Size: px
Start display at page:

Download ""

Transcription

1

2

3

4 Minutes of the 19 th Joint Co-ordination Committee meeting of Generation projects granted Connectivity/LTA in Western Region (WR) held on at POWERGRID, Gurgaon 1. The 19th Joint Co-ordination Committee meeting of generation projects in Western Region was held at POWERGRID Office, Gurgaon on 28th Mar, The list of participants of the meeting is enclosed at Annexure-I. 2. After welcoming the participants by CTU, it was informed that Minutes of the 18th Meeting of the Joint Co-ordination Committee of generation projects which were granted LTA in Western Region held on , were circulated vide letter ref. no. C/CTU/WR/OA/18JCC dated As no observations/comments are received, the minutes were confirmed as circulated. 3. It was re-iterated that JCC forum has been created for co-ordination purpose to attempt matching of generation s with the associated transmission system, and accordingly, the information given by generation developers is being taken into cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic & other status of generation project /dedicated line. However, for any substantial issue, it may kindly be submitted by official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions (Regulation 18) specifically regarding notice, clearly therein mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges. An advisory in this regard is available at CTU website. 4. It was also emphasized that Joint Coordination Committee meetings were institutionalized by the Hon ble Central Electricity Regulatory Commission to enable better coordination of generation and transmission projects in terms of the applicable CERC Regulations, Detailed Procedure and BPTAs/LTAAs. In this regard, it is also pertinent to mention that the BPTAs/LTAAs executed with the generation project developers/companies monitored hereunder provides that if any of the developers fail to construct the generating station/dedicated transmission line or makes an exit or abandons its project, then POWERGRID shall have the right to collect the transmission charges and/or damages as the case may be in accordance with the CERC Regulations, Orders etc. Further, as per the BPTAs/LTAAs, the construction phase bank guarantee submitted by the project developers/lta customers is also encashable in case of adverse progress of individual generations project(s)/unit(s) assessed during the Joint Coordination Committee meetings. It was also informed that in light of a number of recent CERC orders, wherein the Hon ble Commission has emphasized upon stricter implementation of the various Regulations, Procedures and statutory Agreements, CTU shall assess the progress of various generation projects and take appropriate actions in terms of the applicable provisions/clauses of the Regulations/Procedure/Agreements. Page 1 of 31

5 Page 2 of CTU emphasized that generation developers should ensure completion of their dedicated transmission lines to match with the commissioning of transmission network in order to avoid bottling up of power. It was further stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the generation developers need to implement the final dedicated transmission system as the matter has been very seriously looked into by Hon ble CERC in Petition no. 112/TT/ CTU informed that recently in no of cases, generation developers have submitted online additional details in respect of Connectivity (CON-4) only when the generation projects are on the verge of commissioning. Thus, a very short period of time is available for processing and issuance of Connection Offer (CON-5) and subsequent signing of Connection Agreement. As per the CERC Connectivity Regulations/ Detailed Procedure, 2009, the CON-4 details are to be furnished to CTU at least 2 (two) years prior to physical interconnection which may be noted by all the applicants. 7. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein. 8. It was noted that some of the generation developers / applicants have been repetitively not attending the JCC Meetings. All such generation developers / applicants were requested to attend the future meetings so as to have a better co-ordination. 9. All those generation projects that have achieved COD and their respective dedicated transmission lines have also been commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being called for further JCC meetings (Details of all such generation projects as per Table T1(i), T2(ii) & T3(iii)). 10. It was clarified that in terms of the recent CERC Orders and directions, the liability to pay transmission charges shall commence irrespective of opening of LC and signing of TSA. In default thereof, necessary action in terms of CERC Regulations including curtailment of STOA may be taken. Regardless of the said CERC Orders, all DICs are duty bound to establish payment security mechanism (LC) under Regulation 12 (8) of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, Regarding execution of TSA, it was informed that under the applicable provisions of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 and CERC Orders pronounced thereupon, TSA notified under Regulation 13 is the default transmission agreement and mandatorily applies to all DICs. 12. Further, it was also brought to the attention of all the participants that CERC vide Order in Petition 229/RC/2015 wherein inter alia it has been emphasized that all Designated ISTS Customers (DICs) of ISTS are bound to establish payment security mechanism (LC) and pay transmission charges from the date of commissioning of associated transmission system or

6 Page 3 of 31 d date under BPTA, whichever is later. In case of default in payment of transmission charges and/or maintaining LC, the DICs TSA shall be liable for termination/suspension and shall thus be ineligible to inject power into the ISTS. 13. The participants of the meeting were informed that as per a recent order of Hon ble CERC in petition no. 229/RC/2015 (dated ), the commission has held that where the entire transmission system has been commissioned but the generator has not established payment security mechanism and/or the generating station has not been commissioned, CTU shall operationalize the LTA from the date of the commissioning of the entire transmission system and raise the bills as per Regulations in vogue. In case, a particular generator has carried out certain transactions under STOA / MTOA after the date of commencement of LTA i.e. date of commissioning of entire transmission system, the charges already paid towards such transactions shall be offset from the bills to be raised for LTA. If the generator does not open the LCs, it shall be denied medium term open access and short term open access till the LCs are opened. Thereafter the LTA customers were requested to update the progress of their generation projects and the discussion are summarised below: Status of the Generation Projects HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) All the generation projects in Corridor-IV are commissioned /abandoned and their corresponding dedicated/connectivity transmission lines have also been commissioned. Sl. / LTA RAIGARH (KOTRA) COMPLEX 1 RKM Powergen Ltd (4X360) Target Beneficiaries HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) WR NR SR UP 200MW (18 th JCC) U1/U2: commissioned U3: synchronized, COD Nov 17 U4: Mar 18 (19 th JCC) U1/U2: commissioned U3: synchronized, COD Nov 17 U4: Apr 18 Dedicated / Connectivity line & Status 400kV RKM- Raigarh PS (Near Kotra) D/c (Quad) line () 200 MW (NR) already operational since Further LTA for 819 MW operationalized with effect from Based on M/s RKMPL s successive requests for relinquishment of LTA, 819MW

7 Sl / LTA Athena Chhattisgarh Power Ltd. (2X600) SKS Power Gen. (Ch) Ltd. (4X300) Visa Power Ltd. (1X600+1X660) Target Beneficiaries WR NR SR NIL NIL (18 th JCC) Not attended U1: Mar 18 U2: Sep 18 (as per 16 th JCC) Not attended (U1: U2: Dec 17 U3:Dec 21 U4:Mar 22 as per letter dt ) Page 4 of 31 (19 th JCC) Not attended U1: Mar 18 U2: Sep 18 (as per 16 th JCC) Not attended (U1: U2: Dec 17 U3:Dec 21 U4:Mar 22 as per letter dt ) NIL Not attended Not attended Dedicated / Connectivity line & Status has been reduced to 550MW vide CTU letter dtd w.e.f and further to 350MW vide CTU letter dtd w.e.f kV Athena - Raigarh PS (Near Kotra) D/c (Quad) line works completed and test charged during April kV SKS - Raigarh PS (Near Kotra) D/c line (Quad) - 400kV Visa Power - Raigarh PS (Near Kotra) D/c (Triple) line - Jun 17 As per 15th JCC, 92% of the generation project is completed. However, project is facing financial constraint for which the project developer is making efforts. Consistent absence from JCC meetings. Accordingly, there is no update on the progress of the project. Action on account of adverse progress may be taken in terms of BPTA/Regulations. Consistent absence from JCC meetings. Accordingly, there is no update on the progress of the project. Action on account of adverse progress may be taken in terms of BPTA/Regulations. However, Petition 169/MP/2017 and 253/MP/2017 filed before CERC for relinquishment of 170MW & 513MW respectively. Consistent absence from JCC meetings. Accordingly, there is no update on the progress of the project available. Action towards the adverse progress may be taken in terms of

8 Sl. / LTA JANJGIR-CHAMPA COMPLEX 5 KSK Mahanadi Power Co. Ltd. (6X600) Target Beneficiaries WR NR SR Tamil Nadu: 500 MW UP: 1000 MW (18 th JCC) U-3/4: U1: Sep 18 U2: (COD) U-5/6: / (19 th JCC) U-3/4: U1: Jan 19 U2: U-5/6: / (status of U5/6 was not updated by KSKMPCL) Dedicated / Connectivity line & Status BPTA/Regulations. In the order dated in petition 61/MP/2017, CERC has rejected that the delay in commissioning of the generation project of the Petitioner due to cancellation of coal block is affected by force majeure. And has held that the Petitioner shall be liable to pay the transmission charges from the dates of commissioning of the transmission assets within the scope of POWERGRID. Further, Hon ble CERC has disallowed VISA to relinquish without liability. 400kV KSK Champa Pooling Station 2xD/c (Quad) 1 st D/c line commissioned in Oct 16; 2 nd D/c by Dec 18 Representative informed that 54 out of 83 foundations are completed. LTA for 1900MW had been operationalized. In the 18th JCC Meeting, representative had stated that they will open the requisite LC by However, the LC has not yet been opened. As per CERC order in 229/RC/2015, KSK is required to open LC within 30 days of CERC order, otherwise necessary actions as per applicable CERC regulations including curtailment of MTOA/STOA may be taken. 6 Lanco Amarkantak Power Pvt. Ltd NIL Not attended (U-3: Sept 18 U-4: Dec 18) Not attended. (Status submitted LANCO Champa PS 400kV D/c (Quad) As per status submitted on , the promotor and EPC Contractor of the project, Page 5 of 31

