Legend. 0 1,000 2,000 Feet

Size: px
Start display at page:

Download "Legend. 0 1,000 2,000 Feet"

Transcription

1 0 1,000 2,000 Feet Legend Approximate Project Boundary Service Layer Credits: Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, OpenStreetMap contributors, and the GIS User Community

2 Legend Approximate Project Boundary (±339.0 ac.) NRCS Soil Descriptions Floridana-Immokalee-Okeelanta association (±.81 ac.) Myakka-Myakka, wet, fine sands, 0-2% slopes (± ac.) Palmetto sand (±0.32 ac.) Feet

3 FLUCCS Code Description Improved Pastures 213 Woodland Pastures Streams and Waterways 534 Reservoirs less than 10 acres Freshwater Marsh 821 Transmission Tower Total Project Acreage Legend Approximate FLUCCS Habitat Lines Approximate Project Boundary Feet 213 ± Acreage

4 B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg LEGEND EXISTING WETLAND IMPACT -1 (1.67 AC TOTAL) (0.66 AC IMPACT) THE MASTERS AVENUE -3 (0.25 AC TOTAL) -2 (0.13 AC TOTAL) (0.07 AC IMPACT) -8 (0.22 AC TOTAL) (0.22 AC IMPACT) WETLAND SE-W28 (3.55 AC) WETLAND SE-W60 (0.30 AC) FUTURE BOURNESIDE BOULEVARD EXTENSION PROJECT BOUNDARY (TYP.) -4 (0.34 AC TOTAL) (0.34 AC IMPACT) -5 (0.13 AC TOTAL) (0.13 AC IMPACT) -10 (0.05 AC TOTAL) (0.05 AC IMPACT) -9 (0.04 AC TOTAL) (0.04 AC IMPACT) WETLAND SE-W23 (6.49 AC) IMPACT TABLE IMPACT # AREA (AC) DREDGE (CY) FILL (CY) OSW ,453 OSW OSW OSW OSW OSW OSW OSW OSW WETLAND SE-W26 (2.45 AC) -6 (0.17 AC TOTAL) (0.17 AC IMPACT) -11 (0.15 AC TOTAL) (0.15 AC IMPACT) -13 (0.59 AC TOTAL) (0.59 AC IMPACT) -18 (0.01 AC TOTAL) WETLAND SE-W21 (0.64 AC) -7 (0.07 AC TOTAL) (0.05 AC IMPACT) WETLAND SE-W22 (31.88 AC) -12 (0.31 AC TOTAL) (0.31 AC IMPACT) IMPACT TABLE IMPACT # AREA (AC) DREDGE (CY) FILL (CY) OSW , OSW , OSW ,883 OSW , OSW ,191 1 OSW OSW TOTAL 3. 20,875 8,197 EXISTING BOURNESIDE BOULEVARD -17 (0.05 AC TOTAL) -16 (0.04 AC TOTAL) (0.02 AC IMPACT) -15 (0.10 AC TOTAL) (0.10 AC IMPACT) -14 (0. AC TOTAL) (0. AC IMPACT) PROJECT BOUNDARY (TYP.) UNIVERSITY PARKWAY WETLAND SE-W17 (1.08 AC) -19 (0.06 AC TOTAL) (0.06 AC IMPACT) SCALE: 1" = 500' CIVIL VICINITY MAP dwg 1

5 B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg THE MASTERS AVENUE -1 (0.38 AC. IMPACT) -8 (SEE SHEET 6) 1A WETLAND SE-W60 (0.30 AC.) 1A -1 (1.67 AC TOTAL) -1 IMPACTS PROPERTY BOUNDARY (TYP.) -1 (0.28 AC. IMPACT) 1B 1B WETLAND SE-W28 (3.55 AC) 1A VOLUME = 925 CY SECTION 1A-1A 1B VOLUME = 8 CY SECTION 1B-1B CIVIL OSW-1 IMPACTS dwg 2

6 B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg -1 (SEE SHEET 2) WETLAND SE-W28 (3.55 AC) PROPERTY BOUNDARY (TYP.) 2B -5 (SEE SHEET 4) 2A -2 (0.13 AC TOTAL) (0.07 AC IMPACT) -3 (0.25 AC TOTAL) 4A 2A 2B -4 (0.34 AC TOTAL) (0.34 AC IMPACT) 4A BOULEVARD EXTENSION FUTURE BOURNESIDE -2 AND -4 IMPACTS 2A VOLUME = 295 CY SECTION 2A-2A NWL EL = 53. BOTTOM EL = 33. SECTION 2B-2B 20' 2B TOTAL DREDGE VOLUME = 764 CY 4A VOLUME = 922 CY SECTION 4A-4A CIVIL OSW-2 & OSW-4 IMPACTS dwg 3

7 B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg -5 (0.13 AC TOTAL) (0.13 AC IMPACT) -4 (SEE SHEET 3) 5A WETLAND SE-W26 (2.45 AC) -6 (0.17 AC TOTAL) (0.17 AC IMPACT) -5 & -6 IMPACTS 5A 6A 6A FUTURE BOURNESIDE BOULEVARD EXTENSION 5A VOLUME = 425 CY SECTION 5A-5A 6A VOLUME = 270 CY SECTION 6A-6A CIVIL OSW-5 & OSW-6 IMPACTS dwg 4

