1 Investigation of the Impact of Switching a Heavily Loaded Transmission Line on Operation of a Power Plant with Turbine-generator Units INVESTIGATION OF THE IMPACT OF SWITCHING A HEAVILY LOADED TRANSMISSION LINE ON OPERATION OF A POWER PLANT WITH TURBINE-GENERATOR UNITS Andrzej Kąkol / Institute of Power Engineering Research Institute, Gdańsk Division Bogdan Sobczak / Institute of Power Engineering Research Institute, Gdańsk Division 1. INTRODUCTION The Polish Power Grid is a part of a large synchronised international grid of mainland Europe ENTSO-E (formerly UCTE) one of the largest systems in the world, with a peak demand exceeding 400 GW. In a synchronous power grid transfers of power between individual operators influence not only the operators who participate in transactions but also other systems. In most cases the affected systems are direct neighbours of those directly involved in the transaction. Flows through the systems which do not participate in a power transmission transaction are known as loop flows. The loop flows are an undesirable side effect and their negative impact depends on their magnitude. Development of the European energy market, as well as development of renewable power sources, result in a significant increase in power flow and subsequently loop flows within the power grids managed by mainland European operators. These are observed in eastern and western neighbours of Germany: Benelux countries, Poland, Czech Republic and Slovakia. Such a situation occurs as the excess power generated by the wind farms in the northern part of Germany and western Denmark flows to the consumers located in southern Germany, as well as Austria and Italy areas which have considerable pump storage capacities. Loop flows caused by the wind power generation in Germany and Denmark have already reached an intensity which threatens the safe operation of power systems neighbouring Germany. Large loop flows considerably limit transmission capacities and also transfer some active and reactive power losses related to the transmission transaction to the countries which do not directly participate in it. Except for the construction of new transmission lines (which is ruled out due to the long investment timescale in most European countries) the loop flows can be limited by solutions such as re-dispatching conventional power generation units, changing transmission system topology and introducing phase shifters in the grid (in most cases at cross-system lines). In addition, application of solutions which limit loop flows requires coordination between transmission system operators, as otherwise they might just result in transferring problems into neighbouring systems. Large loop flows also cause some less obvious side effects. Transmission lines heavily loaded by loop flows are difficult to reconnect after an emergency trip due to the high voltage angle difference, especially in the case of lines outgoing from a power station s switchyard. At the same time a loop flow caused by events in another system is difficult to suppress rapidly. This creates a threat of a snowball overload failure and emergency trips of an increasing number of lines in extreme cases leading to a general system failure. This paper presents results of a study carried out by the Gdańsk Division of the Institute of Power Engineering for PSE Operator SA aimed at analysing the dynamic threat for Krajnik substation and Dolna Odra Power Abstract Development of the European energy market, combined with development of renewable power generation sources result in increased power transfers within the grid, including undesirable loop flows. If such flows occur near power stations on a single line (e.g. exchange line) they might cause some threats related to potential line trips and reconnections. Trip of a heavily loaded line considerably distorts active and reactive power balance in the area of the power plant in question. Reconnection of a tripped line with significant voltage angle difference causes strong torque variations on the shaft of a turbinegenerator unit. This paper presents results of a simulation of electromagnetic and electromechanical phenomena which occur if a heavily loaded transfer line connected to a switchyard of a large power station with turbine generators is tripped and then reconnected. 23

2 24 Andrzej Kąkol, Bogdan Sobczak / Institute of Power Engineering Research Institute, Gdańsk Division Plant (EDO) caused by high power transfers from Germany. Apart from the impact of tripping and reconnecting the transmission line to Vierraden, the impact of power flows from Germany on the stability of EDO s generators was also investigated. 2. SCOPE OF RESEARCH Investigation of potential threats for the Krajnik substation and Dolna Odra Power Station caused by high power flows coming into the Polish grid over the 220 kv line Krajnik Vierraden included: Determining the relation between the power flow from Vierraden and dynamic stability of large disturbances on the Power Station s generators, defined by critical time of a near-to-generator three-phase short-circuit Determining the relation between the power flow from Vierraden and dynamic stability of small disturbances on the Power Station s generators, defined by a damping coefficient of post-disturbance oscillations Determining the relation between the power flow from Vierraden on the course of electric transition phenomena following a line trip and reconnection, in particular in the case of the Vierraden line Determining the relation between the power flow from Vierraden on torsional vibrations of turbine-generator shafts at the Power Station following line trips and reconnections, in particular those of the Vierraden line. 3. KRAJNIK SUBSTATION Krajnik Substation is a substation of the Dolna Odra Power Station. The substation is equipped with 110 kv, 220 kv and 400 kv switchyards coupled by 220/110 kv and 400/220 kv transformers (two units). Four power generation units are connected to the 220 kv switchyard, while three others are connected to the 400 kv switchyard. A doublecircuit transmission line to Vierraden substation goes out of the 220 kv switching station. Analytical research indicates that in conditions of very high wind power output in Germany, when no countermeasures are in effect, the load on this line (power flow from Germany) might even reach levels around 1000 MW (which is above the permissible capacity of the line). Fig 1 shows such a situation with 544 MW incoming flow on each circuit of the line. This makes the power flowing from Germany higher than the combined output of all EDO units operating at that time. Each EDO unit operating at the time had a generator rated at MVA equipped with electromechanical AC excitation systems, digital voltage regulators and system stabilisers. Fig 1. Voltages and power flows at Krajnik substation.

