RFP Workforce Housing at Canyons Village. Developers Meeting 10/19/2016

Size: px
Start display at page:

Download "RFP Workforce Housing at Canyons Village. Developers Meeting 10/19/2016"

Transcription

1 RFP Workforce Housing at Canyons Village Developers Meeting 10/19/2016

2 CVMA Overview - CVMA Formed in November 1999 to oversee the development and progression of the Canyons Village Specially Planned Area (SPA). - The CVMA functions as the Master Association for the Canyons Village and provides various services including, but limited to: - Upholding resort aesthetics and ensuring cohesive growth by reviewing proposed development for compliance with design and architectural guidelines. - Facilitating resort beautification and upkeep through services such as landscaping, snow removal, road maintenance, etc. - Contributing to and developing amenities and events which promote Canyons Village as a world class destination community. - Monitoring Village traffic and implementing traffic mitigation efforts. - Developing workforce housing to keep pace with development. - Various other County obligations to provide community amenities.

3 Site Overview

4 Location/Site Characteristics - Overview Cabriolet Lift Terminus

5 Location/Site Characteristics - Topography - Approximately 15 ft. grade change from east to west across property. - Approximately 5 ft. grade change from north to south across property. - The site will be approximately 3.4 acres in size.

6 Location/Site Characteristics LV Area Master Plat

7 Preliminary Site Concept - Think of the site as a blank canvas. - The draft Lower Village Master Plan (right) is provided for contextual use to assist in understanding the many moving parts involved with the development of the Lower Village. - The current workforce housing configuration shown in the draft Lower Village Master Plan contains advantageous elements. However the draft Master Plan only represents one possible site plan, and does not necessarily represent the best possible thinking or solution. - As Constant Variables: - Lower Village Parking Structure (B,C) - Vail Controlled Surface Parking (G) - Cabriolet Lift Terminus (Q) - Transit Center (J,K) - Convenience Store (L) - Hole 15 of the Canyons Golf Course) - Independent Variables: - Conceptual Workforce Housing Buildings (E) - CVMA Surface Parking (D)

8 Building Height - Currently the Land Use and Zoning Chart allows for a maximum building height of 2-3 stories. However, possibility exists in which the Land Use and Zoning Chart can be amended to allow for a maximum of 4 stories. 3 Stories 4 Stories 3 Stories

9 Parking - Currently, the requirement for parking is 0.8 spaces/unit. - Approximately 55% of parking may be available adjacent. (depicted in blue) - Underground parking will need to be explored as a means to preserve surface space available for accommodation area.

10 Communal Space - Due to the tight constraints of the property and desire for high amounts of accommodation space, green/open space will be an issue. This concern is mitigated by the many existing multiseason activities available within close vicinity. - In order to enhance the living experience, the CVMA envisions the use of common spaces such as games rooms, theatre rooms, hang out rooms, communal kitchens, on-site laundry, etc. to help off-set the compact nature of the project.

11 Number and Size of Units - As mentioned above, the CVMA does not know the final number of employees they will be required to house as per their obligation. However, the intention of this project is to reasonably maximize the potential number of accommodations within the existing land available. Should the final community obligation exceed the highest capacity available as part of this project, the CVMA will look for additional housing options (on or off site) as buildout density requires additional workforce housing (it is our goal, however, to prevent this possibility).

12 Utilities Overview

13 Lower Village Utilities Overview

14 LV13 Cost Sharing Agreement

15 Capacity/Accommodation

16 Scale/Number of Employees to be Accommodated *Subject to final discussions/approval through Summit County

17 Development Agreement Obligation Structure

18 Obligation Structure Excess Interim Capacity

19 Preferred Project Delivery Methodology

20 Based on its analysis to date, the CVMA would prefer proposals whereby the developer: - Leases the Property from the CVMA pursuant to a long-term ground lease. - Designs the Workforce Housing Project - Constructs the Workforce Housing Project; and - Operates the Workforce Housing Project However, the CVMA will consider submissions presenting alternative delivery methods, including those under which the developer proposes to purchase the Property from the CVMA.

