Rail Interoperability in Spain. ERTMS real deployment

Size: px
Start display at page:

Download "Rail Interoperability in Spain. ERTMS real deployment"

Transcription

1 Rail Interoperability in Spain. ERTMS real deployment 1 I.J. Iglesias. Presenting Author, 1 A. Berrios, 1 A. Arranz, 1 M. Cambronero1, 2 J.A.Jimenez, 2 C.Arias, 2 I.Ribera, 3 D.Molina, 3 J.Tamarit and 3 J.Bueno Coauthors 1 ADIF. Railways Infrastructure Manager, Madrid, Spain. 2 Renfe Operadora. Spanish Railways operator, Madrid, Spain. 3 CEDEX Studies and Experimentation Centre of Public Works and Transportation (Fomento) Ministry, Madrid, Spain Abstract This paper shows how, at the time being, the rail interoperability is a reality in Spain by means of presenting the current implementation of ERTMS/ETCS (European Rail Traffic Management System/European Train Control System) in the new Spanish high speed lines. This has been done in the frame of the very ambitious Spanish high speed program which consists on the construction and putting in operation of approximately Km of new HSLs in the period , with a total investment of around M. The role of Spain as pioneer in implementing the new signaling system is clearly highlighted in this paper. 1.- Introduction The main issue of this paper is to show how the real interoperability among almost the totality of ERTMS/ETCS suppliers is being successfully tested in Spain, presenting the behavior of lines in commercial operation as well as the new lines to be open during the next years. The success of ETCS real deployment is a clear demonstration that nowadays the rail interoperability is a fact, and this paper highlight the role played by the Spanish railways as pioneers in the real implementation of the system, solving the problems derived from the intervention of many suppliers, as well as for the non stability of the ETCS specifications. The paper will clearly differentiate the role played by the main Spanish actors who have actively contributed to this deployment: 1) ADIF (Spanish railways infrastructure Manager) in his role of planning, constructing, testing and exploiting the lines. 2) Renfe Operadora (Spanish public rail operator) by the acquisition of new HS trains with many different ETCS equipments and 3) Finally CEDEX Rail Interoperability lab, by means of testing all the EVCs at lab and solving the main interoperability issues appeared during the tests. This paper would like to point out the role played by the Railways General Directorate of the Spanish Ministry of Public Works and Transportation, as the System Authority of the lines implementing interoperable systems. 2.- The Spanish Infrastructure and Transport Strategic Plan (PEIT) The Spanish High Speed Program is very ambitious and it is based on the Spanish Infrastructure and Transport Strategic Plan (PEIT) that foreseen the construction of almost km of new HS lines with a total investment of M for railways in this period. This high investment is divided in four chapters: 1) High Speed Lines M, 2) Maintenance and improving of conventional network M, 3) Levels crossing suppression M and 4) New rolling stock M. Figure 1 shows the new high speed lines foreseen at PEIT. In this plan the new lines won t be exclusively for passenger s traffic but also for mixed freight-passengers traffic. Furthermore some of the old lines could be also dedicated to freight traffic, with the target of increasing the rate of freight transportation by railways, which at present time is very low in Spain (around 3%). The previous mentioned investment for railways represents a percentage of 44% of the total investment foreseen in Spain for Infrastructures and transport modernization in the period Based on it, Spanish railways have clearly bet for implementing ERTMS/ETCS in this network. The first steps of this important challenge are detailed in this paper.

2 HIGH PERFORMANCES RAIL NETWORK HORIZON 2020 Exclusively passengers Autonomic Communities Mixed network:freight and passengers CURRENT CONVENTIONAl NETWORK Figure 1: New High Speed lines foreseen at PEIT(Spanish Infrastructure and Transport Strategic Plan ). This plan includes both passengers and mixed traffic HSL. 3.- Interoperability in Spain. ERTMS In the frame of this ambitious High Speed Program, Spain decided in 2000 to install ERTMS in all the new lines with the target of promoting the open market among all the signaling systems suppliers. This high risk decision was adopted as the only possible solution to really migrate in the future to a real open rail market following the future railways model: rail network will be constructed and administrated by a public institution and rail operation will be done by both public and private companies. The installation of an unique, interoperable and public system as ETCS is the only way to open the access of new rail operators by avoiding the restriction caused by the installation of a private proprietary signaling system. Although the most impressive part of Spanish program are the new high speed lines, also the conventional lines will be renewed and in all of them the new ETCS system will be progressively installed replacing the old ASFA Spanish signaling system. Obviously this process will be very long, and although in some cases as Madrid and Barcelona commuter lines this replacement is going to be done in the near future, the whole network replacement will take a long time. Another important pending issue in Spain is the Iberian gauge (1665 mm) which is wider than the standard UIC gauge (1435 mm). All the new high speed lines are UIC gauge (including the first one Madrid-Seville in operation from 1992), but the rest of the network lines (including Portuguese network) are Iberian gauge, making more complex the achievement of a real interoperability inside the Iberian peninsula. By this reason Spain is one of the countries more advanced in the variable gauges trains, as well as in the installations that modify the train gauge. At least ten of these facilities are now in operation, allowing train transfers between both networks, and therefore facilitating the

