SIDEWINDER DRILLING RIG 219 LA SALLE, TEXAS
|
|
- Randall Johnathan Reynolds
- 5 years ago
- Views:
Transcription
1 SIDEWINDER DRILLING RIG 219 LA SALLE, TEXAS July, 2015 Infrared Inspection Report Sidewinder Drilling Company Contact Tommy Green Project: CHARTER OAK DRIVE, LITTLE ROCK, AR PHONE: & FAX:
2 ORDER OF REPORT CONTENTS 1: Data To Facilitate Understanding & Utilizing Scan Report 2: Scan Results Overview & Action Taken Form 3: Identified Faulting Conditions, Information & Photographs 4: List Of Facility Equipment Identified By The Customer Representative & Notations Of Faulting Conditions Found DISCLAIMER This report and the recommendations contained in it are based upon conditions and practices observed and information made available to United Spectrographics personnel. This report does not purport to list all hazards or faulty conditions. It is not intended to indicate that other hazards or faulty conditions do not exist. Severity ratings in the report are based on the criteria shown in this report and are intended as guidelines only. No responsibility is assumed for the control of the facility s condition, maintenance practices or correction of conditions indicated herein. By issuing this report, neither United Spectrographics nor any of its employees makes any warranty, expressed or implied, concerning the contents of this report. Furthermore, neither United Spectrographics nor any of its employees shall be liable in any manner (other than liability that may be expressed in any policy of insurance that may be issued by United Spectrographics) for personal injury or property damage or loss of any kind arising from or connected with this inspection or failure to inspect.
3 Utilizing Report Contents Included in this report are Photographs and Thermographs of problem areas found during our recent Infrared Inspection of your facility. Each problem area picture is accompanied by: Date Location Information Temperature Calculations Color-coded Temperature Intensity and/or Condition Significance Data A Brief Comment Relating The Item In The Photograph To Its Corresponding Thermograph Suggested Corrective Recommendations. In most cases, problems (faults) found will be listed according to the date and order that they were located, rather then by significance or priority, as we feel that you and/or your personnel can best judge this, keeping in mind circuit importance and thermograph intensity. Thermal intensity is indicated by use of a color-coded data inserts that locate a fault s position on the standard electrical failure curve. The color of the insert represents the temperature range of the hottest item, or a portion of the item's circuitry, pointed out in the thermograph. The temperature ranges which the colored inserts represent are grouped as follows: INSERT Red Orange Yellow Green Temperature Range 70ºC/126ºF and higher above Ambient Operating Temp. 40ºC/72ºF to 69ºC/124ºF above Ambient Operating Temp. 25ºC/45ºF to 39ºC/70ºF above Ambient Operating Temp. *10ºC/18ºF to 24ºC/43ºF above Ambient Operating Temp. ( * See page 4)
4 Determining Cost Effective Responses Electrical equipment failures generally follow a standard mechanical/electrical failure curve. Dividing the failure curve into temp. ranges and locating a problems position on the curve allows us to indicate the probable time to its failure. Knowing a problems probable time to failure allows you to make a cost effective response to the problem areas that we locate. Below is a depiction of the electrical fault failure curve with the thermal intensity ranges and the colors that we assign to faults detailed in our reports. STANDARD ELECTRICAL FAULT FAILURE CURVE (Does Not Include Area In Blue) MINOR INTERMEDIATE SERIOUS CRITICAL DEVICE TEMP IS AMBIENT, BUT DEVICE IS EITHER FAULTY OR UNSAFE. 10ºC * 18ºF 25ºC 45ºF 40 C 72ºF 70 C 126ºF AMBIENT TEMP YEARS MONTHS MONTHS TO WEEKS WEEKS TO NOW FAULTY EQUIP Built In Trend Monitoring When yearly scans are accomplished, report results allow you to trend monitor your electrical equipment without having to cross reference previous report findings. If a previous years problem is not repaired it will show up again in the current scan report and its current intensity range indicates a current effective response.
5 Defining Total Temperature and Ambient Operating Temperature And Explanation For Their Use Total Temperature: Total Temperature = Ambient Operating Temperature + Fault temperature Allows you, the customer, to evaluate possible damage to equipment. Leads fail between 90ºC/194ºF and 110ºC/230º Phenolic fails around 200ºC/392ºF Transformers and Motor Insulation failure temperature depends on insulation class rating. Contacts start to fail around 130ºC/266ºF Ambient Operating Temperature (AOT*) for Infrared Scanning Purposes: Temperature within a device container (Box or Cabinet) that is not directly affected by faulting component = Normal Equipment Operating Temperature Contained By Box or Cabinet. If there is no container (Example: Device mounted to a wall) it is the temperature adjacent to the device not affected by the fault. Allows you, the customer, to determine if device will operate at intended amperage. Most switchgear is rated to operate at approximately 40ºC/104ºF (Industrial) to 50ºC/122ºF (Marine) If AOT is enough above normal rated temperature, either of the following conditions can cause an unanticipated trip. 1. An intermittent high load. 2. A minor (Green) or intermediate (Yellow) fault. Report pages with photographs: PH stands for Visible Light Photograph TH stands for Infrared Light Thermograph * AOT stands for Ambient Operating Temperature Both black & white and color infrared thermographs are presented to better depict the fault condition.
