Disclaimer This presentation may contain product features that are currently under development. This overview of new technology represents no commitme

Size: px
Start display at page:

Download "Disclaimer This presentation may contain product features that are currently under development. This overview of new technology represents no commitme"

Transcription

1 STO1479BU vsan Beyond the Basics Sumit Lahiri Product Line Manager Eric Knauft Staff Engineer #VMworld #STO1479BU

2 Disclaimer This presentation may contain product features that are currently under development. This overview of new technology represents no commitment from VMware to deliver these features in any generally available product. Features are subject to change, and must not be included in contracts, purchase orders, or sales agreements of any kind. Technical feasibility and market demand will affect final delivery. Pricing and packaging for any new technologies or features discussed or presented have not been determined. 2

3 Agenda 1 The world of Objects 2 Life of vsan Component 3 The 4 Rs of vsan 4 Multi-Level Fault Domains 5 All Flash I/O Flow 3

4 The World of Objects

5 Disk layout in host Cache Capacity vsan Datastore Disk groups contribute to single vsan datastore in vsphere cluster disk group disk group disk group disk group disk group Max 64 nodes Min 2 nodes (ROBO) Max 5 Disk Groups per host 2 Tiers per Disk Group

6 Creating vm, creates several objects in the background (VMDK) Virtual Disk VM home namespace: VMX, log files Virtual memory swap objects 6

7 From VM to components (Object) (components) (blocks) VMworld 2017 Component Component Component Component Content: Not for publication (Max Size: 255 GB) (in low MBs) 7

8 Fault Domains vsphere vsan Host Racks Sites 8

9 Failures to Tolerate (FTT) Always in context to fault domains vsphere vsan Host Racks Sites Failures to Tolerate Failures to Tolerate Failures to Tolerate 9

10 Failures to Tolerate (FTT) FTT implies host failures to tolerate if fault domain is not mentioned vsphere vsan vsphere vsan vsphere vsan FTT=1 FTT=2 FTT=3 10

11 Failures to Tolerate (FTT) can be Nested Survive one site failure and one host failure on the other site vsphere vsan Host Racks Sites 11

12 Fault Tolerance Methods

13 Failures Tolerate Method (FTM) FTT=1 FTT=2 FTT=3 vsphere vsan vsphere vsan vsphere vsan RAID-1. 2bytes/byte. 3bytes/byte 4bytes/byte. 1.3 bytes/byte RAID-5. X X 1.5 bytes/byte RAID-6 X. X 13

14 FTT = Failures to Tolerate FTM = Fault Tolerance Method

15 Notation

16 Object is associated with underlying policy (VMDK) Policy: 1. Failures to Tolerate 2. Fault Tolerance Method VMworld 2017 Content: Not for publication 16

17 Policy dictates how objects are managed (VMDK) Policy: 1. Failures to Tolerate (FTT) 2. Fault Tolerance Method (FTM) VMworld 2017 FTT =1, FTM = RAID-1, Stripe Width >2 Replica (stripes) C1 C2. (components) (VMDK) Replica Content: Not for publication (stripes) C1 C2. (components) 17

18 RAID Abstraction Model Replica C1 C2. (components) (stripes) (VMDK) Replica (stripes) FTT =1, FTM = RAID-1, Stripe Width >2 No witness (RAID-1) R1 (VMDK) (RAID-0) (RAID-0) R0 R0... C1 C2 C1 C2 C1 C2 (components) (components) (components) 18

19 FTT=1,FTM=RAID-1, comparison with stripe and without stripes (no striping) C 250GB (component) 250GB (RAID-1) R1 (VMDK) C (no striping) (component) No witness No witness 250GB 1TB (RAID-1) R1 (VMDK) (RAID-0) (RAID-0) R0 R0.. C1 C2 C1 C2 (components) (components) 250 GB 1 TB 19

20 vsan managed as bunch of components C C vsan Datastore C C C C components

21 Each replica on different Fault Domain (e.g. host) R0 (RAID-0) (RAID-1) R1 (VMDK) R0 (RAID-0) FTT =2, FTM = RAID-1, Stripe Width = 2 R0 (RAID-0) C1 C2 C1 C2 C1 C2 (components) (components) (components) 21

22 Each component is commonly placed on a different host R0 (RAID-0) (RAID-1) R1 (VMDK) R0 (RAID-0) FTT =2, FTM = RAID-1, Stripe Width = 2 R0 (RAID-0) C1 C2 C1 C2 C1 C2 (components) (components) (components) 22

23 Can we survive 2 host failures with 3 hosts? R0 (RAID-0) (RAID-1) R1 (VMDK) R0 (RAID-0) FTT =2, FTM = RAID-1, Stripe Width = 2 R0 (RAID-0) C1 C2 C1 C2 C1 C2 (components) (components) (components) 23

24 Liveness = Availability && Quorum

25 Quorum: In the event of cluster partition, which partition shall proceed? N hosts... partition-01 M hosts... partition-02 25

26 Quorum: The partition with the higher Votes proceed N votes N hosts... partition-01 M votes M hosts... partition-02 Cluster members participate in voting 26

27 If M > N, Partition-2 proceeds N votes N hosts... partition-01 partition-02 proceeds M votes M hosts... partition-02 Cluster members participate in voting 27

28 Voting FTT=1 and FTM = RAID-1

29 Quorum is calculated on a per object basis No witness C (component) (RAID-1) R1 (VMDK) 1 1 C (component) Each component participates in voting With two components, this sums to even number of votes 29

30 Add witness for Tier breaker vote (votes) 1 C (component) (RAID-1) R1 (votes) (VMDK) 1 C (component) 1 (votes) (witness) W Witness is added as Tier breaker vote Acts as an observer which component has latest data 30

31 For VMDK-A, partition-2 has higher votes (votes) 1 N hosts... (votes) 1 (RAID-1) R1 C (component) (VMDK-A) 1 M hosts... partition-01 partition-02 proceeds C (component) W 1 (witness) (votes) C C W (votes) 1 1 (votes) 31

32 General Case: Different objects proceed on different partition (votes) (votes) 1 1 (RAID-1) R1 C (component) (component) N hosts... (VMDK-B) (VMDK-A) 1 C W 1 (votes) (RAID-1) (witness) (votes) M hosts... C C W C W C (votes) 1 (votes) 1 1 C (component) R1 1 C (component) W 1 (witness) (votes) partition-01 proceeds for VMDK-B partition-02 proceeds for VMDK-A 32