21 Preferred Project Delivery Methodology Ground Lease/Purchase: - During the exclusive negotiation, the CVMA may consider reducing the rent or purchase price based on demonstrated need, provision of amenities, energy efficiency measures, and the use of premium construction materials. - If the delivery methodology involves a sale of the Property to the developer, the purchase price of the Property will be determined by the CVMA, taking into account an appraisal valuation.

22 Preferred Project Delivery Methodology Design: - Creative site planning/design will be required to reasonably accommodate the maximum number of employees. However, parking, interconnectivity, and potential open space will need to be integrated into the plan as well. - Design of the Workforce Housing Project must be compliant with the architectural design guidelines of the Canyons SPA and be aesthetically cohesive with existing development. - The Workforce Housing Project will be highly visible from Highway 224 and is adjacent to both the Canyons Village entrance and Hole 15 of Canyons world class golf course. A positive visual impact is essential.

23 Items of Key Importance

24 Turn Key Approach: Items of Key Importance - The CVMA envisions the workforce housing to be designed and operated in a way in which employees can move in within a short amount of time with nothing more than basic possessions (perhaps only a pair of suitcases). - Proposals should explore design and amenity principles found within micro styles of housing in which furniture is potentially built-in and serves a multi-functional purpose, storage space is integrated into various elements, and space-efficient floorplans feel spacious and clutter-free. - An ideal example of turn-key approach would be an employee who shows up mid-day, signs an agreement at the property management office, walks into their housing unit, unloads their suitcases into closets/dressers, tosses their backpack on their bed, catches a bus within a few minutes at the transit hub to grab groceries at Kimball Junction, and is back to the resort in time to begin work on an evening shift. (no need to connect utilities, shop for furniture, etc.)

25 Turn Key Approach: Items of Key Importance

26 Turn Key Approach: Items of Key Importance

27 Turn Key Approach: Items of Key Importance

28 Number of Accommodations Items of Key Importance The CVMA is striving to meet the housing needs of the greatest number of Canyons Village employees possible all while considering employee quality of life and the need for open/green space. Developers who are able to creatively/efficiently/effectively accommodate the largest number of employees will find their proposals amongst the most competitive.

29 Construction Timeline/Phasing Items of Key Importance It is the desire of the CVMA to expedite the development timeline as much as possible. Preference will be given to developers who can complete the entire Workforce Housing Project in one or more phases by the end of 2020.

30 Long-Term Management Items of Key Importance Proposals will need to demonstrate indefinite sustainability in the following areas: - Financially - Proposals will need to show that they are able to operate indefinitely under the premise that the one and only permanent use shall be workforce housing. - Maintenance and Upkeep - Proposals will need to show that they have planned and incorporated a long-term maintenance and upkeep budget and schedule as part of their financial pro-forma. The project is expected to maintain a high quality of living and aesthetic appeal. - Proposals need to demonstrate their understanding and incorporation of the CVMA s continued role in assuring the Workforce Housing Projects long-term operation.

31 Dates/Deadlines/Process EVENT Notice of Request for Proposals Opportunity Posted DATE October 5, 2016 Development Information Meeting October 19, 2016 Requests for Additional Information Due No Later Than: November 8, 2016 Proposals Due December 2, 2016

32 Open Forum Questions

33 CVMA Contact Information Project Manager: Brian Madacsi CVMA Office: 1790 Sun Peak Drive Park City, Utah (435)

Tunney s Pasture Station Bus Loop and Lay-up Area Design

Tunney s Pasture Station Bus Loop and Lay-up Area Design 2017 Canadian Consulting Engineer Award Submission Tunney s Pasture Station Bus Loop and Lay-up Area Design Presented to: Canadian Consulting Engineer 80 Valleybrook Drive Toronto, Ontario M3B 2S9 April

