POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE
|
|
- Roger Spencer
- 5 years ago
- Views:
Transcription
1 POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE Comments / Suggestions on Annual Revenue Requirement (ARR) and Electricity Proposal of JKPDD for FY and 1.1 Power Development Department (PDD) of Jammu & Kashmir, the Petitioner is the sole licensee for transmission and distribution of electricity in the State of Jammu & Kashmir. The Petitioner has filed petitions before the Jammu & Kashmir State Electricity Regulatory Commission (J&KSERC) for approval of its Annual Revenue Requirement (ARR) and determination of for the financial years and The Commission admitted the petition for FY and for on and directed PDD to publish a Public tice for the information of consumers/ stake holders. The salient features of the Petitions are as given below: Table 1: Summary of ARR Petitions Particular (Actual) (Revised Estimate) (Projected) A. Revenue Revenue Demand (At existing tariff) Revenue Realized* B. Expenditure Power Purchase Cost O&M cost Establishment Expenses (incl Employee A&G Expenses) Depreciation Interest & Finance Charges ROR Gross ARR Less non-tariff income Net ARR Unmet Revenue Gap * Without Electricity Duty te: Cost of free power from Salal, Uri and Dulhasti not included, but quantum of free power is included in the availability. 1.3 The projected overall average cost of supply comes to Rs. 7.62/ kwh during FY and to Rs. 6.97/ kwh during as against average overall tariff of Rs. 2.38/ kwh for FY and Rs. 2.34/ kwh for.
2 1.4 Details on the number of consumers, the connected load and the amount of energy sold by PDD in FY and projected for FY and are given below: Table 2: Number of s and Connected Load (MW) S. Categories. of s Connected Load (MW) (A) (RE) (P) (A) (RE) (P) 1 Domestic 1,034,664 1,070,877 1,124, n-domestic/ Commercial 149, , , Agriculture 13,351 13,818 14, State/Central Govt. Dept. 8,929 9,191 9, Public Street Lighting LT Industrial 18,375 19,018 19, HT Industrial , HT-PIU Industrial LT Public Water Works 1,315 1,361 1, HT Public Water Works General Purpose/ Bulk Total 1,227,435 1,270,432 1,333,954 1, , , The Petitioner has submitted that the actual T&D losses for FY and FY were 61.94% and 61.31% respectively. For FY the T&D losses are estimated to be 62.1% and projected to decline by 4.62% to 57.48% in. Table 3: T&D Losses (A) (A) (RE) (P) Total Energy Available MU Energy Available for Sale MU , , T&D Losses MU T&D Losses % 61.94% 61.31% 62.11% 57.48% 1.6 Transmission and Distribution System: The tables below summarize the length of the transmission system at different voltage levels and voltage wise availability of EHT/ HT transformer capacity (MVA).
3 Table 4: Transmission Lines in J&K Transmission Lines Kms as on 31 Mar2009 Added as on 31 Dec kv kv kv kv LT Table 5: Voltage wise availability of EHT/ HT Transformer Capacity (MVA) Voltage (Estimated) (Estimated) (Projected) Req. Avail Gap Req. Avail Gap Req. Avail Gap 220/132 kv 3,057 2, ,175 2, ,175 2, /33 kv 3,515 2, ,651 3, ,651 3, / 11 kv 4,042 3, ,198 3, ,303 3, /0.4 kv 4,648 4, ,827 4, ,948 4, The details of the tariff proposed for FY are as shown in the table below: Sl 1 Domestic Metered Energy Charge (Rs/kWh) upto 30 units/month units/month units/month 1.70 > 200 units/month 2.50 Minimum Charges (Rs/ Month) upto ¼ kw 50 above 1/4 kw upto 1/2 kw 100 above 1/2 kw upto 1 kw 200 Above 1 kw for every 250 W, or part thereof 100 Flat Rate for Unmetered Connection (Rs. / month) upto ¼ kw 80 above 1/4 kw upto 1/2 kw 190 above 1/2 kw upto 3/4 kw 290 above 3/4 kw upto 1 kw 390 above 1 kw upto 2 kw 760 above 2 kw (for every additional ½ kw) ndomestic/ Energy Charge (Rs/kWh) - Metered Connection Single Phase