3 Investigation of the Impact of Switching a Heavily Loaded Transmission Line on Operation of a Power Plant with Turbine-generator Units 4. MODELS OF THE GRID AND DOLNA ODRA POWER STATION Two types of dynamic models were developed to investigate the influence of high load on the line in question: 1. System dynamics model using PSLF software 2. Model of fast-changing phenomena dynamics using PSCAD software. The System dynamics model contains accurate models of base load ( systemic ) power stations of the Polish, German, Czech, Slovak, Austrian and Hungarian grids. Power generation in other systems of mainland Europe was approximated (without exact specification of power generation stations, using exemplary generic models of generators, turbines and control systems). Wind power generation was modelled in the eastern German grid (operated by 50 Hertz Transmission). Increase of wind generation output combined with changing dispatch of conventional power plants was shown to cause increased loop flows in the Polish system MW load on the Krajnik Vierraden line was achieved at wind power output exceeding 10,000 MW. Such a situation should be seen as an overload of the 220 kv Krajnik Vierraden lines and might be caused for instance by a trip of a north-south transmission line in Germany, resulting in increased flow through the Polish grid and exceeding the permissible capacity of the 220 kv Krajnik Vierraden lines. The Model of fast-changing phenomena dynamics covers the Dolna Odra Power Station (generators, their voltage regulation systems and system stabilisers, and step-up transformers), 220 kv and 400 kv switching stations of the Krajnik substation and transmission lines connected to that substation. Due to the fact that scope of analysis included torsional vibrations of each turbine-generator s shaft, the shaft itself was modelled as multi-mass object. Dynamics of the Polish grid is represented by a large equivalent generator, while the German system is simulated by a fixed network to which the 220 kv Vierraden switching station is connected. The multi-mass shaft model takes into account the shaft s structure, discriminating several masses of high torsional rigidity, connected with elements (couplings) of lower rigidity. Rigid components represent rotors of individual turbine sections (high-pressure, intermediate-pressure and low-pressure), generator rotor, and optionally also exciter rotor. Typically, a multi-mass shaft model consists of four to six bodies. For example, a five-body shaft has five natural frequencies, the lowest of which is the natural frequency of the entire shaft in reference to the power grid. The remaining four values are used for analysing phenomena which potentially might cause and amplify shaft torsional vibrations such as: interaction with turbine regulation systems, interaction of torsional vibrations between shafts of parallel turbine units, interaction with AC/DC converters control systems or subsynchronous resonance with the grid compensated with series-connected capacitor banks. Multimasses models are also used to investigate the influence of disturbances caused by grid switching operations on turbine-generator s shaft. The model description shows that the PSLF system model is appropriate to investigate phenomena occurring both in Polish and German grids, in particular those occurring in the 50 Hertz Transmission area of responsibility, while the latter model would only simulate phenomena occurring at the Krajnik substation and within the EDO power generation units. 5. RESULTS ACHIEVED WITH THE SYSTEM DYNAMICS MODEL The full scope of investigation as used for determining the stability of a base load power plant of the Polish power grid was carried out using the systemic model. Angle stability of major disturbances was investigated by comparing critical times of near-to-generator three-phase short-circuits during trips of EDO s outgoing transmission lines. Additionally, for a short-circuit cleared after 150 ms, the number and duration of voltage losses below 80% of nominal value was recorded. Assumed criteria did not reveal any significant impact of the load on the Krajnik Vierraden line on the stability of EDO operation for major disturbances. Angle stability of minor disturbances was determined with Prony s method, by determining frequencies and damping coefficients for primary modes in post-disturbance variations of active power generated by EDO generators. No impact of the load on the Krajnik Vierraden line on the angle stability of EDO generations for minor disturbances was identified. 25

4 26 Andrzej Kąkol, Bogdan Sobczak / Institute of Power Engineering Research Institute, Gdańsk Division The influence of switching operations on the Krajnik Vierraden line was investigated by simulating the following sequence: 1 sec trip of the first circuit of the line 5 sec trip of the second circuit of the line 20 sec reconnection of the first circuit of the line 24 sec reconnection of the second circuit of the line for various values of the line load (power incoming from Germany). Fig. 2 presents variation of the active power of the G5 generator feeding power to the 220 kv switching station. Fig. 3 shows corresponding variations of 220 kv voltage in Krajnik and Vierraden substations when the power flow from Germany is 1100 MW. At this load on the line a trip of both circuits of the Krajnik Vierraden line causes a serious disturbance in both Polish and east German grids. At the 220 kv Krajnik station there is a sudden voltage surge and considerable oscillations of output of EDO generators connected to the 220 kv station (with a magnitude exceeding 100 MW). Voltage surge might be even higher if other outgoing lines of the 220 kv Krajnik station are disconnected. It is possible that the maximum voltage for the power plant s 220 kv switching station which is 245 kv will be exceeded. The simulations have revealed that tripping the Krajnik line at high power flow from Germany causes more serious disturbance within the east German grid. Voltage surge at Vierraden is almost twice as high as in Krajnik. Local excess of reactive power would occur in the area of Vierraden, with a simultaneous reactive power deficit in the remaining area (losses due to suddenly increased load on transmission lines). The final effect would depend on the availability of quickly dispatchable sources of reactive power in Germany. In a model where the wind farms do have such properties, the situation is kept under control. In a model with restricted wind power control capabilities, voltage losses occur and lead to tripping of some generation units. Increased demand for reactive power in Germany affects operation of the Polish Turów Power Plant, which experiences an increased reactive power load on its generators, following a trip of the Krajnik line. Fig 2. Variations of active power of the G5 generator for simulated trip-reconnection sequence of the 220 kv line Krajnik Vierraden loaded at 1100 MW.

