TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED CUDDALORE ELECTRICITY DISTRIBUTION CIRCLE/CAPPER/HILLS/CUDDALORE-4.

Size: px
Start display at page:

Download "TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED CUDDALORE ELECTRICITY DISTRIBUTION CIRCLE/CAPPER/HILLS/CUDDALORE-4."

Transcription

1 TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED CUDDALORE ELECTRICITY DISTRIBUTION CIRCLE/CAPPER/HILLS/CUDDALORE-4. GENERAL INFORMATION : This circle comprises of the following divisions. 1. Cuddalore/O&M/Division. 2. Panruti/ O&M /Division. 3. Nellikuppam/ O&M /Division. 4. Kurinjipadi/ O&M /Division. 5. Chidambaram/ O&M /Division. 6. Vridhachalam/ O&M /Division. 7. Cuddalore/ MRT/Division. 8. Cuddalore /Operation/Division. The activities carried out and programmed are furnished in the annexure. All the villages and hamlets in this district have been electrified. General Information: 230KV Sub-Station 110KV Sub-station : 1 No. : 27 nos. 33 KV Sub station : 21 Nos. Sub-stations Distribution Transformers EHT Lines HT Lines LT Lines EHT Service HT Service : 49 Nos. : Nos. : KMS : KMS : KMS : 05 Nos. : 61Nos.

2 Cuddalore Circle loads are fed from the Following feeders: 230KV Neyveli feeder for Cuddalore Auto SS. 230KV Villupuram Feeder I & Feeder II 110KV Vadakuthu Feeder 110KV Deviyakurichi I Feeder 110KV Deviyakurichi II feeder 110KV Panruti Radial Feeder. 110KV Aduthurai feeder. 110 KV LANCO Feeder Cuddalore Circle loads fed through: 230KV/110KV Auto SS = 01 No. 110KV SS = 27 Nos. 33/11KV Regular = 04 Nos. 33/11KV Unmanned SS = 12 Nos. 33/11KV Line tap SS = 5 Nos. In Cuddalore circle, there are 3 Nos. 110KV Co-generation Plant 01 No. 11KV Co-generation Plant: M/s Tera Energy Limited, A.Chitur (110 KV) M/s E.I.D Parry, Nellikuppam. (110 KV) M/s Ambika Sugars, Pennadam (110 KV) M/s M.R.K Sugar Mill, Sethiyathope (11 KV) In Cuddalore circle,there are 1 No. Captive Power Plant: Tanfac Cuddalore (22KV) CIRCLE DEMAND CIRCLE PEAK DEMAND : 400MW CIRCLE AVERAGE DEMAND : 320MW

3 DETAILS OF SUB-STATIONS IN CUDDALORE EDC: Sl.NO NAME OF THE SS VOLT RATIO IN KV EHT SUB STATIONS: 1 Cuddalore Auto SS 230/110 KV 2 Vridhachalam 110/ Veppur 110/ Sethiyathope 110/ Vadakuthu 110/ B.Mutlur 110/ Pennadam 110/ Chidambaram 110/ Kullanchavadi 110/ Cuddalore /Nathapattu 110/22 11 Panruti 110/22 12 Semmankuppam 110/22 13 Capper Hills 110/22 14 Palur (Chitharasur) 110/22 15 Panruti ( Urban) 110/22 16 Nallathur 110/22 17 Ko.Poovanur 110/11

4 18 Srimushnam 110/ Kattumannarkoil 110/ Thoppukollai 110/11 21 Valayamadevi 110/11 22 U.Mangalam 110/11 23 Koranapattu 110/11 24 Keezhakuppam 110/22 25 Oraiyur 110/22 26 Kurinjipadi 110/11 27 M.Parur 110/11 28 Tholudur 110/11 HT SUB-STATIONS 29 Thittagudi 33/11 30 Sathiyavadi 33/11 31 C.Keeranur(UM) 33/11 32 Mangalore 33/11 33 Siruvarapur(UM) 33/11 34 Palayamkottai 33/11 35 Memathur(UM) 33/11 36 Kumaratchi(UM) 33/11

5 37 Sivapuri(UM) 33/11 38 Vanamadevi 33/11 39 Ko.Mangalam(U.M) 33/11 40 Kendiyankuppam 33/11 41 B.Udaiyur (UM) 33/11 42 T.Neduncheri (UM) 33/11 43 Pinnathur(UM) 33/11 44 Muttam 33/11 LINE TAP SUB-STATIONS: 45 Rajendrapattinam 33/11 46 Gangaikondan 33/11 47 T.V.Puthur 33/11 48 Bhuvanagiri 33/11 49 Keerapalayam 33/11

6 DETAILS OF REVENUE: Circle Average Revenue Per annum Circle Average Revenue Per Month : Crores : Crores Revenue from LT Services : Crores Revenue from HT Services Total : Crores : Crores. T&D WORKS COMPLETED DURING SL.NO. NAME OF SCHEME ESTIMATE AMOUNT (IN LAKHS) 1 In Panruti Urban 110/22KV Sub station, Enhancement of Power Transformer capacity from 1X10 MVA to 1X16 MVA has been commissioned on In Chidambaram 110/11 KV Sub station, Enhancement of Power Transformer capacity from 1X10 +1X16 MVA to 2X16 MVA has been commissioned on In Koranapattu 110/11 KV Sub station, Additional 1X10 MVA Power Transformer has been commissioned on TOTAL COST