4 Sl Commercial Upto 100 units/month to 200 units/month 2.10 above 200 units/month 3.00 Three Phase For all units 3.20 Above 10 kw for all units (Rs./kVAh) 4.00 Fixed Charges (Rs. / kw / month) Single Phase 40 Three Phase 80 Above 10 kw (Rs./kVAh/month) 100 Flat Rate for Unmetered Connection (Rs. / month) Upto 1/4 kw 170 above 1/4 kw upto 1/2 kw 420 above 1/2 kw upto 1 kw 840 Above 1 kw (for every additional 500 Watts, or part thereof) State/ Central Energy Charges (Rs./ kwh) Government LT 6.90 Departments Minimum Charges for connected load (Rs./ month) Upto 1 kw 100 Above 1 kw (for every additional ½ kw) Agricultural Energy Charges for Metered Connections (Rs. / kwh) 0 to 20 HP 0.60 Above 20 HP 6.90 Minimum Charges for connected load (Rs./ HP/ Annum) 0-20 HP 300 Above 20 HP 1500 Flat Rate for Unmetered Connection (Rs./ HP/ month) 0 to 20 HP 150 Above 20 HP Public Street Energy Charge for Metered Connections (Rs./ kwh) Lighting For all units 6.90 Minimum Charges Rs./ kw or any part thereof / month 500 Flat Rate Charges for Unmetered Connections Rs./ kw or any part thereof / month LT Public Energy Charge for Metered Connections (Rs./ kwh) Water Works For all units 6.90 Minimum Charges Rs./ kw or any part thereof / month 500 Flat Rate Charges for Unmetered Connections Rs./ kw or any part thereof / month HT Public Energy Charges for Metered Connection (Rs./kVAh)
5 Sl Water Works 11 kv kv and above 5.35 Demand Charges for Metered Connection(Rs./ kva or part thereof / Month) 11 kv kv and above 190 For Connections above 100 kw supplied on LT, Additional 5% Surcharge on Demand and Energy Charges at 11 KV tariff shall be chargeable For Connections with sanctioned load above 1 MVA metered on LT, additional 7.5% Surcharge on Demand and Energy Charges at 11 kv tariff shall be chargeable Flat Rate Charges for Unmetered Connection Rs./ kw, or part thereof / Month LT Industrial 9 HT Industrial 10 HT Industrial for Power Intensive Energy Charges for Metered Connections For all units (Rs./kWh) 3.50 Fixed Charges for Metered Connection Rs./KW/month 50 For Connections with sanctioned load upto 100 kw supplied and metered on HT, 2.5% rebate on Energy Charges of the LT Industrial shall be allowed Flat Rate Charges for Unmetered Connection (Rs./ kw/ Month) Upto 8 hrs shift hrs shift 900 above 12 hrs shift kv Energy Charge (Rs./ kvah) 4.00 Demand Charge (Rs./ kva/ month) 120 For Connections with sanctioned load above 100 kw upto 1 MVA metered on LT, additional 5% Surcharge on Demand & Energy Charges at 11 KV tariff shall be chargeable 33 kv Energy Charge (Rs./ kvah) 3.90 Demand Charge (Rs./ kva/ month) 110 For Connections with sanctioned load above 1 MVA metered on LT, additional 7.5% Surcharge on Demand and Energy Charges at 11 kv tariff shall be chargeable For Connections at higher voltages of 66 kv, 1.5% rebate on Energy Charges of 33 kv shall be allowed. 11 kv Energy Charge (Rs./ kvah) 5.35 Demand Charge (Rs./ kva/ Month) kv
6 Sl Industries Energy Charge (Rs./ kvah) 5.15 Demand Charge (Rs./ kva/ Month) 135 For Connections at higher voltages of 66 kv, 1.5% rebate on Energy Charges of 33 kv shall be allowed 11 General Purpose Bulk 12 LT and HT Temporary Connections 11 kv Energy Charge (Rs./ kvah) 5.30 Demand Charge (Rs./ kva/ Month) 145 For multiple connection on LT with aggregate sanctioned load > 100 kw and for connections with sanctioned load above 1 MVA metered on LT, additional 5% Surcharge on Demand & Energy Charges at 11 kv tariff shall be chargeable 33 kv Energy Charge (Rs./ kvah) 6.35 Demand Charge (Rs./ kva/ Month) 140 For Connections with sanctioned and load above 1 MVA metered on LT, additional 7.5% Surcharge on Demand & Energy Charges at 11 kv tariff shall be chargeable For Connections at higher voltages of 66 kv, 1.5% rebate on Energy Charges of 33 kv shall be allowed. 1.5 times the applicable rates (on fixed/ demand and energy charges) 1.8 The Commission has directed PDD to invite comments or suggestions from the public on the above Petition through this notice. 1.9 Any person can obtain copies of the ARR and tariff petition (in English) submitted by PDD for FY and from the following offices on payment of photocopying charges on any working day: (a) Development Commissioner (Power), Janipur, Jammu. (b) (c) (d) Chief Engineer, EM & RE Wing, Kashmir, Exhibition Ground, Srinagar Chief Engineer, EM&RE Wing, Canal Power House, Jammu SE, EM & RE, Circle, Choglamsar, Leh 1.10 Suggestions or comments can be submitted in person or may be sent to: The Secretary, Jammu & Kashmir Electricity Regulatory Commission, PDC Complex, Ashok Nagar, Satwari, Jammu [Fax: ; jkserc@hotmail.com] along with 2 copies to the Development Commissioner (Power), PDD [Fax: ; dcpjkpdd@yahoo.com] by 11 th of March 2010, by 2:00 PM.