3 interoperability inside Spain. Trains CAF (S-120) and Talgo (S-130) are variable gauge trainsets, currently in operation at speeds up to 250 km/h. For all the previous reasons Spain is one of the countries which have clearly bet on the ETCS/ERTMS as the only way of achieving real interoperability. The decision of installing this signaling system in Spain is not only justified by the technical interoperability but also by the competitivity allowed by the installation of this system: ERTMS/ETCS is the only signaling system which allow the open competition among different suppliers, and therefore is the best solution to start the development of a so ambitious high speed network as the Spanish one. Spain, as it is clearly shown in this paper, has been the pioneer on installing both ERTMS levels 1 and 2 with different suppliers for track and train equipments. This way, started in 2000, has been plenty of obstacles: ETCS specifications migration from to 2.2.2, different interpretation by different suppliers, a lot of change request continuously adding possible modifications, a lot of discussions to achieve agreements among competitors, new version etc, etc However, although the way has been hard, at the time being it can be said that interoperability for level 1 is a fact (trains in commercial operation are circulating with ETCS from May 2006 with a high rate of reliability and punctuality) and for level 2 it will be a reality in the first semester of ERTMS High Speed Lines in Spain: current and future situation ADIF as the Spanish Railways Administrator has the task of both building and managing not only the HSL but the totality of the national lines. Therefore ADIF has the mandate of the Spanish Government to build and put in operation the new lines foreseen by PEIT and shown in figure 1. Figure 2 shows the ADIF prediction up to Some of this lines are currently in commercial operation, some of then are in a very advanced status of construction, and the rest have been already started building. SPANISH HIGH SPEED LINES Dotted tine Commercial operation End 2007 End 2008 End 2009 End 2010 Sistema Foreseen LZB LZB System Continuous line ERTMS System Figure 2: ADIF High Speed Lines in commercial operation and lines foreseen up to However as this paper is mainly focused in the ETCS Interoperability the attention will be focused in the lines already in commercial operation, or in the lines under ETCS tests, where the problems arisen form the participation of many suppliers can be clearly shown. The following table (Table I) summarizes the current (January 2008) status of those lines:

4 Line ETCS Supplier ETCS Level/ Speed Length Current situation Future issues Trains operating in this line Track equipment. High Speed Lines.UIC Gauge Madrid- Lleida Ansaldo (CSEE) 1/300Km/h 2/350 Km/h 480 Km Commercial Operation L1 May 2006 L2 in operation at first semester 2008 S-102, S-103 and S-120 Lleida-Roda Thales 1/300Km/h 2/350 Km/h 92 Km Commercial Operation L1 Dec 2006 L2 in operation at the end of 2008 S-102, S-103 and S-120 Roda- Barcelona Thales 1/300Km/h 2/350 Km/h 80 Km Under final Tests Commercial operation: 2008 March S-102, S-103. Zaragoza- Huesca Alstom 1/200 Km/h 80 Km Commercial operation with ASFA ERTMS L1 operation. Mid 2008 S-102 and S- 104 Madrid- Valladolid Thales 1/300Km/h 2/350 Km/h 180 Km Commercial Operation December 2007 L1 L2 in Operation at the end S-102 and S- 130 Córdoba- Málaga Invensys 1/300Km/h 2/350 Km/h 155 Km Commercial Operation LSTM (LZB) December 2007 (also L1 equipped) L2 in Operation at the end S-100, S-102 and S-103 Conventional lines. Spanish Gauge Albacete-La Encina Bombardier Km/h 90 Km Under tests Commercial operation : End 2008 Alaris Madrid Commuter lines Thales /Dimetronic L1 and L2 160 Km Under development Commercial Operation Mid 2009 Civia. Total length: 1317 Km. High speed lines: Conventional (Spanish gauge) lines: 250 Km. Table I. Lines equipped with ETCS, already in operation or under test or development. As it is shown in the previous table all the current ETCS suppliers have taken part in these Spanish lines (Thales and Dimetronic lines are equipped with Siemens eurobalises), and therefore all the aspects related to interoperability have been mainly tested there. Main problems detected during the tests and real implementation are described in this paper. Figure 3 Madrid-Tarragona (Roda) High Speed line