More information

City of Philadelphia Renewable Energy Power Purchasing RFP Pre-Proposal Meeting

City of Philadelphia Renewable Energy Power Purchasing RFP Pre-Proposal Meeting City of Philadelphia Renewable Energy Power Purchasing RFP Pre-Proposal Meeting City Energy Office October 25, 2017 For Participants on the Phone Follow along with slides posted at: http://www.philaenergy.org/public_bids/renewable-energypower-purchasing-agreement-request-for-proposal/

More information

kw ST.GEORGE COMMERCIAL

kw ST.GEORGE COMMERCIAL kw ST.GEORGE COMMERCIAL OFFERING: Residential Development Ground St. George, UT 84770 730 Acres Adjacent to Existing Development Master Planned Community 3,196 Residential Units- Fully Entitled and Recorded

More information

DISTRICT. Regional Commercial (RC) Light Industrial (LI) No maximum. maximum. 60 acres. Smaller areas may be added to an existing RC area.

DISTRICT. Regional Commercial (RC) Light Industrial (LI) No maximum. maximum. 60 acres. Smaller areas may be added to an existing RC area. 7-16-4. Table 2, Table of Standards.,, and Special Purpose Districts. TOOELE CITY, UTAH TABLE 2 TABLE OF STANDARDS MIXED USE, COMMERCIAL, INDUSTRIAL AND SPECIAL PURPOSE S s Maximum Lot Area maximum 25,000

More information

Strategic Plan

Strategic Plan 2005-2015 Strategic Plan SUMMARY OF THE REVISED PLAN IN 2011 A decade focused on developing mass transit in the Outaouais A updated vision of mass transit in the region The STO is embracing the future

More information

LEGAL DESCRIPTION REZONE PARCEL

LEGAL DESCRIPTION REZONE PARCEL Certco, Inc. 5321 Verona Road Madison, WI 53711 LEGAL DESCRIPTION REZONE PARCEL A part of the Southwest Quarter of the Southwest Quarter of Section 05, Township 06 North, Range 09 East, City of Fitchburg,

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION

2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,

More information

Draft Marrickville Car Share Policy 2014

Draft Marrickville Car Share Policy 2014 Draft Marrickville Car Share Policy 2014 1. Background 1.1. Marrickville Council has supported car sharing in the LGA since 2007 as part of a holistic approach to encouraging more sustainable modes of

More information

UCSF Mount Zion Proposed Garage 2420 Sutter Street. November 18,

UCSF Mount Zion Proposed Garage 2420 Sutter Street. November 18, UCSF Mount Zion Proposed Garage 2420 Sutter Street November 18, 2010 1 UCSF Mount Zion UCSF Comprehensive Cancer Center -- only comprehensive cancer center in Northern California, designated by the National

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

APPENDIX VMT Evaluation

APPENDIX VMT Evaluation APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation

More information

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 SUBMISSION TO METROLINK PUBLIC CONSULTATION From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 Suggested Route Map including stations Rathmines, Terenure, Rathfarnham INTRODUCTION

More information

SANDAG 3D Visualization Howard Blackson 6:15. Sub Area A Coalition Massing/Phasing - Mike Labarre 6:30

SANDAG 3D Visualization Howard Blackson 6:15. Sub Area A Coalition Massing/Phasing - Mike Labarre 6:30 Agenda Grantville Master Plan Stakeholders Committee Meeting April 13, 2009 SANDAG 3D Visualization Howard Blackson 6:15 Sub Area A Coalition Massing/Phasing - Mike Labarre 6:30 Land Use and Street Alternatives

More information

Sunnyside Yard Master Plan. RFQ Information Session September 13, 2017

Sunnyside Yard Master Plan. RFQ Information Session September 13, 2017 Sunnyside Yard Master Plan RFQ Information Session September 13, 2017 Agenda 1. Introduction by Tom McKnight 2. Context for the Sunnyside Yard Master Plan 3. RFQ Process 4. Questions Sunnyside Yard in

More information

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 Presentation Outline Context t of Mississauga i City Centre Implementing Paid Parking and TDM

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

Purpose: General Provisions:

Purpose: General Provisions: 10-19-1 Purpose: The purpose of off-street parking requirements is to promote traffic/pedestrian safety and efficiency and to minimize hard surfaced areas to reduce storm water run-off and visual impacts

