1 PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108, CONTRACT NO SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL IN SPECIFICATION BOOK* SOUTHERN ARIZONA PAVING NAC CONSTRUCTION FALCONE BROTHERS BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST HR RESTAKING FEES LS STORMWATER POLLUTION PREVENTION PLAN 10, , , , , , ,000 FA MODIFY STORMWATER POLLUTION PREVENTION PLAN , , , ,000 $ MARKET PRICE ADJUSTMENT , , , LS CLEARING AND GRUBBING 5, , , , , , LS REMOVAL OF MISCELLANEOUS CONCRETE 29, , , , , , ,000 FA REMOVAL OF UNKNOWN STRUCTURES AND OBSTRUCTIONS , , , ,489 LF REMOVAL OF CONCRETE CURB , , , ,469 SY REMOVAL OF ASPHALTIC CONCRETE PAVEMENT , , , ,252 SY REMOVAL OF ASPHALTIC CONCRETE PAVEMENT (MILLING) , , , ,000 FA REMOVE AND REPLACE ASPHALTIC CONCRETE (PAVEMENT PATCH, MILL) , , , LF REMOVAL OF PIPE (18" STORM DRAIN) LF REMOVAL OF PIPE (54" STORM DRAIN) , , , LF REMOVE FENCE , SY REMOVE GROUTED RIPRAP , CY REMOVE AND SALVAGE RIPRAP , LS REMOVE AND SALVAGE (TRAFFIC SIGNAL EQUIPMENT AND CONDUCTORS) 3, , , , , , ,402 CY ROADWAY EXCAVATION , , , CY CONSTRUCT BERM , , , ,672 CY AGGREGATE BASE , , , SY PORTLAND CEMENT CONCRETE PAVEMENT (12") , , , TN BITUMINOUS TACK COAT , , , , , ,000 FA CRACK SEALING (ASPHALTIC CONCRETE PAVEMENT) , , , TN ASPHALTIC CONCRETE (MIX NO. 2) , , , ,961 TN ASPHALTIC CONCRETE (MIX NO. 1) , , , ,372 TN ASPHALTIC CONCRETE (ASPHALT-RUBBER) , , , ,000 FA ASPHALTIC CONCRETE (MIX NO. 1) (TEMPORARY) , , , LF PIPE, REINFORCED CONCRETE, CLASS II, 24" , , , LF PIPE, REINFORCED CONCRETE, CLASS II, 30" , , , LF PIPE, REINFORCED CONCRETE, CLASS II, 36" , , , LF PIPE, REINFORCED CONCRETE, CLASS II, 42" , , , LF PIPE, REINFORCED CONCRETE, CLASS II, 48" , , , LF PIPE, REINFORCED CONCRETE, CLASS II, 54" , , , LF SEWER PIPE (4") (DUCTILE IRON, CL 350) (PRIVATE SEWER) (SEE EXHIBIT"F") , , , EA CONCRETE PIPE COLLAR (ADOT STD DWG C-13.80) 1, , , EA CONCRETE CATCH BASIN (TRANSVERSE DRAIN, W=3') 27, , , , , , EA CONCRETE CATCH BASIN (TRANSVERSE DRAIN, W=4') 29, , , , , , EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, TYPE 3 (L=12') 6, , , , , , EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, TYPE 3 (L=20') 8, , , , , , EA CONCRETE CATCH BASIN, PC/COT STD DTL 309, (DOUBLE, OFF ROAD) 4, , , , , ,200.00
2 PAGE 2 SOUTHERN ARIZONA PAVING NAC CONSTRUCTION FALCONE BROTHERS BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, (TYPE 3, 2 WINGS) (4' WING 8, , , , , , & 8' WING) EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, (TYPE 3, 2 WINGS) (8' WING 8, , , , , , EA CONCRETE CATCH BASIN, PC/COT STD DTL 309, (SINGLE, OFF ROAD) (D<8') 5, , , , , , EA JUNCTION STRUCTURE (PREFABRICATED "Y", 54 DEGREES) 1, , , , , , EA MANHOLE (STORM DRAIN) PC/COT STD DTL 300 5, , , , , , EA MANHOLE (STORM DRAIN) PC/COT STD DTL 301 8, , , , , , EA RESET FRAME AND COVER FOR MANHOLE (STORM DRAIN, PC/COT STD DTL , , , , ) EA RESET FRAME AND COVER FOR MANHOLE (SANITARY SEWER) , , , , EA RESET FRAME AND COVER FOR MANHOLE (UTILITY) , , , , EA RESET FRAME AND COVER FOR CLEANOUT EA SEWER CLEANOUT (PRIVATE SEWER) (SEE EXHIBIT "F") , , , LF PIPE. DUCTILE IRON (DI), 6" (CLASS 350) , , , LF PIPE. DUCTILE IRON (DI), 12" (CLASS 350) , , , LF PIPE, COPPER, 1" W/FITTINGS , , , EA TAPPING SLEEVE & VALVE, 12" X 6" 3, , , , , , EA GATE VALVE, 6" 1, , , , EA GATE VALVE, 