9 Sl. 7 Sl. 1 / LTA (2X660) Vandana Vidyut Ltd. (2X135+1X270) / LTA Mahan (Essar power Ltd.(2X600) Target Beneficiaries WR NR SR CSPTCL : 25 MW (18 th JCC) U1&2:Under forced shutdown since Jan 15 U3: Held up as per status sent vide letter dt ) Page 6 of 31 (19 th JCC) through dtd : U3 & U4: 84% overall progress) U1&2:Under forced shutdown since Jan 15 U3: unit dropped considering the nonavailability of power demand/ppa for already commissioned capacity (as per status sent vide letter dt ) Other Generation Projects in Western Region Target Beneficiaries WR NR ER SR ESIL : 450 MW PPA with ESIL has (18 th JCC) U-1: U-2: synchronized (19 th JCC) U-1: U-2: synchronized Dedicated / Connectivity line & Status line - (Status LITL was admitted to NCLT in submitted through August 2017 for Corporate dtd Insolvency Resolution Process : (CIRP) initiated by LITL Total Tower : 144 lenders, at present the work is Foundation suspended. Project Lenders Completed: 119 are taking steps required for Erection Completed : restart and completion at the 108 earliest. Stringing 11.5 Action on account of adverse Kms) progress may be taken in terms of BPTA/Regulations. Vandana Vidhyut Dharamjaygarh PS 400kV D/c line : construction work of line is presently on hold due to financial hurdles Dedicated / Connectivity line & Status Mahan TPS WR PS 400kV D/c line Work has been Project is presently disconnected from the Grid as the interim LILO connectivity of Korba-Birsinghpur line has been discontinued since Apr 17. M/s VVL has been deregistered as a user of WRLDC w.e.f Appropriate action may be taken in terms of BPTA/Regulations. The representative of Essar informed that as per the status submitted by EPTCL :

10 Sl. 2 3 / LTA Karnataka Power Corporation Ltd (2X800) Essar Power Gujarat Ltd. (4X X150) Target Beneficiaries WR NR ER SR been terminated NIL NIL (18 th JCC) Page 7 of 31 (19 th JCC) ( ) ( ) Extension granted by CERC for COD by Not attended As per 15 th JCC : U-1 : 48 months U-2 : 54 months (from the date of issue of LOA for BTG package) U1: 36 months after receipt of approvals and confirmation of viability of Project which is expected by Project is uncertain. Project is on hold due to pending approvals and no power offtake beneficiaries Dedicated / Connectivity line & Status started by Essar Power Transmission Co Ltd. Expected completion by Jun 18. KPCL - Champa PS 400kV D/c (Quad) line: to match with Generation project Salaya TPS - Bachau 400kV D/c line by EPTL - advanced stage of completion 942 out of 942 foundations and 942 out of 942 towers have been erected and stringing has been done for 298km out of 337km (i.e. 39km remaining) APTEL in its order in DFR 1052 of 2018 dated has granted extension to complete the dedicated line till with no further extensions to be entertained. EPMPL is yet to open the requisite LC and sign supplementary agreement. MOEF clearance still awaited. Coal Block is yet to be allocated. No progress since last JCC. Essar Power Gujarat is before APTEL in an appeal 237 of 2017 against CERC order in Petition 440/MP/2014 regarding encashment of the bank guarantee

11 Sl. 4 / LTA NPCIL (Kakrapar) (2X700) Target Beneficiaries WR NR ER SR (18 th JCC) Sept 20. U2: Nothing Specified U3 & U4: Project on Hold U5, U6, U7, U8: Project on hold (19 th JCC) ** Not attended Not attended Dedicated / Connectivity line & Status in place. on account of the adverse progress of the generating station in terms of the Transmission Service Agreement. Relinquishment for 250MW requested by EPGL vide letter dtd Request to be dealt with based on outcomes in above petition. Further, petition 122/MP/2017 filed for KAPP S/W is ready. Both ckt of KAPP- Navsari & Kapp- Vapi connected at KAPP S/W as contingency arrangement. relinquishment of 250MW without liability in CERC. TSA has not been signed by Essar Power Gujarat Ltd. yet. Developer neither attended the meeting nor forwarded progress report. Developer is required to submit the progress report as per the format attached with the meeting notice (also available on website). 5 NTPC (Lara-I) (2X800) NIL U1 : synchronized ( ), Not attended. Status submitted on Lara - Raigarh PS (Kotra) 400 kv D/c line - Page 8 of 31

12 Sl. 6 7 / LTA NTPC (Khargone) (2X660) NTPC (Gadarwara) (2X800) Target Beneficiaries WR NR ER SR (18 th JCC) Commissioning Jan 18 U2 : Dec 18 (19 th JCC) as below: U1 : synchronized ( ), Commissioning Mar 18 U2 : Jun 19 Not attended Not attended Dedicated / Connectivity line & Status Khargone STPP switchyard - Khandwa pool 400kV D/c (Quad) line - Jul'19 LILO of one circuit of Rajgarh Khandwa 400kV D/c line at Khargone (interim) - Feb'18 Gadarwara STPS - Jabalpur Pool 765kV D/c line Generation Projects granted Connectivity and LTA (LTA Agreement signed) Sl. 1. / LTA Inox Wind Infrastructure Services Ltd., Dayapar (500 MW) Target Beneficiaries NR ER WR SR PPA has been signed for 250MW through PTC (UP :100MW, Bihar : (18 th JCC) 100 MW: Aug MW: Sept MW: Oct MW: (19 th JCC) Not attended Dedicated / Connectivity line & Status IWISL (Dayapar) - Bhuj PS 220kV D/c line (high capacity conductor enabling at least 500MW power transfer at nominal voltage) along with associated line bays at both ends June 18. Section 68 obtained. As per 18 th JCC: Land for 16 acres obtained and applied for 157 hectares. Bay implementation agreement has been signed Advance towards Page 9 of 31

13 Sl. 2. / LTA Srijan Energy System Pvt. Ltd. (300MW) Target Beneficiaries NR ER WR SR 50MW, Jharkhand : 50MW & BSES Rajdhani : 50MW) Nil (18 th JCC) Jan MW: Feb MW: Mar MW: MW : MW : MW : (19 th JCC) 20 MW: MW : MW : MW : Dedicated / Connectivity line & Status SESPL switchyard Bhuj PS 220kV D/c line along with line bays at both ends. Route finalized. Forest application approved from State Govt., under process at MoEF. bay implementation has been made. 250 MW bid secured in SECI-I & 250 MW in SECI-II. Revenue land for 259 locations (for about 518 MW) under possession. Defence NOC obtained for 181 locations (362MW). State Nodal Agency s developer permission obtained for 118 locations (236MW). Stage-1 forest clearance received for 297 hectares. Bay implementation agreement has been signed and consultancy fee paid. POWERGRID has provided draft bid documents, discussions clarifications ongoing. & Page 10 of 31

14 Sl. 3. / LTA Gujarat Power Corporation Limited, Radhanesda (700MW) Target Beneficiaries NR ER WR SR (18 th JCC) NIL Dec 19 (19 th JCC) Not attended As per status submitted through letter dtd : Dec 19 Dedicated / Connectivity line & Status Banaskantha (Radhanesda) Solar Park Banaskantha (Radhanesda) [GIS] pooling station 220kV 2xD/c line alongwith associated line bays at Solar Park As per status submitted through letter dtd : Total land (1407Hactor) acquired. Pollution clearance & financial closure pending Route survey for the line begin soon M/s GPCL shall be liable for payment of transmission charges from the date of commissioning of transmission system as per CERC Regulations. 4. Renew Power Ventures Pvt. Ltd., Bhuvad (400MW) MW: May MW: Jun 20 Page 11 of MW: May MW: Jun 20 RPVPL switchyard - Bhachau 220kV D/c line along with associated line bays at both ends (to be constructed by RPVPL) * Route survey completed. Line (43kms) is not passing through any forest land. Approval under section 68 of CEA has been obtained. Approval u/s 164 is yet to be obtained. 260 acres out of 370 acres land has been acquired. DILR for 150 locations obtained. Demand note from collector for 12 locations has been received. Joint MoU has been signed along with Ostro for sharing of common infrastructure for entry into the GIS substation. Bay implementation agreement has been signed and

