1 NVF Annual Bridge Conference 2013 NORWEGIAN (TEMPORARY) EMERGENCY BRIDGES Gunnar Magnus Haugen NPRA, Bridge Department
2 Emergency Bridges up to now (7) UNEXPECTED INCIDENTS EMERGENCY INCIDENTS IN NORWAY APPROX. 12/ YEAR, TOTAL TEMPORARY PROJECT AS PR TO DAY 59
3 EMERGENCY INCIDENTS
4 Gulli Temporary Bridge, E16, KONGSVINGER
5 Resources Bridge equipment, approx. 2,6km Equipment for emergency use: 1,4 km Road bridges 700rm Pedestrian bridges Other equipment In use apt: Superprop approx. 100rm Squer towers ca 200rm Pontoons ca 200 Mobile ferrry teminals 4 Push boats/jacking eq. etc approx rm Road bridges Approx. 500rm Pedestrian bridges approx. 60rm towers 1 Mobile ferry Terminal Emergency Staff: 2 NPRA Bridge Section (Management, Calculation, Design, HSE-HMS) 6 NPRA Regions (Site managers/ Depot staff etc.)
6 MAINDEPOT AT HOLTERMOEN Tot. 8 Depots for Emergency equipment in Norway
7 Other Resources in Norway Norwegian Railway Authority 2 Depot in Norway (MU) No Site Mangers for emergency bridging (*from NPRA*) Norwegian Army Man-Leguan + Bailey 1942/43 20% New Bailey (1995) Uniflote pontoons Erection crew/ Heavy Construction Machines
8 EQUIPMENT- SHORT BRIDGES Short bridges Joint Bridges Mabey Compact/Delta, decking elements Lsp= 3,0-4,5m
9 JOINT-BRIDGES
10 EQUIPMENT ELEMENT BRIDGES Short bridges Joint Bridges Mabey Compact/Deltadekkeelementer Lsp= 3,0-4,5m Elementbridges Quick assembly bridges Janson JSK/ Unibridge/ Mabey Quick Lsp=6,0-21,0m (45m)
11 Elementbridges
12 EQUIPMENT LOGISTIC BRIDGES Short bridges Joint Bridges Mabey Compact/Deltadekkeelementer Lsp= 3,0-4,5m Elementbridges Quick assembly bridges Janson JSK/ Unibridge/ Mabey Quick Lsp=6,0-21,0m (45m) Logistic bridges Panel Bridges Acrow/ Bailey Lsp=15-50m free span One Lane 3,8-4,2m Two Lane 7,2m
13 Examples of logistic bridges
14 EQUIPMENT HEAVY BRIDGES Short bridges Joint Bridges Mabey Compact/Deltadekkeelementer Lsp= 3,0-4,5m Elementbridges Quick assembly bridges Janson JSK/ Unibridge/ Mabey Quick Lsp=6,0-21,0m (45m) Logistic bridges Heavy bridges Panel Bridges Acrow/ Bailey Panel Bridges Mabey Universal Lsp=15-50m free span One Lane 3,8-4,2m Two Lane 7,2m Lsp=30-80m free span One Lane 4,2m Two Lane 7,3m Railway Bridges
15 Examples - Heavy Bridges (Up to 80m free span)
16 EQUIPMENT - TOWERS Short bridges Joint Bridges Mabey Compact/Deltadecking elements Lsp= 3,0-4,5m Elementbridges Quick assembly bridges Janson JSK/ Unibridge/ Mabey Quick Lsp=6,0-21,0m (45m) Logistic bridges Heavy bridges Towers Panel Bridges Acrow/ Bailey Panel Bridges Mabey Universal Acrow Superprop towers Acrow square towers etc. Lsp=15-50m free span One Lane 3,8-4,2m Two Lane 7,2m Lsp=30-80m free span One Lane 4,2m Two Lane 7,3m Railway Bridges Tower heights (Practical up to ca. 30m) Capacity up to approx kn pr. leg
17 Examples Towers
18 EQUIPMENT - PONTOONS Short bridges Joint Bridges Mabey Compact/Deltadecking elements Lsp= 3,0-4,5m Elementbridges Quick assembly bridges Janson JSK/ Unibridge/ Mabey Quick Lsp=6,0-21,0m (45m) Logistic bridges Heavy bridges Towers Pontoons Panel Bridges Acrow/ Bailey Panel Bridges Mabey Universal Acrow Superprop towers Acrow square towers etc. Uniflote pontoons (small barges 2,5X5,3m) Lsp=15-50m free span One Lane 3,8-4,2m Two Lane 7,2m Lsp=30-80m free span One Lane 4,2m Two Lane 7,3m Railway Bridges Tower heights (Practice up to ca. 30m) Capacity up to approx kn pr. leg Pontoon bridges/ Floating bridges Temporary ferry terminals Temporary ferries etc.