6 In addition to the corrective response time frame suggested below and the failure curve located on the previous page, you may want to consider using the military standard responses presented below. Military Standard For Evaluating Faults Located In Electrical Equipment Utilizing Temperature Data Obtained With Infrared Imaging Equipment: Temperatures rise above Ambient Operating Temperature: *10ºC/18ºF to 24ºC/43ºF component failure unlikely, but corrective measures required at next scheduled routine maintenance period or as scheduling permits. (Green Label) 25ºC/45ºF to 39ºC/70ºF component failure probable, unless corrected. (Yellow Label) 40ºC/72ºF to 69ºC/124ºF component failure almost certain, unless corrected. (Orange Label) 70ºC/126ºF and above component failure imminent. Immediately inform the person responsi ble for continued operation of equipment. (Red Label) Note: United Spectrographics uses a Blue Label to indicate faults that require attention due to either ambient temperature (Ex: Phase Not Operating), faulty equipment elements or unsafe conditions. * Note: Temperature conditions below 10ºC/18ºF rise above AOT are not considered significant enough to record and are usually not included in the reports unless the fault temperature is being affected by a cooling medium such as oil or wind. Fault Correction Recommendation When Our Source Assessment Is Inaccurate: When a fault is indicated in a connection or component and examination by your electrician does not turn up a loose connection or faulty component where we have indicated, a fault does exist. The electrician should continue to investigate the next connection or component to be found in the direction that the heat is coming from until a source is located. Example: If a molded case breaker line side lead connection lug is indicated as a fault source and is found to be secure, but not frozen in place, look for a loose connection or sign of over temp. in the lead holder lug.
7 SCAN RESULTS OVERVIEW PROMPT ATTENTION ITEMS: Because of: 1. The intensity or heat level indicated at the time of the scan. 2. Deterioration caused by excessive temperature not present at the time of the scan. 3. Physical condition irregularities observed at the time of the scan. We recommend that the following faults be given prompt attention: Faults: #1 Items With Asterisks Have High Total or Ambient Operating Temperatures. United Spectrographics July, 2015
8 SUMMARY OF FINDINGS FAULTS BY CATEGORY NUMBER OF FAULTS FAULT NO./ITEM NO. MINOR 0 0 INTERMEDIATE 0 0 SERIOUS 1 1/12 CRITICAL 0 0 SERIOUS 0 0 Number of items located at facility: 94 Number of faults: 1
9 ACTION TAKEN Sidewinder Drilling Rig 219 La Salle, Texas July, 2015 Fault # Item # Category Repaired Monitor Date Name 1 12 Serious
10 PROJECT: CUST REP: Eric SCAN REP: Tim Charleston DATE: 07/17/15 LOCATION: SCR House Plug Board Right Door Receptacle Labeled: MP1A-F PH # 1 > ITEM: SOURCE: TEMP: Receptacle Plug Buss connection lug and/or internal contact area. Temp. of area indicating a faulting condition is: 99ºC / 211ºF Total Temp - 39ºC / 103ºF AOT = 60ºC / 108ºF above AOT. TH # 1 > COMMENTS Abnormal heat is being generated in plug component. See orange arrows in PH#1 and TH#1. TH # 1 > Loose and/or corroded contact area. Clean, inspect and re-secure serviceable components. TEMPERATURE ABOVE AOT 60 C / 108 F
11 AREA/EQUIPMENT LIST Following is a list of the electrical equipment located at the Sidewinder Drilling, Rig 219, La Salle, Texas, facility and data relating to its operating condition at the time the scan was performed. NOTE: Items noted as visually inspected were not operational or show no visible load at the time of the inspection. No. Equipment Oper. Visually Inspected EQUIPMENT LIST Fault # SCR HOUSE 1 SCR 1 X 2 Gen 1 X 3 Top Drive Feeder X 4 SCR 2 X 5 Gen 2 X 6 Transformer Feeder X 7 SCR 3 X 8 Gen 3 X 9 Transformer Feeder X 10 SCR 4 X 11 Distribution Panel 1 120/208 VAC X 12 Plug Board X 1 MCC 13 Relay Panel & GND Fault X 14 DWA Blower X 15 DWB Blower X 16 RT Blower X 17 Air Compressor #1 LOTO 18 Air Comp 1 X 19 MP1A Blower X 20 MP1B Blower X 21 MP1 Liner Spray Pump X