5 Investigation of the Impact of Switching a Heavily Loaded Transmission Line on Operation of a Power Plant with Turbine-generator Units Fig 3. Variations of the 220 kv voltage at Krajnik and Vierraden switching stations (the latter showing larger surge) for simulated trip-reconnection sequence of the 220 kv line Krajnik Vierraden loaded at 1100 MW. After the line trip, the voltage angle difference between 220 kv switchyards in Krajnik and Vierraden exceeds 60. At this value it is not possible to switch the line back into operation. The presented active power variations indicate that reconnection of the first circuit is just as major a disturbance for EDO generators feeding power into a 220 kv switching station as a near to generator three-phase short circuit. The identified threat for the power plant and Krajnik station, as well as possible serious disturbances in the grid of eastern Germany after a trip of the second circuit of the Krajnik Vierraden line show that the load on that line should be limited to a value which in the case of a single circuit trip does not automatically result in an immediate trip of the other circuit due to overload. 6. RESULTS OBTAINED WITH A MODEL OF FAST-CHANGING PHENOMENA Simulated sequences of trip/reconnection of the Krajnik Vierraden line reveal that considerable torsional vibrations of the turbine units shafts occur upon the trip of the second circuit of the line (ultimate line trip) and after reconnection of the first circuit. The magnitude of the vibrations increases along with the load on the line (power flow incoming from Germany). The highest torque occurs between the generator rotor and the low-pressure turbine shaft. When a transmission line load exceeds 1000 MW, the oscillations are comparable to the torque values obtained during simulations of near-to-generator short-circuits. Fig. 4 presents torsional oscillations between the low-pressure turbine shaft and generator shaft of the G5 unit recorded for a simulated trip/reconnection sequence of the 220 kv Krajnik Vierraden line. Fig. 4. Torsional vibrations (expressed in relative units of the generator s nominal power) between the LP turbine rotor and rotor of the G5 generator for simulated trip-reconnection sequence of the 220 kv lines Krajnik Vierraden loaded at 1100 MW. 27

6 28 Andrzej Kąkol, Bogdan Sobczak / Institute of Power Engineering Research Institute, Gdańsk Division 7. IMPACT OF GRID SWITCHING OPERATIONS ON EDO TURBINE-GENERATOR S SHAFTS Each line switching operation either scheduled or unscheduled (e.g. trip due to short-circuit, followed by an autoor manual reconnect attempt) occurring near the power station results in a sudden change of the generator s electric moment and induces torsional vibrations on the turbine-generator unit s shaft. Vibration amplitude depends on the angle between voltage vectors on the circuit breaker and on the electrical distance between the breaker and the generator. Torsional oscillations cumulatively influence material fatigue and shorten shaft lifetime the magnitude of those effects strongly depends on the amplitude values. The shaft of a turbine-generator unit is designed to withstand up to several dozen strong shocks caused, for example, by near-to-generator short-circuits or unsuccessful synchronisation attempts and a very high number of lighter shocks caused by remote or minor disturbances, e.g. line switching at small angle differences. According to the available sources a disturbance which results in a change of a electrical generator output lower than 50% of its nominal active power does not affect the actual lifetime of a shaft [1, 2, 3, 4]. Torsional oscillations have one more significant feature they have low natural damping. Therefore, two disturbances occurring over a short period could result in much greater oscillations than any of those disturbances would cause separately. For that reason, if switching operations are carried near a power station, it is required to separate them in time (according to the previously quoted references by at least 10 seconds). In the case of the Krajnik station and Dolna Odra Power Plant, a loop flow over the 220 kv Krajnik Vierraden line results in a high load not only on this particular line, but also on other transmission lines connected to the Krajnik substation. Potential scheduled or unscheduled switching of the lines outgoing from that station will thus be carried out at larger voltage angle differences, resulting in increased torsional oscillations. The simulations have revealed that if the transmission from Vierraden reaches 1100 MW, the 50% active power criterion may be kept also when attempting to switch on the lines outgoing from the 400 kv switchyard. 8. CONCLUSION The investigation carried out with a system dynamics model and a model for dynamics of fast-changing phenomena has shown that dynamic threats for the Dolna Odra Power Plant related with power transmission from Vierraden to Krajnik exceeding MW result mainly from a possible loss of that connection a trip of both circuits following potential emergency trip of a single circuit. In such a case trip of the second circuit causes a serious disturbance on the EDO generators and voltage surges at Krajnik and Vierraden substations. After a trip of both circuits of the Krajnik Vierraden line reconnection may only be possible after decreasing the voltage angle difference which would most probably require considerably decreasing power generation output in north-eastern Germany. High power flows from Vierraden increase load on other lines going out from the Krajnik station which impedes switching operations and increases the risk of inducing excessive torsional vibrations on EDO turbine-generator units shafts. Such risks, however, only occur when the load on the cross-border line exceeds permissible values. REFERENCES 1. Kundur P, Power System Stability and Control, McGraw-Hill Professional Publishing, IEEE Working Group Interim Report: Effects of switching network disturbances on turbine generator shaft systems, IEEE Transaction on Power Apparatus and Systems, vol. PAS-101, issue 9, September Opera L, Popescu V., Sattinger, Coordinated synchronism check settings for optimal use of critical transmission network corridors, IEEE Lamrecht D.R., Problems of torsional stresses in shaft lines of turbine generators, CIGRE WG 11.01, Section 3, Recommendations, Electra no. 143, August 1992.

THE EFFECT OF DISTURBANCES IN THE ELECTRICAL POWER SYSTEM ON TORQUE MOMENTS OF THE HIGH-POWER TURBINE SET SHAFT

THE EFFECT OF DISTURBANCES IN THE ELECTRICAL POWER SYSTEM ON TORQUE MOMENTS OF THE HIGH-POWER TURBINE SET SHAFT THE EFFECT OF DISTURBANCES IN THE ELECTRICAL POWER SYSTEM ON TORQUE MOMENTS OF THE HIGH-POWER TURBINE SET SHAFT The results presented in this paper have been obtained through research co-financed by the

More information

Journal of American Science 2015;11(11) Integration of wind Power Plant on Electrical grid based on PSS/E

Journal of American Science 2015;11(11)   Integration of wind Power Plant on Electrical grid based on PSS/E Integration of wind Power Plant on Electrical grid based on PSS/E S. Othman ; H. M. Mahmud 2 S. A. Kotb 3 and S. Sallam 2 Faculty of Engineering, Al-Azhar University, Cairo, Egypt. 2 Egyptian Electricity

More information

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE Yunqi WANG, B.T. PHUNG, Jayashri RAVISHANKAR School of Electrical Engineering and Telecommunications The

More information

Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor

Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor > 57 < 1 Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor Masaki Yagami, Non Member, IEEE, Junji Tamura, Senior Member, IEEE Abstract This paper

More information

Power import, transboundary connections, Market Coupling. Grzegorz Onichimowski President of the Board, TGE S.A.