19 Examples use of Pontoons/ Floating equipment
20 EQUIPMENT PEDESTRAIN BRIDGES Short bridges Joint Bridges Mabey Compact/Deltadecking elements Lsp= 3,0-4,5m Elementbridges Quick assembly bridges Janson JSK/ Unibridge/ Mabey Quick Lsp=6,0-21,0m (45m) Logistic bridges Heavy bridges Towers Pontoons Pedestrian Bridges Panel Bridges Acrow/ Bailey Panel Bridges Mabey Universal Acrow Superprop towers Acrow square towers etc. Uniflote pontoons (small barges 2,5X5,3m) Panel Bridges / Element Bridges Acrow/Bailey/JPB/JSK Lsp=15-50m free span One Lane 3,8-4,2m Two Lane 7,2m Lsp=30-80m free span One Lane 4,2m Two Lane 7,3m Railway Bridges Tower heights (Practice up to ca. 30m) Capacity up to approx kn pr. leg Pontoon bridges/ Floating bridges Temporary ferry terminals Temporary ferries etc. Lsp=3,0-50m free span Deck Width: 1,8m 3,0m
21 Pedestrian Bridges
22 SPECIAL ASSEMBLY METHODES
23 Element Bridges for Heavy Transport
24 New Bridge types: Unibridge
25 UNIBRIDGE DEVELOPMENTS
Come across. m o d u l a r s o l u t i o n s
Come across B R I D G E S P O N T O O N S R O R O S m o d u l a r s o l u t i o n s Design, manufacturing, erection on site in rent and or sale Janson Bridging. Leading the way in modular solutions Janson
More informationJob Report. Bosphorus Bridge, Turkey
Bosphorus Bridge, Turkey Bridge length: 1 400 m Bridge width: 59 m Dimensions bridge elements: 59.00/24.00 m Weight bridge elements: 1 000 to Lifting distance from water surface: 80.00 m Number of elements
More informationCHAPTER 10 FLOATING WHARVES
CHAPTER 10 FLOATING WHARVES Both the US Army and Navy have floating equipment suitable for constructing floating wharves. The most promising equipment of each service is discussed below. Section I. Army
More informationgroundworks technical reference section 4 : double acting hydraulic braces supplement supershaft plus technical details
groundworks technical reference section 4 : double acting hydraulic braces supplement supershaft plus technical details Issue 4 January 2016 Supershaft Plus is a modular hydraulic system. outer sleeve
More informationFirst published June 2007 Copyright China Trend Building Press Limited
First published June 2007 Copyright China Trend Building Press Limited trend@building.com.hk In order to construct the foundations, piers and portal frames for the viaduct, a 1.8 km-long temporary access
More informationChallenges and solutions for transport in Norway
Challenges and solutions for transport in Norway Therese Ustvedt, adviser Director General s Staff Norwegian Public Roads Administration Transport Network Public roads, total 94 600 km - National roads
More informationTechnical Data Sheet. British Standards Compliant. TECHNICAL DATA SHEET System 160 (British Standards)
Technical Data Sheet British Standards Compliant Mass 10 System 160 Mass 25 Mass 50 MAT 75 / 125 Superprop Hydraulics Quickbridge MU Falsework MU Bridging Compact Bridging BarrierGuard 800 Instrumentation
More informationHead of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management
BDir Dipl Ing Manfred Silvanus Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management www.bmvi.de AGENDA - Federal Ministry of Transport and Digital
More informationEurocode Compliant. supplement. groundworks technical reference section 4: double acting hydraulic braces. supershaft plus technical details
groundworks technical reference section 4 : double acting hydraulic braces supplement supershaft plus technical details Page 1 Eurocode Compliant Issue 1 supershaft plus (SSP) 1. Introduction Supershaft
More informationMODULAR BARGE SYSTEM
MODULAR BARGE SYSTEM Introducing a modular barge system that can be configured, modified and extended as your needs and projects vary. We can fabricate in coated steel, or stainless steel according to
More informationmilitary applications
military applications The Matière Company HISTOry In 1932, Louis Matière installed his first water conduits. Since that era, the Matière Company has laid approximately 45,000 kilometres of pipes. Today,
More informationManufacturing operating and maintaining different rolling stock
Manufacturing operating and maintaining different rolling stock Business model with a corporate centre and three different activity areas Renfe-Operadora Railway transport operator in Spain PASSENGERS:
More informationLETTER THE BARNHART S KEY TO FIT ANY LOCK PAGE 3. A Mountain Top Experience Page 2. Barnhart s Modular Lift Tower In The Motor City Page 2
A Mountain Top Experience Page 2 Barnhart s Modular Lift Tower In The Motor City Page 2 THE LIFTING LETTER 2 0 0 4 T H I R D E D I T I O N A P U B L I C A T I O N O F B A R N H A R T Barnhart s Key To
More informationSubstringer system with 5 main girders = 11,100,000 lb (97 lb/sf) Multi-girder system with 8 main girders = 11,000,000 lb (96 lb/sf)
Memo To: John Clute Iowa Department of Transportation, Bridge Division From: Gary Krupicka \ Todd Horton Project: NHSX-34-1(68)--3H-65 CC: Brad Hofer (IaDOT), Matt Tondl (HDR) Date: March 6, 2006 Job No:
More informationNEW TREND ON TRANSMISSION POWER LINES AND RELATED STRINGING EQUIPMENT DEVELOPMENT
NEW TREND ON TRANSMISSION POWER LINES AND RELATED STRINGING EQUIPMENT DEVELOPMENT Background Several regions of the world are facing severe pressure on transmission line infrastructure, while the trends
More informationHYOP AND HYDROGEN INFRASTRUCTURE IN NORWAY IPHE, OSLO MAY 19, 2014 ULF HAFSELD, CEO HYOP
HYOP AND HYDROGEN INFRASTRUCTURE IN NORWAY IPHE, OSLO MAY 19, 2014 ULF HAFSELD, CEO HYOP HYOP HYOP AS is an independent company dedicated to bring hydrogen fuel to the market HYOPs mission is to own and
More informationLa Yesca hydroelectric power plant, Mexico
Projects@Rexroth 1 Projects@DC 2 Projects@DC 3 Projects @ Rexroth in the world 4 Reference projects: Civil Engineering La Yesca hydroelectric power plant, Mexico Bosch Rexroth AG CFE Comisión Federal de
More informationB.C. MINISTRY OF TRANSPORTATION. Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE
1. OBJECTIVE B.C. MINISTRY OF TRANSPORTATION Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE 17 th Street Bridge (lift span, at Courtenay) To ensure safe
More informationCOSTS IN PREVENTION OF CRIME ON PUBLIC TRANSPORT
1. Introduction COSTS IN PREVENTION OF CRIME ON PUBLIC TRANSPORT APPENDIX 4 The Home Office costs of crime study include estimates for the costs incurred in anticipation (or prevention) of crime. These
More informationSustainability and road transport in Norway
Sustainability and road transport in Norway Henrik Kofoed Nielsen - University of Agder Karl Sigurd Fredriksen - Norwegian Public Roads Administration Rein Terje Thorstensen - University of Agder Ivana
More informationEnergy-efficient Transportation Systems
Energy-efficient Transportation Systems Electric Propulsion Systems for Busses Diesel-Electric / Hydrogen / Battery Busses Chicago, 05/13/2014 Dr.-Ing. Thoralf Knote Fraunhofer Institute for Transportation
More informationDesign Concept and Financing of the Light Rail Zagreb Project
Davorin KOLIĆ ITA Croatia - - - Neuron Zagreb doo Design Concept and Financing of the Light Rail Zagreb Project Presentations Metro Zagreb HKIG, Zagreb September 7,, 2009 References D.Kolić 1992 Metro
More informationSYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE
TROLLEY WIRE INSPECTION PROCEDURE JUNE 2014 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM 6029 Version Number: 15 TrolleyWire Inspection Procedure Document Status:
More informationCorridor Management Committee. March 7, 2012
Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed
More informationSAUSALITO FERRY TERMINAL REPLACEMENT PROJECT. Item 5A- PPT Presentation Page 1 of 23
SAUSALITO FERRY TERMINAL REPLACEMENT PROJECT OCTOBER 10, 2017 CITY OF SAUSALITO CITY COUNCIL MEETING Page 1 of 23 PROPOSED PROJECT SUMMARY EXISTING PROPOSED (ACCESS PIER WITHOUT BELVEDERES) Gate Location
More informationMULTI-PURPOSE FLOATING PLATFORMS
MULTI-PURPOSE FLOATING PLATFORMS INDUSTRIAL APPLICATIONS Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters www.truenorthservicesllc.com
More informationAppendix H: Construction Impacts H-3 Air Quality
Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263
More informationNational Transport Plan ( )
National Transport Plan (2018-2029) A short introduction Ole Kristian Sollie Norwegian Public Roads Administration National Transport Plan 2018-2029 Prioritisation of resources Four national agencies are
More informationHIGH WIRE ACT. When the lights went out at Kitimat, it was the cue for Rio Tinto Alcan to embark on one of its most complex engineering feats ever.