8" 2, , , , , , EA COMBINATION AIR RELEASE VALVE, 1" (ARV) 2, , EA ADJUST EXISTING VALVE BOX AND COVER , , , EA FIRE HYDRANT 3, , , , , , LF REMOVE AND DISPOSE NON CEMENT ASBESTOS (CA) WATER PIPE, 10" AND , , , SMALLER EA REMOVE AND DISPOSE CEMENT ASBESTOS (CA) WATER PIPE, 12" AND , , , LARGER EA REMOVE AND DISPOSE EXISTING FIRE HYDRANT , , , EA CONNECTIONS, 6" , , , , EA CONNECTIONS, 12" 1, , , , , , EA TIE OVER (T), 1" EA STUBS (S), 1" , , , , , EA SERVICE ABANDONEMENT (A) EA CONCRETE HEADWALL (DETAIL D3, STA 51+40, LT) 10, , , , , , EA ACCESS BARRIER GATE (54") (STORM DRAIN, ADOT STD DWG C-13.75) 2, , , , , , LF SIGN POST U-CHANNEL (GALVANIZED STEEL) , EA FOUNDATIONS FOR SIGN POST , , , LF SIGN POST (PERFORATED) , , , LS REMOVE AND SALVAGE SIGNS , , , , SF REGULATORY SIGN PANELS (DIAMOND GRADE) SF REGULATORY SIGN PANELS (TYPE IV) , , , LS MAINTENANCE AND PROTECTION OF TRAFFIC 55, , , , , , ,000 $ FURNISH AND INSTALL TEMPORARY TRAFFIC CONTROL DEVICES , , , LF TEMPORAY STEEL PLATES (TRAFFIC RATED) , , , ,400 LF/DAY TEMPORAY STEEL PLATES (TRAFFIC RATED) (IN USE) , , ,096 LF PAVEMENT MARKING (WHITE SPRAYED THERMOPLASTIC) (0.060") , , , ,882 LF PAVEMENT MARKING (YELLOW SPRAYED THERMOPLASTIC) (0.060") , , , EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090")(SINGLE , , , ARROW) EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090")(ONLY) , , , EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090") (MERGE , ARROW) EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090") (NOT
3 PAGE 3 SOUTHERN ARIZONA PAVING NAC CONSTRUCTION FALCONE BROTHERS BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST ,045 LF PAVEMENT MARKING (WHITE SPRAYED THERMOPLASTIC) (TRANSVERSE) , , , (0.090") EA PAVEMENT SYMBOL, PREFORMED, TYPE 1, BIKE LANE LEGEND AND EA PAVEMENT SYMBOL, PREFORMED, TYPE 1, YIELD BAR TRIANGLE ,455 SF PAVEMENT MARKING (GREEN PREFORMED THERMOPLASTIC) (BIKE LANE) , , , EA PAVEMENT MARKER, RAISED, TYPE C EA PAVEMENT MARKER, RAISED, TYPE D EA PAVEMENT MARKER, RAISED, TYPE G EA TUBULAR MARKERS ,023 LF PAVEMENT MARKING (PAINTED) (TEMPORARY) , , , EA POLE (TYPE A) (10') , , , EA POLE (TYPE I) , , , EA POLE (TYPE R) 5, , , , , , EA POLE (TYPE W) 7, , , , , , EA POLE (TYPE 2) (SUBTYPE B) (WITH MAST ARM) 2, , , , , , EA POLE FOUNDATION (TYPE A) EA POLE FOUNDATION (TYPE I) , , , EA POLE FOUNDATION (TYPE R) 1, , , , , , EA POLE FOUNDATION (TYPE 2) (SUBTYPE B) , , , EA POLE FOUNDATION (TYPE W) 1, , , , , , EA MAST ARM (20 FT.) (TAPERED) (LUMINAIRE) , , , EA MAST ARM (50 FT.) (TAPERED) 3, , , , , , EA MAST ARM (65FT) (TAPERED) 6, , , , , , EA REMOVE AND SALVAGE EXISTING STREET LIGHTING POLES (MAST ARMS, , , LIGHTS AND HARDWARE INCLUDED) EA REMOVE AND RELOCATE EXISTING STREET LIGHTING POLES (MAST ARMS , , AND LIGHTS INCLUDED) ,400 LF ELECTRICAL CONDUIT (2") (PVC) , , , LF ELECTRICAL CONDUIT (2-1/2") (PVC) LF ELECTRICAL CONDUIT (2-1/2" DUCT) (SR-205) (TEP UNDERGROUND) , , , LF ELECTRICAL CONDUIT (3") (PVC) , , , LF ELECTRICAL CONDUIT (4" DUCT) (SR-205) (TEP UNDERGROUND) , , , LF ELECTRICAL CONDUIT (4") (PVC) , , , LF ELECTRICAL CONDUIT (4") (PVC) (SECOND IN TRENCH) , , , LF ELECTRICAL CONDUIT (6" DUCT) (SR-205) (TEP UNDERGROUND) , , , EA RISER (2-1/2") (SR-220) (TEP UNDERGROUND) EA RISER (4") (SR-220) (TEP UNDERGROUND) , , EA RISER (6") (SR-220) (TEP UNDERGROUND) 