUNTED BACKHOE HOUR / , , , , AGGREGATE BASE CLASS 5 TON / , , , , FULL DEPTH RECLAMATION / , , , BITUMINOUS PATCHING MIXTURE TON / , , , , MILL BITUMINOUS SURFACE (2.0") / , , , , MILLED SINUSOIDAL RUMBLE STRIPS / , , , , MILLED SINUSOIDAL RUMBLE STRIPS-CL / , , , , ULTRATHIN BONDED WEARING COURSE / , , , , BITUMINOUS MATERIAOR FOG SEAL GAL / , , , , BITUMINOUS MATERIAOR SEAL COAT GAL / , , , , BITUMINOUS SEAL COAT

6 Tabulation of Bids Page 5 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , ,355, ,411, ,487, TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TON / , TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 1.5" THICK , , , / , , , , , , PLUG AND ABANDON CATTLE PASS / , , , COARSE FILTER AGGREGATE (CV) / , , FINE AGGREGATE BEDDING (CV) / , , , " CAS PIPE CULVERT / " CAS PIPE CULVERT / , , , " CAS PIPE CULVERT / , , , " RC PIPE CULVERT / , , , " RC PIPE CULVERT / , " RC PIPE CULVERT / " CAS PIPE APRON

7 Tabulation of Bids Page 6 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / " CAS PIPE APRON / " RC PIPE APRON / , , , , , , " RC PIPE APRON / , , , " RC PIPE CULVERT DESIGN / , , , " CAS SAFETY APRON / , , , " RC SAFETY APRON / , , , " RC SAFETY APRON / , , , INSTALL PIPE CULVERT / , , , INSTALL PIPE APRON / , , , , , , CLEAN OUT BOX CULVERT / " SAFETY APRON / , , , " SAFETY APRON

8 Tabulation of Bids Page 7 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , " SAFETY APRON / , , , " PIPE CULVERT / , , , " PIPE CULVERT / , , , " PIPE CULVERT / , , , " TP PIPE DRAIN / , , INSTALL PRECAST CONCRETE HEADWALL / CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL , , / , , , LINING CULVERT PIPE 24" / , , , LINING CULVERT PIPE 30" / , , , LINING CULVERT PIPE (24") SPECIAL / , , , LINING CULVERT PIPE (30") SPECIAL / , , , LINING CULVERT PIPE (36") SPECIAL

9 Tabulation of Bids Page 8 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , , LINING CULVERT PIPE (48") SPECIAL / , , , LINING CULVERT PIPE (73" SPAN) SPECIAL / , , , CM HIGH DENSITY / , , , MAIL BOX SUPPORT / , , , RELOCATE MAIL BOX SUPPORT / GUIDE POST TYPE B / , , , , , , TRAFFIC CONTROL / , , , SIGN PANE TYPE C S F / , , , INSTALL SIGN PANEL TYPE C / , , , INSTALL SIGN PANEL TYPE D / INSTALL MARKER / , , , TEMPORARY FENCE

10 Tabulation of Bids Page 9 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , , , SILT FENCE, TYPE MS / , STORM DRAIN INLET PROTECTION / , , , SEDIMENT CONTROL LOG TYPE COMPOST / , , , , , , STABILIZED CONSTRUCTION EXIT / , , , CULVERT END CONTRO / , , , , FERTILIZER TYPE 3 LB / , , , SOIL BED PREPARATION / , , , SEEDING / , , , SEED MIXTURE LB / SEED MIXTURE LB / SEED MIXTURE LB / , , , , EROSION CONTROL BLANKETS CATEGORY 0

11 Tabulation of Bids Page 10 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc / , , , , EROSION CONTROL BLANKETS CATEGORY 3N / , , MOWING / , , WEED SPRAYING / WEED SPRAY MIXTURE GAL / , , , , HYDRAULIC STABILIZED FIBER MATRIX LB / , , , , INTERIM PAVEMENT MARKING / , , " SOLID LINE PAINT / , , , , " SOLID LINE PAINT / , " SOLID LINE PAINT / , , " BROKEN LINE PAINT / , " DOTTED LINE PAINT / , , , PAVEMENT MARKING SPECIAL S F

