EVSE Load Balancing VS Load Shedding 1: Largest number of 30 Amps EVSEs that can be fed as per the code from the 600 volts feeder

Size: px
Start display at page:

Download "EVSE Load Balancing VS Load Shedding 1: Largest number of 30 Amps EVSEs that can be fed as per the code from the 600 volts feeder"

Transcription

1 EVSE Load Balancing VS Load Shedding 1: Largest number of 30 Amps EVSEs that can be fed as per the code from the 600 volts feeder The schematics shows that the 1600A feeder is split in 7 branches From the electrical code perspective, the limiting factor of each branch is the 225 kva transformer Based on the transformer size, the maximum output current on the 208/120 Volts side is 625 Amps, so the closest standard Distribution panel size would be 600 Amps Each EVSE should be connected between 2 phases (to get 208 Volts) through a dual pole 40 A breaker, and will draw a maximum of 30A (while charging an EV), representing a 6.24 kw load each. To keep everything balanced, every group of 3 EVSEs should be connected as follow o EVSE 1: Between phase A and Phase B o EVSE 2: Between phase B and phase C o EVSE 3: Between Phase C and phase A When fully loaded (80% of 600 amps feeding a perfectly balanced load), the maximum output power we can get from a 3 phases, 600 Amp 208 panel is kw So the maximum number of EVSE that can be connected without exceeding the limit as per the electrical code is EVSE being a multiple of 3, this means that in the worst case scenario (27 EV drawing 30Amps), everything will be well balanced. So the maximum number of EVSE that can be connected to each of the 7 branches in full respect of the code is 27 units. For the full site configuration (7 branches), this means a maximum of 189 units can be fed by the 600 Volts AC feeder. The following diagram shows how one of the 7 branches could be set up to feed 27 EVSEs through a A distribution panel hosting 27 dual pole 40Amps breakers:

2 2: Putting the electrical code aside, what is the largest number of EVSEs that can reasonably be fed from the same feeder. The limiting factor from this perspective is the amount of energy on average each user will expect when connected for the average amount of time his EV will be connected to the EVSE For a multi-dwelling building the average connection time is from returning home in the evening (6 to 9 PM) to leaving home in the morning (6 to 9 AM), which means 12 hours, to be safe let s reduce that number to 8 hours. In Canada most people live within 30 km from work, meaning that if they don t charge at work, they will deplete their battery for 60 km per day.

3 Depending on the EV size the driving habits, and the season, the energy consumption is between 100 Watt Hours (Leaf in Summer, average driver) to 300 Watt hours (Tesla S, aggressive driver in winter) per km. Based on an average of 200 Watt Hours per km (which is realistic) and assuming that most drivers will not be able to charge at work (which is not realistic as workplace charging will soon become a trend) the average amount of energy that will be required represents 12 kwh per day per EV (or per EVSE if each one is used) This means that the electrical system must be designed to be able to transfer a minimum of 12 kwh per EVSE per day and this during a period of 8 hours. This means that the average transfer rate is 12 kwh/ 8hours, which means 1.5 kw So based on this, without considering the type of charging solution (level 1 or Level 2 or Smart Level2) the electrical system should be designed for a sustained load of 1.5 kw per EVSE installed This means that each feeders of the clouded area will be able ultimately to feed kw/1.5 kw = 114 EVSEs, which means a 4 folds increase compared to the limit imposed by the electrical code 3: Possible options to increase by a factor of 4 the number of 30A EVSE As pointed out, one way of increasing the number of EVSEs is to implement a load control scheme that will time share the total power draw to limit it to an average of 1.5 kw per EVSE. The other way which we promote is to implement a power sharing scheme that will in effect allow 100% of the EVSEs to transfer power at any time, but at a power level which is controlled in real time not to exceed the system limit The following paragraph describe in details how each method can be achieved and what are the implications to make each one compliant to the electrical code. 4: Load control scheme As stated in section 2, to keep the quality of service expected by EV users we need to increase by a factor of 4 the number of EVSEs connected to the 208 distribution panel. This means that the number of individual circuit breakers increase by a factor of 4 (to a total of 128 dual pole 40 A breakers), so a good strategy would be to connect from the main 600A distribution panel, 4 sub panels located at convenient locations to feed, it would be preferable to feed multiple sub panels each located in a convenient area to feed 27 EVSEs To control each individual EVSE, a 40 amps contactor will be needed o For a fail safe operation the Contactor should be Normally open (this way, if a control wire is cut, then the EVSE cannot draw any power) o Some EVSE have a remote control input that could be used to remotely control them, although, this method is not adequate to implement a fail safe load control (the EVSE is allowed to draw full power when the control wire is cut) Two years ago, this was our initial thought on how to get around the code to increase the number of EVSEs, the main issues we discovered with this scheme are the following o The interlock that will avoid to have more than maximum number of EVSE connected will be software based. This means that the controller would need to be UL1998 certified which has many serious implications This certification is very long and expensive to get Software should be re submitted each time it is modified,