1, , , , LF ELECTRICAL CONDUIT (2 1/2") (RGS) EA ELECTRICAL CONDUIT (2 1/2") (RGS) (SWEEP) (TEP) EA PULL BOX (NO. 3-1/2) , , , EA PULL BOX (NO. 7) , , , EA PULL BOX (NO. 7) (WITH EXTENSION) , , , EA PULL BOX (PENCEL TYPE) 1, , , , , , EA PULL BOX (CHRISTY N-36) , , , EA PULL BOX (SR-225B) (TEP UNDERGROUND) 6, , , , , , EA J2 BOX (SR-234) (TEP UNDERGROUND) , , LS CONDUCTORS (TRAFFIC SIGNALS AND INTREGAL STREET LIGHTING) 6, , , , , , LS CONDUCTORS (STREET LIGHTING) 4, , , , , , EA TRAFFIC SIGNAL FACE (TYYE F) , , , EA TRAFFIC SIGNAL FACE (TYPE Q) , , ,200.00
4 PAGE 4 SOUTHERN ARIZONA PAVING NAC CONSTRUCTION FALCONE BROTHERS BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST EA TRAFFIC SIGNAL FACE (PEDESTRIAN) (MAN/HAND) , , , EA PEDESTRIAN PUSH BUTTON ASSEMBLY WITH PLACARD (2"ADA BUTTON) , , , EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE II) , , , EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE IV) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE V) , , , EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VI) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VII) , , , EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE XI) , , , EA CONTROL CABINET (COT SUPPLIED/CONTRACTOR INSTALLED) EA CONTROL CABINET FOUNDATION EA UNINTERRUPTED POWER SOURCE (COT SUPPLIED/ CONTRACTOR INSTALLED) EA INSTALL VIDEO DETECTION SYSTEM (COT SUPPLIED/CONTRACTOR , , INSTALLED) EA OPTICOM PRE-EMPTION SYSTEM (COT SUPPLIED/CONTRACTOR INSTALLED) , , EA PHOTO ELECTRIC CELL EA LUMINAIRE (HORIZONTAL MOUNT) (HPS 400 WATT) , , , SF STREET NAME SIGN PANEL , , , ,000 FA MAINTAIN EXISTING TRAFFIC SIGNALS AND LIGHTING SYSTEMS , , , ,000 FA TEMPORARY TRAFFIC SIGNALS , , , LS ELECTRICAL SERVICE (TUCSON ELECTRIC POWER) 1, , , , EA TRANSFORMER (PAD MOUNTED) (SR-209) (TEP UNDERGROUND) 1, , , , , , EA PEDESTAL (SR-209) (TEP UNDERGROUND) , , EA GROUND ROD (3/4" X 10') EA GROUND ROD (AGENCY SUPPLED/CONTRACTOR INSTALLED) ,689 SY LANDSCAPE GRADING (SWALES AND WATER HARVESTING INCLUDED) , , , SY DECOMPOSED GRANITE (1/2" MINUS) , , , ,100 SY DECOMPOSED GRANITE (3" MINUS, DESERT PAVEMENT) , , , SY DECOMPOSED GRANITE (SALVAGE AND REUSE) , , EA DECORATIVE BOULDERS (18") , EA DECORATIVE BOULDERS (24") , , EA DECORATIVE BOULDERS (36") , , EA TREE (15 GALLON) (W/ROOT BARRIER/COMPLETE-IN-PLACE AS SHOWN ON , PLANS) EA SHRUB (1 GALLON) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA SHRUB (5 GALLON) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) , , , EA AGAVE (5 GALLON) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) , , , EA CACTUS (SAGUARO) (1'-3') (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA CACTUS (COMPLETE-IN-PLACE AS SHOWN ON PLANS) , EA TREE STAKES (2 PER TREE) LS LANDSCAPE ESTABLISHMENT PERIOD 18, , , , , , ,500 FA MISCELLANEOUS WORK (LANDSCAPE ESTABLISHMENT MAINTENANCE) , , , LS NATIVE PLANT PRESERVATION PLAN/WASH ORDINANCE (SHEETS 84-86) 52, , , , , , COMPLETE-IN-PLACE AS SHOWN ON PLANS EA BACKFLOW PREVENTION UNIT (REDUCED PRESSURE) (1") (INCLUDE 1, , , , , , ENCLOSURE AND FROST BLANKET) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA EMITTER (ASSEMBLY) (MULTI OUTLET) (INCLUDE BOX AND COVER) , , , (COMPLETE-IN-PLACE AS SHOWN ON PLANS) LS EMITTER DISTRIBUTION TUBING (STAKING INCLUDED) , , EA PRESSURE REGULATOR (3/4") (INCLUDE BOX AND COVER) (COMPLETE-IN , , PLACE AS SHOWN ON PLANS)