5 5.- High Speed trains equipped with ETCS To complement the role performed by ADIF, Renfe Operadora, the public Spanish rail operator, have started testing a big number of HS trains, equipped with different ETCS suppliers. Table II summarizes this information: Train Class Serie 100 Serie 102 Serie 103 Serie 104 Serie 120 Serie 130 Train supplier Alstom Talgo - Bombardier Siemens Alstom - CAF CAF - Alstom Talgo - Bombardier Fleet Composition 2 power heads 8 cars power heads 12 cars ** 8 cars 4 cars 4 cars 45 2 power heads 11 cars Length (m) 200,15 200,24 200,32 107,1 107,3 185,2 Speed (km/h) ( 220 ) * 250 ( 220 ) * Seats 328 (+1 hp) 314 (+2 hp) 346 (+2 hp) 402 (+2 hp) 236 (+1 hp) 229 (+1 hp) 237 (+1 hp) 298 (+1 hp) Type of power Synchronous Asynchronous Asynchronous Asynchronous Asynchronous Asynchronous Signalling ERTMS-LZB- ASFA ERTMS-STM LZB- ASFA ERTMS-STM LZB- ASFA ERTMS - LZB - ASFA ERTMS supplier Alstom Siemens Siemens Alstom ERTMS - ASFA Ansaldo-CSEE Transport ERTMS-STM LZB- EBICAB-ASFA Bombardier Commercial service *Speed in conventional lines (Iberian gauge). Trains S-120 and S-130 have variable gauge systems. Table II. Renfe High Speed trains equipped with ETCS in commercial operation. Additionally to this table Renfe is installing Invensys-Dimetronic ETCS equipment in 10 Alaris trains (series 490) which will circulate in the track Albacete-La Encina (spanish gauge). At the time being the six trains described in the previous table are in commercial operation in the lines as it is also described in table I. Table II summarizes the results, related to reliability, punctuallity obtained with the trains more time operating (Siemens S-103 and Talgo S-102) The combination of these trains with the ADIF s lines show the complexity of the Spanish HS program from the point of view of Interoperability. This clearly shows the role played by Spain as a Real Interoperability Lab, as well as the resolution of all the problems appeared during the setting up process has allowed the fact of start operating commercial lines with ETCS. Figures 4 and 5 show the cab of S-102 and S-103 respectively, both equipped with ERTMS/ETCS. Figure 4. Talgo S-102 train cabin equipped with ETCS

6 Figure 5. Siemens S-103 train cabin equipped with ETCS Finally table III summarizes the results, related to incidences for both ETCS and STM-LZB obtained with the trains which started before the commercial operation (Siemens S-103 and Talgo S-102) Talgo-S-102 Siemens S-103 ETCS STM LZB ETCS STM LZB Commercial Operation May Nov-2007 June 2007 June 2007 Total circulations 9, , Total Kms 3,670, , , ,494 N er of Incedences 31* KM/ Incidences 118, , , , *16 of the 31 incidences were due to odometry problems (with ice and snow) already solved. 6.- Interoperability cross table Table III. ETCS and STM-LZB first exploitation data.. As a summary of the two previous paragraphs, table IV describes the real state of interoperability in Spain by means of showing in a cross analysis both the current and future implementations of ETCS in track and on board installations: CROSS INTEROPERABILITY IN SPAIN TRACK EQUIPMENT Alstom Ansaldo Bombardier Invensys (Siemens balise) Thales (Siemens balise) AlstomS-104 YES YES YES Ansaldo S-120 YES YES YES Bombardier S-130 Under tests Under tests InvensysAlaris trains YES ON BOARD EQUIPMENT SiemensS-102/S-103 YES YES YES YES Thales No on board unit from Thales Table IV. Cross Interoperability in Spain. ETCS lines versus ETCS trains.