15 Sl. 5. / LTA Ostro Kutch Wind Pvt. Ltd., Bachau (300MW) Target Beneficiaries NR ER WR SR (18 th JCC) Ph I (150MW) : Jun 18 Ph II (100MW): Sept 18 (19 th JCC) Ph I (150MW) : Jun 18 Ph II (100MW): Sept 18 Dedicated / Connectivity line & Status OKWPL switchyard - Bhachau 220kV D/c line along with associated line bays at both ends (to be constructed by OKWPL)* Approval under section 68 and 164 is available. The line survey is completed. 256 towers are to be erected, 232 tower foundations completed, 232 tower erection completed km out of 69 km stringing done. Pooling substation construction has been completed & testing in progress. GIS civil activity completed. consultancy fee paid. Work awarded to Siemens. 250 MW bid secured in SECI-II. PSA between SECI & buying DISCOMs signed on PPA b/w seller & SECI signed on LTA Agreement signed on out of 125 Machine foundations completed and 8 erected. DILR obtained for 260 locations. Demand note for 56 locations (~112MW) received from district collector. Bay implementation agreement has been signed and consultancy fee paid. PPA signed for 250 MW through PTC through SECI-I bids. Page 12 of 31

16 Sl / LTA Rewa Ultra Mega Solar Ltd. SEI Sunshine Power Private Ltd. (180MW) 750 Target Beneficiaries NR ER WR SR MPPMCL (651 MW) DMRC (99 MW) subject to submission of Delhi STU NOC Tata Power Delhi Distribution Ltd. 180 MW (18 th JCC) Not attended As per 17 th JCC: Feb 18 (part commissio ning) Sep 18 (19 th JCC) 5MW by end of April 18 and entire 750MW progressiv ely by Jan 19 Not attended Dedicated / Connectivity line & Status Transmission system for Connectivity RUMS Ltd. switchyard Rewa PS 220kV 3xD/c line along with associated bays at Solar Park (to be implemented by generation developer) Establishment of 400/220kV, 1x500 MVA Pooling station at Rewa LILO of 1st circuit of Vindhyachal STPS-Jabalpur 400kV 2nd D/c line (ckt- 3&4) at Rewa PS 6 Nos. 220kV Line bays at Rewa PS (for RUMS-Rewa PS 220kV 3xD/c) Connected at STU grid - 220kV Shivpuri(MPPTCL) Section 68 yet to be applied. STU connectivity obtained. Sep 18. The representative was requested to sign the LTA Agreement as per revised intimation dated at the earliest. Representative was informed about liability of payment of transmission charges upon commissioning of associated tr system. As per 18 th JCC, Section 68 approval not yet obtained. 700 acres of land secured and under possession. EPC contact awarded. Work on connectivity line (8-10 Km) is yet to be started. Page 13 of 31

17 Generation Projects granted only Connectivity Sl. Connectivity 1 Adani Green Energy Ltd., Sami (300MW) 2 BLP Vayu (Project 2) Pvt. Ltd., Bololi (100MW) 3 Wind World (India) Ltd. Mumbai (WWIL) (500MW) Connectivity Schedule (TA/Intimation) (18 th JCC) Page 14 of 31 (19 th JCC) Dedicated / Connectivity line & Status 300 Dec 2017 Dec 19 Dec 19 AGEL - Sami (Adani) 220 kv D/c line along with associated line bays at both ends (under developer scope) yet to be started 1x500 MVA, 400/220 kv ICT at Sami (Adani) substation Aug 2018 Dec 18 Dec Sep 2018 U-1: Mar 19 U-2: Jul 19 U-3: Nov 19 U-4: Mar 20 U-5: Jul 20 Project is uncertain as of now U-1: Mar 20 U-2: Jul 20 U-3: Nov 20 U-4: Mar 21 U-5: Jul 21 BLPVPL (Bololi)-Kolhapur (GIS) 220kV S/c line along with associated line bays at both ends along-with Installation of 1*500MVA, 400/220kV ICT at Kolhapur GIS yet to be started WWIL (Walka Mota)-Bhuj PS 220kV D/c (Twin ACSR moose equivalent conductor) line along with associated line bays at both ends Sec-68 received from CEA. No physical progress on transmission line acres pvt. land out of 1500 acres required land in possession. Implementation of the generation project is dependent on the future of SECI bids/state bids. No action towards implementation of generation project as well as dedicated connectivity system. No land acquired. No work started. Applied lease for revenue land. Approval from collector is awaited. Land for 55 locations out of 250 has been acquired. DILR NOC received for all 250 locations. Stage 1 ín-principle forest clearance for 25 locations obtained. Implementation of the generation project is dependent on the future of SECI bids/state bids.

18 Sl. Connectivity Connectivity Schedule (TA/Intimation) (18 th JCC) (19 th JCC) Dedicated / Connectivity line & Status 4 Orange Rajkot Wind Power Pvt. Ltd. (ORWPL) (Hajapar) 100 Ph-1 : 31 Oct 2018 Ph-2 : 31 Mar 2019 Ph-1 : Jun 19 Ph-2 : Sept 19 Sep 19 to Dec 19 ORWPL (Hajapar) - Bhuj PS 220kV S/c line along with associated line bays at both ends.- line survey completed Yet to apply for Section 68. Collector Allotment for 39 locations has been received. Further, for 42 locations DILR NOC received. Implementation of the generation project is dependent on the future of SECI bids/state bids. 5 Suzlon Power Infra Ltd. (SPIL) (Baranda) 250 Ph-1 : 31 Mar 2019 Ph-2 : Not provided Ph-3 : 31 Mar 2020 Ph-1 (125MW) : Mar 19 Ph-2 (62.5 MW): Jun 19 Ph-3 (62.5 MW) : Sep 19 Ph-1 (125MW) : Mar 19 Ph-2 (62.5 MW): Jun 19 Ph-3 (62.5 MW) : Sep 19 (vide ) SPIL (Baranda) Bhuj PS 220 kv S/c (single ACSR moose equivalent conductor) line along with associated line bays at both ends Feasibility check work in progress. Acquired 90 hectares out of 120 hectares. Substation land under acquisition.. 6 Suzlon Power Infra Ltd. (SPIL) (Fulra) (1X50 + 2X100) 250 Ph-1 : 31 Mar 2019 Ph-2 : Not provided Ph-3 : Not provided Ph-1 (126 MW) : Oct 18 Ph-2 (63 MW) : Dec 18 Ph-3 (63 MW) : Feb 19 Ph-1 (126 MW) : Oct 18 Ph-2 (63 MW) : Dec 18 Ph-3 (63 MW) : Feb 19 (vide ) SPIL (Fulra) Bhuj PS 220 kv S/c (single ACSR moose equivalent conductor) line along with associated line bays at both ends Feasibility check work in progress Acquired 50 hectares out of 120 hectares. Substation land under acquisition. 7 M/s Inox Wind Infrastructure Services Ltd (Kotda) 500 Ph-1 : 31 Mar 2019 Ph-2 : 30 Jun 2019 Ph-3 : 30 Sep 2019 Ph-4 : 31 Oct MW: Mar MW: Jun MW: Sep MW: Oct 19 Page 15 of 31 Not attended IWISL (Kotda) - Bhuj PS 220kV D/c line (high capacity conductor enabling at least 500MW power transfer at nominal voltage) along with associated line bays at both ends No land is under possession. Representative informed that Implementation of the generation project is dependent on the future of SECI bids/state bids.

