1 Networks Charges for Connection to the Distribution System 2010 Revision 10 Status: Approved Commercial and Customer Asset Management ESB Networks

2 Contents 1.0 ABOUT THIS DOCUMENT SCOPE DEFINITIONS OF TERMS USED IN THIS DOCUMENT PRINCIPLES OF THE CONNECTION CHARGES CONNECTION CHARGE CALCULATION Standard MIC Charge Network Charges Trenching Charge Exceptional Costs Shared Network Charge APPLICATION OF CONNECTION CHARGES Domestic Non-Scheme Connection Charges Housing Scheme Connection Charges Business Connection Charges Situations where Standard Charges do not apply REVIEW ARRANGEMENTS APPENDIX 1: STATEMENT OF CHARGES FOR CONNECTION TO THE DISTRIBUTION SYSTEM APPENDIX 2: REFUNDS IN RESPECT OF SHARED NETWORK Page 2 of 38

3 1.0 About This Document This document has two purposes: 2.0 Scope It sets out the basis of calculation of charges for connection to the Distribution System that are payable by individual customers, whether domestic or business. Charges in respect of infrastructure for large multi-customer developments such as business parks are determined according to different rules and are dealt with in the Business Parks Policy. It includes a statement of standard charges for 2008 in Appendix 1. CER approval of these charges is required under the Electricity Regulation Act and the Distribution System Operator licence. This document describes connection charges payable for providing individual connection points for users of the Distribution System. It does not describe the connection process or the Distribution Use of System tariffs. These are described in more detail in the following documents which can be found on ESB Networks website ( Related Documents of Interest to Customers Connected to the Distribution System No. Document Title Source Issue Date 1 Guide to the Process for Connection to the Distribution System DSO September Distribution Use of System Tariffs DSO September Distribution System Security and Planning Standards (demand customers only) DSO September Business Parks Policy DSO January 2004 Details of the user categories and distribution nominal voltages are given in the Distribution Code. Page 3 of 38

4 Table 1. Users of the Distribution System User Type Connection Voltage User Category (Distribution Code) DUoS Tariff Code Description Domestic and Farm LV B4 DG1 DG2 Housing Schemes, Small Domestic Developments, Single Houses, Apartments and Farm Buildings Business (Commercial and Industrial) LV A4, A5, B3, B4 DG3, DG5, DG5A, DG5B, DG6, DG6A, DG6B, MV B2 DG7, DG7A, DG7B 38 kv B1(38 kv only) DG8, DG8A, DG8B, DG9, DG9A, DG9B All Connections Embedded Generators 110 kv B1 (110 kv only) DG10 Section below. LV, MV, 38 & 110 kv A1, A2, A3-1 DG5A, DG6A, DG7A, DG8A, DG9A All Connections 1 Generators do not pay DUoS charges on exported energy but pay Operating and Maintenance Charges. DUoS charges on imported energy are based on the unit charges appropriate to the business DUoS group; generators do not pay standing charges or capacity charges. Page 4 of 38

5 3.0 Definitions of Terms Used in This Document In general, the definitions of terms used in this document are the same as in the Distribution Connection Agreements (see 1.0 Definitions and Interpretation, General Conditions for connection of Industrial and Commercial customers to the Distribution System, pp 3 9). The definitions of terms particular to this document are given below. Term Network Station Switching Station Common Costs Definition Distribution Transformer Substation, usually with a primary voltage of 38 kv or 110 kv and an MV secondary voltage. The secondary is connected in to the local MV network. In the context of this document, a switching substation connected at 38 kv or 110 kv primary voltage. Common costs of a substation consist of the costs of the site, the building plus the equipment, which are shared by all users connected to the substation. Thus the costs of those items of electrical equipment through which current drawn by every user connected to the station must pass are included in the common costs. Shared Network Electrical Network (e.g. common network station equipment/site, transmission network connecting that station to the system and any associated remote end station works) used to connect more than one of the cluster generators to the existing network. This excludes transmission/distribution network downstream of the network station. Stranded Asset Dedicated Connection Asset Any asset constructed to cater for the existing MIC that is now deemed not necessary for the reduced MIC. Electrical network (lines, cables, switchgear etc.) used to connect a single user to the transmission or distribution system. The connection asset is specific to the user and does not form part of the connection to any other user. Page 5 of 38

6 Term Definition Distribution System Operator (DSO) Least-cost technicallyacceptable solution Maximum Export Capacity (MEC) Maximum Import Capacity (MIC) ESB in its role as Distribution System Operator licence holder. The term that describes the cheapest connection method that meets the requirements in the Planning and Security Standards and the Distribution Code The amount of electricity referred to as being the Maximum Export Capacity in the Connection Agreement. The amount of electricity referred to as being the Maximum Import Capacity in the Connection Agreement. Disturbing Load Electrical load that causes voltage disturbance or waveform distortion on networks affecting voltage quality for other users of the distribution system. Distribution System Security and Planning Standards (demand customers only) A document submitted by DSO to CER for approval under the terms of its licence. The document outlines the DSO s approach to the development of network and how the connection of new loads and embedded generators to the Distribution System is assessed. 4.0 Principles of the Connection Charges Equality of Treatment Under the Electricity Regulation Act, 1999, ESB has the following obligation: Where providing for use of the transmission or distribution system or where offering terms for the carrying out of works for the purpose of connection to the transmission or distribution system of the Board, the Board shall not discriminate unfairly as between any persons or classes of persons. In the context of connection charges, this can be interpreted as follows: Customers with similar capacity requirements should bear similar charges subject to considerations of economic efficiency. Economic Efficiency For reasons of economic efficiency, the method of connection to the network is the Least Cost Technically Acceptable Solution (LCTAS). Page 6 of 38

7 The LCTAS is defined as the solution which is technically acceptable and which results in the least cost being incurred by the DSO in implementing the solution and which facilitates the long term development of the electricity network in the area. The process of choosing the LCTAS is specific to each case and is detailed in the Distribution System Security and Planning Standards. Any additional costs incurred by ESB Networks in providing a connection, which is deemed by ESB Network to be over and above the LCTAS, are borne in full by the customer or developer. There are situations where standard charges are not applicable and where connection charges are calculated on a case by case basis. Examples of cases where costs above the least-cost technically-acceptable solution arise are: - Disturbing Loads installed by the customer. These can effectively require an increased capacity over and above the nominal capacity (MIC). - Requests by the customer to use underground cable where overhead line would normally be used. - Requests by the customer to site a substation required for connection in a non-optimal location requiring extra construction costs or extra telecoms and other costs. - Higher security than required under the Distribution Code. Simplicity Any system of connection charges should be as simple as possible. This has a number of advantages: - Faster quotations for customers. - Easy for the customer to understand - Reduced administrative overheads - Reduction in auditing overhead 5.0 Connection Charge Calculation The connection charge for a customer is made up of the following: - Standard MIC Charge - Network Charge - Trenching Charge - Exceptional charge - Shared Network Charge Page 7 of 38

8 5.1 Standard MIC Charge Standard charges are intended to recover part of the DSO s costs in providing new connections. The method for calculating standard charges is as follows: 1. Establish the range of least cost technically acceptable connection methods 2. For each of these valid connection methods calculate - Connection Asset Charge. This is 50% of the cost of the dedicated connection asset. It includes the cost of installing metering, cables/lines and DSO equipment in the user s terminal station necessary to effect the connection. - Capacity Charge (Only for Business Customers). This is an average charge per kva for reinforcement of the existing system. It consists of o 50% of the cost of the customer s share of the capacity of the MV/LV substation. o 25% of the average cost of network reinforcement. (Only applies for business customers with an MIC of 500 kva or greater) 3. Determine the proportion of actual connections accounted for by each of the valid connection methods, i.e. the weighting factors. 4. Calculate the standard charge as a weighted average of the charges for the set of valid connection methods. 5.2 Network Charges For standard 12kVA and enhanced 16kVA domestic one-off connections and housing schemes the standard MIC charge includes MV network costs within defined distance criteria, outside these criteria additional MV network charges apply based on standard MV network charges. For 20kVA and 29kVA special connections to domestic customers the standard MIC charge does not include network charges. Where applicable standard network charges per metre are used. For business customers and domestic customers with apartment connections the standard MIC charge does not include network charges, where applicable standard network charges per metre are used. 5.3 Trenching Charge The customer is required to provide all trenching free of charge to ESB both inside and outside the site (except for single urban domestic dwellings, see below). For the avoidance of doubt, trenching on the customer site is always the responsibility of the customer. Page 8 of 38

