DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

Size: px
Start display at page:

Download "DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1."

Transcription

1 DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 Tel (613) Fax (613)

2 TABLE OF CONTENTS PAGE 1. INTRODUCTION Scope of Work ADJACENT ROADS AND INTERSECTIONS MAXIME STREET SITE Trip Generation and Parking Space Demand Trip Distribution TRANSPORTATION IMPACT Background and Total Traffic Volumes Traffic Analysis Parking Demand FINDINGS APPENDIX LIST OF FIGURES 2.1 EXISTING 2015 PEAK AM AND PM HOUR TRAFFIC COUNTS PEAK AM AND PM HOUR SITE GENERATED TRIPS YEAR 2020 PEAK AM AND PM HOUR BACKGROUND TRAFFIC YEAR 2020 PEAK AM AND PM HOUR TOTAL TRAFFIC LIST OF TABLES 3.1 TRIP GENERATION RATES PARKING DEMAND RATES PEAK HOUR SITE TRIPS GENERATED PARKING DEMAND SITE ACCESS/MAXIME STREET LoS & Delay MAXIME STREET/CYRVILLE ROAD LoS & Delay... 13

3 DEVELOPMENT PROPERTY 1627 MAXIME STREET, OTTAWA TRANSPORTATION OVERVIEW 1. INTRODUCTION The owners of lands at 1627 Maxime Street are preparing an application for a Zoning By-law Amendment which would permit additional uses for the property. The subject property is located on the east side of Maxime Street approximately 55 m north of the intersection of Cyrville Road and Maxime Street. The property has an area of 1, m 2 with a lot frontage of m. The lot has one 2.5 storey building with a gross floor area of 613 m 2. Although currently vacant, the site was the previous location of a child daycare facility. The site provided a play area for the children at the rear of the building with a 17 space parking lot at the front of the building. The proposal for a By-law Amendment would permit additional uses for the site. The owners of the property have retained the firm of D. J. Halpenny & Associates Ltd. to examine the traffic and parking impact on the adjacent roads resulting from the changing of use through the rezoning of the land. The existing building and parking would be utilized in the new use for the site. 1.1 Scope of Work The scope of the study will be the examination of the impact of four possible uses of the site on the surrounding roads. The uses would be from the proposed permitted uses. The four uses were identified by the owners and would be the more appropriate use for the size and location of the site, along with the size of the building and amount of parking which would remain and become part of the new use. The study will generate the expected number of trips for each of the four uses selected for the site. The use with the highest expected site generated trips and parking demand would be examined for the weekday peak AM and PM hour. The extent of the study would be confined to the site access onto Maxime Street and the Maxime/Cyrville intersection. The analysis will use the existing 2015 traffic counts at the Maxime/Cyrville intersection and the expected counts at the year 2020, which represents five years beyond the anticipated rezoning of the property. The site is expected to generate a low volume of trips and would not trigger the preparation of a transportation assessment study report as documented in the City of Ottawa Transportation Impact Assessment Guidelines. In support of the rezoning of the lands, this Transportation Overview report is being prepared which will examine the impact of the four possible uses which would be supported by the proposed rezoning.

4 2 2. ADJACENT ROADS AND INTERSECTIONS The site will front onto Maxime Street. Maxime Street is a north-south two lane urban local street. The width of the street is approximately 8.5 m. Parking is prohibited along the east side of the road and permitted along the west side of the road. The speed limit is posted at 40 km./h. Cyrville Road is an east-west two lane urban arterial road which is located approximately 55 m south of the subject lands. Cyrville Road is identified in the City of Ottawa Transportation Master Plan (TMP) as a spine route for the cycling network and cross-town bikeway. Parking is prohibited along both sides of the road. The speed limit is posted at 50 km./h. at Maxime Street, and increases to 60 km./h. west of the Maxime/Cyrville intersection. The intersection of Cyrville Road and Maxime Street is a two-way stop controlled intersection with a stop sign at the southbound Maxime Street approach. The northbound approach is the rear access (truck access) to the Lazboy Furniture Galleries. The southbound Maxime Street left turn lane storage extends approximately 40 m to the midpoint of the site access, with an additional 25 m taper. The Maxime/Cyrville intersection has the following lane configuration: Northbound Lazboy Access - Southbound Maxime Approach - Eastbound Cyrville Approach - Westbound Cyrville Approach - One shared left/through/right lane One left turn lane (40 m vehicular storage) One shared through/right lane One left turn lane (55 m vehicular storage) One shared through/right lane One left turn lane (15 m vehicular storage) One shared through/right lane Figure 2.1 shows the weekday peak AM and PM hour traffic counts taken by the consultant at the intersection of Cyrville Road and Maxime Street on June 24, MAXIME STREET SITE The subject property is 1, m 2 in size with an existing building. The existing 2.5 storey building is currently vacant and has a floor area of 613 m 2. A child daycare facility was the previous tenant of the site. The site has one access onto Maxime Street and a parking lot with 17 parking spaces at the front of the building. The existing building and parking lot will remain and be utilized in the future land use. The site is located approximately 55 m north of the Maxime/Cyrville intersection. Development in the area consists of single family residential dwellings to the north and east of the site, a gas station and strip mall (convenience store and takeout restaurant) adjacent to the south property limit, and a parcel of land with a food truck to the west across from the site on the west side of Maxime Street. The applicant is applying for a Zoning By-law Amendment in order to expand the permitted uses for the site. In discussions with City of Ottawa staff, the proposed list of uses has been narrowed to include the following:

5 3 FIGURE 2.1 EXISTING 2015 PEAK AM AND PM HOUR TRAFFIC COUNTS

6 4 Community Health and Resource Centre Convenience Store Daycare Instructional Facility Office Personal Service Business Place of Worship Retail Store Residential Care Facility School For the transportation analysis, four potential uses were identified. The uses were selected by scale, function, and location of the property. Since the existing building and parking lot will remain, the best use of the property would utilize the existing infrastructure and are influenced by potential tenant interest in the property. The following are the four uses which will be examined in the study analysis: 1. Residential Care Facility 2. Office 3. Retail Store 4. School 3.1 Trip Generation and Parking Space Demand The site currently comprises of a single building with a gross floor area of 613 ft 2 (6,598 ft 2 ). The site will retain the one access onto Maxime Street and a parking lot with 17 spaces. The site generated trips were determined using the Institute of Transportation Engineers (ITE) document, Trip Generation, 9 th Edition, and the demand for parking spaces the ITE document, Parking Generation, 3 rd Edition. The analysis used the ITE trip rates for the weekday peak AM and PM hour and ITE Average Peak Period Parking Demand, with the exception of the school use which utilized local trip counts and data. The expected trips generated and parking demand for each of the four land uses were examined in the following: 1. The care facility use utilized the ITE Land Use 253 Congregate Care Facility to analyze the site. The Congregate Care Facility is an independent living development that provides centralized amenities such as dining and housekeeping. The number of site generated trips and parking demand will be based on the size of the existing building which would house approximately 15 dwelling units. 2. The office use utilizes the ITE Land Use 715 Single Tenant Office Building for the analysis. The office use would contain a building with offices, meeting rooms, and space for storage. The trips and parking is based on the existing gross floor area of the building which is 613 m 2 (6,598 ft 2 ). 3. The retail store use utilizes the ITE Land Use 826 Specialty Retail Center which provides a variety of retail stores including quality apparel, hard goods and services, real estate offices, etc. The retail stores are not generally open during the morning peak hour of the adjacent roads (7:45 AM to 8:45 AM) and therefore the AM trip generation rate is not provided. The peak PM hour trip rate is based on the gross floor area of the building. The ITE parking document does not provide the expected parking demand for this land