8 B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg WETLAND SE-W22 (31.88 AC) -14 (SEE SHEET 9) -13 (SEE SHEET 8) -15 (0.10 AC TOTAL) (0.10 AC IMPACT) 15A 15A 15B 15B -7 (0.07 AC TOTAL) (0.05 AC IMPACT) PROJECT BOUNDARY (TYP.) -16 (0.04 AC TOTAL) (0.02 AC IMPACT) 16A 16A WETLAND SE-W21 (0.64 AC) -18 (0.01 AC TOTAL) -17 (0.05 AC TOTAL) -7, -15, AND -16 IMPACTS FUTURE BOURNESIDE 7A VOLUME = 68 CY BOULEVARD EXTENSION SECTION 7A-7A 7A 7A NWL EL = BOTTOM EL = SECTION 15A-15A 20' 15A TOTAL DREDGE VOLUME = 4,191 CY 15B VOLUME = 1 CY SECTION 15B-15B 16A VOLUME = 61 CY SECTION 16A-16A CIVIL OSW-7, OSW-15 AND OSW-16 IMPACTS dwg 5

9 B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg -8 (0.22 AC TOTAL) (0.22 AC IMPACT) WETLAND SE-W60 (0.30 AC.) -1 (SEE SHEET 2) WETLAND SE-W23 (6.49 AC) -9 (0.04 AC TOTAL) (0.04 AC IMPACT) -10 (SEE SHEET 7) -8 AND -9 IMPACTS 8A 8A 9A 9A 8A VOLUME = 454 CY SECTION 8A-8A 9A VOLUME = 89 CY SECTION 9A-9A CIVIL OSW-8 & OSW-9 IMPACTS dwg 6

10 CIVIL B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg -12 (SEE SHEET 8) -9 (SEE SHEET 6) -11 (0.15 AC TOTAL) (0.15 AC IMPACT) -10 (0.05 AC TOTAL) (0.05 AC IMPACT) 11A 11A 11B 11B 10A 10A WETLAND SE-W22 (31.88 AC) -10 AND OSW-11 IMPACTS -13 (SEE SHEET 8) 10A VOLUME = 169 CY SECTION 10A-10A NWL EL = BOTTOM EL = SECTION 11A-11A 20' 11A TOTAL DREDGE VOLUME = 1,171 CY 11B VOLUME = 390 CY SECTION 11B-11B OSW-10 & OSW-11 IMPACTS dwg 7

11 -11 (SEE SHEET 7) CIVIL B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg 12A 12A -12 (0.31 AC TOTAL) (0.31 AC IMPACT) 12B 12B -13 (0.59 AC TOTAL) (0.59 AC IMPACT) WETLAND SE-W22 (31.88 AC) 13A 13A -12 AND OSW-13 IMPACTS 12A VOLUME = 391 CY SECTION 12A-12A NWL EL = BOTTOM EL = SECTION 12B-12B 20' 12B TOTAL DREDGE VOLUME = 1,153 CY 13A VOLUME = 1,883 CY SECTION 13A-13A OSW-12 & OSW-13 IMPACTS dwg 8

12 B:\Projects\ (Lakewood Ranch 339 Acres) Phase One\Drawings-Exhibits\ Impact Exhibits\Current Plans\ dwg 14A 14A 14B 14B -14 (0. AC TOTAL) (0. AC IMPACT) NWL EL = BOTTOM EL = (SEE SHEET 8) SECTION 14A-14A NWL EL = BOTTOM EL = ' 14A TOTAL DREDGE VOLUME = 2,024 CY SECTION 14C-14C 20' 14C TOTAL DREDGE VOLUME = 11,572 CY 14C 14C -14 IMPACTS WETLAND SE-W22 (31.88 AC) -19 (0.06 AC TOTAL) (0.06 AC IMPACT) 14B VOLUME = 968 CY SECTION 14B-14B 19A 19A VOLUME = CY SECTION 19A-19A 19A WETLAND SE-W17 (1.08 AC) -19 IMPACTS CIVIL OSW-14 & OSW-19 IMPACTS dwg 9

Non-ABM Component Status. Presented to project status meeting: 11/27/2017

Non-ABM Component Status. Presented to project status meeting: 11/27/2017 Non-ABM Component Status Presented to project status meeting: 11/27/2017 1 StreetLight update areas Airport» TOD splits» Distribution Internal/External» TOD splits» Distribution» External-External vs.

