59-2 KA Page 1 of 16

Size: px
Start display at page:

Download "59-2 KA Page 1 of 16"

Transcription

1 59-2 KA Page 1 of 16

2 Area office to Page 2 of 16

3 Rock Wedge TYPICAL SECTION C 2.0 in. Overlay 2.0 in. Mill Rock Wedge edge of Asphalt Match Existing Surface 30.0 ft wedge 2.0ft+ not to scale Typical slope 1.56 % on tangents and on super-elevated sections to match existing super or as directed by the Engineer. Existing surface may be irregular and contain edge ruts. Contractor to fill to finished slope. Material for wedges shall be furnished by the contractor and paid for as Pavement Edge Wedge (Rock). To allow for a reasonable transition the overlay is to be tapered approximately three feet at all paved side roads and entrances (except those that are approved to be fully paved). ROADWAY WIDTHS Approx. Approx. Location mile Width ft Location mile Width egin 0.21 miles south of the NCL of Garnett, thence north to 0.25 miles south of the AN/FR Co. line Widenings: North Ent. to School 333 sqyds Scipio Rd 1321 sqyds S Left Turn Lane to Homerun Drive & N Right Turn Lane to Homerun Drive sqyds RATE OF APPLICATION Quantity based on SR- Ton/yd 2 PG or 0.05 approved gal/yd 2 alternate shall be used for Tack. Rock Edge 150 lb/ft 3 Millings 145 lb/ft 3 Date: 12/19/ :35 AM AndersonCo. PROJ. NO.59-2 KA Page 3 of 16 KANSAS DEPARTMENT OF TRANSPORTATION TITLE: MILLOLROCKW

4 Rock Wedge TYPICAL SECTION C 1.5 in. Overlay 3.0 in. Mill Rock Wedge (Shldrs Vary) edge of Asphalt Match Existing Surface 46.0 ft wedge 2.0ft+ not to scale Typical slope 1.56 % on tangents and on super-elevated sections to match existing super or as directed by the Engineer. Existing surface may be irregular and contain edge ruts. Contractor to fill to finished slope. Material for wedges shall be furnished by the contractor and paid for as Pavement Edge Wedge (Rock). To allow for a reasonable transition the overlay is to be tapered approximately three feet at all paved side roads and entrances (except those that are approved to be fully paved). ROADWAY WIDTHS Approx. Approx. Location mile Width Location mile Width egin approx miles south of the AN/FR Co. line, thence North to the AN/FR County line RATE OF APPLICATION Quantity based on SR- Ton/yd 2 PG or 0.05 approved gal/yd 2 alternate shall be used for Tack. Rock Edge 150 lb/ft 3 Millings 145 lb/ft 3 Date: 12/14/2017 2:36 PM AndersonCo. PROJ. NO.59-2 KA Page 4 of 16 KANSAS DEPARTMENT OF TRANSPORTATION TITLE: MILLOLROCKW

5 Ú City limit or Urban boundary No Centerline rumble strips Centerline rumble strips City connecting link or Urbanized (Unincorporated city) TYPICAL CITY CONNECTING LINK OR URANIZED AREA Centerline rumble strips ì Major HighwayÜ ì Major HighwayÜ Ú Minor Highway or County Road Ú City limit or Urban boundary GENERAL NOTES Construction of centerline rumble strips in asphalt pavement is paid under the bid item "Rumble Strips (Milled) (Centerline)". All work and materials required to construct the strips in accordance to these details and Special Provisions are included in this item. See typical sections for other surfacing details. Do not construct rumble strip on bridges or concrete bridge approaches. No variation in spacing between depressions will be permitted. Either rumble strip shape is acceptable with no mixing of shapes on a project unless approved by the engineer. For Shoulder Rumble Strip details see Standard drawing RD707. ì Major HighwayÜ ì Major HighwayÜ TYPICAL RURAL INTERSECTION WITH YPASS LANES No Centerline rumble strips Centerline rumble strips ì Major HighwayÜ ì Major HighwayÜ TYPICAL RURAL INTERSECTION WITH LEFT TURN LANES Centerline rumble strips Page 5 of 16 KDOT Graphics Certified Ú Minor Highway or County Road Centerline rumble strips No Centerline rumble strips Centerline rumble strips 1 OF Revised notes S.W.K. J.O Rem ì rumble strips thru sdrd. S.W.K. J.O.. NO. DATE REVISIONS Y APP'D RD706 MILLED RUMLE STRIPS FHWA APPROVAL (CENTERLINE) DESIGNED DETAILED QUANTITIES DESIGN CK. DETAIL CK. QUAN.CK. KDOT Graphics Certified APP'D. James O. rewer TRACED owser TRACE CK. King

6 Page 6 of 16 KDOT Graphics Certified ShoulderÜ ì ProjectÜ TYPICAL MINOR SIDEROAD OR ENTRANCE Centerline Rumble Strips Edge of travel wayü Traffic ÙCenterline Rumble Strips of Undivided Highway Traffic Edge of travel wayû TYPICAL INSTALLATION ELEVATION 7" 5" A A PLAN DETAILS OF DEPRESSION 7" 5" Revised notes S.W.K. J.O Rem ì rumble strips thru sdrd. S.W.K. J.O.. A A PLAN DETAILS OF DEPRESSION (Alternate Shape) NO. RD706 DATE REVISIONS Y APP'D MILLED RUMLE STRIPS FHWA APPROVAL (CENTERLINE) DESIGNED DETAILED QUANTITIES DESIGN CK. DETAIL CK. QUAN.CK. APP'D. James O. rewer TRACED owser TRACE CK. King KDOT Graphics Certified "to " depth SECTION - (ALT. SHAPE) 2 OF 2 "to " depth SECTION A-A (Typical for both shapes) ÚTop of pavement ÚTop of pavement SECTION - 7" ALT. RUMLE STRIP SHAPE "to " depth Radius Radius "to " depth End of Rad. Úì Sideroad or Paved Entrance End of Rad.

