1 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP Watershed Improvements on an Annual Contract? A1. No, you do not have to be on the Watershed Improvements Pre-Qualification List to submit a proposal. Note attached pricing from the last contract Gwinnett County had for watershed improvements. These prices were obtained through a bid process vs. the request for proposal process. This addendum should be acknowleed on the Proposal Signature Form (Page 28) of the Proposal. Failure to do so may result in your bid being deemed non-responsive. Thank you, Shelley McWhorter Shelley McWhorter, CPPB Purchasing Associate III Attachment: Bid Pricing

2 BID TABULATION PAGE 1 OF 9 LABOR AND EQUIPMENT RATES FOREMAN 200 HR $49.61 $9, LABORER 1000 HR $27.56 $25, SURVEYOR 200 HR $82.69 $15, HEAVY EQUIPMENT 4.A TRACKED EXCAVATOR W/HYDRAULIC THUMB (30,000-50,000 LB) 16 HR $ $2, B MINI EXCAVATOR 40 HR $ $3, C RUBBER TIRE LOADER 16 HR $ $1, D SKID STEER LOADER (3,500 LB) 40 HR $ $3, E DUMP TRUCK (SINGLE AXLE) 8 HR $55.13 $ F DUMP TRUCK (MULTI AXLE) 8 HR $ $1, G TRACKED DUMP TRUCK 8 HR $ $ H BOOM TRUCK CRANE (12 TON) 8 HR $11.03 $80.00 CONSTRUCTION FACILITIES PROJECT SIGN 5.A PROJECT SIGN LARGE 3 EA $ $1, B PROJECT SIGN - SMALL 20 EA $ $12, C INTERPRETATIVE 2 EA $ $1, D MITIGATION BANK BOUNDARY 10 EA $ $4, REMOVAL S SAW CUTS IN EXISTING PAVEMENT 100 LF $4.41 $ REMOVAL OF EXISTING DRAINAGE STRUCTURES 5 EA $ $ REMOVE EXISTING PIPE, ALL TYPES AND SIZES 50 LF $1.65 $ DEBRIS REMOVAL 20 LOAD $ $3, CAST IN PLACE CONCRETE CONCRETE STRUCTURES, CAST IN PLACE, INCLUDING REINFORCING STEEL 10.A Class AAA (5000 psi) 5 CY $ $2, B Class AA1 (4500 psi) 5 CY $ $2, C Class A (3000 psi) 5 CY $ $1, D Class B (2200 psi) 5 CY $ $ CONCRETE STRUCTURES, CAST IN PLACE, WITHOUT REINFORCING STEEL 11.A Class AAA (5000 psi) 5 CY $ $1, B Class AA1 (4500 psi) 5 CY $ $2, C Class A (3000 psi) 5 CY $ $1, D Class B (2200 psi) 5 CY $ $ GROUTING (NON-PRESSURE) 10 CY $ $2,750.00

3 BID TABULATION PAGE 2 OF 9 CLEARING AND EARTHWORK 13.A CLASSIFIED STONE 75 CY $55.13 $3, B WELL GRADED RIP RAP 100 CY $62.84 $5, GEOGRID REINFORCEMENT 150 SY $2.21 $ CLEARING AND GRUBBING -MULCH ON- 5 AC $4, $22, CLEARING AND GRUBBING -HAUL OFF 1 AC $9, $8, SELECTIVE TREE PRUNING 17.A LIMBS < 8 HEIGHT 40 EA $18.19 $ B LIMBS > 8 HEIGHT 10 EA $49.61 $ TREE REMOVAL 18.A EA $ $100, B > EA $ $45, STUMP GRINDING 19.A EA $55.13 $ B B > EA $55.13 $ ORANGE BARRIER FENCE LF $0.83 $9, TEMPORARY CHAIN LINK FENCE 100 LF $11.03 $1, EXCAVATION AND BACKFILLING 8000 CY $13.23 $96, IMPORTED FILL 2500 CY $11.03 $25, ADDITIONAL EXCAVATION COST WHERE DEPTH TO TOP OF PIPE IS GREATER THAN A DEPTH TO TOP OF PIPE 40 LF $22.05 $ B GREATER THAN 15 DEPTH TO TOP OF PIPE 40 LF $22.05 $ ROCK EXCAVATION (0-100 CY/PROJECT) 20 CY $ $2, SPOIL REMOVAL 3500 CY $13.78 $43, FLOWABLE FILL 3 CY $ $ NATURAL DRAINAGE SYSTEM (NDS) SOIL 150 CY $47.41 $6, EROSION AND SEDIMENT CONTROL CONSTRUCTION EXIT 5 EA $ $4, SILT FENCE TYPE C 2500 LF $3.31 $7, COFFERDAM 100 SF $49.61 $4, SILT BAG 2 EA $1, $3, ROCK FILTER DAM 10 CY $ $1, ROCK CHECK DAM 10 CY $ $1, INLET SEDIMENT TRAP 10 EA $82.69 $ SWAMP MAT 10 EA $2, $20, COIR WATTLES 100 LF $11.58 $1, COIR ROLLS 100 LF $18.74 $1,700.00