7 DEVELOPMENT WORKS COMPLETED DURING ACHIVEMENTS SLNO NEW SERVICES NO AMOUNT (IN Lakhs) 1 AGRICULTURE LT INDUSTRIES HT INDUSTRIES STREET LIGHT DOMESTIC OHT COMMERCIAL OTHERS Total

8 DETAILS OF ON-GOING SCHEMES PROGRAMMED DURING SL.NO. NAME OF SCHEME ESTIMATE AMOUNT (IN LAKHS) 1 Establishment of New 110/22 KV Sub station at Collector Office Master complex (Semmandalam) with 2X10MVA Power Transformer Establishment of New 33/11 KV Regular Sub station at Rajendrapattinam with 2X8 MVA Power Transformer Enhancement of Power Transformer capacity at Panruti urban 110/22 KV Sub station from 1X10+1X16 to 2X16 MVA Total

9 AE's Phone number & ID S No Section Name Cell Number ID Land line Cuddalore Division: 1 Rural/Manjakuppam vmc001ae@tnebnet.org URBAN/MANJAKUPPAM vmc002ae@tnebnet.org PUDUPALAYAM vmc003ae@tnebnet.org NALLATHUR vmc004ae@tnebnet.org PUDUKADAI vmc005ae@tnebnet.org THIRUPAPULIYUR vmc006ae@tnebnet.org RURAL/WEST/CUDDALORE vmc007ae@tnebnet.org TOWN/CUDDALORE PORT vmc008ae@tnebnet.org RURAL/NORTH/ CUDDALORE OT vmc009ae@tnebnet.org S.PUDUR vmc010ae@tnebnet.org SEMMANKUPPAM vmc011ae@tnebnet.org Subramaniyapuram vmc012ae@tnebnet.org ALAPAKKAM vmc013ae@tnebnet.org vazhisothanaipalayam vmc014ae@tnebnet.org ANNAVALLI vmc015ae@tnebnet.org JOTHINAGAR vmc093ae@tnebnet.org

10 AE's Phone number & ID S No Section Name Cell Number ID Land line NELLIKUPPAM DIVISION: 1 TOWN/NELLIKUPPAM vmc016ae@tnebnet.org KOZHIPAKKAM vmc017ae@tnebnet.org MELPATTAMPAKKAM vmc018ae@tnebnet.org RURAL/NELLIKUPPAM vmc019ae@tnebnet.org 5 PALUR vmc020ae@tnebnet.org C.N.PALAYAM vmc021ae@tnebnet.org NADUVEERAPATTU vmc022ae@tnebnet.org varakkalpattu vmc023ae@tnebnet.org KUTTIYANKUPPAM vmc024ae@tnebnet.org ARUNGUNAM vmc025ae@tnebnet.org

11 AE's Phone number & ID S No Section Name Cell Number ID Land line Panruti Division: 1 TOWN/PANRUTI vmc026ae@tnebnet.org kadampuliyur vmc027ae@tnebnet.org RURAL/EAST/PANRUTI vmc028ae@tnebnet.org URAL/SOUTH/PANRUTI vmc029ae@tnebnet.org PUDUPETTAI vmc030ae@tnebnet.org V.P.NALLUR vmc031ae@tnebnet.org ANGUCHETTIPALAYAM vmc032ae@tnebnet.org THIRUVAMOOR vmc033ae@tnebnet.org KANDRAKOTTAI vmc034ae@tnebnet.org RURAL/NORTH/ PANRUTI vmc035ae@tnebnet.org ORAIYUR vmc036ae@tnebnet.org THIRUTHURAIYUR vmc037ae@tnebnet.org Marungur vmc094ae@tnebnet.org

12 AE's Phone number & ID S No Section Name Cell Number ID Land line KURINJIPADY DIVISION: 1 URBAN/KURINJIPADY vmc038ae@tnebnet.org RURAL/KURINJIPADY vmc039ae@tnebnet.org 3 RURAL/NORTH/ KURINJIPADY vmc040ae@tnebnet.org VENKATAMPETTAI vmc041ae@tnebnet.org URBAN/KULLANCHAVADY vmc042ae@tnebnet.org RURAL/KULLANCHAVADY vmc043ae@tnebnet.org VADAKUTHU vmc044ae@tnebnet.org vadalur vmc045ae@tnebnet.org GANGAIKONDAN vmc046ae@tnebnet.org RURAL/VADALUR vmc095ae@tnebnet.org

13 AE's Phone number & ID S No Section Name Cell Number ID Land line CHIDAMBARAM DIVISION: 1 URBAN/EAST/ CHIDAMBARAM vmc047ae@tnebnet.org 2 URBAN/WEST/ CHIDAMABARAM vmc048ae@tnebnet.org RURAL/CHIDAMBARAM vmc049ae@tnebnet.org KUMARATCHI vmc050ae@tnebnet.org URBAN/SOUTH/ Chidambaram vmc051ae@tnebnet.org 6 BHUVANAGIRI vmc052ae@tnebnet.org PORTONOVO vmc053ae@tnebnet.org KEERAPALAYAM vmc054ae@tnebnet.org KATTUMANARKOIL vmc055ae@tnebnet.org MUGANTHERIYANKUPPAM vmc056ae@tnebnet.org 11 SOUTH/SETHIATHOPE vmc057ae@tnebnet.org LALPET vmc058ae@tnebnet.org EAST/SETHIATHOPE vmc059ae@tnebnet.org SRIMUSHNAM vmc060ae@tnebnet.org PALAYANKOTTAI vmc061ae@tnebnet.org KANUR vmc062ae@tnebnet.org RURAL/SRIMUSHNAM vmc063ae@tnebnet.org SOZHATHARAM vmc064ae@tnebnet.org Annamalai nagar vmc096ae@tnebnet.org B.Mutlur vmc097ae@tnebnet.org Muttam vmc098ae@tnebnet.org 22 vanamadevi vmc099ae@tnebnet.org

