1

2 Bangladesh s Power Sector : At a Glance December, 2014 Installed Capacity (MW) : 10,709 De-rated Capacity (MW) : 10,130 Maximum Generation (MW) : 7,418 Total Consumers (in Million) : 15.4 Transmission Lines (ckt. km) : 9,425 Distribution Lines (km) : 3,03,000 Per Capita Generation (including Captive) : 348 Access to Electricity (including Off-Grid Renewable) : 68%

3 Electricity Demand and Challenges With sustained GDP Growth, Electricity demand is increasing at a rate of 9-12 % Power sector are facing following challenges to meet this demand growth : Shortage of primary fuel supply from indigenous resources Financing capital intensive power projects

4 Strategic Policy on Power

5 Historical Installed Capacity(MW) in Bangladesh Year

6 Installed Capacity & Maximum Generation in Bangladesh Year

7 Historical Energy Net Generation (GWh) in Bangladesh Year

8 Generation: Fuel Wise & Owner (Installed Capacity Dec 14) Gas HFO HSD FO Coal Hydro Import Total ,709

9 Bangladesh Grid Network Year 1972 Grid Infrastructure: 132kV Line: 1583 ckt km 66kV Line: 167 ckt. km

10 Bangladesh Grid Network Year 2003 PGCB Infrastructure: 230kV Line: 1365 ckt. km 132kV Line: 4961 ckt. km 230/132kV SS: 7 (3150 MVA) 132/33kV SS: 63 (5507 MVA) Tr. Line added since 1972 >1655 ckt.km 230 kv >3375 ckt.km 132kV

11 Bangladesh Grid Network Year 2015 Grid Infrastructure: 400kV Line: ckt. km 230kV Line: 3044 ckt. km 132kV Line: 6337 ckt. km HVDC Station: 1 (500MW) 230/132kV SS: 18 (8775 MVA) 132/33kV SS: 108 (13963 MVA) Tr. Line added since 2003 >164.7 ckt.km 400 kv >1701 ckt.km 230 kv >1234 ckt.km 132kV

12 Bangladesh Grid Network Year 2021 Grid Infrastructure: 800kV DC Line: 172 ckt. km 400kV Line: 3623 ckt. km 230kV Line: 4854 ckt. km 132kV Line: 9749 ckt. km HVDC Station: 3 (2500MW) 400/230kV SS: 10 (12430 MVA) 230/132kV SS: 46 (15025 MVA) 132/33kV SS: 170 (28701 MVA)

13 Power System Master Plan (up to 2030) PSMP 2010 : Long term planning up to 2030 Conducted by : TEPCO, Japan Completion of Study : February 2011 Findings: - Generation capacity requirement by 2021: 24 GW - Generation capacity requirement by 2030: 39 GW - Coal based generation capacity by 2030 : 20 GW

14 Summery of Demand & Generation Forecast Master Plan-2010 Demand forecast Generation Plan Government Considering Policy GDP: 08% GDP: 06% Considering GDP: 07% Gen. Capacity Proposed GW 8 GW 9 GW 13 GW GW 10 GW 13 GW 24 GW GW 14 GW 19 GW 30 GW GW 18 GW 28 GW 39 GW

15 Regional Power Exchange/ Trading

16 Bangladesh India Co-operation Bangladesh-India signed an MOU to promote technical, bilateral co-operation in power sector development Salient Features of MOU signed on 11th January 2010 Exchange of power Grid connectivity between the two countries

17

18 Grid Interconnection Project a) Objectives : i) To establish a Grid Interconnection with India. ii) To minimize the power crisis in Bangladesh to some extent. b) Main Components (BD part): i) 27 km 400 kv double ckt transmission line ii) 400 kv Back-to-Back HVDC station at Bheramara. c) Main Components (Indian part): i) 72 km 400 kv double ckt transmission line ii) 400 kv switching station at Baharampur.

19 1 st Grid Interconnection between Bangladesh & India Farakka 400kV Baharampur India 71 km 27 km Bangladesh 500 MW 230kV Bheramara Ishurdi 400kV double ckt line HVDC Back-to-back Jeerat Khulna South 19

20 Grid Interconnection Project Project Cost (BD Part) : Total = Tk 1, Crore F. E = Tk Crore (ADB) }As per Approved DPP L. C = Tk Crore (GOB+PGCB) Total =Tk 1, Crore As per RDPP F. E = Tk Crore (ADB) approved on L. C = Tk Crore (GOB+PGCB)} Project Cost (Indian Part) : Total Cost Crore Indian Rs.

21 400kV Switchyard

22 Valve Hall

23 230kV Switchyard

24 Control Room, Valve Hall and Converter Transformer

25 Benefits found from this station Socio-economic development of these region by energy cooperation. Ease power crisis. Power quality improvement. Milestone for further regional cooperation.