33 Components can be classified as data component and witness component (no striping) (1 vote) D (data component) (RAID-1) R1 (1 vote) (VMDK) 1 1 D (no striping) (data component) 1 (1 vote) W (witness component)

34 Min count of hosts required for survive N host failures?

35 Minimum 2N+1 hosts required to survive N host failures N hosts = N shares of votes... partition-01 If each host represents same share of vote Wining partition would require a minimum of N+1 hosts (N +1) hosts = (N+1) shares of vote partition-02 is winning partition Minimum size of cluster = 2N+1 hosts to survive N host failures 35

36 Min cluster size is determined by meeting Liveness requirement Liveness = (Quorum) && (Availability) Min of hosts in cluster = Max (Min hosts for Quorum, Min hosts for Availability) 36

37 Examples FTT =1, FTM = RAID-1 Min host for availability = 2 Min host of Quorum = 2N+1 = 3 Min cluster size =3 FTT=2, FTM = RAID-1 Min host for availability = 3 Min host for Quorum = 2N+1 =5 Min cluster size =5 37

38 Examples of Liveness (Quorum + Availability)

39 Quorum (FTT:2, FTM: RAID-1 ) = 5 Hosts, no stripe FTT =2, FTM = RAID-1, Stripe Width = 1 (VMDK) D (RAID-1) R D D (data component) (data component) (data component) 3 data components = 3 votes (witness component) 1 W W 1 2 witness components = 2 votes 39

40 Votes Re-assigned / Re-balanced as stripe width is changed FTT =2, FTM = RAID-1, Stripe Width = 2 1 (VMDK) C1 (components) R0 (RAID-0) R1 2 2 R0 2 C2 1 (RAID-1) (RAID-0) 1 C1 1 C2 1 C1 1C2 (components) (components) R0 (RAID-0) 2 3 W W Assign higher votes to break tie 40

41 Quorum with stripe width =2 C2 Partition - 1 C (2 votes) W Partition 2 proceeds C2 C1 C2 C1 (2 votes) (2 votes) (1 vote) (1 vote) W (VMDK) Availability but no Quorum (Availability) && (Quorum) 41

42 Quorum = True Availability = False

43 It is possible to have Quorum but no Availability Partition - 1 Quorum C1 C1 1 1 (VMDK) R1 R0 R0 R0 C1 (votes) 1 3 W Partition - 2 Quorum C2 C2 C W 43

44 RAID-5

45 RAID 5 protection against 1 host failure (VMDK) R5 1 C0 1 C1 Each component on a separate host Assigned higher vote to break tie C2 1 C3 esxi-01 esxi-02 esxi-03 esxi-04 45

46 RAID 5 protection against 1 host failure (VMDK) 1 C0 1 D1 D2 P1 D3 C1 R5 Each component is divided into data and parity blocks C2 1 C3 esxi-01 esxi-02 esxi-03 esxi-04 46

47 The Life of vsan Component

48 Object States: can be not compliant but accessible Compliance status: Are all replicas good? 2 R0 R1 R0 C1 C2 C1 C2 (VMDK) Operational status: Is Accessible? 3 Accessible implies Liveness (votes) 2 (votes) W esxi-03 (votes) esxi-01 esxi-02 48

49 Object States: can be not compliant but accessible Compliance status: Are all replicas good? R0 R1 R0 C1 C2 C1 C2 (VMDK) Operational status: Is Accessible? 3 Accessible implies Liveness (votes) 2 2 (votes) W esxi-03 (votes) Active = known good Degraded = known bad, rebuild now Absent = known bad, cause not known, repair after 60 mins esxi-01 esxi-02 Stale = Active however needs update 49

50 4 Rs Resync, Rebuild, Repair and Reconfiguration (Host-1) R1 C1.. C4 (VMDK) (Host-4) (components) (blocks) VMDK is divided into components Components comprise of data blocks Each component on different host Each data block of fixed size R1 C1.. C4 (VMDK) (state: active-stale) (resync blocks) Partial Resync Copy data to stale components When a component comes back from being absent R1 C1.. C4 (VMDK) (build out the component) Repair / Reconfigure Build fresh component Full Resync (state: degraded) 50

51 Rebuild Example

52 Begin: All components / elements are in active state (Active) A A C1 C2 (Active) (Active) W (2 votes) (3 votes) (2 votes) Tolerate 1 host failure with RAID-1 A (Active) A C1 (Active) C2 A 53

53 Cluster partitions with unknown cause, components go Absent Partition - 1 (Absent) Absent: Known bad, but cause not known A B C1 A B C2 2 (2 votes) (Active) A Partition 2 W C1 C2 3 2 (3 votes) (2 votes) A A (Active) Cluster partition, cause unknown, do not repair immediately Object is not compliant but accessible 54

54 Partition with both Availability and Quorum proceeds Partition - 1 (Absent) A B C1 vm HA to partition -2, partition-2 has both quorum and availability C2 2 A B A W Partition 2 - proceeds C1 3 2 A A C2 (2 votes) (3 votes) (2 votes) Availability no Quorum Quorum && Availability 55

55 Partition is resolved, component is Resynced (Active-Stale) AS AS A C1 C2 Resync 2 (2 votes) W C1 3 2 A A C2 (3 votes) (2 votes) Active-Stale Component is Resynced Component marked as Active Stale, Object is not compliant 56

56 All components / elements are in active state (Active) A A C1 C2 (Active) (Active) W (2 votes) A (Active) C1 (3 votes) (2 votes) A (Active) C2 A All components are Active Object is compliant and accessible 57

57 Repair Scenarios

58 Absent Components Repair After 60 Min Partition - 1 (Absent) Resync after 60 min A A W C1 C2 C1 C2 2 A Partition 2 : most recent data 3 2 (2 votes) (3 votes) (2 votes) A A 59

59 Degraded Components Repair Immediately Hardware Failure Causes Degraded (Degraded) Known bad, Resync Now D W C1 C2 C1 C2 2 D (2 votes) A 3 2 (3 votes) (2 votes) A A 60