9 Where however at the request of the customer ESB arranges to have the trenching outside of the customer site carried out by a contractor, the cost of the trenching is included in the quotation and is based on either a firm quotation from the contractor or standard trenching charges as listed in Appendix 1. For single urban domestic dwellings the standard charge includes the cost of up to 50m of trenching (excavation, ducting and reinstatement) from the dwelling. Once again for clarity this does not include trenching required on the customer site. 5.4 Exceptional Costs These costs include - High Trenching Costs Where the actual trenching charge is over 110% of the standard trenching charge then the customer will be charged the full contractor trenching charge. (This will only arise where ESB arrange for trenching on behalf of the customer and the customer is quoted using standard trenching charges) - Additional Charges Local authority road opening charges and any wayleave, easement or other costs imposed by third parties are charged in full. - Supplementary Charges (Business Only) Supplementary charges apply to business customers where the length of the feeding network is exceptional. This is because of the extra cost of providing capacity on these networks. 5.5 Shared Network Charge A shared network charge / refund applies in cases where a connection to a new customer makes use of the connection asset of an existing customer, see appendix 2. Page 9 of 38

10 6.0 Application of Connection Charges 6.1 Domestic Non-Scheme Connection Charges The total connection charge for domestic non-scheme customers is the sum of the following five charges: 1) Standard charge (available for the following connection types) - 12kVA Family Apartment new connection - 12kVA new connection - 12kVA to 16kVA upgrade - 16kVA new connection - 20kVA new connection - 29kVA new connection There are no standard charges for domestic upgrades to MIC >16kVA, charges are calculated using 50% of design costs. Standard charges for the above connection types are listed in Table A1.0 in Appendix 1 and apply to: - 12kVA additional family apartment connections where an existing 12kVA or 16kVA connection exists in the same dwelling. - 12kVA and 16kVA rural connections located within 500m of existing MV overhead network, measured as crow flies. - 12kVA and 16kVA urban connections within 50m of LV three phase network, measured along route length to the nearest connection point. - 20kVA and 29kVA urban or rural domestic special connections regardless of location. 2) MV Network Charges (additional network charges may apply as follows) - Rural 12kVA and 16kVA domestic connections outside distance criteria Up to 500m of MV network is included in the standard charge for 12kVA and 16kVA rural connections in (1) above. For any MV network between 500m and 1 km from the connection point, a 50% allowance is included in the standard MV network per meter charge listed in Table A8. No allowance applies to MV network beyond 1km from the connection point, i.e. charge is twice the standard MV charge per metre. - 20kVA and 29kVA special connections The standard charge for 20kVA and 29kVA connections listed in (1) above does not include any MV network charge. Where MV network is required, standard MV network charges per metre are added. For any MV network up to 1km from the connection, a 50% allowance is included in the standard MV network per meter charge listed in Table A8. No allowance applies to MV network beyond 1km from the connection point, i.e. charge is twice the standard MV charge per metre. Page 10 of 38

11 3) Trenching Charges (see section 5.3) 4) Exceptional Charges (see section 5.4) 5) Shared Network Charges (see section 5.5) Design Costs There are no standard charges for 3kVA non-dwelling connections. Charges are based on 50% of design costs. Any MV network required up to 1km from the connection point includes a 50% allowance. No allowance applies to MV network beyond 1km from the connection point i.e. charge is 100% of the cost of the MV network. Notes: Standard kva capacities Domestic connections are only available for the standard capacities of 3kVA, 12kVA, 16kVA, 20kVA and 29kVA. Connections with an MIC of 30 kva or greater are treated as business connections. 3kVA connections are not suitable for dwellings. Special connections Special connections of capacity 20kVA or 29kVA whether single phase or three phase are subject to a minimum charge equal to that of the enhanced 16kVA connection. Family Apartments A 12kVA Family Apartment connection is provided to cater for secondary metering of an extension or sub-division of an existing domestic dwelling for family use. It is electrically the same as a two-apartment development without the requirement for a landlord connection and shares the same service. The following criteria apply: - Only one Family Apartment connection per dwelling. - For family use only, e.g. aged family member, not for sub-letting. - Proof of planning permission as a Family Apartment from the relevant Local Authority may be requested. Where planning permission is not required, ESB Networks may require evidence of family use. - The main dwelling and Family Apartment should be internally connected by means of an interconnecting door. - The existing service must be adequate to cater for the main dwelling load as well as the proposed Family Apartment. Where any of the criteria above are not met, the new connection may be dealt with as a standard 12kVA house or apartment development. The Family Apartment standard charge is listed in Table A1.0, Appendix 1. Page 11 of 38

12 6.2 Housing Scheme Connection Charges The total connection charge for domestic housing scheme customers is the sum of the following five charges: 1) Standard charge Housing Schemes (20 or more houses) The standard charge is based on the average length of roadway per house. Small Domestic Developments (2-19 houses) For developments up to 8 houses a single charge applies. For developments from 9 to 19 houses the charge depends on the average length of roadway per house. These standard charges are quoted in Tables A2.0 and A2.1, Appendix 1. 2) Network Charges The standard charges in (1) above include the costs of up to 500m of MV network measured from the nearest housing scheme MV substation. Where more than 500m of MV network is required, additional network charges are applied as follows: - Between 500m and 1 km from a housing scheme MV substation, a 50% allowance is included in the standard MV network charges. (see Table A8). - No allowances apply to network more than 1 km from a housing scheme MV substation, i.e. charge is twice the standard MV network charge. 3) Trenching Charges (see section 5.3) 4) Exceptional Charges (see section 5.4) 5) Shared Network Charges (see section 5.5) Design Costs The standard charges for housing schemes and small domestic developments assume the following conditions. - Separate service per house. - Connection capacity of 12kVA. - For small domestic developments of between two and four houses the average length of roadway per house is in the range of 1 to 50 metres. - For developments with five or more houses the average length of roadway per house is in the range of 1 to 14 metres. - The development is completed within 3 years of payment of connection charges. Where these conditions do not hold then the developer should be quoted on the basis of 50 % of design costs. No allowances apply to MV network more than 1 km from a housing scheme MV substation, i.e. charge is twice the standard MV network charge. Page 12 of 38

13 6.3 Business Connection Charges Single Business The connection charge for business customers is the sum of - Standard Charge. The standard charge is based on the customer MIC, refer to Tables A3 - A7 in Appendix 1. - MV/HV Network Charge, see table below. MV/HV Network Charge New MV Network Customer MIC <5,000 kva Customer MIC >5,000 kva Standard MV network charge per metre New HV Network Connection via new HV/MV substation No HV network charge Charge 50% of attributable cost of new HV network, where attributable cost for new connection is (customer MIC/Firm capacity of substation)*cost of new HV network. For increases in capacity the attributable cost is (Increase in MIC/Firm capacity of substation)*cost of new HV network) 1 Connection at HV Charge 50% of the cost of new HV network. Where connection is via a new HV substation the customer is also charged 50% of attributable cost of new HV network to feed that substation where attributable cost is (Customer MIC/Firm capacity of substation)*cost of new HV network. - Trenching Charges. The customer is required to provide all trenching free of charge to ESB both inside and outside the site. Where at the request of the customer ESB arranges to have the trenching work outside the customer site carried out by a contractor, the cost of the trenching is included in the quotation. 1 For the purposes of calculating HV network charges, any increases in MIC within 12 months of the requirement to construct the HV network will be taken as the relevant increase in MIC. Page 13 of 38