4 o Only 25% of the EVSE will actually be able to charge EVs at the same time, the algorithm that will time share the power transfer will need switch quite frequently (every 30 minutes or every hour) otherwise, people staying connected a short length of time run the risk of getting no energy transfer at all. o Shutting off the AC power of an EVSE while a car is charging creates all kind of issues: Some will horn (like the Chevy Volt) Some others (Nissan Leaf) will turn on their Malfunction Indicator Lamp (MIL) when this happens too frequently. Some will not resume drawing power by themselves (will need to have the connector unplugged and reinserted to continue) Assuming that it would be possible to certify an interlockable load control scheme, a strategy would be to associate one Load controller to each sub panel, and to install each of the 27 X 40 A contactors + the load controller close the subpanel in an enclosure certified for this purpose. At the end the additional hardware required make this solution really expensive The following diagram shows how one of the 7 branches could be set up to feed 108 EVSEs through a A distribution panel feeding 4 sub panels each hosting 27 dual pole 40Amps breakers, feeding a load enclosure hosting the load controller and the 27 contactor required to connect each group of 27 EVSEs. 5: Power sharing scheme The basis on which is based this scheme is as follow o Our Smart EVSE (CoRe+PS), from the electrical code perspective is an 8 amps load, that can be increased to 30 amps when all conditions are there to safely do it

5 o When all conditions are not met, then the CoRe+ limits the power draw form any connected EV to 8 amps (1,664 kw), which is a fail safe condition o The controller that allows to increase the power draw beyond 8 amps do it in near real time (every 5 seconds or so) by taking in consideration the actual power drawn of every connected EVs. o So when the maximum power transfer limit is reached, the controller gradually decreases the maximum power set point of the CoRe+PS units feeding EVs drawing power o When connected EVs reach their full charge, the freed up capacity is quickly re assigned to EVs that are still charging, increasing the power transfer (up to the maximum of 6,24 kw) o The end result us an optimized power transfer, and quicker charge time to every EVs This scheme has been developed and proven out: o The CoRe+ PS has been CSA certified during Q o Since then we have done several projects representing up to 20 EVSEs which are connected to electrical systems that would have required to be upgraded if regular level 2 EVSEs would have been used, and this in full respect with the electrical code. The following diagram shows how one of the 7 branches could be set up to feed 108 EVSEs through a A distribution panel feeding 4 sub panels each hosting 27 dual pole 40Amps breakers, feeding a load enclosure hosting the load controller and the 27 contactor required to connect each group of 27 EVSEs. 6: Conclusion

6 Our power sharing scheme brings the following benefits over developing a load control scheme o Already proven out, certified and compliant with the electrical code o Much lower cost to install o Much lower cost in term of electrical material o Much more scalable, can be deployed in multiple phases. Phase one could represents the installation of the distribution boxes + 50% of the EVSEs, or can represent the installation of 50% of the subpanels, with 100% of the EVSEs Subsequently, additional EVSEs can be added in phase with the demand for the service. o Much better quality of service to users, each EVSE connected to an EV always transfer the highest possible amount of power at all time o Intrinsically safe, each possible failure mode ends up with a power draw that is always below the electrical infrastructure limit. On top of power sharing, we can set up our controller to implement Power Limiting capability to reduce OPEX by taking advantage of Time of Use electricity cost, or to reduce Demand Charges.

Burnaby Electric Vehicle (EV) Charging Infrastructure Technical Bulletin Requirements and Guidelines for EV Charging Bylaw

Burnaby Electric Vehicle (EV) Charging Infrastructure Technical Bulletin Requirements and Guidelines for EV Charging Bylaw Burnaby Electric Vehicle (EV) Charging Infrastructure Technical Bulletin Requirements and Guidelines for EV Charging Bylaw Please refer to the website for latest version of this document: www.burnaby.ca/ev

More information

Distribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014

Distribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014 Distribution Capacity Impacts of Plug In Electric Vehicles Chris Punt, P.E. MIPSYCON 2014 1 Outline EV Benefits EV Growth Where are we today? Where are we going? Potential Distribution Capacity Issues

More information

Electric Plug-In Vehicle/Electric Vehicle Status Report

Electric Plug-In Vehicle/Electric Vehicle Status Report Electric Plug-In Vehicle/Electric Vehicle Status Report Prepared by: Sanjay Mehta, Electrical Engineering Assistant August 2010 ABSTRACT The purpose of this report is to identify the various Electric Plug-in-

More information

Distribution Line Transformer / Secondary

Distribution Line Transformer / Secondary - T&D Assessment Distribution Line Transformer / Secondary Pacific Gas and Electric Company November 15, 2010 Analysis of Transmission, Distribution Substation & Primary, Transformer & Secondary Impacts

More information

Managing Electric Vehicle Supply Equipment (EVSE) Installations

Managing Electric Vehicle Supply Equipment (EVSE) Installations Managing Electric Vehicle Supply Equipment (EVSE) Installations Introduction to Electric Vehicle EVSE Electric vehicles create a need to build an infrastructure that will supply the added load of charging.