26 Eastern Interconnection Project 26

27 Main Objectives: Eastern Interconnection Project As per the decision of seventh JWG/JSC meeting on power sector co-operation between Bangladesh and India a Joint Technical Committee (JTC) was formed to examine and recommend the system requirement/strengthening on the both sides of the border to import 100 MW power in radial mode from Palatana to Eatern Side of Bangladesh. To import 100 MW power in radial mode from Palatana to Eastern Side of Bangladesh. To strengthening power exchange capacity on the both sides of the border.

28 Tripura (India)- Comilla(Bangladesh) Grid Interconnection Project a) Implementation Period : Sep, 2014 to Dec 2015 b) Estimated Cost (in BDT) : (Bangladesh Part) Total GoB (FE) PGCB Project Aid = Crore (24.04 mus$) = Crore ( Crore) (13.66 mus$) = Crore = NA c) Foreign Financing : NA

29 Tripura (India)- Comilla(Bangladesh) Grid Interconnection Project d) Major Scope (Bangladesh Part): (i) (ii) Bangladesh Border Comilla (N) 400 kv Double Circuit Line Comilla (N) Comilla (S) 132 kv Double Circuit Line : 28 km : 18 km (iii) 132 KV Bay Extension at Comilla (S) : 2 Nos.

30 Route Overview 400kV T/L: 23km (India) 400kV T/L: 28km Border Crossing (Madla BGB Camp) 132kV T/L: 18km Palatana PP

31 Radial Operation: Synchronization with Indian System Tripura-1 132/33kV 25/41 MVA 132/33kV 25/41 MVA 132kV Bus Tripura-2 Comilla(N)-Feni Ckt.-2 Comilla(N)-Feni Ckt.-1 Scope of Work (Bangladesh part) 132/33kV 50/75 MVA Comilla(N) Ckt-3 Chandpur 50 MW 132/33kV 50/75 MVA Legend CB Status ON CB Status OFF

32 Operation: Synchronization with Bangladesh System Tripura-1 132/33kV 25/41 MVA 132/33kV 25/41 MVA 132kV Bus Tripura-2 Comilla(N)-Feni Ckt.-2 Comilla(N)-Feni Ckt.-1 Scope of Work (Bangladesh part) 132/33kV 50/75 MVA Comilla(N) Ckt-3 Chandpur 50 MW 132/33kV 50/75 MVA Legend CB Status ON CB Status OFF

33 Tripura (India)- Comilla(Bangladesh) Grid Interconnection Project Progress (Bangladesh Part) Construction work of Transmission Line 400kV & 132kV started with completion target of October, kV Transmission line piling for 16 nos. of towers out of 80 towers has been completed. 132kV Transmission line piling for 2 nos. of towers out of 54 towers has been completed.

34 34

35 Capacity Upgradation(500MW) of Existing Bheramara HVDC Station Project a) Implementation Period : January 2015-June 2018 b) Estimated Cost (in BDT) : (Bangladesh Side only) Total = mus$ Local = mus$ Foreign = mus$ c) Foreign Financing : Expected from ADB

36 Capacity Upgradation(500MW) of Existing Bheramara HVDC Station Project Major Scopes (Bangladesh Side) (1) Bheramara Second Phase 500MW BtB HVDC Station (2) Bheramara Ishwardi 230 kv Double Circuit: 12km (India Side) (1) 400 Kv Farakka Behrampur D/C Line (70 Km.) (2) Removal of existing LILO of Farakka. (3) LILO at Sagardighi. (4) LILO at Jeerat.

37 India Farraka Bangladesh Scope of Works Ishurdi Legend: 230kV Existing 230kV U/C 230kV Planned Sagardighi 400kV Existing 400kV U/C Bahrampur Bheramara Bheramara 360MW CCPP Main Objective: To import additional 500MW power from India. Jeerat Subhasgram Khulna (S)

38 Bheramara HVDC Station

39 Bheramara HVDC Station Space for new HVDC Station

40 Capacity Upgradation(500MW) of Existing Bheramara HVDC Station Project Overall Progress (i) Consultancy Agreement between PGCB and PGCIL signed on 30/12/2014 (ii) Expected Time of EPC Contract signing 25/09/2015. (iii) Construction Time 24 months.

41 41

42 Finding of JTT Report between Bangladesh & India Following Three Alternates was recommended: Alternate-1: Shilchar-Meghnaghat/Bhulta-Bahrampur High Capacity 400kV Line (Dropping of 500/1000 MW by HVDC BtB Station at Meghnaghat/Bhulta) Alternate-2: ±800 kv, 6500 MW HVDC multi-terminal line from Rangia/Rowta (India) Jamalpur/Barapukuria (Bangladesh)- suitable location in WR/NR/SR (India) Alternate-3: 765 kv Bongaigaon (NER/ India) Jamalpur/Barapukuria (Bangladesh) Purnea (ER/India). Barapukuria dropping MW to Bangladesh by HVDC BtB Station.