14 Trenching on the customer site is always the responsibility of the customer. Standard trenching charges are quoted in Table A8 Appendix 1. - Exceptional Charges. Supplementary charges apply to business customers where the length of the feeding network is very long. This is because of the extra cost of providing capacity on these networks. Specifically they apply to - MV customers, with a maximum import capacity in excess of 500kVA and located greater than 7km from a 38kV station. See Table A9, Appendix kV customers, with a maximum import capacity in excess of 2,500kVA and connected to circuits longer than 18km between 110kV stations. See Table A10, Appendix 1. Other exceptional charges are included such as high trenching costs, easement costs etc, see section Shared Network Charges / Refunds. A shared network charge / refund may apply in cases where a connection to a new customer makes use of the connection asset of an existing customer. The shared network refund is paid to the customer who accepted the connection agreement / terms for the original connection. The shared network charge is paid by the customer who accepts the connection agreement / terms for the new connection. The value of the shared network charge / refund depends on - Use of connection asset made by the customers. For shared MV/HV lines or cables this is based on the relative (import or export) capacities of the customers. - The capital contribution originally charged in respect of the shared asset excluding any standard charge. Details for eligibility and calculation of refunds in respect of shared network are given in Appendix 2. Due to their interim nature, temporary connections do not provide permanent benefits to the customers availing of them. However, there are certain situations where the location and size of a connection have meant that the option of a temporary connection has conferred a substantial benefit. In these situations refunds may apply Increases in Capacity The charge for an increase in MIC is equal to the standard charge for the proposed capacity less that corresponding to the existing capacity. In cases where new MV/HV network is required, there is an additional charge which is calculated in the same way as for a new connection, as outlined in Section Page 14 of 38

15 New HV network may be required where either the increased MIC requires a new HV/MV substation or where the increased MIC requires a connection at HV. Any such HV network charge is additional to any MV network charge or increased capacity charge Reductions in Capacity A charge may be made for a reduction in MIC depending on whether stranded assets remain following the reduction in MIC. If there are no stranded assets then the customer can be offered a revised Connection Agreement for the reduced MIC level free of capital charge. If there are stranded assets then the capital contribution for a reduced MIC level is the standard charge for the existing MIC level less the standard charge for the reduced MIC level less an allowance for DUoS paid since connection of the existing MIC. Capital Contribution = [a-b-c] a = Standard Connection Charge for the existing MIC level b = Standard Connection Charge for the reduced MIC level c = Allowances Recovered via DUoS Allowances recovered are [(a-b)*n/20] where n is the number of years, or part of a year, that the customer was on the existing MIC level Multi-Business Development Centralised Metering Where the metering for all the business customers is centralised at a single metering location the total connection charge for a multi-business development is the sum of: - Standard charge for total MIC For business units the total MIC is the sum of the individual MIC s at the common metering position (i.e. diversity is not taken into account). - 50% of metering costs - Additional charges MV / HV Network Charges, Trenching Charges, Exceptional Charges and Shared Network Charges are added as for a Single Business in section Example Ten Business Units: 15 kva 3 phase connections. Metering for all the units centralised in one room. Sum MIC = 10 x 15 kva = 150 kva Connection Charge = Standard Charge for 150 kva 3 phase Connection + 50% of Metering Costs + MV / HV Network Charges + Trenching Charges + Exceptional Charges + Shared Network Charges Page 15 of 38

16 Non-Centralised Metering Where the metering for all the business customers is not centralised the total connection charge for a multi-business development is simply the sum of connection charges for the individual business customers Mixed Development A mixed development is defined as a development which consists of a mixture of domestic and business customers. An apartment complex with a landlord connection is treated as a mixed development. Centralised Metering Where the metering for all the domestic and business customers is centralised at a single metering location (i.e. in one room) the connection charge for the mixed development is the sum of - Standard Charge for Total MIC For commercial units the total MIC is the sum of the individual MIC s at the common metering position (i.e. diversity is not taken into account). For domestic units the total MIC is the sum of the design MIC s at the common metering position (i.e. diversity is taken into account). - 50% of Metering Costs - Additional Charges MV / HV Network Charges, Trenching Charges, Exceptional Charges and Shared Network Charges are added as for a Single Business in section Example Three Business Units: (Two Shops 15 kva, One Business 35kVA). Three Apartments & Landlord: (Apartment 12kVA, Landlord 15kVA). Metering for all the units is centralised in one room. Sum Business MIC = 15 kva + 15 kva + 35 kva = 65 kva Sum Apartments & Landlord MIC = 12 kva kva kva + 15kVA = 32 kva Total MIC = Sum Business MIC + Sum Apartment & Landlord MIC = 65 kva + 32 kva = 97 kva Connection Charge = Standard Charge for 97 kva Connection + 50% of Metering Costs + MV / HV Network Charge + Trenching Charges + Exceptional Charges + Shared Network Charges. 1 After Diversity Maximum Demand (ADMD) for 12kVA load is taken as 2.5kVA Page 16 of 38

17 Non-Centralised Metering Where the metering for all the domestic and business customers is not centralised the total connection charge for the mixed development is simply the sum of the connection charges for the individual business and domestic customers. Apportionment of MV network charges in Mixed Developments In a mixed development with a mixture of apartment / housing scheme / business connections the apportionment of MV network charges across the different quotations is made in the ratio of the MIC s for the particular phase of the development being quoted. For example, if the MV cable length required in a development phase is 1,000 metres and Total Apartment MIC 200kVA Total Housing Scheme MIC 300kVA Total Business MIC 500kVA Therefore apportion MV network costs in the ratio of 2:3:5, i.e. 200m for apartment, 300m for housing scheme and 500m for business quotation Substation Sites and Buildings Users of the Distribution System to be connected at MV are required to provide either a terminal substation room or building, free of charge to ESB Networks, as part of the arrangements to accept a connection. Users of the Distribution System to be connected at 38kV or 110kV are required to provide a site free of charge to ESB Networks and to carry out specific civil works. Users of the Distribution System to be connected at LV may be required to provide a substation room or building or a plinth for a free-standing unit substation, free of charge to ESB Networks, depending on the MIC and the capacity available on the local network. These requirements are set out in the Distribution System Security and Planning Standards. In the case of a substation room or building, ESB Networks will provide a specification covering the dimensions and the construction details. Where a site is required, the specification for the dimensions and the civil works will be provided. The above details will be issued together with, or in advance, of the quotation for connection, as appropriate. A substation facility provided by one user may subsequently be used to connect others. In cases of a connection at 38 kv or 110 kv and where the MV system would benefit from a HV injection, a shared switching station may be built instead of a terminal station. In these cases, the user will only be required to bear a share of the common civil works costs. In all of the above situations, it is a condition for connection that the substation building or site, as applicable, is legally transferred free of charge to ESB Networks. Page 17 of 38

18 Further details relating to substations are contained in the documents Conditions Governing Connection to the Distribution System and The Distribution System Security and Planning Standards Connections to the Distribution System at 110 kv Demand Customers Connected at 110 kv Charges are based on 50% of the cost of the connection. Refunds Refund Policy is the same as for other voltages, see Appendix Situations where Standard Charges do not apply The situations where standard charges do not apply are listed here. In each case the connection charge is calculated as described in Section 5.0 above Connections for construction works (Temporary connections) Builders connection for construction works The connection charge for a builder s connection is twice the Standard Charge for business connections (see Appendix 1, Table A3) and twice the associated network charge (on the basis that the standard connection charge includes a 50% allowance). The connection will be provided for a single purpose, e.g. construction; and will be terminated after a fixed period, i.e. re-use of connection will not be permitted. Connections to domestic premises for completion of construction work on a single house The connection charge for a builder s connection to facilitate completion of construction work on a house is twice the Standard Charge for business connections (see Appendix 1, Table A3) and twice the associated network charge (on the basis that the standard connection charge includes a 50% allowance). When the permanent connection is required, on production of a valid completion certificate by an electrical contractor, a service cable will be provided to connect the temporary connection point to the permanent connection point at the house. The standard service alteration charge will apply for this work Wasting Assets Wasting assets are typically sandpits and quarries etc., where the requirement for the connection will lapse when the asset has been exploited. The connection charge is 150% of the Standard Charge, based on the MIC. Page 18 of 38