5 PAGE 5 SOUTHERN ARIZONA PAVING NAC CONSTRUCTION FALCONE BROTHERS BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST EA HOSE END FLUSH CAP ASSEMBLY (INCLUDE BOX AND COVER) (COMPLETE , IN-PLACE AS SHOWN ON PLANS) EA FILTER UNIT (1-1/2") 1, , EA CONTROLLER (AUTOMATIC) 4, , , , , , EA CONTROL VALVE (REMOTE) (ELECTRIC) (1 1/2") EA 1-1/2 " MASTER VALVE SUMP PER COT STDS EA 1" DRIP VALVE ASSEMBLY W/FILTER, BALL VALVE AND BOX , , , EA GATE VALVE (1") , , , EA GATE VALVE (2") ,600 LF PIPE (PVC) (3/4") (SCHEDULE 40) (LATERAL) , , , ,000 LF PIPE (PVC) (1") (SCHEDULE 40) (LATERAL) , , , LF PIPE (PVC) (1-1/4") (SCHEDULE 40) (MAINLINE) , , , LF PIPE (PVC) (2") (SCHEDULE 40) (MAINLINE) ,060 LF PIPE (PVC) (2") (SCHEDULE 40) (SLEEVE) , , , LF PIPE (PVC) (3") (SCHEDULE 40) (SLEEVE) ,500 LF IRRIGATION CONTROL WIRE (14 GAUGE) , , EA PROVIDE WATER SERVICE (1") 10, , , , , , LS MOBILIZATION 218, , , , , , LF CHAIN LINK FENCE, TYPE 1 (60") , , , ,452 LF CONCRETE CURB (COT/PC STD DTL NO 209, TYPE 2) (TRANSITIONS AND , , , DEPRESSIONS INCLUDED) LF CONCRETE CURB AND GUTTER (COT/PC STD DTL NO 209, TYPE 1(G)) , , , EA CONCRETE CURB TERMINAL SECTION (COT/PC STD DTL NO 212) , EA CONCRETE TRANSITION CURB (PC/COT STD. DTL. 210) ,694 SF CONCRETE SIDEWALK , , , SF CONCRETE PAD (6" THICK) , , , EA CONCRETE CURB ACCESS RAMP (COT/PC STD DTL NO 207) (TYPE 1) 1, , , , , , EA CONCRETE CURB ACCESS RAMP (COT/PC STD DTL NO 207) (TYPE 3) , , , , EA SCUPPER (SIDEWALK, TYPE 2, 2 CELLS) 4, , , , , , EA SURVEY MONUMENT (PC/COT DETAIL 103, SHEET 1 OF 3) , , EA SURVEY MONUMENT (FRAME AND COVER) , EA TRUNCATED DOMES (MEDIAN ISLANDS BULLNOSES) , , , , EA TRUNCATED DOMES (RIGHT TURN TRAFFIC ISLAND) , , LS BUILDING (RELOCATE RESTROOM) 18, , , , , , SY MEDIAN PAVING (EXPOSED AGGREGATE FINISH) , , , ,246 SY MEDIAN PAVING (COLORED CONCRETE) , , , ,000 $ MISCELLANEOUS WORK (MINOR ALTERATIONS IN DETAILS OF , , , CONSTRUCTION) LS CONTRACTOR QUALITY CONTROL 49, , , , , , TOTAL BID 3,345, ,369, ,472,444.44
6 PAGE 6 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108, CONTRACT NO SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL IN SPECIFICATION BOOK* KE & G CONSTRUCTION EAGLE ROCK ENGINEER'S ESTIMATE BID ITEM ESTIMATED NO. QUANTITY UNIT ITEM HR RESTAKING FEES LS STORMWATER POLLUTION PREVENTION PLAN ,000 FA MODIFY STORMWATER POLLUTION PREVENTION PLAN ,000 $ MARKET PRICE ADJUSTMENT LS CLEARING AND GRUBBING LS REMOVAL OF MISCELLANEOUS CONCRETE ,000 FA REMOVAL OF UNKNOWN STRUCTURES AND OBSTRUCTIONS ,489 LF REMOVAL OF CONCRETE CURB ,469 SY REMOVAL OF ASPHALTIC CONCRETE PAVEMENT ,252 SY REMOVAL OF ASPHALTIC CONCRETE PAVEMENT (MILLING) ,000 FA REMOVE AND REPLACE ASPHALTIC CONCRETE (PAVEMENT PATCH, MILL) LF REMOVAL OF PIPE (18" STORM DRAIN) LF REMOVAL OF PIPE (54" STORM DRAIN) LF REMOVE FENCE SY REMOVE GROUTED RIPRAP CY REMOVE AND SALVAGE RIPRAP LS REMOVE AND SALVAGE (TRAFFIC SIGNAL EQUIPMENT AND CONDUCTORS) ,402 CY ROADWAY EXCAVATION CY CONSTRUCT BERM ,672 CY AGGREGATE BASE SY PORTLAND CEMENT CONCRETE PAVEMENT (12") TN BITUMINOUS TACK COAT ,000 FA CRACK SEALING (ASPHALTIC CONCRETE PAVEMENT) TN ASPHALTIC CONCRETE (MIX NO. 2) ,961 TN ASPHALTIC CONCRETE (MIX NO. 1) ,372 TN ASPHALTIC CONCRETE (ASPHALT-RUBBER) ,000 FA ASPHALTIC CONCRETE (MIX NO. 1) (TEMPORARY) LF PIPE, REINFORCED CONCRETE, CLASS