12 No. Equipment Oper. Visually Inspected 22 MP1 Lube Oiler Locked Out Fault # 23 MP1 Charging Pump X 24 MP2A Blower X 25 MP2B Blower X 26 MP2 Liner Spray Pump X 27 MP2 Lube Oiler X 28 MP2 Charging Pump X 29 Tesco 30 Amp X 30 Spare LOTO 31 A/C #1 X kva Lighting Transformer X 33 Baylor Brake X 34 New Shaker #2 X 35 Main HPU X 36 Brake Cooling Pump 1 Locked Out 37 Brake Cooling Pump 2 Locked Out 38 A/C #2 X 39 Mud Tank Panel Locked Out 40 Accumulator BOP X 41 Shaker 1 And 2 X 42 Degasser Pump Locked Out 43 Trip Tank #1 X 44 Water XFER Pump #1 LOTO 45 Desander X 46 Desilter X 47 Trip Tank #2 X 48 Water Transfer Pump #2 X 49 Mud Mix Pump #1 X
13 No. Equipment Oper. Visually Inspected 50 Mud Mix Pump #2 X 51 Spare X 52 Dog House A/C Feeder X 53 Dog House Purge Feeder X 54 Steam Clean X 55 Centrifuge #1 X 56 Vacuum Degasser Locked Out 57 Iron Roughneck HPU X 58 Agitator 1,2,3 X 59 Agitator 4,5,6,7 X 60 Centrifuge FD Pump 2 X 61 Centrifuge #2 X 62 Block Heater #1 Locked Out 63 Block Heater #2 Locked Out 64 Block Heater #3 Locked Out 65 Pit Fan #4 Locked Out 66 Desander Degasser Locked Out 67 Catwalk X 68 Camp Feed Rig Transformer X Fault # OUTSIDE SCR HOUSE 69 Plug Board X 70 Third Party Use 480/277 Volt Distribution Panel X GENERATOR HOUSE 71 Generator #1 Motor Lead Junction Box X 72 Generator #2 Motor Lead Junction Box X 73 Generator #3 Motor Lead Junction Box X 74 Air Compressor #1 Control Cabinet X 75 Air Compressor #2 Control Cabinet X 76 Service Entry / Plugs X TRANSFORMER AREA
14 No. Equipment Oper. Visually Inspected 77 Air Compressor #1 Control Cabinet X Fault # 78 Transformer No kva Transformer X 79 Transformer No kva Transformer X MUD PUMP AREA 80 Mud Pump #1 Motor Lead Junction Box (Left) X X 81 Mud Pump #1 Motor Lead Junction Box (Right) X X 82 Mud Pump #2 Motor Lead Junction Box (Left) X X 83 Mud Pump #2 Motor Lead Junction Box (Right) X X 84 Plug Board (Between Mud Pumps) X X MUD TANK AREA 85 Plugs Between Mud Tanks X X 86 Plug Board X X TOP DRIVE HOUSE 87 CB8 120/240 Volt Distribution Panel X 88 Top Drive Control Cabinet X 89 Plug Board (Outside Top Drive House) X DRAWWORKS AREA 90 Drawworks Motor Lead Junction Box (Left) X 91 Drawworks Motor Lead Junction Box (Right) X DRILL FLOOR 92 Plug Board X 93 Top Drive Junction Box X DRILL SHACK 94 Unlabeled 208/120 Volt Distribution Panel X
SIDEWINDER DRILLING RIG 127 MIDLAND, TEXAS
SIDEWINDER DRILLING RIG 127 MIDLAND, TEXAS November, 2017 Infrared Inspection Report Sidewinder Drilling Rig 127 Pecan Acres 23 PSA 3-3H(WB) Company Contact Colton Chesney Project: 02201117 2605 CHARTER
More informationBUZZI UNICEM USA PRESIDENT S ISLAND TERMINAL MEMPHIS, TENNESSEE
BUZZI UNICEM USA PRESIDENT S ISLAND TERMINAL MEMPHIS, TENNESSEE July, 2015 Infrared Inspection Report Buzzi Unicem Terminal Company Contact Randy Miguez Project: 06220715 2605 CHARTER OAK DRIVE, LITTLE
More informationSYSCO INDIANAPOLIS INDIANAPOLIS, INDINA
SYSCO INDIANAPOLIS INDIANAPOLIS, INDINA November, 2017 Infrared Inspection Report Sysco Indianapolis LLC. 4000 West 62nd Street Indianapolis, Indiana, 46268 Company Contact: Trevor Gray Project: 05161117
More informationSYSCO OKLAHOMA LLC NORMAN, OKLAHOMA
SYSCO OKLAHOMA LLC NORMAN, OKLAHOMA August, 2018 Infrared Inspection Report SYSCO Oklahoma LLC 1350 West Tecumseh Road Norman, Oklahoma, 73069 Company Contact Chris Hill Project: 03210818 2605 CHARTER
More informationSYSCO CENTRAL CALIFORNIA MODESTO, CALIFORNIA
SYSCO CENTRAL CALIFORNIA MODESTO, CALIFORNIA July, 2018 Infrared Inspection Report Sysco Central California 136 South Mariposa Road Modesto, California, 95393 Company Contact: Steve Handel Project: 04110718
More informationSYSCO RDC SOUTH ALACHUA, FLORIDA
SYSCO RDC SOUTH ALACHUA, FLORIDA July, 2018 Infrared Inspection Report Sysco RDC South 12421 NW 173rd Street Alachua, Florida, 32615 Company Contact: Natha Hall Project: 05110818 2605 CHARTER OAK DRIVE,
More informationThermal Imaging Infrared Survey. Report. Report. Thermography Inspection at ABC Company.