43 Alternate-3 Alternate-2 Alternate-1

44 A committee form in the 8 th JSC meeting held in Delhi on October, 2014 comprising of three member from each countries are now working for detail feasibility of Alternate-2. In Bangladesh side tentative location for building HVDC station near Barapukuria has been identified. Tentative line route in Bangladesh Territories has been identified.

45 Border to Border via Barapukuria 100km 800kV Bipole HVDC Line 500MW HVDC Station at Barapukuria Main Objective: To connect the huge hydroelectric potential of Bhutan and Arunachal Province to India through Bangladesh territory. To draw MW power at Barapukuria from Cross Boarder Interconnection

46 Tentative Route for 800kV HVDC Bipole Line in Bangladesh Territory Entry Point of Bipole Line Route-1 : 85km (BD Part) Exit Point of Bipole Line Route-2 : 83km (BD Part)

47

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh mohammad_alauddin4124@yahoo.com December 19, 2013 Total area

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

Power Sector Overview- Bangladesh Afghanistan

Power Sector Overview- Bangladesh Afghanistan Power Sector Overview- Bangladesh Afghanistan Pakistan Nepal Bhutan India First meeting of core team on South Asian Regional Power Exchange (SARPEX) 7 th -9 th February, 2017 New Delhi, India Maldives...

More information

STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE

STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE South Asia Regional Workshop on Policies and Regulations to Increase Cross Border Energy Trade ( February 15-17,2012; New Delhi) RAM

More information

Overview of India Preparations for. Interconnections with Bangladesh & Sri

Overview of India Preparations for. Interconnections with Bangladesh & Sri Overview of India Preparations for Interconnections with Bangladesh & Sri Lanka Overview of India Preparations for Interconnections with Bangladesh & Sri Lanka Outline. India Bangladesh Interconnector

More information

The Electric Power System

The Electric Power System The Electric Power System INDIA Indian Power System 1 2 Basic facts Area:3.288 million km² Population:1.25 Billion Electricity consumers: 216 Million- (31.3.2013) Number of TSOs: 14- (31.3.2013) Numbe

More information

Indian Power System Framework

Indian Power System Framework R P SASMAL 1 ST JUNE 2016 Indian Power System Framework Electricity - A Concurrent Subject Both Central & State Govt. are responsible for overall development of Power Sector Generators Central Level Central

More information

CROSS BORDER INTERCONNECTION AND POWER TRADE WITH NEIGHBOURING COUNTRIES

CROSS BORDER INTERCONNECTION AND POWER TRADE WITH NEIGHBOURING COUNTRIES CROSS BORDER INTERCONNECTION AND POWER TRADE WITH NEIGHBOURING COUNTRIES Indian Scenario GROWTH OF INSTALLED CAPACITY FROM 11 TH PLAN TO 13 TH PLAN ( MW) Coal/ LIGNITE At the end of 11 th Plan March 2012

More information

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector Date 26.11.2012, New Delhi Total Capacity Thermal CAPACITY ADDITION (1/1) In 11 th Plan UoM State Sector

More information

Country Scenario - Pakistan

Country Scenario - Pakistan NATIONAL TRANSMISSION & DESPATCH COMPANY LIMITED (NTDCL), PAKISTAN Country Scenario - Pakistan SAARC Perspective Workshop on the Past, Present and Future of High Voltage DC (HVDC) Power Transmission 30

More information

The SAARC Power Grid Nepal s Perspective

The SAARC Power Grid Nepal s Perspective The SAARC Power Grid Nepal s Perspective Anil Rajbhandary Director, Power Trade Department, NEA Medium Term Vision for Energy Connectivity in the SAARC Region 10 March, 2015; Islamabad Energy Resources

More information

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS

More information

10 th Asia Clean Energy Forum 2015

10 th Asia Clean Energy Forum 2015 10 th Asia Clean Energy Forum 2015 Mohammad Alauddin Joint Secretary Power Division Ministry of Power, Energy & Mineral Resources Government of the People s Republic of Bangladesh 16 June 2015 Outline

More information

Regional Meeting on Sustainable Energy for Asia -Pacific Least Developed Countries Kathmandu, Nepal. Surendra Rajbhandari

Regional Meeting on Sustainable Energy for Asia -Pacific Least Developed Countries Kathmandu, Nepal. Surendra Rajbhandari Regional Meeting on Sustainable Energy for Asia -Pacific Least Developed Countries Kathmandu, Nepal Surendra Rajbhandari 1 Status of Electrification and Access as of July 2016 NEA, state owned electric

More information

Electricity industry structure and capacity growth trends

Electricity industry structure and capacity growth trends Electricity industry structure and capacity growth trends Restructuring since 1997 has resulted in the separation of electricity generation from transmission and distribution. However, the sector continues

More information

HVDC Systems in India

HVDC Systems in India HVDC Systems in India Outline Introduction HVDC Systems presently in operation Main Data/Salient Features Upcoming Projects Future Challenges Transmission Network - Present 765kV/400kV lines: about 1,03,000