4 BID TABULATION PAGE 3 OF TEMPORARY SEEDING 6 AC $ $1, STRAW BALES 100 EA $7.72 $ GEOTEXTILE WOVEN 200 SY $2.76 $ GEOTEXTILE - NON-WOVEN 100 SY $3.86 $ COIR BLANKET SY $9.10 $99, COIR MATTRESS 1500 SY $8.82 $12, STABILIZATION S STABILIZATION 5 CY $ $ PERMANENT SOIL REINFORCING MAT 100 SY $4.69 $ GABION STRUCTURES 20 CY $49.61 $ STONE RIP RAP TYPE I, 24" IN PLACE 150 CY $58.43 $7, STONE RIP RAP TYPE III, 12" IN PLACE 700 CY $55.13 $35, STONE GROUTED RIP RAP, 12" IN PLACE 10 CY $77.18 $ STEEL SHEET PILES 80 SF $ $10, VINYL SHEET PILES 80 SF $ $9, STREAM AND WETLAND CONSTRUCTION LOG ON-SITE 6 EA $ $3, LOG IMPORTED 54.A FT FT 10 EA $ $8, B FT - 50 FT 5 EA $1, $5, FIELD STONE BOULDER 55.A EXTRA LARGE 7 CY $ $1, B LARGE 9 CY $ $2, C MEDIUM 9 CY $ $2, D SMALL 12 CY $ $3, GRANITE QUARRY STONE BOULDER 56.A EXTRA LARGE 3 CY $ $ B LARGE 5 CY $ $1, C MEDIUM 5 CY $ $1, D SMALL 10 CY $ $2, RIVER COBBLE 10 CY $ $2, RIFFLE ROCK 8 CY $ $1, RIVER PEBBLE 5 CY $ $ GROUT FOR INSTREAM STRUCTURES 25 CF $49.61 $1, STONE TOE PROTECTION & BENDWAY 800 CY $7.72 $5, ROOT WAD REVETMENT 25 LF $71.66 $1, CROSS-VANE 63.A EXTRA LARGE 265 LF $ $69, B LARGE 415 LF $ $89, C MEDIUM 430 LF $ $98, D SMALL 300 LF $ $69,000.00

5 BID TABULATION PAGE 4 OF J-HOOK VANE 64.A EXTRA LARGE 100 LF $ $20, B LARGE 140 LF $ $19, C MEDIUM 150 LF $ $23, D SMALL 110 LF $ $17, BOULDER VANE 65.A EXTRA LARGE 8 LF $ $2, B LARGE 16 LF $ $3, C MEDIUM 10 LF $ $2, D SMALL 20 LF $ $4, J-HOOK LOG VANE 66.A EXTRA LARGE 125 LF $ $17, B LARGE 180 LF $ $22, C MEDIUM 175 LF $ $31, D SMALL 115 LF $ $23, LOG VANE 67.A EXTRA LARGE 10 LF $0.00 $1, B LARGE 12 LF $ $1, C MEDIUM 14 LF $ $1, D SMALL 8 LF $ $ STEP POOL VANE 68.A EXTRA LARGE 140 LF $ $39, B LARGE 220 LF $ $59, C MEDIUM 240 LF $ $64, D SMALL 160 LF $ $43, LOG SILL 69.A EXTRA LARGE 12 LF $ $1, B LARGE 14 LF $ $1, C MEDIUM 8 LF $ $ D SMALL 15 LF $ $1, CONSTRUCTED RIFFLE - WITH SILLS 8 CY $ $3, CONSTRUCTED RIFFLE 510 CY $ $71, TOE WOOD PROTECTION 10 SY $33.08 $ LIVE FASCINE 125 LF $13.78 $1, STONE CASCADE 74.A EXTRA LARGE 8 SY $ $2, B LARGE 10 SY $ $3, C MEDIUM 18 SY $ $6, D SMALL 6 SY $ $2, SOIL ENCAPSULATED LIFTS (SEL) 1900 LF $25.36 $43,700.00