12 Tabulation of Bids Page 11 of 22 Engineer's Estimate Knife River Corporation - North Central (2) Duininck, Inc. Section Totals: $6,270, $5,153, $5,382, Life Cycle Costs: Section Total with LCC: $6,270, $5,153, $5,382, Contract Item Totals Contract Time Totals Contract Life Cycle Costs Totals $6,270, $5,153, $5,382, $0.00 $0.00 $0.00 $0.00 Contract Grand Totals $6,270, $5,153, $5,382, ( ) indicates item is bid as Lump Sum

13 Tabulation of Bids Page 12 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , , , QUALITY MANAGEMENT / , , , , QUALITY MANAGEMENT SPECIAL / , , , , MOBILIZATION / , , , , FIELD LABORATORY TYPE D / MAINT AND RESTORATION OF HAUL ROADS / , , , , CLEARING / , , , , GRUBBING / , , REMOVE PIPE DRAIN / , , , REMOVE PERFORATED PIPE / , , REMOVE PIPE CULVERTS / , , REMOVE FENCE / , , REMOVE RC CATTLE PASS

14 Tabulation of Bids Page 13 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , REMOVE PAVEMENT / , , REMOVE CONCRETE PAVEMENT / , , , REMOVE BITUMINOUS PAVEMENT / , , , REMOVE BITUMINOUS SHOULDER PAVEMENT / , , REMOVE RC CATTLE PASS APRON / REMOVE CONCRETE HEADWALL / REMOVE SIGN TYPE C / REMOVE SIGN TYPE D / SAWING CONCRETE PAVEMENT (FULL DEPTH) / , , SAWING BITUMINOUS PAVEMENT (FULL DEPTH) / , , SALVAGE PIPE CULVERT / SALVAGE MARKER

15 Tabulation of Bids Page 14 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , SALVAGE PIPE APRON / , SALVAGE PRECAST CONCRETE HEADWALL / SALVAGE SIGN TYPE C / SALVAGE SIGN TYPE D / , , , , DEWATERING / , , , CONSTRUCT ENTRANCE / , , DITCH CLEANING / , , , GEOTEXTILE FABRIC TYPE V / , , , EXCAVATION - COMMON / , , , EXCAVATION - SUBGRADE / , , , SELECT GRANULAR EMBANKMENT (CV) / , , , COMMON EMBANKMENT (CV)

16 Tabulation of Bids Page 15 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , , AGGREGATE SURFACING CLASS 1 TON / , , TRACTOR MOUNTED BACKHOE HOUR / , , , AGGREGATE BASE CLASS 5 TON / , , , FULL DEPTH RECLAMATION / , , BITUMINOUS PATCHING MIXTURE TON / , , , MILL BITUMINOUS SURFACE (2.0") / , , , MILLED SINUSOIDAL RUMBLE STRIPS / , , , MILLED SINUSOIDAL RUMBLE STRIPS-CL / , , , ULTRATHIN BONDED WEARING COURSE / , , , BITUMINOUS MATERIAOR FOG SEAL GAL / , , , BITUMINOUS MATERIAOR SEAL COAT GAL / , , , BITUMINOUS SEAL COAT

17 Tabulation of Bids Page 16 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , ,371, ,592, TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TON / , TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 1.5" THICK , , / , , , , PLUG AND ABANDON CATTLE PASS / , , COARSE FILTER AGGREGATE (CV) / , FINE AGGREGATE BEDDING (CV) / , " CAS PIPE CULVERT / " CAS PIPE CULVERT / , , " CAS PIPE CULVERT / , , " RC PIPE CULVERT / , , " RC PIPE CULVERT / , " RC PIPE CULVERT / " CAS PIPE APRON