Power import, transboundary connections, Market Coupling. Grzegorz Onichimowski President of the Board, TGE S.A. Power import, transboundary connections, Market Coupling Grzegorz Onichimowski President of the Board, TGE S.A. Power import, transboundary connections, Market Coupling Conference Power Ring, December_2008

More information

Performance Analysis of Transient Stability on a Power System Network

Performance Analysis of Transient Stability on a Power System Network Performance Analysis of Transient Stability on a Power System Network Ramesh B Epili 1, Dr.K.Vadirajacharya 2 Department of Electrical Engineering Dr. Babasaheb Ambedkar Technological University, Lonere

More information

Power Conditioning of Microgrids and Co-Generation Systems

Power Conditioning of Microgrids and Co-Generation Systems Power Conditioning of Microgrids and Co-Generation Systems Nothing protects quite like Piller piller.com Content 1 Introduction 3 2 Basic requirements of a stable isolated network 3 3 Requirements for

More information

Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm

Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm Downloaded from orbit.dtu.dk on: Apr 07, 2019 Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm Arana Aristi, Iván; Johnsen, D. T.; Soerensen, T.; Holbøll, Joachim Published

More information

/12/$ IEEE. M. Bashir M.Sc student, Student Member, IEEE Ferdowsi University of Mashhad Mashhad, Iran

/12/$ IEEE. M. Bashir M.Sc student, Student Member, IEEE Ferdowsi University of Mashhad Mashhad, Iran Effect of Increasing the Grounding Grid Resistance of a Ground System at a Substation on the Safety and Transient Overvoltage on the Interior Equipments M. Bashir M.Sc student, Student Member, IEEE Ferdowsi

More information

COMPARISON OF DIFFERENT METHODS FOR EXCITATION OF SYNCHRONOUS MACHINES

COMPARISON OF DIFFERENT METHODS FOR EXCITATION OF SYNCHRONOUS MACHINES Maszyny Elektryczne Zeszyty Problemowe Nr 3/2015 (107) 89 Stefan Schmuelling, Christian Kreischer TU Dortmund University, Chair of Energy Conversion Marek Gołȩbiowski Rzeszow University of Technology,

More information

Grid Stability Analysis for High Penetration Solar Photovoltaics

Grid Stability Analysis for High Penetration Solar Photovoltaics Grid Stability Analysis for High Penetration Solar Photovoltaics Ajit Kumar K Asst. Manager Solar Business Unit Larsen & Toubro Construction, Chennai Co Authors Dr. M. P. Selvan Asst. Professor Department

More information

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK.

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK. DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK. N. Lettas*, A. Dagoumas*, G. Papagiannis*, P. Dokopoulos*, A. Zafirakis**, S. Fachouridis**,

More information

Wind Power Plants with VSC Based STATCOM in PSCAD/EMTDC Environment

Wind Power Plants with VSC Based STATCOM in PSCAD/EMTDC Environment 2012 2nd International Conference on Power and Energy Systems (ICPES 2012) IPCSIT vol. 56 (2012) (2012) IACSIT Press, Singapore DOI: 10.7763/IPCSIT.2012.V56.2 Wind Power Plants with VSC Based STATCOM in

More information

Unit Protection System for Pumped-Storage Power Stations

Unit Protection System for Pumped-Storage Power Stations Unit Protection System for Pumped-Storage Power Stations 1. Introduction In many power systems, pumped-storage power stations are used in addition to run-of-river power stations. These power stations serve

More information

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen)

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen) Technical Paper: Low voltage ride-through testing of wind turbine converters at ABB helps wind turbines meet the requirements of IEC 61400-21 more quickly (by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka

More information

Climate change drivers for a single and smart EU grid

Climate change drivers for a single and smart EU grid Climate change drivers for a single and smart EU grid Smart and Secure Transmission Grids to Realise US and EU Renewable Energy Potentials Keith Bell University of Strathclyde, Scotland Expected growth

More information

Examples of Electric Drive Solutions and Applied Technologies

Examples of Electric Drive Solutions and Applied Technologies Examples of Electric Drive Solutions and Applied Technologies 2 Examples of Electric Drive Solutions and Applied Technologies Atsushi Sugiura Haruo Nemoto Ken Hirata OVERVIEW: Hitachi has worked on specific

More information

Transmission Networks Developments and the Role of Interconnections with Neighbouring Countries

Transmission Networks Developments and the Role of Interconnections with Neighbouring Countries Transmission Networks Developments and the Role of Interconnections with Neighbouring Countries Tomasz Siewierski Electricity Market Research Group Technical University of Lodz, Poland Energy in Poland,

More information

STABILIZATION OF ISLANDING PEA MICRO GRID BY PEVS CHARGING CONTROL

STABILIZATION OF ISLANDING PEA MICRO GRID BY PEVS CHARGING CONTROL STABILIZATION OF ISLANDING PEA MICRO GRID BY PEVS CHARGING CONTROL Montree SENGNONGBAN Komsan HONGESOMBUT Sanchai DECHANUPAPRITTHA Provincial Electricity Authority Kasetsart University Kasetsart University

More information

European System Disturbance on 4 November 2006

European System Disturbance on 4 November 2006 European System Disturbance on 4 November 2006 Mattia Marinelli; matm@elektro.dtu.dk Center for Electric Power and Energy DTU Risø Campus University of California Santa Cruz 6 th Aug 2014 Summer School

More information

PSO project EaseWind Enhanced ancillary services from Wind Power Plants. Anca D. Hansen DTU Wind Energy

PSO project EaseWind Enhanced ancillary services from Wind Power Plants. Anca D. Hansen DTU Wind Energy PSO project EaseWind Enhanced ancillary services from Wind Power Plants Anca D. Hansen DTU Wind Energy Background PSO project EaseWind (2011-2014) Enhanced Ancillary Services from Wind Power Plants Partners:

More information

Power Flow Simulation of a 6-Bus Wind Connected System and Voltage Stability Analysis by Using STATCOM

Power Flow Simulation of a 6-Bus Wind Connected System and Voltage Stability Analysis by Using STATCOM Power Flow Simulation of a 6-Bus Wind Connected System and Voltage Stability Analysis by Using STATCOM Shaila Arif 1 Lecturer, Dept. of EEE, Ahsanullah University of Science & Technology, Tejgaon, Dhaka,

More information

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Abstract: G. Thrisandhya M.Tech Student, (Electrical Power systems), Electrical and Electronics Department,

More information

The Influence of Voltage Stability on Congestion Management Cost in a Changing Electricity System. Fabian Hinz.