More information

Rare ±1 Acre Drive Thru Opportunity 281 S Cannon Blvd, Kannapolis, NC 28083

Rare ±1 Acre Drive Thru Opportunity 281 S Cannon Blvd, Kannapolis, NC 28083 01 Avg. HH Income HAR DIN G AVE. ADJACENT BUILDING S. 0 S. Tryon Street, Suite 500 aidginc.com / 70-71-8080 NOT IN SCOPE NO / Charlotte, NC 80 RIGHT TURN ON RED S. CANNON BLVD. ROW 55' - 0" PROPERTY LINE

More information

WASTE MANAGEMENT CASTLEGAR._. Mftif:J evir,rfter

WASTE MANAGEMENT CASTLEGAR._. Mftif:J evir,rfter '4742ÿ &424731ÿ&478 '1(184ÿ)ÿ*1ÿ01234ÿ ÿÿ!"#$% WASTE MANAGEMENT w CASTLEGAR._ Mftif:J evir,rfter 3ÿ4124ÿ3ÿ24ÿÿ2442ÿ4124ÿ 214ÿ349ÿÿ412ÿ44474 4ÿ3424ÿ84742ÿ3ÿ4ÿ914 01234ÿ6171849473ÿ2ÿ4124ÿ3 SETTING OUT YOUR

More information

DRAFT KIRKLAND HIGH QUALITY POZZOLAN MINE SUPPLEMENTAL TRAFFIC ANALYSIS. Bureau of Land Management TABLE OF CONTENTS

DRAFT KIRKLAND HIGH QUALITY POZZOLAN MINE SUPPLEMENTAL TRAFFIC ANALYSIS. Bureau of Land Management TABLE OF CONTENTS DRAFT KIRKLAND HIGH QUALITY POZZOLAN MINE SUPPLEMENTAL TRAFFIC ANALYSIS Prepared for: Prepared by: Bureau of Land Management Date: March 29, 2018 Project No.: 1998.01 BLM File No.: AZA 37212 TABLE OF CONTENTS

More information

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018 Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT

More information

2.0 PROJECT DESCRIPTION

2.0 PROJECT DESCRIPTION 2.0 PROJECT DESCRIPTION California Flats Solar, LLC (the project proponent), a wholly owned subsidiary of First Solar, Inc., is proposing to build and operate a 280-megawatt (MW) alternating current (AC)

More information

Final Transportation Plan For. Oro Medonte, On

Final Transportation Plan For. Oro Medonte, On Final Transportation Plan For Burl s Creek Event Grounds Oro Medonte, On Prepared by 2 Winners Circle Albany, NY 12205 For Burls Creek Event Grounds Inc. 180 8 th Line South Oro Medonte, ON/Canada Version

More information

CLICK ON THE DESCRIPTION TO VIEW THE ROUTE MAP FOR THAT AREA. City of. Hopkins. City of. Minneapolis. City of. Minnetonka.

CLICK ON THE DESCRIPTION TO VIEW THE ROUTE MAP FOR THAT AREA. City of. Hopkins. City of. Minneapolis. City of. Minnetonka. City of Hopkins SGMNT C1-A Hwy 169 to Londonderry Dr CLICK ON TH DSCIPTION TO VI TH OUT MAP FO THAT AA City of Minnetonka SGMNT C1-B Londonderry Dr to Vernon Ave City of Minneapolis SGMNT C1-C Vernon Ave

More information

Bakken/Three Forks Drilling Economics

Bakken/Three Forks Drilling Economics / Drilling Economics Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority May 22, 2018 Objective Define where the / system may be economic in the current oil price environment.

More information

UNITED PARCEL SERVICE PROTECTED RESOURCE

UNITED PARCEL SERVICE PROTECTED RESOURCE 2205000 400000 405000 415000 420000 2205000 Figure 1. Site Map Project Limits 2200000 2195000 2200000 2195000 0 1,000 2,000 3,000 4,000 Data Sources: USGS Topographic Series Map (24k), Dinsmore Quadrangle

More information

2015 Water and Wastewater Impact Fee Study. City of Mesquite, Texas DRAFT. Prepared by: Texas Registration Number 928

2015 Water and Wastewater Impact Fee Study. City of Mesquite, Texas DRAFT. Prepared by: Texas Registration Number 928 2015 Water and Wastewater Impact Fee Study Prepared by: Texas Registration Number 928 801 Cherry Street, Unit 11, Suite 950 Fort Worth, TX 76102 817.335.6511 January 2015 ã KimleyHorn and Associates, Inc.,

More information

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas Tax Increment Reinvestment Zone #1 City of Kaufman, Texas PRELIMINARY PROJECT AND FINANCING PLAN DECEMBER 2015 Foreword Table of Contents Introduction TIRZ Boundary Current Conditions & Ownership Proposed

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT

Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT The general location of Ronald Reagan Washington National Airport (DCA or the Airport) is shown

More information

USDA Farm Service Agency

USDA Farm Service Agency USDA Farm Service Agency McIntosh County, North Dakota 1.57 UHEL RP 4 60.78 NHEL 6 142.32 NHEL 17 7 4.6.1 UHEL NHEL T 138 16 226.68 UHEL 5 4.7 NHEL 8 178.37 HEL ") 11 5.65 HEL 15 0.44 UHEL Farm 744 S21

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Accessing GIS Data:Orthophotography and the New York State Interactive Mapping Gateway

Accessing GIS Data:Orthophotography and the New York State Interactive Mapping Gateway Accessing GIS Data: Orthophotography and the New York State Interactive Mapping Gateway Accessing GIS Data:Orthophotography and the New York State Interactive Mapping Gateway 11/14/2000 Click here to start

More information

Corporate Engagement in Wetlands Restoration

Corporate Engagement in Wetlands Restoration Corporate Engagement in Wetlands Restoration ConocoPhillips Coastal Wetlands A Model for Success Presentation Overview Property Overview CWPPRA Engagement ConocoPhillips/Ducks Unlimited Collaboration Restoration