7 5 use, but the analysis has used the available parking demand ratio for one of the possible uses in the analysis. The parking demand ratio for ITE Land Use Apparel Store was used in the parking analysis for a retail store. 4. There is interest in the development of the site as a school or learning centre. Because of its size and location, the interest is in a private school for after school tutoring such as a Kuman Learning Centre. The study analysis has used the site trips and parking demand rates which were obtained from data and counts gathered for a Kuman Learning Centre in Kanata. The site expects between 25 and 30 students to attend classes. Assuming that 25 students arrive after classes during the peak PM hour, with 84% of the students arrive by private vehicles and 1.5 students per vehicle (siblings, friends and neighbours were found to share rides), the number of peak PM hour trips was determined to be: [25 (students) x 0.84 (private vehicle)] / 1.5 (car sharing) = 14 Vehicle Trips With tutoring sessions of approximately 30 minutes and most parents/caregivers dropping off students and arriving back to pick them up, each student would generate two trips entering and two trips exiting the site per day. The total expected trips during the peak PM hour would be: 2 x 14 (trips) = 28 trips entering the site 28 trips exiting the site 56 peak hour trips or 2.24 Trips/Student The peak period parking demand was determined by assuming 12.5 students during a ½ hour period (25 students total) of which 84% arrive by car with a vehicle occupancy of 1.5 students per vehicle. The parking demand would be 7 parking spaces or 0.28 parking spaces per student which is in agreement with parking counts taken at the Kanata Kuman Learning Centre. Table 3.1 provides the Trip Generation Rates which were obtained from the ITE Trip Generation manual and local data. The Average Peak Period Parking Demand Rates for the peak period were determined from the ITE Parking Generation manual and local data for an after school tutoring facility. Table 3.2 shows the expected average peak period parking demand for each of the four land uses examined in the study. The trip generation rates (Table 3.1) were used to determine the expected number of site generated trips using the gross floor area of the existing building, or assuming 15 dwelling units for a residential care facility, or 25 students in an after school tutoring facility. Table 3.3 provides the expected number of site trips generated for each of the four land uses. To be conservative, the study has not applied a transit share reduction to the expected site generated trips.

8 6 TABLE 3.1 TRIP GENERATION RATES LAND USE TRIP GENERATION RATE Peak AM Hr. Peak PM Hr. 1) Congregate Care Facility (ITE 253) 0.06 T/Dwelling Unit 0.17 T/Dwelling Unit 2) Single Tenant Office Building (ITE 715) 1.80 T/1000 ft T/1000 ft 2 3) Specialty Retail Center (ITE 826) T/1000 ft 2 4) School (Local Data) T/Student TABLE 3.2 PARKING DEMAND RATES LAND USE PEAK PERIOD PARKING DEMAND 1) Congregate Care Facility (ITE 253) 0.41 V/Dwelling Unit 2) Office Building (ITE 701) 2.40 V/1000 ft 2 (Weekday) 3) Apparel Store (ITE 870) 2.13 V/1000 ft 2 (Saturday) 4) School (Local Data) 0.28 V/Student (Weekday PM hour) TABLE 3.3 PEAK HOUR SITE TRIPS GENERATED UNIT TYPE WEEKDAY PEAK AM HR. WEEKDAY PEAK PM HR. TOTAL ENTER EXIT TOTAL ENTER EXIT 1) Residential Care Facility 1 1 (59%) 0 (41%) 1 73 (50%) 73 (50%) 2) Office (89%) 1 (11%) 11 2 (15%) 9 (85%) 3) Retail Store (44%) 10 (56%) 4) School (50%) 28 (50%) The site contains 17 existing parking spaces which will be utilized in the proposed land use. The peak period parking demand rates of Table 3.2 were applied to the four land uses examined in

9 7 the study with the expected average peak period parking demand presented in Table 3.4. The four land uses were all determined to be within the number of parking spaces provided on the existing site. TABLE 3.4 PARKING DEMAND LAND USE PEAK PERIOD PARKING DEMAND 1) Residential Care Facility 6 Parking Spaces 2) Office 16 Parking Spaces 3) Retail Store 14 Parking Spaces 4) School 7 Parking Spaces 3.2 Trip Distribution The peak period for site trips during the peak AM hour was for an office land use. The directional distribution of site generated trips was determined from the background traffic counts taken on June 24, The distribution of peak AM hour trips was as follows: To/From the North - Maxime 45% To/From the South - Maxime 55% To/From the Southeast - Cyrville 35% To/From the Southwest - Cyrville 20% The school use of the site would produce the highest volume of traffic during the peak PM hour. Students of an after school tutoring facility would travel from a residential area in close proximity to the school site. The study has used the school land use for the peak PM hour traffic analysis and has based the directional distribution of traffic on the density of the surrounding residential community. The distribution of peak PM hour trips was as follows: To/From the North - Maxime 80% To/From the South - Maxime 20% To/From the Southeast - Cyrville 15% To/From the Southwest - Cyrville 5% The above distribution for an office use was used for the peak AM hour traffic, and after school tutoring was used for the peak PM hour traffic. Figure 3.1 shows the expected distribution of site generated trips during the weekday peak AM and PM hour.