More information

Jennifer Szaro Renewables Manager, OUC

Jennifer Szaro Renewables Manager, OUC Jennifer Szaro Renewables Manager, OUC Bottom Line: They re Coming Cost savings Reduced Tailpipe Emissions Energy independence Economic development and job creation 3 Hybrid Conversions Standard hybrids

More information

Electric Drive Vehicle Infrastructure Training. Instructor s Manual. National Alternative Fuels Training Consortium

Electric Drive Vehicle Infrastructure Training. Instructor s Manual. National Alternative Fuels Training Consortium Electric Drive Vehicle Infrastructure Training Instructor s Manual National Alternative Fuels Training Consortium Part 4: : Service Panel to Receptacle Overview of Service Panel The role of the service

More information

Managing EV Load Workplace Charging Project Utility Perspective

Managing EV Load Workplace Charging Project Utility Perspective Managing EV Load Workplace Charging Project Utility Perspective Hawk Asgeirsson, Manager Power Systems Technologies (Retired) June 29, 2016 DTE Energy is an Integrated Energy Company 2 Agenda Why manage

More information

Coulomb. The business of Charging

Coulomb. The business of Charging Coulomb The business of Charging Coulomb s Business Coulomb s mission is to ensure people don t hesitate to buy electric because of fueling concerns We realize our mission by providing a toolkit of everything

More information

Coulomb The business of Charging

Coulomb The business of Charging Coulomb The business of Charging Coulomb s Business Coulomb s mission is to ensure people don t hesitate to buy electric vehicles because of fueling concerns We realize our mission by providing a toolkit

More information

EV Supply Equipment Overview Growing Sustainable Communities Conference October Dubuque, Iowa.

EV Supply Equipment Overview Growing Sustainable Communities Conference October Dubuque, Iowa. EV Supply Equipment Overview Growing Sustainable Communities Conference October 12. 2011 Dubuque, Iowa www.cesco.com This is Crescent Electric 10 th largest Electrical Distributor in North America Founded

More information

A PHEV is a hybrid vehicle with batteries that can be recharged by connecting a plug to an external power source.

A PHEV is a hybrid vehicle with batteries that can be recharged by connecting a plug to an external power source. A PHEV is a hybrid vehicle with batteries that can be recharged by connecting a plug to an external power source. Features: Internal Combustion Engine Electric Motor Plug to connect to the electrical grid

More information

EV - Smart Grid Integration. March 14, 2012

EV - Smart Grid Integration. March 14, 2012 EV - Smart Grid Integration March 14, 2012 If Thomas Edison were here today 1 Thomas Edison, circa 1910 with his Bailey Electric vehicle. ??? 2 EVs by the Numbers 3 10.6% of new vehicle sales expected

More information

SDG&E Electric Vehicle activities

SDG&E Electric Vehicle activities SDG&E Electric Vehicle activities Managing load and storage while maximizing customer value CAISO V2G Workshop Tuesday, February 5, 2013 Matt Zerega mzerega@semprautilities.com 2011San Diego Gas & Electric

More information

Puget Sound Energy Overview

Puget Sound Energy Overview Northwest Electric Meter School Leslie Moynihan Program Manager, Customer Connected Solar August 2018 Puget Sound Energy Overview Service Area - 6,000+ square miles in 10 Counties Electric - Customers

More information

400/230 Volt 60Hz UPS Power

400/230 Volt 60Hz UPS Power olt 60Hz Power Using ual Voltage standby generation and in one Nothing protects quite like Piller www.piller.com Contents 1 Abstract...3 2 Introduction...4 3 Alternative Power istribution...6 4 Integrating

More information

Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities

Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities By: Nasser Kutkut, PhD, DBA Advanced Charging Technologies

More information

LOCAL VERSUS CENTRALIZED CHARGING STRATEGIES FOR ELECTRIC VEHICLES IN LOW VOLTAGE DISTRIBUTION SYSTEMS

LOCAL VERSUS CENTRALIZED CHARGING STRATEGIES FOR ELECTRIC VEHICLES IN LOW VOLTAGE DISTRIBUTION SYSTEMS LOCAL VERSUS CENTRALIZED CHARGING STRATEGIES FOR ELECTRIC VEHICLES IN LOW VOLTAGE DISTRIBUTION SYSTEMS Presented by: Amit Kumar Tamang, PhD Student Smart Grid Research Group-BBCR aktamang@uwaterloo.ca

More information

201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE

201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE 201 S. Anaheim Blvd. Page No. 3.2.1 A. GENERAL 1. The character of electric service available at any particular location should be ascertained by inquiry at the City's Electrical Engineering Division office.

More information

NorCal Clean Tech Expo and West Coast Collaborative. Fleet EVs and Charging Strategies

NorCal Clean Tech Expo and West Coast Collaborative. Fleet EVs and Charging Strategies NorCal Clean Tech Expo and West Coast Collaborative Fleet EVs and Charging Strategies Dwight MacCurdy SMUD Energy Strategy R&D October 17, 2018 Powering forward. Together. Sacramento Municipal Utility

More information

CHANGING TIRES: Electric Car Chargers, Car Sharing, And More

CHANGING TIRES: Electric Car Chargers, Car Sharing, And More CHANGING TIRES: Electric Car Chargers, Car Sharing, And More Join the conversation: #nmhcoptech @apartmentwire Lori Reeves (Moderator) Vice President, Strategic Business Services Forest City Residential

More information

Electric Vehicles: Updates and Industry Momentum. CPES Meeting Watson Collins March 17, 2014