More information

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) February 2013 Contents I. Introduction 1 II. Status of Electricity Supply and Demand 2 1. Electricity Demand 2 2. Electricity

More information

Electricity industry structure and key players

Electricity industry structure and key players Electricity industry structure and key players Growth in capacity, production and consumption, 2006 2017 Expected demand and addition to generation capacity, 2018 2027 Growth in transmission network and

More information

Building Collaboration Between East African Nations via Transmission Interconnectors

Building Collaboration Between East African Nations via Transmission Interconnectors Building Collaboration Between East African Nations via Transmission Interconnectors Eng. Christian M.A. Msyani Ag. DEPUTY MANAGING DIRECTOR TRANSMISSION - TANESCO CONTENTS 1. TANESCO - Existing Power

More information

Renewable Energy Development in the Mediterranean Region Renewable Energy Investments In The Mediterranean And Beyond

Renewable Energy Development in the Mediterranean Region Renewable Energy Investments In The Mediterranean And Beyond Dott. Matteo Codazzi Milano, 30.10.2017 Renewable Energy Development in the Mediterranean Region Renewable Energy Investments In The Mediterranean And Beyond Milano, CESI has a solid track record in RES

More information

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL Third Meeting of Taskforce 2, February 25-26, 2015; Colombo, Sri Lanka LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL Surendra Rajbhandari Chief, Project Management Directorate,

More information

A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka

A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka Menaka Rajaguru Department of External Resources Ministry of National Policies and Economic Affairs Country Profile Country Profile

More information

Interconnection between Arab countries

Interconnection between Arab countries Interconnection between Arab countries Eng. Fawzi Kharbat Secretary General AUE Enabling renewable energy in the electricity systems workshop 16 April 2014 Tunis 1 Arab Union of Electricity Date of Establishment:

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Da Afghanistan Breshna Sherkat

Da Afghanistan Breshna Sherkat Da Afghanistan Breshna Sherkat DABS PRESENTATION 14 September 2014 DABS Home Office Kabul, Afghanistan www.dabs.af 1 AFGHANISTAN ENERGY SECTOR Afghanistan Energy Infrastructure, generation, transmission

More information

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2 Contents 3 Need for the project... 2 3.1. Project Background... 2 3.2. Energy mix and demand forecast... 2 3.3. 5000+ Project... 4 List of tables Table 3-1: Electric power generation sources and energy

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

SET Plan The 10th Year Anniversary Central European Energy Conference 2017

SET Plan The 10th Year Anniversary Central European Energy Conference 2017 MARKET COUPLING: UKRAINIAN WAY SET Plan The 10th Year Anniversary Central European Energy Conference 2017 UKRENERGO 2 TRANSMISSION COMPANY (state-owned, consists of 8 regional systems) Substations 137

More information

TURKISH POWER SYSTEM OVERVIEW AND INTERCONNECTION WITH GEORGIAN POWER SYSTEM TURKISH ELECTRICITY TRANSMISSION CORPORATION (TEIAS)

TURKISH POWER SYSTEM OVERVIEW AND INTERCONNECTION WITH GEORGIAN POWER SYSTEM TURKISH ELECTRICITY TRANSMISSION CORPORATION (TEIAS) TURKISH POWER SYSTEM OVERVIEW AND INTERCONNECTION WITH GEORGIAN POWER SYSTEM TURKISH ELECTRICITY TRANSMISSION CORPORATION (TEIAS) 1 CONTENT MAIN FUNCTIONS OF TEIAS TURKISH POWER SYSTEM OVERVIEW EXISTING

More information

Next Generation of UHVDC System. R. Montaño, D Wu, L. Arevalo, B. Jacobson ABB - HVDC Sweden

Next Generation of UHVDC System. R. Montaño, D Wu, L. Arevalo, B. Jacobson ABB - HVDC Sweden Conference-1 Latest Technologies in T & D, Renewable Energy Integration, Smart Grid, Energy Efficiency, Communication Next Generation of UHVDC System R. Montaño, D Wu, L. Arevalo, B. Jacobson ABB - HVDC

More information

Title of presentation

Title of presentation Title of presentation Power Projects Selection, Risk, Financing & Operation by Professor Bart Nnaji Chairman & CEO ipad West Africa 2008, Abuja, NIGERIA The State of Power in Africa Installed Capacity

More information

Efficient & Reliable Power Delivery

Efficient & Reliable Power Delivery Efficient & Reliable Power Delivery Dr. Udo Niehage CEO Power Transmission Division Energy Sector CEPSI 2008 Macau Macau, October 30, 2008 Siemens AG 2008 Energy Sector The future energy market Strong

More information

YUKON DEVELOPMENT CORPORATION

YUKON DEVELOPMENT CORPORATION YUKON DEVELOPMENT CORPORATION 2 http://www.ydc.yk.ca YUKON DEVELOPMENT CORPORATION ANNUAL REPORT 2016 TABLE OF CONTENTS Message from the Chair...4 Message from the President and Chief Executive Office...