Thermal Imaging Infrared Survey Report. Thermal Imaging Infrared Survey Report. Thermography Inspection at ABC Company. Vancouver,BC May 25,2012 www.aiturgroup.com info@aiturgroup.com Rick Turdubay, Certified
More informationFault Summary The following table is a summary of faults or items featured for your information
This document is an annotated sample of a report you receive. following our visit to your premises... We pride ourselves on the quality of the report and submit. this sample for your evaluation.. Report
More information2006 Thermographic Inspection. Terrific Towers 1001 Sparks St Sydney. Vol. 9
8/139 Woolooware Rd Burraneer NSW 2230 T. (02) 9544 3588 F. (02) 9544 3688 E. info@thermalimagingservices.com.au W. www.thermalimagingservices.com.au Accredited Thermographers 2006 Thermographic Inspection
More informationCompany Name City, State. Thermographic Study (date) Prepared By: L&S Electric, Inc. PO Box 740 Schofield, WI
Company Name City, State Thermographic Study (date) Prepared By: L&S Electric, Inc. PO Box 740 Schofield, WI 54476-0740 April 9, 2012 (Customer Name & Address) Attn: Customer Enclosed is a report on the
More informationmodel ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION
MODEL: PS600 HZ: 60 A model ps600 installation and service manual for federal model ps600 FEDERAL SIGNAL CORPORATION POWER SUPPLY VOLTS: SERIES: 120VAC FEDERAL SIGNAL CORPORATION UNIVERSITY PARK, IL. U.S.A.
More informationB BASIC HEAT TREATMENT CONSOLE
Maritime Stress PO Box 2898, 30 Estates Road Dartmouth, NS, B2W 4Y2, Canada Toll Free: 1-877-468-1781 Phone: (902) 468-7873 Fax: (902) 468-2304 Website: E-mail: info@maritimestress.com OPERATION MANUAL
More informationRig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading
Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80
More informationThermography Report. Inspection Site: Lucky Mining Co. Rocky Rd Smithville, NSW. Requested By: John Seemore. Date of Inspection:
Thermography Report Inspection Site: Lucky Mining Co. Rocky Rd Smithville, NSW Requested By: John Seemore Date of Inspection: 27-10-2006 Reference Number: 2710061 Thermographer: John Crawford Thermal Imaging
More informationEasyStart 364 (ASY-364-X20-IP) Installation Instructions for the Coleman / Airxcel Air Conditioners
EasyStart 364 (ASY-364-X20-IP) Installation Instructions for the Coleman / Airxcel Air Conditioners using Installation Kit KIT-364-CM1 Contents Introduction... 2 Safety first... 2 Making a good crimp...
More informationSubstation inspection guidelines Mark B. Goff, P.E.
Substation inspection guidelines Mark B. Goff, P.E. Tennessee Valley Authority, Chattanooga, Tennessee ABSTRACT We need to better understand what our infrared camera is really showing us. Without guidelines,
More informationApplication Engineering Europe
Date of last update: Feb-12 Ref: D7.8.4/0112-0212/E Application Engineering Europe CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS 1/17 1 Introduction CoreSense is an ingredient brand name for
More informationSM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety
SM-1700 Secondary Shunt Trip Coil Assembly Powered by Safety SM-1700 Secondary Shunt Trip Coil Assembly SM-1700 Contact Information Powell Electrical Systems, Inc. www.powellind.com info@powellind.com
More informationAUTOMATIC 12 WAY HEAT TREATMENT CONSOLE
Maritime Stress PO Box 2898, 30 Estates Road Dartmouth, NS, B2W 4Y2, Canada Toll Free: 1-877-468-1781 Phone: (902) 468-7873 Fax: (902) 468-2304 Website: E-mail: info@maritimestress.com OPERATION MANUAL
More informationATLAS Wheel Balancer Electrical Flow Chart
ATLAS Wheel Balancer Electrical Flow Chart WARNING: Leave all work to trained and licensed electricians. Attempting repairs yourself is extremely dangerous, with the potential for serious injury and even
More informationMast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)
General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads
More informationReliable Temperature Compensation is Critical to CNG Vehicle Safety
Reliable Temperature Compensation is Critical to CNG Vehicle Safety August 18, 2014 This Technical Bulletin addresses the potential hazards created by failure of compressed natural gas (CNG) dispensers
More informationProCS and ProC Series Heat Trace Panelboards
ProCS and ProC Series Heat Trace Panelboards Introduction Contents Introduction... 2 System Overview... 3 Certifications... 4 Heat Trace Panel Images... 4-5 AMC Heat Trace Panel (HTP) Selection Guide...
More informationIB PowlVac ITE-HK Remote Racking Device
IB-51802 PowlVac ITE-HK Remote Racking Device for use with ITE-HK 5kV & 15kV Circuit Breakers and PowlVac ITE-HK 5kV & 15kV Replacement Circuit Breakers Powered by Safety PowlVac ITE-HK Remote Racking
More informationAGM. I-Lux MR 16 Style 2 & 5, Coil & Shunt. 108 Fairgrounds Drive Suite 8 Manlius, NY Phone: Fax:
AGM I-Lux MR 16 Style 2 & 5, Coil & Shunt Revision 7.5 Pg 2 I-Lux Catalog / Item Numbers Catalog Code XXX.XXF Sign Size 1 ~ Size 1 2 ~ Size 2 3 ~ Size 3 5 ~ Size 5 Sign Style 2 ~ Style 2 (3 step 4.8A -
More informationData Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931
Data Bulletin 0931DB0101 July 2001 Cedar Rapids, IA, USA Ground-Censor Ground-Fault Protection System Type GC Class 931 09313063 GT Sensor Shunt Trip of Circuit Interrupter Window Area for Conductors GC
More informationEasyStart Installation Instructions for Dometic Family RV A/Cs
EasyStart Installation Instructions for Dometic Family RV A/Cs DuoTherm Brisk Brisk II Penguin Penguin II Contents Introduction... 4 Safety first... 4 Making a good crimp... 4 Identifying Dometic AC Units...