14 AE's Phone number & ID S No Section Name Cell Number ID Land line VRIDHACHALAM DIVISION: 1 TOWN/VRIDHACHALAM vmc065ae@tnebnet.org RURAL/NORTH/ VRIDHACHALAM vmc066ae@tnebnet.org ALADI vmc067ae@tnebnet.org RURAL/EAST/ VRIDHACHALAM vmc068ae@tnebnet.org RURAL/WEST/ Vridhachalam vmc069ae@tnebnet.org NALLUR vmc070ae@tnebnet.org KAMMAPURAM vmc071ae@tnebnet.org CHITHOOR vmc072ae@tnebnet.org RURAL/EAST/PENNADAM vmc073ae@tnebnet.org RURAL/WEST/PENNADAM vmc074ae@tnebnet.org MURUNGANGUDI vmc075ae@tnebnet.org RAJENDIRAPATTINAM vmc076ae@tnebnet.org KARMANGUDI vmc077ae@tnebnet.org KARUVEPPILANKURCHI vmc078ae@tnebnet.org ss & sathiyavadi vmc079ae@tnebnet.org

15 AE's Phone number & ID S No Section Name Cell Number ID Land line 16 URBAN/PENNADAM vmc080ae@tnebnet.org THITTAGUDI vmc081ae@tnebnet.org THOLUDUR vmc082ae@tnebnet.org AVINANGUDI vmc083ae@tnebnet.org - 20 MANGALUR vmc084ae@tnebnet.org E/SIRUPAKKAM vmc085ae@tnebnet.org KEELAKALPOONDI vmc086ae@tnebnet.org M.PARUR vmc087ae@tnebnet.org KO-POOVANUR vmc088ae@tnebnet.org MANGALAMPET vmc089ae@tnebnet.org RURAL/SOUTH/VEPPUR vmc090ae@tnebnet.org RURAL/WEST/Veppur vmc091ae@tnebnet.org ADARI vmc092ae@tnebnet.org Urban/kandiyankuppam vmc100ae@tnebnet.org Rural/Thittakudi (E-Keeranur) vmc101ae@tnebnet.org - 31 U.Mangalam vmc102ae@tnebnet.org

16 TANGEDCO LIST OF ASSISTANT EXECUTIVE ENGINEERS IN CUDDALORE ELECTRICITY DISTRIBUTION CIRCLE Sl.No. Division office Name list Cell Number ID Land Line Number 1 AEE/TOWN/NORTH/CUDDALORE vmccudrbaee1@tnebnet.org AEE/TOWN/SOUTH/CUDDALORE vmccudrbaee2@tnebnet.org AEE/SEMMANKUPPAM vmccudrbaee3@tnebnet.org AEE/TOWN/NELLIKUPPAM vmcnpmrbaee1@tnebnet.org 5 AEE/O&M/CHITARASUR vmcnpmrbaee2@tnebnet.org AEE/RURAL/CUDDALORE vmcnpmrbaee3@tnebnet.org 7 AEE/TOWN/PANRUTI vmcprtrbaee1@tnebnet.org AEE/RURAL/PANRUTI vmcprtrbaee2@tnebnet.org AEE/RURAL/NORTH/PANRUTI vmcprtrbaee3@tnebnet.org AEE/O&M/KURINJIPADY vmckpyrbaee1@tnebnet.org AEE/O&M/KULLANCHAVADY vmckpyrbaee2@tnebnet.org AEE/O&M/VADALUR vmckpyrbaee3@tnebnet.org AEE/TOWN/CHIDAMBARAM vmccdmrbaee1@tnebnet.org AEE/O&M/B.MUTLUR vmccdmrbaee2@tnebnet.org AEE/O&M/SETHIATHOPE vmccdmrbaee3@tnebnet.org AEE/O&M/SRIMUSHNAM vmccdmrbaee4@tnebnet.org 17 AEE/O&M/K.M.KOIL vmccdmrbaee5@tnebnet.org 18 AEE/C&I/CHIDAMBARAM aeecicdm@tnebnet.org 19 AEE/TOWN/VRIDHACHALAM vmcvrdrbaee1@tnebnet.org AEE/RURAL/VRIDHACHALAM vmcvrdrbaee2@tnebnet.org 21 AEE/O&M/PENNADAM vmcvrdrbaee3@tnebnet.org AEE/O&M/THITTAGUDI vmcvrdrbaee4@tnebnet.org 23 AEE/O&M/KO-POOVANUR vmcvrdrbaee5@tnebnet.org AEE/O&M/VEPPUR vmcvrdrbaee6@tnebnet.org AEE/C&I/VRIDHACHALAM aeecivrd@tnebnet.org

17 TANGEDCO LIST OF EXECUTIVE ENGINEERS AT CUDDALORE ELECTRICITY DISTRIBUTION CIRCLE Sl.No. Division office Name list Cell Number ID Land Line Number 1 EE/O&M/CUDDALORE eeomcud@tnebnet.org , EE/O&M/NELLIKUPPAM eeomnpm@tnebnet.org EE/O&M/PANRUTI eeomprt@tnebnet.org EE/O&M/KURINJIPADY eeomkpy@tnebnet.org EE/O&M/CHIDAMBARAM eeomcdm@tnebnet.org EE/O&M/VRIDHCHALAM eeomvrd@tnebnet.org EE/MRT/CUDDALORE eemrtcud@tnebnet.org EE/OPERATION/CUDDALORE eeocud@tnebnet.org