More information

Williston Basin Petroleum Conference

Williston Basin Petroleum Conference Williston Basin Petroleum Conference Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority May 22, 2018 Natural Gas Capture Production Gathering Processing Transmission Technology

More information

North Dakota Industrial Commission. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

North Dakota Industrial Commission. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority North Dakota Industrial Commission Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority October 24, 2017 Presentation Outline Current oil transportation dynamics Understanding

More information

Wildland Solutions RDM Monitoring Procedure Keith Guenther November 2007 version

Wildland Solutions RDM Monitoring Procedure Keith Guenther November 2007 version Wildland Solutions RDM Monitoring Procedure Keith Guenther November 2007 version Annually create an RDM zone map and a pasture success map with supporting information collected at monitoring reference

More information

Industrial Commission Update. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Industrial Commission Update. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority Industrial Commission Update Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority January 24, 2018 US Williston Basin Oil Production - 2017 JJ Kringstad - North Dakota Pipeline

More information

January 2018 Monthly Update North Dakota Pipeline Authority Justin J. Kringstad January 16, 2018

January 2018 Monthly Update North Dakota Pipeline Authority Justin J. Kringstad January 16, 2018 January 2018 Monthly Update North Dakota Pipeline Authority Justin J. Kringstad January 16, 2018 US Williston Basin Oil Production - 2017 JJ Kringstad - North Dakota Pipeline Authority 2 Monthly Production

More information

American Petroleum Institute Dickinson Chapter. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

American Petroleum Institute Dickinson Chapter. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority American Petroleum Institute Dickinson Chapter Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority February 27, 2018 JJ Kringstad - North Dakota Pipeline Authority 2 Presentation

More information

Upcoming Meetings: MPO Policy Board September 25, 2018 Joint CAMPO SAWMPO Meeting October, 10 11:30-1:00 Basic City Brewery, Waynesboro.

Upcoming Meetings: MPO Policy Board September 25, 2018 Joint CAMPO SAWMPO Meeting October, 10 11:30-1:00 Basic City Brewery, Waynesboro. 401 E. Water St, Charlottesville, VA 22902 www.tjpdc.org (434) 979-7310 info@tjpdc.org email Agenda MPO Technical Committee Tuesday, September 18 th, 2018 @ 10:00 a.m. Water Street Center, 407 E. Water

More information

SITE VICINITY MAP SCALE: NONE

SITE VICINITY MAP SCALE: NONE L:\Projects\75000\75200-75299\75271_AshGrove\75271.005 PT\CAD\Working\Sheets\Fender_Pile_Replacment\75271.005_PT_FENDER_PILE-COVER.dwg Kelly Clark 12/7/2018 11:03:55 AM PROJECT LOCATION OREGON SITE VICINITY

More information

ENERGY CONSERVATION USING VARIABLE-FREQUENCY DRIVES FOR CENTER PIVOT IRRIGATION

ENERGY CONSERVATION USING VARIABLE-FREQUENCY DRIVES FOR CENTER PIVOT IRRIGATION Proceedings of the 29th Annual Central Plains Irrigation Conference, Burlington, Colorado, Feb. 21-22, 2017 Available from CPIA, 760 N. Thompson, Colby, Kansas ENERGY CONSERVATION USING VARIABLE-FREQUENCY

More information

North Dakota Department of Mineral Resources. 600 East Boulevard Ave. - Dept 405 Bismarck, ND (701) (701)

North Dakota Department of Mineral Resources. 600 East Boulevard Ave. - Dept 405 Bismarck, ND (701) (701) North Dakota Department of Mineral Resources http://www.oilgas.nd.gov http://www.state.nd.us/ndgs 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020 (701) 328-8000 Wells 14,457 active

More information

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO PREPARED FOR: SHEA HOMES 9380 STATION ST., SUITE 600 LONE TREE, CO 80124 PHONE: 303-791-8180 CONTACT: RYAN MCDERMED PREPARED BY:

More information

Ample drive-thru stacking is provided, to not detrimentally impact on-site circulation.

Ample drive-thru stacking is provided, to not detrimentally impact on-site circulation. Traffic Impact Study To: From: Eric Carlson ECA Architects and Planners Bill Grieve, P.E., PTOE Senior Transportation Engineer Justin Opitz Transportation Planner Date: November 2, 2018 Subject: Proposed

More information

LOON LAKE HYDRO ACOUSTIC SURVEY RESULTS AND TREATMENT DATA 2012

LOON LAKE HYDRO ACOUSTIC SURVEY RESULTS AND TREATMENT DATA 2012 LOO LAKE HYDRO ACOUSTIC SURVEY RESULTS AD TREATMET DATA 212 632 W. Eastwood Drive Mequon, WI Hydro acoustics utilizes sound energy to detect objects and contours underwater. By integrating digital echo

More information

A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT

A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT Highway and Floodplain Cochise County Grant Grant amount- up to $1,693,265 over 3 years Components:

More information

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 IN THE SPOTLIGHT Roadway Improvement Projects - Package #2 Construction Package #2 is the second of four groupings of similar