7 Construct rumble strips on shoulder through passing or climbing lane (Except for entrances, sideroads, and intersections) ì Major HighwayÛ TYPICAL PASSING OR CLIMING LANES Rumble strips continuous on median shoulders TYPICAL INTERCHANGE RAMP ENTRANCE & EXIT Rumble strips on shoulder No rumble strips to be constructed on shoulder through this area Rumble strips on shoulder ì Major HighwayÛ Rumble strips on shoulder No rumble strips to be constructed on shoulder through this area Rumble strips on shoulder Revised Detail, Rumble Strip Dim. S.W.K. J.O.. TYPICAL INTERSECTION Add. detail for Rumble strip on PCCP S.W.K. J.O Added Sec. - (Alt.) S.W.K. J.O Rev. Layout and Added Alt. Shape S.W.K. J.O.. NO. DATE REVISIONS Y APP'D MILLED RUMLE STRIPS (CONCRETE/ASPHALT SHOULDER) SHOULDER WIDTH ï 2'-0" RD707 FHWA APPROVAL DESIGNED DETAILED DESIGN CK. DETAIL CK. QUAN.CK. QUANTITIES APP'D. James O.rewer TRACED owser TRACE CK. King Limit of rumble strips No rumble strips to be constructed on outside shoulder through this area Rumble strips on outside shoulder on outside shoulder Limit of rumble strips No rumble strips to be constructed on outside shoulder through this area Rumble strips on outside shoulder on outside shoulder Page 7 of 16 KDOT Graphics Certified 1 OF 2 KDOT Graphics Certified Ú Minor Highway Unimportant Road

8 Trans. Jt.Ü Trans. Jt.Ü Trans. Jt.Ü Trans. Jt.Ü 6" 6" KDOT Graphics Certified Rumble strips on shoulder No rumble strips to be constructed Rumble strips on shoulder through this area 10 Depressions Revised Detail, Rumble Strip Dim. S.W.K. J.O Add. detail for Rumble strip on PCCP S.W.K. J.O Added Sec. - (Alt.) S.W.K. J.O Rev. Layout and Added Alt. Shape S.W.K. J.O.. NO. DATE REVISIONS Y APP'D MILLED RUMLE STRIPS (CONCRETE/ASPHALT SHOULDER) SHOULDER WIDTH ï 2'-0" RD707 FHWA APPROVAL DESIGNED DETAILED DESIGN CK. DETAIL CK. QUAN.CK. QUANTITIES APP'D. James O.rewer TRACED owser TRACE CK. King KDOT Graphics Certified "to " depth 2'-8 " 15'-0" ShoulderÜ ì ProjectÜ MINOR SIDEROAD OR ENTRANCE Edge of Travel WayÜ Typ. 15'-0" PLAN VIEW-SPACING OF RUMLE STRIPS End of Rad. Úì Sideroad or Paved Entrance End of Rad. Contr.Jt. (Conc.)Ü 2'-8 " Contr.Jt. (Conc.)Û 2'-8 " Note: Construct rumble strips at normal spacing on the shoulders at field or other low-use, non-paved entrances. 6'-0" (typ.) Edge of Travel WayÜ Typ. 14 " MILLED RUMLE STRIP on PCCP OVERLAY (ï 5") SECTION - (ALT. SHAPE) "to " depth Conc. Sho. GENERAL NOTES All work and materials required for construction of rumble strips in asphalt or concrete pavement are paid under the bid item "Rumble Strips (Milled)". See typical sections for other surfacing and shoulder details. Construct rumble strips on directional ramps and tapers. Adjust the number of depressions when concrete pavement contraction joint spacing is less than 15'-0". No variation in spacing between depressions is permitted. Clearance is 2'-0" (min.) to 3'-0" (max.) between Either rumble strip shape is acceptable with no mixing of shapes on a project unless approved by the engineer. ÚTop of pavement Top of pavementü SECTION - ELEVATION SECTION A-A (Typical for both shapes) Do not construct rumble strips on bridges or concrete bridge approaches the edge of depression and contraction joint. Center each group of depressions between contraction joints. Page 8 of 16 "to " depth Radius Radius "to " depth 7" 5" A A 7" PLAN DETAILS OF DEPRESSION PLAN 7" 5" A A DETAILS OF DEPRESSION (Alternate Shape) 2 OF 2