19 Sl. Connectivity Connectivity Schedule (TA/Intimation) (18 th JCC) (19 th JCC) Dedicated / Connectivity line & Status No action towards implementation of generation project as well as dedicated connectivity system has been undertaken. 8 M/s Adani Green Energy Limited (AGEL) 9 M/s Adani Green Energy Limited (AGEL) 10 M/s Adani Green Energy Limited (AGEL) 11 Ostro Kutch Wind Pvt. Ltd. (OKWL), Bhuj Dec 19 Dec 19 AGEL Khavda (500MW Wind Farm) Bhuj PS 400 kv S/c line along with associated line bays at both ends Dec 19 Dec 19 AGEL Khavda (750MW Solar Farm) Bhuj PS 400 kv S/c line along with associated line bays at both ends Dec 19 Dec 19 AGEL Khavda (1000MW Wind Farm) Bhuj PS 400 kv D/c line along with associated line bays at both ends 300 Ph-1 : 31 Mar 2019 Ph-2 : 30 Sep 2019 Ph-3 : 31 Mar 2020 Mar 19 Mar 19 OKWL Bhuj Switchyard Bhuj PS 220 kv S/c (twin ACSR zebra equivalent conductor) line along with Page 16 of 31 No land is under possession. Defense NOC not received yet. It was insisted that subject to the facilitations that may be incorporated in the new Wind Connectivity procedure, AGEL should sign the LTAA w/o any further delay. Accordingly, CTU shall take action as per extant procedure or CERC order received in the mean-time. Petition no. 18/MP/2018 filed before CERC to allow time extension for signing of LTA & TSA. 146 hec of land (292MW) acquired. Representative informed that

20 Sl. Connectivity Connectivity Schedule (TA/Intimation) (18 th JCC) (19 th JCC) Dedicated / Connectivity line & Status associated line bays at both ends. No physical progress on transmission line. Implementation of the generation project is dependent on the future of SECI bids/state bids. Page 17 of 31

21 List of generation projects commissioned along with the dedicated/connectivity lines and further coordination not required HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) Table T1 (i) Sl. / LTA CHATTISGARH IPP Maruti Clean Coal (1X300) Dheeru Power Gen Chhattisgarh State Power Trading Co. Ltd MADHYA PRADESH IPP 4. Jaiprakash Power Ventures Ltd. (2X660) Target Beneficiaries WR NR Rajasthan: 250 MW NIL MW (from MCCPL) MP MW (Operational) Last updated status U-1:, COD in Jul 15 9 th JCC : Uncertain Approached CERC for relinquishment 9 th JCC U-1/2 : Dedicated / Connectivity line & Status LILO of one ckt of ACB TPS - WR PS(Bilaspur) 400kV D/c line is Dheeru gen - WR PS (Bilaspur) 400kV D/c line Jaiprakash - Satna 400kV D/c (High Capacity) line commissioned Matter on issue of payment of Transmission charges for alleged force majeure is pending before APTEL Matter is sub judice in Dwarka Court. In one of the pleadings, project developer has informed the Court that project is abandoned. CERC vide its ROP dated in the CSPTrCL Petition 84/MP/2016 has directed CTU to utilize the relinquished capacity for grant of pending LTA applications and CTU as per the direction has allocated the relinquished capacity for grant of LTA to the pending applications MW under operation to MP on firm basis and balance quantum of MW has been relinquished as per JPVL s prayer in Petition no. 293/MP/2015. Relinquishment charges to be determined in accordance with outcome in Petition no. 92/MP/2015. JPVL has filed appeal in APTEL. Page 18 of 31

22 Sl / LTA Aryan MP Power generation Pvt. Ltd (2X600) Bina Power Supply Company Ltd (2X250) Target Beneficiaries WR NR NIL NIL Last updated status 9 th JCC: Abandoned 10 th JCC: Dedicated / Connectivity line & Status Aryan MP - Vindhyachal Pooling station 400kV D/c (High Capacity) Bina TPS - Bina (PG) / Bina (MPPTCL) 400kV D/c line - Petition no. 69/MP/2014 filed for relinquishment of 1122 MW. CERC has ordered that relinquishment is subject to payment of relinquishment charges. The bank guarantee of Rs.56.1 Crores has been encashed. Aryan has approached the Central commission by filing petition 242/MP/2017. Entire LTA relinquished by BPSCL in Petition no. 98/MP/2015 filed before CERC. Relinquishment charges to be payable in terms of outcome in Petition no. 92/MP/2015. Appeal filed before APTEL. HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) Table T1 (ii) Sl. / LTA Quantu m Target Beneficiaries WR NR SR Last updated status Dedicated / Connectivity line & Status RAIGARH (KOTRA) COMPLEX 1. Korba West Power Co. Ltd. (1X600) CSPTCL: 5% U-1: Mar'14 (COD) 400kV Korba (W)- Raigarh PS (near Kotra) D/c line KWPCL has filed petition 269/MP/2017 to defer the operationalization of LTA. Generation has met a major accident and is not generating. 2. DB Power Ltd. (2X600) Tamil Nadu: 208 MW Rajasthan- 250 U-1: Feb 14 U-2: Mar 15 (COD) DB Power Raigarh PS (near Kotra) 400kV D/c (Quad) line - commissioned Page 19 of 31

23 Sl. / LTA Quantu m RAIGARH (TAMNAR) COMPLEX Jindal Power Ltd. (4X600) Jindal Power Ltd. (400 MW) TRN Energy Pvt. Ltd (2X300) RAIGARH COMPLEX GMR Chhattisgarh Energy Pvt. Ltd. (2X685) Chhattisgarh State Power Trading Co. Ltd Target Beneficiaries WR NR SR Tamil Nadu : 400 MW Kerala: 190 & MW Last updated status 10th JCC: U-1/2: Mar 14 (COD) U-3: Jan 15 (COD) U-4: NIL UP : 390 MW NIL MW U-1: (COD) U-2: commissioned U-1: Jun 15 (COD); U-2: Mar 16 Dedicated / Connectivity line & Status JPL Raigarh PS (near Tamnar) 2xD/c 400kV (Quad) all 4 ckts commissioned. 400kV TRN - Raigarh PS (near Tamnar) D/c line GMR - Raipur PS 400kV D/c (Quad) line - commissioned (Jan 14) LTA of 400 MW to Tamil Nadu and 190MW to Kerala are under operation. Relinquishment of 110MW from WR & 190MW from NR wef communicated vide letter dated LTA for 393 MW had been operationalized in terms of CERC Orders in Petition 84/MP/2016. Petition filed before CERC in Petition No: 11/MP/2017 regarding relinquishment of 386MW in WR and balance 430 MW to be kept in abeyance. Delhi High court vide order dated has stayed any coercive action against applicant. As per CERC orders dated in Petition84/MP/2016, relinquishment of 4699 MW (Corridor IV & V) LTA to CSPTrCL has been approved. JANJGIR-CHAMPA COMPLEX 8. Bharat Aluminium Co. Ltd. (BALCO- 4X300) Tamil Nadu : 200 MW Kerala : 95 MW U-1/2:, U-3/4: commissioned Balco Dharamjaygarh / Korba PS 400kV D/c line Page 20 of 31

24 Other Generation Projects in Chhattisgarh & Madhya Pradesh Table T1 (iii) Sl / LTA PTC(Lanco-II) (1X300) MB Power Madhya Pradesh Ltd (2X600) Target Beneficiaries WR NR ER SR Haryana 300 MW UP-192 MW (Operational) Latest updated status U-1: May 15 (COD) U-2: Mar 16 Dedicated / Connectivity line & Status Pathadi TPS - Bipalspur PS (near Sipat) 400kV D/c (Quad) line - commissioned MB TPS - Jabalpur PS 400kV D/c (Triple) line LTA of 300 MW to Haryana operational. LTA of 392 MW operational Dhariwal Infrastructure Ltd. NTPC (Vindhyachal - V) (1X500) Jhabua Power Ltd (Ph I 1X600) MP Power Management Company Ltd. Torrent Energy Ltd. (3X400) Tamil Nadu: 100 MW UP: 170 MW GoI Allocation Oct 15 (COD) Kerala: MW U-1: May 16 (COD) NIL U-1: May NIL Commissi oned LILO of one ckt of Bhadravati - Parli 400kV line at Dhariwal TPS - Interconnection at 400kV Bus of Vindhyachal TPS-IV switchyard Jhabua TPS - Jabalpur PS 400kV D/c (Triple) line - Jhabua TPS - Jabalpur Pool 400kV D/c (Triple) line: TEL(DGEN) TPS Navsari 400kV D/c (Triple) line commissioned LTA for 100 MW to Tamil Nadu and 34MW to NPCL (UP) are operational Balance LTA of 5.75 MW relinquished MW LTA under operation and balance LTA of 48.5 MW relinquished TSA signed on by the Developer. Lead LTTC (M/s Torrent Energy Ltd.) to take relevant action as per TSA as M/s DGENTCL has confirmed that they are not taking up the project. Page 21 of 31

25 Status of the Transmission System HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) Transmission System under the Scope of POWERGRID: All elements have been commissioned. The details of elements are as below Sl. Scope of Transmission System 1 Indore- Vadodara 765kV S/c 2 Vadodara Pirana 400kV D/c (Quad) 3 Establishment of 765/400kV, 2x1500 MVA substation at Vadodara Status of other associated transmission lines All elements have been commissioned. The details of elements are as below Sl. Scope of Transmission System KV S/C Bina - Gwalior line (3rd Ckt) 2 765KV S/C Gwalior-Jaipur line (2nd Ckt) KV S/C Jaipur - Bhiwani line Transmission System under the Scope of POWERGRID HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) Establishment of Pooling Stations at Raigarh (Near Kotra) and Raipur for IPP Generation Projects in Chhattisgarh Part-1 All elements of part-1 have been commissioned. The details of elements are as below: Page 22 of 31