The Influence of Voltage Stability on Congestion Management Cost in a Changing Electricity System. Fabian Hinz. Faculty of Business and Economics, Chair of Energy Economics, Prof. Dr. Möst The Influence of Voltage Stability on Congestion Management Cost in a Changing Electricity System www.ee2.biz Fabian Hinz 15th

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Tibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University

Tibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University Tibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University Contents Introduction Planned Network Reinforcement for 2020 The Three Machine Generic Model Subsynchronous Resonance

More information

FINITE-ELEMENT ANALYSIS OF ACCIDENTAL ENERGIZING OF AN OFF-LINE TURBOGENERATOR*

FINITE-ELEMENT ANALYSIS OF ACCIDENTAL ENERGIZING OF AN OFF-LINE TURBOGENERATOR* Vol. 2(37), No. 1, 2017 POWER ELECTRONICS AND DRIVES DOI: 10.5277/PED170104 FINITE-ELEMENT ANALYSIS OF ACCIDENTAL ENERGIZING OF AN OFF-LINE TURBOGENERATOR* ADAM GOZDOWIAK, PIOTR KISIELEWSKI, LUDWIK ANTAL

More information

DYNAMIC BEHAVIOUR OF SINGLE-PHASE INDUCTION GENERATORS DURING DISCONNECTION AND RECONNECTION TO THE GRID

DYNAMIC BEHAVIOUR OF SINGLE-PHASE INDUCTION GENERATORS DURING DISCONNECTION AND RECONNECTION TO THE GRID DYNAMIC BEHAVIOUR OF SINGLE-PHASE INDUCTION GENERATORS DURING DISCONNECTION AND RECONNECTION TO THE GRID J.Ramachandran 1 G.A. Putrus 2 1 Faculty of Engineering and Computing, Coventry University, UK j.ramachandran@coventry.ac.uk

More information

The future role of storage in a smart and flexible energy system

The future role of storage in a smart and flexible energy system The future role of storage in a smart and flexible energy system Prof Olav B. Fosso Dept. of Electric Power Engineering Norwegian University of Science and Technology (NTNU) Content Changing environment

More information

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC IJSTE - International Journal of Science Technology & Engineering Volume 2 Issue 01 July 2015 ISSN (online): 2349-784X Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC Ravindra Mohana

More information

Review paper on Fault analysis and its Limiting Techniques.

Review paper on Fault analysis and its Limiting Techniques. Review paper on Fault analysis and its Limiting Techniques. Milap Akbari 1, Hemal Chavda 2, Jay Chitroda 3, Neha Kothadiya 4 Guided by: - Mr.Gaurang Patel 5 ( 1234 Parul Institute of Engineering &Technology,

More information

Overview of Flexible AC Transmission Systems

Overview of Flexible AC Transmission Systems Overview of Flexible AC Transmission Systems What is FACTS? Flexible AC Transmission System (FACTS): Alternating current transmission systems incorporating power electronic-based and other static controllers

More information

Abstract. Benefits and challenges of a grid coupled wound rotor synchronous generator in a wind turbine application

Abstract. Benefits and challenges of a grid coupled wound rotor synchronous generator in a wind turbine application Issue #WP102: Technical Information from Cummins Generator Technologies Benefits and challenges of a grid coupled wound rotor synchronous generator in a wind turbine application White Paper Ram Pillai

More information

Islanding of 24-bus IEEE Reliability Test System

Islanding of 24-bus IEEE Reliability Test System Islanding of 24-bus IEEE Reliability Test System Paul Trodden February 17, 211 List of Figures 1 24-bus IEEE RTS, with line (3,24) tripped and buses 3,24 and line (3,9) uncertain....................................

More information

Field Verification and Data Analysis of High PV Penetration Impacts on Distribution Systems

Field Verification and Data Analysis of High PV Penetration Impacts on Distribution Systems Field Verification and Data Analysis of High PV Penetration Impacts on Distribution Systems Farid Katiraei *, Barry Mather **, Ahmadreza Momeni *, Li Yu *, and Gerardo Sanchez * * Quanta Technology, Raleigh,

More information

Analysis of Eclipse Drive Train for Wind Turbine Transmission System

Analysis of Eclipse Drive Train for Wind Turbine Transmission System ISSN 2395-1621 Analysis of Eclipse Drive Train for Wind Turbine Transmission System #1 P.A. Katre, #2 S.G. Ganiger 1 pankaj12345katre@gmail.com 2 somu.ganiger@gmail.com #1 Department of Mechanical Engineering,

More information

Study of Fault Clearing by A Circuit Breaker In Presence of A Shunt Capacitor Bank

Study of Fault Clearing by A Circuit Breaker In Presence of A Shunt Capacitor Bank Day 2 - Session V-B 299 Study of Fault Clearing by A Circuit Breaker In Presence of A Shunt Capacitor Bank Murali Kandakatla, B. Kondala Rao, Gopal Gajjar ABB Ltd., Maneja, Vadodara, India Thane Introduction

More information

INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT

INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT Prof. Chandrashekhar Sakode 1, Vicky R. Khode 2, Harshal R. Malokar 3, Sanket S. Hate 4, Vinay H. Nasre 5, Ashish

More information

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Rong Cai, Mats Andersson, Hailian Xie Corporate Research, Power and Control ABB (China) Ltd. Beijing, China rong.cai@cn.abb.com,