II, 24" LF PIPE, REINFORCED CONCRETE, CLASS II, 30" LF PIPE, REINFORCED CONCRETE, CLASS II, 36" LF PIPE, REINFORCED CONCRETE, CLASS II, 42" LF PIPE, REINFORCED CONCRETE, CLASS II, 48" LF PIPE, REINFORCED CONCRETE, CLASS II, 54" LF SEWER PIPE (4") (DUCTILE IRON, CL 350) (PRIVATE SEWER) (SEE EXHIBIT"F") EA CONCRETE PIPE COLLAR (ADOT STD DWG C-13.80) EA CONCRETE CATCH BASIN (TRANSVERSE DRAIN, W=3') EA CONCRETE CATCH BASIN (TRANSVERSE DRAIN, W=4') EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, TYPE 3 (L=12') EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, TYPE 3 (L=20') EA CONCRETE CATCH BASIN, PC/COT STD DTL 309, (DOUBLE, OFF ROAD) UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST COST , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,000.00
7 PAGE 7 KE & G CONSTRUCTION EAGLE ROCK ENGINEER'S ESTIMATE BID ITEM ESTIMATED NO. QUANTITY UNIT ITEM EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, (TYPE 3, 2 WINGS) (4' WING & 8' WING) EA CONCRETE CATCH BASIN, PC/COT STD DTL 308, (TYPE 3, 2 WINGS) (8' WING EA CONCRETE CATCH BASIN, PC/COT STD DTL 309, (SINGLE, OFF ROAD) (D<8') EA JUNCTION STRUCTURE (PREFABRICATED "Y", 54 DEGREES) EA MANHOLE (STORM DRAIN) PC/COT STD DTL EA MANHOLE (STORM DRAIN) PC/COT STD DTL EA RESET FRAME AND COVER FOR MANHOLE (STORM DRAIN, PC/COT STD DTL 303) EA RESET FRAME AND COVER FOR MANHOLE (SANITARY SEWER) EA RESET FRAME AND COVER FOR MANHOLE (UTILITY) EA RESET FRAME AND COVER FOR CLEANOUT EA SEWER CLEANOUT (PRIVATE SEWER) (SEE EXHIBIT "F") LF PIPE. DUCTILE IRON (DI), 6" (CLASS 350) LF PIPE. DUCTILE IRON (DI), 12" (CLASS 350) LF PIPE, COPPER, 1" W/FITTINGS EA TAPPING SLEEVE & VALVE, 12" X 6" EA GATE VALVE, 6" EA GATE VALVE, 8" EA COMBINATION AIR RELEASE VALVE, 1" (ARV) EA ADJUST EXISTING VALVE BOX AND COVER EA FIRE HYDRANT LF REMOVE AND DISPOSE NON CEMENT ASBESTOS (CA) WATER PIPE, 10" AND SMALLER EA REMOVE AND DISPOSE CEMENT ASBESTOS (CA) WATER PIPE, 12" AND LARGER EA REMOVE AND DISPOSE EXISTING FIRE HYDRANT EA CONNECTIONS, 6" EA CONNECTIONS, 12" EA TIE OVER (T), 1" EA STUBS (S), 1" EA SERVICE ABANDONEMENT (A) EA CONCRETE HEADWALL (DETAIL D3, STA 51+40, LT) EA ACCESS BARRIER GATE (54") (STORM DRAIN, ADOT STD DWG C-13.75) LF SIGN POST U-CHANNEL (GALVANIZED STEEL) EA FOUNDATIONS FOR SIGN POST LF SIGN POST (PERFORATED) LS REMOVE AND SALVAGE SIGNS SF REGULATORY SIGN PANELS (DIAMOND GRADE) SF REGULATORY SIGN PANELS (TYPE IV) LS MAINTENANCE AND PROTECTION OF TRAFFIC ,000 $ FURNISH AND INSTALL TEMPORARY TRAFFIC CONTROL DEVICES LF TEMPORAY STEEL PLATES (TRAFFIC RATED) ,400 LF/DAY TEMPORAY STEEL PLATES (TRAFFIC RATED) (IN USE) ,096 LF PAVEMENT MARKING (WHITE SPRAYED THERMOPLASTIC) (0.060") ,882 LF PAVEMENT MARKING (YELLOW SPRAYED THERMOPLASTIC) (0.060") EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090")(SINGLE ARROW) EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090")(ONLY) EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090") (MERGE ARROW) EA PAVEMENT SYMBOL (WHITE SPRAYED THERMOPLASTIC) (0.090") (NOT UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST COST 6, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