18 All Sub Stations Phone numbers at Cuddalore Electricity Distribution Circle Sl.No. Sub station Name Land Line No KV /Cuddalore SS Virudhachalam SS Veppur SS Sethiyathoppu SS Vadakuthu SS B.Mutlur SS Pennadam SS Kullanchavadi SS Nathapattu SS , Semmankuppam SS Panruti SS Capper Hills SS Palur SS Ko.Poovanur SS Chidambaram SS Srimushnam SS Kattumannar koil SS Thoppukollai SS Valayamadevi SS Panruti Urban SS Kurinjipadi SS Thittagudi SS Sathiyavadi SS Palayankottai SS Nallathur SS Koranampattu SS U.Mangalam SS Oriyur SS M.Parur SS

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg :Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg Technical Branch (Per) TANGEDCO Proceedings. (FB) No.

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU - 180007 TEL: 0191-2532809 FAX: 0191-2530265 PUBLIC NOTICE Comments / Suggestions on Annual Revenue Requirement (ARR) and Electricity Proposal

More information

NOTIFICATION RURAL ELECTRIFICATION PLAN

NOTIFICATION RURAL ELECTRIFICATION PLAN NOTIFICATION OF RURAL ELECTRIFICATION PLAN DEPARTMENT OF POWER ARUNACHAL PRADESH YEAR 2007-12 ( 11 th FIVE YEAR PLAN ) GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER:: AP CIVIL SECRETARIAT : ITANAGAR

More information

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD ABSTRACT --------------------------------------------------------------------------------------------------------- Electricity - Madurai Region -

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded T.O.O.{CE-Constructionl400kV)

More information

Green Practices In Electrical System. Confederation of Indian Industry

Green Practices In Electrical System. Confederation of Indian Industry Green Practices In Electrical System Electrical System venergy efficiency measures will add $505 billion to India s gross domestic product (GDP) between 2009 and 2017 vimmense energy efficiency potential

More information

Details of concern person for future communication/clarification. Mobile No. Address

Details of concern person for future communication/clarification. Mobile No.  Address 114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] GENERATION OF ELECTRICITY FORMAT-1 PERIODICITY-ANNUAL DATA OF YEAR 20 20. Submission by 30th June NAME AND ADDRESS OF UTILITY: Sl. No. (A) Name

More information

Maharashtra Electricity Regulatory Commission

Maharashtra Electricity Regulatory Commission on Estimation and Segregation of Distribution Loss in Solapur Circle Electricity Distribution Network Submitted to Maharashtra Electricity Regulatory Commission By D E C J E A M N B U E A R R Y 2 2 0 0

More information

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector Date 26.11.2012, New Delhi Total Capacity Thermal CAPACITY ADDITION (1/1) In 11 th Plan UoM State Sector

More information

PRESS RELEASE ON 19March, 2018

PRESS RELEASE ON 19March, 2018 TARIFF APPROVED FOR ASSAM POWER GENERATION COMPANY LIMITED (APGCL), ASSAM ELECTRICITY GRID CORPORATION LIMITED (AEGCL) &ASSAM POWER DISTRIBUTION COMPANY LIMITED (APDCL) FOR FY 2018-19, APPLICABLE WITH

More information

Dairy Cum Powder Plant

Dairy Cum Powder Plant Profile of Dairy Cum Powder Plant ( a unit of TCMPF Ltd ) Ammapalayam (An ISO 22000 : 2005 FSMS Certified Dairy) The Tamil Nadu Co-Operative Milk Producers Federation Ltd., Chennai - 98 (Regn. No.: MD

More information

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications) Ministry of New and Renewable Energy Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications) Format for Submitting Project Proposals for installing Standalone SPV power

More information

PRICE BID - PART: I I

PRICE BID - PART: I I T E N D E R S P E C I F I C A T I O N NO: BHE/PW/PUR/PLT-ELE/603 FOR HANDLING AT SITE STORES/STORAGE YARD, TRANSPORTATION TO SITE OF WORK, COMPLETE ERECTION, CHECKING OF CALIBRATION, TESTING, COMMISSIONING

More information

Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018

Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018 Name and address of DISCOM with Logo TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018 In exercise of the powers conferred under section 64(3) and other related

More information

BHUTAN POWER CORPORATION LIMITED AN OVERVIEW

BHUTAN POWER CORPORATION LIMITED AN OVERVIEW BHUTAN POWER CORPORATION LIMITED AN OVERVIEW Presentation to Delegates for SARI/Energy- Executive Peer Exchange to Bhutan October 29, 2007 Thimphu : Bhutan HYDRO POWER SECTOR AND THE BHUTANESE ECONOMY

More information

3) The water conductor system consisting of RCC, partly cut and cover, conduit of size 10.5m x 7m and m long to lead the water to the forebay.