18 Tabulation of Bids Page 17 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / " CAS PIPE APRON / , , " RC PIPE APRON / , , , , " RC PIPE APRON / , , " RC PIPE CULVERT DESIGN / , , " CAS SAFETY APRON / , , " RC SAFETY APRON / , , " RC SAFETY APRON / , , INSTALL PIPE CULVERT / , , INSTALL PIPE APRON / , , , , CLEAN OUT BOX CULVERT / " SAFETY APRON / , , " SAFETY APRON

19 Tabulation of Bids Page 18 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , " SAFETY APRON / , , " PIPE CULVERT / , , " PIPE CULVERT / , , " PIPE CULVERT / , , " TP PIPE DRAIN / , INSTALL PRECAST CONCRETE HEADWALL / CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL , / , , LINING CULVERT PIPE 24" / , , LINING CULVERT PIPE 30" / , , LINING CULVERT PIPE (24") SPECIAL / , , LINING CULVERT PIPE (30") SPECIAL / , , LINING CULVERT PIPE (36") SPECIAL

20 Tabulation of Bids Page 19 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , LINING CULVERT PIPE (48") SPECIAL / , , LINING CULVERT PIPE (73" SPAN) SPECIAL / , , CM HIGH DENSITY / , , MAIL BOX SUPPORT / , , RELOCATE MAIL BOX SUPPORT / GUIDE POST TYPE B / , , , , TRAFFIC CONTROL / , , SIGN PANE TYPE C S F / , , INSTALL SIGN PANEL TYPE C / , , INSTALL SIGN PANEL TYPE D / INSTALL MARKER / , , TEMPORARY FENCE

21 Tabulation of Bids Page 20 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , , SILT FENCE, TYPE MS / STORM DRAIN INLET PROTECTION / , , SEDIMENT CONTROL LOG TYPE COMPOST / , , STABILIZED CONSTRUCTION EXIT / , , CULVERT END CONTRO / , , , FERTILIZER TYPE 3 LB / , , SOIL BED PREPARATION / , , SEEDING / , , SEED MIXTURE LB / SEED MIXTURE LB / SEED MIXTURE LB / , , , EROSION CONTROL BLANKETS CATEGORY 0

22 Tabulation of Bids Page 21 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC / , , , EROSION CONTROL BLANKETS CATEGORY 3N / , MOWING / , WEED SPRAYING / WEED SPRAY MIXTURE GAL / , , , HYDRAULIC STABILIZED FIBER MATRIX LB / , , , , INTERIM PAVEMENT MARKING / , " SOLID LINE PAINT / , , , " SOLID LINE PAINT / " SOLID LINE PAINT / , " BROKEN LINE PAINT / " DOTTED LINE PAINT / , , PAVEMENT MARKING SPECIAL S F

23 Tabulation of Bids Page 22 of 22 (3) Central Specialties, Inc. (4) HARDRIVES, INC. Section Totals: Life Cycle Costs: $5,614, $5,744, Section Total with LCC: $5,614, $5,744, Contract Item Totals Contract Time Totals $5,614, $5,744, Contract Life Cycle Costs Totals $0.00 $0.00 Contract Grand Totals $5,614, $5,744, ( ) indicates item is bid as Lump Sum

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND 1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING

More information

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017 FEASIBILITY REPORT 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY October 2, 2017 Prepared for: City of Inver Grove Heights 8150 Barbara Avenue Inver Grove Heights,

More information

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary Construction Contract Bid Evaluation Summary I. Lowest responsive, responsible bidder: Eastman Aggregate Enterprises, LLC (Primary) and Rio Bak Corporation (Secondary) II. Bidders, ranked from lowest to