HIGH WIRE ACT When the lights went out at Kitimat, it was the cue for Rio Tinto Alcan to embark on one of its most complex engineering feats ever. 20 Words and pictures by Dwight Magee, Corporate Affairs
More informationWhen you need to find a way
When you need to find a way 2003-2018 OVER A DECADE OF EXCELLENCE WWW.JWAOIL.COM Overview JWA Oilfield Supplies Pty Ltd is a member of the JWA Groups of Companies and is wholly Australia owned and operated.
More informationWillamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee
Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee 05.28.09 09 Bridge Type - Cost Vertical Clearance Bicycle Pedestrian Path Width Bridge Type - Cost WRBAC
More informationhareket CASE STUDY 600t AUTOCLAVE TRANSPORTATION FROM PETKIM PORT TO GORDES
CASE STUDY 600t AUTOCLAVE TRANSPORTATION FROM PETKIM PORT TO GORDES 1 CONTENTS PROJECT INFORMATION LOAD DETAILS TRANSPORT ROUTE TRANSPORT CONFIGURATION TECHNICAL DETAILS OF TRAILER REASONS FOR CHOOSING
More informationProduct range Presented by the go-to expert For all your needs
Product Range Presented by the GO-TO EXPERT FOR ALL YOUR NEEDS STREAMLINED SOLUTIONS Terex Port Solutions offers a comprehensive portfolio of state-of-the-art cargo handling equipment, port management
More informationModernization of Afipsky Refinery. The Russia and CIS Project & Equipment Forum RPEF 2015 April 21-22, 2015, Moscow
Modernization of Afipsky Refinery The Russia and CIS Project & Equipment Forum RPEF 2015 April 21-22, 2015, Moscow Contents Current Status of Afipsky Refinery Approved Modernization Program: Completed
More informationIncremental Lifting System
Synchronously Lift and Mechanically Hold Incremental Lifting System JS-Series, Jack-Up Systems JS-Series, Jack-Up Systems JS-250, Enerpac Jack-Up System (one lifting tower shown) Incremental Lifting System
More informationResearch Update Briefing for 18 November HSRMC
Research Update Briefing for 18 November HSRMC David Howson, 17 th November 2014 1 Contents: Helicopter Health Monitoring Helicopter Ditching & Water Impact Operations to Moving Helidecks Helideck Lighting
More informationBjørnafjorden Suspension Bridge K1&K2 Girder Design
K1&K2 Girder Design 3.6.216 Issued to client HSL CH KAA Rev Dato/Date Beskrivelse/Reason for issue Utført/ Made by Kontr./ Checked Godkjent/ Approved Tittel /Title Dok.nr /Doc. no. K1&K2 Girder Design
More informationNEW MOBILITIES EMERGING IN PARIS
NEW MOBILITIES EMERGING IN PARIS Roger LAMBERT French ministry of ecology, sustainable development and energy -ITS task force Why Paris must take action Pollutionis a source of concern because, in certain
More informationAlberta Transportation Rumble Strips - C-TEP Lunch and Learn
Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Bill Kenny P.Eng, Director: Design, Project Management and Training, Technical Standards Branch. - July 2011 What are Rumble Strips? A preventative
More informationDrink Driving and latest developments in Norway. SMART policies, 5th October, Helsinki
Drink Driving and latest developments in Norway SMART policies, 5th October, Helsinki www.ma-norge.no Vision zero a safe system A vision based on zero killed and zero seriously injured The vision is based
More informationSHIP COLLISION: REPAIR & REHABILITATION OF A CABLE STAYED BRIDGE
Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey SHIP COLLISION: REPAIR & REHABILITATION OF A CABLE STAYED BRIDGE Sumitaka KURINO 1, Hiroshi KUDO 2, Masaru KUDO 3 and Yuichi YAMAMOTO 4 ABSTRACT
More informationReport RL 2004:21e. Accident involving aircraft LN-ALK at Malmö Sturup Airport, M county, Sweden, on 14 April 2004
ISSN 1400-5719 Report RL 2004:21e Accident involving aircraft LN-ALK at Malmö Sturup Airport, M county, Sweden, on 14 April 2004 Case L-07/04 SHK investigates accidents and incidents with regard to safety.