8 PAGE 8 KE & G CONSTRUCTION EAGLE ROCK ENGINEER'S ESTIMATE BID ITEM ESTIMATED NO. QUANTITY UNIT ITEM ,045 LF PAVEMENT MARKING (WHITE SPRAYED THERMOPLASTIC) (TRANSVERSE) (0.090") EA PAVEMENT SYMBOL, PREFORMED, TYPE 1, BIKE LANE LEGEND AND EA PAVEMENT SYMBOL, PREFORMED, TYPE 1, YIELD BAR TRIANGLE ,455 SF PAVEMENT MARKING (GREEN PREFORMED THERMOPLASTIC) (BIKE LANE) EA PAVEMENT MARKER, RAISED, TYPE C EA PAVEMENT MARKER, RAISED, TYPE D EA PAVEMENT MARKER, RAISED, TYPE G EA TUBULAR MARKERS ,023 LF PAVEMENT MARKING (PAINTED) (TEMPORARY) EA POLE (TYPE A) (10') EA POLE (TYPE I) EA POLE (TYPE R) EA POLE (TYPE W) EA POLE (TYPE 2) (SUBTYPE B) (WITH MAST ARM) EA POLE FOUNDATION (TYPE A) EA POLE FOUNDATION (TYPE I) EA POLE FOUNDATION (TYPE R) EA POLE FOUNDATION (TYPE 2) (SUBTYPE B) EA POLE FOUNDATION (TYPE W) EA MAST ARM (20 FT.) (TAPERED) (LUMINAIRE) EA MAST ARM (50 FT.) (TAPERED) EA MAST ARM (65FT) (TAPERED) EA REMOVE AND SALVAGE EXISTING STREET LIGHTING POLES (MAST ARMS, LIGHTS AND HARDWARE INCLUDED) EA REMOVE AND RELOCATE EXISTING STREET LIGHTING POLES (MAST ARMS AND LIGHTS INCLUDED) ,400 LF ELECTRICAL CONDUIT (2") (PVC) LF ELECTRICAL CONDUIT (2-1/2") (PVC) LF ELECTRICAL CONDUIT (2-1/2" DUCT) (SR-205) (TEP UNDERGROUND) LF ELECTRICAL CONDUIT (3") (PVC) LF ELECTRICAL CONDUIT (4" DUCT) (SR-205) (TEP UNDERGROUND) LF ELECTRICAL CONDUIT (4") (PVC) LF ELECTRICAL CONDUIT (4") (PVC) (SECOND IN TRENCH) LF ELECTRICAL CONDUIT (6" DUCT) (SR-205) (TEP UNDERGROUND) EA RISER (2-1/2") (SR-220) (TEP UNDERGROUND) EA RISER (4") (SR-220) (TEP UNDERGROUND) EA RISER (6") (SR-220) (TEP UNDERGROUND) LF ELECTRICAL CONDUIT (2 1/2") (RGS) EA ELECTRICAL CONDUIT (2 1/2") (RGS) (SWEEP) (TEP) EA PULL BOX (NO. 3-1/2) EA PULL BOX (NO. 7) EA PULL BOX (NO. 7) (WITH EXTENSION) EA PULL BOX (PENCEL TYPE) EA PULL BOX (CHRISTY N-36) EA PULL BOX (SR-225B) (TEP UNDERGROUND) EA J2 BOX (SR-234) (TEP UNDERGROUND) LS CONDUCTORS (TRAFFIC SIGNALS AND INTREGAL STREET LIGHTING) LS CONDUCTORS (STREET LIGHTING) EA TRAFFIC SIGNAL FACE (TYYE F) EA TRAFFIC SIGNAL FACE (TYPE Q) UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST COST , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,000.00
9 PAGE 9 KE & G CONSTRUCTION EAGLE ROCK ENGINEER'S ESTIMATE BID ITEM ESTIMATED NO. QUANTITY UNIT ITEM EA TRAFFIC SIGNAL FACE (PEDESTRIAN) (MAN/HAND) EA PEDESTRIAN PUSH BUTTON ASSEMBLY WITH PLACARD (2"ADA BUTTON) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE II) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE IV) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE V) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VI) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VII) EA TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE XI) EA CONTROL CABINET (COT SUPPLIED/CONTRACTOR INSTALLED) EA CONTROL CABINET FOUNDATION EA UNINTERRUPTED POWER SOURCE (COT SUPPLIED/ CONTRACTOR INSTALLED) EA INSTALL VIDEO DETECTION SYSTEM (COT SUPPLIED/CONTRACTOR INSTALLED) EA OPTICOM PRE-EMPTION SYSTEM (COT SUPPLIED/CONTRACTOR INSTALLED) EA PHOTO ELECTRIC CELL EA LUMINAIRE (HORIZONTAL MOUNT) (HPS 400 WATT) SF STREET NAME SIGN PANEL ,000 FA MAINTAIN EXISTING TRAFFIC SIGNALS AND LIGHTING SYSTEMS ,000 FA TEMPORARY TRAFFIC SIGNALS LS ELECTRICAL SERVICE (TUCSON ELECTRIC POWER) EA TRANSFORMER (PAD MOUNTED) (SR-209) (TEP UNDERGROUND) EA PEDESTAL (SR-209) (TEP UNDERGROUND) EA GROUND ROD (3/4" X 10') EA GROUND ROD (AGENCY SUPPLED/CONTRACTOR INSTALLED) ,689 SY LANDSCAPE GRADING (SWALES AND WATER HARVESTING INCLUDED) SY DECOMPOSED