Electric Vehicles: Updates and Industry Momentum. CPES Meeting Watson Collins March 17, 2014 Electric Vehicles: Updates and Industry Momentum CPES Meeting Watson Collins March 17, 2014 1 1 Northeast Utilities launched an EV Tech Center to answer questions and help EV drivers get connected www.plugmyride.org

More information

Airports Going Green Conference

Airports Going Green Conference Airports Going Green Conference Green Transport Luis Giron Siemens role in green and efficient airports References Baggage handling systems (BHS) BHS operation & maintenance services Cargo handling systems

More information

Critical Home Power. Economical Manual start Whole House AC Power For Amateurs. Hugh Maguire N1QGE

Critical Home Power. Economical Manual start Whole House AC Power For Amateurs. Hugh Maguire N1QGE Critical Home Power Economical Manual start Whole House AC Power For Amateurs Hugh Maguire N1QGE Goal of presentation Show how one amateur supplied all the critical loads in the home with minimal temporary

More information

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust May 24, 2018 Oklahoma Department of Environmental Quality Air Quality Division P.O. Box 1677 Oklahoma City, OK 73101-1677 RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation

More information

The Near Future of Electric Transportation. Mark Duvall Director, Electric Transportation Global Climate Change Research Seminar May 25 th, 2011

The Near Future of Electric Transportation. Mark Duvall Director, Electric Transportation Global Climate Change Research Seminar May 25 th, 2011 The Near Future of Electric Transportation Mark Duvall Director, Electric Transportation Global Climate Change Research Seminar May 25 th, 2011 Mainstream PEV Commercialization Began December 2010 Chevrolet

More information

NORDAC 2014 Topic and no NORDAC

NORDAC 2014 Topic and no NORDAC NORDAC 2014 Topic and no NORDAC 2014 http://www.nordac.net 8.1 Load Control System of an EV Charging Station Group Antti Rautiainen and Pertti Järventausta Tampere University of Technology Department of

More information

Oregon s EV Charging Network National Association of State Energy Officials June 12, 2012

Oregon s EV Charging Network National Association of State Energy Officials June 12, 2012 Oregon s EV Charging Network National Association of State Energy Officials June 12, 2012 Art James Oregon Department of Transportation Office of Innovative Partnerships 1 OREGON In Perspective Population

More information

workplace charging an employer s guide

workplace charging an employer s guide workplace charging an employer s guide taking responsibility At your business, the efficient use of energy brings benefits such as lower bills, improved comfort levels for your customers and employees,

More information

Analysis of Impact of Mass Implementation of DER. Richard Fowler Adam Toth, PE Jeff Mueller, PE

Analysis of Impact of Mass Implementation of DER. Richard Fowler Adam Toth, PE Jeff Mueller, PE Analysis of Impact of Mass Implementation of DER Richard Fowler Adam Toth, PE Jeff Mueller, PE Topics of Discussion Engineering Considerations Results of Study of High Penetration of Solar DG on Various

More information

GS-100D+ Preconfigured Kits Manual

GS-100D+ Preconfigured Kits Manual 100W 400W GS-100D+ Preconfigured Kits Manual Copyright 2012, Grape Solar, Inc. All Rights Reserved 1 2 Overview The GS-100D+Preconfigured Kits are designed to be modular and expandable solar generators,

More information

CHAPTER V RESIDENTIAL WIRING

CHAPTER V RESIDENTIAL WIRING CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this

More information

GS-100+ Preconfigured Kits

GS-100+ Preconfigured Kits Kit Sizing Guide REV 170615 100 W 200 W 300 W 400 W GS-100+ Preconfigured Kits Kit Sizing Guide Copyright 2012, Grape Solar, Inc. All Rights Reserved www.grapesolar.com Valid from March 2014 1 Kit Sizing

More information

The leader in clean electric transportation. Corporate Overview NASDAQ: ECTY April 20, 2011

The leader in clean electric transportation. Corporate Overview NASDAQ: ECTY April 20, 2011 The leader in clean electric transportation Corporate Overview NASDAQ: ECTY April 20, 2011 Safe Harbor Statement As provided by the Safe Harbor Statement under the Private Securities Litigation Reform

More information

Solid-State Relays. Solid-State Relays. Features. Description. Overview

Solid-State Relays. Solid-State Relays. Features. Description. Overview Features Rugged, epoxy encapsulation construction 4,000 volts of optical isolation Subjected to full load test and six times the rated current surge before and after encapsulation Unique heat-spreader

More information

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections One-Line / Riser Diagrams Drawings are not reviewed prior to submission. Because of

More information

Using OutBack Inverters for 3-Phase 480V Applications

Using OutBack Inverters for 3-Phase 480V Applications Using OutBack Inverters for 3-Phase 480V Applications Introduction This application note will discuss how to adapt OutBack Power 230V single phase inverters for 60 Hz 480V three-phase applications using

More information

Solar Microgrid Integrates Solar PV, Energy Storage, Smart Grid Functionality and Advanced Vehicle-to-Grid Capabilities

Solar Microgrid Integrates Solar PV, Energy Storage, Smart Grid Functionality and Advanced Vehicle-to-Grid Capabilities Case Study Solar Microgrid Integrates Solar PV, Energy Storage, Smart Grid Functionality and Advanced Vehicle-to-Grid Capabilities Project awarded Maryland Energy Administration s prestigious Game Changer