More informationEmissions for the ferry routes: 1) Rødby - Puttgarden, 2) Gedser - Rostock and 3) Trelleborg - Rostock
Emissions for the ferry routes: 1) Rødby - Puttgarden, 2) Gedser - Rostock and 3) Trelleborg - Rostock Version 2010.12.12 By Hans Otto Holmegaard Kristensen Consulting Naval Architect and senior researcher
More informationAccelerated Bridge Construction
Accelerated Bridge Construction Friday September 16 th, 2005 Page 1 Purpose of this Meeting Introduction to Mammoet Some Memorable Projects Highlight our activities per industry: SPMT s and Hydraulic Transporters
More informationCENTURY MONTHLY DEVELOPMENT UPDATE JULY 2018
ASX / MEDIA ANNOUNCEMENT ASX: NCZ 01 August 2018 CENTURY MONTHLY DEVELOPMENT UPDATE JULY 2018 Restarting of operations at the Century Zinc Mine now imminent, with strong progress made in the final refurbishment
More informationPerformance-Based Communication Tools for Maintenance Budgets. 11th National Conference on Transportation Asset Management July 12th, 2016.
Performance-Based Communication Tools for Maintenance Budgets 11th National Conference on Transportation Asset Management July 12th, 2016 Rob Zilay Presentation Outline Performance-based maintenance tools
More informationFinancing Public Transportation Operations
Financing Public Transportation Operations Case-Study Berlin Ingeborg Junge-Reyer Presidency C4 Senator for Urban Development, Berlin Berlin in numbers Population Area City:.4 Million Metropolitan Region:
More informationNew Queensferry Crossing
Other ways to lift and shift Last month we looked at heavy lifting with mobile cranes, with a focus on developments in the 500 tonne capacity and above sector. However there are numerous occasions when
More informationSuper Watt Wave Catcher Barge
Super Watt Wave Catcher Barge Powers At Least Four Direct Drive Wind Turbine Type Generators Dry Enclosure Horizontal Mooring Legs Upper Section - Spiral Strand Wire Rope and Seabed Section Chain Vertical
More informationODENSE MARITIME TECHNOLOGY
ODENSE MARITIME TECHNOLOGY November 2017 Defense Special Vessels Container Bulk Tank Shipyard Advisory OMT Profile EXPERIENCE Building on 90 years excellence in ship design from Odense Steel Shipyard in
More informationMuseum Campus Transportation Study Open House.
Museum Campus Transportation Study Open House IDEAS TO HELP PEOPLE FIND THE WAY Finding the way: Visitor center/transport hub Multi-modal transfer point Provide information about all museums or other facilities
More informationCavotec Shore power solutions MoorMaster automated mooring Combined Mooring & Charging solutions
Short introduction to Cavotec Shore power solutions MoorMaster automated mooring Combined Mooring & Charging solutions 2015 Sunday, 13 March 2016 Slide 1 Cavotec Market Units Ports & Maritime Airports
More informationBattery Electric (BEV) and Plug-in Hybrid Vehicle (PHEV) in Norway
Battery Electric (BEV) and Plug-in Hybrid Vehicle (PHEV) in Norway Asbjørn Hagerupsen Norwegian Public Roads Administration e-mail: asbjorn.hagerupsen@vegvesen.no www.vegvesen.no Norwegian EV policy history
More informationDMB Proposed Toll Increase
DMB Proposed Toll Increase December 2018 The Delaware River and Bay Authority Bi-state agency established in 1962 Provides Crossings between Delaware and New Jersey Economic development benefitting the
More informationGM Remarks. Fiscal and Management Control Board. August 14, 2017
GM Remarks Fiscal and Management Control Board August 14, 2017 Agenda Warehouse / Money Room / Bus Maintenance Commuter Rail Wi-Fi Update Operations Performance Incidents Capital Projects Major Projects
More informationHURTIGRUTEN SHORE POWER AND HYBRID STRATEGY FOR PASSENGER SHIPS
HURTIGRUTEN SHORE POWER AND HYBRID STRATEGY FOR PASSENGER SHIPS Tor Geir Engebretsen, COO/SVP Maritime Operations, Hurtigruten AS Workshop Sustainable Energy Supply & Innovative Solutions for Emission
More informationELECTRIC INCIDENT INVESTIGATION WORKSHOP