19 A bond may be required as security for decommissioning and reinstatement charges Disturbing Loads The connection charge for a disturbing load is 1. The Standard Charge for the same size of normal load plus 2. The difference between the design cost of the connection method required for the disturbing load and the design cost of the connection method which would have catered for a normal load of the same size Convenience Connections A convenience connection is one where the customer requests a more expensive connection method than the LCTAS, e.g. underground cable where an overhead line would normally be constructed, a more circuitous route to the connection point or a substation in a non-convenient location. In circumstances such as these the charge for connection is 1. The Standard Charge for the normal method of connection which would otherwise have applied, i.e. the LCTAS plus 2. The difference between the design cost of the convenience connection method and the design cost of the normal method of connection as above Enforced High-Cost Connections Some connections cost more than the LCTAS because of restrictions imposed by third parties. These may be associated with safety considerations or local authority planning issues. Examples are connections in the vicinity of airports or high-amenity / scenic areas. Additional connection costs may arise because of a requirement for cabling and / or a more circuitous route to the point of connection. In situations such as these, the charge for connection is 1. The Standard Charge for the normal method of connection which would otherwise have applied, i.e. the LCTAS plus 2. The difference between the design cost of the enforced connection method and the design cost of the normal method of connection as above Specific User Requirements (a) Dedicated Connection Asset In certain circumstances, a proposed user of the Distribution System to be connected at LV may request that no other connection be made in the future from the substation. In situations such as these the charge for connection is 1. The design cost of the dedicated asset(s) plus 2. 50% of the design cost of all other elements of the job Page 19 of 38

20 (b) Work to be carried out at a particular time If a customer requests that work associated with the connection be carried out at weekends or after normal working hours, the connection charge is calculated as follows: 1. The connection charge which would have applied in normal circumstances plus % of the additional costs arising from the above request Remote Terrain Connections may be required in remote areas, e.g. mountain tops for such as repeater stations, communications transmitters etc. In the majority of these situations, the connection asset is effectively dedicated, a ground-mounted substation is often necessary due to security of supply considerations and the transformer size may be mismatched to the MIC. In circumstances such as these, the charge for connection is 100% of the design cost Night Storage Heating The connection charge for a load which includes night storage heating is 1. The Standard Charge based on the load (MIC), excluding the NSH element(s), plus any additional charges that would normally apply, e.g. network charges, trenching (if applicable) etc. plus % of the difference between the gross design cost corresponding to the total load (including NSH load) and the gross design cost to cater for the normal load Standby Connection at MV The Distribution System Security and Planning Standards requires that standby will be available (except in exceptional circumstances) for single point loads 1MVA. Therefore, for a looped MIC 1MVA or a tail-fed MIC < 1MVA, the charge for connection is calculated in the normal way, i.e. Standard Charge plus network charges and any other charges (as applicable), e.g. trenching, shared network etc. However, where the user requests a standby connection for an MIC < 1MVA, the connection charge is 1. The Standard Charge for the forward feed method of connection, calculated in the normal way as above plus 2. The design cost of the additional network required to provide the standby connection Automatic Changeover Automatic changeover is not normally provided to users of the Distribution System. In the event of a specific request for ACO, the matter should be Page 20 of 38

21 referred to Commercial and Customer Section, Asset Management. 7.0 Review Arrangements The charges described in this document are based on the construction costs of the least-cost technically-acceptable solution. ESB s Standard Costs provide the installed cost for each item of electrical plant. The Standard Costs are revised on average once or twice per year using current material and labour costs. The connection charges are recalculated and submitted to CER annually for their approval. Page 21 of 38

22 ESB Appendix 1: Statement of Charges for Connection to the Distribution System About this document This document describes the current charges for connection to the distribution system. All terms in this statement have the meanings given to them in the Distribution Code and in the General Conditions for Connection of Industrial and Commercial Customers and Generators to the Distribution System. 2. Applying for a Connection The Guide to the Process for Connection to the Distribution System provides information on applying for a new connection or for increased or reduced capacity for an existing connection. On receiving a completed application, ESB Networks will provide a quotation (which is incorporated into a Connection Agreement). Please see the ESB Networks Customer Charter for service guarantees. The Connection Agreement incorporating a quotation sets out: The cost of connection. The period for which the terms will remain valid (e.g. for business customers this is 3 months). Any other conditions which may apply. The cost of connection quoted is subject to ESB Networks obtaining any wayleaves or easements required from landowners or planning approvals, where these are necessary. The cost of connection quoted is subject to change in the event of unforeseen construction conditions e.g. forestry conflicts, etc. Revised terms and a quotation will apply in any of these events. The terms are accepted by signing the Connection Agreement and returning it with full payment plus any other documentation specified in the agreement to ESB Networks. Acceptance of terms includes those set out in the Distribution Code, General Conditions for Connection and any / all conditions as amended and approved by the Commission for Energy Regulation from time to time. Page 22 of 38

23 ESB 3. Details of Charges Notes: 1. Connection Charges are subject to VAT of 13½%. In this document, connection charges for one-off domestic connections are shown inclusive of VAT and all other charges exclusive of VAT. This is shown clearly in each charge table. 2. The charges quoted are based on the principle of the least cost technically-acceptable solution (LCTAS) as defined in The Distribution System Security and Planning Standards. Where the customer chooses a more costly connection, the customer bears the cost difference. 3. The charges are based on the connection asset remaining in service for a minimum period of 20 years. Where it is known that the duration will be shorter, a reduced allowance and hence higher charge will apply. Page 23 of 38

24 ESB Table A1.0 Domestic Non-Scheme Connection Charges Description 1 Maximum Import Capacity kva Connection Charge including VAT ( ) Standard Connection 2 12kVA 1,644 Enhanced Connection 16kVA 2,229 Upgrade Connection 12kVA to 16kVA 979 Family Apartment 12kVA 151 Non-Dwelling Farm Building 3kVA 50% of design costs Special Connection (single phase) 20kVA 1,525 plus MV network charges Special Connection (single phase) Special Connection (three phase) Special Connection (three phase) Capacities 30 kva 29kVA 20kVA 29kVA 30kVA 2,041 plus MV network charges 2,126 plus MV network charges 2,730 plus MV network charges Business Connection 1 All connections are single phase unless otherwise stated 2 This level is to meet European standard EN50160 Page 24 of 38

25 ESB Table A2.0 Domestic Scheme Connection Charges Standard Charges for Small Domestic Developments (2-19 Houses) excl. VAT Connection Capacity 12kVA No. of Houses Average Length of Roadway per House (m) see footnote see footnote see footnote Connection Capacities of kva use 50% of Design Costs Connection Capacities of MIC 30 kva treated under Business Charges 1 For two, three and four house domestic developments an upper limit of 50 metres average length of roadway per house applies. Page 25 of 38

26 ESB Table A2.1 Domestic Scheme Connection Charges Standard Charges for Housing Schemes (20 houses or more) excl. VAT Connection Capacity 12kVA Connection Capacity Average Length of Roadway per House (m) Standard Connection Charge per house Connection Capacities of kva use 50% of Design Costs Connection Capacities of MIC 30 kva treated under Business Charges Page 26 of 38

27 ESB Table A3: Business Demand Customer Connection Charges (MIC 2kVA to 5000kVA) Maximum Import Capacity (kva) Dedicated LV Connection Single Phase < 2kVA Standard Charge (per installation) 10m clipped m UG only m UG joint hole m UG (Br Joint) 1,710 LV OH/UG <200m 1,560 Pole & Trafo 2,710 Single Phase LV Connection Three Phase LV Connection 15 1, , , , , , , , , , , , , ,450 LV Connection 500kVA to 1000kVA See Table A6 Page 27 of 38

28 ESB Table A3: Business Demand Customer Connection Charges (MIC 2kVA to 5000kVA) Maximum Import Capacity (kva) MV Connection (10kV or 20kV) Standard Charge (per installation) < 500 8, , , , ,650 1,000 16,500 1,200 19,460 1,400 22,420 1,600 25,370 1,800 28,350 2,000 31,300 2,200 34,270 2,400 37,220 2,500 38,640 2,600 40,180 2,800 43,160 3,000 46,110 3,200 49,080 3,400 52,020 3,600 55,000 3,800 57,950 4,000 60,910 4,200 71,640 4,400 83,040 4, ,480 4, ,750 Page 28 of 38