7 1.11 The suggestions or comments shall be filed in English, Hindi or Urdu, in four copies, and should carry the full name, postal address and address, if any, of the sender. It should be indicated whether the objection is being filed on behalf of any organization of category of consumers. It should also be mentioned if the sender wants to be heard in person, in which case opportunity would be given by the Commission at the Public Hearing to be held at Jammu on 13 th March, 2010 and at Srinagar on 15 th March 2010 for which no separate notice will be given. Time and venue of the public hearing shall be as given below: Jammu Date: 13 th March, 2010 Time: AM Venue: Institution of Engineers, (PWD Guest House) Gandhi Nagar, Jammu Srinagar Date: 15 th March, 2010 Time: AM Venue: Auditorium, IMPA, Moulana Azad Road, Srinagar JKPDD shall reply to each of the objections/comments/suggestions received within one day of the receipt of the same but not later than 12 th of March, 2010 for all the objections and comments/suggestions received till 11 th of March, Sd/- Development Commissioner (Power) JKPDD
JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE
JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine
More informationWestern Electricity Supply Company of Orissa Ltd., Burla, Sambalpur , Orissa
Western Electricity Supply Company of Orissa Ltd., Burla, Sambalpur-768017, Orissa Publication of Applications u/s 64(2) of the Electricity Act, 2003, read with Reg. 53(7) of the OERC (Conduct of Business)
More informationReliance Infrastructure Limited Reg. Office: H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai Website:
Reliance Infrastructure Limited Reg. Office: H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai 400 710 Website: www.rinfra.com PUBLIC NOTICE Objections/comments on Reliance Infrastructure
More informationPRESS RELEASE ON 19March, 2018
TARIFF APPROVED FOR ASSAM POWER GENERATION COMPANY LIMITED (APGCL), ASSAM ELECTRICITY GRID CORPORATION LIMITED (AEGCL) &ASSAM POWER DISTRIBUTION COMPANY LIMITED (APDCL) FOR FY 2018-19, APPLICABLE WITH
More informationUP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice
UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing
More informationNESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015
NESCO UTILITY Januganj, Balasore-756019 TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015 In exercise of the powers conferred under section 64(3) and other
More informationPRESS NOTE. Distribution Tariff for Maharashtra State Electricity Distribution Company Limited (MSEDCL) applicable with effect from 1 June, 2015
26 June, 2015 PRESS NOTE Distribution for Maharashtra State Electricity Distribution Company Limited (MSEDCL) applicable with effect from 1 June, 2015 MSEDCL s Multi-Year Petition for the Control Period
More informationName and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018
Name and address of DISCOM with Logo TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018 In exercise of the powers conferred under section 64(3) and other related
More informationODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR *****************
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** From To Secretary I/c. The Managing Director, NESCO At/Po : Januganj Dist : Balasore - -
More informationANNEXURE: TARIFF SCHEDULE
ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2017 GENERAL 1. The tariff figures indicated in this tariff schedule
More informationUTTARAKHAND POWER CORPORATION LIMITED
UTTARAKHAND POWER CORPORATION LIMITED PUBLIC-NOTICE In terms of the provisions of section 45 of the Electricity Act, 2003, the consumers and the general public are hereby informed of the tariff and charges
More informationCASE NOS. 79, 80, 81 & 82 of 2017/363 Date