26 Sl. Scope of Transmission System 1 Raigarh Pooling Station (Near Kotra) Raipur Pooling Station 765kV D/c 2x240 MVAR line reactors at each end on both circuits 2 Raigarh Pooling Station (Near Kotra) Raigarh 400kV D/c 3 Raipur Pooling Station Raipur 400kV D/c 4 Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra), 1x240 MVAR B/R at 765kV & 1x80 MVAR bus reactor at 400kV 5 Establishment of 765/400kV 1x1500MVA Raipur Pooling Station (1x240 MVAR B/R) Establishment of Pooling Stations at Champa and Raigarh (Near Tamnar) for IPP Generation Projects in Chhattisgarh Part-2 All elements of part-2 have been commissioned. The details of elements are as below: Sl. Scope of Transmission System 1 Champa Pooling Station Raipur Pooling Station 765kV D/c - 2x240 MVAR line reactors at Raipur 2 Raigarh Pooling station(near Kotra) Raigarh pooling station(near Tamnar) 765kV D/c 3 Champa Pooling Station Dharamjaygarh/Korba 765kV S/c 4 Raigarh Pooling Station (near Kotra) Champa Pooling Station 765kV S/c 5 Establishment of 765/400kV 6x1500MVA Champa Pooling Station, 1x240 MVAR B/R at 765kV and 1x80 MVAR bus reactor at 400kV 6 Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) (1x240 MVAR B/R) Integration of Pooling Stations in Chhattisgarh with Central part of WR for IPP Generation Projects in Chhattisgarh Part-3 All elements of part-3 have been commissioned. The details of elements are as below: Sl. No Scope of Transmission System 1 Raipur Pooling Station Wardha 765kV D/c - 2x240 MVAR line reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Page 23 of 31

27 Sl. No Wardha 2 Wardha bus reactor 1x330 MVAR Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhattisgarh Part-4 All elements of part-4 have been commissioned. The details of elements are as below: Transmission System 1 Wardha Aurangabad (PG) 765kV D/c - 2x330 MVAR line reactors at Wardha and 2x240 at Aurangabad 2 Aurangabad(PG) Boisar 400kV D/c (Quad)- 2x63 MVAR line reactors at each end on both circuits 3 Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s (1x240 MVAR B/R) 4 Augmentation of transformation capacity at Boisar by 1x500MVA System strengthening in North/West part of WR for IPP Projects in Chhattisgarh Part-5 All elements of part-5 have been commissioned. The details of elements are as below: Sl. Transmission System 1 Padghe Padghe(PG) 400kV D/c (Quad) 2 Vadodara Asoj 400kV D/c(Quad) 3 Aurangabad (PG) Padghe(PG) 765kV 1 D/c - 2x240 MVAR line reactors at each end on both circuits 4 Establishment of 765/400kV 2x1500MVA Padghe(PG) S/s [GIS] (1x240 MVAR B/R) System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh Part-6 All elements of part-6 have been commissioned. The details of elements are as below: Sl. No Scope of Transmission System 1 Raipur Pooling Station Wardha 765kV 2nd D/c- - 2x240 MVAR line Page 24 of 31

28 Sl. No Scope of Transmission System 2 Reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha System strengthening in Wardha-Aurangabad corridor for IPP Projects in projects in Chhattisgarh Part-7 All elements of part-7 have been commissioned. The details of elements are as below: Sl. No Sl. No Scope of Transmission System 1 Wardha Aurangabad (PG) 765kV 2nd D/c 2x330 MVAR line reactor at Wardha and 2x240 line reactor at Aurangabad WR-NR HVDC interconnector for IPP Projects in Chhattisgarh Part-9 All elements of part-9 have been commissioned. The details of elements are as below: Transmission System 1 Establishment of 3000MW +800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra (NR) 2 Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s 3 LILO of Abdullapur Sonepat 400kV D/c(triple) at Kurukshetra 4 Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra Transmission elements being implemented by transmission licensee through tariff based competitive bidding process. Part-10 [TBCB award placed to succesful bidder Sterlite in Mar 12 with commissioning of 39 months(june 15)] All elements of part-10 have been commissioned. The details of elements are as below: Sl. No Scope of Transmission System 1 Aurangabad(PG) Dhule (IPTC) 765kV S/c line 2 Dhule (IPTC) Vadodara (PG) 765kV S/c line Page 25 of 31

29 3 Dhule (IPTC) Dhule (MSETCL) 400kV D/c Quad line 4 Establishment of 765/400kV, 2x1500MVA Dhule(IPTC) S/s Status of other Transmission Lines Sl. Transmission System Status Status No (as per 18 th WR JCC) (as per 19 th WR JCC) 1 Kurukshetra - Jind line (Q) 400KV D/C 2 Jabalpur Pooling Station - Bina 765 KV D/C line 3 Jabalpur PS-Bhopal 765kV S/c TBCB 4 Bhopal- Indore 765kV S/c TBCB 5 TEL(DGEN) TPS- Vadodara 400kV D/c - - ISTS licensee not taking 6 Navsari- Besthan 220kV - - up the implementation of line. 7 Jabalpur Poolin Stn. - Orai 765KV D/C line Apr 18 in Mar 18 8 Orai- Aligarh 765kV D/C Apr 18 1 st Ckt commissioned in Mar 18 and 2 nd Ckt commissioned in Apr Narendra (New Kudgi) - Kolhapur 765KV D/C line (initialy charged at 400KV) * 10 Kakrapar APP - Vapi line 400KV D/C 11 Vindhayachal PS- Jabalpur PS 765kV D/c Jun 18 Jun 18 TBCB 12 Lara STPS - Raigarh (Kotra) 400KV D/C line For supply of start-up power. 13 Kakrapar APP Navsari 400 kv D/c Line /400 KV Champa Pooling Station ( 6x1500MVA ) /400KV Jabalpur Pooling station (2x1500MVA) /400kV ICT at Vindhayachal PS(1x1500 MVA) 17 Lara- I TPS Champa Pooling Station 400kV D/c (Quad). 18 Up-gradation of +800kV, 3000MW HVDC bipole between Champa Pooling station Kurukshetra (NR) to 6000MW Dec 18 Dec 18 Page 26 of 31

30 Status of other Transmission System associated with LTA customers Sl. No LTA Transmission System Status (as per 18 th JCC) 1. Rewa Ultra Mega Solar Ltd. Transmission system required for LTA for transfer of 750 MW of power from REWA UMS, Madhya Pradesh to WR & NR which is under implementations as part of different schemes (i) Inter-Regional System Strengthening Scheme in WR and NR (Part-B) Jabalpur PS - Orai 765kV D/C line Orai - Aligarh 765kV D/C line Orai - Orai 400kV D/C (Quad) line LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai LILO of Agra - Meerut 765kV S/C at Aligarh LILO of Kanpur - Jhatikara 765kV S/C at Aligarh Apr 18 Status (as per 19 th JCC) in Mar 18/Apr 18 (ii) Transmission System Strengthening in WR-NR Transmission Corridor for IPPs in Chhattisgarh Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS Kurukshetra (NR) to 6000MW Kurukshetra (NR) Jind 400kV D/c (Quad)- commissioned (iii) Additional Transmission system required for LTA Addition of 400/220kV, 2x500 MVA ICT at Rewa PS LILO of 2nd circuit of Vindhyachal STPS-Jabalpur 400kV 2nd D/c line (ckt-3&4) at Rewa PS 1x125 MVAr, 420 kv Bus Reactor at Rewa PS Page 27 of 31 Dec 18 Feb 18 (Matching with solar park generation) Dec 18 Line & S/s along with 2X500MVA, 400/220kV ICT charged in Mar 18. Balance 1 500MVA, 400/220kV ICT is anticipated to be ready by Sep 18

31 Sl. No LTA Transmission System Status (as per 18 th JCC) 2. SEI Sunshine Power Private Ltd. Inter-Regional System Strengthening Scheme in WR and NR (Part-B) Jabalpur PS - Orai 765kV D/C line Orai - Aligarh 765kV D/C line Orai - Orai 400kV D/C (Quad) line LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai LILO of Agra - Meerut 765kV S/C at Aligarh LILO of Kanpur - Jhatikara 765kV S/C at Aligarh Apr 18 Status (as per 19 th JCC) in Mar 18/Apr Inox Wind Infrastructure Services Ltd. Transmission System Strengthening in WR-NR Transmission Corridor for IPPs in Chhattisgarh Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS Kurukshetra (NR) to 6000MW Kurukshetra (NR) Jind 400kV D/c (Quad) - commissioned Common Transmission System requirement for transfer of power from Western Region to Northern Region & Eastern Region for IWISL- Dayapar (500MW) wind farm and AGEL - Khavda generation projects (500MW & 1000MW wind farms and 750MW solar park) A. Under implementation as part of Green Energy Corridor ISTS: i) Bhuj PS - Banaskantha PS 765kV D/c line#-sep 18 ii) Banaskantha Sankhari 400kV D/c line# -Sep 18 iii) Banaskantha PS - Chittorgarh PS 765kV D/c line#- Sep 18 iv) Chittorgarh PS - Chittorgarh (RVPN) 400kV D/c (quad) line# - commissioned #under implementation as part of Green Energy Corridors B. Additional Transmission System for LTA to ER & NR for IWISL- Dayapar (500MW) wind farm: i) Installation of 2x500MVA, 400/220kV ICT at Bhuj P.S.* *The ICTs are also required under Common Transmission System for LTA of M/s SESPL to WR, NR & SR Dec 18 Jul 18 Jul 18 Dec 18 Sep 18 Sep 18 Page 28 of 31