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

ECONOMIC SURVEY STATISTICAL APPENDIX

ECONOMIC SURVEY STATISTICAL APPENDIX ECONOMIC SURVEY 2017-18 STATISTICAL APPENDIX STATISTICAL APPENDIX : ECONOMIC SURVEY 2017-18 PAGE 1 National Income and Production 1.1 Gross National Income and Net National Income... A1-A2 1.2 Annual

More information

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015 Workshop on International Good Practices of Sustainable Energy Technologies Beirut Energy Forum 9-11 Sep 2015 Eng. Ziad Jebril Sabra Advisor to the Minister Ministry of Energy and Mineral Resources JORDAN

More information

Electricity sector overview

Electricity sector overview Electricity sector overview Electricity market structure Snapshot of electricity sector Growth in capacity and production Growth in consumption Growth in transmission line and transformer capacity Institutional

More information

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank Off-Grid Renewable Energy Program in Myanmar Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank 1 ADB Off-grid Renewable Energy Program Phase 1: (October 2013 June 2014)

More information

Transmission System Operators in the Interplay between Physics and Market

Transmission System Operators in the Interplay between Physics and Market Session 02: Large Scale Renewables Integration and the Changing Roles of TSO and DSO Companies Transmission System Operators in the Interplay between Physics and Market DI Mag.(FH) Gerhard Christiner Chief

More information

Overview of Indian Power Sector. February 29, 2008

Overview of Indian Power Sector. February 29, 2008 Overview of Indian Power Sector February 29, 2008 Evolutionary Phase of Power Sector Radical changes in structural, institutional and operational arrangements. Supply of electricity is moving away from

More information

Contents 1. Country Background 2. Lao Power Sector 3. Power Sector Policy 4. Current Electric Power Situation (statistics) 5. Demand Forecasting 6. Ex

Contents 1. Country Background 2. Lao Power Sector 3. Power Sector Policy 4. Current Electric Power Situation (statistics) 5. Demand Forecasting 6. Ex Training and Dialogue on Energy Policy 04 to 24 April 2010, Tokyo, Japan. Country Report Presentation By: Viengsay CHANTHA Chief of Lao Electric Power Technical Standards (LEPTS) Regulatory Unit Department

More information

PRESENTATION ON ELECRICITY SUPPLY IN BOTSWANA. Botswana China Business Forum. 31 August 2018

PRESENTATION ON ELECRICITY SUPPLY IN BOTSWANA. Botswana China Business Forum. 31 August 2018 PRESENTATION ON ELECRICITY SUPPLY IN BOTSWANA Botswana China Business Forum 31 August 2018 PRESENTATION PLAN 1. THE ELECTRICITY SUPPLY INDUSTRY IN BOTSWANA 2. ELECTRICITY CONSUMPTION AND SOURCES OF SUPPLY

More information

Update on the Philippine Wholesale Electricity Spot Market

Update on the Philippine Wholesale Electricity Spot Market Update on the Philippine Wholesale Electricity Spot Market A Presentation to the APEx Asia Pacific Conference New Delhi, India 1 Presentation WESM Overview 2010 Market Results Market Outlook 2 WESM Overview

More information

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014 Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014 1.0 The 4 th meeting of the Standing Committee on Power System Planning of North

More information

Energy Outlook for Asia and the Pacific

Energy Outlook for Asia and the Pacific Energy Outlook for Asia and the Pacific Aiming Zhou Senior Energy Specialist Asian Development Bank 25-29 Nov, 2013 Coverage of the Outlook Time Frame: 2010 2035 Geographic Coverage: Developing Asia o

More information

Indian engineering TRANSFORMING TRANSMISSION

Indian engineering TRANSFORMING TRANSMISSION Indian engineering TRANSFORMING TRANSMISSION A 2016 NASA photo of India s electrification. India to become the world s first country to use LEDs for all its lighting needs by 2019 (photograph courtesy

More information

HVDC MATIARI -LAHORE TRANSMISSION PROJECT ABDUR RAZZAQ CHEEMA, EX-GENERAL MANGER (GRID SYSTEM CONSTRUCTION PROJECTS) NTDC

HVDC MATIARI -LAHORE TRANSMISSION PROJECT ABDUR RAZZAQ CHEEMA, EX-GENERAL MANGER (GRID SYSTEM CONSTRUCTION PROJECTS) NTDC HVDC MATIARI -LAHORE TRANSMISSION PROJECT ABDUR RAZZAQ CHEEMA, EX-GENERAL MANGER (GRID SYSTEM CONSTRUCTION PROJECTS) NTDC SEQUENCE OF PRESENTATION OVERVIEW GENERATION PROPOSED IN SOUTH (2011) EVACUATION