60 Fresh components Resynced From Existing Components (Degraded) D C1 C2 2 (2 votes) A D Resync W C1 C2 3 2 A A R R C1 C2 2 (Reconfiguring Find another host to resync, Resync begins Object state is not-compliant but accessible (Another Host) 61

61 Object is Compliant Again (Degraded) (remove) D D C1 C2 2 (Active) A C1 (Active) C2 A (Active) W (Active) A A A C1 C (Active) Degraded component is marked for deletion 62

62 Rebuild RAID schematics Resync begins C1 (Degraded) R0 (VMDK) R1 R0 R0 C1 C2 C2 C1 W C2 Resync begins 63

63 Rebuild RAID schematics Resync ends C1 R0 (mark for removal) (VMDK) R1 R0 R0 C1 C2 C2 C1 W C2 Resync Ends 64

64 Reconfiguration Changing Storage Policies

65 Reconfiguration Increase FTT =2 to FTT =3 R1 R0 R0 R0 R1 R0 R0 R0 R0

66 Reconfiguration Increase Sripe Width R1 R0 R0 R0 R0 R0 R1 R0 R0 R0 R0

67 Multi-Level Fault Domains

68 Failures to Tolerate (FTT) can be Nested Survive one site failure and one host failure on the other site vsphere vsan Host Racks Sites 69

69 Stretched Cluster deployment with local fault protection RAID-5 Cluster vsphere RAID-1 3 rd site for witness vsan RAID-5 Cluster Prior examples, host is the fault domain 2 Levels of fault domain Site and host Failures to tolerate at each level 5ms RTT, 10GbE 70

70 RAID tree for stretched cluster with local fault protection D1 D2 P1 D3 R5 R1 R5 D1 P1 D2 D3 (Site -1) (Site -2) 71

71 Survive 1 site failure D1 D2 P1 D3 R5 R1 R5 D1 P1 D2 D3 (Site -1) (Site -2) 72

72 Survive 1 site failure and 1 host failure D1 D2 P1 D3 R5 R1 R5 D1 P1 D2 D3 (Site -1) (Site -2) 73

73 Anatomy of write: from site - 1 to site - 2 2a 1 Issue write Update Local Data and Parity R5 D1 D2 R1 P1 D3 R5 2b Send only data across sites Dn R5 Remote Helper Raid Tree (proxy owner) D1 D2 3 Remote side calculates parity. P1 D3 (Site -1) (Site - 2) 74

74 Votes in Stretched Cluster

75 5 Votes per site 3 voting entities for first level Site-1, Site-2 and the witness 1 1 D1 D2 D3 P1 R5 2 R1 5 5 Witness has equal share of votes as the other 2 entities (e.g. sites) 1 R5 D1 D2 W D3 P1 (Site -1) 4 components for second level Total of 5 votes (odd number of votes) (Site -2) 76

76 Witness is assigned same voting rights as the sites 3 voting entities for first level Site-1, Site-2 and the witness D1 D2 D3 P1 5 R5 R1 Witness has equal share of votes as the other 2 entities (e.g. sites) R5 D1 D2 W 5 D3 P1 (Site -1) 4 components for second level Total of 5 votes (odd number of votes) (Site -2) 77

77 I/O Flows

78 Anatomy of a All Flash Write H1 virtual disk vsphere Virtual SAN H2 5 7 H3 Pretty much same as hybrid: VM running on host H1 H1 is owner of virtual disk object Number Of Failures To Tolerate = 1 Object has 2 replicas on H1 and H2 1. Guest OS issues write op to virtual disk 2. Owner clones write op 3. In parallel: sends prepare op to H1 (locally) and H2 4. H1, H2 persist op to Flash (log) 5. H1, H2 ACK prepare op to owner 6. Owner waits for ACK from both prepares and completes I/O 7. Later, owner commits batch of writes

79 All-flash: Destaging Cache to Capacity H1 virtual disk vsphere Virtual SAN H2 hot H3 VMworld 2017 Data from committed writes accumulate on Flash Cache (Write Buffer) From different VMs / virtual disks In all-flash, blocks that are written most often (hot) stay in write cache. In all-flash, blocks that are infrequently accessed (cold) are destaged to flash capacity layer. Content: Not for publication cold

80 Nerd Out With These Key vsan Activities at VMworld Practice with Hands-on-Labs Learn from self-paced and expert led hands on labs vsan Getting Started Workshop (Expert led) VxRail Getting Started (Self paced) Self-Paced lab available online 24x7 VMworld 2017 Visit SDDC Assessment Lounge Discover how to assess if your IT is a good fit for HCI Four Seasons Willow Room/2nd floor Open from 11am 5pm Sun, Mon, and Tue Learn more at Assessing & Sizing in STO1500BU Become a vsan Specialist Earn VMware digital badges to showcase your skills Content: Not for publication New 2017 vsan Specialist Badge Education & Certification Lounge: VM Village Certification Exam Center: Jasmine EFG, Level 3 #HitRefresh on your current data center and discover the possibilities!

81 3 Easy Ways to Learn More about vsan Storage Hub Technical Library StorageHub.vmware.com Reference architectures, off-line demos and more Easy search function And More! VMworld 2017 New vsan Tools vsan Sizer vsan Assessment Hands-On Lab Test drive vsan for free today! Content: Not for publication Live at VMworld Practical learning of vsan, VxRail and more 24x7 availability online for free! 82

82

83

PowerChute TM Network Shutdown v3.1. User Guide. VMware

PowerChute TM Network Shutdown v3.1. User Guide. VMware PowerChute TM Network Shutdown v3.1 User Guide VMware 990-4595A-001 Publication Date: December, 2013 Table of Contents Introduction... 1 UPS Configuration... 2 Network Configuration... 3 UPS Configuration

More information

Training Program 2018 Where Education Meets Technology

Training Program 2018 Where Education Meets Technology Training Program 2018 Where Education Meets Technology January December 2018 Training Program 2018 At Ziehm Imaging, we are strongly committed to our customers and their patients. Which means a lot more

More information

Dell EMC SCv ,000 Mailbox Exchange 2016 Resiliency Storage Solution using 10K drives

Dell EMC SCv ,000 Mailbox Exchange 2016 Resiliency Storage Solution using 10K drives Dell EMC SCv3020 14,000 Mailbox Exchange 2016 Resiliency Storage Solution using 10K drives Microsoft ESRP 4.0 Abstract This document describes the Dell EMC SCv3020 storage solution for Microsoft Exchange