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT April 25, 2012 Tahoe Transportation District (TTD) Tahoe Transportation District (TTD) established 1980 as Bi-State Agency TTD Goals Implement Transportation

More information

Attachment 5 Eglinton West LRT Planning and Technical Update

Attachment 5 Eglinton West LRT Planning and Technical Update Eglinton West LRT Planning and Technical Update 1. Introduction In July 2016, City Council approved an Eglinton West LRT with between 8 and 12 stops between Mount Dennis and Renforth Gateway, and up to

More information

The Latest on Joint Development Policy Guidance

The Latest on Joint Development Policy Guidance Panelists The Latest on Joint Development Policy Guidance Moderator: Jonathan Davis Deputy General Manager and Chief Financial Officer Massachusetts Bay Transportation Authority James Blakesley, Attorney-Advisor,

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

What We Heard Report - Metro Line NW LRT

What We Heard Report - Metro Line NW LRT What We Heard Report - Metro Line NW LRT by Metro Line NW LRT Project Team LRT Projects City of Edmonton April 11, 2018 Project / Initiative Background Name Date Location Metro Line Northwest Light Rail

More information

Terminal Alternatives

Terminal Alternatives Chapter 5 Terminal Alternatives Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority OCTOBER 2008 Contents Section Page 5 Terminal Alternatives...5-1 5.1 Terminal

More information

The Solar Zone at the UA Tech Park Phase II Expansion

The Solar Zone at the UA Tech Park Phase II Expansion The Solar Zone at the UA Tech Park Phase II Expansion Request for Proposals: Solicitation for Advanced Technology Demonstration Projects in the Area of Solar Energy Generation and/or Energy Storage The

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED nsert TTC logo here STAFF REPORT ACTION REQUIRED Gap Between Subway Trains and Platforms Date: November 13, 2017 To: From: TTC Board Chief Executive Officer Summary This report is in response to an October

More information

Recommended Vision for the Downtown Rapid Transit Network

Recommended Vision for the Downtown Rapid Transit Network Recommended Vision for the Downtown Rapid Transit Network April 2008 Presentation Overview Context Transit options Assessment of options Recommended network Building the network 2 1 Rapid Our Vision Reliable

More information

THE FUTURE OF VANCOUVER S VIADUCTS

THE FUTURE OF VANCOUVER S VIADUCTS THE FUTUE OF VANCOUVE S VIADUCTS Welcome to our information session on the future of Vancouver s viaducts. Over the past two years City staff have been testing the replacement of the Georgia and Dunsmuir

More information

THE FUTURE OF VANCOUVER S VIADUCTS

THE FUTURE OF VANCOUVER S VIADUCTS THE FUTUE OF VANCOUVE S VIADUCTS Welcome to our information session on the future of Vancouver s viaducts. Over the past two years City staff have been testing the replacement of the Georgia and Dunsmuir

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016 MANASSAS PARK STATION PARKING EXPANSION Site Evaluation & Recommendation October 18, 2016 1 INFORMATION ITEM Project Overview Parking Demand Site Evaluation VRE Recommended Preferred Alternative Next Steps

More information

Proposed Denver Zoning Code Text & Map Amendment

Proposed Denver Zoning Code Text & Map Amendment Proposed Denver Zoning Code Text & Map Amendment 38 th and Blake/River North Overlay Zone Districts August 26, 2017 1 This Presentation Includes: Sponsor, Community Partners and Process Project Scope and

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Parking Management Element

Parking Management Element Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking

More information

The Engineering Department recommends Council receive this report for information.