GRANITE (1/2" MINUS) ,100 SY DECOMPOSED GRANITE (3" MINUS, DESERT PAVEMENT) SY DECOMPOSED GRANITE (SALVAGE AND REUSE) EA DECORATIVE BOULDERS (18") EA DECORATIVE BOULDERS (24") EA DECORATIVE BOULDERS (36") EA TREE (15 GALLON) (W/ROOT BARRIER/COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA SHRUB (1 GALLON) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA SHRUB (5 GALLON) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA AGAVE (5 GALLON) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA CACTUS (SAGUARO) (1'-3') (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA CACTUS (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA TREE STAKES (2 PER TREE) LS LANDSCAPE ESTABLISHMENT PERIOD ,500 FA MISCELLANEOUS WORK (LANDSCAPE ESTABLISHMENT MAINTENANCE) LS NATIVE PLANT PRESERVATION PLAN/WASH ORDINANCE (SHEETS 84-86) COMPLETE-IN-PLACE AS SHOWN ON PLANS EA BACKFLOW PREVENTION UNIT (REDUCED PRESSURE) (1") (INCLUDE ENCLOSURE AND FROST BLANKET) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) EA EMITTER (ASSEMBLY) (MULTI OUTLET) (INCLUDE BOX AND COVER) (COMPLETE-IN-PLACE AS SHOWN ON PLANS) LS EMITTER DISTRIBUTION TUBING (STAKING INCLUDED) EA PRESSURE REGULATOR (3/4") (INCLUDE BOX AND COVER) (COMPLETE-IN- PLACE AS SHOWN ON PLANS) UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST COST , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
10 PAGE 10 KE & G CONSTRUCTION EAGLE ROCK ENGINEER'S ESTIMATE BID ITEM ESTIMATED NO. QUANTITY UNIT ITEM EA HOSE END FLUSH CAP ASSEMBLY (INCLUDE BOX AND COVER) (COMPLETE- IN-PLACE AS SHOWN ON PLANS) EA FILTER UNIT (1-1/2") EA CONTROLLER (AUTOMATIC) EA CONTROL VALVE (REMOTE) (ELECTRIC) (1 1/2") EA 1-1/2 " MASTER VALVE SUMP PER COT STDS EA 1" DRIP VALVE ASSEMBLY W/FILTER, BALL VALVE AND BOX EA GATE VALVE (1") EA GATE VALVE (2") ,600 LF PIPE (PVC) (3/4") (SCHEDULE 40) (LATERAL) ,000 LF PIPE (PVC) (1") (SCHEDULE 40) (LATERAL) LF PIPE (PVC) (1-1/4") (SCHEDULE 40) (MAINLINE) LF PIPE (PVC) (2") (SCHEDULE 40) (MAINLINE) ,060 LF PIPE (PVC) (2") (SCHEDULE 40) (SLEEVE) LF PIPE (PVC) (3") (SCHEDULE 40) (SLEEVE) ,500 LF IRRIGATION CONTROL WIRE (14 GAUGE) EA PROVIDE WATER SERVICE (1") LS MOBILIZATION LF CHAIN LINK FENCE, TYPE 1 (60") ,452 LF CONCRETE CURB (COT/PC STD DTL NO 209, TYPE 2) (TRANSITIONS AND DEPRESSIONS INCLUDED) LF CONCRETE CURB AND GUTTER (COT/PC STD DTL NO 209, TYPE 1(G)) EA CONCRETE CURB TERMINAL SECTION (COT/PC STD DTL NO 212) EA CONCRETE TRANSITION CURB (PC/COT STD. DTL. 210) ,694 SF CONCRETE SIDEWALK SF CONCRETE PAD (6" THICK) EA CONCRETE CURB ACCESS RAMP (COT/PC STD DTL NO 207) (TYPE 1) EA CONCRETE CURB ACCESS RAMP (COT/PC STD DTL NO 207) (TYPE 3) EA SCUPPER (SIDEWALK, TYPE 2, 2 CELLS) EA SURVEY MONUMENT (PC/COT DETAIL 103, SHEET 1 OF 3) EA SURVEY MONUMENT (FRAME AND COVER) EA TRUNCATED DOMES (MEDIAN ISLANDS BULLNOSES) EA TRUNCATED DOMES (RIGHT TURN TRAFFIC ISLAND) LS BUILDING (RELOCATE RESTROOM) SY MEDIAN PAVING (EXPOSED AGGREGATE FINISH) ,246 SY MEDIAN PAVING (COLORED CONCRETE) 300,000 $ MISCELLANEOUS WORK (MINOR ALTERATIONS IN DETAILS OF CONSTRUCTION) LS CONTRACTOR QUALITY CONTROL TOTAL BID UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST COST , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,619, ,729, ,108,320.60
BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationCT Consultants, Inc.
Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS
More informationMaine Turnpike Authority
Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More informationFederal Project No.: HSIP-5A27(567)
Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More informationMoDOT 2016 UNIT BID PRICES Northwest District
MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF
More informationMaine Turnpike Authority
Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016
More informationBID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.
BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010
More informationSUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71
BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,
More informationMaine Turnpike Authority
York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00
More informationMaine Turnpike Authority
Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING
More informationRiverside County Transportation Department Summary of Bids
Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationMaine Turnpike Authority
Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationAustin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724
National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00
More informationFederal Project No.: OC-095-1(348)
Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING
More informationCounty of Santa Cruz 0579
County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701
More informationFederal Project No.: STP-5128(388)
Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationOhio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director
Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationLicensed Class C Virginia Contractor No.
month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors
More information2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH
Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:
More informationCity of Grand Island Tuesday, February 13, 2018 Council Session
City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff
More informationMcCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1
McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John
More information2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00
1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00
More informationFederal Project No.: NHPP-967-7(083)
Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY
More informationATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION
ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationHOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND
1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More information2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH
Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationPatton Hill Road (Four Inch Main), Project No
Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationTahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.
Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station
More informationCITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS
CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD
More informationADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18
November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed
More informationMaine Turnpike Authority
Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061
More informationDELETE first sentence of first paragraph that reads: REPLACE with the following:
To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation
More informationUnits Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00
More informationFor Conduit Inspections
Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit
More information2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)
106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All
More informationItems Unit Quantity Unit Price Total Unit Price Total
Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH
More informationCity of Grand Island Tuesday, June 26, 2018 Council Session
City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS
San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance
More informationCITY OF STANDARD SPECIFICATIONS
CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS
San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013
More informationOaks Commerce Center
Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing
More informationSAN ANTONIO WATER SYSTEM
SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5026 2017 SMP MERRY ANN DR. FROM FRANCES JEAN TO DEAD END G:\TXC\Projects\SAWS\SAWS - Merry Ann\03_CADD\01_Sheets\Merry Ann_Water\01_Sheets\1 MANN WATR CVR.dwg
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationCITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.
SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT
More informationTENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016
TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement
More information2, total unit $ total unit $ total unit $ total $
BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.
More informationUBC Watermain as shown on Sheet 202 : Sub total 97,050
Preliminary Cost Estimate Brock Commons Phase 1 Watermain replacement UBC Portion of Works only Replace existing 150mm dia CI and 200mm dia AC watermain with 200mm & 250mm dia DI (ductile iron) watermain
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationDESIGN STANDARDS SECTION DS 3 STREETS
DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
(1) McKenna General Engineering, (2) Zusser Company, (3) Palp, (4) C. W. Crosser Construction, 1,155,777.00 1,306,820.00 1,439,957.00 1,461,985.00 1 IMPLEMENTATION OF THE SWP 1 15,000.00 LS 15,000.00 2
More informationSan Antonio, Texas 78222
1.01 3 EA Pump Removal $1,125.00 $3,375.00 1.02 3 EA Pump Installation $1,200.00 $3,600.00 1.03 1 EA Downhole Video Survey $2,000.00 $2,000.00 1.04 1 EA Geophysical Logging $2,500.00 $2,500.00 2.01 50
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273
AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011
More informationEXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY
EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110
More informationADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.
ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551
More informationB E C K E R & F R O N D O R F Construction Cost Consulting Project Management
Project: Okehocking Nature Center Number: 07142E2 Client: M2 Architecture Date: June 5, 2009 Phase: DD B E C K E R & F R O N D O R F Construction Cost Consulting Project Management ESTIMATE SUMMARY CODE
More information365, , , A Total of Schedule I and II 530, , A 702, A
BID ABSTRACT COUNTY OF VENTURA - PUBLIC WORKS AGENCY Page 1 of 3 Bids opened on April 2, 2019 ENGINEER'S ESTIMATE LOW BIDDER 2nd Bidder Project Name Piru Stormwater Capture For Groundwater Recharge Project
More informationIngham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15
COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More information