More information

Enhancing Energy Efficiency of Database Applications Using SSDs

Enhancing Energy Efficiency of Database Applications Using SSDs Seminar Energy-Efficient Databases 29.06.2011 Enhancing Energy Efficiency of Database Applications Using SSDs Felix Martin Schuhknecht Motivation vs. Energy-Efficiency Seminar 29.06.2011 Felix Martin Schuhknecht

More information

PowerChute TM Network Shutdown v4.0. User Guide. VMware

PowerChute TM Network Shutdown v4.0. User Guide. VMware PowerChute TM Network Shutdown v4.0 User Guide VMware 990-4595C-001 Publication Date: January 2015 Table of Contents Introduction... 1 UPS Configuration... 2 Network Configuration... 3 UPS Configuration

More information

Chassis Profiles and Templates

Chassis Profiles and Templates About Cisco UCS Storage Servers, page 1 Chassis Profiles, page 2 Creating a Chassis Profile Template, page 7 Creating a Chassis Profile Instance from a Chassis Profile Template, page 8 Binding a Chassis

More information

Eilat, 11/2017. Cost Effective switchgear Modernization solutions

Eilat, 11/2017. Cost Effective switchgear Modernization solutions Eilat, 11/2017 Cost Effective switchgear Modernization solutions Asset upgrade Today s situation Aging of install base. Demands for Health & Safety Standards. Demands for improve quality of supply. Lose

More information

MongoDB - Replication & Sharding

MongoDB - Replication & Sharding MongoDB - Replication & Sharding Masterprojekt NoSQL Mirko Köster Universität Hamburg Fachbereich Informatik Arbeitsgruppe VSIS 29. November 2013 Mirko Köster MongoDB - Replication & Sharding 29.11.2013

More information

Open & Evolutive UAV Architecture

Open & Evolutive UAV Architecture Open & Evolutive UAV Architecture 13th June UAV 2002 CEFIF 16-juin-02 Diapositive N 1 / 000 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information

More information

Using cloud to develop and deploy advanced fault management strategies

Using cloud to develop and deploy advanced fault management strategies Using cloud to develop and deploy advanced fault management strategies next generation vehicle telemetry V 1.0 05/08/18 Abstract Vantage Power designs and manufactures technologies that can connect and

More information

Welcome to the waitless world. CBU for IBM i. Steve Finnes

Welcome to the waitless world. CBU for IBM i. Steve Finnes CBU for IBM i Steve Finnes finnes@us.ibm.com CBU for IBM i Offering for IBM i HA/DR environments Consolidation environments (AIX, i and Linux) for HA/DR operations Offering Supports Optional permanent

More information

Sinfonia: a new paradigm for building scalable distributed systems

Sinfonia: a new paradigm for building scalable distributed systems CS848 Paper Presentation Sinfonia: a new paradigm for building scalable distributed systems Aguilera, Merchant, Shah, Veitch, Karamanolis SOSP 2007 Presented by Somayyeh Zangooei David R. Cheriton School

More information

Automatic Genset Controller, AGC-4 Display readings Push-button functions Alarm handling Log list

Automatic Genset Controller, AGC-4 Display readings Push-button functions Alarm handling Log list OPERATOR'S MANUAL Automatic Genset Controller, AGC-4 Display readings Push-button functions handling Log list DEIF A/S Frisenborgvej 33 DK-7800 Skive Tel.: +45 9614 9614 Fax: +45 9614 9615 info@deif.com

More information

Contents. Solar Select TM Frequently Asked Questions

Contents. Solar Select TM Frequently Asked Questions Solar Select TM Frequently Asked Questions Contents Program Overview and How Solar Select Works... 1 Participation Requirements... 3 Cost and Payment... 4 Solar Production... 5 Development, Equipment,

More information

Adventures in Clojure Navigating the STM sea and exploring Worlds. Tom Van Cutsem

Adventures in Clojure Navigating the STM sea and exploring Worlds. Tom Van Cutsem Adventures in Clojure Navigating the STM sea and exploring Worlds Tom Van Cutsem Part 1: Clojure in a Clojure in a nutshell A modern Lisp dialect (2007), designed by Rich Hickey JVM as runtime platform

More information

In-Place Associative Computing:

In-Place Associative Computing: In-Place Associative Computing: A New Concept in Processor Design 1 Page Abstract 3 What s Wrong with Existing Processors? 3 Introducing the Associative Processing Unit 5 The APU Edge 5 Overview of APU

More information

UKSM: Swift Memory Deduplication via Hierarchical and Adaptive Memory Region Distilling

UKSM: Swift Memory Deduplication via Hierarchical and Adaptive Memory Region Distilling UKSM: Swift Memory Deduplication via Hierarchical and Adaptive Memory Region Distilling Nai Xia* Chen Tian* Yan Luo + Hang Liu + Xiaoliang Wang* *: Nanjing University +: University of Massachusetts Lowell

More information

LEAP: LSC Evaluation and Achievement Program

LEAP: LSC Evaluation and Achievement Program LEAP: LSC Evaluation and Achievement Program Instructions for the LSC The LEAP online evaluation system is a tool to evaluate achievement and progress of the 59 LSCs. The program evaluates and helps identify

More information

FLEXIBILITY FOR THE HIGH-END DATA CENTER. Copyright 2013 EMC Corporation. All rights reserved.

FLEXIBILITY FOR THE HIGH-END DATA CENTER. Copyright 2013 EMC Corporation. All rights reserved. FLEXIBILITY FOR THE HIGH-END DATA CENTER 1 The World s Most Trusted Storage Platform More Than 20 Years Running the World s Most Critical Applications 1988 1990 1994 2000 2003 2005 2009 2011 2012 New Symmetrix

More information

JUMO DSM software. PC software for management, configuration, and maintenance of digital sensors. Operating Manual T90Z001K000

JUMO DSM software. PC software for management, configuration, and maintenance of digital sensors. Operating Manual T90Z001K000 JUMO DSM software PC software for management, configuration, and maintenance of digital sensors Operating Manual 20359900T90Z001K000 V1.00/EN/00661398 Contents 1 Introduction...................................................