More information

WESTERN EL DORADO COUNTY SHORT- AND LONG-RANGE TRANSIT PLAN

WESTERN EL DORADO COUNTY SHORT- AND LONG-RANGE TRANSIT PLAN WESTERN EL DORADO COUNTY SHORT- AND LONG-RANGE TRANSIT PLAN Final Report Prepared for the El Dorado County Transportation Commission Prepared by Short- and Long-Range Transit Plan Final Report Prepared

More information

IFC07 E-03. USB Connectors HDMI Connectors DisplayPort Connectors

IFC07 E-03. USB Connectors HDMI Connectors DisplayPort Connectors ELEC T R ONIC COMPONEN T S IFC07 E-03 USB Connectors HDMI Connectors DisplayPort Connectors Contents Contents 1 USB3.0 Connectors Plug Cables 2 USB Connectors Mini-B Receptacles 3 Plugs 4-5 HDMI Connectors

More information

SECTION 4 ENVIRONMENTAL SETTING

SECTION 4 ENVIRONMENTAL SETTING SECTION 4 ENVIRONMENTAL SETTING 4.1 OVERVIEW OF ENVIRONMENTAL SETTING This section provides an overview of the regional setting and environmental conditions within the proposed project area and vicinity.

More information

EU Market Situation for Poultry. Civil Dialogue Group. 25 October 2016

EU Market Situation for Poultry. Civil Dialogue Group. 25 October 2016 EU Market Situation for Poultry Civil Dialogue Group 25 October 216 Thousand Tons F O R E C A S T 16 14 Experts EU production forecast on Poultry and Rabbit (Missing data (BE-EL-AT-RO-LT-SE) - No expert

More information

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015 CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015 IN THE SPOTLIGHT Roadway Improvement Projects - Package #3 The design and construction Package #3 is a grouping of similar

More information

LEED v4 Building Design and Construction Quiz #3 LT

LEED v4 Building Design and Construction Quiz #3 LT LEED v4 Building Design and Construction Quiz #3 LT 1. How are walking and bicycling distance measured? A. Straight-line radius from a main building entrance B. Straight-line radius from any building entrance

More information

PARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2

PARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2 PRELIMINARY ENGINEERING REPORT PARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2 October 215 Project No. 22223 Prepared by STEGER BIZZELL Texas Registered Engineering Firm F-181 Consulting Engineers - Georgetown,

More information

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian

More information

44

44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 WETLAND IMPACTS Wetland No. 1 Approximate Station Cowardin Class 2 WESPAK-SE Wetland Type 3 Temporary Impact Area (acres) 4 Permanent

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,

More information

DS Preliminary Hydrology Report EAST CAT CANYON FIELD REDEVELOPMENT PROJECT

DS Preliminary Hydrology Report EAST CAT CANYON FIELD REDEVELOPMENT PROJECT DS-13186-117 Preliminary Hydrology Report For EAST CAT CANYON FIELD REDEVELOPMENT PROJECT Prepared for: Aera Energy LLC 10000 Ming Avenue Bakersfield, CA 93311-1302 661-665-5000 Project Address: Sections

More information

Air Quality Calculations

Air Quality Calculations EIS for Proposed Modernization and Expansion of TBR Appendix J Air Quality Calculations EIS for Proposed Modernization and Expansion of TBR This page left blank intentionally. Table 1 Summary of Constructions

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

PUCO Case No EL-BLN In the Matter of the Letter of Notification for the Adjustment to Carrollton-Sunnyside 138kV Transmission Line

PUCO Case No EL-BLN In the Matter of the Letter of Notification for the Adjustment to Carrollton-Sunnyside 138kV Transmission Line Legal Department American Electric Power 1 Riverside Plaza Columbus, OH 43215-2373 AEP.com December 28, 2018 Hector Garcia Christen M. Blend Senior Counsel Regulatory Services (614) 716-3410 (P) (614)

More information

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Philadelphia Regional Port Authority U.S. Army Corps of Engineers Philadelphia District DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Investigation of Submarine Utility Crossings Stations 249+000 to 515+000

More information

SC05 E-04. AC Inlets Power Supply Connectors

SC05 E-04. AC Inlets Power Supply Connectors ELECT R O N I C COMPONENTS SC0 E-0 AC Inlets Power Supply Connectors Contents Contents... AC Inlets AC Inlets... AC Inlets (for Lead Wire)... Power Supply Connectors Low-Profile Type Poles... 6 Poles...

More information

REFERENCE MAP ATTACHMENT 4. Swan Hills RS - 7L172 - A Edith Lake to Sarah Lake Transmission Project

REFERENCE MAP ATTACHMENT 4. Swan Hills RS - 7L172 - A Edith Lake to Sarah Lake Transmission Project 7L19 6L11 PROPOSED 144 kv TRANSMISSION LINE 7L172 67 11 5 S wan Ri v e r W5 W3A W2 W3 W1A W1 67 10 5 C2 739S EDITH LAKE ) C1 6L97 Edith Lake Provincial Recreation Area E dith C r eek Edit h W7 W7A W9 W10

More information

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA Prepared for: THE TOWN OF ASHLAND BOARD OF SELECTMEN AND PLANNING DEPARTMENT Prepared by: June 3, 216 Hydrologic/Hydraulic