The Engineering Department recommends Council receive this report for information. CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision

More information

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Premium Transit Network. Columbia Pike Transit Stations

Premium Transit Network. Columbia Pike Transit Stations Premium Transit Network Columbia Pike Transit Stations Update Presented to County Board May 31, 2016 1 Today s Goals Provide update on Transit Stations Should Staff continue to explore a prefabricated

More information

Otay Ranch Station 2020 MOBILITY SERVICES MAP REGIONAL MOBILITY HUB IMPLEMENTATION STRATEGY

Otay Ranch Station 2020 MOBILITY SERVICES MAP REGIONAL MOBILITY HUB IMPLEMENTATION STRATEGY MAGDALENA REGIONAL MOBILITY HUB IMPLEMENTATION STRATEGY Otay Ranch Station Mobility hubs are transportation centers located in smart growth areas served by high frequency transit service. They provide

More information

Application of Autonomous Vehicle Technology to Public Transit

Application of Autonomous Vehicle Technology to Public Transit Application of Autonomous Vehicle Technology to Public Transit University Transportation Research Center 2014 Ground Transportation Technology Symposium November 19, 2014 Jerome M. Lutin, Ph.D., P.E. Senior

More information

Prince George CNG Operations and Maintenance Facility Project BC Transit

Prince George CNG Operations and Maintenance Facility Project BC Transit Prince George CNG Operations and Maintenance Facility Project BC Transit Prepared by March 16, 2017 March 16, 2017 Prince George Transit Operations and Maintenance CNG Facility Project Page 1 TABLE OF

More information

St. Catharines Transit Commission Accessibility Plan. St. Catharines Transit Commission Accessibility Plan

St. Catharines Transit Commission Accessibility Plan. St. Catharines Transit Commission Accessibility Plan St. Catharines Transit Commission 2013-2018 Accessibility Plan 1 2013-2018 ST. CATHARINES TRANSIT ACCESSIBILITY PLAN The following document is the St. Catharines Transit s Accessibility Plan for the next

More information

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman # 5 ) UN-15-17 LA SIERRA AUTO SALES SPECIAL USE PERMIT VEHICLE SALES PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: April 12, 2017 Item: UN-15-17 Prepared by: Robert Eastman GENERAL

More information

1 Downtown LRT Connector: Draft Concept

1 Downtown LRT Connector: Draft Concept Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future

More information

Managed Electric Vehicle Charging: New Opportunities for Demand Response.

Managed Electric Vehicle Charging: New Opportunities for Demand Response. Managed Electric Vehicle Charging: New Opportunities for Demand Response www.peakload.org Utilities & Electric Vehicles The Case for Managed Charging November 15, 2017 Erika H. Myers Director of Research

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

La Jolla Community Parking Management Plan A PLAN TO ADDRESS PARKING ISSUES AND TO UNIFY OUR COMMUNITY March 1, 2008

La Jolla Community Parking Management Plan A PLAN TO ADDRESS PARKING ISSUES AND TO UNIFY OUR COMMUNITY March 1, 2008 DRAFT FOR DISCUSSION PURPOSES ONLY La Jolla Community Parking Management Plan A PLAN TO ADDRESS PARKING ISSUES AND TO UNIFY OUR COMMUNITY March 1, 2008 [This is not to be read as a completed or finished

More information

Rail~Volution 2012 R. Gregg Albright

Rail~Volution 2012 R. Gregg Albright CALIFORNIA HIGH-SPEED RAIL AUTHORITY October 16 th, 2012 Rail~Volution 2012 R. Gregg Albright WHAT IS CALIFORNIA HIGH-SPEED TRAIN PROJECT (CHSTP) and HOW WILL IT BE IMPLEMENTED? 2 CALIFORNIA HIGH SPEED

More information

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401 Cedar View Subdivision No. 2 Hillcrest Dr. 81401 Property Information Packet John Renfrow * Jim Renfrow M b f Renfrow Realty Member of: Rocky Mountain Commercial Brokers www.rmcbrokers.com Page 1 Executive

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Birmingham Parking. City of Birmingham, Michigan. June 2018

Birmingham Parking. City of Birmingham, Michigan. June 2018 Birmingham Parking City of Birmingham, Michigan June 2018 1 OVERVIEW Supply Utilization Key Findings Stakeholder Feedback Strategies SUPPLY DOWNTOWN BIRMINGHAM PARKING SYSTEM SUPPLY On-Street 1,262 total