More information

IES GRID FEED-IN LIMITER

IES GRID FEED-IN LIMITER IES GRID FEED-IN LIMITER Installation and User Manual Models SPS01101-ABB SPS01303-ABB CONTAINS IMPORTANT INSTALLATION AND TESTING PROCEDURES THAT MUST BE FOLLOWED TO ENSURE COMPLIANCE WITH ENERGEX AND

More information

E-Mobility Trainings. Handling electric drives safely. TÜV SÜD Akademie GmbH

E-Mobility Trainings. Handling electric drives safely. TÜV SÜD Akademie GmbH E-Mobility Trainings Handling electric drives safely TÜV SÜD Akademie GmbH 01 02 E-Mobility Trainings Handling electric drives safely Electric vehicle drives are gaining ground in both hybrid and pure

More information

Veritas CloudPoint Release Notes. Ubuntu

Veritas CloudPoint Release Notes. Ubuntu Veritas CloudPoint 2.0.2 Release Notes Ubuntu May 2018 Veritas CloudPoint Release Notes Last updated: 2018-05-23 Document version: 2.0.2 Rev 3 Legal Notice Copyright 2018 Veritas Technologies LLC. All

More information

TRITON ERROR CODES ERROR CODE MODEL SERIES DESCRIPTION RESOLUTION

TRITON ERROR CODES ERROR CODE MODEL SERIES DESCRIPTION RESOLUTION 0 8100, 9100, 9600, 9610, 9615, 9640, No errors 9650, 9700, 9710, 9705, 9750, RL5000 (SDD),RL5000 (TDM), RT2000, 9800, MAKO, SuperScrip 1 9615 Unsolicited note channel 1 2 9615 Unsolicited note channel

More information

MEMORANDUM DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SEVICES RAUL JUAREZ, FLEET MAINTENANCE COORDINATOR GLENDA BONER, ADMINISTRATIVE SECRETARY

MEMORANDUM DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SEVICES RAUL JUAREZ, FLEET MAINTENANCE COORDINATOR GLENDA BONER, ADMINISTRATIVE SECRETARY MEMORANDUM TO: FROM: BY: CITY COUNCIL DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SEVICES RAUL JUAREZ, FLEET MAINTENANCE COORDINATOR GLENDA BONER, ADMINISTRATIVE SECRETARY SUBJECT: CONSIDERATION OF THE

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

IBM CMM Quick Reference Guide

IBM CMM Quick Reference Guide IBM CMM Quick Reference Guide Contents Introduction Prerequisites Requirements Components Used CMM Overview CMM Layout Useful CMM Screens Login Screen System Information Screen Event Log Screen Chassis

More information

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects Instructions for Completing Oncor s Interconnection Application For Solar PV Projects Program Year 2009 Take a Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company s commitment

More information

DataCore Virtualization Appliance

DataCore Virtualization Appliance DataCore Virtualization Appliance Fujitsu-DataCore SVA November 2018 The Fujitsu Storage Virtualization Appliance (SVA) is a complete hardware solution for DataCore s SANsymphony SAN virtualization product.

More information

Learning paths. The path to higher performance ABB UNIVERSITY. ABB University. Learning paths

Learning paths. The path to higher performance ABB UNIVERSITY. ABB University. Learning paths ABB UNIVERSITY Learning paths The path to higher performance Learning paths for ABB Ability System 800xA ABB Ability Symphony Plus / Harmony Quality Control Systems Advant Master Advant MOD ABB University

More information

Setup of a multi-os platform based on the Xen hypervisor. An industral case study. Paolo Burgio

Setup of a multi-os platform based on the Xen hypervisor. An industral case study. Paolo Burgio Setup of a multi-os platform based on the Xen hypervisor An industral case study Paolo Burgio paolo.burgio@unimore.it Roberto Cavicchioli Ignacio Sanudo Olmedo Marco Solieri Who are we? High-Performance

More information

SyncUP FLEET. Implementation Guide

SyncUP FLEET. Implementation Guide SyncUP FLEET Implementation Guide Overview The purpose of this document is to provide all the information necessary for successfully deploying a customer pilot for Hours of Service. This document is split

More information

PRODUCT DESCRIPTIONS AND METRICS

PRODUCT DESCRIPTIONS AND METRICS PRODUCT DESCRIPTIONS AND METRICS Adobe PDM - AEM 5.6.1 Subscription OnPremise (2013v3) The Products and Services described in this PDM are subject to the applicable Sales Order, the terms of this PDM,

More information

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager Agenda Item # 2 Work Session Meeting Date April 20, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne Ludlow City Manager Discussion Item Background Discussion of Options for

More information

Copyright 2012 EMC Corporation. All rights reserved.

Copyright 2012 EMC Corporation. All rights reserved. 1 Transforming Storage: An EMC Overview Symmetrix storage systems Boštjan Zadnik Technology Consultant Bostjan.Zadnik@emc.com 2 Data Sources Are Expanding Source: 2011 IDC Digital Universe Study 3 Applications

More information

ABB Services for Low Voltage equipment Your choice, your future

ABB Services for Low Voltage equipment Your choice, your future ABB Services for Low Voltage equipment Your choice, your future You choose, we respond. Globally. The future of your equipment depends on the service you choose Whatever you choose, it should be a well-informed

More information

WEB ENABLE ONLINE DATA LOGGER AND REMOTE MONITORING FOR 66 KW ON GRID SOLAR PV SYSTEM

WEB ENABLE ONLINE DATA LOGGER AND REMOTE MONITORING FOR 66 KW ON GRID SOLAR PV SYSTEM WEB ENABLE ONLINE DATA LOGGER AND REMOTE MONITORING FOR 66 KW ON GRID SOLAR PV SYSTEM The Dept of Electronics and Instrumentation Engineering has duly signed MOU with MAS solar systems, Coimbatore. The

More information

Study Guide For Diesel Trade Theory N2

Study Guide For Diesel Trade Theory N2 Study Guide For Diesel Trade Theory N2 Study Guide And Intervention Surface Area. 508 views. Mark Schem Of Physics 5054 P4. Find out how to receive the answers for your diesel trade theory n2 exam papers.