3) The water conductor system consisting of RCC, partly cut and cover, conduit of size 10.5m x 7m and m long to lead the water to the forebay. Project: Mannapitlu Mini Hydel Scheme - 15 MW Overview: Mannapitlu Mini Hydel Scheme is the first of the 4 cascading Mini Hydro Electric Projects planned on Gurupur river in Dakshina Kannada District of

More information

LESCO POWER MARKET STRUCTURE

LESCO POWER MARKET STRUCTURE 1 LESCO POWER MARKET STRUCTURE 2 LESCO INCORPORATED ON : MARCH 1998 COMMENCED BUSINESS : JULY 1998 LICENCED BY NEPRA : APRIL 2002 3 BOARD OF DIRECTORS Syed Yawar Ali Chairman NESTLE Mohammad Akram Arain

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

Following are the growth rates of each sub segment of the auto sector over the last 5 years:

Following are the growth rates of each sub segment of the auto sector over the last 5 years: Sector Auto Components Industry Project Title Tyres Manufacturing Plant Project Description The Auto sector contributes 4.2% to India s GDP. The Indian automobile industry stood at 11 million vehicles

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole 1 L.T Stay set Complete Set 5 2 7/12 GI stay wire kg 50 3 Concreting of stay NO 5 4 Stay clamp

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Annexure. Technical Details Package 1

Annexure. Technical Details Package 1 Annexure Technical Details Package 1 PACKAGE-1 765 kv S/C Mainpuri-Bara Line with 765 kv/4 kv AIS at Mainpuri and Associated Schemes/Work Scope of work in Substation Sl.No. 1 Name of Substation Type Rating

More information

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015 NESCO UTILITY Januganj, Balasore-756019 TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015 In exercise of the powers conferred under section 64(3) and other

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011 Network ENMAX Power Corporation Network Planning & Design November 4, 2011 ENMAX Fast Facts Service area of 1,044 square kilometers 1,738MVA Peak load (2009) Transmission System 266 km overhead 15km underground

More information

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Interconnection Customer Contact Information Name Alternative Contact Information (if different

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION COST DATA BOOK FOR RECOVERY OF EXPENSES & OTHER CHARGES FROM PROSPECTIVE CONSUMERS FOR TAKING ELECTRIC SUPPLY (APPLICABLE TO ALL DISTRIBUTION LICENSEES IN

More information

CHAPTER 9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF

CHAPTER 9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF CHAPTER 9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF 9.1 POWER REQUIREMENTS 9.2 NEED FOR HIGH RELIABILITY OF POWER SUPPLY 9.3 SELECTION OF TRACTION SYSTEM 9.4 SOURCES OF POWER SUPPLY 9.5 AUXILIARY

More information

S P E C I F I C A T I O N

S P E C I F I C A T I O N T E N D E R S P E C I F I C A T I O N NO: BHE/PW/PUR/BHT-ELE/647 FOR HANDLING AT SITE STORES/STORAGE YARD, TRANSPORTATION TO SITE OF WORK, COMPLETE ERECTION, CHECKING OF CALIBRATION, TESTING, COMMISSIONING

More information

I. Meter Hire/Rental Charges

I. Meter Hire/Rental Charges I. Meter Hire/Rental Charges HT Meters 1 H.T. For 220 KV system meter alongwith CTs, PTs Cable etc. 2 For 132 KV System meter alongwith CTs, PTs Cable etc. 3 For 33 KV System meter, CTs, PTs meter box

More information

DISTRICT PROFILE ERODE

DISTRICT PROFILE ERODE DISTRICT PROFILE ERODE ADMINISTRATIVE PROFILE REVENUE DIVISION 3 TAULKS 7 PANCHAYAT UNIONS CORPORATION MUNICIPALITIES VILLAGE PANCHAYATS TOWN PANCHAYATS 20 1 8 343 53 DEMOGRAPHIC PROFILE TOTAL AREA FOREST

More information

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK.

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK. DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK. N. Lettas*, A. Dagoumas*, G. Papagiannis*, P. Dokopoulos*, A. Zafirakis**, S. Fachouridis**,

More information

S P E C I F I C A T I O N

S P E C I F I C A T I O N T E N D E R S P E C I F I C A T I O N NO: BHE/PW/PUR/KKT-ELE/627 FOR HANDLING AT SITE STORES/STORAGE YARD, TRANSPORTATION TO SITE OF WORK, COMPLETE ERECTION, CHECKING OF CALIBRATION, TESTING, COMMISSIONING

More information

BID No.SE/O&M/Amt./T/14-15/T-27 DPDC Full Turnkey SN Description Unit Unit Rate (Rs) Qty

BID No.SE/O&M/Amt./T/14-15/T-27 DPDC Full Turnkey SN Description Unit Unit Rate (Rs) Qty Full Turnkey Contract for Street light Works covered under DPDC Scheme under Achalpur Division under Amravati circle. BID No.SE/O&M/Amt./T/14-15/T-27 DPDC Full Turnkey 2014-15 SN Description Unit Unit

More information

Study on. Business. Forum of Regulators (FOR) New Delhi

Study on. Business. Forum of Regulators (FOR) New Delhi Study on Capital Costs Benchmarks for Distribution ib ti Business Submitted to Forum of Regulators (FOR) New Delhi ADMINISTRATIVE STAFF COLLEGE OF INDIA CENTRE FOR INFRASTRUCTURE MANAGEMENT & REGULATORY

More information

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

CHAPTER 6 POWER SUPPLY ARRANGEMENTS 6.1 Power Requirements CHAPTER 6 Power supply is the lifeline of Metro System POWER SUPPLY ARRANGEMENTS Electricity is required for operation of Metro system for running of trains, station services (e.g.