More information

Solid-State Relays. Solid-State Relays. Features. Description. Overview

Solid-State Relays. Solid-State Relays. Features. Description. Overview Features Rugged, epoxy encapsulation construction 4,000 volts of optical isolation Subjected to full load test and six times the rated current surge before and after encapsulation Unique heat-spreader

More information

Installation and Construction Notes for EVSE4

Installation and Construction Notes for EVSE4 Installation and Construction Notes for EVSE4 You need to read and understand this if you want to build an EVSE that will be safe and need to pass a building inspectors review. Before beginning this process

More information

Battery Power Inverters

Battery Power Inverters Battery Power Inverters Renogy 500W 1000W 2000W Pure Sine Wave Inverter Manual 2775 E. Philadelphia St., Ontario, CA 91761 1-800-330-8678 1 Version 1.4 Important Safety Instructions Please save these instructions.

More information

Proposed Zoning Bylaw Text Amendments Pertaining to Electric Vehicle Charging Infrastructure Requirements (Bylaw No. 4905,2018)

Proposed Zoning Bylaw Text Amendments Pertaining to Electric Vehicle Charging Infrastructure Requirements (Bylaw No. 4905,2018) CoQuitlam For Council September 10, 2018, Our file: 08-3360-20/18 118298 RZ/l Doc#: 3032571.VI To: From; Subject: For: City Manager Director Development Services Proposed Zoning Bylaw Text Amendments Pertaining

More information

Wind Interconnection and Net-Metering in MA. Tim Roughan - National Grid Joe Feraci - NStar

Wind Interconnection and Net-Metering in MA. Tim Roughan - National Grid Joe Feraci - NStar Wind Interconnection and Net-Metering in MA Tim Roughan - National Grid Joe Feraci - NStar Electric Transmission and Distribution System The Electric Power System (EPS) is designed to safely and reliably

More information

Electric Vehicles Coordinated vs Uncoordinated Charging Impacts on Distribution Systems Performance

Electric Vehicles Coordinated vs Uncoordinated Charging Impacts on Distribution Systems Performance Electric Vehicles Coordinated vs Uncoordinated Charging Impacts on Distribution Systems Performance Ahmed R. Abul'Wafa 1, Aboul Fotouh El Garably 2, and Wael Abdelfattah 2 1 Faculty of Engineering, Ain

More information

Electric Vehicles: Opportunities and Challenges

Electric Vehicles: Opportunities and Challenges Electric Vehicles: Opportunities and Challenges Henry Lee and Alex Clark HKS Energy Policy Seminar Nov. 13, 2017 11/13/2017 HKS Energy Policy Seminar 1 Introduction In 2011, Grant Lovellette and I wrote

More information

ELECTRIC VEHICLE(EV) TECHNOLOGY: INFRASTRUCTURE DEVELOPMENT AND ITS IMPLICATIONS FOR THE EXISTING ELECTRICITY GRID

ELECTRIC VEHICLE(EV) TECHNOLOGY: INFRASTRUCTURE DEVELOPMENT AND ITS IMPLICATIONS FOR THE EXISTING ELECTRICITY GRID ELECTRIC VEHICLE(EV) TECHNOLOGY: INFRASTRUCTURE DEVELOPMENT AND ITS IMPLICATIONS FOR THE EXISTING ELECTRICITY GRID Emerging Regulatory Issues Workshop February 6-7, 2018. Kingston, Jamaica OUR/CBD/USAID-CARCEP/High

More information

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDG 50 kw FOREWARD Requirements for Parallel Operations for Customers with Generation Not Exceeding 50 kw is intended to be used

More information

Safety Design of CHAdeMO Quick Charging System

Safety Design of CHAdeMO Quick Charging System Page000855 Abstract EVS25 Shenzhen, China, Nov. 5-9, 2010 Safety Design of CHAdeMO Quick Charging System Takafumi Anegawa Tokyo Electric Power Company R&D Center, Mobility Technology Group 4-1, Egasaki-cho,

More information

Delta All-In-One Storage solutions

Delta All-In-One Storage solutions Delta All-In-One Storage solutions Hybrid inverter 6.0 kwh Li-ion Smart monitor & control Power meter Model : Model : BX_6.0 Model : R4E Model : PE / PE It is time to embrace true energy independence www.solar-inverter.com

More information

How to provide a better charging performance while saving costs with Ensto Advanced Load Management

How to provide a better charging performance while saving costs with Ensto Advanced Load Management How to provide a better charging performance while saving costs with Ensto Advanced Load Management WHAT IS ADVANCED LOAD MANAGEMENT and why is it important for your EV charging infrastructure? In order

More information

Physical Design of a Volt/Var Implementation

Physical Design of a Volt/Var Implementation 1 Physical Design of a Volt/Var Implementation Hydro-Québec Distribution s approach Prepared by Bruno Fazio 2 Subjects Context Volt control Planning Control strategies and exploitation Var control Planning