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

NOTICE TO BIDDERS ADDENDUM NO. 2. Dated: November 16, 2018 SAP & CP

NOTICE TO BIDDERS ADDENDUM NO. 2. Dated: November 16, 2018 SAP & CP Public Works Department Donald J. Theisen, P.E. Director NOTICE TO BIDDERS Wayne H. Sandberg, P.E. Deputy Director/County Engineer Type of Work: ADDENDUM NO. 2 Dated: November 16, 2018 SAP 082-617-011

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way IONIA COUNTY ROAD COMMISSION 170 E. Riverside Drive; P.O. Box 76, Ionia MI 48846 (616) 527-1700 (office) or (616) 527-8848 (fax) APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

Feasibility Report. Olson Lake Trail Improvements. City of Lake Elmo, Minnesota. City Project No SEH No

Feasibility Report. Olson Lake Trail Improvements. City of Lake Elmo, Minnesota. City Project No SEH No Feasibility Report Olson Lake Trail Improvements City of Lake Elmo, Minnesota City Project No. 2015.125 SEH No. 139299 April 4, 2017 April 4, 2017 RE: Olson Lake Trail Improvements Feasibility Report City

More information

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

OTTAWA COUNTY ROAD COMMISSION Bid Comparison OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

Stemmer Ridge Road Street & Utility Improvement Project

Stemmer Ridge Road Street & Utility Improvement Project City of Prior Lake 4646 Dakota Street SE Prior Lake, MN 55372 June 9, 2014 Stemmer Ridge Road Street & Utility Improvement Project City of Prior Lake Scott County, Minnesota WSB Project No. 1964-14 FEASIBILITY

More information

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32. PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P )

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P ) District 3 Administration 7964 Industrial Park Road Baxter, MN 56425 Memo To: Dan Anderson Transportation District Engineer From: Scott Zeidler Senior Engineering Specialist Date: December 11, 2017 RE:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

The Tulalip Tribes of Washington

The Tulalip Tribes of Washington The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

PAGE 1 of 18 WEIGHTED AVERAGE

PAGE 1 of 18 WEIGHTED AVERAGE UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

Page 1 of KA

Page 1 of KA Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT 86-29 S.A.P. 019-686-016 PROPOSAL ATTACHMENTS 1. The Attachment MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

MUNICIPALITY OF MONROEVILLE

MUNICIPALITY OF MONROEVILLE MUNICIPALITY OF MONROEVILLE An Equal Opportunity Employer N O T I C E T O B I D D E R S PROPOSAL FOR BITUMINOUS PAVING MATERIALS DATE: FIRM NAME: AUTHORIZED AGENT (print) AUTHORIZED AGENT (signature) ADDRESS:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

REQUEST FOR COUNCIL ACTION. List of Exhibits A. Project Plan Set B. Bolton & Menk Proposal for Engineering / Inspection Services

REQUEST FOR COUNCIL ACTION. List of Exhibits A. Project Plan Set B. Bolton & Menk Proposal for Engineering / Inspection Services Item #08 - CC Agenda - 05/2/2016 [Page 1 of 5] REQUEST FOR COUNCIL ACTION : May 2, 2016 ITEM NO: 8 Department Approval: Administrator Reviewed: Agenda Section: Name Adam Edwards JML Public Works Director/

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15 COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC , IA - 2017 DIVISION 1 - GENERAL 1.01 TRAFFIC CONTROL LS 1 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 DIVISION 2 - EARTHWORK 2.01 CLEARING

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

DRAINAGE. December

DRAINAGE. December DRAINAGE December 2017-1 TAB - 2501 STATEMENT OF ESTIMATED QUANTITIES TAB SHT NO ITEM DESCRIPTION UNITS ARPONS TOTAL ESTIMATED QUANTITY D 25 2104.502 CATCH BASIN EACH 1 D 25 2104.502 S EACH 9 D 25 2104.503

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 DECEMBER 6, 2018 ADDENDUM 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 ADDITIONAL INFORMATION DOCUMENTS The following document: Questions and Responses

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:

More information