7 7.- Field Tests Before starting the lines commercial exploitation with different trains, it was necessary to perform some tests to assure the same interpretation of the specifications, as well as to demonstrate interoperability among all the existing suppliers. The first phase of this process was performed at CEDEX Rail Interoperability Lab in 2004 and 2005, where all the existing EVCs (European Vital Computer) from Ansaldo, Siemens, Alstom, Invensys and Bombardier were tested in a laboratory simulated track and also in a laboratory track reproducing Madrid-Lleida line. These tests are better explained in paragraph 8, but it is necessary to point out the importance of having performed these lab tests before start testing equipments on real track. Obviously, all the ETCS equipments on board or on track are previously tested by the suppliers. EVCs are tested in supplier s lab and track installation is tested by means of performing validation tests done by the supplier with an EVC selected by him. However, before putting in operation any line in Spain, it was decided (mainly based on the results obtained at CEDEX lab) that some additional tests were necessary to demonstrate the correct integration of the whole system composed by the on board equipment and the track installation. These system integration tests have been called Complementary Tests and have been defined jointly by ADIF, RENFE, CEDEX and TIFSA under the coordination of the Ministry of Fomento (Public Works and Transportation). This group has created the ETCS Complementary Validation Tests by means of first creating a set of Test Cases based on the functionality implemented in the two first Spanish lines (Madrid-Lleida and Lleida-Tarragona). The aim of these Test cases is to check the integration of an On Board Unit in a Spanish line. These tests are not exhaustive nor intend to demonstrate the safety of the system, because these two issues shall be demonstrated by the suppliers with the corresponding certification and safety case processes. The working group has created a total number of 215 Test Cases when a new On Board Unit is going to be tested either in a new line or in an already validated line. These test cases summarize the most important functionality of the Spanish lines with the aim of demonstrating the correct integration between on board and track ETCS subsystems. The Test cases have to be translated into scenarios in each specific line, tacking into account the specific routing and functionality implemented in each line. Obviously, the translation into scenarios would try to minimize the number of runs to be performed on the line. Typical time to perform the whole set of test Cases for a new EVC takes around 3 weeks, depending on the specific functionality of each line. As the process of testing in the real line is expensive and it takes a long time, it was decided to reduce the number of Test Cases when a new line is going to be tested with an already validated On Board unit. In this case the number of Test Cases has been reduced to 69 and the total time can vary between 4 and 6 labour days. The third situation is the case that an On Board Unit (OBU) which was validated in another ETCS line is going to operate in a new line (already validated with a different OBU), the number of Test Cases to be executed is 57 which means scenarios execution during 4-6 days. Finally in some cases like trains S-102 (Talgo) and S-103(Siemens) the same OBU has been installed in a different train. In this case if train S-102 has been already tested in a line, the test cases to be executed with train S-103 in the same line are only those affecting the train behaviour and not the OBU functionality. In this case only 20 test cases are necessary (those affecting Odometry, Train Interface Unit and braking) Table V summarised the previous figures. Naturally this table is just an orientation, because both the number of Test Cases and the time to execute the corresponding scenarios can vary in function of the functionality implemented in different ETCS lines. These are the values currently used in Spain but they can be increased or decreased in future lines depending if these lines implement more or less ETCS functionalities than the present ones.

8 In general the definition of both Test case and scenario could be the following: 1) A Test Case defines an specific ETCS functionality to be tested. The same test case can generate different tests because although it represents the same functionality, this can be tested with different variable values depending on the line specific implementation, i.e. timers, commercial stops, transitions 2) An scenario is the practical implementation of the test case in the real Track. It is necessary to perform a detailed analysis of the track to implement these test cases and also to concatenate several test cases in an unique scenario with the aim of minimizing the testing time. Number of Test Cases Scenarios (very variable in different lines) Typical number of testing days New OBU over a new line 215 aprox 21 3 weeks Already validated OBU over a new line 69 Aprox days Already validated OBU over a new line(already validated with another OBU) A different train equipping an OBU already validated in this line 57 Aprox days 20 Aprox days Table V. Number of Test Cases and execution time for the Integration tests: ETCS Complementary Validation Tests Finally we point out the importance of creating a working group where all the major ETCS actors as well as the Spanish ETCS experts worked together to define those Test cases and Scenarios. It is also important to mention that this group has permitted the possibility of distributing to all the OBUs suppliers, the telegrams of all the lines of ADIF. In this way OBUs suppliers can simulate in their own labs the line before start testing with a train. Many interoperability aspects have been detected during the execution of these tests. The most important issues detected are summarised in the following: a) Specs different understanding (i.e. infill information, maximum number of plain text messages shown at DMI ) b) Adjustment of the release speed to the field c) Reliability of some track components (i.e. eurobalise) d) EVC SW modification to improve time processing in some cases (BG very closed, two much gradient sections in a MA ) e) Unreal Braking curves due to few gradient information or short MAs f) Loss of communication in L2 g) DMI differences. h) Different status of change requests (CRs) implementation. Figure 6. Tests on track. ETCS EVC-Track Integration Tests.