10 8 FIGURE 3.1 PEAK AM AND PM HOUR SITE GENERATED TRIPS

11 9 4. TRANSPORTATION IMPACT The study will examine the operation of the existing site s access onto Maxime Street, and the intersection of Maxime Street and Cyrville Road. The time period of the analysis would be the weekday peak AM and PM hour of the adjacent roads. The study will examine the operation of the intersections for the existing traffic counts, and at the year 2020 which represents five years beyond the time in which the By-law Amendment for rezoning will be submitted. The analysis has considered four possible uses of the existing property and has conducted an analysis for the peak AM and PM hours using the use which generated the highest volume of site trips. The analysis will use the Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the 2010 Highway Capacity Manual. For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays Demand Exceeds Capacity The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. The parking demand analysis has determined the average peak period parking demand for the four land uses examined, and compared the demand with the number of parking spaces provided on the site. 4.1 Background and Total Traffic Volumes The study will examine the impact of the site using the 2015 traffic counts and expected traffic at the year With the surrounding area essentially built up, the study has assumed an annual growth in background traffic of 1.0 percent for five years (growth factor of 1.051) which was applied to the traffic counts at all approaches to the Maxime/Cyrville intersection. Figure 4.1 presents the expected year 2020 background traffic which does not include the possible site generated trips. The total traffic volumes are the addition of the 2020 background traffic and the expected site generated trips (Figure 3.1). Figure 4.2 shows the 2020 total traffic volumes.

12 10 FIGURE 4.1 YEAR 2020 PEAK AM AND PM HOUR BACKGROUND TRAFFIC

13 11 FIGURE 4.2 YEAR 2020 PEAK AM AND PM HOUR TOTAL TRAFFIC

14 Traffic Analysis The will examine the operation of the site access onto Maxime Street for the expected 2020 volume of traffic, and the operation of the Maxime/Cyrville intersection for the existing 2015 traffic counts and expected 2020 traffic. The results of the analysis are discussed in detail in the following sections: Site Access and Maxime Street Intersection The proposed land use for the site will utilize the existing access onto Maxime Street. The site access is located at approximately the end of the storage lane and beginning of the taper for the southbound Maxime left turn lane to the Maxime/Cyrville intersection. The access is approximately 7 m in width and comprises of one lane entering and one lane exiting which would share left/right turning movements. The operational analysis was conducted assuming an office use during the peak AM hour and after school tutoring facility during the peak PM hour. The analysis determined that the southbound Maxime shared left/through movement and westbound shared left/right site exit would function at a Level of Service (LoS) A during both the 2020 peak AM and PM hours. Table 4.1 summarizes the operation of the access with the analysis sheets provided in the Appendix as Exhibit 1 for the peak AM hour and Exhibit 2 for the peak PM hour. The analysis determined that the 95 th percentile queue at the site exit would occur during the peak PM hour and would be 0.11 vehicles in length. The site access provides a clear throat distance of 1 vehicle. TABLE 4.1 SITE ACCESS/MAXIME STREET LoS & Delay Intersection Approach WEEKDAY PEAK AM HOUR YEAR (2020) WEEKDAY PEAK PM HOUR YEAR (2020) LoS Delay (sec.) LoS Delay (sec.) SB Left/Through Maxime Street (A) (7.4) (A) (7.5) WB Left/Right Site Access (A) (9.8) (A) (9.4) Maxime Street and Cyrville Road Intersection The intersection of Maxime Street and Cyrville Road is located approximately 55 m south of the site (centreline to centreline of site access). The intersection is controlled by stop signs at the southbound Maxime Street and northbound Lazboy Furniture Galleries driveway approaches. The intersection has exclusive left turn lanes at the eastbound and westbound Cyrville Road and southbound Maxime Street approaches. The left turn lane at the southbound Maxime Street approach contains approximately 40 m of vehicular storage with a 25 m taper. The storage lane extends to the site access.

