1 UIC ERTMS Conference Budapest ETCS in Switzerland Views and Learning from an early Investor Signal to the future 1
2 UIC ERTMS Conference Budapest Topics: 1. Ongoing ETCS Level 2 Projects 2. Strategy and Rollout planning 3. Benefits of ETCS Level 1 Limited Supervision Signal to the future 2
3 Current ETCS Level 2 projects New Line Mattstetten-Rothrist (NBS) NBS Mattstetten-Rothrist 45km double track, thereof 14.5 km in tunnels 242 trains per day (total ) Headway km/h Nominal speed 200km/h Signalling system ETCS Level 2 based on subset of SRS with lateral signal fallback fleet of 468 vehicles retrofitted with ETCS Commissioning of ETCS Level 2 by mid 2006 nationale Zugsicherung SIGNUM und ZUB ETCS Level 1 Limited Supervision ETCS Level 2 3
4 Current ETCS Level 2 projects Status of ETCS on the New Line NBS _ Since the line is operational with fallback system (line side signalling) at maximum speed of 160km/h. _ In May 2005 Site Acceptance Tests of the vehicles has successfully been passed. _ From July to Dec the Level 2 system was successfully tested during days with «Shadow Running» (total of 600 runs). _ From of system stress test close to timetable has been performed (2100 runs with 8 trains simultaneous). _ End of March 2006 the refitting of the 468 vehicles with ETCS was completed. Concept for commissioning: _2nd July 2006: commercial operation in off-peak hours. _December 2006: full commercial operation at maximum speed of 160 km/h. _December 2007: full commercial operation at 200km/h. 4
5 Current ETCS Level 2 projects Concept of Commissioning ETCS Level 2 on NBS Jan Feb März 2006 Apr Mai Juni Juli Aug Sep Okt Nov Dez 1st phase time table train runs Shadow Runs 2nd phase time table train runs Train runs in Level 0 on rest of network 1st phase: (8 Locos, Vmax=125km/h) Timeframe 23:30 h 05:45 h Headway 2 minutes 64 train runs per night Vehicles Re420 / Re460 / Re465 Allowance for operation from FOT Reduced commercial operation with ETCS L2 (passenger traffic in off-peak hours) New time table Commercial operation of ETCS L2 Specification of the 1st series of time-table train runs: _ A total of 2100 train runs were performed during 43 nights _ Using a specific time-table based on 2 minutes headway and 125 km/h maximal speed _ Test fleet was composed of 8 locos and accomplished km in total (all locos simultaneously on NBS) _ ETCS took over full safety responsibility _ During day time 3 train sets performed additional runs on the re maining network, for the purpose of endurance testing 5
6 Current ETCS Level 2 projects Aims of Time-Table Train Runs _To gain an impression about system stability under target operational conditions. _to apply operational measures: out of course runnings (train delays), number of safety cut-outs of ETCS trackside equipment. _to detect any system anomalies which were not revealed during pr evious test campaigns (i.e. one-loco field test). _to familiarise a broader group of operational staff with the handling of ETCS systems. 6
7 Current ETCS Level 2 projects Results of Time-Table Train Runs Number of Events _None of the events did have an impact on safety _One issue related to RBC availability was resolved within a week. _The issues causing most of the system cut-outs have been eliminated until end of March Sum Availability Subject to availability, but analysis not yet finalised 7
8 Current ETCS Level 2 projects New Base Tunnel Lötschberg (LBL) LBL Lötschberg base tunnel _ 34.6 km single / partial double track tunnel _ 110 trains per day (total ) _ Headway km/h _ Maximum Speed 250km/h _ Signalling system ETCS Level2 based on subset of SRS with minimal lateral signal fallback _ Commissioning of ETCS Level 2 planned for June
9 Current ETCS Level 2 projects Status of ETCS on the New Base Tunnel LBL _ Development and testing of signalling system is on time. _ A dedicated test track (1200m) outside the tunnel is being operated for system testing. Interoperability tests between Alstom onboard and Alcatel trackside have successfully been performed. _ Approx train runs have to be performed until December 2007 to proof the robustness of the ETCS system. _ Until end of 2007 a total fleet of 553 vehicles will be fitted with ETCS for operation on NBS and LBL. Concept for commissioning: _May 2007: reduced commercial operation (cargo trains) _December 2007: full commercial operation (110 trains per day, mixed traffic) 9
10 Current ETCS Level 2 projects Overview Interoperability in Switzerland Vehicle fleet equipped with ETCS on -board system (total fleet of 553 vehicles / 644 systems / 20 loco types are b eing equipped with ETCS) «compatibility» (Italy) New Line Mattstetten-Rothrist New Basetunnel Lötschberg New HS-Lines in Italy Lines equipped with ETCS Level 2 track-side system (total track-length of 136km will be in operation with ETCS Level 2) 10
11 Current ETCS Level 2 projects Lessons learnt from the ongoing Projects _ Successful implementation of ERTMS/ETCS needs an overall system-leadership managing the integration process and taking care of both, track-side and on-board system. _ To provide compatibility between different suppliers, «Bug fixings» has been urge required to get the current ETCS project into operation (SRS SRS2.3.0). _ To implement interoperability on the TEN-T corridor projects, enhancements in functionality (e.g. national parameterisation of braking curves, crypto key management, RBC-RBC handover) are required in the specification ( SRS3.0.0). _ ERTMS is an IT-based technology to be implemented in a safety-relevant railway environment. This requires new skills, new processes and training of the system operators. 11
12 UIC ERTMS Conference Budapest Topics: 1. Ongoing ETCS Level 2 Projects 2. Strategy and Rollout Planning 3. Benefits of ETCS Level 1 Limited Supervision Signal to the future 12
13 ETCS strategy and rollout planning Driving Factors of the Strategy Journey time Capacity Network Access Interoperability Renewal of signalling system Requirement: Higher speed, shorter headways and need for capacity increase require cab-signalling and traffic management system. Requirement: Fastest possible transition to «ETCSonly» onboard equipment. Requirement: Interoperability on the North-/South corridor to be achieved until Requirement: The legacy signallingsystems are getting obsolete and has to be replaced. 13
14 ETCS strategy and rollout planning Targets of SBB Strategy SIGNUM ZUB ETM SIGNUM ZUB ETM ETCS 2006 Multiple system equipments Legacy national system SIGNUM ZUB ETM ETCS inkl. LS ca ETCS only equipment for new vehicles existing fleet will operate as before ETCS on entire network Target to be achieved New vehicles will only require ETCS onboard equipment for unrestricted network access. Generation of customer benefit Action to be done National legacy system will be replaced and standardised by ETCS on the entire network. Implementation within short period 14
15 ETCS strategy and rollout planning Overview of transalpine Cargo Traffic (2003 / 2004) Lötschberg: 16m gross t per year source SBB I-BF-NK, statistic 2004 mixed traffic: Wagon load freight, Unaccompanied intermodal traffic, Rollende Landstrasse (piggyback) Gotthard: 36m gross t per year source SBB I-BF-NK, statistic 2004 mixed traffic: Wagon load freight, Unaccompanied intermodal traffic, Rollende Landstrasse (piggyback) 15
16 ETCS strategy and rollout planning Focus 2012: North- / South Corridor Targets until approx _ Implementation of ETCS Level 2 and Level 1 Limited Supervision on north-/south corridors as part of Rotterdam-Genua project. Rollout in coordination with infrastructure companies and operators (cargo). Technical interoperability to be the main focus. national signalling system SIGNUM and ZUB ETCS Level 1 Limited Supervision ETCS Level 2 short term 16
17 ETCS strategy and rollout planning Mid-term Focus: Replacement of Legacy System Targets until approx _ Commissioning of ETCS Level 2 on new Gotthard Base Tunnel (53km) _ Replacement of legacy system ZUB/SIGNUM on entire network by ETCS Level 1 Limited Supervision _ First application of ETCS Level 2 within nodes/hubs. ETCS Level 1 Limited Supervision ETCS Level 2 short term 17
18 ETCS strategy and rollout planning Lessons learnt from 1st Migration Steps _ ETCS has to generate benefits for the operators as soon as possible. Thereby reduction of equipment cost is the overall objective. _ Funding of onboard equipment must be considered together with the first ETCS projects. Otherwise migration may fail and ETCS would not be accepted by the operators. _ Infrastructure managers have to define a migration-strategy that shows the transition to ETCS on the entire network. Thereby ETCS has to fulfill at least technical interoperability at the same level of safety as the existing national signaling system. _ The corridor approach shall be used as the inception kernel followed by the rollout on the entire network. Leanings from one corridor project should be assigned to the others. _ The first implementation of ETCS must not be the one for the next 100 years. An intermediate solution may be useful for transition to the final Level 2 or 3 implementation. 18
19 UIC ERTMS Conference Budapest Topics: 1. Ongoing ETCS Level 2 Projects 2. Strategy and Rollout planning 3. Benefits of ETCS Level 1 Limited Supervision Signal to the future 19
20 Benefits of ETCS Level 1 Limited Supervision ETCS Solution within Nodes??? 20
21 Benefits of ETCS Level 1 Limited Supervision ETCS Solution within Nodes?? ETCS-Line Equipment in 2021 for High-Velocity-Lines (HVL)?? ETCS Line Equipment parallel ETCS and LZB gaps to be filled with? 21
22 Benefits of ETCS Level 1 Limited Supervision Characteristics of ETCS Level 1 Full- and Limited Supervision ETCS FS FS FS FS LS LS LS LS (technical) Interoperability operation based on ETCS operating rules potential increase of safety requires modern interlocking full reengineering of trackside needed operation based on national operating rules at least same national level of safety works with any interlocking generation existing trackside engineering remains Full Supervision Mode for high speed and conventional Lines Limited Supervision Mode for conventional Lines only 22
23 Benefits of ETCS Level 1 Limited Supervision Advantages for Train Operator Simplification of onboard equipment For the rolling-stock, Limited Supervision supports the aim of reducing costs for the onboard equipment, means reducing the transition period where both ETCS and national systems are required. Clear operational rules The main difference between ETCS Full Supervision and LS is the suppression of cab signalling information. For this reason the driver is responsible for obeying the line-side signals as well as other information generally needed for driving according to national rules. No impact on existing installations The introduction of the new mode Limited Supervision requires just minor modifications in the specification and will be implemented together with the next release of ERTMS (SRS 3.0.0). All existing ETCS-installations will not be influenced by this new mode. 23
24 Benefits of ETCS Level 1 Limited Supervision Business case for Infrastructure-Managers Technical Interoperability The basic aim with this new ETCS mode is to create the possibili ty for equipping dedicated lines and/or nodes with ETCS track-side equipment in short time with a minimum of costs so that technica l interoperability with ETCS equipped trains is obtained. Adaptation to existing infrastructure ETCS Level 1 Limited Supervision may be overlaid to an already existing signalling infrastructure. Existing Interlockings, line-side signals and cabling are not touched. Upgradeability Sunk costs will be minimal, when at a later occasion, e.g. in context of a complete renewal, ETCS with Full Supervision will be installed on those routes. Functionality and safety ETCS with Limited Supervision will provide at least the same functionality and safety level as the already existing national signalling and cc-system. 24
25 Benefits of ETCS Level 1 Limited Supervision Business case for Industry Generating volumes The quick implementation of Limited Supervision will generate additional new projects on infrastructure as well as on train operator side. The sooner ETCS is available on the network, the more operators are equipping their trains with ETCS. Simple implementation The additions are mostly limited to the already existing mode- and mode transition tables in chapter 4. Only a few additions have to be studied and added to the other chapters. No new principles The changes follow the basic concepts of ERTMS/ETCS, especially the already defined modes Full Supervision and On Sight, no new principles or concepts are introduced. The changes are defined from an ERTMS/ETCS point of view and not as a national solution. 25
26 Benefits of ETCS Level 1 Limited Supervision Limited Supervision: a Win-Win Approach Win-Win Train Operators: Faster transition to ETCS-only Infrastructure Managers: More ETCS for the money «Limited Supervision» is requested to be implemented together with the next specification of ERTMS (SRS 3.0.0). 26
27 Main Conclusions ETCS Level 2 will confirm it s operational fitness and performance on the NBS by end of Application scale and performance requirements (mixed traffic, 2 min. 200 km/h) will provide a reference for many other ETCS applications on conventional rail in Europe. The key investments for fast implementation of ETCS on the entire network in Switzerland are done. More than 500 vehicles are already equipped with EuroCAB and EuroRadio. Implementation of ETCS happens with customer focus : infrastructure provides an attractive ETCS-only access on the whole network, including stations. The north-south corridor approach will generate the first benefit for cargo operators from 2012 on. 27
28 UIC ERTMS Conference Budapest Thank you! Signal to the future 28
Need, Strategy and Implementation of ERTMS
Need, Strategy and Implementation of ERTMS A contribution to interoperability, capacity enhancement and safety in Switzerland Jan Richard Strategy Manager ERTMS SBB Infrastructure UIC ERTMS Platform Plenary,
More informationIndustry experience with ERTMS projects in Switzerland
Industry experience with ERTMS projects in Switzerland The challenge of Interoperability Friedrich HAGEMEYER () Chairman of UNIFE ETCS Steering Committee UIC ERTMS World Conference Bern, 12 September 2007
More informationThe Swiss approach based on B3
Schweizerische Eidgenossenschaft Confédération suisse Confederazione Svizzera Confederaziun svizra Federal Department of the Environment, Transport, Energy and Communications Federal Office of Transport
More informationERTMS Level 2 Trackside
Industry experience with ERTMS Level 2 Trackside Guillaume de TILIERE (ALSTOM ERTMS Standard) Content: 1. ERTMS L2 versus L1 2. ERTMS L2 Trackside Products 3. Projects and experience in commercial operation
More informationETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments
ETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments Michel Van Liefferinge, UNISIG General Manager CCRCC 2012 6-7 November 2012, Lille UNIFE & UNISIG
More informationERTMS/ETCS braking curves Robert Dijkman EEIG ERTMS Users Group
ERTMS/ETCS braking curves Robert Dijkman EEIG ERTMS Users Group 15-17 December 2004 UIC ERTMS Conference Rome 1 Why are braking curves an issue? SRS 222: 1. No feasible input defined to enable the driver
More informationLeading the way to the future. Peter Elestedt
ERTMS Regional Leading the way to the future Peter Elestedt UIC ERTMS World Conference, Stockholm, 26 April 2012 Agenda Bombardier implementation of ERTMS Regional ERTMS Regional outside Europe Leading
More informationERTMS Platform Steering # 15 Brussels, 2 Dec Update on ERTMS MoU activities and on ERTMS implementations in Europe (from UIC data base)
Update on ERTMS MoU activities and on ERTMS implementations in Europe (from UIC data base) The MoU signed on 17 March 2005 in Brussels between the European Commission and the European Railway associations
More informationPlease find enclosed a letter from François Bellot, Minister for Mobility, regarding the above matter. [complimentary close]
Letter from: Jan Hoogmartens, Deputy Permanent Representative of Belgium to the European Union Date: 5 July 2017 To: Violeta Bulc, Commissioner for Transport; copies to: K. Fitch, DG MOVE; A, Cordeiro
More informationPlatform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation)
Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation) LILLE - Valenciennes, - E R A February, the 5 th - 2009 Overview 1. Italian ETCS high speed lines in
More informationDer ERTMS-Markt außerhalb Europas
Der ERTMS-Markt außerhalb Europas DR. KLAUS MINDEL www.thalesgroup.com ETCS worldwide market Africa 2 ETCS worldwide market Near middle far East 3 ETCS worldwide market middle south America More information?
More informationsiemens.com/mobility Trainguard Full interoperability for rail traffic
siemens.com/mobility Trainguard Full interoperability for rail traffic Siemens we offer our customers optimized ETCS solutions One of the major challenges faced by society is to ensure mobility. To remain
More informationA Joint initiative by ProRail and Network Rail for ETCS Level 3 Hybrid Demonstration
A Joint initiative by ProRail and Network Rail for ETCS Level 3 Hybrid Demonstration 59 60 41 46 Britain s railways are booming but are facing a capacity crunch Passenger numbers have doubled since 1996
More informationNational technical rules for vehicles Related Control Command and Signalling Requirements
National technical rules for vehicles Related Control Command and Signalling Requirements Note: Relevant TSI is Control, Command and Signalling (Commission Regulation (EU) 2016/919 of 27 May 2016 - which
More informationThe criteria of choice for new High Speed fleet
Amsterdam, March 17-19th, 2008 The criteria of choice for new High Speed fleet Emilio Maestrini CONTENTS 1. DRIVERS 2. MAIN FACTORS ON HIGH SPEED MARKET 3. EVOLUTION OF HIGH SPEED SYSTEM 4. INTEROPERABILITY
More informationHigh Speed Passenger Rail Interoperability in North America
High Speed Passenger Rail Interoperability in North America APTA Rail Conference - Boston Thomas Peacock Larry D. Kelterborn June15, 2011 Discussion Topics The New Transportation Vision Meaning of Interoperability
More informationAnnex A. to Technical Specification "Operations and traffic management" adopted by
Document version : 1 Annex A to Technical Specification "Operations and traffic management" adopted by Commission Decision 2008/231/EC of 1 st February 2008 concerning the technical specification of interoperability
More informationRailway Obsolescence Management Contract
Railway Obsolescence Management Contract Olivier Vivancos, Alstom IIOM Conference, June 2017 A complete range of transport solutions ROLLING STOCK Tram, metro, suburban/regional, high speed, very high
More informationInteroperability TSIs applicable to Railway vehicles. Innotrans, September, 2010
Interoperability TSIs applicable to Railway vehicles Innotrans, 21-24 September, 2010 1. Purpose of the presentation 2. Geographical scope (Directives and TSIs) 3. Technical scope of TSIs 4. TSIs applicable
More informationSignalling Programme. Presentation of Banedanmarks ERTMS programme Programme Diretor Morten Søndergaard
Signalling Programme Presentation of Banedanmarks ERTMS programme 12.02.2013 Programme Diretor Morten Søndergaard Background of the Signalling Programme Rail Data 3.000+ trains/day 38.000 daily departures
More informationUNISIG * EEIG ERTMS USERS GROUP * UNIFE
ERTMS/ETCS REF: VERSION: DATE: 17/12/15 Page 1/18 Modification history Issue number date Draft 27.07.99 Draft 01 30.08.99 0.1.1 24.09.99 1.0.0 11.10.99 1.0.1 31.01.2000 1.0.2 14.02.2000 1.0.3 22.02 1.1.0
More informationIn the report various scenario s are presented, which have been investigated. The figure below shows the scope of the three (main) senario s:
National Implementation Plan of ERTMS in The Netherlands 1. Decision making process April 2014: Preference decision In April 2014 the Dutch Parliament agreed with the Dutch Government to implement its
More informationHybrid ERTMS/ETCS Level 3
123-133 Rue Froissart, 1040 Brussels, Belgium Tel: +32 (0)2 673.99.33 - TVA BE0455.935.830 Website: www.ertms.be E-mail: info@ertms.be Principles Hybrid ERTMS/ETCS Level 3 Ref: Version: Date: Hybrid ERTMS/ETCS
More informationNotified National Technical Rules (NNTRs)
Federal Department of the Transport, Energy and Communications DETEC Infrastructure Division ID CH-TSI CCS-001 State: Status Applicable from: July 2016 s for the use of rolling stock on ETCS lines Referenced
More informationThe Signalling Programme
The Signalling Programme Jan Schneider-Tilli, Programme Director 1. June 2016 - DTU 1 Agenda 1. Background to the Signalling Programme 2. ERTMS 3. Way ahead 4. Programme Management, Collaboration & MSP
More informationCommuter Rail Update. October 25, 2018
Commuter Rail Update October 25, 2018 2 page page 3 State of Commuter Rail Network, July 2014 The 2014 Commuter Rail network had multiple issues and a history of neglect & under-investment FIRST UP? UPGRADES
More informationPOSITION PAPER Version 3.0
POSITION PAPER Version 3.0 Revision of the Technical Specification for Interoperability / Energy (ENE) Brussels, September 26 th, 2012 1. REFERENCE DOCUMENT UNION RAIL SYSTEM - SUBSYSTEM Energy - TSI Energy
More informationThe Engineering Department recommends Council receive this report for information.
CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision
More informationRetrofitting unlocks potential
54 ABB REVIEW SERVICE AND RELIABILITY SERVICE AND RELIABILITY Retrofitting unlocks potential A modern approach to life cycle optimization for ABB s drives delivers immediate performance improvement and
More informationModernising the Great Western railway
Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western
More informationOverview of Railway Noise Control in Europe
Overview of Railway Noise Control in Europe J. Oertli Swiss Federal Railways, Schanzenstrasse 5, 3000 Bern, Switzerland jakob.oertli@sbb.ch 1789 European and national legislation, increasing freight traffic,
More informationAŽD Praha. ATO system type AVV. in everyday operation at Czech railway network. Vladimír Kampík. European Affairs Director, AŽD Praha
AŽD Praha ATO system type AVV in everyday operation at Czech railway network Vladimír Kampík European Affairs Director, AŽD Praha Rail traffic automation 3 pillars TARGET: Increase capacity and effectives
More informationThe German Tolling Prospects
The German Tolling Prospects Christian Kohlhase First Secretary (Transport, Building and Urban Affairs) National Governors Association State Summit on Innovative Transportation Funding and Financing Washington,
More informationCustomer Service, Operations and Security Committee. Information Item III-A. January 12, 2017
Customer Service, Operations and Security Committee Information Item III-A January 12, 2017 Train Reliability Program Page 4 of 19 Washington Metropolitan Area Transit Authority Board Action/Information
More informationAutomatic Electronic Gas Metering Management in Italy
Automatic Electronic Gas Metering Management in Italy Richard W Black Energy & Utilities Consultant IBM ITALIA AGENDA Introduction Automatic Electronic Gas Metering Management in Italy Gas Standards -
More informationThe opening of European retail electricity markets to competition: lessons learned from the United States
The opening of European retail electricity markets to competition: lessons learned from the United States Stéven Curet Power Industries, Economic Department - Embassy of France 23 rd IAEE North American
More informationSatellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania
Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania Teodor Gradinariu UIC Burkhard Stadlmann Wels University, Austria Ioan Nodea RCCF, Romania
More informationHybrid ERTMS/ETCS Level 3
123-133 Rue Froissart, 1040 Brussels, Belgium Tel: +32 (0)2 673.99.33 - TVA BE0455.935.830 Website: www.ertms.be E-mail: info@ertms.be Principles Hybrid ERTMS/ETCS Level 3 Ref: Version: Date: Hybrid ERTMS/ETCS
More informationMODERN TRAMS IN SCANDINAVIA
May 2017 Banekonference MODERN TRAMS IN SCANDINAVIA Besançon, France Agenda Introduction to SYSTRA Group profile, expertise & services Tramway à la française concept Our view of a modern tram Our general
More informationDraft Results and Open House
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi
More informationAdvantages of ERTMS for Sweden
Advantages of ERTMS for Sweden Reduced investment cost (>30%) Reduced maintenance costs for infrastructure (>20%) Increased competition between suppliers Advantages of ERTMS (2) Better traffic flow Increased
More informationRailway noise control in urban areas. Jakob Oertli, SBB Infrastructure, Noise Abatement; Chair UIC Noise Groups
Railway noise control in urban areas Jakob Oertli, SBB Infrastructure, Noise Abatement; Chair UIC Noise Groups Contents. 1. Railway noise situation 2. Policy and legislation 3. Noise reduction technology
More informationBuilding a single European market for railway rolling stock
Building a single European market for railway rolling stock Janis Vitins Locomotive Division Rail Forum Europe Strasbourg, 5 th July 2011 Bombardier A world leader in rail transportation, business & regional
More informationSNCF ERTMS RETURN ON EXPERIENCE THOMAS JOINDOT RAILWAY STRATEGY AND REGULATION DEPARTMENT UIC ERTMS CONFERENCE STOCKHOLM
SNCF ERTMS STRATEGY AND RETURN ON EXPERIENCE THOMAS JOINDOT ERTMS DIRECTOR RAILWAY STRATEGY AND REGULATION DEPARTMENT UIC ERTMS CONFERENCE 1 SNCF ERTMS STRATEGY AND RETURN ON EXPERIENCE Paris LONDON January
More informationHow our experience could serve your ambitions Lessons learnt
London Sept 11, 2014 How our experience could serve your ambitions Lessons learnt Pierre-Etienne Gautier, VP Innovation, SYSTRA 1. hs2 Challenges HS2 project sets ambitious targets V360 70 M.ton/year in
More informationKEYNOTE Michel Ruesen Jaime Tamarit Abstract
25 número 5 - junio - 2018. Pág 85-91 The role of the ertms users group in the consolidation of the ERTMS technical specification for baselines 2 and 3 Michel Ruesen Jaime Tamarit ERTMS Users Group Abstract
More informationDraft Results and Recommendations
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System
More informationREDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS
REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS D-Rail Final Workshop 12 th November - Stockholm Monitoring and supervision concepts and techniques for derailments investigation Antonella
More informationVariable Speed Limit Pilot Project in BC
Variable Speed Limit Pilot Project in BC Road Safety Engineering Award Nomination Project Description and Road Safety Benefits British Columbia is unique in its challenges. The highways network has more
More informationSound Transit Operations July 2016 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link
More informationSP2 Requirements toward the freight system of FFE (Madrid Spain) 21 September 2017
Capacity for Rail SP2 Requirements toward the freight system of 2030-2050 FFE (Madrid Spain) 21 September 2017 Bo-Lennart NELLDAL Project Leader WP2.1 Content 1. Today s market 2. Demand for rail and freight
More informationDiagnostic car of SBB Infrastructure
Diagnostic car of SBB Infrastructure Infrastructure Asset Management I-FW-FB, 01.05.2006 Measurement SBB Stöckackerstrasse 25 CH-3018 Berne Telefon ++41 512 20 23 90 Fax ++41 512 20 39 22 E-mail peter.waelchli@sbb.ch
More informationEnglish version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface
English version of Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr. 1127 af 30. november 2012) Preface Please note that the English version is for informational
More informationInfrastructure investment
EN ANNEX I Physical object of the major project Infrastructure investment 1. Title of project: Modernisation of Cegléd traction substation, the line section Gyoma (excl.) Békéscsaba (incl.) and ETCS installation
More informationTOGETHER CHARGING A BRIGHTER FUTURE.
TOGETHER CHARGING A BRIGHTER FUTURE. A VISION To be at the forefront of the UK's transition to electric vehicles. Helping to decarbonise road transport across the Northern Power House Cities, through
More informationFoothill Transit Battery Electric Bus Performance Results
Foothill Transit Battery Electric Bus Performance Results Leslie Eudy Matt Jeffers EV Summit, Cocoa Beach, Florida October 18, 2016 Presentation Outline NREL overview Zero emission bus (ZEB) evaluation
More informationHigh speed innovation in Adif. Antonio Berrios Villalba ADIF (Spain)
Fast track to Sustainable Mobility High speed innovation in Adif Antonio Berrios Villalba ADIF (Spain) Topic 6 Innovations in Fixed and Mobile Equipment, Session D Technical developments in superstructure
More informationMobility Management: Caltrain
Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review
More informationFast Charging - a strategic view from E.ON
Fast Charging - a strategic view from E.ON Matthias Mahrt, E-Mobility @ E.ON Innovation and Projects, E.ON AG CHAdeMO Europe Assembly Amsterdam, 23.09.2011 An overview. Of us. E.ON is one of the world's
More informationTHE TRANSRAPID MAGLEV MAINTENANCE PROCESS
THE TRANSRAPID MAGLEV MAINTENANCE PROCESS (*) Dr.-Ing. Friedrich Löser, (**) Dr.-Ing. Chunguang Xu, (***) Dr. rer. nat. Edmund Haindl (*)ThyssenKrupp Transrapid GmbH, Moosacher Str. 58, 80809 Munich, Germany,
More informationIMPROVING OUR NETWORK PERFORMANCE. BNSF Service Update
IMPROVING OUR NETWORK PERFORMANCE BNSF Service Update 1 Service Challenges Taking Action Progress Service Challenges Service Challenges Increasing Volumes Support Continued BNSF Growth 11,000 2006 Units
More informationUsing cloud to develop and deploy advanced fault management strategies
Using cloud to develop and deploy advanced fault management strategies next generation vehicle telemetry V 1.0 05/08/18 Abstract Vantage Power designs and manufactures technologies that can connect and
More informationElectric Multiple Unit Procurement Update
Electric Multiple Unit Procurement Update Board of Directors August 7, 2014 Context* * The proposed project is not yet approved pending environmental clearance. 2 1 Status April 2014 - JPB update on EMU
More informationAustralia s First Fully Automated Metro Opportunities & Solutions. Oliver Fried Technical Director, Sydney Metro
Australia s First Fully Automated Metro Opportunities & Solutions Oliver Fried Technical Director, Sydney Metro Overview Sydney s rail future - Opportunities for metro Project features & performance Fully
More informationReview of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them
Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them Project Team João ALMEIDA (CP - jcdalmeida@mail.cp.pt ) David DE
More informationGuide for the application of the CR ENE TSI
European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.00 Date: 26 August 2011 Document prepared by Document type:
More informationIntermediate results
Intermediate results 11th UIC Sustainability Conference Madrid June 17th 2010 17.06.2010 1 Mads Bergendorff Macroplan Consulting Presentation overview Latest results of the project Simulation and evaluation
More informationService Quality: Higher Ridership: Very Affordable: Image:
Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to
More informationLoading gauge enhancement studies
Loading gauge enhancement studies RAG - 27 May 2015 easier, faster, safer Geographical scope This study focuses on the enhancement of loading gauge on the Calais Longuyon Luxembourg - Thionville Metz Strasbourg
More informationDP-5 Machine Operation and Controls:
DP-5 Machine Operation and Controls: 1. PR 5A : Vehicle Interactions (Levels 7 9) Performance Requirements User Requirements Development Tool (pending) UG Electric UG Diesel Surface Test Configurations
More informationLate Starter. Tuesday, November 6, 2018
Late Starter Tuesday, Please note the following item(s) was not included with your agenda as this item(s) was received after the agenda package was printed. Planning and Works Committee Report TES-RTS-18-09,
More informationLow Emission Vehicle Policy Development in London
Low Emission Vehicle Policy Development in London Garrett Emmerson Chief Operating Officer: Surface Transport, Transport for London London s Road Network There are around 28m transport trips in London
More informationThe potential for insurance markets to reduce road trauma. Samantha Cockfield, Manager Road Safety
The potential for insurance markets to reduce road trauma Samantha Cockfield, Manager Road Safety Outline TAC at a glance Role in road safety Road trauma the strategy Key reduction measures safer roads
More informationINSERO QUARTERLY, Q4 2014
INSERO QUARTERLY, Q4 20 - Nordic electric vehicle market overview with the latest sales figures, infrastructure overview and the main market tendencies FEBRUARY 2015 INSERO QUARTERLY, Q4 20 3 INTRODUCTION
More informationBattery Electric Bus Evaluation Results
Battery Electric Bus Evaluation Results Leslie Eudy Matt Jeffers 2017 APTA Bus and Paratransit Conference, Reno, NV May 8, 2017 NREL Snapshot Dedicated Solely to Advancing Energy Efficiency and Renewable
More informationDriverless Train Operation
Driverless Train Operation siemens.com.cn/ingenuityforlife Table of content Grade of Automation 3 Passengers expectations of driverless operation 4 Operators expectations of driverless operation 5 Siemens
More informationTrain Examination (Braking System) Addendum. Lesson Plan and WorkBook
Train Examination (Braking System) Addendum Lesson Plan and WorkBook (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates
More informationABB Drive Services Your choice, your future
ABB Drive Services Your choice, your future Your choice, your future The future of your drives depends on the service you choose. Whatever you choose, it should be a well-informed decision. No guesswork.
More informationProposed Program of Interrelated Projects
DALLAS AREA RAPID TRANSIT Proposed Program of Interrelated Projects Federal Transit Administration Capital Investment Program Summer 204 INTRODUCTION The current federal transportation bill, Moving Ahead
More informationChapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes
Chapter 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes 4.1 This chapter relates to the following questions listed
More informationANNUAL SUMMARY REPORT FY 2005 PERFORMANCE REPORT SUMMARY COMPARATIVE ANALYSIS
ANNUAL SUMMARY REPORT FY 2005 PERFORMANCE REPORT SUMMARY COMPARATIVE ANALYSIS RAIL OPERATIONS: Rail Passenger injuries increased from 34 in FY04 to 41 in FY05. The Woodley Park collision accounted for
More informationCommuter Rail Performance. October
Commuter Rail Performance October 31 2016 1 Background - overall performance Year To Date: 89.67% YTD 125,629 trains North: 90.79% YTD 48,426 trains South: 89.07% YTD 77,203 trains 2 Background - overall
More informationMobility Management Mobility Centre. Karl-Heinz Posch EPOMM-Coordinator FGM deputy-director
Mobility Management Mobility Centre Karl-Heinz Posch EPOMM-Coordinator FGM deputy-director EPOMM Member states EPOMM Member states Network partners in other countries Managing mobility for a better future
More informationPartial Automation for Truck Platooning
Partial Automation for Truck Platooning Observations and Lessons Learned to Date from California's Experience with Truck Platooning Matt Hanson 2017 ITS CA Conference September 18, 2017 Burlingame, CA
More informationNational implementation plan for France. (Version as of 27 June 2017) 1. General description of the signalling systems on the French network in 2017
Regulation (EU) 2016/919 from the Commission of 27 May 2016 on the technical specification for interoperability relating to the control-command and signalling subsystems of the railway system in the European
More informationUSING LEAN TO ENGAGE AND ALIGN THE ENTIRE ORGANIZATION. Didier Rabino, VP Lean Sensei Julie Garrison, HR System Director November 9, 2015
USING LEAN TO ENGAGE AND ALIGN THE ENTIRE ORGANIZATION Didier Rabino, VP Lean Sensei Julie Garrison, HR System Director November 9, 2015 ABOUT THE PRESENTERS Julie GARRISON HR System Director 1999 2006:
More informationPeninsula Corridor Electrification Project Cost / Schedule Update
Peninsula Corridor Electrification Project Cost / Schedule Update LPMG Meeting November 20, 2014 Context Caltrain/high-speed rail blended system - Primarily 2 track system - Minimize impacts - Shared system
More informationSofia Urban Transport challenges and strategies
Sofia Urban Transport challenges and strategies HoPE International Workshop, Karlsruhe 26 November 2015 Sofia Area 1 311 sq.km. Population 1 300 000 inhabitants Length of the public transport network 1
More informationUIC WORKSHOP ON ENERGY EFFICIENCY OF FUTURE TRAINS
UIC WORKSHOP ON ENERGY EFFICIENCY OF FUTURE TRAINS Infrastructure for energy efficiency: Innovation technologies towards energy efficiency Rome, 4-10-2017 Claudio Spalvieri RFI Technical Dpt. - Technology
More informationIs there an alternative solution?
From Manned Toll Collection to All Electronic Tolling Is there an alternative solution? Alexis ZASS President of the managing board - GEA 1 Toll collection operations on bridges, tunnels, or for town access
More informationHinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety
Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety 1 Where are we? Hinkley Point 2 EDF Energy s Nuclear New Build Projects February 2018 EDF Energy plc. All rights Reserved
More informationABB life cycle services Uninterruptible power supplies
ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you
More informationCongestion tax in Stockholm - Effects and Lessons learned
Congestion tax in Stockholm - Effects and Lessons learned Christer Rydmell, Swedish Road Adminstration Karin Brundell- Freij, WSPAnalysis 1& Strategy RUC in Sweden The Öresund bridge The Svinesund bridge
More informationINTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY
INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY Reference: IU-ENE-071221-TSI 2.1 Document Type: Version: Title: 2.1 - Draft Technical Specification of Interoperability Preliminary
More informationCaltrain Modernization EMU Procurement
Caltrain Modernization EMU Procurement Boarding Height CAC Meeting May 20, 2015 Context 2 1 Riders (Boardings) Average Weekday Ridership Since 2004 143% increase 60,000 55,000 50,000 45,000 40,000 35,000
More informationOffshore Application of the Flywheel Energy Storage. Final report
Page of Offshore Application of the Flywheel Energy Storage Page 2 of TABLE OF CONTENTS. Executive summary... 2 2. Objective... 3 3. Background... 3 4. Project overview:... 4 4. The challenge... 4 4.2
More informationTen years of truck toll collection in Austria
Press discussion Ten years of truck toll collection in Austria Kapsch a technical pioneer and international model for success July 2, 2014 02.12.2009 Titel der Präsentation Untertitel der Präsentation
More informationThe distributor valve
The distributor valve Understanding the operation of a pneumatic brake, and in particular of the operating principles of the pneumatic control, relies on understanding the global operation of the main
More informationInvestor Meeting June 16 th 2017
Investor Meeting June 16 th 2017 Last month, deliveries increased worldwide MAY 2017 vs. 2016 Germany 50,800 +6.0 % Europe 99,800 +5.9 % International 35,700-9.1 % North America 50,600-1.9 % South America
More informationThe Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit
The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,
More information