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN PLOT NO. 4, CHUNOKOLI, SHAILASHREE VIHAR, CHANDRASEKHARPUR, BHUBANESWAR-751021 ***************** CASE NOS. 79, 80, 81 & 82 of 2017/363 Date.22.03.2018
More informationANNEXURE: TARIFF SCHEDULE
ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2018 GENERAL 1. The tariff figures indicated in this tariff schedule
More informationWheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators
KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival
More informationGujarat Energy Transmission Corporation Limited (GETCO)
GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2010-11 and For Gujarat Energy Transmission Corporation Limited (GETCO) Case No. 1152 of 2011 7 th April, 2012 1 st Floor, Neptune
More informationOrissa Power Transmission Corporation Ltd. Janpath, Bhubaneswar , Orissa ** ** ** PUBLIC NOTICE
Orissa Power Transmission Corporation Ltd. Janpath, Bhubaneswar-751022, Orissa ** ** ** PUBLIC NOTICE Publication of Applications u/s Sec. 64(2) of the Electricity Act, 2003, read with Reg. 53(7) of the
More informationOrissa Power Transmission Corporation Ltd. Janpath, Bhubaneswar , Orissa ** ** ** PUBLIC NOTICE
Orissa Power Transmission Corporation Ltd. Janpath, Bhubaneswar-751022, Orissa ** ** ** PUBLIC NOTICE Publication of Applications u/s Sec. 64(2) of the Electricity Act, 2003, read with Reg. 53(7) of the
More informationANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2016
ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2016 GENERAL 1. The tariff figures indicated in this tariff schedule
More informationRespondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad
1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website
More informationTARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents
Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2005-06 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars
More informationCASE No. 35 of In the matter of
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationPUNJAB STATE POWER CORPORATION LIMITED REPORT ON OUTCOMEOF THE MOCK TRIALSFOR DESIGN OF TWO PART TARIFF
PUNJAB STATE POWER CORPORATION LIMITED REPORT ON OUTCOMEOF THE MOCK TRIALSFOR DESIGN OF TWO PART TARIFF JANURAY, 2014 TABLE OF CONTENTS A1: APPROACH OF TWO PART TARIFF PROPOSAL 3 A2: APPROACH AND METHODOLOGY
More informationGovernment of Pakistan Ministry of Water and Power ****************** NOTIFICATION
.00 Government of Pakistan Ministry of Water and Power ****************** Islamabad, the 16th May, 2012. NOTIFICATION S.R.O, ' ( 1)/2012: In pursuance of sub-section (4) of section 31 of the Regulation
More informationTariff Circular & Tariff Schedules
Tariff Circular & Tariff Schedules (Effective from 01 st April 2015) Madhya Gujarat Vij Company Limited Corporate Office, S.P. Vidyut Bhavan, Race Course, Vadodara-390 007 1465/2014 ANNEXURE: TARIFF SCHEDULE
More informationCASE No. 86 of In the matter of. Petition of the Brihanmumbai Electric Supply & Transport Undertaking for revision in Service Connection Charges
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationUttar Gujarat Vij Company Limited APR for FY & ARR for FY TARIFF SCHEDULE
TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND GENERAL EXTRA HIGH TENSION Effective from 1 st April 2010 1. The tariff figures indicated in this tariff schedule are
More informationAnnexure III: Tariff Schedule
Annexure III: Tariff Schedule MINDSPACE BUSINESS PARKS PRIVATE LIMITED SCHEDULE OF ELECTRICITY TARIFFS (Effective from 1 September, 2018) The Maharashtra Electricity Regulatory Commission, in exercise
More information:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg
:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg Technical Branch (Per) TANGEDCO Proceedings. (FB) No.
More informationMPSEZ Utilities Private Limited Truing up for FY and Determination of Tariff for FY
ANNEXURE: TARIFF SCHEDULE Tariff Schedule for Adani Ports and SEZ Ltd License area of MPSEZ Utilities Pvt. Ltd. Effective from 1 st April, 2018 General Conditions 1. This tariff schedule is applicable
More informationTARIFF STRUCTURE OF TNEB
CHAPTER V TARIFF STRUCTURE OF TNEB 5.1 Introduction 5.2 Technical Aspects on Tariff 5.3 Tariff Structure in TNEB 5.4 Procedure for Fixation of Tariff 5.5 Role of TNERC on Tariff 5.6 Analysis of Tariff
More informationCase No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. Present : Sri. T. M. Manoharan, Chairman Sri. K. Vikraman Nair, Member OP 11/2016
1 KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram Present : Sri. T. M. Manoharan, Chairman Sri. K. Vikraman Nair, Member OP 11/2016 In the matter of Implementation of Unnat Jyothi by
More informationAnnexure 1: Category-wise Tariff for BEST's consumers for FY (effective from 1 September, 2018)
Sr. No. Annexure 1: Category-wise Tariff for BEST's consumers for FY 2018-19 (effective from 1 September, 2018) Consumer Category & Consumption Slab HIGH TENSION CATEGORIES FY 2018-19 (Existing - Approved
More informationSCHEDULE OF TARIFF AND. (Applicable w.e.f )
SCHEDULE OF TARIFF AND SCHEDULE OF GENERAL & SERVICE CHARGES (Applicable w.e.f. 01.04.2017) HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED VIDYUT BHAWAN, SHIMLA-171004 CONTENTS Sr. No. Description Page
More informationBEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP. Exhibit Accompanying Direct Testimony of Judith M. Ridenour
Docket No. UE 339 Exhibit PAC/303 Witness: Judith M. Ridenour BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP Exhibit Accompanying Direct Testimony of Judith M. Ridenour Estimated Effect of Proposed
More informationJEA Distributed Generation Policy Effective April 1, 2018
Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The
More information-_... _- ._- I- -_ LT -III:IHDUSTRY TARIFF FOR RETAIL SALE OF ELECTRICITY FOR FY ~ AND CONDITIONS)
/ TARIFF FOR RETAIL SALE OF ELECTRICITY FOR FY201516 (RETAILSUPPLYTARIFF RATESAND TERMS AND CONDITIONS) LTI:DOMESTIC Energy Fixed Charge Consumer Category Unit (~/Month) (Telescopic) Energy Charge (~/Unit)
More informationGovernment of Pakistan Ministry of Water and Power ****************** NOTIFICATION
Government of Pakistan Ministry of Water and Power ****************** Islamabad, the 16th May, 2012, NOTIFICATION S.R.O 5J2- ( 1)/2012 : In pursuance of sub-section (4) of section 31 of the Regulation
More informationBEFORE THE NEW MEXICO PUBLIC REGULATION
BEFORE THE NEW MEXICO PUBLIC REGULATION IN THE MATTER OF THE APPLICATION ) OF PUBLIC SERVICE COMPANY OF NEW ) MEXICO FOR REVISION OF ITS RETAIL ) ELECTRIC RATES PURSUANT TO ADVICE ) NOTICE NO. 513 ) )
More informationASSAM ELECTRICITY REGULATORY COMMISSION
ASSAM ELECTRICITY REGULATORY COMMISSION FILE NO. AERC. 503/2015 PETITION NO. 15/2015 IA No. 2/2016 ORDER SHEET 17.11.2016 Before the Assam Electricity Regulatory Commission ASEB Campus, Dwarandhar, G.
More informationEXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION
REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION
More informationMaharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in
More informationDELHI ELECTRICITY REGULATORY COMMISSION Page 384 of 411 August 2017
TARIFF SCHEDULE Sr. No. CATEGORY FIXED CHARGES ENERGY CHARGES 1 DOMESTIC 1.1 INDIVIDUAL CONNECTIONS A Upto 2 kw 20 Rs./kW/month B > 2kW and 5 kw 35 Rs./kW/month C > 5kW and 15 kw 45 Rs./kW/month D >15kW
More informationMYT Petition citing various reasons and uncertainties in the electricity market.
EXECUTIVE SUMMARY A. Background Considering the concerns expressed by MSEDCL about certain provisions of MYT Regulations 2011, Hon ble Commission vide Order dated 23 rd August, 2011 (Case No. 24 of 2011)
More informationPetition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :
Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu
More informationHARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517
HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 Website: www.hpgcl.org.in E-mail- ceplg@hpgcl.org.in EXPRESSION
More informationBihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna
Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP
More informationKANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.
P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. 39 PURPOSE: The purpose of the Solar Subscription Pilot Rider (Program) is to provide a limited number of
More informationDetails of concern person for future communication/clarification. Mobile No. Address
114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] GENERATION OF ELECTRICITY FORMAT-1 PERIODICITY-ANNUAL DATA OF YEAR 20 20. Submission by 30th June NAME AND ADDRESS OF UTILITY: Sl. No. (A) Name
More informationCustomers with solar PV units in NSW producing and consuming electricity
Independent Pricing and Regulatory Tribunal FACT SHEET Customers with solar PV units in NSW producing and consuming electricity Based on Solar feed-in tariffs - Setting a fair and reasonable value for
More informationBefore the. Case No. 106 of 2009
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in
More informationDEPARTMENT OF TRANSPORTATION
This document is scheduled to be published in the Federal Register on 08/28/2012 and available online at http://federalregister.gov/a/2012-20756, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [910-EX-P]
More informationII pepco. February 6, 2018
Wendy E. Stark Office 202.872.2347 Deputy General Counsel Fax 202.331.6767 pepco.com EP1006 westark@pepcoholdings.com 70 1 Ninth Street NW Washington, DC 20068-0001 II pepco. An Exelon Company February
More informationSub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner
MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of determination of Parallel Operation Charges. Suo-Motu Petition No. 73/2012 ORDER (Date of order 31 st December, 2012) MPERC,
More informationNeed Assessment Document (NAD) DDUGJY
Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing
More informationFrequently Asked Questions for Grid Connected Solar Rooftop Systems
Frequently Asked Questions for Grid Connected Solar Rooftop Systems 1. What is a Solar Rooftop System? In a solar rooftop system, the solar panels are installed in the roof of any residential, commercial,
More informationNational Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing
National Grid Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES 2 nd Amended Compliance Filing Attachment 1: Book 2 of 2 April 2010 Submitted to: Rhode Island
More informationGujarat Power Sector A Statistical Profile
Power Sector A Statistical Profile 6th Floor, GIFT ONE, Road 5C, Zone 5, GIFT CITY, Gandhinagar, 8 55. Ph.: +91796 Fax : +91796 5/55 Email : gerc@gercin.org Website : www.gercin.org 6th Floor, GIFT ONE,
More informationRIPUC No Cancelling RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY NET METERING PROVISION
THE NARRAGANSETT ELECTRIC COMPANY NET METERING PROVISION RIPUC No. 2178 Sheet 1 I. Definitions Commission shall mean the Rhode Island Public Utilities Commission. Community Remote Net Metering System shall
More informationNEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)
NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public
More informationTARIFF SCHEDULE FOR RETAIL TARIFF RATES AND TERMS AND CONDITIONS OF SUPPLY FOR FY
Appendix- 1 TARIFF SCHEDULE FOR RETAIL TARIFF RATES AND TERMS AND CONDITIONS OF SUPPLY FOR FY 2013-14 (Effective from 1 st April, 2013) PART - A: LOW TENSION SUPPLY System of supply: Low Tension Alternating
More informationEXHIBIT A-2 Amending Chapter TMC (all additions and amendments effective April 1, 2018) Chapter ELECTRIC ENERGY REGULATIONS AND RATES 1
EXHIBIT A-2 Amending Chapter 12.06 TMC (all additions and amendments effective April 1, 2018) Chapter 12.06 ELECTRIC ENERGY REGULATIONS AND RATES 1 Amended and Added Sections: 12.06.140 Tampering and injury
More information1 fi\ Peter W. Gurnham, Q.C., Chair
ORDER M08192 2017 NSUARB 127 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION by the TOWN OF ANTIGONISH, on behalf of its ELECTRIC
More informationCompendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India
457 JOINT ELECTRICITY REGULATORY COMMISSION Joint Electricity Regulatory Commission for State of Goa & Union Territories Grid Connected Solar Power Regulations 2015 Dated 8 th May 2015 Sl. No Description
More informationELECTRICITY TARIFFS 2013/2014
ELECTRICITY TARIFFS 2013/2014 Presented by Cobus Kritzinger Leon Swanepoel Deputy Director Finance Head Electro Technical Services CONTENTS BACKROUND ELECTRICITY SALES BULK PURCHASES SALARY INCREASE TARIFF
More informationThank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.
Mary L. Cottrell, Secretary March 27, 2009 Page 1 Stacey M. Donnelly Counsel September 23, 2009 Mark D. Marini, Secretary Department of Public Utilities One South Station Boston, MA 02110 Re: D.P.U. 09-03
More informationUNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE
Schedule LSM-DJD-1 Page 1 of 2 UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE Calculation Calculation of the Calculation of the of the EDC EDC/ Only EDC/Non- 1. (Over)/under Recovery
More informationIn-House Paper on Rationalizing Rural Domestic Tariff & achieving 100% Metering
Date: December 30, 2016 In-House Paper on Rationalizing Rural Domestic Tariff & achieving 100% Metering The paper proposes a Model which aims at the following: 1. Achieving 100% metering of rural s. 2.
More informationNIT No. DEERS/SSDI-JK/05 of 2018 Dated 29/08/2018 E-Tender id No: 2018_FD_ 60565
1 Phone/Fax: 0194-2494585 Government of Jammu & Kashmir, Department of Environment and Remote Sensing, SDA Housing Colony, Bemina, Srinagar, Kashmir-190018 Website: www.jkdears.com Email:dirjkers@gmail.com
More informationCustomers with solar PV units in NSW producing and consuming electricity
Independent Pricing and Regulatory Tribunal FACT SHEET Customers with solar PV units in NSW producing and consuming electricity Based on Solar feed-in tariffs - Setting a fair and reasonable value for
More informationIn-House paper on Implementation of Telescopic Tariffs in LMV-6 category
Date: January 23, 2017 In-House paper on Implementation of Telescopic Tariffs in LMV-6 category Background As per Section 61 of the Electricity Act, 2003, the electricity Tariff charged from any consumer
More informationNew Rate Structure Encouraging greater efficiency
New Rate Structure Encouraging greater efficiency Presentation for CHENACT Project Stephen Worme Chief Marketing Officer March 31, 2010 Agenda Tariffs for Hotels Secondary Voltage Power (SVP) Large Power
More informationIn-House Paper on the implementation of Single Part Tariff in Power Distribution
December 9, 2016 In-House Paper on the implementation of Single Part Tariff in Power Distribution Background: Tariff Introduction: Tariff is the price Structure at which electricity is sold to the consumers.
More informationFirst Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.
First Revision of Sheet No. 11.1 P.S.C.U. No. 50 Canceling Original Sheet No. 11.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 11 STATE OF UTAH Street Lighting Company-Owned System AVAILABILITY:
More informationTHE PUBLIC SERVICE COMMISSION OF WYOMING
NAME: Powder River Energy Corporation WY PSC Tariff No. 7 ADDRESS:, Sundance, WY 82729 THE PUBLIC SERVICE COMMISSION OF WYOMING TARIFF RATE RIDER 5th Revised Sheet No. 1 Cancels 4th Revised Sheet No. 1
More informationBlock No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur
Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur ARR/TARIFF PETITION FY-12 PROPOSED TARIFF SCHEDULE - LT ANNEXURE TO TARIFF PETITION FOR FINANCIAL
More informationA detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites /
PRESS STATEMENT The Kenya Power & Lighting Company Limited (KPLC) has submitted an Application to the Energy Regulatory Commission (ERC) for approval of the proposed Electricity Tariffs and Tariff Structures
More informationNational Electric Power Regulatory Authority Islamic Republic of Pakistan
National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar 2nd Floor, OPF Building, G-512, Islamabad Ph: 9206500, 9207200, Fax: 9210215 E-mail: registrar@nepra.org.pk No. NEPRA/TRF-133/KESC-2009/4766-4770
More informationApplication for release of capital subsidy on installation of Grid Connected Solar Power Plant
Chandigarh Renewal Energy, Science & Technology Promotion Society (CREST) Under the Aegis of Department of Science & Technology, Chandigarh Administration), Paryavaran Bhawan, First Floor, Sec-19B, Madhya
More informationMINUTES OF THE 47 th SLCF MEETING HELD ON
MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION
More informationRATE SCHEDULE FOR FY
ANNEXURE XII RATE SCHEDULE FOR FY 2009-10 ANNEXURE -XII Page 231 RETAIL TARIFFS FOR FINANCIAL YEAR 2009-10: The Uttar Pradesh Electricity Regulatory Commission (UPERC), in exercise of power vested in it
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007
KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)
More informationI N V O I C E S U M M A R Y
I N V O I C E S U M M A R Y Send To: Chief Engineer Copy To: New Power House Industrial area phase I Near Transport Chowk, Chandigarh 160001 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary:
More informationBEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) SETTLEMENT TESTIMONY MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS ENTERGY SERVICES, INC.
BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF FOR APPROVAL OF CHANGES IN FOR RETAIL ELECTRIC SERVICE SETTLEMENT TESTIMONY OF MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS
More information-and- Peter W. Gurnham, Q.C., Chair. ("Utility"), made application on January 14, 2015, to the Nova Scotia Utility and Review
ORDER M06662 2015 NSUARB 11 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT -and- IN THE MATTER OF AN APPLICATION by the TOWN OF BERWICK, on behalf of its ELECTRIC COMMISSION,
More informations m BC hydro REGENERATION December 22, 2011
BC hydro REGENERATION s m Janet Fraser Chief Regulatory Officer Phone: 6046234046 Fax: 6046234407 bchydroregu latoryg rou p@bchydro.com December 22, 2011 Ms. Alanna Gillis Acting Commission Secretary British
More informationHydro One Networks Inc. TARIFF OF RATES AND CHARGES for the Service Area Formerly Served by Napanee Electric Commission Effective Date: May 1, 2007
Page 1 of 7 Page 1 of 7 APPLICATION The application of these rates and charges shall be in accordance with The Licence of The Distributor and any Codes, Guidelines or Orders of The Board, and amendments
More informationANNEXURE A RATE SCHEDULE
ANNEXURE A RATE SCHEDULE AS PER UP ELECTRICITY REGULATORY COMMISSION ORDER DATED NOV 10, 2004 224 Retail Tariffs for the Financial Year 2004-05 The Uttar Pradesh Electricity Regulatory Commission (UPERC),
More informationDAKSHIN GUJARAT VIJ COMPANY LIMITED LIMITED SURAT MYT Petition, True-up Petition Formats - Distribution & Retail Supply Sr. No. Title Reference 1 Aggr
DAKSHIN GUJARAT VIJ COMPANY LIMITED LIMITED Title Reference 1 Aggregate Revenue Requirement - Summary Sheet ARR-Summary 2 Customer Sales Forecast Form 1 3 Power Purchase Expenses Form 2 4 Summary of Operations
More informationBEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR
BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR CASE NO. Filing of Petition for True Up of & Determination of Tariff for FY 2018-19 Under GERC MYT Regulations 2016 and Section 62 of the
More informationGOVERNMENT OF ANDHRA PRADESH ABSTRACT
1 GOVERNMENT OF ANDHRA PRADESH ABSTRACT PUBLIC SERVICES Employees Welfare Scheme Andhra Pradesh State Employees Group Insurance Scheme 1984 Revised Rate of Interest on accumulated Savings Fund Communication
More informationis attached to and becomes a part of a agreement dated, 20,
Electric Metal Melting (Alternative) Schedule Designation R1.1 Standard Contract Rider No. 1.1 DE 963-7033 8/18 THIS RIDER, dated, 20, is attached to and becomes a part of a agreement dated, 20, between
More informationH.R. Renewable Energy and Energy Conservation Tax Act of 2008
H.R. Renewable Energy and Energy Conservation Tax Act of 2008 February 12, 2008 I. INCREASE PRODUCTION OF RENEWABLE ELECTRICITY Long-term extension and modification of renewable energy production tax credit.
More informationLevel 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)
Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Interconnection Customer Contact Information Name Alternative Contact Information (if different
More informationTemporary Adjustments to Rates for Low-Income Programs.
Onita R. King Rates & Regulatory Affairs Tel: 503.721.2452 Fax: 503.721.2516 email: ork@nwnatural.com September 12, 2016 NWN WUTC Advice No.16-04 / UG- Steven V. King, Executive Director & Secretary Washington
More informationSAILASHREE VIHAR, BHUBANESWAR TEL , , FAX
ODISHA ELECTRICITY REGULATORY COMMISSION PLOT No.4, CHUNOKOLI, SAILASHREE VIHAR, BHUBANESWAR 751 021 TEL. No. 2721048, 2721049, FAX : 2721053/2721057 e-mail : orierc@gmail.com website : www.orierc.org
More informationRE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES
January 31, 2017 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice 16-020 Schedule 45 Public DC Fast Charger Delivery
More informationMarch 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition
Donald A. Fellows, Jr. Manager of Revenue and Tariffs March 13, 2000 ADVICE 1439-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Modification to Power Factor
More informationENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE
Page 1 of 19 ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE RATES IN EFFECT AS OF JANUARY 1, 2017 Page 2 of 19 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100
More informationDETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)
DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION
More information