More informationIntegrated Inverter/Battery Monitoring System (IBMS)
Integrated Inverter/Battery Monitoring System (IBMS) Battery monitoring at its finest Maintenance Bypass Switch Input AC to DC Converter DC to AC Inverter Static Bypass Switch Output Operations: Normal
More informationLAGO Energy Presents,
LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION
More informationSERIES VAC Microprocessor Based Direct Spark Ignition Control FEATURES DESCRIPTION APPLICATIONS THE TOTAL SOLUTION FOR GAS IGNITION CONTROL
SERIES 35-72 120 VAC Microprocessor Based Direct Spark Ignition Control 35.72.03 FEATURES Two Mounting Configurations Open Board With Stand-Off's - saves space and cost Potted - protection for washdown
More informationFour Corners Mine. Lockout Procedures. 15 Dragline
Four Corners Mine Lockout Procedures BE 15 Dragline Revision Log Rev. No. Requested By Approved By Revised By Rev. Date 0 Initial Issue FCO Mine Safety B. Marceaux 05.07.07 Committee 1 Electrical Department
More informationTechnical Service Bulletin IOX/DCX Transmitter Maintenance Schedule
Technical Service Bulletin 140610 IOX/DCX Transmitter Maintenance Schedule Service Bulletin 140610 applies to Comark IOX, DCX and Paragon transmitters. This bulletin contains important maintenance schedule
More informationUBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Building Operations Electrical Technical Support.2 UBC Energy & Water Services 2.0 REQUIREMENTS FOR COMMISSIONING AND TESTING 2.1 Testing.1 Unit
More informationCOMMITMENT TO EXCELLENCE
PERFORMANCE DRIVEN OPERATIONS IN TEXAS AND OKLAHOMA COMMITMENT TO EXCELLENCE Basin Drilling, LP 1121 ESE Loop 323 Suite 218 Tyler, Texas 75701 (903) 561-8211 (903) 561-5844 fax www.basindrilling.com About
More informationJSAP - AC - Main MCC - Shutdown.doc JSAP - AC - Main MCC - Start Up - REV1.doc JSAP - AC - MCC Feeder - Shutdown.doc JSAP - AC - MCC Feeder - Start
JSAP - AC - Main MCC - Shutdown.doc JSAP - AC - Main MCC - Start Up - REV1.doc JSAP - AC - MCC Feeder - Shutdown.doc JSAP - AC - MCC Feeder - Start Up.doc JSAP - AC - Mud Pump(s) - Rig Out.doc JSAP - AC
More informationHenny Penny Rotisserie Display Model SCD-6/8 TECHNICAL MANUAL
Henny Penny Rotisserie Display Model SCD-6/8 TECHNICAL MANUAL TABLE OF CONTENTS Section Page Section 1. TROUBLESHOOTING... 1-1 1-1. Introduction... 1-1 1-2. Safety... 1-1 1-3. Troubleshooting... 1-1 1-4.
More informationGenerator/Loadbank Quick Connection Tap Box
/ Generator/Loadbank Quick Connection Tap Box WM2-Series Generator/Loadbank Quick Connection Solutions Brochure www.apt-power.com 433 N. 36 th Street Lafayette, IN 47905 (765) 446-2343 ALN: 517 Rev. 01
More informationINFRARED INSPECTION REPORT
REPORT February 13, 2015 Companies Unlimited 1401 Brand St. Los Angeles, CA 90028 Contact: Ron McKinney An Introduction to Infrared Inspection When installed correctly and operated within their ratings,
More informationManual Transfer Switch
Manual Transfer Switch Instruction Manual 30 1200 Amp 2, 3 & 4 Pole Page 1 WARNING Before Installation READ THIS MANUAL carefully to learn how to properly install, operate and maintain this unit. Personal
More informationMODEL A96 SERIES. 130Vdc Switchmode Utility Rectifier / Battery Charger. Used with LaMarche Power Cage ECN/DATE
MODEL A96 SERIES 130Vdc Switchmode Utility Rectifier / Battery Charger Used with LaMarche Power Cage CPN112138 ECN/DATE ISSUE DATE: ECN 17010-12/05 106 BRADROCK DRIVE DES PLAINES, IL. 60018-1967 (847)
More informationEasy Start. 364 (3 ton) Soft Starter 368 (6 ton) Soft Starter. Installation Manual
Easy Start 364 (3 ton) Soft Starter 368 (6 ton) Soft Starter Installation Manual Micro Air Corporation Phone (609) 259-2636 124 Route 526. www.microair.net Allentown NJ 08501 Fax (609) 259-6601 Retrofit
More informationDepartment of Defense
OPERATION & MAINTENANCE MANUAL For 30kW Ruggedized Tactical Load Bank L = 27 W = 14 H = 17 Submitted To Department of Defense Prepared By Fidelity Technologies Corp. (Manufacturer) 2501 Kutztown Rd. Reading,
More informationPlug & Abandonment Light Drilling Workover Well Intervention
Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE
More informationPOWER PINNER RAPID FIRE 7005 RF OPERATOR S MANUAL