More information

Aggregation of plug-in electric vehicles in electric power systems for primary frequency control

Aggregation of plug-in electric vehicles in electric power systems for primary frequency control Aggregation of plug-in electric vehicles in electric power systems for primary frequency control Seyedmahdi Izadkhast Researcher at Delft University of Technology Outline Introduction Plug-in electric

More information

Studies regarding the modeling of a wind turbine with energy storage

Studies regarding the modeling of a wind turbine with energy storage Studies regarding the modeling of a wind turbine with energy storage GIRDU CONSTANTIN CRISTINEL School Inspectorate of County Gorj, Tg.Jiu, Meteor Street, nr. ROMANIA girdu23@yahoo.com Abstract: This paper

More information

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 61 CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 3.1 INTRODUCTION The modeling of the real time system with STATCOM using MiPower simulation software is presented in this

More information

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited

More information

HVDC Back-to-Back Interconnections Enabling reliable integration of power system

HVDC Back-to-Back Interconnections Enabling reliable integration of power system HVDC Back-to-Back Interconnections Enabling reliable integration of power system Dr Liliana Oprea FICHTNER GmbH&Co KG Swiss Chapter of IEEE PES Baden-Dättwil, 4 September 2013 Table of Contents Need for

More information

Copyright 2003 Advanced Power Technologies, Inc.

Copyright 2003 Advanced Power Technologies, Inc. Overview of the Standard for Interconnecting Distributed Resources with Electric Power Systems, IEEE 1547 and it s potential impact on operation of the Distributed Generation (DG) systems and on the design

More information

Experiences with Wind Power Plants with Low SCR

Experiences with Wind Power Plants with Low SCR 1 Experiences with Wind Power Plants with Low SCR Lessons learned from the analysis, design and connection of wind power plants to weak electrical grids IEEE PES General Meeting Denver CO, 26 March 2015

More information

Implementation of a Wide Area Monitoring System (WAMS) for Austria's Power Grid

Implementation of a Wide Area Monitoring System (WAMS) for Austria's Power Grid Implementation of a Wide Area Monitoring System (WAMS) for Austria's Power Grid Dr. Michael Weixelbraun Austrian Power Grid AG (APG) International Synchrophasor Symposium, March 22-24, 2016 1 Austrian

More information

Using energy storage for modeling a stand-alone wind turbine system

Using energy storage for modeling a stand-alone wind turbine system INTERNATIONAL JOURNAL OF ENERGY and ENVIRONMENT Volume, 27 Using energy storage for modeling a stand-alone wind turbine system Cornel Bit Abstract This paper presents the modeling in Matlab-Simulink of

More information

Performance Analysis of 3-Ø Self-Excited Induction Generator with Rectifier Load

Performance Analysis of 3-Ø Self-Excited Induction Generator with Rectifier Load Performance Analysis of 3-Ø Self-Excited Induction Generator with Rectifier Load,,, ABSTRACT- In this paper the steady-state analysis of self excited induction generator is presented and a method to calculate

More information

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection B. Bagen, D. Jacobson, G. Lane and H. M. Turanli Manitoba

More information

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience Y. Sun 1, 2,*, W. G. Kuijpers 3, E. C. W. de Jong 1,2, and H. Pustjens 3 1 Electrical Energy System, Eindhoven University

More information

Case study: Utility-scale battery for balancing power in Germany

Case study: Utility-scale battery for balancing power in Germany SA Energy Storage 2017 Case study: Utility-scale battery for balancing power in Germany Johannesburg, 28 November 2017 Dr. Tobias Bischof-Niemz Agenda Overview ENERTRAG Definition Primary Control Reserve

More information

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008 NB Power Customer Service and Distribution June 2008 Prepared by: Steven Wilcox Revised by: Steven Wilcox TABLE OF CONTENTS 1.0 Introduction 4 2.0 NB Power Policy on Independent Power Production 4 3.0

More information

Energy Storage for the Grid

Energy Storage for the Grid GE Energy Energy Storage for the Grid Devon Manz Nick Miller Hamid Elahi GE Energy Consulting GE Copyright 2011 1 Storage Electricity Power Pumped Hydro Compressed Air Energy Battery Flywheel Ultracap

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

ELECTROMECHANICAL OPTIMIZATION AGAINST TORSIONAL VIBRATIONS IN O&G ELECTRIFIED TRAINS MICHELE GUIDI [GE O&G] ALESSANDRO PESCIONI [GE O&G]

ELECTROMECHANICAL OPTIMIZATION AGAINST TORSIONAL VIBRATIONS IN O&G ELECTRIFIED TRAINS MICHELE GUIDI [GE O&G] ALESSANDRO PESCIONI [GE O&G] ELECTROMECHANICAL OPTIMIZATION AGAINST TORSIONAL VIBRATIONS IN O&G ELECTRIFIED TRAINS MICHELE GUIDI [GE O&G] ALESSANDRO PESCIONI [GE O&G] Topics INTRODUCTION - Mechanical vibrations in electrified trains

More information

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems Ben Huckaba, P.E. President & Principal Engineer 317-273-9841 benh@alphaeng.us Indiana University Bloomington,

More information

Effect of crowbar resistance on fault ride through capability of doubly fed induction generator

Effect of crowbar resistance on fault ride through capability of doubly fed induction generator ISSN: 2347-3215 Volume 2 Number 1 (January, 2014) pp. 88-101 www.ijcrar.com Effect of crowbar resistance on fault ride through capability of doubly fed induction generator V.Vanitha* and K.Santhosh Amrita

More information

The behavior of the cycloconverter fed gearless drive under abnormal electrical conditions

The behavior of the cycloconverter fed gearless drive under abnormal electrical conditions Mining The behavior of the cycloconverter fed gearless drive under abnormal electrical conditions Reprint Authors: Kurt Tischler Siemens AG, Mining Technologies, Erlangen, Germany Reprint: WORKSHOP SAG

More information

Power System Stability Analysis on System Connected to Wind Power Generation with Solid State Fault Current Limiter