9 " SOLID WHITE EDGELINE 4" SOLID YELLOW LINE 6" DOTTED WHITE EXTENSION LINE 6" SOLID WHITE EDGELINE D/4 6" ROKEN WHITE LANE LINE 6" WHITE LANE DROP LINE NOTE: DOTTED EXTENSION LINE TAPER LENGTH POSTED SPEED * 12 FOR POSTED SPEEDS AOVE 40 MPH W 4-2 D TYPICAL MARKING FOR AUXILIARY PASSING LANE 6" ROKEN WHITE LANE LINE 4" SOLID YELLOW LINE SHOULDER LINE EDGE OF PAVEMENT 6" SOLID WHITE EDGE LINE TYPICAL SPACING FOR DOTTED EXTENSION LINES, UNLESS OTHERWISE NOTED ON PLANS " SOLID WHITE EDGE LINE EDGE OF PAVEMENT SHOULDER LINE 6" ROKEN WHITE LANE LINE 4" ROKEN YELLOW LINE TWO-WAY LEFT TURN DETAIL FOR FIVE LANE ROADWAY TYPICAL SPACING FOR LANE DROP. UNLESS OTHERWISE NOTED ON PLANS " SOLID YELLOW LINE SHOULDER LINE EDGE OF PAVEMENT 32 6" SOLID WHITE EDGE LINE 6" SOLID WHITE EDGE LINE EDGE OF PAVEMENT TYPICAL SPACING FOR ROKEN LINES UNLESS OTHERWISE NOTED ON PLANS SHOULDER LINE 4" ROKEN YELLOW LINE TWO-WAY LEFT TURN DETAIL FOR THREE LANE ROADWAY 4" 4" 16 SPACING (FT) 10 X SPEED (MPH) TWO-WAY LEFT TURN ARROW SPACING DETAIL 4" TYPICAL SPACING FOR NO PASSING LINES UNLESS OTHERWISE NOTED ON PLANS NOTE: IF ARROWS ARE USED SPACE THE ARROWS AS SHOWN IN THE SPACING DETAIL. Page 9 of 16 Pg 1 of 2 5/25/12 Added Dotted Extension and Lane Drop s.a.h..d.g. 2 9/20/05 Removed Aux. Passing Lane Dotted Ext. J.F.F..D.G. 1 7/26/05 New FHWA Approval Date J.F.F..D.G. NO. DATE REVISIONS Y APP D TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS TE308 FHWA APPROVAL 5/25/2012 APP D rian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK..D.G. DETAIL CK..D.G. QUAN. CK. TRACE CK.

10 3 NOTE: ALL PAVEMENT MARKINGS SHALL E ROKEN AT CROSS ROADS. FOR HIGHWAY JUNCTIONS THE NO PASSING ZONE WILL EXTEND 1000 FROM INTERSECTION. 4" ROKEN YELLOW LINE 6" SOLID WHITE LANE LINE 4" SOLID YELLOW LINE 6" WHITE EDGE LINE 6" WHITE EDGE LINE " WHITE EDGE LINE 6" SOLID WHITE LANE LINE 4" SOLID YELLOW LINE 4" ROKEN YELLOW LINE 6" WHITE EDGE LINE TYPICAL ROAD JUNCTION MARKINGS WITH YPASS LANES EDGE OF PAVEMENT 6" ROKEN WHITE LANE LINE SHOULDER LINE 6" SOLID WHITE EDGE LINE 12 4" SOLID YELLOW DOULE LINE " SOLID WHITE EDGE LINE EDGE OF PAVEMENT SHOULDER LINE 6" ROKEN WHITE LANE LINE TYPICAL MARKINGS FOR FOUR LANE ROADWAY 6" SOLID WHITE EDGE LINE W14-3 EDGE OF PAVEMENT 4" ROKEN YELLOW LINE " SOLID YELLOW NO PASSING LINE EDGE OF PAVEMENT SHOULDER LINE 6" SOLID WHITE EDGE LINE TYPICAL TWO LANE MARKINGS NOTE: LONGITUDINAL PAVEMENT MARKING LINES SHALL E OFFSET A MINIMUM OF 2" FROM LONGITUDINAL PAVEMENT JOINTS. Pg 2 of 2 NOTE: ON NON I, US, AND K ROUTES, 4" EDGE LINES MAY E INSTALLED. 6" EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES. Page 10 of 16 5/25/12 Added Dotted Extension and Lane Drop s.a.h..d.g. 2 9/20/05 Removed Aux. Passing Lane Dotted Ext. J.F.F..D.G. 1 7/26/05 New FHWA Approval Date J.F.F..D.G. NO. DATE REVISIONS Y APP D TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS TE308 FHWA APPROVAL 5/25/2012 APP D rian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK..D.G. DETAIL CK..D.G. QUAN. CK. TRACE CK.

11 3 TYPICAL SIGNING AND MARKING FOR RIGHT LANE MUST TURN RIGHT 4" ROKEN YELLOW LINE SIDE ROAD 25 MIN 8 FOR 55 MPH AND AOVE USING THE SAME SPACING " SOLID WHITE LINE " SOLID YELLOW LINE 8" ROKEN WHITE LANE DROP LINE RIGHTLANE TYPICAL CROSSWALKS TYPE I: CROSSWALK LINES SHALL E SOLID WHITE LINES. THEY SHALL E SPACED A MINIMUM OF 6 APART FROM INSIDE EDGE TO INSIDE EDGE. TYPE II: THESE LINES SHOULD E SOLID WHITE 24" WIDE PLACED PARALLEL TO THE DIRECTION OF TRAFFIC FLOW. THE LINE PLACEMENT IS DETERMINED Y LANE LINE,CENTER LINE, AND WHEEL PATH IN SUCH A MANNER AS TO MINIMIZE TRAFFIC WEAR. THE CROSSWALK WIDTH SHOULD E NOT LESS THAN 8. THE TRANSVERSE CROSSWALK LINES MAY E ADDED. MUST TURN RIGHT R3-7 THE LANE DROP MARKINGS LENGTH IS A MINIMUM OF 100 AND A MAXIMUM OF 250 PRIOR TO THE 8"SOLID WHITE LINE WHEN REQUIRED, STOP LINES SHALL E INSTALLED A MINIMUM OF 5 FROM CROSSWALKS. 5 MIN. TYPE II TYPE I Pg 1 of 2 6 MIN. 2 5/25/12 Updated Chart and Lane Drop s.a.h..d.g. 10/20/06 RR Xing Symbol Changed from 18" to 16" T.L.H..D.G. 1 9/20/05 Added 4" Solid Yellow Double to RRxing J.F.F..D.G. NO. DATE REVISIONS Y APP D TYPICAL MISCELLANEOUS 5 MIN. 8 Page 11 of 16 PAVEMENT MARKING DETAIL SHEET TE309 FHWA APPROVAL 7/26/2005 APP D rian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK..D.G. DETAIL CK..D.G. QUAN. CK. TRACE CK.