More information

EV Charging Infrastructure

EV Charging Infrastructure EV Charging Infrastructure Ready. Set GO! Marcy Bauer Market Manager, Carolinas / Virginia / Florida Mobile: 919-451-5725 marcy.bauer@nrg.com T 70 T 55 70 70 50 55 75 T 30 35 60 70 50 50 55 35 T 90 70

More information

TECHNICAL WHITE PAPER

TECHNICAL WHITE PAPER TECHNICAL WHITE PAPER Chargers Integral to PHEV Success 1. ABSTRACT... 2 2. PLUG-IN HYBRIDS DEFINED... 2 3. PLUG-IN HYBRIDS GAIN MOMENTUM... 2 4. EARLY DELTA-Q SUPPORT FOR PHEV DEVELOPMENT... 2 5. PLUG-IN

More information

Driving to Net Zero. Deploying EV Charging Infrastructure: What Site Hosts Need to Know. County of Santa Clara Office of Sustainability

Driving to Net Zero. Deploying EV Charging Infrastructure: What Site Hosts Need to Know. County of Santa Clara Office of Sustainability Deploying EV Charging Infrastructure: What Site Hosts Need to Know Driving to Net Zero Submitted to: Santa Clara County Submitted by: ICF FUNDED THROUGH A GRANT AWARDED BY THE CALIFORNIA STRATEGIC GROWTH

More information

City of Houston EVs and EVSEs

City of Houston EVs and EVSEs City of Houston EVs and EVSEs July 27 th Clean Cities: Workplace Charging Workshop Jedediah Greenfield, Fleet Management Department 832.393.6910 * jedediah.greenfield@houstontx.gov EV s, something old

More information

A Novel Hybrid Smart Grid- PV-FC V2G Battery Charging Scheme

A Novel Hybrid Smart Grid- PV-FC V2G Battery Charging Scheme A Novel Hybrid Smart Grid- PV-FC V2G Battery Charging Scheme By E. Elbakush* A. M. Sharaf** *University of New Brunswick **SHARAF Energy Systems Inc. Contents Abstract Introduction System Configuration

More information

PREPARED FOR: City of Richmond 6911 No 3 Road Richmond, B.C. V6Y 2C1. AUTHORED BY: AES Engineering Ltd.

PREPARED FOR: City of Richmond 6911 No 3 Road Richmond, B.C. V6Y 2C1. AUTHORED BY: AES Engineering Ltd. Report For Electric Vehicle Charging Infrastructure in New Multifamily Developments - Requirement Options and Costing Analysis Electrical Engineering Services PREPARED FOR: 6911 No 3 Road Richmond, B.C.

More information

Simply reliable. ABB Single-phase Transformers. When transformation means safety and control.

Simply reliable. ABB Single-phase Transformers. When transformation means safety and control. Simply reliable. ABB Single-phase s. When transformation means safety and control. 2CSC446005B0201 Robust and reliable. The two ranges of ABB transformers - to meet every need. The operational control

More information

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM Page 1 of 19 Table of Contents 1.0 SCOPE...4 2.0 PURPOSE...4 3.0 LIMITATIONS...5 4.0 GENERAL INTERCONNECTION

More information

Electric Transportation Initiatives. PSC Workshop: Electric Vehicle Charging September 6, 2012 Christopher Gillman

Electric Transportation Initiatives. PSC Workshop: Electric Vehicle Charging September 6, 2012 Christopher Gillman Electric Transportation Initiatives PSC Workshop: Electric Vehicle Charging September 6, 2012 Christopher Gillman State of Plug-in Electric Vehicles in PEF s s territory Plug-in Electric Vehicles (PEV)

More information

ChargeTO Smart-Charging Pilot Matt Stevens, Ph.D.

ChargeTO Smart-Charging Pilot Matt Stevens, Ph.D. ChargeTO Smart-Charging Pilot Matt Stevens, Ph.D. July 20, 2016 Portland, Oregon 1 2 3 Project Design Unmanaged Load Managed Load 4The Outlook EV Adoption Do we need to manage (smart-charge) charging at

More information

HOW DATA CAN INFORM DESIGN

HOW DATA CAN INFORM DESIGN HOW DATA CAN INFORM DESIGN Automakers are missing a chance to cut costs on product development by reducing reliance on trial-and-error WHEN AUTOMAKERS THINK about customer data, they usually focus on how

More information

Using Inverter Input Modes for Smart Grid Management

Using Inverter Input Modes for Smart Grid Management Using Inverter Input Modes for Smart Grid Management Some battery based grid connected inverters from OutBack Power have a unique collection of functions designed to optimize utility power usage for OutBack

More information

CURRENT LIMITING SUBPANEL

CURRENT LIMITING SUBPANEL Project: Fixture Type: Location: Contact/Phone: PRODUCT DESCRIPTION The Juno Trac-Master Current Limiting Subpanel is THE solution for complying with stringent energy codes like ASHRAE 90.1 and California

More information

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH IS NOT FOR "DO-IT-YOURSELF" INSTALLATION. It must be installed by

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Supply-Side PV Connections

Supply-Side PV Connections Perspectives on PV Supply-Side PV Connections by John Wiles Plan reviewers and inspectors throughout the country are seeing increasing numbers of supply-side connected utility interactive photovoltaic