15 13 Using the 2015 traffic counts (no site traffic) the intersection operates at an acceptable level of service. During the peak PM hour time period all approaches function at an acceptable level of service with the exception of the southbound Maxime left turn movement which functions at a LoS F (93.1 sec. approach delay), with a 95 th percentile queue of 4.82 vehicles (35 m) which would extend to the site access. The 95 th percentile queue is consistent with observations during the 2015 traffic count which recorded a 4 vehicle queue on one occasion during the peak PM hour. At the year 2020 with the increased background traffic and the trips from an office use on site, all approached would operate at an acceptable level of service. During the peak PM hour which would include the trips from an after school tutoring facility, all approaches would operate at an acceptable level of service with the exception of the southbound Maxime left turn movement which would continue to function at a LoS F (146.5 sec. approach delay), with a 95 th percentile queue of 6.53 vehicles (49 m) which would extend past the site access which may result in a delay for some vehicles entering and exiting the site. Table 4.2 summarizes the operation of the intersection with the analysis sheets provided as Exhibits 3 and 4 for the 2015 traffic counts and Exhibits 5 and 6 for the expected 2020 volume of traffic. TABLE 4.2 MAXIME STREET/CYRVILLE ROAD LoS & Delay Intersection Approach WEEKDAY PEAK AM HOUR YEAR 2015 (2020) WEEKDAY PEAK PM HOUR YEAR 2015 (2020) LoS Delay (sec.) LoS Delay (sec.) EB Left Cyrville Road A (A) 9.0 (9.1) A (A) 8.2 (8.3) WB Left Cyrville Road A (A) 7.6 (7.6) A (A) 9.4 (9.5) NB Left/Through/Right Driveway B (B) 10.7 (10.7) C (C) 18.7 (19.6) SB Left Site Exit C (D) 22.9 (25.6) F (F) 93.1 (146.5) SB Through/Right Maxime Street B (B) 13.1 (13.6) B (B) 10.5 (10.7) With the southbound Maxime left turn lane approach functioning at a LoS F, a traffic signal warrant analysis was conducted to determine if traffic signals may be required. The traffic signal warrant analysis, which is provided in the Appendix as Exhibit 7, determined that the intersection met 59 percent of the warrants. Traffic signals would therefore not be warranted based on the expected volume of traffic. The expected traffic from the site is expected to have a minor impact on the operation of the intersection and would not trigger a requirement for intersection modifications. The possible uses for the site would likely generate approximately the same volume of trips as the previous use as a child daycare facility.

16 Parking Demand The site currently provides 17 parking spaces. Utilizing the expected average peak period parking demand using the ITE parking manual and local counts for an after school tutoring facility, the demand for parking for the four typical uses examined were less than that provided. The office use was determined to generate a peak period parking demand of 16 spaces. The existing site was determined to provide sufficient parking for most uses. Additional on-street parking is available along the west side of Maxime Street if required during peak hours. 5. FINDINGS The site examined in this is located on the east side of Maxime Street approximately 55 m north of the Maxime/Cyrville intersection. The previous tenant of the site was a child daycare facility. The property has an area of 1, m 2 and contains one 2.5 storey building with a gross floor area of 613 m 2 and a 17 space parking lot. The site is currently vacant but the owners are preparing an application for a Zoning By-law Amendment which would permit additional uses for the property. The building and parking lot will remain. The examined four of the more likely uses of the site based on the size, location, and function of the existing building and property. The number of site generated trips was determined for the weekday peak AM and PM hour for the expected traffic at the year 2020, which is five years beyond the date for the application for rezoning of the property. The parking demand was determined for the peak period parking demand for the various uses. Traffic Analysis The study determined that the site would generate the highest volume of site trips during the peak AM hour as an office use and during the peak PM hour as an after school tutoring facility. 1. The operational analysis of the traffic determined that the site access would function at an acceptable level of service for the expected 2020 traffic volumes. The 95 th percentile queue was determined to be 0.11 vehicles during the 2020 peak PM hour with the site providing a clear throat distance of 1 vehicle. There would be no requirement for modifications to the existing site access. 2. For the 2015 traffic counts the Maxime/Cyrville intersection was determined to function at an acceptable level of service during the peak AM hour. During the 2015 peak PM hour all approaches functioned at an acceptable level of service with the exception of the southbound Maxime left turn movement which functioned at a Level of Service (LoS) F. Following the development of the site and increase in background traffic at the year 2020, the intersection continued to function at an acceptable level of service during the peak AM hour, and during the peak PM hour all approaches functioned at an acceptable level of service with the exception of the southbound Maxime left turn movement which continued to function at a LoS F with a 95 th percentile queue of 6.53 vehicles (49 m).

17 15 During the peak PM hour the queue from the southbound Maxime left turn movement may extend past the site exit which may result in a slight delay for exiting vehicles. A traffic signal warrant analysis was conducted which determined that the intersection would meet 59 percent of the warrants using the expected 2020 traffic volumes. There would be no requirement to modify the intersection due to traffic from the site. Peak Period Parking Demand The existing site would provide 17 parking spaces. The peak period parking demand analysis determined that an office use for the site would produce a parking demand for 16 vehicular spaces. There should be sufficient parking on the site for the intended land uses with no requirement to provide additional parking. The expected site generated trips and demand for parking would be similar to that experienced when the site functioned as a child daycare facility. This was prepared in support of the proposal for a By-law Amendment which would permit additional uses for the property at 1627 Maxime Street. Prepared by: David J. Halpenny, M. Eng., P. Eng.