Power System Stability Analysis on System Connected to Wind Power Generation with Solid State Fault Current Limiter IJSTE - International Journal of Science Technology & Engineering Volume 2 Issue 2 August 2015 ISSN (online): 2349-784X Power System Stability Analysis on System Connected to Wind Power Generation with

More information

NO-BREAK KS. Dynamic UPS system PRESENTATION

NO-BREAK KS. Dynamic UPS system PRESENTATION NO-BREAK KS Dynamic UPS system PRESENTATION Contents Chapter 1: Description of No-Break KS System...3 Chapter 2: Operation when mains power is available...4 Chapter 3: Operation when mains supply is disrupted...6

More information

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances 29 Juli 2014 Page 1 Characteristics of the Project Parameter Detail

More information

Investigation of Transient Recovery Voltage Across a Circuit Breaker with Presence of Braking Resistor

Investigation of Transient Recovery Voltage Across a Circuit Breaker with Presence of Braking Resistor Australian Journal of Basic and Applied Sciences, 5(5): 231-235, 2011 ISSN 1991-8178 Investigation of Transient Recovery Voltage Across a Circuit Breaker with Presence of Braking Resistor 1 Amir Ghorbani,

More information

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 106 CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 5.1 INTRODUCTION Inherent characteristics of renewable energy resources cause technical issues not encountered with conventional thermal,

More information

Wind Farm Evaluation and Control

Wind Farm Evaluation and Control International society of academic and industrial research www.isair.org IJARAS International Journal of Academic Research in Applied Science (2): 2-28, 202 ijaras.isair.org Wind Farm Evaluation and Control

More information

Power Quality and Power Interruption Enhancement by Universal Power Quality Conditioning System with Storage Device

Power Quality and Power Interruption Enhancement by Universal Power Quality Conditioning System with Storage Device Australian Journal of Basic and Applied Sciences, 5(9): 1180-1187, 2011 ISSN 1991-8178 Power Quality and Power Interruption Enhancement by Universal Power Quality Conditioning System with Storage Device

More information

AF series contactors (9 2650)

AF series contactors (9 2650) R E32527 R E39322 contactors General purpose and motor applications AF series contactors (9 2650) 3- & 4-pole contactors General purpose up to 2700 A Motor applications up to 50 hp, 900 kw NEMA Sizes 00

More information

Integration of Large Wind Farms into Electric Grids

Integration of Large Wind Farms into Electric Grids Integration of Large Wind Farms into Electric Grids Dr Mohammad AlZoubi Introduction Development WHAT IS NEXT!! Over the next 12 years, Europe must build new power capacity equal to half the current total.

More information

North-South Interconnections in Central-East and South- East Europe

North-South Interconnections in Central-East and South- East Europe European Network of Transmission System Operators for Electricity North-South Interconnections in Central-East and South- East Europe Building power bridges between Eastern and Western Europe; relieving

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

POSSIBILITIES OF POWER FLOWS CONTROL

POSSIBILITIES OF POWER FLOWS CONTROL Intensive Programme Renewable Energy Sources June 2012, Železná Ruda-Špičák, University of West Bohemia, Czech Republic POSSIBILITIES OF POWER FLOWS CONTROL Stanislav Kušnír, Roman Jakubčák, Pavol Hocko

More information

4th European PV-Hybrid and Mini-Grid Conference, Glyfada, Greece, May 2008

4th European PV-Hybrid and Mini-Grid Conference, Glyfada, Greece, May 2008 Stability in Mini-Grids with Large PV Penetration under Weather Disturbances- Implementation to the power system of Kythnos Evangelos Rikos 1, Stathis Tselepis 1, Aristomenis Neris 2 1. Centre for Renewable

More information

Islanding of 24-bus IEEE Reliability Test System

Islanding of 24-bus IEEE Reliability Test System Islanding of 24-bus IEEE Reliability Test System Paul Trodden February 14, 211 List of Figures 1 24-bus IEEE RTS, with line (3,24) tripped and buses 3,24 and line (3,9) uncertain....................................

More information

Consequences on Grid Operation by Decentralized Renewable Power Generators

Consequences on Grid Operation by Decentralized Renewable Power Generators Fakultät für Informations- Medien- und Elektrotechnik Consequences on Grid Operation by Decentralized Renewable Power Generators Consideration in the German Low Voltage and Medium Voltage Directive and

More information

APPLICATION NOTE USING A MODEL 3060-MS AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS. Abstract. Introduction. Dissipative Load Bank

APPLICATION NOTE USING A MODEL 3060-MS AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS. Abstract. Introduction. Dissipative Load Bank USING A MODEL 3060-MS AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS Abstract This application note describes the necessary procedure to use a standard Pacific Power Source Model 3060-MS

More information

Reactive power support of smart distribution grids using optimal management of charging parking of PHEV

Reactive power support of smart distribution grids using optimal management of charging parking of PHEV Journal of Scientific Research and Development 2 (3): 210-215, 2015 Available online at www.jsrad.org ISSN 1115-7569 2015 JSRAD Reactive power support of smart distribution grids using optimal management

More information

The Application of Power Electronics to the Alberta Grid

The Application of Power Electronics to the Alberta Grid The Application of Power Electronics to the Alberta Grid Peter Kuffel, Michael Paradis ATCO Electric APIC May 5, 2016 Power Electronics Semiconductor devices used in power transmission systems Types: Thyristor

More information

Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line

Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line Nitin goel 1, Shilpa 2, Shashi yadav 3 Assistant Professor, Dept. of E.E, YMCA University

More information

Modelling and Analysis of Thyristor Controlled Series Capacitor using Matlab/Simulink

Modelling and Analysis of Thyristor Controlled Series Capacitor using Matlab/Simulink Modelling and Analysis of Thyristor Controlled Series Capacitor using Matlab/Simulink Satvinder Singh Assistant Professor, Department of Electrical Engg. YMCA University of Science & Technology, Faridabad,