6 BID TABULATION PAGE 5 OF SOIL ENCAPSULATED LIFTS (SEL) WITH COIR FIBER BLOCK 110 LF $25.36 $2, STORMWATER OUTFALL STEPS 20 LF $ $4, SITE RESTORATION AND LANDSCAPING S ASPHALT PAVING RESURFACING (INCLUDING MILLING) 200 SY $24.81 $4, CURB RESTORATION 79.A NEW 6" X 24" X 12" HIGH BACK 50 LF $22.05 $1, B NEW 6" X 30" X 12" HIGH BACK 10 LF $22.05 $ C NEW 6" X 24" X 10" ROLL BACK 10 SY $22.05 $ SIDEWALK RESTORATION 10 SY $55.13 $ CHAIN LINK FENCE 81.A HEIGHT 160 LF $13.78 $2, B HEIGHT 110 LF $17.09 $1, C HEIGHT 30 LF $19.29 $ SPLIT RAIL FENCE 82.A RAIL FENCE 120 LF $14.06 $1, B RAIL FENCE 120 LF $15.71 $1, WOODEN PRIVACY FENCE 83.A HEIGHT 200 LF $15.44 $2, B HEIGHT 80 LF $18.74 $1, DECORATIVE FENCE 84.A HEIGHT 40 LF $ $6, B HEIGHT 10 LF $ $1, SEGMENTAL WALL (FACE) 85.A MODULAR BLOCK 60 LF $23.15 $1, B PERMANENT FIELDSTONE 60 LF $20.95 $1, HAND GRADING 1500 SY $1.10 $1, SAND FILL 150 CY $88.20 $12, SOIL AMENDMENT SY $0.44 $4, TOPSOIL 100 CY $20.95 $1, SODDING 800 SY $8.82 $6, CONTAINER PLANTING 91.A GALLON 250 EA $9.37 $2, B GALLON 250 EA $27.56 $6, C GALLON 250 EA $49.61 $11, LIVE PLANTING 92.A PLUG 75 SY $44.10 $3, B BARE ROOT 80 SY $44.10 $3, TREE 145 EA $ $31, UPLAND SEEDING 5 AC $ $1,000.00

7 BID TABULATION PAGE 6 OF WETLAND SEEDING 1 AC $ $ WOOD MULCH 96.A BARK NUGGETS 850 SY $2.76 $2, B SHREDDED BARK 210 SY $2.76 $ LIVE STAKING 600 EA $2.21 $1, LIVE WHIP 400 EA $5.51 $2, LIVE POLE 200 EA $4.69 $ PLANT PROTECTION 145 EA $14.06 $1, B INVASIVE SPECIES CONTROL PHYSICAL REMOVAL 1 AC $6, $5, B INVASIVE SPECIES CONTROL CHEMICAL TREATMENT 1 AC $4, $3, DRAINAGE STRUCTURES PLAIN PVC SCH 80, IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 103.A " PVC PIPE 25 LF $36.66 $ B " PVC PIPE 25 LF $46.31 $1, C " PVC PIPE 25 LF $61.74 $1, PERFORATED PVC SCH 80, IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 104.A " PVC PIPE 25 LF $38.31 $ B " PVC PIPE 25 LF $47.41 $1, C " PVC PIPE 25 LF $63.06 $1, ASP, 16 GAUGE,IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 105.A " - 36" ASP 20 LF $ $2, B " - 72" ASP 20 LF $ $3, C " - 96" ASP 20 LF $ $3, RCP PIPE ANY CONFIGURATION 106.A IN 3 INCREMENTS 20 LF $27.56 $ B IN 3 INCREMENTS 20 LF $44.10 $ C IN 3 INCREMENTS 20 LF $47.68 $ D IN 3 INCREMENTS 20 LF $52.92 $ HDPE, IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 107.A " - 8" HPDE PIPE (PLAIN) 20 LF $16.54 $ B " - 8" HPDE PIPE (PERFORATED OR SLOTTED) 40 LF $17.64 $ C " - 24" HDPE PIPE 20 LF $40.79 $ D " - 36" HDPE 20 LF $66.15 $1, E " - 48" HDPE 20 LF $99.23 $1,800.00

8 BID TABULATION PAGE 7 OF F " - 60" HDPE 20 LF $ $2, FISH STOCKING 460 LBS $17.64 $7, CONCRETE FLUME 15 CY $ $6, CONCRETE FLUME WITH STONE INLAY 15 CY $ $7,500.00