More information

Valcom Failsafe Unit. 1620ESv2 SERIES. Operation and Maintenance Manual

Valcom Failsafe Unit. 1620ESv2 SERIES. Operation and Maintenance Manual Valcom Failsafe Unit 1620ESv2 SERIES Operation and Maintenance Manual Table of Contents Section Title Page 1. - Introduction.. 2. - Unpacking the Failsafe unit. 3. - Installation 3.1 - Auto / Timed UPS

More information

5 Volt Sensor Supply Circuit - Test

5 Volt Sensor Supply Circuit - Test Page 1 of 10 Shutdown SIS Previous Screen Product: INDUSTRIAL ENGINE Model: C4.4 INDUSTRIAL ENGINE 444 Configuration: C4.4 Industrial Engine 44400001-UP Troubleshooting C4.4 and C6.6 Industrial Engines

More information

Net Metering and Solar Incentive Proposed Framework

Net Metering and Solar Incentive Proposed Framework Net Metering and Solar Incentive Proposed Framework STAKEHOLDER MEETING JUNE 11, 2014 June 12, 2014 1 Meeting Agenda June 11, 2014 2-3pm. Review framework. Today s Meeting is to EXPLAIN a compromise framework

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Start Your Own Food Truck Business Cart Trailer Kiosk Standard And Gourmet Trucks Mobile Catering Bustaurant Startup Series

Start Your Own Food Truck Business Cart Trailer Kiosk Standard And Gourmet Trucks Mobile Catering Bustaurant Startup Series Start Your Own Food Truck Business Cart Trailer Kiosk Standard And Gourmet Trucks Mobile Catering Bustaurant We have made it easy for you to find a PDF Ebooks without any digging. And by having access

More information

Cumulative Percent Frequency Percent Valid Percent

Cumulative Percent Frequency Percent Valid Percent Frequency Table Fully Online Hybrid Online Partially Online H_10 Course Type Frequency 868 24.7 24.7 24.7 1735 49.3 49.3 74.0 832 23.6 23.6 97.6 84 2.4 2.4 100.0 H_13 Period Frequency 1162R 100.0 H_14

More information

EVSE Load Balancing VS Load Shedding 1: Largest number of 30 Amps EVSEs that can be fed as per the code from the 600 volts feeder

EVSE Load Balancing VS Load Shedding 1: Largest number of 30 Amps EVSEs that can be fed as per the code from the 600 volts feeder EVSE Load Balancing VS Load Shedding 1: Largest number of 30 Amps EVSEs that can be fed as per the code from the 1600A @ 600 volts feeder The schematics shows that the 1600A feeder is split in 7 branches

More information

ARC-H: Adaptive replacement cache management for heterogeneous storage devices

ARC-H: Adaptive replacement cache management for heterogeneous storage devices Journal of Systems Architecture 58 (2012) ARC-H: Adaptive replacement cache management for heterogeneous storage devices Young-Jin Kim, Division of Electrical and Computer Engineering, Ajou University,

More information

Outline. Background Performed evaluations. General experiences Future work. ATAM Experiences. Architecture used in 3O3P project SA-AFL architecture

Outline. Background Performed evaluations. General experiences Future work. ATAM Experiences. Architecture used in 3O3P project SA-AFL architecture Xiaohong Jin Pia Stoll Mariana Olsson Corporate Research ABB ATAM Experiences ABB AB, Corporate Research - 1 3/29/2005 Outline Background Performed evaluations Architecture used in 3O3P project SA-AFL

More information

Informatica Powercenter 9 Transformation Guide Pdf

Informatica Powercenter 9 Transformation Guide Pdf Informatica Powercenter 9 Transformation Guide Pdf Informatica Powe rcenter Express Getting Started Guide Version 9.5.1 May Informatica PowerCenter Transformation Guide Transformation Descriptions The.

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Vanpool Regional Administration

Vanpool Regional Administration Vanpool Regional Administration Contents Introduction... 2 Structure and Layout... 2 Make sure you are in the right application... 3 Vanpool Program Configuration... 3 Lookup... 5 Adding a new van... 6

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

Hardware Withdrawal: IBM TotalStorage Enterprise Storage Server selected features and feature conversions

Hardware Withdrawal: IBM TotalStorage Enterprise Storage Server selected features and feature conversions IBM United States Announcement 907-112, dated May 22, 2007 Hardware Withdrawal: IBM TotalStorage Enterprise Storage Server selected features and feature conversions Feature withdrawals...2 Direct customer

More information

e-track Certified Driver Operating Manual

e-track Certified Driver Operating Manual e-track Certified Driver Operating Manual Copyright 2016 all rights reserved. Page: Table of Contents System Overview 4 Login 5 Certifying Logs 6 Unidentified Driver Records 8 Requested Edits 9 ECM Link

More information

CalMod Program EMU Procurement Update

CalMod Program EMU Procurement Update CalMod Program EMU Procurement Update Board of Directors May 7, 2015 Agenda Item 7a Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service

More information

Energy Storage and Distributed Energy Resources Phase 3 (ESDER 3)

Energy Storage and Distributed Energy Resources Phase 3 (ESDER 3) Energy Storage and Distributed Energy Resources Phase 3 (ESDER 3) Straw Proposal Technical Working Group March 9, 018 10 a.m. 4 p.m. (Pacific Standard Time) Agenda Time Item Speaker 10:00-10:10 Stakeholder

More information

ABB life cycle services Uninterruptible power supplies

ABB life cycle services Uninterruptible power supplies ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you

More information

HOLY SPIRIT RCSRD NO.4 BUS DRIVER S GUIDE

HOLY SPIRIT RCSRD NO.4 BUS DRIVER S GUIDE HOLY SPIRIT RCSRD NO.4 BUS DRIVER S GUIDE Updated May 2017 Holy Spirit RCSRD No.4 Bus Driver s Guide TABLE OF CONTENTS INTRODUCTION... 3 CARRIER PROFILE... 4 BUS DRIVERS... 5 Authorized Driver... 5 Un-authorized

More information

Life cycle services for protection and control relays Full support from start to finish

Life cycle services for protection and control relays Full support from start to finish Life cycle services for protection and control relays Full support from start to finish The main purpose of the protection and control relay is to protect both human lives and equipment as well as ensure

More information

Harris IRT Enterprises Digital Resistance Tester Model XP

Harris IRT Enterprises Digital Resistance Tester Model XP Harris IRT Enterprises Digital Resistance Tester Model 5012-06XP Specifications & Dimensions 2 Theory of Operation 3 Operator Controls & Connectors 4 Test Connections 5 Calibration Procedure 6-7 Options