More information

PLANNING AND ZONING COMMISSION

PLANNING AND ZONING COMMISSION CITY OF DARIEN PLANNING AND ZONING COMMISSION Wednesday, May 3, 2017 7:00 PM City Hall Council Chambers AGENDA 1. Call to Order 2. Establish Quorum 3. Regular Meeting: A. Public Hearing Case: PZC 2017-02

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

SLN08 B-01. DC Solenoids

SLN08 B-01. DC Solenoids ELECT R O N IC COMPO NENTS SLN08 B-01 DC Solenoids Contents & Features Index & DC Solenoids Features... 1 Solenoid Specifications... 2 Product List... 3 How to Select Solenoids... 4-5 DC Solenoids (PM

More information

Study for the Possibility of Application of Ultra Super Critical Steam Conditions for Coal Fired Power Plant in Vietnam

Study for the Possibility of Application of Ultra Super Critical Steam Conditions for Coal Fired Power Plant in Vietnam Feasibility Studies with the Aim of Developing a Bilateral Offset Credit Mechanism FY2011 Studies for Project Development and Organization Study for the Possibility of Application of Ultra Super Critical

More information

Circuit Protectors TBC05 E-03

Circuit Protectors TBC05 E-03 Circuit Protectors TBC05 E-03 Contents Contents 1 Notice 1 Specifications ist 2 Example of Used 3 TBC5000 Series Manual Reset Type and Auto Reset Type 4 12 TBC6000 Series Manual Reset Type 13 17 Notice

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

Welcome. Please Sign In

Welcome. Please Sign In Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal

More information

Appendix A. Fuels Treatment. Understory Treatment

Appendix A. Fuels Treatment. Understory Treatment Walker Reduction Project treatments for the Walker Reduction Project, legend follows. 001 38 PCT HP OB HAND RI, 10% 002 71 CT WF MP NT GROUND RI, 10% 003 34 FUELS_REDUX MP UB MECH/HAND 10% 004 25 NT NT

More information

Taylor s Falls Business Park

Taylor s Falls Business Park Site Information Taylor s Falls Business Park County Road 37, Taylors Falls, MN Chisago County HRA-EDA 12/23/2014 Taylors Falls Business Park County Road 37 Taylors Falls, MN 55084 PROPERTY FEATURES: Zoned

More information

HYDRAULIC EXCAVATOR. Super Long Front. Hydraulic Excavator Attachments PC200LC-8 PC220LC-8 PC270LC-8 PC350LC/HD-8 PC450LC-8

HYDRAULIC EXCAVATOR. Super Long Front. Hydraulic Excavator Attachments PC200LC-8 PC220LC-8 PC270LC-8 PC350LC/HD-8 PC450LC-8 PC200LC-8 PC220LC-8 PC270LC-8 PC350LC/HD-8 PC450LC-8 Super Long Front Hydraulic Excavator ttachments FRONT LENGTHS 15.2-19.8 m 50' - 65' HYDRULIC EXCVTOR Photo may include optional equipment PC200LC-8,

More information

PRELIMINARY UTILITY REPORT FOR TOPGOLF INTERNATIONAL, INC.

PRELIMINARY UTILITY REPORT FOR TOPGOLF INTERNATIONAL, INC. PRELIMINARY UTILITY REPORT FOR TOPGOLF INTERNATIONAL, INC. THORNTON, COLORADO Prepared for: ARCO Murray Contact: Rachel Bohac Phone: 331.251.2726 Prepared by: 1225 17 th Street, Suite 514 Denver, CO 80202

More information

: Anandro Amellonado. Alternatives of Dredging Method Based on Interpretation of Soil Investigation in The North Kalibaru Project

: Anandro Amellonado. Alternatives of Dredging Method Based on Interpretation of Soil Investigation in The North Kalibaru Project Author Site Supervisor School Supervisors Reader : Anandro Amellonado : Jan Willem Markvoort : Michiel Parlevliet, Dyah Iriani : Eric Boer Alternatives of Dredging Method Based on Interpretation of Soil

More information

Super Long Front. PC210LC-10 PC240LC-10 PC290LC-10 PC360LC-10 PC390LC-10 PC490LC-10 Hydraulic Excavator Attachments. FRONT LENGTHS 50' 65'

Super Long Front. PC210LC-10 PC240LC-10 PC290LC-10 PC360LC-10 PC390LC-10 PC490LC-10 Hydraulic Excavator Attachments. FRONT LENGTHS 50' 65' FRONT LENGTHS 50' 65' 15.2 19.8 m PHOTOS MY INCLUDE OPTIONL EQUIPMENT PC210LC-10 PC240LC-10 PC290LC-10 PC360LC-10 PC390LC-10 PC490LC-10 Hydraulic Excavator ttachments Super Long Front WLK-ROUND Super Long

More information

GIS analysis and optimization of faecal sludge logistics at city-wide scale in Kampala, Uganda

GIS analysis and optimization of faecal sludge logistics at city-wide scale in Kampala, Uganda GIS analysis and optimization of faecal sludge logistics at city-wide scale in Kampala, Uganda Supplementary information Schoebitz, L., Bischoff, F., Lohri, C.R., Niwagaba, C.B., Siber, R., Strande, L.

More information

This page is intentionally left blank.