More information

EE 742 Chap. 7: Wind Power Generation. Y. Baghzouz Fall 2011

EE 742 Chap. 7: Wind Power Generation. Y. Baghzouz Fall 2011 EE 742 Chap. 7: Wind Power Generation Y. Baghzouz Fall 2011 Overview Environmental pressures have led many countries to set ambitious goals of renewable energy generation. Wind energy is the dominant renewable

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

Life Needs Power, Hannover Messe 2017 Inertia in Future Electrical Power Systems Challenges and Solutions Dr. Ervin Spahic

Life Needs Power, Hannover Messe 2017 Inertia in Future Electrical Power Systems Challenges and Solutions Dr. Ervin Spahic Life Needs Power, Hannover Messe 2017 Inertia in Future Electrical Power Systems Challenges and Solutions Dr. Ervin Spahic siemens.com/energy-management Motivation Challenge of reduced synchronous generators

More information

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System Raju Pandey, A. K. Kori Abstract FACTS devices can be added to power transmission and distribution systems at appropriate

More information

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 3 August 2017 INCIDENT CLASSIFICATIONS

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

ECEN 667 Power System Stability Lecture 19: Load Models

ECEN 667 Power System Stability Lecture 19: Load Models ECEN 667 Power System Stability Lecture 19: Load Models Prof. Tom Overbye Dept. of Electrical and Computer Engineering Texas A&M University, overbye@tamu.edu 1 Announcements Read Chapter 7 Homework 6 is

More information

Electrical grid stability with high wind energy penetration

Electrical grid stability with high wind energy penetration ECOWAS Regional Workshop on WIND ENERGY Praia, Cape Verde. November 4 5, 2013 Electrical grid stability with high wind energy penetration Fernando CASTELLANO HERNÁNDEZ Head of Wind Energy Section Renewable

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Laboratory Tests, Modeling and the Study of a Small Doubly-Fed Induction Generator (DFIG) in Autonomous and Grid-Connected Scenarios

Laboratory Tests, Modeling and the Study of a Small Doubly-Fed Induction Generator (DFIG) in Autonomous and Grid-Connected Scenarios Trivent Publishing The Authors, 2016 Available online at http://trivent-publishing.eu/ Engineering and Industry Series Volume Power Systems, Energy Markets and Renewable Energy Sources in South-Eastern

More information

A CASE STUDY OF A FLOW-INDUCED TORSIONAL RESONANCE

A CASE STUDY OF A FLOW-INDUCED TORSIONAL RESONANCE A CASE STUDY OF A FLOW-INDUCED TORSIONAL RESONANCE William F. Eckert, P.Eng., Ph.D. Field Services Manager Brian C. Howes, M.Sc., P.Eng. Chief Engineer Beta Machinery Analysis Ltd., Calgary, AB, Canada,

More information

The Electric Power System

The Electric Power System The Electric Power System - Sweden- Swedish Power System 1 2 Basic facts 2014 Area: 450 295 km 2 Population: 9.6 Million Number of electricity consumers: 5.3 Million Number of TSOs: 1 Number of DSOs: 170

More information

Adaptive Power Flow Method for Distribution Systems With Dispersed Generation

Adaptive Power Flow Method for Distribution Systems With Dispersed Generation 822 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 17, NO. 3, JULY 2002 Adaptive Power Flow Method for Distribution Systems With Dispersed Generation Y. Zhu and K. Tomsovic Abstract Recently, there has been

More information

FEM Analysis and Development of Eclipse Gearbox for Wind Turbine

FEM Analysis and Development of Eclipse Gearbox for Wind Turbine International Journal of Current Engineering and Technology E-ISSN 2277 4106, P-ISSN 2347 5161 2016 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Research Article G.B.

More information

Squirrel cage induction generator based wind farm connected with a single power converter to a HVDC grid. Lluís Trilla PhD student

Squirrel cage induction generator based wind farm connected with a single power converter to a HVDC grid. Lluís Trilla PhD student Squirrel cage induction generator based wind farm connected with a single power converter to a HVDC grid Lluís Trilla PhD student Current topology of wind farm Turbines are controlled individually Wind

More information

ASSESSING BEHAVOIR OF THE OUTER CROWBAR PROTECTION WITH THE DFIG DURING GRID FAULT

ASSESSING BEHAVOIR OF THE OUTER CROWBAR PROTECTION WITH THE DFIG DURING GRID FAULT 2 nd International Conference on Energy Systems and Technologies 18 21 Feb. 2013, Cairo, Egypt ASSESSING BEHAVOIR OF THE OUTER CROWBAR PROTECTION WITH THE DFIG DURING GRID FAULT Mohamed Ebeed 1, Omar NourEldeen

More information

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

Experience on Technical Solutions for Grid Integration of Offshore Windfarms Experience on Technical Solutions for Grid Integration of Offshore Windfarms Liangzhong Yao Programme Manager AREVA T&D Technology Centre 18 June 2007, DTI Conference Centre, London Agenda The 90MW Barrow

More information

Targeted Application of STATCOM Technology in the Distribution Zone

Targeted Application of STATCOM Technology in the Distribution Zone Targeted Application of STATCOM Technology in the Distribution Zone Christopher J. Lee Senior Power Controls Design Engineer Electrical Distribution Division Mitsubishi Electric Power Products Electric

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Pumped storage for balancing wind power fluctuations in an isolated grid

Pumped storage for balancing wind power fluctuations in an isolated grid Wind Power to the Grid EPE Wind Energy Chapter 1 st seminar Delft University of Technology, 8-9 March 008 Pumped storage for balancing wind power fluctuations in an isolated grid Jon Are Suul, Professor

More information

Battery Energy Storage System addressing the Power Quality Issue in Grid Connected Wind Energy Conversion System 9/15/2017 1

Battery Energy Storage System addressing the Power Quality Issue in Grid Connected Wind Energy Conversion System 9/15/2017 1 Battery Energy Storage System addressing the Power Quality Issue in Grid Connected Wind Energy Conversion System 9/15/2017 1 CONTENTS Introduction Types of WECS PQ problems in grid connected WECS Battery

More information