32 Sl. No LTA Transmission System Status (as per 18 th JCC) 4. Srijan Energy System Pvt. Ltd. (300MW) Common Transmission System for LTA to WR, NR & SR (i)installation of 2x500MVA, 400/220kV ICT at Bhuj PS Transmission System for LTA to WR (90 MW) (i)bhuj PS - Banaskantha PS 765kV D/c line - Sep 18 (ii)banaskantha Sankhari 400kV D/c line - Sep 18 Transmission System for LTA to NR (150 MW) (i)bhuj PS - Banaskantha PS 765kV D/c line - Sep 18 (ii)banaskantha PS - Chittorgarh PS 765kV D/c line - Sep 18 (iii)chittorgarh PS - Chittorgarh (RVPN) 400kV D/c (quad) line - commisisoned Transmission System for LTA to SR (60 MW) (i)wardha Nizamabad 765kV D/c line along with Nizamabad Dichpally 400kV D/c line (HTLS) (ii)nizamabad Hyderabad (Maheshwaram) 765kV D/c line along with associated 400kV transmission system. Jul 18 Mar 17 Jul 17 Status (as per 19 th JCC) Sep 18 Page 29 of 31

33 Annexure-I List of Participants in the 19 th Joint Co-ordination Committee meeting of Generation projects granted LTA in WR held on Sl. Name Designation Organization 1. Shiva Suman Dy. Director Central Electricity Authority 2. Manoj Panda AGM Wind World India Ltd. 3. M Krishna Kumar Sr. Advisor Wind World India Ltd. krishna.kumar.m@vaayuenergy.com; mmkkpgrid@gmail.com 4. Dipak Panchal Manager Adani Green Energy Ltd. dipak.panchal@adani.com 5. Somil Garg Manager Ostro Kutch Wind Pvt. Ltd somil.garg@ostro.in 6. Ankushrao Dhane AGM Projects Orange Rajkot Wind Power Pvt. Ltd ankushraodhane@orangerenewable.net 7. Rajat Bhutani Manager Orange Rajkot Wind Power Pvt. Ltd rajatbhutani@orangerenewable.net 8. T. Rajesh Kumar Manager RKM Power Pvt. Ltd. t.rajeshkumar@rkmpower.in 9. Ajay Kumar Sr. Manager (Commercial) Essar Power M.P. Ltd. & Essar Power ajay.kumar22@essar.com Gujarat Ltd. 10. Vivek Gupta Manager Renew Power Ventures Pvt. Ltd. vivek.gupta@renewpower.in 11. S Vinod AVP Projects Renew Power Ventures Pvt. Ltd. vinod@renewpower.in Ujjwal Surana Sr. Manager-Regulatory & Project Developement Srijan Energy Systems Pvt. Ltd. ujjwal.surana@continuumenergy.in Ankit Kumar Manager KSK Mahanadi Power Co. Ltd. ankitkumar@ksk.co.in 14. S.N. Sharma Engineer Karnataka Power Corporation Ltd. kpclre@gmail.com 15. Ashish Ranjan Sr. Manager BLP Energy Pvt. Ltd. ashish.ranjan@enel.com 16. Balakishore Kollabathula AVP BLP Energy Pvt. Ltd. Balakishore.kollabathula@enel.com Page 30 of 31

34 Sl. Name Designation Organization 17. Avaneesh Shukla Executive Engineer Rewa Ultra Mega Solar Ltd Mukesh Khanna GM (CTU-Plg) Power Grid Corporation of India Ltd. 19. P.S. Das Asst. GM (CTU-Plg) Power Grid Corporation of India Ltd. 20. Jyoti Prasad DGM (CTU-Plg.) Power Grid Corporation of India Ltd. 21. Prahlad Saraswat DGM (Commercial) Power Grid Corporation of India Ltd. 22. K K Jain CM (Commercial) Power Grid Corporation of India Ltd. kkjain@powergridindia.com 23. Anita A. Srivastava Manager (Commercial) Power Grid Corporation of India Ltd. anitas@powergridindia.com 24. Swapnil Verma Officer (Law) Power Grid Corporation of India Ltd. swapnilverma@powergridindia.com 25. Trupti Panigrahi Manager (BDD) Power Grid Corporation of India Ltd. trupti@powergridindia.com 26. Deepak Kumar Engineer (BDD) Power Grid Corporation of India Ltd. kumar.deepak@powergridindia.com 27. K.K. Thakur AGM POWERGRID WR-II kk.thakur@powergridindia.com 28. Pratyush Singh Sr. Engineer (CTU-Plg) Power Grid Corporation of India Ltd pratyush.singh@powergridindia.com 29. Shashank Shekhar Engineer (CTU-Plg) Power Grid Corporation of India Ltd shashankshekhar@powergridindia.com Page 31 of 31

Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on at POWERGRID, Gurgaon

Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on at POWERGRID, Gurgaon Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on 25.05.2015 at POWERGRID, Gurgaon 1. The 9 th Joint Co-ordination Committee meeting of IPPs in WR was held at POWERGRID

More information

Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh

Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh Distribution List - WR: 1. Sh. J Mohan GM (Planning) R.K.M. Powergen Pvt. Ltd. 14, Dr. Giriappa Road, T. Nagar, Chennai - 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 Sh. T Rajesh Kumar Manager

More information

Distribution List - WR:

Distribution List - WR: Distribution List - WR: 1. Sh. J Mohan GM (Planning) R.K.M. Powergen Pvt. Ltd. 14, Dr. Giriappa Road, T. Nagar, Chennai - 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 3. Sh. R. Srinivasan Vice

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region ----------------------------------------------------------------------------------------------------------------.

More information

Report on the 6 th Joint Co-ordination Meeting of IPPs granted LTA in WR

Report on the 6 th Joint Co-ordination Meeting of IPPs granted LTA in WR Report of the 6 th Joint Co-ordination Committee Meeting of IPPs Granted LTA in WR held on 27.09.2013 High Capacity Power Transmission Corridors IV (MP+Chhattisgarh), High Capacity Power Transmission Corridors

More information

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on 26.0.20 at CC, POWERGRID. The 6 th meeting of the Joint Co-ordination Committee of IPPs in ER was held at POWERGRID Office,

More information

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon पत क स च : Sl. Organization Address Tele/Fax No./email No. 1 PGCIL Sh. I S Jha, Chairman & Managing Director, Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana-122001.

More information

HVDC Systems in India

HVDC Systems in India HVDC Systems in India Outline Introduction HVDC Systems presently in operation Main Data/Salient Features Upcoming Projects Future Challenges Transmission Network - Present 765kV/400kV lines: about 1,03,000

More information

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai 545-558 Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on 5-09-2014 at Mumbai 1.0 The 37 th meeting of the Standing Committee on Power System Planning

More information

1. Sh. J Mohan 7. Sh. Vikas Saxena 2. Sh. R. Srinivasan, 8. Sh. H. M. Jain 3. Sh.T.Ramakrishna Rao 9. Sh. C. Narasimha 10. Sh.

1. Sh. J Mohan 7. Sh. Vikas Saxena 2. Sh. R. Srinivasan, 8. Sh. H. M. Jain 3. Sh.T.Ramakrishna Rao 9. Sh. C. Narasimha 10. Sh. 1. Sh. J Mohan GM (Planning) R.K.M POWERGEN Pvt. Ltd. No.14, Dr.Giriappa Road, T. Nagar, Chennai 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 2. Sh. R. Srinivasan, Vice President (Corp.) Athena

More information

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region 1. Confirmation of minutes of 27th meeting held on 30.5.2009 1.1 Minutes of 27 th meeting was circulated

More information

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region a) Power Supply to M/s Noida Power Company Limited (NPCIL) NPCL has applied to CTU for connectivity for

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

HIGH CAPACITY POWER TRANSMISSION CORRIDOR

HIGH CAPACITY POWER TRANSMISSION CORRIDOR HIGH CAPACITY POWER TRANSMISSION CORRIDOR - PROJECT INCEPTION REPORT Power Grid Corporation of India Ltd. Gurgaon BACKGROUND 1. Pursuant to the introduction of Long Term Open Access (LTOA) in the inter-state

More information

List of Participants:

List of Participants: Lit of Participant: 15. Shri Ahih Shukla Senior Manager Gamea Renewable Pvt. Ltd. (Mathak, Gagodar, Latur, Ghat Pimpri, Tuljapur/Deoingh & Kod Wind Power Project) Future IT Prk, B-Block, 8 th Flr, No.