This page is intentionally left blank. This page is intentionally left blank. Bipole III Southern Ground Electrode Line Route Selection Introduction Manitoba Hydro has recently selected a route for the southern ground electrode line (Map 1).

More information

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT TO: FROM: Parking and Public Improvements Commission Marisa Lundstedt, Director of Community Development Erik Zandvliet T.E., City Traffic Engineer

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

Dave Claassen, PPG; Richard Feinberg, AECOM; Scott Mikaelian, AECOM; Mark Terrill, PPG; Brian McPeak, PP, LLC

Dave Claassen, PPG; Richard Feinberg, AECOM; Scott Mikaelian, AECOM; Mark Terrill, PPG; Brian McPeak, PP, LLC AECOM 732-564-3600 tel 30 Knightsbridge Road, Building 5, Suite 520 732-369-0122 fax Piscataway, New Jersey 08854 Memorandum To Michael McCabe File: 60149955.4010A CC Dave Claassen, PPG; Richard Feinberg,

More information

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270

More information

Woodland Transit Study

Woodland Transit Study Woodland Transit Study Prepared for the Yolo County Transportation District Prepared by Woodland Transit Study Prepared for the Yolo County Transportation District 350 Industrial Way Woodland, CA 95776

More information

Figure 1. Southern Chesapeake 2 & 3 Watershed MDPU Map Southern Chesapeake Watershed MDPU Study Areas 2 & 3 City of Chesapeake, Virginia 17

Figure 1. Southern Chesapeake 2 & 3 Watershed MDPU Map Southern Chesapeake Watershed MDPU Study Areas 2 & 3 City of Chesapeake, Virginia 17 Hydraulic Connection with Cooper's Ditch Hydraulic Connection with Cooper's Ditch Homestead Outfall Subcatchments 0,750 3,500 Figure. Southern Chesapeake 2 & 3 Watershed MDPU Map City of Chesapeake, Virginia

More information

Woodland Transit Study Technical Memorandum One: Existing Conditions

Woodland Transit Study Technical Memorandum One: Existing Conditions Woodland Transit Study Technical Memorandum One: Existing Conditions Prepared for the Yolo County Transportation District Prepared by LSC Transportation Consultants, Inc. Woodland Transit Study Technical

More information

NEVADA COUNTY TRANSPORTATION COMMIS. Prepared by LSC Transportation Consultants. Prepared for the. City of Morro Bay Public Works

NEVADA COUNTY TRANSPORTATION COMMIS. Prepared by LSC Transportation Consultants. Prepared for the. City of Morro Bay Public Works Morro Bay Transit Prepared For the Short Range Transit Plan NEVADA COUNTY 2018-2023 TRANSPORTATION COMMIS Prepared by LSC Transportation Consultants Prepared for the City of Morro Bay Public Works Morro

More information

Draft Final Report Merced County Short Range Transit Plan

Draft Final Report Merced County Short Range Transit Plan Draft Final Report Merced County Short Range Transit Plan Prepared for the Merced County Association of Governments Prepared by LSC Transportation Consultants, Inc. This page left intentionally blank.

More information

Memorandum October 5, 2017

Memorandum October 5, 2017 614 Magnolia Avenue Ocean Springs, Mississippi 39564 228.818.9626 Memorandum October 5, 2017 To: Gary Miller, U.S. Environmental Protection Agency From: David Keith, John Laplante, Matt Henderson, and

More information

Received June 2, 2017 PLN-PUDC

Received June 2, 2017 PLN-PUDC MASTER LAND USE PLAN for: a prestigious community presented by: Breeden Investment Properties and Davenport Management Company Virginia Beach, Virginia 23452(757) 468-6800 Received PLN-PUDC-2016-008 page

More information

McCALLUM TESTING LABORATORIES, INC.

McCALLUM TESTING LABORATORIES, INC. McCALLUM TESTING LABORATORIES, INC. Geotechnical Engineering, Materials Testing & Environmental Services Crestline Realty Corporation 39 Edwin Drive Virginia Beach, VA 2362 November 29, 11 Attention: Subject:

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

Week Ending: Oct. 25, 2018

Week Ending: Oct. 25, 2018 Week Ending: Oct. 25, 2018 Market Page 1. Thurs. Close Last Thurs. Close Weekly Change Week's High Week's Low Life of Contract High Life of Contract Low NEW YORK COTTON FUTURES (Cents/Lb.) December-18

More information

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16

More information

McILvain Enterprises Inc P.O. Box 757 (mailing) 2510 McBride Devillier Loop (physical) Winnie, TX Office Fax

McILvain Enterprises Inc P.O. Box 757 (mailing) 2510 McBride Devillier Loop (physical) Winnie, TX Office Fax McILvain Enterprises Inc P.O. Box 757 (mailing) 2510 McBride Devillier Loop (physical) Winnie, TX 77665 409-296-4531 Office 409-296-3530 Fax www.mcilvainenterprises.com lanny@mcilvainenterprises.com McILvain

More information

Circular & Rectangular Multi-Pole Connectors MPC06

Circular & Rectangular Multi-Pole Connectors MPC06 Circular & Rectangular Multi-Pole Connectors MPC06 Contents Contents... Multi-Pole Circular Connectors Specifications Table... Product Lineup... P Quick Locking Type... - 7 0P Quick Locking Type... - 0