ELECTRIC INCIDENT INVESTIGATION WORKSHOP Schedule Start Hour Finish Hour Day 1 Breakfast 8:00 A.M. 8:30 A.M. Workshop in session Introduction Electrical Theory Physiological Effects of Electricity 8:30
More informationUTSLIPPSFRIE FJORDER OG MARITIM SEKTOR
UTSLIPPSFRIE FJORDER OG MARITIM SEKTOR ZERO seminar Håndverkeren 10. april 2018 Helge Otto Mathisen Konserndirektør kommunikasjon & samfunnskontakt Color Line er en viktig bro mellom Norge og Kontinentet
More informationPrivate Roads & Municipal Waste Collection Policy POLICY NUMBER: 12 DATE APPROVED: April 21, 2015 (# ) DATE REVISED:
TOPIC: Private Roads & Municipal Waste Collection Policy POLICY NUMBER: 12 DATE APPROVED: April 21, 2015 (#2015-053) DATE REVISED: TITLE: This Policy may be cited as the Private Roads Policy of the Municipality
More informationEfficient(Logis-cs: The(Key to(african(shea(exporters Success
Efficient(Logis-cs: The(Key to(african(shea(exporters Success THE$SHEA$TREE$AND$ITS$NUTS «"Green"fruit"Gold"value"» $ Efficient$Logis6cs:$The$Key$to$Shea$Exporters$Success SHEA%PRODUCTION%AREAS African(Shea
More informationFRAMO. FRAMO High Capacity Oil Spill Recovery System a cost effective solution. By Jørgen Brandt Theodorsen, Engineer Oil recovery systems
FRAMO FRAMO High Capacity Oil Spill Recovery System a cost effective solution By Jørgen Brandt Theodorsen, Engineer Oil recovery systems Framo Manufacturer of FRAMO pumping system for Oil & Gas and Marine
More informationMARINTEK The Norwegian Marine Technology Research Institute
MARINTEK The Norwegian Marine Technology Research Institute Ocean laboratory to test out offshore construction and vessel concepts 50 x 80 meter Towing tank 260 meter Engine laboratory Raiser laboratory
More informationMore persons in the cars? Status and potential for change in car occupancy rates in Norway
Author(s): Liva Vågane Oslo 2009, 57 pages Norwegian language Summary: More persons in the cars? Status and potential for change in car occupancy rates in Norway Results from national travel surveys in
More information1 HAMMAR MRRS MANUAL REMOTE RELEASE SYSTEM. Product Information. Revision 1
1 Product Information Hammar MRRS MANUAL Remote release System 2 solutions that improve safety, Performance as well as economy THE HAMMAR REMOTE RELEASE SYSTEMS Hammar Remote Release Systems are de signed
More informationBabcock International Group
P10101 400kV TD Beauly Denny Route New Overhead Line Bird Flight Diverter Schedule 48 Fibre OPGW (Keziah) Earthwire Drawing No. P10101/3105 Pages 1 13 inclusive Document Author: P. Ransome Signature: P.
More informationLIFTING LETTER Engineers at Barnhart Tackle Difficult Feed Water Heater Change Out Page 2
BARNHART CRANE & RIGGING COMPANY THE LIFTING LETTER 2 0 0 3 T H I R D E D I T I O N Engineers at Barnhart Tackle Difficult Feed Water Heater Change Out Page 2 A PUBLICATION OF BARNHART CRANE & RIGGING
More informationECO 250 CUTTER SUCTION DREDGER
ECO 250 CUTTER SUCTION DREDGER RELIABLE BRANDS REPLACEABLE AUGER KNIVES OPTIMIZED PRODUCTION Dredge Yard +31 85 3035 866 www.dredgeyard.com MULTI-PURPOSE DREDGERS QUALITY FROM START TO FINISH Dredge Yard
More informationBus and coach transport for greening mobility
Bus and coach transport for greening mobility Contribution to the European Bus and Coach Forum 2011 The great challenge of decarbonizing transport requires low-carbon technology and decoupling 120% EU-27
More informationSecondary Seals & Selected Floating Roof Issues. Secondary Seals & Selected Floating Roof Issues
Secondary Seals & Selected Floating Roof Issues 2006 Storage Tank Conference September 27, 2006 Presentation by Larry C. Hiner Chicago Bridge & Iron Co. 14105 S. Route 59 Plainfield, Illinois 60544 Phone:
More informationPurple Line Extension Section 1 Construction Community Meeting April 19, 2018
Purple Line Extension Section 1 Construction Community Meeting April 19, 2018 1 Agenda Section 1 MOW 64 Facility Project Construction Updates: Wilshire/Western Wilshire/La Brea Wilshire/Fairfax Wilshire/La
More informationFlying bridge SL82-542
Flying bridge SL82-542 Flying bridge SL82-588 Cockpit SL82-542 Salon SL82-571 Salon SL82-484 Salon SL82-588 Owner s cabin SL82-584 Owner s cabin SL82-589 Profile A B C Flying bridge A B C Main deck A B
More informationPipelines & Flow Assurance
Pipelines & Flow Assurance Angus Macaulay Subsea Engineering Team Lead Paradigm Flow Services SUBSEA EXPO 2016 Free the Pigs - Case Study Angus Macaulay Subsea engineering co-ordinator Paradigm Flow Services
More informationRegulations relating to the Use of Vehicles, Chapter 5
Regulations relating to the Use of Vehicles, Chapter 5 Section 5-1 Limits specified on registration etc. A vehicle must not be used or authorised for use if the axle load, load from an axle combination,
More informationBridging the gaps: China works to boost combat engineer capabilities
Bridging the gaps: China works to boost combat engineer capabilities [Content preview Subscribe to Jane s International Defence Review for full article] China s People s Liberation Army has taken into
More informationPAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc
PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS Paul Mak, PE, SE HDR Inc 801 S. Grand Ave. Suite 500, Los Angeles, CA 90017. Tel
More informationCENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018
ASX / MEDIA ANNOUNCEMENT ASX: NCZ 02 July 2018 CENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018 New Century continues strong progress toward restarting Century operations, with planned refurbishment activities
More informationAppendix D. List of Existing Structures
A120 Braintree to A12 Technical Appraisal Report Appendix D. List of Existing Structures B3553T41-JAC-HGN-00-REP-C-0002 Page 134 of 135 A120 Braintree to A12 - Existing Structures Existing Structure Name
More informationCABLE CAR A new type of public transport in Gothenburg Stadsleveransen:
CABLE CAR A new type of public transport in Gothenburg Stadsleveransen: A success story on urban freight logistics Michelle Coldrey City of Gothenburg 1/12 2016 Michelle Coldrey City of Gothenburg Urban
More informationDropped Object Incidents on Chevron operated assets
Dropped Object Incidents on Chevron operated assets January 2010 2010 Chevron Summary There were three RIDDOR-reportable Dropped Objects on Chevron operated assets in January 2010: No personnel were injured
More informationBridging Team Efforts Supporting Current & Future Forces. UNCLASSIFIED: Dist A. Approved for public release
Bridging Team Efforts Supporting Current & Future Forces UNCLASSIFIED: Dist A. Approved for public release Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection
More informationPUSH BOAT FENDER LAYOUT
Schuyler Push Boat Fenders PUSH BOAT FENDER LAYOUT SIDE TOP HEADLOG FLEET DECK BOW CORNER TRANSOM STERN CORNER TOP GENERAL ARRANGEMENT SIDE PROFILE 815 Schuyler Push Knee Fenders STANDARD FENDERS (Model
More informationJob Report. New coastal highway route, Reunion Island, France. Facts Heaviest Modul: t Prefabricated pillars:
New coastal highway route, Reunion Island, France Heaviest Modul: 4 800 t Prefabricated pillars: 48 pcs Total modules: 146 pcs Moved loads: 400 000 t Lenght viaduct: 5 400 m Constuction time: 3years On
More informationPORT TYRE CRANE. SANY Industrial Park, Gaolan Port Economic and Development Zone, Zhuhai, Guangdong, China
PORT TYRE CRANE SANY Industrial Park, Gaolan Port Economic and Development Zone, Zhuhai, Guangdong, China Tel 0756-7266945 Service 4008 87 8318 Fax 0731-84031999-149 Consulting 4008 87 9318 Email sanyport@sany.com.cn
More informationnorthernstrands.com Suspended Access Systems and Equipment
northernstrands.com Suspended Access Systems and Equipment northernstrands.com Suspended Access Systems Overview Northern Strands offers the largest rental fleet of suspended access equipment in Saskatchewan.
More informationHeavy Lift Hovercraft. Date: Jan 2017
Heavy Lift Hovercraft Presenter email Date: Jan 2017 logistics problems? rise above it Who is HFL? Hoverbarge Freight Ltd (HFL) incorporated in Ontario, Canada is owned by the leading experts in Hoverbarges/hovercraft,
More informationAL Jaber Leasing Services L.L.C (ALES) 2013 Third Quarter Bulletin
AL Jaber Leasing Services L.L.C (ALES) 2013 Third Quarter Bulletin ALES Announcement Dear All, I would like you all to join me in welcoming Mr. Darren Andrew Platts & Mr. Mohit Bhargava to Al Jaber Leasing
More informationTHE DESIGN OF ANCHOR ELEVATION PLATFORMS FOR CUTTER SUCTION DREDGE D ARTAGNAN
THE DESIGN OF ANCHOR ELEVATION PLATFORMS FOR CUTTER SUCTION DREDGE D ARTAGNAN LAST MEN STANDING G.A.P.L. Teheux 1, M. Lambalk 2 ABSTRACT When dredging hard materials with a cutter suction dredge (CSD),
More informationPre-Project Proposal
Sky Way Transport Canada Ltd. 710-485 McGill Street, Montreal QC H2Y 2H4, Canada Concept of High-Speed Track SkyWay on the Route Heraklion-Chania, Crete Pre-Project Proposal SWC 2017 Montreal 2017 The
More informationMercy College Vehicle and Parking Regulations. Office of Campus Safety (914)
Mercy College Vehicle and Parking Regulations Office of Campus Safety (914) 674-7225 Contents Introduction 3 Registration 3 Permits 3 Fees 3 Motorcycles / Scooters 3 Handicap parking 4 Temporary permits/visitors
More informationLOADS BRIDGE LOADING AND RATING. Dead Load. Types of Loads
BRIDGE LOADING AND RATING LOADS 0 1 Types of Loads Bridges are subjected to many different types of loads. There are three important types of bridge loads: Dead load Live load Other loads Dead Load Dead
More informationJackup Strategy Richard Roper Sr. Director Capital Projects. April 11, 2012
Jackup Strategy Richard Roper Sr. Director Capital Projects April 11, 2012 1 Jackup Strategy 120 Jackup Orders 100 80 Build Boom Early 80 s 60 40 Followed by Recession Next Build Boom Continuation of Build
More informationMoSTS&PM 2010 Sign Number Reference
INFORMATION SIGNS I-7 I-007-1 Stop of Interest Ahead I-8 I-007-2 Viewpoint Ahead I-9 I-009-1 Viewpoint Entrance I-10 I-020-L Rest Area LEFT ARROW I-10 I-020-R Rest Area RIGHT ARROW I-11 I-022-L Rest Area
More informationPower From Shore: An introduction to HVDC Light Offshore
Lead Competence Center presentation Power From Shore: An introduction to HVDC Light Offshore COE-0017 ABB AS, Automation Technologies Division - 1 - Presentation overview: COE-0017 ABB Automation Technologies
More informationElect ric f erries and t he use of dat a
4TH ANNUAL FERRY SARETY AND TECHNOLOGY CONFERENCE, MARCH 21, 2018 Elect ric f erries and t he use of dat a Technology & Decision Making Ryan Bishop, Sales Director NAM ABB Marine & Ports Tot al int egrat
More informationMARINE EQUIPMENT. marine equipment marine equipment 97
MARINE EQUIPMENT 96 marine equipment marine equipment 97 Powerpack Total weight (without wire) 2.280 mm 1.280 mm 1.863 mm 2.500 kg Diesel engine Number of cylinders 4 Power 71 kw RPM 1.800 Cooling Radiator
More informationUse of odometer readings in defining road traffic volumes and emissions
Use of odometer readings in defining road traffic volumes and emissions Tuuli Järvi VTT Technical Research Centre of Finland 2 Use of odometer readings in defining road traffic volumes and emissions Contents
More informationCONTAINER PONTOONS 6
CONTAINER PONTOONS 6 12 CoNTAINeR PoNTooNS CoNTAINeR PoNTooNS 13 Coupling 6 Container m30 Pre-tensioning Tensile stress Shear stress Per coupling side 350 kn, (10kN = 1 ton) 400 kn, tested by GL 280 kn,
More informationIncremental Lifting System
Synchronously Lift and Mechanically Hold Incremental Lifting System JS-Series, Jack-Up Systems JS-Series, Jack-Up Systems Shown: JS-250-Series Jack-Up System (one lifting tower shown) Incremental Lifting
More informationRinghals Two Instrumentation & Control Exchange TWICE
Ringhals Two Instrumentation & Control Exchange TWICE Replacement of entire Main Control Room (MCR), I&C System (SS and SRS), new Simulator and enhanced race-way separation & segregation, Temporary Operations
More informationASSEMBLY INSTRUCTIONS
WIND GENERATOR KIT Complete Set Including All Accessories 500 Watts rated at 12,5 m/s (= 28 mph) 6 Meter (= 20 ft.) Free-Standing Tower ASSEMBLY INSTRUCTIONS Contents WIND GENERATOR KIT Complete Set Including
More information