9 It is also important to mention that this group has permitted the possibility of distributing to all the OBUs suppliers, the telegrams of all the lines of ADIF. This way is very useful because OBUs suppliers can simulate in their own labs the line before start testing with a train in the real track. 8.- Tests performed at CEDEX Rail Interoperability laboratory Background CEDEX involvement in ERTMS started in 1990 with the EMSET project. This project, devoted to show the feasibility of the interoperability concept, was a complete success. At this very early stage of the ERTMS deployment, all the European signaling companies developed prototypes for the key components of the ETCS system, both trainborne or trackside. Most important, there was a common agreement to implement a set of test benches, where these ETCS prototypes could be tested in an independent way, in order to add transparency to the full demonstration process. CEDEX inherited the test tools, and at the end of the EMSET project at 2000, started an update and review process that is still going on. The tools were relocated in two main laboratories (Eurobalise and Eurocabine), both belonging to the Physics and Electronic Department, which was renamed firstly to Rail Interoperability Laboratory and, recently, to Rail Research Laboratory (RRL). From that time, RRL got involved in the european process to elaborate the test specification for Eurobalise and Eurocabine, in such a way that it became the first external partner to UNISIG leading a specification working group. The participation in these forums contributed to gain knowledge and experience around the signaling companies experts. Moreover, all these works were accompanied by several test campaigns in both labs, what helped to check the robustness of the test specification and the utility of the test benches. The first consequence from these works consisted in the CEDEX declaration as the first ERTMS- ETCS Reference Laboratory by the UNISIG companies. With this declaration, UNISIG recognizes CEDEX firstly as a valid laboratory to test Eurobalises and Eurocabines and secondly, as a valid referee to solve interoperability problems. During the last years, CEDEX has maintained these european tasks and has incorporated a growing technical assistance to ADIF (Spanish Infrastructure Manager), RENFE (Main Spanish Operator) and DGF (Spanish Authority) in the Spanish ERTMS Program deployment. In Table VI, tasks performed by CEDEX during the last years are listed. Eurobalise Test Campaign ( ). Eurobalise and BTM tests System Test Specifications ( ). EVC Test Campaign ( ). Harmonization of JRU, DMI, Euroradio and specs interpretation. First european certification of an Eurobalise (2005). First european certification of an Eurocab (2007). System Test Specification upgrade to S.R.S (2007- ) Spanish DMI harmonization(2004) Specific JRU SW development (2004- ). All suppliers EVCs tests at lab.( ). Eurobalise reliability test at Mad-Lleida HSL ( ). Participation and evaluation of S-100, S- 102, S-103, S-104 and S-120 L1 tests (2004- ). Participation and evaluation of S-102 L2 Tests in Madrid-Lleida HSL (2006). Participation and evaluation of HSL Lleida- Tarragona, Cordoba-Malaga, Madrid- Valladolid and Tarragona-Barcelona L1 Tests (2006- ) All suppliers balise tests (2006 ) European activities National activities Table VI. List of activities performed by CEDEX Rail Interoperability Labs in the recent past.