More information

PLANNING JUSTIFICATION REPORT ZONING AMENDMENT

PLANNING JUSTIFICATION REPORT ZONING AMENDMENT PLANNING JUSTIFICATION REPORT ZONING AMENDMENT Proposed Expansion of Mercedes-Benz Motor Vehicle Dealership 441 North Service Road, Burlington, Ontario December 2016 Prepared for: Mr. Ken Szekely Quantum

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

Garrett Hill Master Plan

Garrett Hill Master Plan Garrett Hill Master Plan Visioning Workshop February 13, 2007 Campbell Thomas & Company Agenda Welcome Existing conditions summary Critical issues Visioning exercise Summary & next steps Critical Assets

More information

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS 5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS The Transportation Services Committee recommends the adoption of the recommendations contained in the following report

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

TRAIN, BUS & TRANSIT

TRAIN, BUS & TRANSIT TRAIN, BUS & TRANSIT Input Metra 1 Metra does not want to add parking because of space; maxed out on number of cars per train. Developments on Rt. 59 will affect. 2 Should do studies regarding what the

More information

SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS

SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS 501. Off-Street Parking Requirements Intent. The intent of this section is to provide for off-street parking adequate to each type of development in

More information

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Addressing ambiguity in how electricity industry legislation applies to secondary networks In Confidence Office of the Minister of Energy and Resources Chair, Cabinet Business Committee Addressing ambiguity in how electricity industry legislation applies to secondary networks Proposal 1 This

More information

ATTACHMENT [B] PROJECT DESCRIPTION REQUESTED CITY OF LOS ANGELES ACTIONS

ATTACHMENT [B] PROJECT DESCRIPTION REQUESTED CITY OF LOS ANGELES ACTIONS ATTACHMENT [B] PROJECT DESCRIPTION REQUESTED CITY OF LOS ANGELES ACTIONS I. Project Location The Los Angeles International Airport (LAX) Landside Access Modernization Program ( Project ) comprises approximately

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

4. Transportation Plan

4. Transportation Plan The sizes of the most suitable sites are indicated in Table 4.3.6.2. Table 4.3.6.2: Site Sizes and Potential Development Area Potential Development Site Site Size (m 2 ) Area m 2 (3 Floors) D1 29,000 87,000

More information

Information Meeting Transfer Station Options. September 30, 2014

Information Meeting Transfer Station Options. September 30, 2014 Information Meeting Transfer Station Options September 30, 2014 Outline of Presentation Why we are looking at changes Background on current Transfer Station Options that were considered need, function

More information

Transportation Sustainability Program

Transportation Sustainability Program Transportation Sustainability Program Photo: Sergio Ruiz San Francisco 2016 Roads and public transit nearing capacity Increase in cycling and walking despite less than ideal conditions 2 San Francisco

More information

4/15/2015 Item #10D Page 1

4/15/2015 Item #10D Page 1 MEETING DATE: April 15, 2015 PREPARED BY: Jeff Murphy, Director DEPT. DIRECTOR: Jeff Murphy DEPARTMENT: Planning & Land Use INTERIM CITY MGR: Larry Watt SUBJECT: Introduction of City Council Ordinance

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016 # 2 HOLDOVER Revised ZON2016-01992 BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016 CASE NUMBER 6065 APPLICANT NAME LOCATION VARIANCE REQUEST ZONING ORDINANCE REQUIREMENT ZONING AREA OF PROPERTY

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,

More information

Project : Mana Tropicale. Builder : Mana Projects. Location : Sarjapur Road, Bangalore East. Overview

Project : Mana Tropicale. Builder : Mana Projects. Location : Sarjapur Road, Bangalore East. Overview Overview Mana Tropicale - Highlights: Mana Tropicale, the most awaited residential launch is located on the prime Sarjapur Road, Bangalore. The project offers luxurious 2 to 3 BHK apartments that are compacted

More information

East Turnaround. Access to Ayreswood Avenue would be restricted to right-in/rightout movements under the proposed Rapid Transit plan.