29 ESB Table A4: Business Demand Customer Connection Charges (MIC 5MVA to 15MVA) Maximum Import Capacity (kva) MV Connection (10kV or 20kV) MV Connection (20kV) Standard Charge (per installation) 5, ,750 5, ,710 5, ,400 5, ,890 5, ,240 6, ,430 6, ,320 6, ,210 6, ,800 6, ,370 7, ,650 7, ,760 7, ,740 7, ,570 7, ,230 8, ,740 8, ,020 8, ,290 8, ,580 8, ,860 9, ,140 9, ,410 9, ,700 9, ,970 9, ,270 10, ,550 10, ,670 10, ,810 10, ,770 10, ,740 Page 29 of 38

30 ESB Table A4: Business Demand Customer Connection Charges (MIC 5MVA to 15MVA) Maximum Import Capacity (kva) Standard Charge (per installation) 11, ,520 11, ,190 11, ,810 11, ,290 11, ,620 12, ,940 12,200 1,005,230 12,400 1,048,390 12,600 1,092,370 12,800 1,137,230 13,000 1,183,040 13,200 1,229,880 13,400 1,277,380 13,600 1,326,030 13,800 1,375,390 14,000 1,425,740 14,200 1,477,060 14,400 1,529,080 14,600 1,582,250 14,800 1,636,120 15,000 1,690,960 Page 30 of 38

31 ESB Table A5: Business Demand Customer Connection Charges (MIC 15MVA to 20MVA) Note that due to network constraints MV connections over 15MVA may not be offered. However, this Table may be used for small increases where technically possible. Maximum Import Capacity (kva) MV Connection (20kV) MV Connection (20kV) > 20MVA Standard Charge (per installation) 15,000 1,690,960 15,200 1,713,510 15,400 1,736,080 15,600 1,758,780 15,800 1,781,340 16,000 1,803,900 16,200 1,826,480 16,400 1,849,040 16,600 1,871,590 16,800 1,894,150 17,000 1,916,710 17,200 1,939,280 17,400 1,961,830 17,600 1,984,410 17,800 2,006,970 18,000 2,029,650 18,200 2,052,220 18,400 2,074,780 18,600 2,097,330 18,800 2,119,900 19,000 2,142,460 19,200 2,165,030 19,400 2,187,580 19,600 2,210,150 19,800 2,232,700 20,000 2,255, kv Connection See Table A7 Same as for MV Page 31 of 38

32 ESB Table A6: Business Demand Customer Connection Charges (MIC 500kVA to 1000kVA) Note that due to higher capacity charges and higher DUoS charges, LV connections over 500kVA may not be economical for the customer. However, this Table may be used for small increases where technically possible. Maximum Import Capacity (kva) LV Connection Standard Charge (per installation) , , , , , , , , , ,270 1,000 25,650 Page 32 of 38

33 ESB Table A7: Business Demand Customer Connection Charges (MIC 20MVA to 25MVA) Note that due to network constraints MV connections over 15MVA may not be offered. However, this Table may be used for small increases where technically possible. Maximum Import Capacity (kva) MV Connection (20kV). Standard Charge (per installation) 20,200 2,277,970 20,400 2,300,530 20,600 2,323,090 20,800 2,345,650 21,000 2,368,230 21,200 2,390,780 21,400 2,413,350 21,600 2,435,900 21,800 2,458,460 22,000 2,481,020 22,200 2,503,580 22,400 2,526,150 22,600 2,548,850 22,800 2,571,410 23,000 2,593,970 23,200 2,616,540 23,400 2,639,100 23,600 2,661,660 23,800 2,684,220 24,000 2,706,780 24,200 2,729,360 24,400 2,751,910 24,600 2,774,480 24,800 2,797,160 25,000 2,819,720 Page 33 of 38

34 ESB Table A8: MV Network Charges and Trenching Charges Network MV Overhead Line Charge for new network in ( ) per metre Single Phase (Unmetered) Single Phase (Metered) Phase (< 5MVA) Phase (>= 5MVA) MV Underground Cable Single Phase (Unmetered) Single Phase (Metered) Phase (70/185s) Phase (400s) Trenching Charge for trenching work in ( ) per metre Road/Path Grass Page 34 of 38

35 ESB Table A9: Business Demand Customer Connection Charges Supplementary charge where MV MIC is greater than 500 kva and more than 7 km from the station km kva ,100 2,200 3,300 4,400 5,500 6,600 7,700 8, ,200 4,400 6,600 8,800 11,000 13,100 15,300 17, ,300 6,600 9,900 13,100 16,400 19,700 23,000 26, ,400 8,800 13,100 17,500 21,900 26,300 30,700 35, ,500 11,000 16,400 21,900 27,400 32,900 38,300 43, ,600 13,100 19,700 26,300 32,900 39,400 46,000 52, ,700 15,300 23,000 30,700 38,300 46,000 53,700 61, ,800 17,500 26,300 35,100 43,800 52,600 61,400 70, ,900 19,700 29,600 39,400 49,300 59,200 69,000 78, ,000 21,900 32,900 43,800 54,800 65,700 76,700 87, ,100 24,100 36,200 48,200 60,300 72,300 84,400 96, ,100 26,300 39,400 52,600 65,700 78,900 92, , ,200 28,500 42,700 57,000 71,200 85,500 99, , ,300 30,700 46,000 61,400 76,700 92, , , ,400 32,900 49,300 65,700 82,200 98, , ,500 Table A10: Business Demand Customer Connection Charges Supplementary charge where 38kV MIC is greater than 2500 kva and connected to circuits longer than 18km km kva ,000 7,000 11,900 16,900 21,900 26,800 31,800 36,800 41, ,000 13,900 23,900 33,800 43,700 53,700 63,600 73,600 83, ,000 20,900 35,800 50,700 65,600 80,500 95, , , ,000 27,800 47,700 67,600 87, , , , , ,900 34,800 59,600 84, , , , , , ,900 41,800 71, , , , , , , ,900 48,700 83, , , , , , , ,900 55,700 95, , , , , , , ,900 62, , , , , , , , ,900 69, , , , , , , , ,900 76, , , , , , , , ,900 83, , , , , , , , ,800 90, , , , , , , , ,800 97, , , , , , , , , , , , , , , , ,300 Page 35 of 38

36 ESB Notes on Business Demand Customer Connection Charges Note 1 Note 2 Note 3 Note 4 Note 5 Note 6 Note 7 Note 8 The standard charge includes the appropriate transformer capacity charge and the direct cost of connection and metering. MV overhead lines, MV underground cables and trenching where carried out by ESB are charged separately on a "euro per metre" ( /m) basis. A revenue allowance has been given where appropriate. MV overhead line is charged on a "euro per metre" ( /m) basis. The /m for 3ph MV up to 5MVA is weighted to include 150 s AL,92 s SCA, 50 s CU and 50 s SCA based on total km of each conductor type used, above 5MVA the /m is based on 150's AL. The /m charge for 1ph is based on 50 s SCA. Both 1ph and 3ph /m charges are weighted to include bog, rock and standard ground conditions. MV underground cable is charged on a "euro per metre" ( /m) basis, 3 x 70/185 s and 3 x 400's XLPE are separately shown. Trenching is not included and if carried out by ESB is charged on a /m basis. Additional charge where trenching (MV or LV) is carried out by ESB. The charge is weighted for footpaths and roadways in concrete or bitmac. Granite footpaths not included. Separate charge is shown for trenching in grass. The standard charge includes 38 kv and MV capacity charges. A supplementary charge is added if the entire MV circuit exceeds 7.0 km and MIC exceeds 500kVA. A supplementary charge is added if the entire 38kV circuit exceeds 18.0 km and MIC exceeds 2500kVA. Details on Table A8 and A9. LV connections in the range 500 kva kva are possible but due to charges for MV/LV transformer capacity (as well as MV & 38 kv capacity charges) they are more costly. Details on Table A6. The standard charge for 38kV connections is the same as the standard charge for the MIC level at MV and can be taken from the MV table. A supplementary charge must be added if the entire 38kV circuit length exceeds18.0 km and the MIC exceeds 2500 kva, details on Table A9. New 38kV Lines/Cables charged at 50%. For MIC > 5MVA, any new 38kV/110kV network is chargeable as a capital contribution at 50% of Attributable Costs. The Attributable Cost of the 38kV/110kV network is determined as a proportion of the firm capacity of the station taken up by the customer. If the customer was taking up 60% of the station then the customer would be charged 50% of 60% of the cost of the 38kV/110kV lines / cables. e.g. MIC 15MVA, new 110kV line to new station required, station a 2x20MVA station with a firm capacity of 25MVA, customer charged 50% of 15/25ths (MIC/Firm Capacity 15MVA/25MVA) of the cost of the new 110kV line. Page 36 of 38

ESB Networks DAC. Statement of Charges

ESB Networks DAC. Statement of Charges - ESB Networks DAC Statement of Charges Revision Date: 9/2018 Revision No.: 15 Document No: DOC-101209-AXR Issued by: ESB NETWORKS Designated Activity Company Approved by : CRU Effective Date: 01/10/2018

More information

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT 14 TH MARCH 2008 TABLE OF CONTENTS Page 1 Introduction... 2 2 Charging Methodology Objectives... 4 3 Connection Charging Methodology... 5 4 Connection

More information

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT 14 TH MARCH 2008 TABLE OF CONTENTS Page 1 Introduction...1 2 Charging Methodology Objectives...3 3 Connection Charging Methodology...4 4

More information

Wholesale Developer Services Charges

Wholesale Developer Services Charges Wholesale Developer Services Charges 2017-2018 V1.3 31.1.17 Contents Contents Water Infrastructure Charges... 3 Charges... 3 Payment... 4 Building Water Charges... 5 Household... 5 Other Construction Work...

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Rates in effect as of September 1, 2015 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Page 1 of 19 ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE RATES IN EFFECT AS OF JANUARY 1, 2017 Page 2 of 19 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100

More information

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Rates in effect as of July 1, 2011 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff Residential

More information

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Page 2 of 22 ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE RATES IN EFFECT AS OF APRIL 1, 2018 Page 2 of 22 Page 3 of 22 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE RATES IN EFFECT AS OF APRIL 1, 2018 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff Residential

More information

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Rates in effect as of January 1, 2018 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff Residential

More information

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers DISTRIBUTION CODE Contents 1 Introduction 2. Advisory and Information Systems 3. Supply 3.1 Quality of Electric Supply 3.2 Interference with other Customers 3.3 Application for the Supply of Electricity

More information

Construction and Connection of Street Light Assets

Construction and Connection of Street Light Assets Construction and Connection of Street Light Assets 1. INTRODUCTION... 2 2. FURTHER INFORMATION... 3 3. DEFINITIONS... 3 3.1 Designer... 3 3.2 Street Light Asset Owner... 3 3.3 Road Owner... 4 3.4 Developer...

More information

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing. LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com December 28, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 Re: Tariff Advice

More information

Electricity Network pricing schedule. Module 15 Effective April 1, 2011 for Electricity line charges. Version

Electricity Network pricing schedule. Module 15 Effective April 1, 2011 for Electricity line charges. Version Electricity Network pricing schedule Module 15 Effective April 1, 2011 for Electricity line charges Version 2011.1 Contents Section 1: Pricing Schedules...3 1.1 Wellington electricity Network line charges...3

More information

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5 Columbia City, Indiana Page 1 of 5 SCHEDULE DG-2 LARGE POWER DISTRIBUTED GENERATION I. AVAILABILITY This Distributed Generation Rate is available to any member in good standing of Northeastern REMC (Northeastern)

More information

PAID PARKING INFORMATION LEAFLET

PAID PARKING INFORMATION LEAFLET PAID PARKING INFORMATION LEAFLET INFORMATION ON PAID PARKING CONTROL WITHIN THE DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL (DLRCC) ADMINISTRATIVE AREA Q. Why implement Paid Parking Control? The Council s practice

More information

Basic Connection Services Application and Price Guide

Basic Connection Services Application and Price Guide Basic Connection Services Application and Price Guide 2016-17 Disclaimer TasNetworks (which, for the purposes of this disclaimer, includes all of its related bodies corporate, its officers, employees,

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

UNS Electric, Inc. Rules and Regulations

UNS Electric, Inc. Rules and Regulations Original Sheet No.: 902 A. In these, the following definitions will apply unless the context requires otherwise: 1. Actual Cost: The cost incurred by the Company for labor, materials and equipment including

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 77/15 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

SECTION 3 CUSTOMER CLASS SPECIFIC

SECTION 3 CUSTOMER CLASS SPECIFIC SECTION 3 CUSTOMER CLASS SPECIFIC 3.0 General PowerStream shall recover costs associated with the installation of Connection Assets, by customer class, via a Basic Connection Charge and a Variable Connection

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 8/18 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

57. Line Extensions Policy 1: Individual Residential Customers

57. Line Extensions Policy 1: Individual Residential Customers Page 1 of 36 NHPUC NO. 20 - ELECTRICITY DELIVERY Original Page 57 LIBERTY UTILITIES Line Extensions Policy 1: Individual Residential Customers 57. Line Extensions Policy 1: Individual Residential Customers

More information

POWER NETWORKS Electricity Network Tariffs and Charges

POWER NETWORKS Electricity Network Tariffs and Charges POWER NETWORKS 2018-19 Electricity Network Tariffs and Charges June 2018 Power and Water Corporation Table of Contents 1 Introduction 1 2 Business Characteristics 1 3 2014 Network Price Determination 2

More information

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

Northeastern Rural Electric Membership Corporation Columbia City, Indiana Page 1 of 5 SCHEDULE ADG - 1 AGGREGATED DISTRIBUTED GENERATION SERVICE I. AVAILABILITY This Aggregated Distributed Generation Schedule is available to any member in good standing of Northeastern REMC (Northeastern),

More information

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004 Rate Schedule: R Page 1 of 1 RESIDENTIAL RATE SCHEDULE R Available in all territory served by the Cooperative, in accordance with the established rules and regulations of the Cooperative. Residential uses

More information

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES. The following charges will apply from 1 July 2016. Accounts issued on or after this date will be charged on a pro-rata basis. The charges

More information

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS Effective from 1 st April 2013 The methodology set out in this statement was approved

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Service & Installation Rules

Service & Installation Rules Service & Installation Rules CONSOLIDATED AMENDMENTS - MARCH 2011 Published 3 September 2012 SA Power Networks www.sapowernetworks.com.au Issue 3 September 2012 Page 1 of 55 Revision Notes: DATE SECTION

More information

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES MUNICIPAL UTILITIES S BOARD OF PUBLIC UTILITIES AMY CRAFT-AHRENS WILLIAM CULBERTSON MIKE FROST MEGAN NEWLOVE MATT PAQUETTE MAYOR RICHARD EDWARDS MUNICIPAL ADMINISTRATOR LORI TRETTER UTILITIES DIRECTOR

More information

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES MUNICIPAL UTILITIES S BOARD OF PUBLIC UTILITIES WILLIAM CULBERTSON MIKE FROST JOYCE KEPKE JOHN MEKUS MEGAN NEWLOVE MAYOR RICHARD A. EDWARDS MUNICIPAL ADMINISTRATOR JOHN S. FAWCETT UTILITIES DIRECTOR BRIAN

More information

Automated and Electric Vehicles Bill

Automated and Electric Vehicles Bill Automated and Electric Vehicles Bill SECOND MARSHALLED LIST OF AMENDMENTS TO BE MOVED IN COMMITTEE OF THE WHOLE HOUSE Amendment No. [Amendments marked * are new or have been altered] Clause 8 37 Page 5,

More information

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Fees and Charges PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY 1 Fees and Charges SECTION TABLE OF CONTENTS PAGE TABLE OF CONTENTS... 2 DELEGATED AUTHORITY... 3 ELECTRICAL FEES AND CHARGES... 4 PRE-DESIGN

More information

APRIL 2011 FINAL RATES

APRIL 2011 FINAL RATES STATEMENT OF CHARGES FOR USE OF INDEPENDENT POWER NETWORKS LIMITED S ELECTRICITY DISTRIBUTION NETWORK APRIL 2011 FINAL RATES This statement is effective from 1st April 2011 Independent Power Networks Limited,

More information

Charges Scheme 2017/18

Charges Scheme 2017/18 Charges Scheme 2017/18 Connection, disconnection, development and infrastructure charges (the scheme is for all customers including developers and self-lay providers) bristolwater.co.uk 1 The charging

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B;

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B; Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B; AND IN THE MATTER OF an Application by Thunder Bay Hydro Electricity

More information

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire. AVAILABLE: Within established City Limits. AUSTIN UTILITIES Schedule (110) Issued 11/12/13 Supersedes (110) Issued 11/13/12 Sheet No. 1 of 1 RESIDENTIAL SERVICE APPLICABLE: To single-family residences

More information

Standard Battery Energy Storage System (BESS) Connection Arrangements

Standard Battery Energy Storage System (BESS) Connection Arrangements Standard Battery Energy Storage System (BESS) Connection Arrangements Introduction A battery energy storage system (BESS) can be operated in a number of different ways to provide benefit to a customer.

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

EDS ELECTRIC VEHICLE CONNECTIONS

EDS ELECTRIC VEHICLE CONNECTIONS Document Number: EDS 08-5050 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-5050 ELECTRIC VEHICLE CONNECTIONS EPN, LPN, SPN This standard outlines the design requirements for the connection of

More information

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES Table of Contents I. DEFINITIONS... 2 II. DEPOSITS... 3 A. Establishment of Credit... 3 B. Deposit Refunds... 4 III. CUSTOMER SERVICE FEES AND CHARGES... 4 A.

More information

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Fees and Charges PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY 1 SECTION TABLE OF CONTENTS Fees and Charges PAGE TABLE OF CONTENTS... 2 DELEGATED AUTHORITY... 3 ELECTRICAL FEES AND CHARGES... 4 SERVICE

More information

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES Table of Contents I. DEFINITIONS... 2 II. DEPOSITS... 3 A. Establishment of Credit... 3 B. Deposit Refunds... 4 III. CUSTOMER SERVICE FEES AND CHARGES... 4 A.

More information

Appendix Item Addendum

Appendix Item Addendum Addendum to ESAH Version 3 Supply Application Appendix Item Addendum 1 Electrical System Item 1.4.5 Short Circuit Ratings Addendum for type of short circuit rating for system voltage of 275kV. 2 Types

More information

Resident Permit and Visitor Permit Guidelines

Resident Permit and Visitor Permit Guidelines OPERATING GUIDELINES Resident Permit and Visitor Permit Guidelines Approved by: GM, City Services May 2003 Subsequent Amendments: 9 September 2016 Associate Director (Vanessa Godden) Amended to reflect

More information

Max value Max life Range from. ($000) (Years) Pole Type

Max value Max life Range from. ($000) (Years) Pole Type Draft Handbook Vector Asset Description 1 Unit Maximum Maximum Life Max value Max life Max Asset Life Max Asset Life Range from Submitters Max Asset Life ($000) SUBTRANSMISSION Concrete Wood Concrete Wood

More information

Reg No 2003/011612/30. Electrical Service Connection Policy

Reg No 2003/011612/30. Electrical Service Connection Policy Reg No 2003/011612/30 Electrical Service Connection Policy 1 CENTLEC (SOC) LTD Subject: Electrical Service Connection Policy Policy No: Directorate: Wires Board Item No: Sub-Directorate: Planning Date

More information

Net Metering Policy Framework. July 2015

Net Metering Policy Framework. July 2015 Net Metering Policy Framework July 2015 Table of Contents 1.0 BACKGROUND... 2 2.0 POLICY OBJECTIVE... 2 3.1 Eligibility... 3 3.1.1 Renewable Generation... 3 3.1.2 Customer Class... 3 3.1.3 Size of Generation...

More information

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Fees and Charges PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY 1 Fees and Charges SECTION TABLE OF CONTENTS PAGE TABLE OF CONTENTS... 2 DELEGATED AUTHORITY... 3 ELECTRICAL FEES AND CHARGES... 4 ENGINEERING

More information

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS Appendix 6.7 SUR ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Page No. Eligibility...1 Reference Demand...1 Billing...2 Interruptions...3

More information

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein: SCHEDULE OF STANDARD PRICES FOR ESKOM TARIFFS 1 APRIL 2015 TO 31 MARCH 2016 FOR NON-LOCAL AUTHORITY SUPPLIES, AND 1 JULY 2015 TO 30 JUNE 2016 FOR LOCAL AUTHORITY SUPPLIES 1. Standard prices The standard

More information

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES. The following charges will apply from 1 July 2017. Accounts issued on or after this date will be charged on a pro-rata basis. The charges

More information

Introduction to Charging: Which Parties Pay Which Charges?

Introduction to Charging: Which Parties Pay Which Charges? Introduction to Charging: Which Parties Pay Which Charges? Information I National Grid Last Updated December 2015 Connection Charging - The cost of sole use assets required to connect to the transmission

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Southern California Edison Original Cal. PUC Sheet No. 58584-E Schedule CRPP Sheet 1 APPLICABILITY This Schedule is applicable to Customer Participants, as defined below, who elect to participate in the

More information

Alameda Point Electric Infrastructure Improvements Public Utilities Board Update May 15, 2017

Alameda Point Electric Infrastructure Improvements Public Utilities Board Update May 15, 2017 Alameda Point Electric Infrastructure Improvements Public Utilities Board Update May 15, 2017 Presentation Overview I. Mutual Goals II. Alameda Point Overview III. Incremental Development Process and Project

More information

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

PHILIPPINE DISTRIBUTION CODE 2017 EDITION PHILIPPINE DISTRIBUTION CODE 2017 EDITION PDC 2017- Background Revised the PDC 2001 Starts of revision in 2010 April 18 and 24, 2012 conducted a series of expository presentation for Visayas and Mindanao

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

33kV Connection up to 90MVA

33kV Connection up to 90MVA Electricity Specification 217 Issue 2 December 2007 33kV Connection up to 90MVA Contents 1 Scope 2 General 3 Connection Arrangements 4 Equipment Records 5 Documentation 6 Documents Referenced 7 Keywords

More information

EDS FUSE RATINGS AT DISTRIBUTION SUBSTATIONS

EDS FUSE RATINGS AT DISTRIBUTION SUBSTATIONS Document Number: EDS 05-4001 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 05-4001 FUSE RATINGS AT DISTRIBUTION SUBSTATIONS EPN, LPN, SPN This design standard details the HV and LV fuse ratings

More information

1. General Requirements

1. General Requirements Ge n e ra lre q u ire me n ts 2016 Electric Service Requirements, 3rd Edition Section 1 Section 1 General Requirements Directory Page 1.1 Manual Purpose and Scope 1 1.2 Customer and Power Company Defined

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 62257-9-2 First edition 2006-10 Recommendations for small renewable energy and hybrid systems for rural electrification Part 9-2: Microgrids IEC 2006 Copyright - all rights

More information

OVERVIEW OF UNIFORM TRANSMISSION RATES

OVERVIEW OF UNIFORM TRANSMISSION RATES Exhibit H1 Tab 1 Schedule 1 Page 1 of 2 1 OVERVIEW OF UNIFORM TRANSMISSION RATES 2 3 4 5 6 7 8 9 Transmission rates in Ontario have been established on a uniform basis for all transmitters in Ontario since

More information

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65 M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65 CLASS OF SERVICE: CUSTOMER GENERATING SYSTEMS OVER 20 KW RATE CGS 1 AVAILABILITY To customers owning generating

More information

The Energy Queensland Group Notice of no non-network options

The Energy Queensland Group Notice of no non-network options The Energy Queensland Group Notice of no non-network options 24 September 2018 MCE Mount Crosby East Establish new substation to replace Mount Crosby Substation (SSMTC) Page 1 of 1 DISCLAIMER While care

More information

Energy from Waste Grid Connections

Energy from Waste Grid Connections Energy from Waste Grid Connections Catherine Cleary Grid Connection Lead TNEI Services catherine.cleary@tnei.co.uk 0161 233 4839 Overview Introduction to the UK Electricity Network Key Grid Connection

More information

Connection Application

Connection Application Connection Application For the Design and Quotation of an Electricity Connection This Connection Application is designed to assist us make your connection as efficient as possible. This information will

More information

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018 Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018 Houses Questions and Answers Provided on December 19, 2017 This document is intended

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

Noble County Rural Electric Membership Corporation

Noble County Rural Electric Membership Corporation Albion, Indiana Page 1 of 5 SCHEDULE NB-1 RESIDENTIAL NET BILLING I. AVAILABILITY This Net Billing Rate is available to any residential member in good standing of Noble REMC (Noble) who owns and operates

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

Tariffs Charges 2017/2018

Tariffs Charges 2017/2018 Tariffs Charges 2017/2018 Charges for non-local authorities effective from 1 April 2017 to 31 March 2018 Charges for local authorities effective from 1 July 2017 to 30 June 2018 Contents 1. Customer contact

More information

Consolidated Edison Company of New York, Inc.

Consolidated Edison Company of New York, Inc. PSC NO: 11 Electricity Leaf: 1 Initial Superseding Economic Development Delivery Service No. 2 Consolidated Edison Company of New York, Inc. Schedule For Economic Development Delivery Service Subsequent

More information

ISSUANCE OF CURRENT-PERMITS

ISSUANCE OF CURRENT-PERMITS September, 2013 ELECTRICAL SECTION ISSUANCE OF CURRENT-PERMITS The City s Electrical Section is the authority having jurisdiction regarding electrical technology within the City of Surrey, authorized by

More information

Southern Electric Power Distribution plc. Metering and Data Services Statement. Effective from 1st April Version 1.0

Southern Electric Power Distribution plc. Metering and Data Services Statement. Effective from 1st April Version 1.0 Southern Electric Power Distribution plc Metering and Data Services Statement Effective from 1st April 2017 Version 1.0 Scottish and Southern Electricity Networks is a trading name of: Scottish and Southern

More information

H 7366 S T A T E O F R H O D E I S L A N D

H 7366 S T A T E O F R H O D E I S L A N D LC0000 01 -- H S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - MUNICIPAL STREETLIGHT INVESTMENT ACT Introduced By:

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

City of Lethbridge ELECTRIC UTILITY. Electric Distribution Tariff Rate Schedule

City of Lethbridge ELECTRIC UTILITY. Electric Distribution Tariff Rate Schedule City of Lethbridge ELECTRIC UTILITY Electric Distribution Tariff Rate Schedule City of Lethbridge Bylaw 5789 Effective: January 1, 2013 City of Lethbridge Infrastructure Services Electric Utility Document

More information

Company Directive STANDARD TECHNIQUE : TP4B/2. Relating to 11kV and 6.6kV Transformer Protection

Company Directive STANDARD TECHNIQUE : TP4B/2. Relating to 11kV and 6.6kV Transformer Protection Company Directive STANDARD TECHNIQUE : TP4B/2 Relating to 11kV and 6.6kV Protection Policy Summary This document describes the detailed requirements for 11kV/415V and 6.6kV/415V distribution transformer

More information

Hydro One Networks Inc. TARIFF OF RATES AND CHARGES for the Service Area Formerly Served by Napanee Electric Commission Effective Date: May 1, 2007

Hydro One Networks Inc. TARIFF OF RATES AND CHARGES for the Service Area Formerly Served by Napanee Electric Commission Effective Date: May 1, 2007 Page 1 of 7 Page 1 of 7 APPLICATION The application of these rates and charges shall be in accordance with The Licence of The Distributor and any Codes, Guidelines or Orders of The Board, and amendments

More information

Georgia Department of Revenue Policy Bulletin - MVD HB 170 Transportation Funding Act of 2015

Georgia Department of Revenue Policy Bulletin - MVD HB 170 Transportation Funding Act of 2015 Georgia Department of Revenue Policy Bulletin - MVD - 2015-01 HB 170 Transportation Funding Act of 2015 1) Purpose: Effective Date: July 1, 2015. 2) Authority: O.C.G.A. 40-2-11, 40-2-86.1, 40-2-151, 40-2-151.1,

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

Comhairle Cathrach Chorcaí Cork City Council

Comhairle Cathrach Chorcaí Cork City Council Transportation Division City Hall Cork Response to the Consultation Paper on the ESBN Electric Vehicle Pilot & Associated Assets Reference CER/16/286 Introduction welcomes the opportunity to respond to

More information

Unmetered Connections (UMC) Guidance Notes & Price Schedules

Unmetered Connections (UMC) Guidance Notes & Price Schedules LPN WRP Unmetered Connections (UMC) Guidance Notes & Price Schedules London Area WRP Effective from 1 st July 2018. Unmetered Connections (UMC) Guidance Notes Effective from 1 st July 2018 Future price

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Revocation and substitution submission Public 6 January 2016 ABBREVIATIONS TABLE OF CONTENTS Abbreviations...

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 41. Procurement Of RMR Generation... 2 41.1 Procurement Of Reliability Must-Run Generation By The CAISO... 2 41.2 Designation Of Generating Unit As Reliability Must-Run Unit... 2 41.3

More information

Aurora Energy Limited. Network Connection Requirements (NS5.1)

Aurora Energy Limited. Network Connection Requirements (NS5.1) Limited Version 1.1 Issued: 1June 2011 Status and Application of these Requirements All connections on the Aurora electrical distribution network (the Network) are subject to the contractual terms of a

More information

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet 3-1 Cancels First Revision of Sheet 3-1

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet 3-1 Cancels First Revision of Sheet 3-1 P.U.C. Or. 25 Second Revision of Sheet 3-1 Cancels First Revision of Sheet 3-1 SERVICE AVAILABLITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential

More information

EC Forum on Model Approaches to Distribution Pricing. June 2009

EC Forum on Model Approaches to Distribution Pricing. June 2009 EC Forum on Model Approaches to Distribution Pricing June 2009 Session Explain Aurora UoS Pricing and fit with the Retail Model Approach Discuss how we transitioned a Demand tariff structure to Aurora

More information

MYPD3 tariff restructuring plan use-of-system charges. Brochure

MYPD3 tariff restructuring plan use-of-system charges. Brochure MYPD3 tariff restructuring plan use-of-system charges Brochure November 2012 Use-of-system charges for MYPD3 Page 1 PART 1: ESKOM REVENUE REQUIREMENT Introduction The current Multi-Year Price Determination

More information

BLUEBONNET ELECTRIC COOPERATIVE, INC. Section Sheet No. II 3

BLUEBONNET ELECTRIC COOPERATIVE, INC. Section Sheet No. II 3 II 3 For Electric Service 1 of 2 DATE OF APPROVAL November 16, 2018 Effective Date: November 16, 2018 II. S The Cooperative is not responsible for ensuring the Member is billed the most favorable rate.

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

THE PUBLIC SERVICE COMMISSION OF WYOMING

THE PUBLIC SERVICE COMMISSION OF WYOMING NAME: Powder River Energy Corporation WY PSC Tariff No. 7 ADDRESS:, Sundance, WY 82729 THE PUBLIC SERVICE COMMISSION OF WYOMING TARIFF RATE RIDER 5th Revised Sheet No. 1 Cancels 4th Revised Sheet No. 1

More information

Installing or Rebuilding Your Electric Service

Installing or Rebuilding Your Electric Service Installing or Rebuilding Your Electric Service 2 3 Contents Policies for New and Rebuilt Electric Service 2-4 Paperwork and fees...2 Five-year policy...3 Proposed route location and conditions...3 Construction

More information