POWER PINNER RAPID FIRE 7005 RF OPERATOR S MANUAL Copyright: February 20, 2007 Revised: 12-11-2015. Gripnail Corporation An Employee Owned Company 97 Dexter Road East Providence, Rhode Island 02914-2045
More informationINOVA HIGHTECH Ltd. MEP 002/003 Auto Starter Manual
INOVA HIGHTECH Ltd. MEP 002/003 Auto Starter Manual Complete Installation and Operating Manual for the MEP 002/003 Auto / Remote Starter for the following MEP Power Generators: MEP 002A/003A/011A/802A/803A/811A
More informationELECTRICAL SYSTEM RP-7
ELECTRICAL SYSTEM RP-7 This section of the manual does not include integral electrical components of the engine. Refer to section Engine RP-1 for details. This section of the manual is divided into three
More informationProFlo FatBoy
The Standard For Professional Grade Diaphragm Pumps. ProFlo 3300 5500 FatBoy Operational and Installation Guidelines, Repair & Parts Contents 3300 5500 Fatboy Operational and Installation Guidelines...2
More informationSubstation Equipment (Bushings)
Substation Equipment (Bushings) Mark B. Goff, P.E. Tennessee Valley Authority ABSTRACT Bushings provide a point of interface such that electrical current can pass to and from an electrical apparatus. Much
More informationSOLAR DASH CHARGING SYSTEM USER GUIDE
SOLAR DASH CHARGING SYSTEM Doc 1.01 INST049 INSTALLATION STEP 1 Place 20 watt solar panel in the dash of the vehicle facing up. Note: For ideal results position the vehicle in a manner in which the solar
More informationSelective Coordination Enforcement:
Selective Coordination Enforcement: Overcurrent Protective Device Basics by Tim Crnko The Basics of Selective Coordination Merely having a higher ampere overcurrent protective device (OCPD) feeding a lower
More informationP80074 (150 amp connectors) P80071 (300 amp connectors)
Overview: The Restore-Lite Temporary Power Restoration System is a compact mobile transformer unit that contains a single-phase, floating-tap transformer designed to restore power to customers who have
More informationUNDERSTANDING ELECTRICAL EQUIPMENT AND CONDITIONS OF INCREASED RISK
UNDERSTANDING ELECTRICAL EQUIPMENT AND CONDITIONS OF INCREASED RISK 5 October 2017 John A. Weber Principal Electrical Engineer, Hartford Steam Boiler Inspection and Insurance Company Electrical Power Transmission
More informationCylindrical Silencers
Cylindrical Silencers A200 Series and 300 Series Installation and Operation Manual Rev. B (c) Copyright 2012, GT Exhaust, Inc. All Rights Reserved Published: April 30, 2012 NOTICE The instructions herein
More informationAppendix A. Power Management System Test Guidelines
Appendix A Power Management System Test Guidelines The MTS DP Committee wants to thank Don Wilkes of Minden Engineering Company for his authorship of this appendix to the Test Guidelines Table of Contents
More informationEvaluating Water-Damaged Electrical Equipment
Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication serves as a guide that represents the consensus of NEMA member companies and is not intended to override the recommendations
More informationCORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS
Date of last update: Apr-15 Ref: D7.8.4/0112-0415/E Application Engineering Europe CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS CoreSense Diagnostics for Stream Refrigeration Compressors...
More informationSERVICE & OPERATING MANUAL. 126E PTP SHALE SHAKER with Industrial Possum Belly
SERVICE & OPERATING MANUAL 126E PTP SHALE SHAKER with Industrial Possum Belly TRI-FLO 126 PTP HIGH SPEED SHALE SHAKER 1.0 SAFETY 2.0 INTRODUCTION 3.0 MAINTENANCE 4.0 START UP 5.0 OPERATION 6.0 TROUBLESHOOTING
More informationOWNER S MANUAL SELF-PRIMING PORTABLE UTILITY PUMP
Model 54011-0 OWNER S MANUAL SELF-PRIMING PORTABLE UTILITY PUMP Questions, problems, missing parts? Before returning to the store call AQUAPRO Customer Service 8 a.m. - 5 p.m., EST, Monday-Friday 1-844-242-2475
More informationFactory Packaged Controls. OE (AAON Part No. V12090) MODGAS-X Controller Field Technical Guide
Factory Packaged Controls OE377-26-00058 (AAON Part No. V12090) MODGAS-X Controller Table of Contents GENERAL INFORMATION... 3 Overview...3 Features...3 INSTALLATION & WIRING... 4 Supply Air Temperature
More informationALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.
ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. 1. Check log book for incomplete compliance for further operation. 2.