More information

596 Rectifier Retrofit

596 Rectifier Retrofit PRODUCT OVERVIEW 596 Rectifier Retrofit Overview GE Energy has offered the 596 family of rectifiers from the early 1990s. 596 rectifiers can be found in the GPS4812, 2424, PXS Shelves, and OCS Cabinet

More information

Technical and Economic Assessment of Solar Photovoltaic and Energy Storage Options for Zero Energy Residential Buildings

Technical and Economic Assessment of Solar Photovoltaic and Energy Storage Options for Zero Energy Residential Buildings Technical and Economic Assessment of Solar Photovoltaic and Energy Storage Options Pedro Moura, Diogo Monteiro, André Assunção, Filomeno Vieira, Aníbal de Almeida Presented by Pedro Moura pmoura@isr.uc.pt

More information

Best Practices for Alternative Fuel Infrastructure

Best Practices for Alternative Fuel Infrastructure Best Practices for Alternative Fuel Infrastructure Randy Schimka SDG&E - Clean Transportation Group 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. San Diego Regional

More information

Small Generator Interconnection Program Interconnection Technical Requirements

Small Generator Interconnection Program Interconnection Technical Requirements General Program Information What is the purpose of the PGE Small Generator Interconnection Program? How do I initiate a distribution interconnection request for my project? The purpose of our Small Generator

More information

Transformer Protection

Transformer Protection Transformer Protection Course No: E01-006 Credit: 1 PDH Andre LeBleu, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com

More information

Delta All in One Storage Solutions

Delta All in One Storage Solutions The power behind competitiveness Delta All in One Storage Solutions Single Phase Solar Inverter E5 Hybrid inverter 6.0 kwh Li-ion Battery Smart monitor & control Power meter Model : E5 Model : BX_6.0 Model

More information

EV CHARGER REQUIREMENT LEV READY

EV CHARGER REQUIREMENT LEV READY EV CHARGER REQUIREMENT LEV READY QPRF / 1st February 2019 LEV Ready C2 LEV GENERAL INFORMATION Document Version Version Date Changes v1 20/12/2018 Initial draft document v2 07/01/2019 Adding EV charger

More information

Bulletin Engineering Department 6911 No. 3 Road, Richmond, BC V6Y 2C1

Bulletin Engineering Department 6911 No. 3 Road, Richmond, BC V6Y 2C1 Bulletin Engineering Department 6911 No. 3 Road, Richmond, BC V6Y 2C1 www.richmond.ca Electric Vehicle Charging Infrastructure Requirements Zoning Bylaw 8500, Section 7.15 No.: ENGINEERING-05 Date: 2018-03-16

More information

Boston Complete Streets Initiative. PROJECTS and GUIDELINES

Boston Complete Streets Initiative. PROJECTS and GUIDELINES Boston Complete Streets Initiative PROJECTS and GUIDELINES Streets define the character of Boston s neighborhoods and are the common ground where people travel, meet and do business on a daily basis. Complete

More information

ALD Dimmer Enclosures

ALD Dimmer Enclosures ALD Enclosures FEATURES Attractive crinkle black finish. er Connection Power Supply Neutral Taps Modules (not included) Cooling Fans Dimming Electronics (not included) Available in 2 sizes: ALD6 (6 dimmer

More information

Plug- in Electric Vehicles History, Technology and Rates. Ben Echols

Plug- in Electric Vehicles History, Technology and Rates. Ben Echols Plug- in Electric Vehicles History, Technology and Rates Ben Echols Southern Company Southern Company (NYSE: SO), an investor-owned energy company in the Southeast, owns 290 generating units at 77 power

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Revision 0 Electrical Load Analysis 2 August 2016 General Civil Aviation Authority advisory circulars contain guidance and information about standards, practices, and procedures that the Director has found

More information

Plug-in Electric Vehicles

Plug-in Electric Vehicles Plug-in Electric Vehicles Florida Public Service Commission Staff - PEV Workshop September 6, 2012 FPL s experience with Plug-in Electric Vehicles (PEVs) is extensive, and we operate one of the largest

More information

ALL PURPOSE CNC/HEAVY DUTY

ALL PURPOSE CNC/HEAVY DUTY ALL PURPOSE CNC/HEAVY DUTY Rotary Phase Converters 240 & 480 VOLT SERIES Rotary Phase Con verter Operation & Installation Manual MTPC-RB-208.240-1P-10HP-3P DANGER: HIGH VOLTAGE Electric shock could result

More information

Gay E. Canough. OFF-GRID Design. Dr. Gay E. Canough, Master trainer. Living Off the Grid

Gay E. Canough. OFF-GRID Design. Dr. Gay E. Canough, Master trainer. Living Off the Grid OFF-GRID Design Dr. Gay E. Canough, Master trainer 1 Understand the Customer s load 2 Load sizing Gay E. Canough AC Appliance watts amps how many of these? number of hours it is used per day equals watt-hr/

More information

Technical Data Analysis and Power Grid Effects of Fast Charging Processes of Electric Vehicles

Technical Data Analysis and Power Grid Effects of Fast Charging Processes of Electric Vehicles Technical Data Analysis and Power Grid Effects of Fast Charging Processes of Electric Vehicles E-Mobility Integration Symposium 2017 23. October 2017, Berlin M.Sc. Georg Göhler, University of Stuttgart

More information

10% SIGNPOSTING THE FUTURE INCREASE. Implications of evolving technology for the pricing of New Zealand s distribution services

10% SIGNPOSTING THE FUTURE INCREASE. Implications of evolving technology for the pricing of New Zealand s distribution services SIGNPOSTING THE FUTURE Implications of evolving technology for the pricing of New Zealand s distribution services An exciting range of technologies are starting to transform the way consumers use electricity.