12 16" 3 RAILROAD CROSSING MARKING 6" ROKEN WHITE LANE LINE 24" SYMOL 4" ROKEN YELLOW LINE " 15 APPROX. 4" SOLID YELLOW LINE 4" SOLID YELLOW DOULE LINE VARIES 6" SOLID WHITE LINE DISTANCE D FROM CHART A 6" WHITE EDGE LINE W 10-1 R R A THREE-LANE ROADWAY SHOULD E MARKED WITH A CENTERLINE FOR TWO-LANE APPROACH OPERATION ON THE APPROACH TO A CROSSING. ON MULTI-LANE ROADS THE TRANSVERSE ANDS SHOULD EXTEND ACROSS ALL APPROACH LANES, AND INDIVIDUAL R X R SYMOLS SHOULD E USED IN EACH APPROACH LANE. REFER TO STANDARD ALPHAET FOR HIGHWAY SIGNS AND MARKINGS FOR R X R SYMOLS DETAILS. CHART "A" DISTANCE SPEED D MPH (feet) (X) PLACEMENT LOCATION IS DEPENDENT ON SITE CONDITIONS AND OTHER SIGNING TO PROVIDE ADEQUATE ADVANCE WARNING TO THE DRIVER *STOP LINE 8 FROM NEAR EDGE OF GATE OR CANTILEVER, IF PRESENT NOTE: ON NON I, US, AND K ROUTES, 4" EDGE LINES MAY E INSTALLED. 6" EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES (X) (X) (X) ALL DISTANCES ARE MINIMUM. TYPICAL APPROACH TAPER DETAIL 4" DOULE YELLOW LINE X ( FROM CHART ) 25 MINIMUM 4" A YELLOW DIAGONAL LINE L 30 6" SOLID WHITE LANE LINE 4" 24" WHITE STOP LINE 4" THE APPROACH TAPER LENGTH FROM POINT A TO POINT IS TO E DETERMINED USING CHART C. VALUES FOR L WERE CALCULATED USING THE EQUATIONS ELOW AND INCREASED CHART "" APPROACH X SPEED 20 MPH 20 CHART "C" APPROACH L SPEED 20 MPH 80 TO THE NEXT HIGHER 5 MPH INCREMENT. 25 MPH MPH SPEEDS < 45 MPH L= W*S 30 MPH MPH MPH MPH SPEEDS = 45 MPH L= W*S 40 MPH 45 MPH MPH 45 MPH IF ARROWS ARE USED AND UNLESS OTHERWISE SPECIFIED THE SPACE 50 MPH MPH 600 ETWEEN LINES SHOULD E AT LEAST FOUR TIMES THE HEIGHT OF 55 MPH MPH 660 THE CHARACTERS FOR LOW SPEED ROADS UT NOT MORE THAN TEN 60 MPH MPH 720 TIMES THE HEIGHT OF THE CHARACTERS, UNDER ANY CONDITIONS. 65 MPH MPH MPH MPH 840 FOR SPEEDS LESS THAN OR EQUAL TO 40 MPH, R=150. FOR SPEEDS GREATER THAN OR EQUAL TO 45 MPH, R=300. Page 12 of 16 Pg 2 of 2 5/25/12 Updated Chart and Lane Drop s.a.h..d.g. 2 10/20/06 RR Xing Symbol Changed from 18" to 16" T.L.H..D.G. 1 9/20/05 Added 4" Solid Yellow Double to RRxing J.F.F..D.G. NO. DATE REVISIONS Y APP D TYPICAL MISCELLANEOUS PAVEMENT MARKING DETAIL SHEET TE309 FHWA APPROVAL 7/26/2005 APP D rian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK..D.G. DETAIL CK..D.G. QUAN. CK. TRACE CK.

13 LOCATION 6" Solid WHITE Edge 6" roken WHITE Lane 6" Dotted WHITE Extension SUMMARY OF PAVEMENT MARKINGS 6" Solid WHITE Lane 8" Solid WHITE Gore Solid WHITE Diagonal Solid WHITE Chevron Solid WHITE Type I Crosswalk 24" Solid WHITE Type II Crosswalk 24" Solid WHITE Stop 4" Solid YELLOW Double 4" Solid YELLOW 4" roken YELLOW 6" Solid YELLOW Edge N/S 70, ,333 8,628 8,947 8, Solid YELLOW Diagonal TOTALS (LF) 70, , ,628 8,947 8, Project: 59-2 KA Page 13 of 16

14 SUMMARY WORD & SYMOL MARKINGS LOCATION STOP ONLY X-ING SCHOOL Homerun Drive 4 5 TOTALS NOTE: For Specific pavement marking details and dimensions see plan sheets NOTE: ALL TOTALS REFLECT ACTUAL QUANTITY OF PAVEMENT MARKING MATERIALS REQUIRED Project No KA Page 14 of 16