9 BID TABULATION PAGE 8 OF HEADWALL, VARIOUS PIPE SIZES 111.A PRECAST HEADWALL FOR 18" - 36" PIPE 1 EA $ $ B PRECAST HEADWALL FOR 42" - 72" PIPE 1 EA $1, $1, C BRICK HEADWALL FOR 18" - 36" PIPE 1 EA $1, $1, D BRICK HEADWALL FOR 42" - 72" PIPE 1 EA $2, $2, E ROCK HEADWALL FOR 18" - 36" PIPE 1 EA $2, $2, F ROCK HEADWALL FOR 42" - 72" PIPE 1 EA $3, $3, BRICK CATCH BASIN 112.A GROUP 1 (GADOT 1033 / 1034) 10 VF $ $2, B GROUP 2 (GADOT 1033 / 1034) 10 VF $ $3, PRECAST CATCH BASIN 113.A GROUP 1 (GADOT 1033 / 1034) 10 VF $ $2, B GROUP 2 (GADOT 1033 / 1034) 10 VF $ $2, REPLACEMENT TOP FOR 1033/ VF $ $7, BRICK MANHOLE, TYPE 1 (GADOT 1011A) 10 VF $ $2, BRICK MANHOLE, TYPE 2 (GADOT 1011A) 10 VF $ $2, PRECAST MANHOLE, TYPE 1 (GADOT 10 VF $ $2, PRECAST MANHOLE, TYPE 2 (GADOT 10 VF $ $2, MANHOLE COVERS 10 EA $ $6, BRICK DROP INLET, GROUP 1 (GADOT 1019A) 10 VF $ $2, BRICK DROP INLET, GROUP 2 (GADOT 1019A) 10 VF $ $2, BRICK DROP INLET, GROUP 1 (GWINNETT P&D 610) 10 VF $ $2, BRICK DROP INLET, GROUP 2 (GWINNETT P&D 610) 10 VF $ $2, BRICK DROP INLET, GROUP 1 (GADOT 9031S/9031D) 10 VF $ $7, BRICK DROP INLET, GROUP 2 (GADOT 9031S/9031D) 10 VF $ $7, PRECAST DROP INLET, GROUP 1 (GADOT 1019A) 10 VF $ $2, PRECAST DROP INLET, GROUP 2 (GADOT 1019A) 10 VF $ $2, PRECAST DROP INLET, GROUP 1 (GWINNETT P&D 610) 10 VF $ $2, PRECAST DROP INLET, GROUP 2 (GWINNETT P&D 610) 10 VF $ $2,700.00

10 BID TABULATION PAGE 9 OF PRECAST DROP INLET, GROUP 1 (GADOT 9031S/9031D) 10 VF $ $2, PRECAST DROP INLET, GROUP 2 (GADOT 9031S/9031D) 10 VF $ $2, REPLACEMENT TOP FOR DI 610, W\RING & COVER 1 EA $ $ REPLACEMENT TOP FOR DI 1019A, W\FRAME & GRATE 1 EA $ $ REPLACEMENT TOP FOR DI 9031S/9031D, W\ STEEL PLATE 1 EA $1, $1, ROADWAY RESTORATION STREET CUT 135.A DETAIL A 41 SY $50.72 $1, B DETAIL B 41 SY $59.54 $2, C DETAIL C 17 SY $51.82 $ D DETAIL D 11 SY $22.05 $ DRIVEWAY RESTORATION 136.A " CONCRETE 49 SY $82.69 $3, B " CONCRETE 18 SY $ $1, TOTALS $1,897, Will vendor hold pricing firm? Renewal Option 1 Will vendor hold pricing firm? Renewal Option 2 Will vendor hold pricing firm? Renewal Option 3 Will vendor hold pricing firm? Renewal Option 4 Recommended Vendor: Attn: Jason Freeland 871 Old Peachtree Road NW Lawrenceville, GA P: F: jason.freeland@dickersongroup.net 5% 5% 5% 5%

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 DECEMBER 6, 2018 ADDENDUM 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 ADDITIONAL INFORMATION DOCUMENTS The following document: Questions and Responses

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32. PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

ENGINEERING & ENVIRONMENTAL

ENGINEERING & ENVIRONMENTAL 1-800-292-8989 www.iowaonecall.com CITY OF WEST BRANCH, IOWA THIS ENGINEERING DOCUMENT HAS BEEN REVIEWED BY THE JURISDICTION AND IS RECOMMENDED FOR FILING WITH THE CITY CLERK ENGINEERING & ENVIRONMENTAL