More information

Case No. 163 of In the matter of

Case No. 163 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

RFP Corrigendum No. 01

RFP Corrigendum No. 01 RFP Corrigendum 01 The RFP document for selection of Transmission Service provider for the Package- 1 against tender specification ESD-765/4 has been modified to the extent below: S. Clause / Page 1. Definition

More information

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on 16-12-2015 2)In-principle Approval_Tumkur Phase-I Government of India Ministry of Power Central Electricity Authority PSP & PA- I Division

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi-11 0001 **** Dated, 8 th Jan, 2019 OFFICE MEMORANDUM Subject: Minutes of the 3 rd meeting of the Empowered

More information

Minutes of the 40 th Meeting of Standing Committee on Power System Planning in Western Region held on at NRPC, Katwaria Sarai, New Delhi

Minutes of the 40 th Meeting of Standing Committee on Power System Planning in Western Region held on at NRPC, Katwaria Sarai, New Delhi 269-282 21 2016 269-282 21.06.2016 Minutes of the 40 th Meeting of Standing Committee on Power System Planning in Western Region held on 01.06.2016 at NRPC, Katwaria Sarai, New Delhi Member (Power System),

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

Indian Power System Framework

Indian Power System Framework R P SASMAL 1 ST JUNE 2016 Indian Power System Framework Electricity - A Concurrent Subject Both Central & State Govt. are responsible for overall development of Power Sector Generators Central Level Central

More information

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur 1. Shri Ravinder Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri (E) Mumbai 400 093

More information

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX : Distribution List : 1. Shri Ravinder Member (Power Systems) Central Electricity Authority Sewa Bhawan, R K Puram New Delhi-110 066 FAX : 011-26102045 3. CEO POSOCO B-9, Qutab Institutional Area Katwaria

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

2. Member Secretary Eastern Regional Power Committee (ERPC) 14, Golf Club Road, Tollygunge Kolkata

2. Member Secretary Eastern Regional Power Committee (ERPC) 14, Golf Club Road, Tollygunge Kolkata 1. Member (Power System) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110066 3. Managing Director Jharkhand Urja Sancharan Nigam Limited (JUSNL) Engineering Building, HEC, Dhurwa, Ranchi

More information

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018 भ रत सरक र GOVERNMENT OF INDIA उज म लय MINISTRY OF POWER क य व त धकरण CENTRAL ELECTRICITY AUTHORITY द ण य व त स म त SOUTHERN REGIONAL POWER COMMITTEE य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT April 2018

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

SOLAR PLANT PERFORMANCE IN INDIA

SOLAR PLANT PERFORMANCE IN INDIA Now Available SOLAR PLANT PERFORMANCE IN INDIA 2017-18 Report (PDF) Data-set (Excel) India Infrastructure Research SOLAR PLANT PERFORMANCE IN INDIA 2017-18 Table of Contents 1. Solar Power Sector Overview

More information

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region TRANSMISSION GROUP MERC 5 th August 2011 2 Actual Flows for Mumbai Peak FY12 ( 3209 MW) Tie Line Flows (Amp & MW) during Mumbai

More information

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India SECI/SD/EoI/20000 MW Mfg./I/2017 18.12.2017 Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India 1. Objective of EOI: SECI intends to invite Expression of Interest from the

More information

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi 1.0 List of Participants is enclosed at Annex I. 2.0 Chairperson, CEA as Chairperson of

More information

Renewable Regulatory Fund (RRF) Mechanism : -

Renewable Regulatory Fund (RRF) Mechanism : - Renewable Regulatory Fund () Mechanism : - : Chronology of events Outline : Objectives at a glance : Approach : Applicability Role of different stakeholders Brief on CERC Orders on State Load Dispatch

More information

In view of the above list of important grid element & exception list is as below:-

In view of the above list of important grid element & exception list is as below:- OUTAGE PROCEDURE As per standard procedure of WRPC, all EHV elements which have been listed under the list of important grid elements of Western Region, the outages for such elements required OCCM approval.

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner Agenda notes for the 38 th Meeting of Standing Committee on Power System Planning in Western Region 1.0 Confirmation of the minutes of 37 th meeting of the Standing Committee on Power

More information

~ ~ ~1~ctJ'{UI. 2 ~ ~, 9 ct>1~4i<'1ct> ~ (~~~I~~), ~, ~ 1iif, ~ ~\j\)~q~'1 ~ ct>1~~~, ~-8, ~-24, ~ ~ ~ ~ ~.

~ ~ ~1~ctJ'{UI. 2 ~ ~, 9 ct>1~4i<'1ct> ~ (~~~I~~), ~, ~ 1iif, ~ ~\j\)~q~'1 ~ ct>1~~~, ~-8, ~-24, ~ ~ ~ ~ ~. .,.. -- ~~ ~ ~ ~1~ctJ'{UI ~ ~ ~ 4~~1\J1"11 ~iifi"f ~ "flqr oqq;f,,{i~~wi~,{~, "fi ~ 110066 "(p"'~. : 26/10/2011-~. m. ti. 1!./~& ~.s-;j ~: 20.01.2011 1 ~ ~~), 8 I ~~~~, ~3TftfItffi ~), ~ ~ ~, ~ ~ ct>ix41~~11

More information

11Rij ~ / Government of India ~ ~ / Ministry of Power L ~ ~ ~1~<t>XUI / Central Electricity Authority ~~:~

11Rij ~ / Government of India ~ ~ / Ministry of Power L ~ ~ ~1~<t>XUI / Central Electricity Authority ~~:~ f" J,t 11Rij ~ / Government of India ~ ~ / Ministry of Power L ~ ~ ~1~XUI / Central Electricity Authority ~~:~ J ~-~ :. 1' System ~ Planning ~ & ~ Project Y~~1\J111 Appraisal ~t"'f ~ Division ~ ~

More information

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 TRANSMISSION SECTOR GROWTH HIGHLIGHTS Source - POWERLINE Transmission line length

More information

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. 1. List of the participants is enclosed at Annex - I. Member (PS) CEA welcomed

More information

9 ;J;;fzr;:;/=a ~ Central Electricity Authority ~ ~ ~ ~ ~ ~ 0TI g Western Regional Power Committee ISO:

9 ;J;;fzr;:;/=a ~ Central Electricity Authority ~ ~ ~ ~ ~ ~ 0TI g Western Regional Power Committee ISO: 'fff«fmq)f{ 9 ;J;;fzr;:;/=a 0TI g 9001-2008 0flllI -3, Iff;r, 0imt ( ), - 400 093 F-3, MIDe Area, Andheri (East), Mumbai - 400 093 Phone: 022-28221636; 28221681; 28220194-6; Fax: 022-28370193 Ref: no:

More information

File No.CEA-PS-11-23(19)/1/2018-PSPA-I Division

File No.CEA-PS-11-23(19)/1/2018-PSPA-I Division I/796/208 File No.CEA-PS--23(9)//208-PSPA-I Division भ रत सरक र Government of India व द त म तर लय Ministry of Power क न द र य व द त प र ध करण Central Electricity Authority व द त प रण ल य जन एव म ल य कन-I

More information

Before the. Case No. 106 of 2009

Before the. Case No. 106 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu

More information

Thereafter, the agenda items were taken up.

Thereafter, the agenda items were taken up. The Summary record of the 21 st meeting of Standing Committee held at NRPC Conference Room, Katwaria Sarai, Delhi on 03 rd November 2006. (1) List of the participants is annexed. CE SP&PA, CEA welcomed

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB) Agenda note for the 33 rd meeting of the Empowered Committee on Transmission Date and Time: 30 th September, 2014 (Tuesday) at 3:30 PM Venue: Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram,

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

Indian Energy Exchange December For Public Use

Indian Energy Exchange December For Public Use Indian Energy Exchange December 2017 For Public Use In this presentation Installed RE Capacity Total Installed Capacity Renewable Installed Capacity RES 60157 Solar, 14,771 Hydro 44963 W to P; 114 Biopower;

More information

Enhancing Grid Stability in India

Enhancing Grid Stability in India India Japan Energy Forum 2017 Enhancing Grid Stability in India 9 January 2017 Nomura Research Institute 7 th Floor, Tower A, Building 5 DLF Cyber City, Phase III Gurgaon, India Otemachi Financial City

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi-110066 No.1/9/2004/-SP&PA/ 2004 Sh. S.K. Agarwal, Chief Engg. (Plg.), Haryana Vidyut Prasaran

More information

Solar Energy Corporation of India New Delhi-17

Solar Energy Corporation of India New Delhi-17 Solar Energy Corporation of India New Delhi-7 : SECI/Cont./SRT-IV-P/7/0/ Date: 6-07-0 Subject: tification of L bidders of different States in Part-A and for price matching by L, L,L.and so on..0 The Request