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 TRANSMISSION SECTOR GROWTH HIGHLIGHTS Source - POWERLINE Transmission line length

More information

Transmission Grid Development & Investment Planning on EHV Level in Germany

Transmission Grid Development & Investment Planning on EHV Level in Germany Transmission Grid Development & Investment Planning on EHV Level in Germany February, 27th, 2018 Michael Jesberger 1 Kilometer (km) = 0,602 miles 1 Euro = 1,22 $ (Februry, 8th, 2018) March 2016 TenneT

More information

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector HVDC Innovative Technology for Smart Grids and Super Grids CEO Power Transmission Solutions, Siemens Energy Sector BritNed: Pre-launch Press Event Maasvlakte, March 31, 2011 Siemens AG 2011 Energy Sector

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

2018 Load & Capacity Data Report

2018 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

(1) Current State and Issues of the Electricity Sector in Indonesia

(1) Current State and Issues of the Electricity Sector in Indonesia Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Java-Sumatra Interconnection Transmission Line Project (I) Loan Agreement: April 30, 2010 Loan Amount:

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

Inspirational Solar UK and Global Growth

Inspirational Solar UK and Global Growth Inspirational Solar UK and Global Growth 14 th October 2014 Paul Barwell STA CEO Trina,Yingli,Bosch,Kingspan 1 1)The macroeconomic benefits for the UK of investment in solar PV Solar powered growth in

More information

Success Story Scaling Up Energy Efficiency An Indian Experience

Success Story Scaling Up Energy Efficiency An Indian Experience ASIA CLEAN ENERGY FORUM 2017 Success Story Scaling Up Energy Efficiency An Indian Experience Nitin Bhatt Regional Manager - UJALA Energy Efficiency Services Ltd. (EESL), India Largest ESCO in the world

More information

ELECTRICITY SUPPLY INDUSTRY OF BOTSWANA

ELECTRICITY SUPPLY INDUSTRY OF BOTSWANA ELECTRICITY SUPPLY INDUSTRY OF BOTSWANA General Information for Potential Investors May 2008 This publication was produced for review by the United States Agency for International Development. It was prepared

More information

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk 4-6 October 2016 The NEC, Birmingham, UK cleanenergylive.co.uk #celive #seuk @CleanEnergyLive cleanenergylive.co.uk #celive #seuk @CleanEnergyLive UK Energy storage policy A defining issue Clean Energy

More information

Smart Grid Demonstration Projects Update

Smart Grid Demonstration Projects Update Smart Grid Demonstration Projects Update Neil McGuinness Manager, Smart Metering, ESB Networks June 2010 Republic of Ireland Electricity Industry Structure Commission for Energy Regulation Independent

More information

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2.

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2. CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO Rexhep Shaqiri 1, Bogdanov Dimitar 2 1 Technical University - Sofia, E-mail: rexhep_shaqiri@hotmail.com). 2 Technical University -

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

WELCOME RUPANTARITA PRAKRITIK GAS COMPANY LIMITED (RPGCL) (A Company of Petrobangla)

WELCOME RUPANTARITA PRAKRITIK GAS COMPANY LIMITED (RPGCL) (A Company of Petrobangla) WELCOME RUPANTARITA PRAKRITIK GAS COMPANY LIMITED (RPGCL) (A Company of Petrobangla) Meeting on Experience sharing Dialogue on Improving Quality and Performance of Natural Gas Vehicles Program in South

More information

Enhancing Regional Cooperation in Energy Infrastructure Development

Enhancing Regional Cooperation in Energy Infrastructure Development Enhancing Regional Cooperation in Energy Infrastructure Development Davood Manzoor, Ph.D. High-Level Policy Dialogue on Regional Cooperation and Inclusive Development in South and South West Asia 18-19

More information

The research of power interconnection among China, Russia, Mongolia

The research of power interconnection among China, Russia, Mongolia The research of power interconnection among China, Russia, Mongolia CONTENTS Part1 Brief introduction of Inner Mongolia grid Part2 The research of grids interconnection among China, Russia, Mongolia Part1

More information

Presentation of the Company s Performance and Results in 2017

Presentation of the Company s Performance and Results in 2017 Presentation of the Company s Performance and Results in 2017 Lietuvos Energijos Gamyba, AB (LEG) Eglė Čiužaitė 28/2/2018 Vilnius Table of Contents About the Company Overview of 2017: The most important

More information

Share with the GHSEA. Smart Energy Initiatives. Collaboration and a partner eco-system to achieve results

Share with the GHSEA. Smart Energy Initiatives. Collaboration and a partner eco-system to achieve results Share with the GHSEA on behalf of the DSEA - learning and experience Color variant: Siemens Cool Gray Smart Energy Initiatives Collaboration and a partner eco-system to achieve results Realizing a Community-centric

More information

Rural Electrification Workshop International Best Practices and Options for Policy Makers 4 5 April 2013, Yangoon, Union of Myanmar

Rural Electrification Workshop International Best Practices and Options for Policy Makers 4 5 April 2013, Yangoon, Union of Myanmar Rural Electrification Workshop International Best Practices and Options for Policy Makers 4 5 April 2013, Yangoon, Union of Myanmar Rural Electrification Policies in Cambodia Presented by Mr. Loeung Keosela

More information

HVDC-Flexible in China. Sep

HVDC-Flexible in China. Sep HVDC-Flexible in China Sep 2015 1 Content SGCC and CET Overview HVDC Flexible Technology Comparison of Conventional HVDC and Flexible HVDC Applications of Flexible HVDC Flexible HVDC in China Sep 2015

More information

ABB Next Level Big shift in power attractive opportunities

ABB Next Level Big shift in power attractive opportunities Bernhard Jucker and Claudio Facchin, Capital Markets Day, London, ABB Next Level Big shift in power attractive opportunities Slide 1 Agenda Profitably growing ABB s power business Shifting the center of

More information

Workshop on HELE Coal Technologies

Workshop on HELE Coal Technologies Workshop on HELE Coal Technologies Indian Technology Initiatives & Future Challenges 29 th S K Thakur Chief Engineer Central Electricity Authority New Delhi th November 2011 Country Overview Developing

More information

Business opportunities and major projects in India

Business opportunities and major projects in India Business opportunities and major projects in India Rajesh Sharma Vice President, Financing Why India? Fastest growing economy now and in future India to become one of the world's three largest economies

More information

Impact of Afghanistan Power Master Plan on regional interconnection. Bangkok Nov 2013 IEA Training

Impact of Afghanistan Power Master Plan on regional interconnection. Bangkok Nov 2013 IEA Training Central Asia South Asia Connectivity Impact of Afghanistan Power Master Plan on regional interconnection Bangkok Nov 2013 IEA Training Jim Liston Principal Energy Specialist jliston@adb.org Central Asian

More information

Belt & Road Initiative and China- Korea-Japan Power Grid Interconnection

Belt & Road Initiative and China- Korea-Japan Power Grid Interconnection 2017.10 Belt & Road Initiative and China- Korea-Japan Power Grid Interconnection Outline Belt and Road Initiative Interconnection Overview Prefeasibility Study Outcomes Way forward 1 1. Belt and Road Initiative

More information

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016 The role of Transmission System Operator in Belgium and in Europe Vlerick Alumni Event 26 January 2016 Agenda Introduction Infrastructure management Controlling the system Developing the EU Market 1/25/2016

More information

Strategies for Promoting CMM Project Development in India

Strategies for Promoting CMM Project Development in India Strategies for Promoting CMM Project Development in India A.K. Singh CMD, CMPDI Co-Chair, Coal Sub-Committee Methane to Markets Cagliari, Italy 29-30 April,2008 Strategies for Promoting CMM Project Development

More information

Overview of S.L Competitive Energy Solutions for North Carolina

Overview of S.L Competitive Energy Solutions for North Carolina Overview of S.L. 2017-192 Competitive Energy Solutions for North Carolina JENNIFER MCGINNIS CHRIS SAUNDERS STAFF AT TORNEYS, LEGISLATIVE ANALYSIS DIVISION 1 Overview Product of extensive stakeholder process

More information

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 Policy & Regulatory Issues : Solar & Wind Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 About Us Vision To develop a solution with low cost, high technology power generation & fulfill

More information

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only Overview of Electricity Trade Agreement between Québec and Ontario May 10, 2017 For Information Purposes Only Purpose To provide an overview of the electricity trade agreement between the Independent Electricity

More information

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT MINISTRY OF ENERGY AND MINERAL DEVELOPMENT COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT Dr. Stephen Robert Isabalija PERMANENT SECRETARY 13 th -15

More information

Efficient Implementation of Power Sector Reforms in the Philippines

Efficient Implementation of Power Sector Reforms in the Philippines Local Energy Presentation Template Efficient Implementation of Power Sector Reforms in the Philippines DIRECTOR PATRICK T. AQUINO, CESE Energy Policy and Planning Bureau Public Consultation on National

More information

Transmission Line Survey

Transmission Line Survey Transmission Line Survey Name of the Project Owner / Client Scope of Work Type of Survey Instrument & Software tools used Schedule Time of Completio n Year of Completion Letter of Award for "Rate Contract"

More information

Energy and Mobility Transition in Metropolitan Areas

Energy and Mobility Transition in Metropolitan Areas Energy and Mobility Transition in Metropolitan Areas GOOD GOVERNANCE FOR ENERGY TRANSITION Uruguay, Montevideo, 05/06 October 2016 Energy and Mobility Transition in Metropolitan Areas Agenda I. INTRODUCTION

More information

Electricity Access in Lao PDR

Electricity Access in Lao PDR Seminar on Supporting Sustainable Development Goal 7, Target 7.1 By 2030 ensure universal access to affordable, reliable and modern energy services, UNCC, CR-4, Bangkok, Thailand 21-23 June 2016. Electricity

More information

Selling PFIFFNER in the UK. Paul Haines

Selling PFIFFNER in the UK. Paul Haines Selling PFIFFNER in the UK. Paul Haines Contents Introduction, Country & Market Overview UK. Accessing the Market Critical Success Factors. Developing the Business Together. Proposed Pfiffner Support.

More information

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission

More information

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014 1 BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada IEEE PES Meeting July 2014 General BC Hydro Overview Crown Corporation Serving about 95% of province and 1.9 million customers

More information

Yukon s Independent Power Production Policy

Yukon s Independent Power Production Policy Yukon s Independent Power Production Policy Updated October 2018 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy priorities,

More information

ADB Knowledge Partnership Week. Hirokazu Yamaguchi May, 2015

ADB Knowledge Partnership Week. Hirokazu Yamaguchi May, 2015 ADB Knowledge Partnership Week Hirokazu Yamaguchi May, 2015 TEPCO AT A GLANCE 1 THE 10 ELECTRIC POWER COMPANIES BY SERVICE AREA In Japan, 10 regional privately owned and managed General Electricity Utilities

More information

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab. Agenda note for 20 th Standing Committee Meeting for planning of transmission system of Northern Region 1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning

More information

Power Sector Overview Nepal. Anil Rajbhandary, NEA Capacity Building Program for SARPEX Mock Exercise 07 February, 2017; New Delhi

Power Sector Overview Nepal. Anil Rajbhandary, NEA Capacity Building Program for SARPEX Mock Exercise 07 February, 2017; New Delhi Power Sector Overview Nepal Anil Rajbhandary, NEA Capacity Building Program for SARPEX Mock Exercise 07 February, 2017; New Delhi Legislative and Regulatory Framework Key Acts and Regulations that govern

More information

Review of U.S. market reforms for renewable integration, flexibility, and storage

Review of U.S. market reforms for renewable integration, flexibility, and storage Review of U.S. market reforms for renewable integration, flexibility, and storage Eric Hsieh Director Office of Energy Finance and Incentives Analysis U.S. Department of Energy 14 July 2017 Transformations

More information

Smart Grid 2.0: Moving Beyond Smart Meters

Smart Grid 2.0: Moving Beyond Smart Meters Smart Grid 2.0: Moving Beyond Smart Meters Clean Energy Speaker Series State of the Smart Grid February 23, 2011 Prof. Deepak Divan Associate Director, Strategic Energy Institute Director, Intelligent

More information

AGENDA Introduction: Artumas, Overview

AGENDA Introduction: Artumas, Overview AGENDA Introduction: Artumas, Overview WHERE: Mtwara Concession, SE Tanzania EAPIC Forum Gas Utilization for Power Generation (Mtwara Energy Project) September, 2008 Nairobi, Kenya Mtwara Energy Project:

More information

Panel Discussion: Planning for Today and Tomorrow

Panel Discussion: Planning for Today and Tomorrow Panel Discussion: Planning for Today and Tomorrow Moderator: Chuck Farmer, Director, Stakeholder and Panelists: Public Affairs, IESO David Short, Power System Assessments, IESO Ahmed Maria, Senior Manager,

More information

Economic & Steel Market Development in Japan

Economic & Steel Market Development in Japan 1 Economic & Steel Market Development in Japan 68 th OECD Steel Committee Paris May 6-7, 2010 The Japan Iron & Steel Federation 2 Macro-economic overview Steel Supply and Demand v v v Steel Production

More information

The Electric Power System

The Electric Power System The Electric Power System - Thailand - Thailand Power System 1 Basic facts Area: 513,000 km 2 (198,000 sq mi), Population: 65,931,550 (2016) Number of electricity consumers (2016): 22.5 million households

More information

TURKISH ELECTRICITY NETWORK

TURKISH ELECTRICITY NETWORK TURKISH ELECTRICITY NETWORK Mehtap ALPER SAĞLAM & Murat YILMAZ Electrical Engineers, EMRA Network Assessment Workshop Athens, Greece March 2017 TURKİSH ELECTRİCİTY NETWORK INSTALLED CAPACİTY AND DEMAND

More information

Challenges Facing the City of Cape Town in Meeting Renewable Energy Targets

Challenges Facing the City of Cape Town in Meeting Renewable Energy Targets Challenges Facing the City of Cape Town in Meeting Renewable Energy Targets Dr Bulumko Msengana Executive Director: Utility Services City of Cape Town Organised by International Perspective Greenhouse

More information

National Committee Kosovo. SEERC October 2017 Istanbul

National Committee Kosovo. SEERC October 2017 Istanbul National Committee Kosovo SEERC October 2017 Istanbul CIGRE National Committee KOSOVO The CIGRE National Committee of Kosovo was recognized by the Administrative Council of CIGRE, consulted by correspondence

More information