More information

NREL Microgrid Controller Innovation Challenge Event

NREL Microgrid Controller Innovation Challenge Event Power Systems Engineering Center NREL Microgrid Controller Innovation Challenge Event Brian Miller, PE Strategic Team Lead, Microgrids Brian.Miller@NREL.gov 303-275-4917 Overview Background: NREL capabilities

More information

License Model Schedule Actuate License Models for the Open Text End User License Agreement ( EULA ) effective as of November, 2015

License Model Schedule Actuate License Models for the Open Text End User License Agreement ( EULA ) effective as of November, 2015 License Model Schedule Actuate License Models for the Open Text End User License Agreement ( EULA ) effective as of November, 2015 1) ACTUATE PRODUCT SPECIFIC SOFTWARE LICENSE PARAMETERS AND LIMITATIONS

More information

LPG STARTBOX. Instruction Manual. Rempel Power Systems GmbH

LPG STARTBOX. Instruction Manual. Rempel Power Systems GmbH LPG STARTBOX Rempel Power Systems GmbH 2014-10-24 Content Installation Guidelines... 2 Layout... 2 Getting started (Learning mode)... 3 Operating mode... 5 Switch positions... 6 Programming mode (Firmware

More information

Redflow Limited AGM 2017 Commentary Simon Hackett

Redflow Limited AGM 2017 Commentary Simon Hackett Redflow Limited AGM 2017 Commentary Simon Hackett Dear Shareholders, Redflow Limited has certainly had an interesting year. I want to take a few minutes to address my own contributions to the company during

More information

Informatica Powercenter 9 Designer Guide Pdf

Informatica Powercenter 9 Designer Guide Pdf Informatica Powercenter 9 Designer Guide Pdf Informatica PowerCenter 9 Installation and Configuration Complete Guide _ Informatica Training & Tutorials - Download as PDF File (.pdf), Text file (.txt) or

More information

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016 PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS v1.1 Revised Table of Contents 1 Common Alarms and Warnings... 1 2 Common Issues... 6 2.1 Communication problems... 6 2.1.1 Controller communication

More information

CalMod Program EMU Procurement Update. TJPA Board May 14, 2015

CalMod Program EMU Procurement Update. TJPA Board May 14, 2015 CalMod Program EMU Procurement Update TJPA Board May 14, 2015 Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service (with level boarding)

More information

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Moenkopi) Scheduling at Willow Beach. Operating Procedure

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Moenkopi) Scheduling at Willow Beach. Operating Procedure No. 6930 Table of Contents Purpose... 1 1. Limits, Ratings, & Effectiveness Factors... 2 2. Contingency Operations... 2 2.1 Transmission Lines Outages... 2 2.2 APS Terminal Equipment Outages... 2 2.3 SCE

More information

Your Fuel Can Pay You: Maximize the Carbon Value of Your Fuel Purchases. Sean H. Turner October 18, 2017

Your Fuel Can Pay You: Maximize the Carbon Value of Your Fuel Purchases. Sean H. Turner October 18, 2017 Your Fuel Can Pay You: Maximize the Carbon Value of Your Fuel Purchases Sean H. Turner October 18, 2017 Agenda Traditional Funding Mechanisms vs. Market- Based Incentives for Renewable Fuels and Electric

More information

Electronic Vehicle Immobilization System EWS 2

Electronic Vehicle Immobilization System EWS 2 Page 1 of 6 Electronic Vehicle Immobilization System EWS 2 History of BMW vehicle immobilization systems On vehicles produced up to late 1994 vehicle immobilization can be activated via the antitheft alarm

More information

Connecting your business diesel generation

Connecting your business diesel generation Connecting your business diesel generation March 2018 For connections more than 10kW 2 Contents Introduction to large distributed generation systems 3 Congestion management and safety 6 Application form

More information

Industry Webinar Briefing

Industry Webinar Briefing FMCSA National Training Center Webinar Industry Webinar Briefing February 2014 Federal Motor Carrier Safety Administration Webinar Agenda Summary of the Unified Registration System (URS) Biennial Update

More information

Low and medium voltage service. Power Care Customer Support Agreements

Low and medium voltage service. Power Care Customer Support Agreements Low and medium voltage service Power Care Customer Support Agreements Power Care Power Care is the best, most convenient and guaranteed way of ensuring electrification system availability and reliability.

More information

index changing a variable s value, Chime My Block, clearing the screen. See Display block CoastBack program, 54 44

index changing a variable s value, Chime My Block, clearing the screen. See Display block CoastBack program, 54 44 index A absolute value, 103, 159 adding labels to a displayed value, 108 109 adding a Sequence Beam to a Loop of Switch block, 223 228 algorithm, defined, 86 ambient light, measuring, 63 analyzing data,

More information

Finite Element Based, FPGA-Implemented Electric Machine Model for Hardware-in-the-Loop (HIL) Simulation

Finite Element Based, FPGA-Implemented Electric Machine Model for Hardware-in-the-Loop (HIL) Simulation Finite Element Based, FPGA-Implemented Electric Machine Model for Hardware-in-the-Loop (HIL) Simulation Leveraging Simulation for Hybrid and Electric Powertrain Design in the Automotive, Presentation Agenda

More information

BASIC 5: VEHICLE MAINTENANCE

BASIC 5: VEHICLE MAINTENANCE Comprehensive Safety Analysis Initiative BASIC 5: VEHICLE MAINTENANCE Staying on top of safety and compliance under the CSA 2010 initiative will mean getting back to the BASICs. This synopsis will focus

More information

ZT-USB Series User Manual

ZT-USB Series User Manual ZT-USB Series User Manual Warranty Warning Copyright All products manufactured by ICP DAS are under warranty regarding defective materials for a period of one year, beginning from the date of delivery

More information

2015 The MathWorks, Inc. 1

2015 The MathWorks, Inc. 1 2015 The MathWorks, Inc. 1 [Subtrack 2] Vehicle Dynamics Blockset 소개 김종헌부장 2015 The MathWorks, Inc. 2 Agenda What is Vehicle Dynamics Blockset? How can I use it? 3 Agenda What is Vehicle Dynamics Blockset?

More information

One-Stop Service: Monitoring and Managing.