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

Agenda Note for Standing Committee Meeting of Power System Planning in ER

Agenda Note for Standing Committee Meeting of Power System Planning in ER Agenda Note for Standing Committee Meeting of Power System Planning in ER 1.0 Confirmation of the minutes of the meeting held at NRPC, New Delhi on 28.12.2010. Minutes of the Standing Committee Meeting

More information

List of members of WRPC

List of members of WRPC List of members of WRPC 2016-17 1 Chairman,WRPC/CMD,MSEDCL, Mumbai 022-26478672, 22650741(Fort) 2 Member (GO&D), CEA, New Delhi 011-26108834 3 Managing Director, CSPTCL,Raipur 0771-2262141 4 Managing Director,

More information

CASE No. 35 of In the matter of

CASE No. 35 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen 21, rue d Artois, F-75008 PARIS C1-114 CIGRE 2012 http : //www.cigre.or TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT I S Jha Y K Sehgal* Subir Sen Power Grid Corporation

More information

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project PCDO Jan-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan

More information

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

GOVERNMENT OF ANDHRA PRADESH ABSTRACT 1 GOVERNMENT OF ANDHRA PRADESH ABSTRACT PUBLIC SERVICES Employees Welfare Scheme Andhra Pradesh State Employees Group Insurance Scheme 1984 Revised Rate of Interest on accumulated Savings Fund Communication

More information

uploaded shortly and can be downloaded from

uploaded shortly and can be downloaded from Amendment - 01 NIT - SECI/C&P/OFBK5/062017 dated 21/07/2017 Setting up of 5 MW at Ordnance factory kanpur under VGF scheme Sr. No. Ref. Section clause No. existing clause Amended clause 1 1.3. The Solar

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 Policy & Regulatory Issues : Solar & Wind Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 About Us Vision To develop a solution with low cost, high technology power generation & fulfill

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 100 66. No. 51/4/SP&PA-2001/ Date : 10-3-2004 To 1.The Member Secretary, Southern Regional

More information

Intra-State Availability Based Tariff (ABT)

Intra-State Availability Based Tariff (ABT) Intra-State Availability Based Tariff (ABT) What is ABT? 1. In Year 2000, the CERC revised the tariff structures of inter- state generators from drawal-based tariffs to ABT to discipline grid operations.

More information

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL Submitted By: FIRSTGREEN CONSULTING PVT LTD MA, 74, DLF Phase III Gurgaon 122002 info@firstgreen.co

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2006/ Date: 08-08-2006 To 1. The Member Secretary, Southern Regional

More information

Uttar Pradesh Electricity Regulatory Commission, Lucknow

Uttar Pradesh Electricity Regulatory Commission, Lucknow Uttar Pradesh Electricity Regulatory Commission, Lucknow In the matter of Uttar Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems Gross / Net Metering) Regulations, 2019

More information

Ensuring adequacy in the planning and development of Inter State Transmission System Central Electricity Authority October 2013

Ensuring adequacy in the planning and development of Inter State Transmission System Central Electricity Authority October 2013 Ensuring adequacy in the planning and development of Inter State Transmission System October 2013-1 - Ensuring adequacy in the planning and development of Inter State Transmission System Contents 1. Background

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine

More information

Frequently Asked Questions for Grid Connected Solar Rooftop Systems

Frequently Asked Questions for Grid Connected Solar Rooftop Systems Frequently Asked Questions for Grid Connected Solar Rooftop Systems 1. What is a Solar Rooftop System? In a solar rooftop system, the solar panels are installed in the roof of any residential, commercial,

More information

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of determination of Parallel Operation Charges. Suo-Motu Petition No. 73/2012 ORDER (Date of order 31 st December, 2012) MPERC,

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply INDEX S. No. PARTICULARS PAGE NO. A EDS REPLY 1-3 ANNEXURE I ESSENTIAL DETAILS SOUGHT (EDS) 4-5 ANNEXURE II LEASE DOCUMENTS 6-58 ANNEXURE III AUTHENTICATED PAST PRODUCTION DATA 59 ANNEXURE IV CTE (AIR)

More information

26 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects

26 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects Name of State/ Description 1. Order Date Policy on Net Metering for Solar Grid Interactive Roof- Top and Small SPV Power Plants in the State vide G.O. MS. 22 dated 25-03- 2013 Andhra Pradesh Chhattisgarh

More information

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of स खय /No. 1/9/08-SP&PA/ भ रत सरक र/Government of India क य वध त धकरनण/Central Electricity Authority णल आय जन एव पर य जन म य कनण भ ग/SP&PA Division आर क प रम/R.K. Puram नई द ल /New Delhi -110606 [आई आई.एस

More information

Bangladesh s Power Sector : At a Glance

Bangladesh s Power Sector : At a Glance Bangladesh s Power Sector : At a Glance December, 2014 Installed Capacity (MW) : 10,709 De-rated Capacity (MW) : 10,130 Maximum Generation (MW) : 7,418 Total Consumers (in Million) : 15.4 Transmission

More information

enincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series

enincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series Railway Electrification Market Opportunities in India 2018 Estimating $ 5000 Million Opportunity Spread for Value Chain Players by 2020 by tracking opportunity tune for EPC players, Original Equipment

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 100 66. No. 51/4/SP&PA-2001/ Date :, 2003. To 1.The Member Secretary, Southern Regional Electricity

More information

Scaling Successful Mini-grid Programs: Experience of Bangladesh

Scaling Successful Mini-grid Programs: Experience of Bangladesh Frontier Developments in Mini-grids Scaling Successful Mini-grid Programs: Experience of Bangladesh Farzana Rahman Unit Head (Investment), Renewable Energy IDCOL, Bangladesh 6 December 2017 Abuja, Nigeria

More information

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India Date 20th December, 2018 NET PAYROLL DATA EPFO PROVISIONAL ESTIMATE OF NET PAYROLL IN AGE BUCKETS AS PER

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

List of Important Grid Elements in Western Region. In compliance with IEGC 5.2(c), May 2013, Rev-0.

List of Important Grid Elements in Western Region. In compliance with IEGC 5.2(c), May 2013, Rev-0. प चम य ण ल म मह व प ण ड त व क स च List of Important Grid Elements in Western Region आई ई ज स 5.2 स क अन प लन म In compliance with IEGC 5.2(c), May 2013, Rev-0. 1 Table of Contents Sr. No. Contents Page

More information

SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING

SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING A.K. Bohra Chief Executive Officer NESCO, WESCO & SOUTHCO Central Service Office, Bhubaneswar DISTRIBUTED RENEWABLE ENERGY GENERATION With the

More information

The Electric Power System

The Electric Power System The Electric Power System INDIA Indian Power System 1 2 Basic facts Area:3.288 million km² Population:1.25 Billion Electricity consumers: 216 Million- (31.3.2013) Number of TSOs: 14- (31.3.2013) Numbe

More information

Investor Presentation. For Official Use

Investor Presentation. For Official Use Investor Presentation For Official Use Exchange: A Competitive Market Exchanges provide a transparent, competitive and efficient platform for transactions in any market Stock or commodity. Same is true

More information

Agenda of 11 th System Studies Meeting in NER

Agenda of 11 th System Studies Meeting in NER Agenda of 11 th System Studies Meeting in NER Date: 16.12.2015. Venue: Hotel Nandan, Guwahati 1. Review of SPS I, II, III & SPS IV related to Palatana GBPP, OTPC after commissioning of Palatana Module

More information

PRAGATI ENGINEERING COLLEGE

PRAGATI ENGINEERING COLLEGE Report on Industrial Visit to Power Grid 765/400 KV (GIS) Sub-Station No. of days of Visit : Two days Date(s) of Visit : 19 th September, 2017& 7 th October, 2017 Faculty In-charges : 4 Members 1. Mr.S.Ashokreddy,

More information

List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007

List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007 to: details Version: 2007 Technical Rules 1 16-Jan-08 2 16-Jan-08 3 29-Jan-08 Neerabup (two generating units - Units G11 and G12) Neerabup (two generating units - Units G11 and G12) Bluewaters Power Station

More information

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX : Distribution List 1 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 3. Member Secretary Southern Regional Power Committee 29, Race Course Cross

More information

(i) COO (CTU), POWERGRID, Saudamini, Plot No.2, Sector 29, Gurgaon (Haryana)

(i) COO (CTU), POWERGRID, Saudamini, Plot No.2, Sector 29, Gurgaon (Haryana) Copy to: (i) COO (CTU), POWERGRID, Saudamini, Plot No.2, Sector 29, Gurgaon 122 001 (Haryana) (ii) CEO, RECTPCL, 12-21, Upper Ground Floor, Antriksh Bhawan, 22, KG Marg, New Delhi 110 001. (iii) CEO, PFC

More information

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS

More information