1 SERVICE REPORT ELECTRICAL ENGINEERING SERVICES FOR ELECTRICAL ENGINEERING SERVICES FOR PROPOSED TOWNSHIPS FOR PROPOSED TOWNSHIPS ESTER PARK X36, X 37 IRENE EXTENSION 193 SUPPLY AUTHORITY DEVELOPER ENGINEER : Ekurhuleni Municipality SUPPLY AUTHORITY: : JR 209 Investments City of Tshwane (Pty) Municipality Ltd : Pienaar & Erwee Engineers (Pty) Ltd DEVELOPER : : M&T Development (Pty) Ltd ENGINEER : Pienaar & Erwee Engineers (Pty) Ltd POSBUS 1831 P.O. BOX BROOKLYN PLEIN / SQUARE 0075 ROSLYNLAAN 389 ROSLYN AVENUE WATERKLOOF GLEN PRETORIA TEL: (012) Fax: (012) mail@erwee.co.za P1554/02 June 2017

2 INDEX Table of Contents 1. INTRODUCTION LAND DESCRIPTION MUNICIPALITY JURISDICTION AND SUPPLY TOWN PLANNING CADASTRAL DETAILS AUTHORISED CAPACITY BULK SUPPLY AND INFRASTRUCTURE SERVICE CONNECTION AUTHORISATIONS DESIGN PARAMETER COST ESTIMATES CONSTRUCTION PROGRAMME SUMMARY... 6 June

3 1. INTRODUCTION 1.1 The purpose of this report is: To provide motivation in support of the town planners memorandum and application for the approval of a subdivision and rezoning; and to confirm that the electrical engineering services can be provided to this proposed township on a sustainable basis Inform the relevant authorities of our involvement in the design of the electrical services for the proposed rezoning Provide high level cost estimate of the bulk electrical services Provide inputs to the town planner for any servitudes or other requirements from an electrical engineering prospective. 1.2 This report will be amended once the approval and conditions is available to eventually assist the Municipality to finalise a Service Agreement. 2. LAND DESCRIPTION 2.1 The proposed development is situated on a Part of the Remainder of Portion 221 of the farm Zuurfontein 33-IR. 2.2 Access to this development will be obtained from Parkland drive on the north eastern side of the proposed development. 2.3 The overall extent of the land on which the two adjacent townships will be established is 14,4957 ha. 2.4 The township application is being submitted by: JR 209 Investments (Pty) Ltd. (M&T Development (Pty) Ltd) 3. MUNICIPALITY JURISDICTION AND SUPPLY 3.1 The proposed developments are situated within the municipal jurisdiction and the electrical supply area of the Ekurhuleni Metropolitan Municipality (EMM). 3.2 The proposed developments falls within the supply area of the Esther Park primary substation, which is supplied from the Eskom 44kV overhead line. The substation is at present equipped with two banks of 2X5MVA 44/11kV transformators, which provides a firm capacity of 10 MVA. The present maximum demand on this substation is 14 MVA which means it is operating outside its firm capacity. 3.3 The Municipality has already appointed Engineers and a Contractor to upgrade the above substation to a 132/11kV substation being supplied from the 132kV Eskom overhead line which passes next to the substation. The Contractor has purchased all the material and is ready to commence with the construction of the substation. 3.4 At present Eskom is a big stumble block in obtaining the final approval to go ahead with the construction as changes must be made to the Eskom 132kV overhead line. June

4 3.5 The EMM bulk contribution and development policies will govern the terms of the service agreement for the development. 4. TOWN PLANNING 4.1 The present zoning of the land is Agricultural. 4.2 An application for township establishment will be submitted. 4.3 The Land-Use table will be as following: Item Description Erven Size (ha) Use FSR 1 Esther Park X Residential 4 75 u/ha 2 Esther Park X Residential 4 75 u/ha 5 CADASTRAL DETAILS 5.1 Various servitudes in favour of the Municipality must be provided for a Bulk Metering Kiosk (BMK) on each consolidated erf in each Township. The servitude must be 6m X 3m. 5.2 Wayleaves for bulk supply cables must be obtained. 6 AUTHORISED CAPACITY 6.1 Load Factor The load factors utilized for this development are as follows: Industrial : Limited to assembling & packing : 40 VA/m² of GLA warehousing, storage, distribution centres and subservient offices Business 2 : Commercial, offices, etc : 80VA/m² of GLA Residential 4 : Housing Development with Density of units/ha : 1.5 kva/unit 6.2 Methodology The method used to calculate the authorised capacity is based on the product of the different land uses and the specific load factors The above results are all summarised to obtain the authorised capacity of the township The total load demand on the substation and network will be less than the authorised capacity due to diversity of the load. June

5 6.3 Authorised capacity The authorised capacity of the Township is calculated in the following table: Table 2: Load Estimate based on planned zoning of land Item Description Land-Use Erven Area (ha) FAR / Density GLA/Units Load Factor Load kva Esther Park X36 a) Erf 1 Residential b) Erf 2 Residential Esther Park X37 a) Erf 1 Residential b) Erf 2 Residential ,740 Total authorised capacity = 1,740 kva 7 BULK SUPPLY AND INFRASTRUCTURE 7.1 The supply to this proposed development will be taken from the 11kV switchgear to be installed inside the substation 11kV switchgear room. 7.2 The bulk supply will be taken via 185mm² x 3 core 11kV PILC cables to supply this development in a ring. The cables will be installed in the overhead line servitude. By installing the cable in a ring with a T3 switch at the end one can easily extend the ring for any possible future developments in the area. 7.3 The Municipality indicated that they would support this application with one condition. The condition would be that the upgrade of the Esther Park substation as mentioned in par 3, has progressed to such an extent that one 40MVA transformer has been energised before the Development can be connected to the network or obtain a section 101 clearance. 7.4 Bulk supply to the extent required by this development will be available within the prescribed distance from the development, in terms of EMM bulk contribution policy. 7.5 In terms of the EMM bulk contribution policy the bulk contribution tariff of R1,5 million/ MVA will apply for this development and the bulk contribution will be payable. 8 SERVICE CONNECTION 8.1 All large erven with authorised capacity in excess of 200 kva will be supplied from the 11 kv network through a Bulk Ring Main Metering Unit with metering which will be installed in a servitude. June

6 9 AUTHORISATIONS 9.1 Wayleaves will need to be obtained for the following: Cable installation within the existing road reserves and servitudes External MV cable. 9.2 The proposed electrical services will be coordinated with the Civil services within the shared road reserves. 9.3 Environmental Authorisations: It is envisaged that no EIA approval would be required. 10 DESIGN PARAMETER 10.1 Designs will be based on standards and requirements of the Supply Authority The internal network of the development will be taken over by the Supply Authority Energy saving measures will employed to reduce the load demand required for the proposed development. Solar or heat pumps will be used for hot water and gas will be used for cooking Street lighting will be installed within the street reserves to comply with the Municipality Standards and specifications All the services will be installed within the street reserve The network design shall comply to the following standards: Office/Business : 8.0 kva/100 m² Industrial 1+2 : 4.0 kva/100m² Residential 2 : 4.0 kva/per unit Residential 3 : 3.5 kva per unit Residential 4 : 1.5 kva per unit Residential 1 : 5.0 kva per unit Special (Infrastructure) : 5.0 kva per unit Special (Gatehouse) : 5.0 kva per unit Schools : 2.0 KVA/100m² Special & Education : 3.5 kva/100m² POS : 0.0 VA/m² Roads : 0.0 VA/m² Max. Voltage Variation : 230 V ± 10 % 10.7 Specifications: Will be in accordance with EMM standards and specifications. June

7 11 COST ESTIMATES 11.1 Cost estimates will be provided with preliminary designs. 12 CONSTRUCTION PROGRAMME 12.1 This will be determined after approval of the application. 13 SUMMARY 13.1 Bulk capacity at 132 kv is available at the Esther Park substation. The Municipality must however finalise the design and construction approvals for the 132kV POD with Eskom and then construct the upgrade of the substation At present the delay is with Eskom and has been for the past 12 months. As soon as the approvals are obtained from Eskom the Municipality can commence with construction of the substation as majority of the material are available The Developer is willing to assist with any bulk construction required by the Municipality. PIENAAR & ERWEE Engineers (Pty) Ltd Per: J.ERWEE Pr. Eng. June

SERVICE REPORT ELECTRICAL ENGINEERING FOUNDERS HILL REMAINDER ERF 13

SERVICE REPORT ELECTRICAL ENGINEERING FOUNDERS HILL REMAINDER ERF 13 SERVICE REPORT ELECTRICAL ENGINEERING SERVICES FOR FOR PROPOSED ELECTRICAL REZONING ENGINEERING SERVICES FOR PROPOSED TOWNSHIPS FOUNDERS HILL REMAINDER ERF IRENE 13 EXTENSION 193 SUPPLY AUTHORITY DEVELOPER

More information

Electrical Engineering Services Report for Proposed Optenhorst Mixed Use Development, Erf 9209, Paarl

Electrical Engineering Services Report for Proposed Optenhorst Mixed Use Development, Erf 9209, Paarl CARSTENS PLASE (PTY) LTD Electrical Engineering Services Report for Proposed Optenhorst Mixed Use Development, Erf 9209, Paarl J24085 REVISION 3 14 March 2018 Electrical Engineering Services Report for

More information

ELECTRICAL SERVICES REPORT PROPOSED AVIEMORE RESIDENTIAL APARTMENT DEVELOPMENT, SEDGEFIELD. Mr. L. Gregory

ELECTRICAL SERVICES REPORT PROPOSED AVIEMORE RESIDENTIAL APARTMENT DEVELOPMENT, SEDGEFIELD. Mr. L. Gregory ELECTRICAL SERVICES REPORT FOR PROPOSED AVIEMORE RESIDENTIAL APARTMENT DEVELOPMENT, SEDGEFIELD FOR Mr. L. Gregory REPORT NO: G/11204/E/R1 Dated: 1 March 2013 2 INDEX Item Description Page 1.0 Introduction

More information

Appendix Item Addendum

Appendix Item Addendum Addendum to ESAH Version 3 Supply Application Appendix Item Addendum 1 Electrical System Item 1.4.5 Short Circuit Ratings Addendum for type of short circuit rating for system voltage of 275kV. 2 Types

More information

Reg No 2003/011612/30. Electrical Service Connection Policy

Reg No 2003/011612/30. Electrical Service Connection Policy Reg No 2003/011612/30 Electrical Service Connection Policy 1 CENTLEC (SOC) LTD Subject: Electrical Service Connection Policy Policy No: Directorate: Wires Board Item No: Sub-Directorate: Planning Date

More information

Design Criteria Implementation for the Network Development Plan Hursthill Substation

Design Criteria Implementation for the Network Development Plan Hursthill Substation Design Criteria Implementation for the Network Development Plan Hursthill Substation Presenter : Riaan Swanepoel PRTechEng 1 Introduction The City of Johannesburg is embarking on a new spatial vision for

More information

Electricity industry structure and key players

Electricity industry structure and key players Electricity industry structure and key players Growth in capacity, production and consumption, 2006 2017 Expected demand and addition to generation capacity, 2018 2027 Growth in transmission network and

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

The Energy Queensland Group Notice of no non-network options

The Energy Queensland Group Notice of no non-network options The Energy Queensland Group Notice of no non-network options 24 September 2018 MCE Mount Crosby East Establish new substation to replace Mount Crosby Substation (SSMTC) Page 1 of 1 DISCLAIMER While care

More information

Managing Director & Country Manager Namibia. SVP, Exploration

Managing Director & Country Manager Namibia. SVP, Exploration 96 97 Managing Director & Country Manager Namibia SVP, Exploration 98 Deep-water port access (Walvis Bay) MINING IN NAMIBIA 99 Population of 2.3 million (2011 World Bank estimate) Strong history of mining

More information

BACKGROUND INFORMATION DOCUMENT (BID)

BACKGROUND INFORMATION DOCUMENT (BID) BACKGROUND INFORMATION DOCUMENT (BID) ENVIRONMENTAL BASIC ASSESSMENT (BA) PROCESS ROODEPOORT STRENGTHENING PROJECT (DEA REF NO 12/12/20/2308) The proposed project consists of the following: Construction

More information

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing. LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com December 28, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 Re: Tariff Advice

More information

Networks. Charges for Connection to the Distribution System Revision 10 Status: Approved. Commercial and Customer Asset Management ESB Networks

Networks. Charges for Connection to the Distribution System Revision 10 Status: Approved. Commercial and Customer Asset Management ESB Networks Networks Charges for Connection to the Distribution System 2010 Revision 10 Status: Approved Commercial and Customer Asset Management ESB Networks Contents 1.0 ABOUT THIS DOCUMENT... 3 2.0 SCOPE... 3 3.0

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

SPP Notification to Construct

SPP Notification to Construct August 13, 2015 SPP Notification to Construct Mr. John Fulton Southwestern Public Service Company P.O. Box 1261 Amarillo, TX 79105 RE: Notification to Construct Approved Reliability Network Upgrades Dear

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Generation Interconnection Facilities Study For

Generation Interconnection Facilities Study For Generation Interconnection Facilities Study For Prepared for: Prepared by: SCE&G Transmission Planning May 27, 2015 TABLE OF CONTENTS General Discussion... Page 3 Generator Interconnection Specifications...

More information

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS Appendix 6.7 SUR ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Page No. Eligibility...1 Reference Demand...1 Billing...2 Interruptions...3

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

Bohn to Kettle River Transmission Project

Bohn to Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Electrical Engineering Services Report for the

Electrical Engineering Services Report for the Electrical Engineering Services Report for the proposed De Zicht residential development on notarially tied Erven 38435 and 38436, Milnerton, Cape Town J37004 Rev 1 11 September 2017 Electrical Engineering

More information

Kettle River Transmission Project

Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota P a g e 1 Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota The purpose of this document is to provide Garden Operators further documentation of engineering

More information

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington Wellington Electricity Lines Ltd 2 Submission on the Wellington Town Belt Bill To: Name: Local Government and Environment Select Committee Parliament Buildings Wellington Wellington Electricity Lines Limited

More information

Department of Energy. Integrated National Electrification Programme. February 2011

Department of Energy. Integrated National Electrification Programme. February 2011 Department of Energy Integrated National Electrification Programme February 2011 BACKGROUND After 1994 electrification programme was endorsed as part of government s RDP initiative During 2001 the government

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

Statement of Expected Price Trends

Statement of Expected Price Trends 2012-13 2016-17 June 2016 TasNetworks Pty Ltd PO Box 606 Moonah TAS 7009 ABN 24 167 357 299 Enquiries regarding this document should be addressed to: TasNetworks Revenue and Pricing Regulation Team Leader

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

JCP&L Verbatim Response to Middletown Township s Questions

JCP&L Verbatim Response to Middletown Township s Questions JCP&L Verbatim Response to Middletown Township s Questions Township officials sent 13 questions about the proposed Monmouth County Reliability Project to JCP&L on June 10 th. JCP&L provided direct responses

More information

DRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner

DRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner DRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner Lake Elmo City Hall 651-747-3900 3880 Laverne Avenue North Lake Elmo, MN 55042 Project Address: Property Owner:

More information

See NT POWERCOS , Classification Based On Service Size.

See NT POWERCOS , Classification Based On Service Size. Newmarket-Tay Power Distribution Ltd. Conditions of Service Number: NT POWER COS 310 01 Issue Date: July, 2007 Next Review Date: February, 2020 Residential 1. Preamble This section covers all items that

More information

Connection Application

Connection Application Connection Application For the Design and Quotation of an Electricity Connection This Connection Application is designed to assist us make your connection as efficient as possible. This information will

More information

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES. The following charges will apply from 1 July 2016. Accounts issued on or after this date will be charged on a pro-rata basis. The charges

More information

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0 TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE October 2013 Revised: 2.0 Quality Management Issue/revision Issue 1 Issue 2 Remarks Draft Final Date 30

More information

Willingdon Substation Decommission

Willingdon Substation Decommission November 2012 Why are you receiving this project information package? New transmission facilities have been proposed in central east Alberta. As a result, some existing facilities are no longer needed.

More information

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein: SCHEDULE OF STANDARD PRICES FOR ESKOM TARIFFS 1 APRIL 2015 TO 31 MARCH 2016 FOR NON-LOCAL AUTHORITY SUPPLIES, AND 1 JULY 2015 TO 30 JUNE 2016 FOR LOCAL AUTHORITY SUPPLIES 1. Standard prices The standard

More information

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC Electric Summary Sheet No. S-1 HOW A CUSTOMER BILL IS CALCULATED 7 RESIDENTIAL SERVICE For a customer who used 1,000 kwh during one month (assuming 30 days of service). Schedule 7 is referred to on customer

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

Automated and Electric Vehicles Bill

Automated and Electric Vehicles Bill Automated and Electric Vehicles Bill SECOND MARSHALLED LIST OF AMENDMENTS TO BE MOVED IN COMMITTEE OF THE WHOLE HOUSE Amendment No. [Amendments marked * are new or have been altered] Clause 8 37 Page 5,

More information

SAIREC Panel Discussion

SAIREC Panel Discussion Text SAIREC Panel Discussion Cape Town 04-Oct-2015 Unlocking Grid Capacity for the Energy Mix Proposed in the IRP Cape Town International Convention Centre Sunday, 04 October 2015, 11:30 for 13:00 Highlights

More information

Summer Reliability Assessment Report Electric Distribution Companies Perspective

Summer Reliability Assessment Report Electric Distribution Companies Perspective Energy Association of Pennsylvania Summer Reliability Assessment Report Electric Distribution Companies Perspective to the Pennsylvania Public Utility Commission June 9, 2011 Harrisburg, PA Terrance J.

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd Power Systems Project and Consultancy Services (PCS) Ltd

More information

SECTION 3 CUSTOMER CLASS SPECIFIC

SECTION 3 CUSTOMER CLASS SPECIFIC SECTION 3 CUSTOMER CLASS SPECIFIC 3.0 General PowerStream shall recover costs associated with the installation of Connection Assets, by customer class, via a Basic Connection Charge and a Variable Connection

More information

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1 THE SOUTH AFRICAN INSTITUTE OF ELECTRICAL ENGINEERS FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1 OVERVIEW : 1. Introduction to Distribution, Transmission and Generation

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES. The following charges will apply from 1 July 2017. Accounts issued on or after this date will be charged on a pro-rata basis. The charges

More information

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein: SCHEDULE OF STANDARD PRICES FOR ESKOM TARIFFS 1 APRIL 2016 TO 31 MARCH 2017 FOR NON-LOCAL AUTHORITY SUPPLIES, AND 1 JULY 2016 TO 30 JUNE 2017 FOR LOCAL AUTHORITY SUPPLIES 1. Standard prices The standard

More information

COJ: MAYORAL COMMITTEE 2017/02/21 FINANCE

COJ: MAYORAL COMMITTEE 2017/02/21 FINANCE REQUEST FOR APPROVAL TO AMEND DRAFT TARIFF OF CHARGES FOR ELECTRICITY SERVICES: 2017/18 1. STRATEGIC THRUST Alignment to GDS 2040 & IDP 2. OBJECTIVE To propose draft electricity tariffs increases and amendment

More information

EMERGING REQUIREMENTS

EMERGING REQUIREMENTS Page of 0 EMERGING REQUIREMENTS EXTERNALLY INITIATED PLANT RELOCATIONS THESL distributes electricity to residential, commercial, and industrial customers via overhead and underground infrastructure. This

More information

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Proposal Concerning Modifications to LIPA s Tariff for Electric Service Proposal Concerning Modifications to LIPA s Tariff for Electric Service Requested Action: LIPA Staff proposes revisions to the Tariff for Electric Service under Service Classification No. 11 ( SC-11 ),

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Energy from Waste Grid Connections

Energy from Waste Grid Connections Energy from Waste Grid Connections Catherine Cleary Grid Connection Lead TNEI Services catherine.cleary@tnei.co.uk 0161 233 4839 Overview Introduction to the UK Electricity Network Key Grid Connection

More information

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers DISTRIBUTION CODE Contents 1 Introduction 2. Advisory and Information Systems 3. Supply 3.1 Quality of Electric Supply 3.2 Interference with other Customers 3.3 Application for the Supply of Electricity

More information

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA 20 March 2014 Report prepared by: Corli Havenga Transportation Engineers

More information

PUSAKA CAPITAL POISED FOR RM3.8 BILLION PROJECTS. Proposed R&R Exercise was recently approved by the Board of STIDC, led by YB

PUSAKA CAPITAL POISED FOR RM3.8 BILLION PROJECTS. Proposed R&R Exercise was recently approved by the Board of STIDC, led by YB PRESS RELEASE FINAL PUSAKA CAPITAL POISED FOR RM3.8 BILLION PROJECTS KUCHING, SARAWAK, 30 SEPTEMBER 2013 Sarawak Timber Industry Development Corporation ( STIDC ) has today signed the Reorganisation &

More information

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8 Header Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations RT 007-11 Balhannah and Uraidla - Final Draft Page 1 of 8 DISCLAIMER The purpose of this document is to inform customers,

More information

NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project

NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project 10 September 2015 Presented by: Louis Dewavrin and Angela Hobbs AGENDA

More information

THE NELSON MANDELA BAY MUNICIPALITY ELECTRICITY TARIFF FOR THE 2016/17 FINANCIAL YEAR (ALL PRICES ARE VAT EXCLUSIVE)

THE NELSON MANDELA BAY MUNICIPALITY ELECTRICITY TARIFF FOR THE 2016/17 FINANCIAL YEAR (ALL PRICES ARE VAT EXCLUSIVE) THE NELSON MANDELA BAY MUNICIPALITY ELECTRICITY TARIFF FOR THE FINANCIAL YEAR (ALL PRICES ARE VAT EXCLUSIVE) Council has revised and approved the inclining block s to be charged to domestic customers in

More information

Improving Accessibility of Regional Bus Stops and Pathways

Improving Accessibility of Regional Bus Stops and Pathways Customer Service and Operations Committee Board Information Item III-A March 13, 2014 Improving Accessibility of Regional Bus Stops and Pathways Page 3 of 17 Washington Metropolitan Area Transit Authority

More information

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK Traffic Impact Assessment LOCATED ERF 1692 IN FRANSCHHOEK, WESTERN CAPE Project No. : STUR0202 NOVEMBER 2017 PREPARED BY: STURGEON

More information

HEARING STATEMENT - PALMERSTON NORTH CITY COUNCIL PLAN CHANGE 15A - RURAL ZONE (GENERAL ISSUES)

HEARING STATEMENT - PALMERSTON NORTH CITY COUNCIL PLAN CHANGE 15A - RURAL ZONE (GENERAL ISSUES) 11111 TRANSPOWER Keeping Ihe energy flowing Sarah Shand Phone: 04 590 7434 Email: sarah.shand@transool.ler.co.nz Transpower House 96 The Terrace PO Box 1021 Wellington 6140 New Zealand p 6444957000 F 6444957]00

More information

Guidelines when working near TasNetworks electrical assets

Guidelines when working near TasNetworks electrical assets Guidelines when working near TasNetworks electrical assets About TasNetworks Tasmanian Networks Pty Ltd (ACN 167 357 299) ( TasNetworks ) is the owner and operator of the regulated electricity network

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager Agenda Item # 2 Work Session Meeting Date April 20, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne Ludlow City Manager Discussion Item Background Discussion of Options for

More information

RURAL ROAD MAINTENANCE POLICY

RURAL ROAD MAINTENANCE POLICY Government of Yukon RURAL ROAD MAINTENANCE POLICY (Updated April 01, 2003 to reflect Department name change from Infrastructure to Highways and Public Works. No change to Policy.) November 1991 TABLE OF

More information

NORTH SLOPE BOROUGH Department of Public Works P.O. Box 350 Barrow, Alaska 99723

NORTH SLOPE BOROUGH Department of Public Works P.O. Box 350 Barrow, Alaska 99723 NORTH SLOPE BOROUGH Department of Public Works P.O. Box 350 Barrow, Alaska 99723 Phone: 907-852-0489 Fax: 907-852-0251 Charlie Sakeagak, Director ATQASUK TRANSMISSION LINE PROJECT INTRODUCTION The continuing

More information

Pre-submission Consultation $ Telecommunications Tower Approval 7,700.00

Pre-submission Consultation $ Telecommunications Tower Approval 7,700.00 Planning Application Processing Fees Schedule of Application Fees In addition to the fees identified below, there may be additional fees charged by other City Departments or agencies, such as Engineering

More information

RENEWABLES INTEGRATION STATUS REPORT

RENEWABLES INTEGRATION STATUS REPORT RENEWABLES INTEGRATION STATUS REPORT NORTHERN IRELAND ELECTRICITY Ltd SYSTEM OPERATOR FOR NORTHERN IRELAND Ltd. June 2015 1. INTRODUCTION The electricity network in Northern Ireland (NI) is facing an unprecedented

More information

Municipality Generator Interconnection Application Single Meter Application Part I

Municipality Generator Interconnection Application Single Meter Application Part I Municipality Generator Interconnection Application Single Meter Application Part I New Application Revised Application A single customer interconnecting to a single meter at a single premise makes a new

More information

Review of Fees for Accident Tows and Tows from Private Property

Review of Fees for Accident Tows and Tows from Private Property STAFF REPORT ACTION REQUIRED Review of Fees for Accident Tows and Tows from Private Property Date: October 27, 2011 To: From: Wards: Reference Number: Licensing and Standards Committee Acting Executive

More information

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview Who is TasNetworks? Delivering your power TasNetworks provides both distribution network services (via the poles and wires)

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications 1. Who is a self-generation or Net Metering Member? This is a Member who has installed grid-connected renewable generation, such

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Power Purchase and Grid Connection Procedures

Power Purchase and Grid Connection Procedures Building Your Biogas System Workshop and Grid Connection Procedures Aidan Foss. amfoss@ieee.org ANF Energy Solutions DG grid connection specialists No project ownership Current projects Biogas 21 Landfill

More information

Estimating the cost of electrification technology options to aid electricity access scale up: The case of Ghana

Estimating the cost of electrification technology options to aid electricity access scale up: The case of Ghana The African Electrification Initiative Practitioner Workshop, Dakar, Senegal November 14 th 16 th, 2011 Estimating the cost of electrification technology options to aid electricity access scale up: The

More information

TOWN OF PRIMROSE DANE COUNTY, WI DRIVEWAY ORDINANCE

TOWN OF PRIMROSE DANE COUNTY, WI DRIVEWAY ORDINANCE TOWN OF PRIMROSE DANE COUNTY, WI DRIVEWAY ORDINANCE 1.01 PURPOSE The purpose of this Ordinance is to regulate the establishment, construction, improvement, modification, or the reworking of a driveway

More information

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT 14 TH MARCH 2008 TABLE OF CONTENTS Page 1 Introduction...1 2 Charging Methodology Objectives...3 3 Connection Charging Methodology...4 4

More information

Network Demand Management Case Study Willows Shopping Centre, Townsville September 2011

Network Demand Management Case Study Willows Shopping Centre, Townsville September 2011 Network Demand Management Case Study Willows Shopping Centre, Townsville September 2011 Network Demand Management Case Study Willows Shopping Centre, Townsville Key challenge Dexus Property Group was keen

More information

ELECTRIC RATE SCHEDULES ROCKY MOUNTAIN POWER. Salt Lake City, Utah. for ELECTRIC SERVICE. in the STATE OF UTAH. Under

ELECTRIC RATE SCHEDULES ROCKY MOUNTAIN POWER. Salt Lake City, Utah. for ELECTRIC SERVICE. in the STATE OF UTAH. Under Original Sheet No. A ELECTRIC RATE SCHEDULES of ROCKY MOUNTAIN POWER Salt Lake City, Utah for ELECTRIC SERVICE in the Under PUBLIC SERVICE COMMISSION OF UTAH TARIFF NO. 50 CANCELS ALL PREVIOUS SCHEDULES

More information

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department. D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

THE PUBLIC SERVICE COMMISSION OF WYOMING

THE PUBLIC SERVICE COMMISSION OF WYOMING NAME: Powder River Energy Corporation WY PSC Tariff No. 7 ADDRESS:, Sundance, WY 82729 THE PUBLIC SERVICE COMMISSION OF WYOMING TARIFF RATE RIDER 5th Revised Sheet No. 1 Cancels 4th Revised Sheet No. 1

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

AMPS SERVICES INC. INCORPORATED 2007 AMPS POWERLINE INC. INCORPORATED 2012

AMPS SERVICES INC. INCORPORATED 2007 AMPS POWERLINE INC. INCORPORATED 2012 AMPS SERVICES INC. INCORPORATED 2007 AMPS POWERLINE INC. INCORPORATED 2012 AMPS SERVICES & POWERLINE INC. AMPS Services Inc. is a consulting engineering firm, specializing in providing a full compliment

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30 BC Hydro Effective: August 1, 2015 Fourth Revision of Page 30 SCHEDULE 1289- NET METERING SERVICE Availability: For any Residential Service Customer and for any General Service Customer who install a Generating

More information

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676) P.O BOX 429, NUKU ALOFA, Tel: (676) 27-390 Fax: (676) 23-047 Email: jvanbrink@tongapower.to 22 October 2012 Lord Dalgety Electricity Commission Tu atakilangi Nuku alofa Dear Lord Dalgety Compliance Reporting

More information

Mar. 11, 2010 PL Ontario Municipal Board Commission des affaires municipales de l Ontario

Mar. 11, 2010 PL Ontario Municipal Board Commission des affaires municipales de l Ontario ISSUE DATE: Mar. 11, 2010 PL050096 Ontario Municipal Board Commission des affaires municipales de l Ontario Edelbrock Bros. Limited, William Matthews and Allto Investments Holdings Inc. appealed to the

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Tariffs Charges 2017/2018

Tariffs Charges 2017/2018 Tariffs Charges 2017/2018 Charges for non-local authorities effective from 1 April 2017 to 31 March 2018 Charges for local authorities effective from 1 July 2017 to 30 June 2018 Contents 1. Customer contact

More information