East Turnaround. Access to Ayreswood Avenue would be restricted to right-in/rightout movements under the proposed Rapid Transit plan. East Turnaround Options at Fanshawe College Ayreswood Access Access to Ayreswood Avenue would be restricted to right-in/rightout movements under the proposed Rapid Transit plan. To mitigate the impacts

More information

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)

More information

Cushman & Adams Substations MOU March 28, Cushman & Adams Substations April, 1937

Cushman & Adams Substations MOU March 28, Cushman & Adams Substations April, 1937 Cushman & Adams Substations MOU March 28, 2018 Cushman & Adams Substations April, 1937 Joint Staff Task Force Terry Coggins, Tacoma Power Ward Groves, Legal Jennifer Hines, Real Property Services Peter

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS 6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS 6.16.1 Off-Street Parking Off-street parking and loading spaces shall be required for all land uses as set forth in this section. A. Minimum Parking Space

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

D. Motor vehicle parking, bicycle parking, and loading areas shall be separated from one another.

D. Motor vehicle parking, bicycle parking, and loading areas shall be separated from one another. 1015 PARKING AND LOADING 1015.01 GENERAL STANDARDS A. Inside the Portland Metropolitan Urban Growth Boundary (UGB), parking, loading, and maneuvering areas shall be hard-surfaced, unless a permeable surface

More information

MOTOR VEHICLE PARKING AREA STANDARDS

MOTOR VEHICLE PARKING AREA STANDARDS 1015 PARKING AND LOADING 1015.01 GENERAL STANDARDS A. Inside the Portland Metropolitan Urban Growth Boundary (UGB), parking, loading, and maneuvering areas shall be hard-surfaced, unless a permeable surface

More information

H4: BIRMINGHAM CURZON STREET STATION

H4: BIRMINGHAM CURZON STREET STATION HIGH SPEED TWO INFORMATION PAPER H4: BIRMINGHAM CURZON STREET STATION This paper outlines the proposals for Curzon Street Station. It will be of particular interest to those potentially affected by the

More information

OTTAWA LIGHT RAIL TRANSIT PROJECT:

OTTAWA LIGHT RAIL TRANSIT PROJECT: November, 2013 OTTAWA LIGHT RAIL TRANSIT PROJECT: TUNNEY S PASTURE TO BLAIR STATION BC CONSTRUCTION ROUNDTABLE / NOVEMBER 21, 2013 Agenda 1. Introduction to RTG 2. Proposal phase 3. Overview of Confederation

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Muni Forward: Get On Board! Siemens S200 SF Light Rail Vehicle

Muni Forward: Get On Board! Siemens S200 SF Light Rail Vehicle Muni Forward: Get On Board! Siemens S200 SF Light Rail Vehicle 07 15 2014 SAN FRANCISCO, CALIFORNIA 1 The Right Vehicle to Meet Increasing Demand for Rail Transit in the City Meets Central Subway time-table

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016 California Energy Storage Policies Carla Peterman Commissioner, California Public Utilities Commission December 2016 California Storage Law and Policy l California has supported energy storage through

More information

Submission to Greater Cambridge City Deal

Submission to Greater Cambridge City Deal What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a

More information

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014 Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing July 24, 2014 Project Description The Central City Line is a High Performance Transit project that will extend from Browne

More information

Application of Autonomous Driving Technology to Transit

Application of Autonomous Driving Technology to Transit Application of Autonomous Driving Technology to Transit 2013 ITS New Jersey Annual Conference MetLife Stadium December 16, 2013 Jerome M. Lutin, Ph.D., P.E. Senior Director, Statewide & Regional Planning

More information

MPO Transit Study. Transit Concept for 2050 November 5, Transit Technologies

MPO Transit Study. Transit Concept for 2050 November 5, Transit Technologies Hillsborough County MPO Transit Study Transit Concept for 2050 November 5, 2007 Transit Technologies 1 Technologies Considered Bus Light Rail Commuter Rail Bus Standard or articulated high-capacity vehicles

More information

SEPULVEDA PASS CORRIDOR

SEPULVEDA PASS CORRIDOR SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information