15 Project: 59-2 KA RECAPITULATION OF QUANTITIES ITEMS TOTAL UNITS PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(4") PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(6") 72,275 PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(8") PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)() PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(4") PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(6") 25,948 PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)() 251 PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(4") PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(6") PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(8") PAVEMENT MARKING (THERMOPLASTIC)(WHITE)() PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(4") PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(6") PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)() PAVEMENT MARKING (EPOXY)(WHITE)(4") PAVEMENT MARKING (EPOXY)(WHITE)(6") PAVEMENT MARKING (EPOXY)(WHITE)(8") PAVEMENT MARKING (EPOXY)(WHITE)() PAVEMENT MARKING (EPOXY)(YELLOW)(4") PAVEMENT MARKING (EPOXY)(YELLOW)(6") PAVEMENT MARKING (EPOXY)(YELLOW)() PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) () PAVEMENT MARKING (INTERSECTION GRADE)(WHITE)(24") PAVEMENT MARKING (INTERSECTION GRADE)(YELLOW)() PAVEMENT MARKING SYMOL (INTERSECTION GRADE) (WHITE) (R/R XING) EACH PAVEMENT MARKING SYMOL (INTERSECTION GRADE) (WHITE) (Lt Turn Arrow) 5 EACH PAVEMENT MARKING SYMOL (INTERSECTION GRADE) (WHITE) (Rt Turn Arrow) 4 EACH PAVEMENT MARKING SYMOL (INTERSECTION GRADE) (WHITE) ( ONLY ) EACH PAVEMENT MARKING SYMOL (INTERSECTION GRADE) (WHITE) (Rt/Thru Arrow) EACH PAVEMENT MARKING REMOVAL NOTE: WORDS & SYMOLS SHALL CONFORM TO THE LATEST EDITION OF "STANDARD ALPHAETS FOR HIGHWAY SIGNS AND PAVEMENT MARKINGS" PRINTED Y THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. Page 15 of 16

16 SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control. SIGN NO. R2-1 R4-1 2 WORK ZONE SIGNS * SIZE SQ. FT & OVER W3-4 2 W3-5 W8-11 W W W W20-5 W W21-5 G20-4 KG KM4-20 KG KI-104a 2 KI-105a 2 LIGHTED DEVICES * WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE HIGH INTENSITY) ARROW DISPLAY PORTALE CHANGEALE MESSAGE SIGN ARRICADES * CHANNELIZING DEVICES * TYPE III (4 TO 12 ) PEDESTRIAN FIXED PORTALE PEDESTRIAN SUMMARY OF TRAFFIC CONTROL DEVICES (EACH) 66 WORK ZONE SIGN (SPECIAL) SIGN NO SQ. FT. & LESS SQ. FT. & OVER RECAPITULATION OF QUANTITIES ITEM QUANTITY UNIT WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) WORK ZONE SIGNS (9.26 TO SQ. FT.) WORK ZONE SIGNS (16.26 SQ. FT. & OVER) WORK ZONE ARRICADES (TYPE 3 4 TO 12 ) WORK ZONE ARRICADES (PEDESTRIAN) CHANNELIZER (FIXED) CHANNELIZER (PORTALE) CHANNELIZER (PEDESTRIAN) WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE HIGH INTENSITY) ARROW DISPLAY PORTALE CHANGEALE MESSAGE SIGN PAVEMENT MARKING (TEMPORARY) 4" SOLID (TYPE I) STA./LINE 4" SOLID (TYPE II) STA./LINE 4" ROKEN (8')(TYPE I) STA./LINE 4" ROKEN (8')(TYPE II) STA./LINE 4" ROKEN (3')(TYPE I) STA./LINE 4" ROKEN (3')(TYPE II) STA./LINE 4" DOTTED EXTENSION (TYPE I) STA./LINE 4" DOTTED EXTENSION (TYPE II) STA./LINE SOLID (LINE MASKING TAPE) STA./LINE ROKEN (LINE MASKING TAPE) STA./LINE SYMOL (TYPE I) EACH SYMOL (TYPE II) EACH FLEXILE RAISED PAVEMENT MARKERS (4" ROKEN (8 )) STA./LINE FLEXILE RAISED PAVEMENT MARKERS (4" ROKEN (3 )) STA./LINE PAVEMENT MARKING REMOVAL LIN. FT. CONCRETE SAFETY ARRIER (TYPE F3) (TEMPORARY) LIN. FT. CONCRETE SAFETY ARRIER (TYPE F3) (TEMP.-INSTALL ONLY) LIN. FT. CONCRETE SAFETY ARRIER (TYPE F3) (TEMP.-RELOCATE) LIN. FT. INERTIAL ARRIER SYSTEM EACH REPLACEMENT MODULES (IS) EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) EACH RIGID RAISED PAVEMENT MARKER (TYPE I) EACH RIGID RAISED PAVEMENT MARKER (TYPE II) EACH TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM TRAFFIC CONTROL LUMPSUM LUMP SUM FLAGGER (SET PRICE) 1 HOUR NOTES: /10/16 Removed Replacement Modules Summary Table, Added JG (IS) to Replacement Modules description NO. DATE REVISIONS Y APP D TRAFFIC CONTROL SUMMARY OF DEVICES RECAPITULATION OF QUANTITIES TE795 FHWA APPROVAL 06/01/15 APP D Kristina Erickson DESIGNED.A.H. DETAILED R.W.. QUANTITIES TRACED DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK. Page 16 of 16 Anderson Co. Proj. No KA Title:

Page 1 of KA

Page 1 of KA Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline

More information

s Contact the Area Construction Engineer at for RAP sample location. Page 2 of 10

s Contact the Area Construction Engineer at for RAP sample location. Page 2 of 10 Page 1 of 10 Page 2 of 10 Page 3 of 10 Ú City limit or Urban boundary No Centerline rumble strips Centerline rumble strips City connecting link or Urbanized (Unincorporated city) TYPICAL CITY CONNECTING

More information

BARTON COUNTY GENERAL HIGHWAY MAP PREPARED BY THE KANSAS NE 120 RD NE 100 RD NE 80 RD NE 70 RD NE 50 RD NE 60 RD T18S T19S. County Ellsworth County

BARTON COUNTY GENERAL HIGHWAY MAP PREPARED BY THE KANSAS NE 120 RD NE 100 RD NE 80 RD NE 70 RD NE 50 RD NE 60 RD T18S T19S. County Ellsworth County TS TS NW 0 RD! Stickney! Millard!!!!! NE 00 RD NE 0 RD NE 0 RD! NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 00 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE N SUSANK RD NE 0 AVE

More information

KDOT PROJECT # 106 KA

KDOT PROJECT # 106 KA Page 1 of 10 KDOT PROJECT # FEDERL PROJECT # HSIP-450(101) KDOT PROJECT # FEDERL PROJECT # HSIP-450(101) Project Location #8 Page 2 of 10 01/05/2017 JG FED # HSIP-450(101) This project is for cutting shoulder

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 07-08001 Sheet 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY TYPICAL TRAFFIC CONTROL, 2-LANE

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 0' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

Night Work Specification

Night Work Specification Night Work Specification 1.0 Hours of Work The contractor is advised that most work for this contract will be carried out during night time hours. For the purposes of this contract night is defined as

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

SECTIO N 610 PAVEMENT SMO O THNESS

SECTIO N 610 PAVEMENT SMO O THNESS SECTIO N 610 PAVEMENT SMO O THNESS 610.1 Description. This work shall consist of measuring the smoothness of the final pavement surface. Smoothness shall be measured using the International Roughness Index

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

Temporary Traffic Control Plans

Temporary Traffic Control Plans Temporary Traffic Control Plans US Department of Transportation Federal Highway Administration (FHWA) MUTCD 2009 EDITION Adopted by WSDOT December 19, 2011 with modifications per WAC 468-95. 2-1 Standard

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 17 STANDARD NOTES SN02 3 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN SP01 4 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

Lee County DOT Traffic Section Design Standard for Sign Installation

Lee County DOT Traffic Section Design Standard for Sign Installation Lee County DOT Traffic Section Design Standard for Sign Installation Traffic Section Table Of Contents Section Title 1. Sign Panel Material 2. Sign Shape 3. Posts 4. Fasteners 5. Retro reflectivity and

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

1400 MISCELLANEOUS Traffic Engineering Manual

1400 MISCELLANEOUS Traffic Engineering Manual TABLE OF CONTENTS Part 14 - MISCELLANEOUS 1400 GENERAL... 14-3 1415 RUMBLE STRIPS (INCLUDING STRIPES) IN THE ROADWAY... 14-4 1415-1 General... 14-4 1415-2 Transverse Rumble Strips... 14-4 1415-2.1 General...

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 8 ROADWAY PLAN PL01 3 OF 8 ROADWAY PLAN PL02 4 OF 8 LANE 10 105 150 205 270 450 500 550 11 12 SHOULDER 115 125 MINIMUM LANE CLOSURE TAPER LENGTH = L 165 225 295 180 245 320 5 25

More information

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT DI E INDE OF SHEETS TYPICAL SECTIONS (TS) ( SHEET)--- QUANTITIES (QU) (7 SHEETS)--------- 3 PLAN-PROFILE (PP)------------------ REFERENCE POINTS (RP)-------------- COORDINATE POINTS (CP)------------- CULVERT

More information

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site.

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site. CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides Note: Located at https://mdotjboss.state.mi.us/tssd/tssdhome.htm May 23, 2017: The following update was made to the web site. GEO-650-D Flares

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

DIVISION V SURFACINGS AND PAVEMENTS

DIVISION V SURFACINGS AND PAVEMENTS 36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide

More information

2003 EDITION. Illinois Supplement to the National Manual on Uniform Traffic Control Devices. Division of Highways

2003 EDITION. Illinois Supplement to the National Manual on Uniform Traffic Control Devices. Division of Highways 2003 EDITION Illinois Supplement to the National Manual on Uniform Traffic Control Devices Division of Highways ILLINOIS SUPPLEMENT TO THE NATIONAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b)

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b) kind is made by TxDOT for any purpose whatsoever. TxDOT assumes no responsibility for the conversion of this standard to other formats or for incorrect results or damages resulting from its use. 3 for

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Portable Temporary Rumble Strips (PTRS) SPECIFIC SUBJECT: Guidelines for the

More information

SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS

SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS 602.01 General 1. This specification establishes a standard for Portland cement concrete pavement smoothness, and defines defective pavement smoothness.