One-Stop Service: Monitoring and Managing. One-Stop Service: Monitoring and Managing. The highest quality from the market leader Solar-Log devices are the most accurate and reliable data loggers on the market. Offer your customers high-quality

More information

Storage and Memory Hierarchy CS165

Storage and Memory Hierarchy CS165 Storage and Memory Hierarchy CS165 What is the memory hierarchy? L1

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Department of Market Quality and Renewable Integration November 2016

Department of Market Quality and Renewable Integration November 2016 Energy Imbalance Market March 23 June 3, 216 Available Balancing Capacity Report November 1, 216 California ISO Department of Market Quality and Renewable Integration California ISO i TABLE OF CONTENTS

More information

UA Road Transport Safety. Rollover Bowtie

UA Road Transport Safety. Rollover Bowtie UA Road Transport Safety Rollover Bowtie 1 Moving vehicle Bow-tie Example Hazard: Recovery Measures Wear a Seat Belt First Aid Training Vehicle Spec - Airbags Threat Bad Weather Top Event - Emergency Response

More information

Facts about DOT Audits

Facts about DOT Audits Are You Prepared for adot Audit? Today s Presenters Miranda Gervais DMO Client Services Manager J. J. Keller & Associates, Inc. Tory Much Sr. DMO Client Service Specialist J. J. Keller & Associates, Inc.

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

1

1 Rural School Bus Pilot Project Application Workshop June 13, 2018 1 How to Ask Questions Submit your questions by typing them in Question Tab as shown on the right hand side of your screen Questions can

More information

New Franchise Agreement: Recyclables, Organics, and Waste. Town of Truckee Town Council Meeting July 25, 2017

New Franchise Agreement: Recyclables, Organics, and Waste. Town of Truckee Town Council Meeting July 25, 2017 New Franchise Agreement: Recyclables, Organics, and Waste Town of Truckee Town Council Meeting July 25, 2017 Agenda Overview of Process, Context Review Regulatory Drivers Review of Current Services Potential

More information

Driver Vehicle Inspection Reports

Driver Vehicle Inspection Reports Driver Vehicle Inspection Reports Vehicle/Asset Safety and Security Inspection Reporting Overview Teletrac s paperless Driver Vehicle Inspection Reports (DVIR) provide improved compliance management, while

More information

Module: Mathematical Reasoning

Module: Mathematical Reasoning Module: Mathematical Reasoning Lesson Title: Speeding Along Objectives and Standards Students will: Determine whether a relationship is a function Calculate the value of a function through a real-world

More information

Lecture 14: Instruction Level Parallelism

Lecture 14: Instruction Level Parallelism Lecture 14: Instruction Level Parallelism Last time Pipelining in the real world Today Control hazards Other pipelines Take QUIZ 10 over P&H 4.10-15, before 11:59pm today Homework 5 due Thursday March

More information

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section Operation and Maintenance Data, include the following: SECTION 16211 - ELECTRICITY METERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Issue 2.0 December EPAS Midi User Manual EPAS35

Issue 2.0 December EPAS Midi User Manual EPAS35 Issue 2.0 December 2017 EPAS Midi EPAS35 CONTENTS 1 Introduction 4 1.1 What is EPAS Desktop Pro? 4 1.2 About This Manual 4 1.3 Typographical Conventions 5 1.4 Getting Technical Support 5 2 Getting Started

More information

CSA Compliance, Safety & Accountability. Training By Patti Gillette, Director of Safety Colorado Motor Carriers Association

CSA Compliance, Safety & Accountability. Training By Patti Gillette, Director of Safety Colorado Motor Carriers Association CSA Compliance, Safety & Accountability Training By Patti Gillette, Director of Safety Colorado Motor Carriers Association CSA What Is It? New, high-impact FMCSA safety program To improve large truck and

More information

CVR Release Notes Page 1 of 7

CVR Release Notes Page 1 of 7 CVR Release Notes Page 1 of 7 CVR Software Release Notes VAEVR Version 9.17 Introduction CVR is pleased to announce Virginia Electronic Vehicle Registration (VA EVR) Software Release 9.17. This release

More information

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards Robert P. Hansen, P.E., PhD GE Specification Engineer Introduction Switchboards are a widely used type of equipment

More information

IMPROVE OPERATIONAL PERFORMANCE BY RAISING CREW SKILL LEVELS THROUGH DNV CERTIFIED TRAINING MODULES

IMPROVE OPERATIONAL PERFORMANCE BY RAISING CREW SKILL LEVELS THROUGH DNV CERTIFIED TRAINING MODULES IMPROVE OPERATIONAL PERFORMANCE BY RAISING CREW SKILL LEVELS THROUGH DNV CERTIFIED TRAINING MODULES WWW.CASTROL.COM/MARINE CASTROL ACADEMY SKILLS TRAINING PROGRAMME 0º 330º 300º 270º 240º THE ADDED VALUE:

More information

Energy Performance Information Request Timeline

Energy Performance Information Request Timeline Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when

More information

Department Mass Update (DMU) eform Online Training

Department Mass Update (DMU) eform Online Training Department Mass Update (DMU) eform Online Training For questions related to DMU contact: Meggan Smith: meggan.smith@utah.edu, (801) 587-1930 Ryan Smith: ryan.k.smith@utah.edu, (801) 581-8412 or your HR

More information

Driver Qualification Handbook

Driver Qualification Handbook 1 The Complete Driver Qualification Handbook Your Step-by-Step Guide to Complying with Regulation Part 391 Managing Your Files 1 Contents Introduction 2 The Driver Qualification File (DQF) 3 Safety Performance

More information

THE witech SOFTWARE VERSION MUST BE AT **15.02** OR HIGHER TO PERFORM THIS PROCEDURE.

THE witech SOFTWARE VERSION MUST BE AT **15.02** OR HIGHER TO PERFORM THIS PROCEDURE. NUMBER: GROUP: 21-030-14 REV. A Transmission and Transfer Case DATE: October 24, 2014 This bulletin is supplied as technical information only and is not an authorization for repair. No part of this publication

More information

80V 300Ah Lithium-ion Battery Pack Data Sheet

80V 300Ah Lithium-ion Battery Pack Data Sheet 80V 300Ah Lithium-ion Battery Pack Data Sheet 80 V, 300 amp-hour capacity, maintenance-free energy storage, IP65 design, fully integrated BMS, integrated fuse and safety relay protection, highly configurable

More information