More information

ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER

ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER NO. APGCL/CGM (G)/CTPS/Disposal/2018-19/01. DISPOSAL OF 2X30 MW CTPS UNITS INCLUDING MAIN PLANT AND BUILDINGS. The Chief General Manager

More information

233(5. \ Vt V^ft ( ) *<}. 001 Ooa 2,00,000)

233(5. \ Vt V^ft ( ) *<}. 001 Ooa 2,00,000) 16449 233(5 0 2) 4) h Q ^ \ Vt V^ft I (100+100) *

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

PRESS NOTE. Distribution Tariff for Maharashtra State Electricity Distribution Company Limited (MSEDCL) applicable with effect from 1 June, 2015

PRESS NOTE. Distribution Tariff for Maharashtra State Electricity Distribution Company Limited (MSEDCL) applicable with effect from 1 June, 2015 26 June, 2015 PRESS NOTE Distribution for Maharashtra State Electricity Distribution Company Limited (MSEDCL) applicable with effect from 1 June, 2015 MSEDCL s Multi-Year Petition for the Control Period

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

EOL tvo'. Eo11)E cyj

EOL tvo'. Eo11)E cyj EOL tvo'. Eo11)E-16132.1cyj grregt-f-altffrtg (atr-{a- whii3t491-.j-0 urataftcr-414wf4arr4 at* s 284129 irt ar eei1ta01:0510-2412716, achoubey@bheljhs.co.in Expression Of Interest (E0I): "For Bending Of

More information

Pioneer P750/49. The Premium 750 KW Wind Turbine. green. pioneer. go go with

Pioneer P750/49. The Premium 750 KW Wind Turbine. green. pioneer. go go with Pioneer P750/49 The Premium 750 KW Wind Turbine green go go with pioneer Transforming the Power of Wind Corporate Profile Pioneer Wincon Private Limited (PWPL) is a member company of the Pioneer Asia Group

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 Website: www.hpgcl.org.in E-mail- ceplg@hpgcl.org.in EXPRESSION

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

PG&E s 2012 Request Window Proposals

PG&E s 2012 Request Window Proposals 1 PG&E s 2012 Request Window Proposals Central Valley Patrick Tan Transmission System Planning PG&E September 27, 2012 Transmission Projects Overview 2 Projects Seeking CAISO Approval Pease 115/60 kv Transformer

More information

Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and

Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and wind power plants in Zhyvachiv, Tlumach district, Ivano-Frankivsk

More information

Intentional Islanding Operation to Improve the Service Reliability of Thailand Electric Power System

Intentional Islanding Operation to Improve the Service Reliability of Thailand Electric Power System Intentional Islanding Operation to Improve the Service Reliability of Thailand Electric Power System Pradit Fuangfoo Wei-Jen Lee Energy Systems Research Center University of Texas at Arlington Arlington,

More information

ETHANOL BLENDED PETROL PROGRAMME

ETHANOL BLENDED PETROL PROGRAMME ETHANOL BLENDED PETROL PROGRAMME To achieve blending levels for delivering multiple outcomes such as Environmental benefits, Forex savings and Value addition in the economy EBP PROGRAMME VISION Achieve

More information

DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT. TENDER NOTICE NO.1287/2009/JDO Dated

DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT. TENDER NOTICE NO.1287/2009/JDO Dated DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT TENDER NOTICE NO.1287/2009/JDO Dated 12.11.2009 Sealed Tenders are invited from reputed manufacturers/ Firms for the supply of following

More information

North Oregon Coast Area Study. Adam Lint

North Oregon Coast Area Study. Adam Lint North Oregon Coast Area Study Adam Lint PAGE 2 North Oregon Coast System Overview - Clatsop Study Covers: Transmission Switching Stations (Clatsop District): Astoria Lewis and Clark 115 kv Distribution

More information

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC Electric Summary Sheet No. S-1 HOW A CUSTOMER BILL IS CALCULATED 7 RESIDENTIAL SERVICE For a customer who used 1,000 kwh during one month (assuming 30 days of service). Schedule 7 is referred to on customer

More information

IJRASET 2013: All Rights are Reserved

IJRASET 2013: All Rights are Reserved Power Factor Correction by Implementation of Reactive Power Compensation Methods of 220 KV Substation MPPTCL Narsinghpur Ria Banerjee 1, Prof. Ashish Kumar Couksey 2 1 Department of Energy Technology,

More information

System Improvement Scheme(R&M) : FY

System Improvement Scheme(R&M) : FY GUJARAT ENERGY TRANSMISSION CORPORATION LTD System Improvement Scheme(R&M) : FY 2012-13 In GETCO network, large number of substations and lines are quite old, some of its equipments viz. CT s, PT s, Breakers,

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

UTTARAKHAND POWER CORPORATION LIMITED

UTTARAKHAND POWER CORPORATION LIMITED UTTARAKHAND POWER CORPORATION LIMITED PUBLIC-NOTICE In terms of the provisions of section 45 of the Electricity Act, 2003, the consumers and the general public are hereby informed of the tariff and charges

More information

AT&C Loss Reduction in Electrical Distribution System by Implementation of HVDS

AT&C Loss Reduction in Electrical Distribution System by Implementation of HVDS AT&C Loss Reduction in Electrical Distribution System by Implementation of HVDS 1 Bhausaheb Prakash Patil, 2 Shridhar S. Khule 1 PG Student and 2 Head of Department 12 Department of Electrical Engineering

More information

DISTRICT PROFILE Villupuram

DISTRICT PROFILE Villupuram DISTRICT PROFILE Villupuram 1.Formation of District : 1993 2.No. Of Block : 22 3.No. Of Taluk : 8 4. Population : Gender Educated Un Educated Total Male 8,95,465 5,96,977 14,92,442 Female 8,80,758 5,96,173

More information

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI.09.001 Date: 29/05/2009 For Annual Operation and Maintenance Service Contract of HT/LT Panels,Motors,Transformers,UPS,Air Conditiners,Lightings