More information

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing. TECHNICAL COMMITTEE: Railroad and Light Rail Transit Technical Committee DATE OF ACTION: June 25, 2004 TOPIC: Crossbuck with Yield or Stop Signs and Advance Signs. STATUS: Accepted by the National Committee

More information

Work Zone Safety & New Interstate Resurfacing Provision

Work Zone Safety & New Interstate Resurfacing Provision 2017 CAPA Presentation Work Zone Safety & New Interstate Resurfacing Provision Steve Kite, PE State Work Zone Engineer Work Zone Safety Data In 2016, Approximately 600 construction projects across NC (not

More information

Table Standardized Naming Convention for ERD Files

Table Standardized Naming Convention for ERD Files S-1 (2399) PAVEMENT SURFACE SMOOTHNESS (2013 version) DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. Always use with SP2005-111 (CONCRETE PAVING MIX SPECIFICATIONS PAVEMENT) and SP2005-140

More information

VDOT 2008 Road and Bridge Standards Section Transition Curves

VDOT 2008 Road and Bridge Standards Section Transition Curves õíßáßáwúkÿîßá VDOT 2008 Road and Bridge s Page Title TC-5.01 & 5.04 802.01 802.02 802.03 802.04 802.05 802.06 Explanation of Tables and Instructions for Use General Conditions Transition Curves for Rural

More information

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Bill Kenny P.Eng, Director: Design, Project Management and Training, Technical Standards Branch. - July 2011 What are Rumble Strips? A preventative

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL December 14, 2010 David Rush VDOT WZS Program Manager Manual on Uniform Traffic Control Devices (MUTCD) Released in December 2009 States have until

More information

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC TRAFFIC CONTROL: The Contractor shall execute the item of Traffic Control as required by the Standard

More information

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study Exhibit H: Typical Traffic Control Plans North Metro Natural Gas Pipeline Project Routing Study North Metro Natural Gas Pipeline Project Routing Study This page intentionally left blank. Contractor: CAMPOS

More information

AASHTO Policy on Geometric Design of Highways and Streets

AASHTO Policy on Geometric Design of Highways and Streets AASHTO Policy on Geometric Design of Highways and Streets 2001 Highlights and Major Changes Since the 1994 Edition Jim Mills, P.E. Roadway Design Office 605 Suwannee Street MS-32 Tallahassee, FL 32399-0450

More information

The Design-Builder shall meet local road criteria provided by the local governing agencies.

The Design-Builder shall meet local road criteria provided by the local governing agencies. 11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary

More information

Control of Pavement Smoothness in Kansas

Control of Pavement Smoothness in Kansas Report No. FHWA-KS-8-5 Final REPORT Control of Pavement Smoothness in Kansas William H. Parcells, Jr., P.E. Kansas Department of Transportation Topeka, Kansas May 29 KANSAS DEPARTMENT OF TRANSPORTATION

More information

Safety Audits in Iowa

Safety Audits in Iowa Safety Audits in Iowa National RSA Peer Exchange April 29-10, 2008 Little Rock, AR Tom Welch, P.E. State Safety Engineer Office of Traffic and Safety Iowa Department of Transportation From 3R to 1R We

More information

.MAINTENANCE. Strategic Initiative Four:

.MAINTENANCE. Strategic Initiative Four: The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining

More information

GARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W

GARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W ROAD SIGNS, SIGN POSTS AND TRAFFIC CONTROL ITEMS - BID TABULATION IFB #15-012 (All Bids) Garden State Highway Products Contact: Joe McCracken 1740 E. Oak Road Vineland, NJ 08361 Phone: 856-692-7572 Fax:

More information

BID SUMMARY SHEET PUBLIC BID NO TRAFFIC WARNING/STREET SIGNS AND SUPPLIES BIDS RECEIVED: MARCH 29, 2016

BID SUMMARY SHEET PUBLIC BID NO TRAFFIC WARNING/STREET SIGNS AND SUPPLIES BIDS RECEIVED: MARCH 29, 2016 1 EACH R1-1 - 30" X 30" Stop Sign $22.90 $23.62 2 EACH R1-2 - 36" x 36" x 36" Yield Sign $16.29 $18.00 3 EACH R1-2 - 24" x 24" x 24" Yield Sign $12.54 $10.03 4 EACH R1-6a-Ped X-ing $22.80 $43.80 5 EACH

More information

Regulatory Signs in Nomenclature Order

Regulatory Signs in Nomenclature Order Regulatory Signs in Nomenclature Order Nomenclature Description Sizes (mm x mm) R 1-1 STOP 600x600 750x750 900x900 1200x1200 R 1-1A RIGHT LANE KEEP MOVING 600x750 750x900 R 1-1B OPPOSING TRAFFIC DOES NOT

More information

PERFORMANCE ACTIVITY 603 SIGNS

PERFORMANCE ACTIVITY 603 SIGNS PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

I.D.O.T. Update Version -

I.D.O.T. Update Version - I.D.O.T. Update - 2007 Version - RUBBLIZATION Rubblization with HMA Overlay Rehabilitation method for deteriorated concrete pavements Alternative to extensive patching or reconstruction Pavement in effect

More information

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Safety Assessment for Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Prepared by: VIRGINIA DEPARTMENT OF TRANSPORTATION Northwestern Regional Operations - Traffic

More information

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. 2399 PAVEMENT SURFACE SMOOTHNESS 2399.1 DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. A Definitions The Department defines Smoothness as the Mean

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL...12.1 12-2 FLAGGING...12.1 12-2.01 Flaggers...12.1 12-2.02 Flagging Costs...12.1 12-3 TRAFFIC-HANDLING EQUIPMENT

More information

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, 2017 Dean Mentjes Federal Highway Administration Juan Pava Illinois Department of Transportation 1 Setting the Stage:

More information

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P )

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P ) District 3 Administration 7964 Industrial Park Road Baxter, MN 56425 Memo To: Dan Anderson Transportation District Engineer From: Scott Zeidler Senior Engineering Specialist Date: December 11, 2017 RE:

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008 961.01 Description 961.02 Prequalification 961.03 Requirements STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008 961.01 Description. This