18 16 APPENDIX OPERATIONAL ANALYSIS WORK SHEETS TRAFFIC SIGNAL WARRANT ANALYSIS

19 17 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS Maxime/Site Access HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Maxime/Access Analysis Year: 2020 Total Traffic Project ID: 1627 Maxime Street Property East/West Street: Site Access North/South Street: Maxime Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration TR LT Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 1 0 Peak Hour Factor, PHF Hourly Flow Rate, HFR 1 0 Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) 5 1 C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 9.8 Approach LOS A

20 18 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS Maxime/Site Access HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Maxime/Access Analysis Year: 2020 Total Traffic Project ID: 1627 Maxime Street Property East/West Street: Site Access North/South Street: Maxime Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration TR LT Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 6 22 Peak Hour Factor, PHF Hourly Flow Rate, HFR 6 23 Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config LT LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 9.4 Approach LOS A

21 19 EXHIBIT PEAK AM HOUR TRAFFIC COUNT ANALYSIS Maxime/Cyrville HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Maxime/Cyrville Analysis Year: 2015 Counts Project ID: 1627 Maxime Street Property East/West Street: Cyrville Road North/South Street: Maxime Street Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration L TR L TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR L TR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config L L LTR L TR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A B C B Approach Delay Approach LOS B C

22 20 EXHIBIT PEAK PM HOUR TRAFFIC COUNT ANALYSIS Maxime/Cyrville HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Maxime/Cyrville Analysis Year: 2015 Counts Project ID: 1627 Maxime Street Property East/West Street: Cyrville Road North/South Street: Maxime Street Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration L TR L TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR L TR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config L L LTR L TR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A C F B Approach Delay Approach LOS C F

23 21 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS Maxime/Cyrville HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Maxime/Cyrville Analysis Year: 2020 Total Traffic Project ID: 1627 Maxime Street Property East/West Street: Cyrville Road North/South Street: Maxime Street Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration L TR L TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR L TR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config L L LTR L TR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A B D B Approach Delay Approach LOS B C

24 22 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS Maxime/Cyrville HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Maxime/Cyrville Analysis Year: 2020 Total Traffic Project ID: 1627 Maxime Street Property East/West Street: Cyrville Road North/South Street: Maxime Street Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration L TR L TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement L T R L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR L TR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config L L LTR L TR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A C F B Approach Delay Approach LOS C F

25 23 EXHIBIT TRAFFIC SIGNAL WARRANT ANALYSIS Maxime/Cyrville

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS Executive Summary... 2 Project Background... 2 Conditions... 2 Findings... 3 Recommendations... 4 Introduction... 6

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO P.O. 61992 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION SEPTEMBER 5, 218 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study 354 Carling Avenue Community Transportation Study/ Transportation Impact Study prepared for: Holloway Lodging Corporation 69 Quinpool Road, th Floor Halifax, NS B3K 5J7 prepared by: 223 Michael Street

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development Solmar Development Corp. 144&176 John St. and 2 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development TRANSPORTATION IMPACT STUDY 18145 November 217 LEA Consulting Ltd. Consulting

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS PARE PROJECT NO. 17120.00 REPORT TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS SUBMITTED TO: GEORGETOWN CAPITAL MANAGEMENT PO BOX 369 GEORGETOWN, MA 01833

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group

More information

Manotick Plaza, Manotick Main Street - Traffic Impact Brief

Manotick Plaza, Manotick Main Street - Traffic Impact Brief March 28 th, 2013 Mr. Nicholas Caragianis Nicholas Caragianis Architect Inc. 137 Pamilla Street Ottawa, ON K1S 3K9 [Tel: 613 237-6801 ext. 222 / Fax: 613 237-8289 / E-mail: nicholas@ncarchitect.ca] Dear

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

TIS / TB/ CTS Check List

TIS / TB/ CTS Check List Study Merivale Type Road Central Park Mixed-Use Development May 2011 Study TIS/CTS Name February 2011 CTS/TIS Check List TIS / TB/ CTS Check List prepared for: Ashcroft Homes 18 Antares Drive Ottawa, ON

More information