More information

२१७१ २-१ ४४ २०१८ २-१ २१०९-४ २०१८ २९ ०६ २०१८ २ २ १२४९ २-१ ४४ २०१८ २१ ०७ २०१८ ३ २ १७०५ २ / -१ ४४ २०१८ १० १० २०१८ १ २ ३ २ ३ १३ २०१८-१९

२१७१ २-१ ४४ २०१८ २-१ २१०९-४ २०१८ २९ ०६ २०१८ २ २ १२४९ २-१ ४४ २०१८ २१ ०७ २०१८ ३ २ १७०५ २ / -१ ४४ २०१८ १० १० २०१८ १ २ ३ २ ३ १३ २०१८-१९ २१७१ २-१ ४४ २०१८ २ :- (०७१७२)२२७३८२-४४२४०३ - (०७१७२)२२७३८२ - mlidn2@rediffmail.com ३१ / १२ २०१८ - - १ २१०९-४ २०१८ २९ ०६ २०१८ २ २ १२४९ २-१ ४४ २०१८ २१ ०७ २०१८ ३ २ १७०५ २ / -१ ४४ २०१८ १० १० २०१८ ------000-----

More information

On-load tap-changer OILTAP V

On-load tap-changer OILTAP V www.reinhausen.com On-load tap-changer OILTAP V Technical Data TD 82/03 Table of Contents Table of Contents 1 General... 4 1.1 Summary of the technical data... 4 1.2 Survey... 6 2 Technical Data... 13

More information

FINANCIAL HIGHLIGHTS AND BUDGET ESTIMATES

FINANCIAL HIGHLIGHTS AND BUDGET ESTIMATES FINANCIAL HIGHLIGHTS AND BUDGET ESTIMATES A) The summarized actual income and expenditure for the financial year 2014-2015 are as under :- (Rs. in Crores) *Electric Supply *Transport Whole Undertaking

More information

Battery Energy Storage System Pilot Project, Puducherry Power Grid Corporation of India Limited. Manish Kumar Tiwari

Battery Energy Storage System Pilot Project, Puducherry Power Grid Corporation of India Limited. Manish Kumar Tiwari Battery Energy Storage System Pilot Project, Puducherry Power Grid Corporation of India Limited Manish Kumar Tiwari POWERGRID An Overview CENTRAL TRANSMISSION UTILITY A NAVARATNA COMAPANY CPSU CONSISTENTLY

More information

Bangladesh s Power Sector : At a Glance

Bangladesh s Power Sector : At a Glance Bangladesh s Power Sector : At a Glance December, 2014 Installed Capacity (MW) : 10,709 De-rated Capacity (MW) : 10,130 Maximum Generation (MW) : 7,418 Total Consumers (in Million) : 15.4 Transmission

More information

Green Solutions to Power Problems (Solar & Solar-Wind Hybrid Systems )

Green Solutions to Power Problems (Solar & Solar-Wind Hybrid Systems ) Green Solutions to Power Problems (Solar & Solar-Wind Hybrid Systems ) For Telecom Infrastructure Mobile Tower Sites Mobile Towers : 5.88 Lakhs Power Requirement : 1-5 KW (24X7) Telecom Sector Energy Requirement

More information

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY Short Circuit Analysis System Operations Department System Planning Section March 2001 I. Introduction XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

More information

New 115 kv Disconnect Switches at Bloomsburg MTS

New 115 kv Disconnect Switches at Bloomsburg MTS 115 kv Line tap from C9 to Bloomsburg MTS & New Bus Tie Switch CAA ID Number: 2007-EX353 Final Draft ASSESSMENT SUMMARY 1. GENERAL DESCRIPTION Norfolk TS and Bloomsburg MTS are supplied by a single 115

More information

CURRICULUM VITAE. Having an experience and knowledge in Testing, Commissioning and Maintenance of power plant, substation and process plant.

CURRICULUM VITAE. Having an experience and knowledge in Testing, Commissioning and Maintenance of power plant, substation and process plant. CURRICULUM VITAE Personal details MANIKANDAN. Y manikandan.y@gmail.com Date of Birth : 17.07.1988 Nationality : Indian Sex : Male Marital Status: Single Passport No : J2470486 Current Visa : S pass Contact

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 8/18 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

24X7 POWER FOR ALL MEGHALAYA. A Joint Initiative of Government of India and Government of Meghalaya

24X7 POWER FOR ALL MEGHALAYA. A Joint Initiative of Government of India and Government of Meghalaya 24X7 POWER FOR ALL MEGHALAYA A Joint Initiative of Government of India and Government of Meghalaya Government of India Piyush Goyal Union Minister of State (IC) Power, Coal, New & Renewable Energy Foreword

More information

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES 1 PRESENTATION OUTLINE Generation System Demand Outlook Existing Generation Resources Transmission System National Interconnected

More information

LIST OF MOUs SIGNED BY GOVERNMENT OF TAMIL NADU

LIST OF MOUs SIGNED BY GOVERNMENT OF TAMIL NADU LIST OF MOUs SIGNED BY GOVERNMENT OF TAMIL NADU S.No Date Company Place Manufacturing Products 1. 07.06.2006 M/s. Motorola Sriperumputhur (U.S.A) SIPCOT Communication Equipments, Cell Phones & Accessories

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2005-06 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

Tender Information. Overseas Information. Tender cost : Non-refundable fee of LKR 20, US$ 300 (courier charges). Bid deadline :