More information

FLOTATION and TRACTION SOLUTIONS MINIMIZING WHEEL TRACKS

FLOTATION and TRACTION SOLUTIONS MINIMIZING WHEEL TRACKS FLOTATION and TRACTION SOLUTIONS MINIMIZING WHEEL TRACKS Efficient Design By the Design and Efficient Use of High Strength Steel, the Reinke Irrigation System weighs 10% to 14% Less than Other Irrigation

More information

Week Ending: Dec. 8, 2016

Week Ending: Dec. 8, 2016 Week Ending: Dec. 8, 2016 Market Page 1. Thurs. Close Last Thurs. Close Weekly Change Week's High Week's Low Life of Contract High Life of Contract Low NEW YORK COTTON FUTURES (Cents/Lb.) March-17 71.42

More information

BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI DOCKET NO ORDER NO FINAL ORDER

BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI DOCKET NO ORDER NO FINAL ORDER BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI RE: PETITION OF PETCO PETROLEUM CORP., TO AMEND THE SPECIAL FIELD RULES FOR PACHUTA CREEK FIELD, CLARKE COUNTY, MISSISSIPPI FILED FOR RECORD JUN ' STATE

More information

MYERS Engineering, g Inc.

MYERS Engineering, g Inc. MYERS Engineering, g Inc. Mixing around the world. 8376 Salt Lake Ave Bell, CA 90201 323 560 4723 Phone 323 771 7789 Fax www.myersmixer.com sales@myersmixer.com email Over 60 years of experience in mixing

More information

FOR LEASE PROCTOR AVENUE City of Industry, CA ±217,464 /SF WAREHOUSE ACRES OF LAND. lee-associates.com

FOR LEASE PROCTOR AVENUE City of Industry, CA ±217,464 /SF WAREHOUSE ACRES OF LAND. lee-associates.com FOR LEASE ±27,464 /SF WAREHOUSE 0.9 ACRES OF LAND 4505 PROCTOR AVENUE City of Industry, CA 9746 lee-associates.com LOCAL EXPERTISE. INTERNATIONAL REACH. WORLD CLASS. BUILDING CHARACTERISTICS PROPERTY HIGHLIGHTS

More information

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT Introduction This amendment summarizes the new near-term and buildout expansion trunk shed plans. Due to recent

More information

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Clean Sweep: Baltimore s Street Sweeping Program Kimberly L. Grove, P.E. Department of Public Works City of Baltimore December 2016 2 Street Sweeping since 1999

More information

LAND FOR SALE. LIVE OAK RAILROAD RAIL SPUR 10 Acres & 1 Mile of Track East Basse Road, Suite 100 San Antonio, TX

LAND FOR SALE. LIVE OAK RAILROAD RAIL SPUR 10 Acres & 1 Mile of Track East Basse Road, Suite 100 San Antonio, TX LAND FOR ALE RAIL PUR 10 Acres & 1 Mile of Track Three Rivers IH-37 Your ign Here George West 10 acre site including 1 mile of track Dedicated Union Pacific ervice Guaranteed daily service from an Antonio

More information

SITE REFERENCE HYDRAULIC PILE HAMMER.

SITE REFERENCE HYDRAULIC PILE HAMMER. SITE REFERENCE HYDRAULIC PILE HAMMER www.powerquip.co.kr 47 TON RAM WEIGHT (Energy 876 kj) > Max. Potential Energy : 89.3 ton.m Pile : Steel Casing Pile

More information

MICHELIN EARTHMOVER & INDUSTRIAL TIRES

MICHELIN EARTHMOVER & INDUSTRIAL TIRES MICHELIN EARTHMOVER & INDUSTRIAL TIRES INNOVATION Since 1959, Michelin has been rolling out innovations for Earthmover customers 1959: Michelin creates the first Earthmover radial tire. 1977: Opening of

More information

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics

More information

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate. NEW! Exhibitors will have complimentary parking during move-in (Nov. 9-13) and move-out (after 4pm, Nov. 17 through 12pm, Nov. 19) if they show a valid IAAPA Attractions Expo 2017 exhibitor badge. During

More information

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.

PARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate. Exhibitors will have complimentary parking during the first 4 days of move-in (Nov. 8-11) and moveout (after 4pm, Nov. 16 through 12pm, Nov. 18). The last day of move-in (Nov. 12) and show days (Nov. 13-16)

More information

Dredging 101 Dredging and Disposal Workshop

Dredging 101 Dredging and Disposal Workshop Dredging 101 Dredging and Disposal Workshop Christopher Frabotta Chief, Navigation Branch U.S. Army Corps of Engineers Galveston District July 24, 2012 US Army Corps of Engineers BUILDING STRONG BUILDING

More information

ATTACHMENT J-2 WETLAND CHARACTERISTICS AND IMPACTS TABLES

ATTACHMENT J-2 WETLAND CHARACTERISTICS AND IMPACTS TABLES ATTACHMENT J-2 WETLAND CHARACTERISTICS AND IMPACTS TABLES Table J-2-1A. Morrow County Wetlands Map Tile No. Milepost Geographic No. Size (acres) Cowardin class HGM class Status 1 Characteristics TBD 1.3

More information