More information

Transfer Switch TS-50. Owner s Manual

Transfer Switch TS-50. Owner s Manual Transfer Switch TS-50 Owner s Manual Table of Contents Introduction 2 Installation 2 Operational Testing 7 Troubleshooting 7 Hi-Pot Testing 8 Generator Note 9 Medical Appliances 10 Caution 10 Disclaimer

More information

Customer Requirements Downtown Secondary Network Service

Customer Requirements Downtown Secondary Network Service Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard

More information

Selection Guide Motor Control Device Solutions

Selection Guide Motor Control Device Solutions Selection Guide Motor Control Device Solutions Expect more and get it from c3controls. Our portfolio of Motor Control Devices consists of worldclass products designed and manufactured to meet your requirements

More information

Cruise Control Wiring

Cruise Control Wiring Cruise Control Wiring By Matt Sandt, Revised 3-28-16 The approach described in this writing applies to solar car motor controls which use a potentiometer connected to a gas pedal. The potentiometer is

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

Multi-Family Charging Solutions

Multi-Family Charging Solutions Multi-Family Charging Solutions Smart EV Charging Solutions for Apartments and Condos, the world s largest and most open electric vehicle (EV) charging network, brings convenient and reliable EV charging

More information

Buying Your First Home EV Charger

Buying Your First Home EV Charger Buying Your First Home EV Charger Written By: Feitan INTRODUCTION It may surprise EV newbies to learn that an electric car s charger is found on board the vehicle. It s the equipment buried in the guts

More information

Model No. PS-2000 WARRANTY AND OPERATING INSTRUCTIONS

Model No. PS-2000 WARRANTY AND OPERATING INSTRUCTIONS Model No. PS-2000 WARRANTY AND OPERATING INSTRUCTIONS Toll free (800) 288-6000 or www.hubbell-wiring.com P a g e 0 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS WARNING- When using electric products,

More information

The electrifica-on of the automobile is a foregone conclusion. - Bob Lutz, re-red Vice Chairman, GM

The electrifica-on of the automobile is a foregone conclusion. - Bob Lutz, re-red Vice Chairman, GM The electrifica-on of the automobile is a foregone conclusion. - Bob Lutz, re-red Vice Chairman, GM 1 EVSE 101 EV and Charging Introduction Jim Burness NCC Training Series EVSE 101: EV and Charging Indroduction

More information

How Does Charging Impact the Electrical Infrastructure

How Does Charging Impact the Electrical Infrastructure How Does Charging Impact the Electrical Infrastructure Arindam Maitra, John Halliwell Presented by: Jason Anderson EPRI APEC March 17, 2015 Auto Industry Investing $ Billions In New PEVs 6 PEVs Arrived

More information

Electric Autos and West Virginia Energy

Electric Autos and West Virginia Energy Electric Autos and West Virginia Energy Electric Autos are not a New Concept Electric Autos are not a New Concept 1909 Baker Electric That s over ONE HUNDRED Years Ago Even in the Modern Era GM EV-1 Toyota

More information

Maintenance Differences Between Single Stage and Turbo Blowers. Proprietary Information

Maintenance Differences Between Single Stage and Turbo Blowers. Proprietary Information Maintenance Differences Between Single Stage and Turbo Blowers Objective: To give an overview on the maintenance requirements between the following blower Technologies Integral Geared Blowers Magnetic

More information

Puglia Active Network. Vincenzo M. Emma Green Week 2017 Bruxelles, 31/05/2017

Puglia Active Network. Vincenzo M. Emma Green Week 2017 Bruxelles, 31/05/2017 Puglia Active Network Vincenzo M. Emma Green Week 2017 Bruxelles, 31/05/2017 Enel Global Infrastructure & Networks 61 Mln Customers Colombia 2.8M customers Italy 32M customers 1.9 Mln Km of lines 414 TWh

More information

MNS PDUpro Intelligent power distribution unit

MNS PDUpro Intelligent power distribution unit MNS PDUpro Intelligent power distribution unit 1 2 3 4 5 1 Low voltage distribution Low voltage circuit-breakers and motor control centers Intelligent electricity distribution center Active harmonic filter

More information

OCEAN COUNTY ARES EMERGENCY GENERATOR USE By WX2NJ. The following was taken from September and October Ocean County ARES Newsletters in 2012:

OCEAN COUNTY ARES EMERGENCY GENERATOR USE By WX2NJ. The following was taken from September and October Ocean County ARES Newsletters in 2012: The following was taken from September and October Ocean County ARES Newsletters in 2012: I recently purchased a used 9KW dual-fuel (gasoline/propane) generator from a gentleman in Atlantic County, who

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I am inspecting a building addition. They have a 480V to

More information