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC , IA - 2017 DIVISION 1 - GENERAL 1.01 TRAFFIC CONTROL LS 1 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 DIVISION 2 - EARTHWORK 2.01 CLEARING

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary Construction Contract Bid Evaluation Summary I. Lowest responsive, responsible bidder: Eastman Aggregate Enterprises, LLC (Primary) and Rio Bak Corporation (Secondary) II. Bidders, ranked from lowest to

More information

The Tulalip Tribes of Washington

The Tulalip Tribes of Washington The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of

More information

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

Oaks Commerce Center

Oaks Commerce Center Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

Side Cutter Kit (Left and Right - fits all 68, 72, 80 Buckets) 48 Pallet Fork Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) These Bolt On Side Cutters (BOSC) greatly extend bucket service life and improve penetration power into hard packed soil or stock piled

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 9/13/2006 Control 0196-07-026 Project STP 2006(438)MM Highway SP 366 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Kermon Environmental Services, Inc. (OC) TOTAL POINTS. D&J Enterprises, Inc. (OS) CrowderGulf, LLC (OS)

Kermon Environmental Services, Inc. (OC) TOTAL POINTS. D&J Enterprises, Inc. (OS) CrowderGulf, LLC (OS) SCORE TABULATION Page 1 of 1 Disaster Debris Removal, Reduction, Disposal and Other Emergency Debris Related Ameri-Green Environmental Bergeron Emergency Services, Inc. D&J Enterprises, Inc. DRC Emergency

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 13 T H TO AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:

More information

http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-102-1.pdf http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-63-1.pdf. COST ESTIMATE FOR PACIFICA QUARRY

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete 1-2 / 2-3 clear $18.00 $30.00

More information

365, , , A Total of Schedule I and II 530, , A 702, A

365, , , A Total of Schedule I and II 530, , A 702, A BID ABSTRACT COUNTY OF VENTURA - PUBLIC WORKS AGENCY Page 1 of 3 Bids opened on April 2, 2019 ENGINEER'S ESTIMATE LOW BIDDER 2nd Bidder Project Name Piru Stormwater Capture For Groundwater Recharge Project

More information

U:\0-PROJECT\Groton - sidewalk\main STREET\MAIN ST CONST-PLAN.dwg, 4/26/ :07:22 AM, AutoCAD PDF (General Documentation).pc3

U:\0-PROJECT\Groton - sidewalk\main STREET\MAIN ST CONST-PLAN.dwg, 4/26/ :07:22 AM, AutoCAD PDF (General Documentation).pc3 ' MIN 1.0% FROM STA 8+80 TO STA 9+0 STA 1+40 TO STA 11+00 STA 119+0 TO STA 10+4 CURB TYPE OVER H BINDER VARIED PROP.." H OVER 8" GRAVEL TYPE C 1:1. :1 PROP. GRANITE CURB TYPE VA, IN REVEAL OVER MIN. DEPTH

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Portland Sand & Gravel Co. Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete

More information

CENTER LINE GROUND LINE EXISTING MANHOLE TRUE SCALE SEWER LINES & MANHOLES GAS WATER CULVERT PERMANENT REFERENCE MONUMENT P.R.M.

CENTER LINE GROUND LINE EXISTING MANHOLE TRUE SCALE SEWER LINES & MANHOLES GAS WATER CULVERT PERMANENT REFERENCE MONUMENT P.R.M. STANDARD SYMBOLS AND ABBREVIATIONS EXISTING CATCHBASIN OR INTAKE CENTER LINE B/B BACK TO BACK OF CURBS PCC PORTLAND CEMENT CONCRETE EXISTING MANHOLE TRUE SCALE GROUND LINE B/J BACK TO JOINT PL PROPERTY

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND 1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89

More information

MINI SKID STEER ATTACHMENT LITERATURE

MINI SKID STEER ATTACHMENT LITERATURE MINI SKID STEER ATTACHMENT LITERATURE 2 BUCKETS & BLADES When you need to power through with productivity you can be sure that you ve come to the right place. With our versatile lineup of buckets and blades,

More information

CP #CP218 NAIL SOFT GROUND N= E= ELEV= GUY WIRE. + WV CP #CP175 Old Magnail N= E= ELEV=858.

CP #CP218 NAIL SOFT GROUND N= E= ELEV= GUY WIRE. + WV CP #CP175 Old Magnail N= E= ELEV=858. O R IG IN A T O R : C IT Y OF M A D IS O N, S T R E E T S DIV IS IO N 805 4906 802 813 4910 821 825 DELAWARE LN 1 2 3 EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY