Grid Specifications and Dynamic Wind Turbine Models

Size: px
Start display at page:

Download "Grid Specifications and Dynamic Wind Turbine Models"

Transcription

1 Code Shift Grid Specifications and Dynamic Wind Turbine Models GRID CODES (GCs) AND DYNAMIC WIND turbine (WT) models are key tools to allow increasing renewable energy penetration without challenging security of supply. In this article, the state of the art and the further development of both tools are discussed, focusing on the European and North American experiences. GC Development: Lessons Learned GCs have to be prepared for conditions years and decades ahead in order to require the appropriate technical features of new generation equipment in the context of the power system challenges that will follow future development in the grid. Twenty years ago, most GCs did not anticipate much change in the future power system structure. The development of significant renewable penetration levels was simply not part of the future scenarios. Today, it is still challenging to estimate credible future energy scenarios. In particular, it is difficult to estimate the growth of renewable energy (RE) generation. In the last decade, grid code requirements under estimated the rapid growth of distributed RE in continental Europe. This resulted in certain technical issues that within the space of a few years have moved from insignificance to major system concerns. Two issues in particular underline this point: fault ride-through (FRT) capability and problems related to a narrow Digital Object Identifier 1.119/MPE Date of publication: 18 October 213 IMAGE LICENSED BY INGRAM PUBLISHING 72 ieee power & energy magazine /13/$ IEEE november/december 213

2 By Thomas Ackermann, Abraham Ellis, Jens Fortmann, Julia Matevosyan, Ed Muljadi, Richard Piwko, Pouyan Pourbeik, Eckard Quitmann, Poul Sorensen, Helge Urdal, and Bob Zavadil frequency operating range (such as the 5.2-Hz issue ). We discuss these below. The need for FRT capability is nowadays widely described by various studies as well as practical records of faults with large loss of distributed generation. Previously, when large central synchronous generation provided nearly all the generation capacity, the philosophy of allowing or even requiring small distributed generators to disconnect during disturbances until the system recovered appeared appropriate. This approach was suitable when the instantaneous penetration of such new generation types covered only a few percent of the demand but not in power systems with significant levels of RE generation. A similar case is the permission (or often the system operator requirement) to trip distributed generation during severe system disturbances involving over frequencies. Traditionally, distributed and RE generation devices were built with a narrow tolerance for frequency deviations. This may be noncritical for low instantaneous RE penetration levels but can become critical when penetration becomes significant. In fact, it has led to a large problem with tens of gigawatts of RE in Germany set to trip at 5.2 Hz. After the FRT and 5.2-Hz problems were identified, incentive programs were started in several European countries (Germany, Italy, Portugal, and Spain) to trigger retrofits of already installed WTs and PV systems. Retrofitting has been shown to be costly, however, and is often problematic from a legal and technical point of view as well. Countries in which the growth of RE started later benefited from the experience of others. november/december 213 ieee power & energy magazine 73

3 Requirements regarding FRT or minimum frequency range are being implemented all over the world, even though the specific penetration with RE is still very low. This anticipation of technical needs for system development is reasonable in light of the fact that some countries have seen up to a ten fold increase in installed capacity in a single year, as it occurred with PV capacity in Italy and Great Britain in 211. In the United States, the discussion about an update of the IEEE 1547 standard in order to appropriately address the FRT and frequency range issues has just started. GCs Around the World In what follows, the North American as well as the European status of GC development is presented. North America The North American Electric Reliability Corporation (NERC) has primary responsibility for maintaining the reliability of the power grid. Recognizing that existing reliability rules did not adequately set clear requirements for new wind and solar technologies, NERC commissioned the Integration of Variable Generation Task Force (IVGTF) to: identify short comings in existing reliability standards make recommendations on what revisions should be implemented. In September 212, the IVGTF published a special assessment report, Interconnection Requirements for Variable Generation. The report contains specific recommendations for: reactive power and voltage control performance during and after disturbances Voltage at POI (p.u.) active power control harmonics and subsynchronous interaction models for facility interconnection studies communications between wind and solar plants and grid operators. NERC is currently using these recommendations to create and/or revise a series of high-priority reliability standards related to what it calls generator verification, including: PRC-19, Coordination of Generator Voltage Regulator Controls with Unit Capabilities and Protection PRC-24, Generator Performance During Frequency and Voltage Excursions MOD-24/25, Verification of Generator Gross and Net Real/Reactive Power Capability MOD-26, Verification of Models and Data for Generator Excitation System Functions MOD-27, Verification of Generator Unit Frequency Response. NERC and IEEE are also working together to address another reliability issue: the IEEE 1547 requirement for distribution-connected generation to trip off when voltage and frequency excursions occur. As the penetration of roof top PV increases, IEEE 1547 compliant PV systems increase the severity of loss-of-generation events. For example, a transmission system fault that causes the loss of a thermal generating plant could simultaneously initiate the tripping of roof top PV systems due to the momentary dip in voltage during the fault. The IVGTF is making recommendations to resolve this situation (Task 1-7). The IVGTF 1-7 report is recommending that IEEE 1547 be revised to include an explicit FRT requirement that does not conflict with the must trip envelope contained in the current standard. In the absence of the updated ERCOT CAISO, PRC-24-1 Draft 7 Manitoba Hydro, 23 kv Manitoba Hydro, 23 kv, Reduced Generation Output Is Permitted Hydro Quebec figure 1. Low and high fault ride-through. The requirements in PRC-24-1 are severity-cumulative duration curves, while other requirements are voltage-versustime envelopes. and revised NERC standards, some ISOs and utilities facing rapid growth of renewable generation in their jurisdictions have developed their own interconnection requirements. Figures 1 and 2 illustrate examples of requirements at the point of interconnection (POI) for low- and high-voltage ride-through and frequency range capabilities. For comparison, the requirements currently stated in NERC s PRC- 24-1, Generator Frequency and Voltage Protective Relay Settings (Draft 7), which applies to large generators, are also plotted. As in Europe, voltage ridethrough and frequency range requirements in North America vary widely from region to region. The adverse consequence of varying 74 ieee power & energy magazine november/december 213

4 voltage-versus-time envelope specifications is that generation facilities need to be designed with far more voltage withstand capability than is actually necessary. The severitycumulative duration approach to voltage ride-through specification recommended in the NERC IVGTF report and taken by PRC (see Figure 1) is more representative of actual duration of exposure to certain voltage ranges and thus less demanding to design for generating facilities. Given the differences in network properties and fault-clearing times from region to region, it is challenging to develop unified, envelope-type ride-through requirements that would be applicable across all of North America. Nevertheless, it should be possible to develop common severitycumulative duration profiles with time and voltage settings that vary based on a region s network properties and needs, similar to those in the recently developed European GC discussed later on in this article. North American standards related to reactive power range and voltage control capability for generators, including RE, are also evolving. With respect to reactive power capability, all of the reviewed examples require reactive capability corresponding to.95 power factor lead/lag at rated active power production at the point of interconnection, but none of the reviewed requirements is fully comprehensive. From the point of view of the industry and the wind power plant (WPP) developers, a reactive capability requirement is fundamental for selection of the appropriate technology, but unclear requirements often lead to misunderstandings and misinterpretations. To avoid them, a reactive power capability requirement needs to address the following questions, at a minimum: Is the range for the required reactive power capability representing a lower bound that has to be provided at all times or an upper bound that operation points must be (or must lie) within? Where is the point of interconnection (POI) at which this range applies? Under what voltage conditions must the minimum reactive capability range be achievable? May active power production be reduced to provide the required reactive power? Should the required reactive power range be continuously controllable, or are steps allowed? What is the minimum reactive capability requirement at zero active power output? Frequency (Hz) CAISO, PRC-24-1 Draft 7 Hydro Quebec, PRC-24-1 Draft 7 figure 2. Frequency range requirements. 1 1, ERCOT, PRC-24-1 Draft 7 Manitoba Hydro What is the required control mode? Is it reactive power, power factor, voltage at the POI, reactive power as a function of voltage at the POI, or some other mode? In North America, the IVGTF made specific recommendations to NERC in its September 212 IVGTF 1-3 report on how to specify reactive power requirements for wind and solar plants. Many in the industry are hoping that NERC will act on these recommendations and develop a clear set of rules governing this critical issue. The present situation, with volumes of confusing and conflicting regional requirements, is detrimental to the overall reliability of power grids. Status in Europe In what follows, the current GC status in Germany is presented as an example of the previously independent national GC developments in Europe. It is followed by an overview of the GCs for all of Europe that are currently under development. Germany The growth of renewable generation in Germany has been among the fastest in the world. By the end of 212, around 32 GW of wind and 32 GW of PV had been installed. One may ask if this is despite or because of the GCs in force. In Germany, most WPPs are connected to the mediumvoltage (MV) grid (1 6 kv) and are therefore subject to the 28 MV Guideline, issued unilaterally by the German Association of Energy and Water Industries. Since then, the guideline has been adapted by amendments several times, clarifying and tightening the technical requirements step november/december 213 ieee power & energy magazine 75

5 by step. In the spring of 213, the Association for Electric, Electronic, and Information Technologies (VDE) began to transform the guideline into a VDE Forum for Network Technology and Network Operation (FNN) recommendation. This process is expected to take one to two years but has the great advantage of having reasonable stakeholder involvement. The 27 Transmission Code established technical highvoltage (HV) requirements. Meanwhile, WPP connections to the 22-kV level and above are still rare in Germany. WPPs connected to the 11-kV level have been increasing over the last several years, however. Since 28, a VDE FNN group of PT IS IE table 1. Thresholds for type B, C, and D PGMs. RG Continental Europe RG Nordic RG Baltic RG UK RG Ireland ES MA GB FR PGM Maximum Capacity Thresholds Synchronous Area Type B Type C Type D Continental Europe 1 MW 5 MW 75 MW Nordic 1.5 MW 1 MW 3 MW Great Britain 1 MW 1 MW 3 MW Ireland.1 MW 5 MW 1 MW Baltic.5 MW 1 MW 15 MW NL BE LU DZ NO CH TN IT AT SI HR figure 3. An overview of the European synchronous areas. DK DE SE CZ PL SK HU RU BA RS ME MK AL experts from the system operators, industry, and other parties has been working on a new VDE recommendation, VDE-AR-N 412 (draft), specifically for the 11- kv level. This new recommendation includes certain new technical aspects. For the first time, for example, explicit numbers are provided regarding negative sequence fault current contribution during unbalanced grid faults. In addition to purely technical requirements, Germany has also established a complex certification process, applicable to the individual generating unit type as well as to the WPP. Its level of detail and explicit requirement to involve independent, accredited certifying bodies is complex and time-consuming. Beyond these technical and certification rules, all German WPPs must meet the requirements of the Ordinance on System Services by Wind Energy Plants (SDLWindV), issued by the German federal government in 29. The SDL- WindV sought to incentivize the better integration of WPPs into the electrical system, in particular the upgrade of older WTs to fault ride-through capability and the installation of technical communication means for emergency dispatching by the system operator. Currently, all connecting WPPs must meet these requirements. The technical requirements of the SDLWindV remain binding; the financial incentive to retrofit the WPPs is fading out, however. LV FI EE LT GR RO BG UA BY RU MD TR CY ENTSO-E Requirements for Generators Network Code for Europe The European Commission (EC) has initiated development of nine Europe-wide GCs or network codes (NCs), as they are called. As of the spring of 213, the first three NCs are in the final phase of becoming legally binding for all of Europe, the first possibly by the first half of 214. The outcome will depend on decisions to be made by energy ministry representatives from the 27 European Union (EU) countries in a process called comitology. The most relevant NC for renewables, the Requirements for Generators (RfG), is discussed briefly below. The RfG NC was used as the pilot to test and refine the NC code development process by ENTSO-E (the organization of 41 European TSOs, which covers ieee power & energy magazine november/december 213

6 countries). The RfG covers a wide range of connection requirements U/p.u. (54 groups of capabilities). Some of these connection requirements 1. are mandatory and exhaustive, e.g., frequency range, and some are nonmandatory and nonexhaustive (deci- U rec2 sions deferred to the national level). Requirements for powergenerating modules (PGMs) are rec1 U brought in on a graded basis, with increasing significance as connection requirements increase. The U clear U PGMs are split into four types, ret with Type A, starting at 8 W, as the least significant. The thresholds for Types B, C, and D are given in Table 1 for each of the synchronous European areas. An overview of these areas is given in Figure 3. All PGMs with connection points at 11 kv or higher are automatically classified as Type D, regardless of MW size. Some of the requirements covered by RfG are discussed below. Fault ride-through voltage against time: The typical focus on the voltage-against-time curve as the key aspect describing the FRT requirements is applied with caution in the RfG, as differences in initial prefault conditions can make the seemingly easiest requirements (14 ms) just as challenging as the most onerous requirement (25 ms). Another major factor is where the reference point is for the voltageagainst-time curve. In Europe this is always defined as the connection point, in North America typically as POI, which can be 4 kv for a very large WPP or the generator terminals for a single WT, at 69 V. Each TSO is required to define and make publicly available the pre- and post fault conditions applying in its jurisdiction following stakeholder consultation and National Regulatory Authority input. The values of the voltages and times in Figure 4 are determined at the national level within sets of permitted values tabulated in the RfG for the different PGM types. This illustrates the clear intent of having ridethrough capability for faults at the transmission level (with wide spread impact) including impact on distribution-connected WPPs, without covering requirements for faults at the distribution level (with only limited local impact). The requirement for asymmetric faults as well as active power recovery will be decided at the national level. Reactive capability and voltage control: The steadystate reactive power capability at the connection point is also provided in tables in the RfG. The steady-state voltage ranges in which these levels of reactive power have to be available vary according to synchronous t clear t rec1 t rec2 t rec3 figure 4. An FRT profile of a PGM according to ENTSO-E s RfG NC. area between.1 p.u. and.225 p.u. Reactive power requirements below maximum capacity are defined on a national basis and may include conditions for reactive power at zero active power. The power park module shall according to Article 16 also be capable of providing reactive power automatically by either voltage control mode, reactive power control mode, or power factor control mode. Future Challenges Further system needs can be expected to become relevant, particularly with the increase of non synchronous generation. This will result in a wide range of power system services previously provided by synchronous generators that will steadily migrate across to RES generation. The additional services to be offered by renewable generation and other generation may include: inertia and/or fast primary response as well as synchronizing torque mitigation of negative sequence voltages damping of low-order harmonics and active filtering development of the protection system to deal with future lower short-circuit currents resynchronization and blackstart capability. Dynamic Models for WT Generators One of the key challenges with renewable generation technologies has been developing and maintaining standard public computer simulation models for the purpose of power system studies. In 27, the International Council on Large Electric Systems (CIGRE) published a report on the subject of the dynamic performance of wind generation technologies and presented some initial ideas about potential simplified model structures. Shortly after the inception of the CIGRE group, the Western Electricity Coordinating Council (WECC) initiated a task force to develop actual generic models and implement t/s november/december 213 ieee power & energy magazine 77

7 them for the commercial tools used in the western U.S. system. The efforts of this task force, the WECC Wind Generator Modeling Group, culminated in the development of the first generation of generic models for WT generators (WTGs) and their implementation in several commercial simulation software packages. These models were released around 29. In late 29, the International Electrotechnical Commission (IEC) started a working group (IEC TC88 WG27) to define standard WTG models. At about the same time, the WECC task force changed its name and became the Renewable Energy Modeling Task Force (REMTF) and was chartered with updating the wind generation generic models as well as developing generic models for PV generation. During these years, the IEEE Power System Dynamic Performance Committee s Working Group on Dynamic Performance of Wind Generation has also served as a forum for these discussions. This and other groups have participated in panel sessions and tutorials to foster collaboration and the exchange of ideas. Finally, a NERC special report issued in 21, Standard Models for Variable Generation, highlighted the need for such standard generic models in North America. Over the past three years, some significant progress has been made by the WECC and IEC modeling groups. Deficiencies were identified in the initial generation of the generic WTG models in 21. This led both the WECC and IEC groups to focus on expanding the firstgeneration models to attempt to cover a wider range of control strategies. Any modeling effort is an evolving process, especially in the case of renewable technologies such as WTGs, where the technology has been constantly changing and evolving in parallel with the modeling efforts. These so-called deficiencies in the first generation of models were therefore to be expected. The remainder of this article is focused on generic and public models. There are, of course, vendor-specific models that provide greater fidelity available from the equipment vendors, but in many cases these are shared only under non disclosure agreements. It is outside the scope of this article to go into the details of why there is a need for a hierarchy of models. For such a discussion, the reader is encouraged to consult references such as the NERC special report. The term generic refers to a model that is standard, public, and not specific to any vendor, so that it can be parameterized in order to reasonably emulate the dynamic behavior of a wide range of equipment while not directly representing any actual turbine controls. The intended usage of these models, as described in the context of the NERC, WECC, and IEC efforts, is primarily for power system stability analysis, with a focus on positive sequence analysis. The need for three-phase models and vendor-specific models still certainly exists for specialized and site-specific studies. The four main WT technologies are shown in Figure 5. Today, the most commonly installed technologies for new WPPs are the type 3 and 4 units. There are, however, a large number of the type 1 and 2 units in service around Type 1 Conventional Induction Generator Type 2 Variable Rotor- Resistance Induction Generator To Grid To Grid (a) Type 3 Doubly Fed Asynchronous Generator (b) Type 4 Full-Converter Unit To Grid ac/dc dc/ac To Grid ac/dc (c) dc/ac Can Be Gearless; Generator Can Be Induction, Synchronous or Permanent Magnet Generator (d) figure 5. The four main WT technologies. 78 ieee power & energy magazine november/december 213

8 GCs are evolving rapidly around the world, but to anticipate future power system needs, even this will have to accelerate. the world, and so modeling them is also of importance. In terms of modeling and control, the type 3 and 4 WTGs are certainly more complicated; they also offer greater flexibility and controllability, however. (See PV Plant and WPP Models: Similarities and Differences. ) One significant difference in the approach to modeling and model validation between the United States and many other parts of the world is the way in which reliability standards are written and applied. In many European countries and others, there are strict grid codes that govern both the performance of generation technologies and how models for those technologies must be validated. Many of these standards, prior to the updating that will align them with the pan-european RfG NC, have subtle but quite significant PV Plant and WPP Models: Similarities and Differences Large PV plants and WPPs with type 4 WTGs are quite similar with respect to their electrical performance. Both use the same collector system topology and plant control strategy. PV converters are connected to a PV array (a dc source), whereas type 4 WTG converters are tied to a generator driven by a WT. With respect to positive-sequence power system dynamics, however, the range of response to grid disturbances is fundamentally the same. Accordingly, following the WECC REMTF approach, the plant controller and generator and converter models are identical to those used for wind power plants (see Figure S1). The only differences are the following: The PV plant model clearly does not require a turbine model. Also, the WECC s REMTF preliminary specification assumed that representation of dc dynamics is not required for this application. The PV plant model uses a simplified version of the electrical controls module (reec_b) to mask some of the wind-specific control functionality included in the reec_a module. This is purely for model user convenience. Vref/Vreg or Qref/Qgen Freq_ref/Freq and At Plant Level Plant_pref/Pgen repc_a Plant Level Control Vt reec_b Qref (or Qext) Qgen Pref Q Control P Control lqcmd lpcmd Current Limit Logic lqcmd lpcmd regc_a Generator/ Converter Model lq lp Pqflag = 1 (P Priority) = (Q Priority) figure S1. A PV plant model structure, as described by the WECC s REMTF. november/december 213 ieee power & energy magazine 79

9 differences, making it challenging for vendors to keep up with all the various markets. In the United States, soon-tobe-effective modeling and data standards (NERCMOD-26 and MOD-27) specify the procedural requirements and responsibilities of the various entities in providing models and ensuring validation. The standards, however, do not specify the exact method for or any quantitative requirements on validation. The process of validation is left to expert engineering judgment. Furthermore, there are no specific GC requirements for equipment performance during transient events in the United States, except for certain minimum requirements stipulated by FERC Order 661-A. Due to these subtle differences in approach and the many specific and varying GCs in international markets, there is much greater emphasis on and closer scrutiny of the comparison between the model and measured quantities during a fault or voltage dip outside than inside North America. In North America (particularly the United States), there is a much greater emphasis on post fault system recovery. The consequence of this on modeling efforts is that the WECC and IEC groups have some differences in their approaches to model development, particularly for type 3 WTGs. Vref/Vreg or Qref/Qgen at Plant Level Freq_ref/Freq and Plant_pref/Pgen repc_a Plant Level Control Vt reec_a Qref (or Qext) Qgen Pref (or TExt) Q Control P Control lqcmd lpcmd Current Limit Logic lqcmd lpcmd regc_a Generator/ Converter Model lq lp spd wtgt_a Drive Train Pqflag = 1 (P Priority) = (Q Priority) (a) Wind Turbine Type 4A Model Grid Protection u WT f WT F OCB Generator System i Wt Electrical Equipment u WT i WT i pcmd i qcmd i pmax i qmax p WT q WT u WT p WTref x WTref Control (b) figure 6. A block diagram of the modular structure of the type 4 WTG model as defined in the most recent draft of (a) the WECC REMTF and (b) the IEC TC88 WG27 documents. 8 ieee power & energy magazine november/december 213

10 The ultimate goal of the modeling efforts is to have suitable models for WPPs that adequately represent the dynamic behavior of the entire plant at the point of common coupling. The focus in both groups has been on type 3 and 4 WTGs. An important new aspect of the second-generation models is the decision by both groups to move toward a modular approach. That is, the models are made up of smaller modules that are truly generic and usable for any appropriate renewable generation system. This allows additional versions to be developed for each module as changes are deemed necessary in the future. This also makes it easier for the differences between the WECC and IEC approaches to be addressed simply through the development of different modules. Figure 6 shows the overall structure of the second-generation type 4 WTG model. For the WECC type 4 WTG, shown in Figure 6(a), the model has four modules: 1) the RE generator and converter model (regc_a), which is used for the type 3 WTG and also for the PV model 2) the RE electrical controls model (reec_a), which is also used for the type 3 WTG, and a simplified version is used for the PV model. 3) the emulation of the drive train (wtgt_a) for simulating drive-train oscillations, which is also used for the type 3 WTG 4) a simple RE plant controller (repc_a), which is also used for the type 3 WTG and PV model. Before approval of the initial specifications in WECC, much work was done within the group to actually test and attempt to validate the model structures against field-measured responses of various vendors equipment for single WT generators. One example is shown in Figure 7. Initial implementation of the models has begun in two of the major commercial software platforms used in the United States. Beta testing of the models in these platforms, versus a bench mark model, is underway (as shown in Figure 7). As with any modeling effort, this process has already led to the identification of some subtle issues that will need resolution before the final release of the models in the commercial tools. The model specification will then be finalized. In the IEC effort, the focus is still on completing the final committee draft of the model specifications for the single WT generators. It is hoped that a committee draft for voting will be issued before the end of 213 and a final draft international standard will be issued by mid-214. As mentioned above, the IEC effort is quite similar to the WECC approach. Several members active in both groups have worked to ensure coordination between the efforts to the extent possible. The key differences at present are in the type 3 model. These differences originate in the distinction between the validation philosophies of the United States and Real Power (p.u.) Reactive Power (p.u.) (a) (b) Measured EPRI WTGMV Commercial Tool figure 7. A comparison of simulation and measured response for a type 4 WTG (measured data are vendor-supplied); the response to a voltage dip at the high-voltage side of the WTG step-up transformer is shown. The blue line is the original measured data. The red dashed line is a simulation based on the Electric Power Research Institute s WTGMV tool. The green line is the simulation with the beta implementation of the model by a commercial software vendor. Values shown are as measured and simulated on the low-voltage side of the transformer. Europe, as explained above. To give one example, consider Figure 8. In this figure, we see one of the type 3 technologies, an ac-side power electronic protection circuit referred to as an active crow bar. Not all type 3 designs use this feature; some employ dc choppers, and others simply over rate the converter and use neither. So this particular discrepancy is limited to one control design approach. Based on an overwhelming majority decision, the WECC group decided that the level of detail pertaining to the action of the active crowbar did not warrant the significant added complexity in the model. Furthermore, all (including those in the IEC group) agree that the model only offers a rather simple emulation and that the parameters may be dependent on operating condition. To truly and faithfully model the action of the active crowbar, detailed three-phase models are needed. The ultimate goal of the modeling efforts is to have suitable models for WPPs that adequately represent the dynamic november/december 213 ieee power & energy magazine 81

11 Real Power (p.u.) Measured Simulated Real Power (p.u.) Measured Simulated Reactive Power (p.u.) (a) Reactive Power (p.u.) (b) figure 8. A comparison of simulation and measured response for a type 3 WTG (measured data is vendor supplied). (a) The comparison between measurement and simulation for the current implementation of the WECC model, where there is no emulation of the active crow bar, and (b) the case with the proposed emulation of the active crowbar, as proposed in the IEC group. Values shown are as measured and simulated on the low-voltage side of the transformer. behavior of the entire plant at the POI. This has not yet been achieved. The IEC group has yet to begin on the plant-level models. The WECC group, with input and ideas from the IEC group and from vendors, has implemented an initial plant-level control model, but it too remains to be validated and may thus require significant modifications. The plant-level models specified in the WECC documentation should not yet be taken as validated and finalized. One challenge has been obtaining the necessary and suitable data to validate plant-level models; this is due to the fact that it is only recently that large wind (and solar) power plants have started to implement adequate monitoring devices, such as phasor measurement units, at the POI. Outlook Recent history has shown that a strong effort covering GCs and dynamic turbine model development is necessary to ensure that system reliability is maintained under high- RE scenarios. GCs are evolving rapidly around the world, but to anticipate future power system needs, even this will have to accelerate. Generation technologies, dynamic models, and system service markets must follow power system needs. Dynamic model development and validation are often addressed in GCs and are an equally critical development in ensuring that study tools are available to model and simulate the behavior of the bulk system during critical disturbances in order to ensure system reliability. These two areas can expect to see continued developments in the future with the increasing penetration of RE on both transmission and distribution systems around the world. For Further Reading (212, Sept.). Interconnection requirements for variable generation, NERC special assessment report. [Online]. Available: (28, June). Generating plants connected to the mediumvoltage network, Guideline for generating plants connection to and parallel operation with the medium-voltage network. BDEW, Berlin, Germany. [Online]. Available: bdew.nsf/id/de7b6erd_netzcodes_und_richtlinien/$file/ BDEW_RL_EA-am-MS-Netz_engl.pdf (213, Mar.). ENTSO-E network code for requirements for grid connection applicable to all generators. ENTSO-E, Brussels, Belgium. [Online]. Available: eu/fileadmin/user_upload/_library/resources/rfg/1338_ Final_Version_NC_RfG.pdf Biographies Thomas Ackermann is with Energynautics GmbH, Darmstadt, Germany. Abraham Ellis is with Sandia National Laboratories, Albuquerque, New Mexico. Jens Fortmann is with RE power Systems SE. Julia Matevosyan is with Electric Reliability Council of Texas (ERCOT). Ed Muljadi is with the National Renewable Energy Laboratory, Colorado. Richard Piwko is with GE Energy Consulting, Schenectady, New York. Pouyan Pourbeik is with the Electric Power Research Institute, North Carolina. Eckard Quitmann is with the ENERCON GmbH, Bremen, Germany. Poul Sorensen is with the Technical University of Denmark, Roskilde, Denmark. Helge Urdal is with National Grid, United Kingdom. Bob Zavadil is with EnerNex LLC, Knoxville, Tennessee. p&e 82 ieee power & energy magazine november/december 213

Experience with Model Validation of PV Power Plants. Abraham Ellis, Ryan Elliott, Ray Byrne Sandia National Laboratories

Experience with Model Validation of PV Power Plants. Abraham Ellis, Ryan Elliott, Ray Byrne Sandia National Laboratories 1 Experience with Model Validation of PV Power Plants Abraham Ellis, Ryan Elliott, Ray Byrne Sandia National Laboratories 2 Outline Overview: PV Plants and WECC/REMTF Models Status of WECC/REMTF generic

More information

Western Electricity Coordinating Council Modeling and Validation Work Group

Western Electricity Coordinating Council Modeling and Validation Work Group Western Electricity Coordinating Council Modeling and Validation Work Group Renewable Energy Modeling Task Force Development of Planning Models dl for Solar PV Systems November 18, 2009 Phoenix, AZ Contact:

More information

Journal of American Science 2015;11(11) Integration of wind Power Plant on Electrical grid based on PSS/E

Journal of American Science 2015;11(11)   Integration of wind Power Plant on Electrical grid based on PSS/E Integration of wind Power Plant on Electrical grid based on PSS/E S. Othman ; H. M. Mahmud 2 S. A. Kotb 3 and S. Sallam 2 Faculty of Engineering, Al-Azhar University, Cairo, Egypt. 2 Egyptian Electricity

More information

New Challenges for the Transatlantic Cooperation N. LOHL, EASA

New Challenges for the Transatlantic Cooperation N. LOHL, EASA New Challenges for the Transatlantic Cooperation N. LOHL, EASA IAQG General Assembly München 16th October 2009 Introduction: IAQB and EASA International Aerospace Quality Group, IAQB refers to: Culture

More information

Session 10 NERC Interconnection Requirements

Session 10 NERC Interconnection Requirements GE Energy Session 10 NERC Interconnection Requirements UVIG Short Course 2014 Portland, Oregon Jason MacDowell NERC Standards Recently Adopted NERC GVSDT* standards MOD (Model Validation): MOD-025: Verification

More information

Modeling of Momentary Cessation and Voltage Ride-Through Level 2 NERC Alert Loss of Solar Resources during Transmission Disturbances due to Inverter

Modeling of Momentary Cessation and Voltage Ride-Through Level 2 NERC Alert Loss of Solar Resources during Transmission Disturbances due to Inverter 1 Modeling of Momentary Cessation and Voltage Ride-Through Level 2 NERC Alert Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Issued May 1,2018 Webinar is provided

More information

Testing Renewable Power Plants on High-Voltage-Ride-Through Capability

Testing Renewable Power Plants on High-Voltage-Ride-Through Capability Testing Renewable Power Plants on High-Voltage-Ride-Through Capability Grid Code Requirements and Testing Procedure Dipl.-Wirt.-Ing. Julian Langstädtler Division Manager Innovation & Consulting FGH GmbH

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

Large Scale Solar Integration

Large Scale Solar Integration Large Scale Solar Integration Experiences and Coming Changes in Distributed Energy Resource Interconnections October 26 th, 2017 Overview Background on Xcel Energy Expansion of Solar in Minnesota Changes

More information

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew. Guide Department: Interconnection Services Document No: GD-1401 v1.0 Title: WIND ISLANDING Issue Date: 11-24-2014 Previous Date: N/A Contents 1 PURPOSE... 2 2 SCOPE AND APPLICABILITY... 2 3 ROLES AND RESPONSIBILITIES...

More information

Integrating 2,000 MW of Wind Power into Canadian Electricity Networks Real Life Challenges and Solutions

Integrating 2,000 MW of Wind Power into Canadian Electricity Networks Real Life Challenges and Solutions Integrating 2,000 MW of Wind Power into Canadian Electricity Networks Real Life Challenges and Solutions, Grid Integration Engineer, ENERCON Canada inc. October 4 th 2016, CANWEA, Montréal Introduction

More information

PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS Public consultation 15 March 23 April 2018 Contents 1 Introduction and background... 2 2 Definitions and applicability... 2 3 SPM categories types... 3 4 SPM

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen)

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen) Technical Paper: Low voltage ride-through testing of wind turbine converters at ABB helps wind turbines meet the requirements of IEC 61400-21 more quickly (by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka

More information

Modeling and Simulation of Battery Energy Storage Systems for Grid Frequency Regulation. X. XU, M. BISHOP, D. OIKARINEN S&C Electric Company USA

Modeling and Simulation of Battery Energy Storage Systems for Grid Frequency Regulation. X. XU, M. BISHOP, D. OIKARINEN S&C Electric Company USA , rue d Artois, F-8 PARIS CIGRE US National Committee http : //www.cigre.org Grid of the Future Symposium Modeling and Simulation of Battery Energy Storage Systems for Grid Frequency Regulation X. XU,

More information

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2. Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft 2012-11-29 Proposed New ISO Rules Section 502.5 Version 2.0 Generating Unit Technical Requirements

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations

Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations Presenter: Bernard Magoro, System Operator, Transmission Division, Eskom SOC Holdings Date: 05 October 2018 Contents 1. Background

More information

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM 1 1 The Latest in the MIT Future of Studies Recognizing the growing importance of energy issues and MIT s role as an honest broker, MIT faculty have undertaken a series of in-depth multidisciplinary studies.

More information

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016 NERC Load Modeling Activities Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016 Introduction Kickoff January 2016 LMTF webpage Chair: Dmitry Kosterev,

More information

European Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids

European Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids European Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids EWIS Concluding Discussion 13th April 2010, Brussels Network Strengthening findings

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

Generating Unit Model Validation Policy

Generating Unit Model Validation Policy Generating Unit Model Validation Policy approved by WECC BOT WECC Generator Testing Task Force History August 10, 1996 WSCC Outage 4600 Observed COI Power (Dittmer Control Center) Real event 4400 4200

More information

Regional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee

Regional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee Regional Cooperation Infrastructure Development and Operation EU Energy Governance 30 April 2014, Berlin Olaf Ziemann Member of ENTSO-E s System Operations Committee About ENTSO-E 41 TSOs from 34 countries

More information

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS January 2018 Contents 1 Introduction and background... 2 2 Definitions and applicability... 2 3 SPM categories types... 3 4 SPM Type A... 4 4.1 Frequency

More information

Technical & Regulatory Standards Development

Technical & Regulatory Standards Development GE Energy Management Technical & Regulatory Standards Development RENEW / ISONE Interconnection of Renewable Generation Jason MacDowell GE Energy Consulting September 30, 2014 Global Renewable Codes &

More information

Renewable Grid Integration Research in the U.S.

Renewable Grid Integration Research in the U.S. Renewable Grid Integration Research in the U.S. Barry Mather Ph.D. NREL- Distributed Energy Systems Integration Group UNSW IEA PVPS Task 14 Workshop Sydney, AU November 26 th, 2013 NREL is a national laboratory

More information

Advanced Inverter Design

Advanced Inverter Design GE Energy Advanced Inverter Design Matt Perkins, Sales Manager Global solar landscape Annual Solar Installations (GW) $3.85 Module ASP ($/W) $1.70 $1.60 $1.35 $1.25 $1.15 70% Industry dynamics 11 9 11

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Full-Scale Medium-Voltage Converters for Wind Power Generators up to 7 MVA

Full-Scale Medium-Voltage Converters for Wind Power Generators up to 7 MVA Full-Scale Medium-Voltage Converters for Wind Power Generators up to 7 MVA Philippe Maibach, Alexander Faulstich, Markus Eichler, Stephen Dewar ABB Switzerland Ltd CH-5300 Turgi, Switzerland Phone: +41

More information

Industry Recommendation Loss of Solar Resources during Transmission Disturbances due to Inverter Settings - II

Industry Recommendation Loss of Solar Resources during Transmission Disturbances due to Inverter Settings - II Loss of Solar Resources during Transmission Disturbances due to Inverter Settings - II Initial Distribution: May 1, 2018 NERC has identified adverse characteristics of inverter-based resource performance

More information

INTERCONNECTED POWER SYSTEMS POWER GRIDS. Chapter 8

INTERCONNECTED POWER SYSTEMS POWER GRIDS. Chapter 8 INTERCONNECTED POWER SYSTEMS POWER GRIDS Chapter 8 POWER GRID ADVANTAGES Large Electrical Inertia Maximizes system stability, reliability and security Maintains frequency, voltage and load flows Offers

More information

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 106 CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 5.1 INTRODUCTION Inherent characteristics of renewable energy resources cause technical issues not encountered with conventional thermal,

More information

Workshop on Grid Integration of Variable Renewable Energy: Part 1

Workshop on Grid Integration of Variable Renewable Energy: Part 1 Workshop on Grid Integration of Variable Renewable Energy: Part 1 System Impact Studies March 13, 2018 Agenda Introduction Methodology Introduction to Generators 2 Introduction All new generators have

More information

Grid Operations & Planning R&D Area Overview

Grid Operations & Planning R&D Area Overview Grid Operations & Planning R&D Area Overview Daniel Brooks Speaker s Job Title Sept 2016 Advisory Committee 2016 Sept 19: Hollywood, FL Grid Operations & Planning R&D Area at a Glance Grid Operations Advanced

More information

Accommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009

Accommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Accommodating High Levels of Variable Generation EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Agenda About NERC About the Integration of Variable Generation Task Force

More information

ABB LITHUANIA 25 YEARS Making Grids Smarter A Journey from a Vision to Reality. Dick Kronman, Head of Smart Grids Center of Excellence

ABB LITHUANIA 25 YEARS Making Grids Smarter A Journey from a Vision to Reality. Dick Kronman, Head of Smart Grids Center of Excellence ABB LITHUANIA 25 YEARS 12.10.2017 Making Grids Smarter A Journey from a Vision to Reality Dick Kronman, Head of Smart Grids Center of Excellence The evolving grid From traditional to smart grid Traditional

More information

Transient Stability Analysis Tool (TSAT) Update April 11, Hongming Zhang EMS Network Applications Manager

Transient Stability Analysis Tool (TSAT) Update April 11, Hongming Zhang EMS Network Applications Manager Transient Stability Analysis Tool (TSAT) Update April 11, 2016 Hongming Zhang EMS Network Applications Manager Agenda Peak Online TSAT Introduction: Where we are on Wide-wide System Model (WSM) -TSAT online

More information

THE BALTIC SEA POWER RING CONNECTED: A GLANCE AT NORDBALT AND LITPOL LINK TODAY AND OUTLOOK FOR TOMORROW

THE BALTIC SEA POWER RING CONNECTED: A GLANCE AT NORDBALT AND LITPOL LINK TODAY AND OUTLOOK FOR TOMORROW THE BALTIC SEA POWER RING CONNECTED: A GLANCE AT NORDBALT AND LITPOL LINK TODAY AND OUTLOOK FOR TOMORROW Daivis Virbickas Litgrid CEO 24 November 2015 90 Electricity consumption reflects the level of economy

More information

Essential Reliability Services Engineering the Changing Grid

Essential Reliability Services Engineering the Changing Grid Essential Reliability Services Engineering the Changing Grid Robert W. Cummings Senior Director Engineering and Reliability Initiatives i-pcgrid March 39, 2016 Change is Coming Characteristics and behavior

More information

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1). Ken Duke Solicitor & Counsel Phone: 604-623-3623 Fax: 604-623-3606 bchydroregulatorygroup@bchydro.com April 30, 2014 Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Dear Ms. Hamilton: RE: (BCUC) British

More information

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1 Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1 A Guide for Iowa s Municipal Electric Utilities On the How the IEEE 1547 Distributed Generation Interconnection Standard Affects Solar

More information

2009 Europe / US International Aviation Safety Conference

2009 Europe / US International Aviation Safety Conference 2009 Europe / US International Aviation Safety Conference Standardisation, EASA model Edmund Bohland Section Manager EASA-Standardisation 1 The European regulatory system Legislative Role Executive Role

More information

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Abstract: G. Thrisandhya M.Tech Student, (Electrical Power systems), Electrical and Electronics Department,

More information

Adding value to IRENA s REmap 2030 project using a European Electricity Model

Adding value to IRENA s REmap 2030 project using a European Electricity Model Adding value to IRENA s REmap 2030 project using a European Electricity Model Seán Collins, Deger Saygin, Paul Deane, Dolf Gielen, Brian Ó Gallachóir Joint Research Centre Petten 11 th October 2016 Agenda

More information

CRE Presentation on Emerging Technology Guidance

CRE Presentation on Emerging Technology Guidance CRE Presentation on Emerging Technology Guidance 6 th June 2016 Emerging Technologies - Timeline According to articles 66 to 70 on Emerging Technologies Within 6 months of the entry into force of the RfG

More information

Review of U.S. market reforms for renewable integration, flexibility, and storage

Review of U.S. market reforms for renewable integration, flexibility, and storage Review of U.S. market reforms for renewable integration, flexibility, and storage Eric Hsieh Director Office of Energy Finance and Incentives Analysis U.S. Department of Energy 14 July 2017 Transformations

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Integration of Large Wind Farms into Electric Grids

Integration of Large Wind Farms into Electric Grids Integration of Large Wind Farms into Electric Grids Dr Mohammad AlZoubi Introduction Development WHAT IS NEXT!! Over the next 12 years, Europe must build new power capacity equal to half the current total.

More information

NERC White Paper On FERC NOPR [Docket No. RM ] Proposal to Revise Standard Generator Interconnection Agreements

NERC White Paper On FERC NOPR [Docket No. RM ] Proposal to Revise Standard Generator Interconnection Agreements NERC White Paper On FERC NOPR [Docket No. RM16-1-000] Proposal to Revise Standard Generator Interconnection Agreements NERC White Paper on NOPR In response to FERC Notice of Proposed Rulemaking (NOPR)

More information

ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV

ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV September 2017 1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Andreas Falk, Ancillary services

More information

Grid Stability Analysis for High Penetration Solar Photovoltaics

Grid Stability Analysis for High Penetration Solar Photovoltaics Grid Stability Analysis for High Penetration Solar Photovoltaics Ajit Kumar K Asst. Manager Solar Business Unit Larsen & Toubro Construction, Chennai Co Authors Dr. M. P. Selvan Asst. Professor Department

More information

Click to edit Master title style

Click to edit Master title style Challenges in grid planning and market integration moving towards the digital energy shift Trondheim, 28 April 2017 Information Technology and Electrical Engineering the digital energy shift Click to edit

More information

PowerGen Europe 2014 CIMAC circle

PowerGen Europe 2014 CIMAC circle PowerGen Europe 2014 CIMAC circle Impact & challenges for product development and daily customer business? 3 rd of June 2014; Köln Jürgen Winterholler Vice President Propulsion & Power Generation Head

More information

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Adopted Based on State and Tariff Interconnection Rules Applicable to Northern States Power,

More information

AMBER M. KLESGES BOARD SECRETARY. No.\w-Tm

AMBER M. KLESGES BOARD SECRETARY. No.\w-Tm \C. 9! J RECOMMENDATION APPROVED; RESOLUTION NO. 16-7999 AND TEMPORARY ORDER 16-7209 & PERMANENT ORDER 16-7210 ADOPTED; BY THE BOARD OF HARBOR COMMISSIONERS \b 1 September 15, 2016 1A THE PORT OF LOS ANGELES

More information

ENTSO-E Regional Grid planning

ENTSO-E Regional Grid planning ENTSO-E Regional Grid planning BASREC Workshop Development of the electricity market and strengthening of elecricity grid in the High North Region St.Petersburg 28th February 2014 Maarit Uusitalo Member,

More information

MINUTES. OF THE 1st MEETING TYPE-APPROVAL AUTHORITIES EXPERT GROUP - TAAEG * * *

MINUTES. OF THE 1st MEETING TYPE-APPROVAL AUTHORITIES EXPERT GROUP - TAAEG * * * EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Consumer Goods and EU Satellite navigation programmes Automotive industry TYPE-APPROVAL AUTHORITIES EXPERT GROUP - TAAEG Brussels, 6.5.2010

More information

EUROPEAN ENERGY MASTER CLASS

EUROPEAN ENERGY MASTER CLASS EUROPEAN ENERGY MASTER CLASS Energy & Risk Management Services Matthew Osborne Principal Risk Manager Frans La Grand European Manager OUR PAN-EUROPEAN CAPABILITY Whilst most European markets are now liberalised,

More information

EE 742 Chap. 7: Wind Power Generation. Y. Baghzouz Fall 2011

EE 742 Chap. 7: Wind Power Generation. Y. Baghzouz Fall 2011 EE 742 Chap. 7: Wind Power Generation Y. Baghzouz Fall 2011 Overview Environmental pressures have led many countries to set ambitious goals of renewable energy generation. Wind energy is the dominant renewable

More information

1 Background and definitions

1 Background and definitions EUROPEAN COMMISSION DG Employment, Social Affairs and Inclusion Europe 2020: Employment Policies European Employment Strategy Youth neither in employment nor education and training (NEET) Presentation

More information

Wind Turbine Grid Integration Challenge

Wind Turbine Grid Integration Challenge AWEA Windpower 2011 Wind Turbine Grid Integration Challenge ABB Inc. June 6, 2011 Slide 1 In booth theater presentations Wind Turbine Grid Integration Challenge Speaker name: Slavomir Seman Speaker title:

More information

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 61 CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 3.1 INTRODUCTION The modeling of the real time system with STATCOM using MiPower simulation software is presented in this

More information

Modeling and Model Validation of BESS

Modeling and Model Validation of BESS Modeling and Model Validation of BESS P. Pourbeik ppourbeik@peace-pllc.com WECC MVWG Meeting January 24-26, 2018 Acknowledgement Slides 7 to 12 in this presentation are based on work published in: [1]

More information

COMMISSION IMPLEMENTING DECISION

COMMISSION IMPLEMENTING DECISION L 188/50 Official Journal of the European Union 19.7.2011 COMMISSION IMPLEMENTING DECISION of 11 July 2011 on a Union financial contribution towards Member States fisheries control, inspection and surveillance

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Battery Energy Storage System addressing the Power Quality Issue in Grid Connected Wind Energy Conversion System 9/15/2017 1

Battery Energy Storage System addressing the Power Quality Issue in Grid Connected Wind Energy Conversion System 9/15/2017 1 Battery Energy Storage System addressing the Power Quality Issue in Grid Connected Wind Energy Conversion System 9/15/2017 1 CONTENTS Introduction Types of WECS PQ problems in grid connected WECS Battery

More information

Implementation of IEC Standard Models for Power System Stability Studies

Implementation of IEC Standard Models for Power System Stability Studies Downloaded from orbit.dtu.dk on: Jan 24, 28 Implementation of IEC Standard Models for Power System Stability Studies Margaris, Ioannis; Hansen, Anca Daniela; Bech, John ; Andresen, Björn ; Sørensen, Poul

More information

Robust Control Technique for Grid-connected Power Conditioner

Robust Control Technique for Grid-connected Power Conditioner Hitachi Review Vol. 63 (2014), No. 8 483 Featured Articles Robust Control Technique for Grid-connected Power Conditioner Hikaru Meguro Kazuya Tsutsumi Masaya Ichinose Tomomichi Ito Akira Kikuchi OVERVIEW:

More information

Inverter-based DER Ride Through and IEEE Standard 1547

Inverter-based DER Ride Through and IEEE Standard 1547 Inverter-based DER Ride Through and IEEE Standard 1547 Andrew Levitt Applied Innovation August 9, 2018 Cumulative Non-wholesale Solar MW More DER deployment in PJM Ride Through Ride Through : generator

More information

PV Grid Integration Research in the U.S.

PV Grid Integration Research in the U.S. PV Grid Integration Research in the U.S. Barry Mather Ph.D. NREL- Power Systems Engineering Center HEPIA IEA PVPS Task 14 Utility Workshop Geneva, Switzerland March 31 st, 2014 NREL is a national laboratory

More information

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Adopted Based on State and Tariff Interconnection Rules Applicable to Northern States Power,

More information

An Introduction to Completing a NERC PRC Study

An Introduction to Completing a NERC PRC Study An Introduction to Completing a NERC PRC-019-2 Study For Synchronous and Distributed Generation Sources PRESENTED BY: MATTHEW MANLEY TEXAS A&M PROTECTIVE RELAYING CONFERENCE MARCH 26-29, 2018 Presentation

More information

TÖÖSTUSE ÄRIPLAAN 2018, , SWISSOTEL, TALLINN ABB in Baltics. Today and tomorrow. Jukka Patrikainen, Country Manager, Baltic States

TÖÖSTUSE ÄRIPLAAN 2018, , SWISSOTEL, TALLINN ABB in Baltics. Today and tomorrow. Jukka Patrikainen, Country Manager, Baltic States TÖÖSTUSE ÄRIPLAAN 2018, 30.11.2017, SWISSOTEL, TALLINN ABB in Baltics Today and tomorrow Jukka Patrikainen, Country Manager, Baltic States ABB One Campus, Jüri Drives and Renewables Factory Grids Integration

More information

Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E)

Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E) Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E) 1. Context: ENTSO-E, 10/20/40 year views, network codes 2.

More information

Demand Response as a Power System Resource

Demand Response as a Power System Resource Demand Response as a Power System Resource Richard Cowart Director, Regulatory Assistance Project www. erranet.org Major points today 1. What? What is Demand Response (DR)? 2. Why? Proven values of DR

More information

Inverter Advancements in UL1741 and UL 62109

Inverter Advancements in UL1741 and UL 62109 Inverter Advancements in UL1741 and UL 62109 2015 UL LLC Scott Picco Staff Engineer Distributed Energy Resources Equipment UL LLC Renewable Energy Standards for safety of Power Conversion Equipment USA

More information

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center

More information

Distributed Energy Resources

Distributed Energy Resources Distributed Energy Resources Operational Impacts Jenny Riesz Principal, Operational Analysis & Engineering About AEMO We operate Australia's National Electricity Market and power grid in Australia s eastern

More information

GLOBAL REGISTRY. Addendum. Global technical regulation No. 10 OFF-CYCLE EMISSIONS (OCE) Appendix

GLOBAL REGISTRY. Addendum. Global technical regulation No. 10 OFF-CYCLE EMISSIONS (OCE) Appendix 9 September 2009 GLOBAL REGISTRY Created on 18 November 2004, pursuant to Article 6 of the AGREEMENT CONCERNING THE ESTABLISHING OF GLOBAL TECHNICAL REGULATIONS FOR WHEELED VEHICLES, EQUIPMENT AND PARTS

More information

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0 Annex 1: Amendments to the technical specification for interoperability relating to the rolling stock locomotives and passenger rolling stock subsystem of the rail system in the European Union (Annex to

More information

Explanatory document for the Nordic synchronous area proposal for ramping restrictions for active power output in accordance with Article 137(3) and

Explanatory document for the Nordic synchronous area proposal for ramping restrictions for active power output in accordance with Article 137(3) and Explanatory document for the Nordic synchronous area proposal for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2

More information

Requirements for Generators European Network Code

Requirements for Generators European Network Code Requirements for Generators European Network Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight

More information

A Case Study on Aggregate Load Modeling in Transient Stability Studies

A Case Study on Aggregate Load Modeling in Transient Stability Studies A Case Study on Aggregate Load Modeling in Transient Stability Studies Presented by: Daniel Feltes Siemens PTI Coauthors: Carlos Grande-Moran, Bernardo Fernandes, James Feltes, Ming Wu and Robert Wells

More information

Grid Code Testing of Wind Turbines by VSC-based Test Equipment

Grid Code Testing of Wind Turbines by VSC-based Test Equipment Grid Code Testing of Wind Turbines by VSC-based Test Equipment Nicolás Espinoza, PhD Student nicolas.espinoza@chalmers.se CHALMERS VÄRLDENS UNIVERSITY SKILLNAD OF TECHNOLOGY Gothenburg, Sweden. 1 of 32

More information

DER Impacts on Bulk Grid Dynamic Performance

DER Impacts on Bulk Grid Dynamic Performance DER Impacts on Bulk Grid Dynamic Performance A Retrospective View of a Prescient Thought Exercise Presented at EPRI-PJM Inverter Interconnections Workshop Valley Forge, PA April 11, 2012 Reigh Walling

More information

WLTP for fleet. How the new test procedure affects the fleet business

WLTP for fleet. How the new test procedure affects the fleet business WLTP for fleet How the new test procedure affects the fleet business Editorial Ladies and Gentlemen, The automotive industry is facing a major transformation process that will also affect the fleet business

More information

June 2014 Euro area unemployment rate at 11.5% EU28 at 10.2%

June 2014 Euro area unemployment rate at 11.5% EU28 at 10.2% STAT/14/121 31 July 2014 June 2014 Euro area unemployment rate at 11.5% EU28 at 10.2% The euro area 1 (EA18) seasonally-adjusted 2 unemployment rate 3 was 11.5% in June 2014, down from 11.6% in May 2014

More information

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens,

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens, Introduction to transmission network characteristics - technical features Slobodan Markovic EKC Athens, 06.03.2017 1 MAIN ISSUES The map shows the region that will be included in the network modelling

More information

VDE FNN Information Solutions for the Future Power Grid

VDE FNN Information Solutions for the Future Power Grid VDE FNN Information Solutions for the Future Power Grid We are evolving the grid VDE Association The VDE Association for Electrical, Electronic and Information Technologies is one of the largest technical

More information

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Fitchburg Gas and Electric Light Company d/b/a Unitil ( Unitil or the Company ) indicated in the 2016-2018 Energy Efficiency

More information

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1. Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.3, 5/16/18 1.0 Scope This document is currently limited in scope to inverter interfaced PV installations

More information

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE Yunqi WANG, B.T. PHUNG, Jayashri RAVISHANKAR School of Electrical Engineering and Telecommunications The

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

Secretariat FRANCE. To prepare international standards regarding specifications for all types of fuses, with the object of determining:

Secretariat FRANCE. To prepare international standards regarding specifications for all types of fuses, with the object of determining: SMB/5201/R IEC/TC or SC 32 Secretariat FRANCE STRATEGIC BUSINESS PLAN (SBP) Date 2013-12-02 Please ensure this form is annexed to the Report to the Standardization Management Board if it has been prepared

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

2015 Grid of the Future Symposium

2015 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,

More information

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience Y. Sun 1, 2,*, W. G. Kuijpers 3, E. C. W. de Jong 1,2, and H. Pustjens 3 1 Electrical Energy System, Eindhoven University

More information

By Mahesh Morjaria, Dmitriy Anichkov, Vladimir Chadliev and Sachin Soni First Solar, Tempe, Arizona

By Mahesh Morjaria, Dmitriy Anichkov, Vladimir Chadliev and Sachin Soni First Solar, Tempe, Arizona Grid Integration of Large Utility-Scale PV Plants: Key Lessons Learned By Mahesh Morjaria, Dmitriy Anichkov, Vladimir Chadliev and Sachin Soni First Solar, Tempe, Arizona Abstract The increase in competitiveness

More information

ABB low voltage wind turbine converters Reliable technology for wind power

ABB low voltage wind turbine converters Reliable technology for wind power ABB low voltage wind turbine converters Reliable technology for wind power Profile The wind power market continues to expand Today s wind turbine manufacturers and wind farm owners are experiencing steady

More information