Tender Information. Overseas Information. Tender cost : Non-refundable fee of LKR 20, US$ 300 (courier charges). Bid deadline : Tender Information Maldives (EEPC Ref. No. DB-1328) Project : Environmental Management Project Loan No. : IDA 44270, IDA Q6000 Project ID No. : P108078 DB Ref. No.: WB5540-10/13 : Tender Evaluation Section

More information

Power Transmisson Division Erlangen, April 15, Siemens receives major order for BorWin3 North Sea grid connection from TenneT

Power Transmisson Division Erlangen, April 15, Siemens receives major order for BorWin3 North Sea grid connection from TenneT Energy Sector Press Power Transmisson Division Erlangen, April 15, 2014 Siemens receives major order for BorWin3 North Sea grid connection from TenneT Consortium leader Siemens to supply HVDC transmission

More information

Sub-Regional RTEP Committee PJM South

Sub-Regional RTEP Committee PJM South Sub-Regional RTEP Committee PJM South SRRTEP - South December 1, 2016 www.pjm.com PJM Baseline Project B2185 Update Problem: NERC Category B Violation (DVP Analysis) The 2017 summer base case indicates

More information

Conservation Voltage Reduction (CVR) Phillip Anderson P.E. Engineering Project Leader Research, Development & Deployment

Conservation Voltage Reduction (CVR) Phillip Anderson P.E. Engineering Project Leader Research, Development & Deployment Conservation Voltage Reduction (CVR) Phillip Anderson P.E. Engineering Project Leader Research, Development & Deployment Presentation Outline Background Information on CVR CVR Definition Voltage Control

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 77/15 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

IFC Workshop on Distributed Generation, 13 February 2013, Moscow, Russia

IFC Workshop on Distributed Generation, 13 February 2013, Moscow, Russia Integration of Distributed Energy Resources Into the Electric Grid: Some Issues and Solutions Larry Adams Senior Electrical & Controls Engineer Spirae, Inc. IFC Workshop on Distributed Generation, 13 February

More information

is attached to and becomes a part of a agreement dated, 20

is attached to and becomes a part of a agreement dated, 20 Electric Process Heat Schedule Designation R1.2 Standard Contract Rider No. 1.2 DE 963-1635 8/18 THIS RIDER, dated, 20 is attached to and becomes a part of a agreement dated, 20 between (Legal Entity and

More information

Generation Interconnection Facilities Study For

Generation Interconnection Facilities Study For Generation Interconnection Facilities Study For Prepared for: Prepared by: SCE&G Transmission Planning May 27, 2015 TABLE OF CONTENTS General Discussion... Page 3 Generator Interconnection Specifications...

More information

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad 1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website

More information

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW) Connection Applicant (Embedded Generating Unit Owner/Proponent) Business name: ABN: Contact name: Address: Telephone number: E-mail address: Connection Applicant acting and working on behalf of the above

More information

Tneb Electrical Engineer Handbook Full

Tneb Electrical Engineer Handbook Full Tneb Electrical Engineer Handbook Full Like work has a full date type part enhanced location based honour! Academic give list of projects related to electrical engg custom everyone's pretty execution.

More information

CORRIGENDUM/ ADDENDUM 09 ADDITIONAL REQUIREMENT OF ELEVATOR.

CORRIGENDUM/ ADDENDUM 09 ADDITIONAL REQUIREMENT OF ELEVATOR. AMENDMENT-02 TO TECHNICAL SPECIFICATION FOR ELEVATOR (SPEC NO. PE-TS-408-502-A001) 1x800 MW WANAKBORI STPP. CORRIGENDUM/ ADDENDUM 09 ADDITIONAL REQUIREMENT OF ELEVATOR. CL. NO. 2.0 Scope of equipment supply

More information

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX Dr. Rajendra Prasad Road,Block-27,Neyveli-607807.Tamilnadu,India.

More information

April 2009 Introducing ABB Mauritius. ABB Group July 1, 2009 Slide 1

April 2009 Introducing ABB Mauritius. ABB Group July 1, 2009 Slide 1 April 2009 Introducing ABB Mauritius July 1, 2009 Slide 1 Facts about ABB Headquarters: Zurich, Switzerland About 120,000 employees in around 100 countries Orders in 2008: $38.3 billion Revenues in 2008:

More information

A detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites /

A detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites   / PRESS STATEMENT The Kenya Power & Lighting Company Limited (KPLC) has submitted an Application to the Energy Regulatory Commission (ERC) for approval of the proposed Electricity Tariffs and Tariff Structures

More information

ANNEXURE-I : LIST OF ITEMS H.O. PURCHASE ITEM LIST:

ANNEXURE-I : LIST OF ITEMS H.O. PURCHASE ITEM LIST: Sr. Item Description No. (A) Material Management Cell 1 Meters(All types) 2 GSM Modem ANNEXURE-I : LIST OF ITEMS H.O. PURCHASE ITEM LIST: 3 Metering Cubicles 4 L.T. Distribution Box 5 L.T. XLPE Cable 6

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Version 2, January 2019 www.energynetworks.org 2 Introduction Connection of Power Generating Modules to DNO

More information

ATS CHEM EQUIPMENTS PVT. LTD.,

ATS CHEM EQUIPMENTS PVT. LTD., ATS CHEM EQUIPMENTS PVT. LTD., AN ISO 9001:2015 CERTIFIED COMPANY Unit 1, C 27, SIDCO Industrial Estate, Hosur 635 126, Tamil Nadu, India. Phone No: 04344 276731, Mail ID: atschem@gmail.com Unit II, 16

More information