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Presented March 6, 2013 by Alan Plunkett, INDOT Bill Smith, INDOT Tom Brennan, Purdue Alan Plunkett/Bill Smith US 231 MOTIVATION

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS CHAPTER 8A. GENERAL Section 8A.01 Introduction... 8A-1 Section 8A.02 Use of Standard Devices, Systems, and Practices... 8A-4

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

Anticipated Changes Based on 2009 Federal MUTCD

Anticipated Changes Based on 2009 Federal MUTCD Anticipated Changes Based on 2009 Federal MUTCD Section 1A.13 Meanings of text headings (Standard, d Guidance, Option, Support) relocated and clarified Standard d statements shall hll not be modified difid

More information

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E. TTI TRAFFIC SAFETY CONFERENCE John A. Barton, P.E. Introduction TxDOT Mission Work with others to provide safe and reliable transportation solutions for Texas. 2 Mission Zero Is a Journey toward: Zero

More information

East Kings Highway and Roberts Avenue Speed Hump Analysis

East Kings Highway and Roberts Avenue Speed Hump Analysis East Kings Highway and Roberts Avenue Speed Hump Analysis BOROUGH OF HADDONFIELD, CAMDEN COUNTY, NEW JERSEY 5/18/2018 Prepared By: Remington & Vernick Engineers 232 EAST KINGS HIGHWAY, HADDONFIELD, NEW

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 08Aug2018 25.00 Introduction Chapter 25... 03May2018 VDOT STANDARD PARAPETS

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 28Dec2016 25.00 Introduction Chapter 25... 28Dec2016 VDOT STANDARD PARAPETS

More information

DESIGN STANDARDS SECTION DS 3 STREETS

DESIGN STANDARDS SECTION DS 3 STREETS DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

High Tension Cable Barrier

High Tension Cable Barrier High Tension Cable Barrier (and Rumble Strips) Practices & Guidelines 2017 Tri-Party Transportation Conference Red Deer, Alberta Hal Cook, P. Eng. Design, Project Management and Training Section Technical

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.

More information

Brent Spence Bridge Design Exceptions - Alternative I

Brent Spence Bridge Design Exceptions - Alternative I s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

ALLEGAN COUNTY ROAD COMMISSION. Adopted by the Board of County Road Commissioners, December 28, Sign Policy

ALLEGAN COUNTY ROAD COMMISSION. Adopted by the Board of County Road Commissioners, December 28, Sign Policy ALLEGAN COUNTY ROAD COMMISSION Adopted by the Board of County Road Commissioners, December 28, 2016 Sign Policy Common/Policies/Sign Policy 2016 TABLE OF CONTENTS Page I. Purpose and Background.................................

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

ESTIMATE PREPARATION ASSISTANCE

ESTIMATE PREPARATION ASSISTANCE S T I P D i s t r i c t 1 C l a r k N o ESTIMATE PREPARATION ASSISTANCE PROJECT ESTIMATE INFORMATION TP a. Estimate prepared by (user's name): Paul H. Judd b. Date of initial estimate: 8/11/2010 c. Date

More information

TRANSPORTATION RESEARCH BOARD. TRB Straight to Recording for All. Rumble Strips/Stripes: Practices and Challenges

TRANSPORTATION RESEARCH BOARD. TRB Straight to Recording for All. Rumble Strips/Stripes: Practices and Challenges TRANSPORTATION RESEARCH BOARD TRB Straight to Recording for All Rumble Strips/Stripes: Practices and Challenges NCHRP Synthesis Report 490: Practice of Rumble Strips and Rumple Stripes NCHRP Project 20-05,

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Moraga-Orinda Fire District

Moraga-Orinda Fire District Moraga-Orinda Fire District Fire Prevention Division Subject: Fire Apparatus Access Roads Approved by: Fire Marshal Kathy Leonard Reference: CFC 2016, MOFD Ordinance 16-02 Standard Number: 2016.503 Effective

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

Pre-Grant Meeting Township Safety Signs Grant Program

Pre-Grant Meeting Township Safety Signs Grant Program Pre-Grant Meeting Township Safety Signs Grant Program Administered by the Ohio LTAP Center a part of The ODOT Office of Local Programs March 28, 2018 or April 12, 2018 Why are you here? Why are you here?

More information

Work Zone Safety. Guidelines for Temporary Traffic Control

Work Zone Safety. Guidelines for Temporary Traffic Control Work Zone Safety Guidelines for Temporary Traffic Control Revised April 2015 1 Table of Contents Introduction 3 Traffic Control Devices 4 Signs 4 Channelizing Devices 7 Lighting Devices 11 Component Parts

More information

La Paz County Public Works Standards Volume I

La Paz County Public Works Standards Volume I La Paz County Public Works Standards Volume I Construction Standards LA PAZ COUNTY PUBLIC WORKS STANDARDS VOLUME I CONSTRUCTION STANDARDS TABLE OF CONTENTS VOLUME I SECTION DESCRIPTION 1.0 INTRODUCTION

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes

More information

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene Work Zone Safety Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene 1 Agenda Manuals/Codes/Statistics Setup & Removal of Work Zones Devices and Locations

More information

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways

More information

BID SUMMARY SHEET CONTRACT NO

BID SUMMARY SHEET CONTRACT NO 1 EACH R1-1 - 30" X 30" Stop Sign $23.61 $23.58 2 EACH R1-2 - 36" x 36" x 36" Yield Sign $16.36 $16.61 3 EACH R1-2 - 24" x 24" x 24" Yield Sign $12.55 $13.24 4 EACH R3-1 - 12" x 6" 4-Way $2.76 $1.98 5

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information