More informationB-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE
B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE Duty B: Power Distribution (600V and below) B-03: Troubleshoot 480V System Issued 06/01/98 Task Preview Troubleshoot 480V System The 480V distribution
More informationMODEL 7100 PORTABLE PIN WELDER OPERATOR S MANUAL
Model 7100 Portable Pin Welder MODEL 7100 PORTABLE PIN WELDER OPERATOR S MANUAL Copyright: March 22, 2005 Revised: December 20, 2016 Gripnail Corporation An Employee Owned Company 97 Dexter Road East Providence,
More informationPump Installation and Service Manual HRS Hydromatic Retractable System
Pump Installation and Service Manual HRS Hydromatic Retractable System NOTE! To the installer: Please make sure you provide this manual to the owner of the pumping equipment or to the responsible party
More informationContinuing Education Course #206 Introduction to Designing Machine Control Systems Part 2
1 of 5 Continuing Education Course #206 Introduction to Designing Machine Control Systems Part 2 1. Continuing to answer the following questions indicates that you understands that the presented material
More informationDigitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers
Supersedes IL 33-858-4 Dated 05/02 Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Digitrip Retrofit System for ITE K-3000, Digitrip Retrofit System for ITE K-3000, K-3000
More informationPHYSICS 6 EXTENDED PHYSICS
PHYSICS 6 EXTENDED PHYSICS GRADE 11 TERM 3 PORTFOLIO TASKS 2013-2014 STS\G11\Portfolio\Extended Physics Assessment Booklet\CDAU\ADVETIVersion 1.0 2014 1 31 Unit/Topic Performance Criteria Assess Event
More informationMatrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL
Matrix APAX 380V-415V 50Hz TECHNICAL REFERENCE MANUAL WARNING High Voltage! Only a qualified electrician can carry out the electrical installation of this filter. Quick Reference ❶ Performance Data Pages
More informationOWNER S MANUAL SUBMERSIBLE UTILITY PUMP
Model 51101-0 OWNER S MANUAL SUBMERSIBLE UTILITY PUMP Questions, problems, missing parts? Before returning to the store call AQUAPRO Customer Service 8 a.m. - 5 p.m., EST, Monday-Friday 1-844-242-2475
More informationMichigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE
PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationPROCESS ELECTRONICS CORPORATION
MINIVERTER MANUAL PROCESS ELECTRONICS CORPORATION 100 BRICKYARD ROAD MOUNT HOLLY, NORTH CAROLINA 28120 TELEPHONE (800) 421-9107 FAX (704) 827-9595 SALES@PECRECTIFIER.COM WWW.PECRECTIFIER.COM SOLID STATE
More informationHigh Frequency SineWave Guardian TM
High Frequency SineWave Guardian TM 380V 480V INSTALLATION GUIDE FORM: SHF-IG-E REL. January 2018 REV. 002 2018 MTE Corporation High Voltage! Only a qualified electrician can carry out the electrical installation
More informationM T E C o r p o r a t i o n. dv/dt Filter. Series A VAC USER MANUAL PART NO. INSTR REL MTE Corporation
M T E C o r p o r a t i o n dv/dt Filter Series A 440-600 VAC USER MANUAL PART NO. INSTR - 019 REL. 041119 2004 MTE Corporation IMPORTANT USER INFORMATION NOTICE The MTE Corporation dv/dt Filter is designed
More informationWingate Creek Mine. Lockout Procedures. 14 Dragline
Wingate Creek Mine Lockout Procedures BE Revision Log Rev. No. Requested By Approved By Revised By Rev. Date 0 Initial Issue R. Barefield R. Barefield 12.03.08 1 Operations/Maint. Facility Mngt. R. Barefield
More informationRE-PR3-E-86&105 3-Phase Panel Mount 86 and 105kW
Page 1 of 6 3-Phase Panel Mount 86 and 105kW Features: Benefits: 0-10Vdc, 0-5Vdc, 4-20mA or manual via potentiometer control input Over temperature protection with auto reset Enclosed panel mounting Efficient
More informationAUTO REEL -AS MODEL #: AS AUTOMATIC CORD REEL WITH AUTO SAFE INSTRUCTION MANUAL
INSTRUCTION MANUAL AUTO REEL -AS AUTOMATIC CORD REEL WITH AUTO SAFE MODEL #: 091-220-20-120-AS INPUT: 120 Volts, 50/60 Hz, 20 Amps File: IM_091-220-20-120-AS_revA.indd Rev: A Revised By: JM Date: 06-09-2015
More informationCOLDWATER LAKE FACILITIES DUPLEX PUMP STATION
COLDWATER LAKE FACILITIES DUPLEX PUMP STATION TROUBLESHOOTING GUIDE REFERENCE: Operation Instructions Ladder Schematic Diagrams SCOPE The following troubleshooting guide has been specifically prepared
More informationM T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation
M T E C o r p o r a t i o n MATRIX FILTER SERIES B 380-415 Volts, 50HZ USER MANUAL PART NO. INSTR - 015 REL. 060628 2006 MTE Corporation IMPORTANT USER INFORMATION NOTICE The MTE Corporation Matrix Filter
More informationInstallation Instructions For Motor Control Center (MCC) Units
s Page 1 of 8 Installation Instructions December, 2013 Installation Instructions For Motor Control Center (MCC) Units Hazardous voltage. Will cause death or serious injury. Always de-energize and ground
More informationMAINFRAME HOT RUNNER TEMPERATURE CONTROL SYSTEMS. Instruction Manual
MAINFRAME HOT RUNNER TEMPERATURE CONTROL SYSTEMS Instruction Manual Copyright, Athena Controls, Inc., 2006 Printed in USA CompuStep is a registered trademark of Athena Controls, Inc. SafeChange is a trademark
More informationAvid Electrical Services
Avid Electrical Services Thermal Imaging Report To: Mr A. Customer Your Business Australia Pty Ltd Fault Summary The following table is a summary of faults or items featured for your information Grading
More informationSIGNAL WORDS QUALIFIED PERSON
SIGNAL WORDS The signal words Danger, Warning and Caution used in this manual indicate the degree of hazard that may be encountered by the user. These words are defined as: Danger - Indicates death or
More informationOutdoorXUPS-600AHV-8364
OutdoorXUPS-600AHV-8364 TSi Power s OutdoorXUPS-600AHV-8364 provides secure and uninterrupted 230 vac power to critical loads. 1) Weather-tight metal cabinet (IP44 or NEMA 3R rated) 2) 2A and 2B are wide
More informationTHERMOGRAPHY REPORT ELECTRICAL
LAMBERT CONDITION MONITORING LTD. CERTIFIED THERMOGRAPHER A.I.R. #12-01-243 THERMOGRAPHY REPORT ELECTRICAL Thermographic inspection at: Sample site Inspected by: David Lambert date: 20170701 Customer Sample
More informationSelective Coordination
Circuit Breaker Curves The following curve illustrates a typical thermal magnetic molded case circuit breaker curve with an overload region and an instantaneous trip region (two instantaneous trip settings
More informationTransfer Switch TS-50. Owner s Manual
Transfer Switch TS-50 Owner s Manual Table of Contents Introduction 2 Installation 2 Operational Testing 7 Troubleshooting 7 Hi-Pot Testing 8 Generator Note 9 Medical Appliances 10 Caution 10 Disclaimer
More informationBoston Gear Ratiotrol DC Motor Speed Control
Boston Gear Ratiotrol DC Motor Speed Control P-3017-BG Doc. No. 60007 Installation and Operation DCX plus Series II Enclosed Models 1/12-1 HP a division of Altra Industrial Motion Contents l General Information
More informationGETZ EQUIPMENT INNOVATORS SYSTEM DUST 120V ECONOMY PART NUMBER: 4G59542 OPERATING AND INSTRUCTION MANUAL
GETZ EQUIPMENT INNOVATORS SYSTEM DUST 120V ECONOMY PART NUMBER: 4G59542 OPERATING AND INSTRUCTION MANUAL 2320 Lakecrest Drive, Pekin IL 61554 PH. (888) 747-4389 Fax (309) 495-0625 Website: www.getzequipment.com
More informationXENON POWER SUPPLY 4000 Watt Gladiator IV
XENON POWER SUPPLY 4000 Watt Gladiator IV 220 Volt Equipment Type 62-00049 Rev. February 2003 STRONG INTERNATIONAL a division of Ballantyne of Omaha, Inc. 4350 McKinley Street Omaha, Nebraska 68112 USA
More informationMaximum operating temperature for standard motors = 110 C. Shut down temperature in case of a malfunction = 115 C.
Section 3 Maintenance & Troubleshooting General Inspection Lubrication & Bearings Type of Grease WARNING: UL rated motors must only be serviced by authorized Baldor Service Centers if these motors are
More information2015 EDITION SUBMERSIBLE MOTORS AIM MANUAL. APPLICATION INSTALLATION MAINTENANCE 60 Hz, Single-Phase and Three-Phase Motors. franklinwater.
0 EDITION AIM MANUAL SUBMERSIBLE MORS APPLICATION INSTALLATION 60 Hz, Single-Phase and Three-Phase Motors franklinwater.com All Motors System Troubleshooting Motor Does Not Start A. No power or incorrect
More informationService and Parts Manual. NO LONGER IN PRODUCTION Some service parts may not be available for this product. Otolaryngology Chair.
thru 391-001 -002 Otolaryngology Chair Serial Number Prefixes: EN, PD & V Service and Parts Manual NO LONGER IN PRODUCTION Some service parts may not be available for this product. 391-001 thru -002 NOTE:
More informationINSPECTOR LINE LOAD SIMULATOR INSTRUCTION MANUAL TASCO, INC.
INSPECTOR LINE LOAD SIMULATOR INSTRUCTION MANUAL INS120P TASCO, INC. THIS TESTER IS DESIGNED FOR USE ONLY BY QUALIFIED ELECTRICIANS. IMPORTANT SAFETY WARNINGS mwarning Read and understand this material
More informationVI Chip BCM Bus Converter Thermal Management
APPLICATION NOTE AN: VI Chip BCM Bus Converter Thermal Management Joe Aguilar Product Line Engineer, VI Chip & Paul Yeaman Principal Product Line Engineer, VI Chip Strategic Accounts Contents Page Introduction
More informationCOOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing
Fusing Equipment MN132028EN Effective November 2016 Supersedes June 2012 (S240-66-1) COOPER POWER SERIES ELF Current-Limiting Dropout Fuse Installation Instructions Pull ring Housing Lifting eye Identification
More informationELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016
DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all
More informationWith its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.
PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE
More information3 Phase Voltage Imbalance
3 Phase Voltage Imbalance Keep in mind when reading ANY article about electrical theory or application is that it only scratches the surface of the topic. You can dedicate years of your life to understanding
More informationINFRARED THERMOGRAPHY:
INFRARED THERMOGRAPHY: X-treme Electrical can now also assist with infrared thermography of various electrical installations. Please take the time to review the following presentation for comprehensive
More informationUser s Manual. ACS550-CC Packaged Drive with Bypass Supplement for ACS550-01/U1 Drives User s Manual
User s Manual ACS550-CC Packaged Drive with Bypass Supplement for ACS550-01/U1 Drives User s Manual ii ACS550-CC Packaged Drive with Bypass ACS550 Drive Manuals GENERAL MANUALS ACS550-01/U1 Drives User's
More information