10 8.2.- Eurobalise Laboratory From the very beginning, the Eurobalise Laboratory has had a deep implication in the European working group devoted to the Air-Gap Interface and Test Specification, hosting several tests campaigns that contributed to get the highly qualified staff currently in charge of the lab. Due to this experience, CEDEX has been able to participate in the solution of the different problems that can arise in the real projects. One of these problems is described below. In 2005, some months before opening the HSL Madrid-Lleida in Level 1, it was detected an interoperability problem between the Eurobalises installed in the track and the ETCS onboard system. The problem had to do with the failure rate in the air-gap communication, since it was too high and affected the normal train operation. CEDEX was requested to support ADIF, RENFE and DGF to find out the origin of the problem. In this regard, from November 2005 up to March 2006 the Eurobalise Lab staff performed some tests in the Madrid-Lleida HSL. Several measurements were done in the track around the balises in order to detect any anomaly in the tele-powering or up-link signals. However, due to the problem randomness, this kind of measurements did not succeed. Finally, CEDEX staff installed a coil under the train antenna to register both the telepowering and uplink signals. This coil was connected to an acquisition system registering at 100 Msamples/s that was placed on the train. After a huge amount of measurements (all the balises in the track were recorded) the main conclusions were the following: When a balise is not received on-board, there is no up-link signal emission. In these cases the telepowering signal emitted by the train was fully compliant with the specifications. The previous result has been registered in 17 not detected balises in different train trips. Most (85%) of the lost balises were fixed balises. The problem was finally solved by means of installing a redundant balise in order to decrease the failure probability, although it is a temporal solution accepted at national level. Figure 7. Eurobalise real track tests. 8.3 Eurocabine Lab The implication of the Eurocabine lab staff in the ERTMS Spanish program deployment started before. In fact, in 2004, as all the ETCS onboard equipments were tested in CEDEX premises during an European test Campaign (Level 1 functionality), a parallel work was also performed, simulating in Lab some real scenarios from the HSL Madrid-Lleida. Thanks to these tests, several results were achieved. First of all, some interoperability problems due to the ETCS information distribution in the balise telegrams were detected and corrected in time. Secondly, it was noticed the differences among DMIs and JRUs from different suppliers. A deep analysis of these differences finished with a Spanish recommendation to harmonize the DMI that was presented to the CENELEC committee in charge of

11 the DMI specification. Regarding the JRU, CEDEX started a software development in order to decode the download from all the suppliers. This software is commonly used by RENFE and ADIF to analyse the incidences in the train operation. In 2005, also during an European Test Campaign (Level 2 functionality), CEDEX detected a compatibility problem between different versions of the EuroRadio specification. The problem was transmitted to the corresponding UNISIG Working Group and the companies developers were advised to take the necessary corrective actions. Figure 8. EVC Tests at CEDEX Eurocab Laboratory. All the works mentioned up to now were done taking advantage of the presence of the ERTMS/ETCS onboard equipments in CEDEX Eurocabine Laboratory during the European Test Campaigns. However, since 2004, CEDEX has developed a parallel task consisting on the analysis and evaluation of the integration tests between trains and lines before the authorization to enter in commercial operation in ERTMS Level 1. This task, of major importance for the main Spanish Parties (ADIF and RENFE) has contributed a lot to the consolidation of CEDEX as a real independent body. For the year 2008, the main effort from CEDEX will be to support ADIF and RENFE in the ERTMS Level 2 validation of the Spanish HSL Conclusions This paper presents an overview of the situation in Spain regarding the deployment of the new European signaling system (ERTMS) and its implementation in the new High Speed Lines. Due to the ambitious Spanish High Speed Program a big number of new lines are being constructed, and at the same time a big amount of new trains will run over these lines. ERTMS is the signaling system implemented in these lines, as well as in the trains, therefore, real interoperability among practically the whole set of signaling systems suppliers is currently being tested in Spain. Paper shows a summary of the results of these first implementations in commercial lines and it also mention the main problems encountered during this process. The first conclusion is that real interoperability is a fact in Spain. Three L1 lines are currently in commercial exploitation with a high level of punctuality and reliability and with 5 signaling supplying companies (Ansaldo, Thales, Siemens, Invensys and Alstom) involved. L2 will be in operation in the first semester of 2008, and all the tests related L2 are very advanced. The way to reach this stage has been hard due to different interpretation of the SRS by the different suppliers, different DMIs, lack of reliability in some components, and of course the impact of the change requests which are specially important in some cases. Up to now the results are good enough, however it is needed to stabilize the specifications as soon as possible to avoid the impact in countries like Spain where, at the time being, ERTMS/ETCS is a reality. Passengers are traveling at 300 Km/h under this control system and new functionalities must be introduced very carefully and- which is more important- must assure backwards compatibility.

UIC- ERTMS Conference 2004

UIC- ERTMS Conference 2004 UIC- ERTMS Conference 2004 Managing the Migration Rome 15 th 17 th December 2004 ETCS TESTS RESULTS Dr. Jorge Ignacio Iglesias. Director of the Rail Interoperability Laboratory (LIF) at CEDEX 1. Interoperability

More information

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS CONTACT: Adif International Department Sor Ángela de la Cruz, 3 28020, Madrid, Spain +34 917 744 247 adifinternational@adif.es international.adif.es ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS CUTTING-EDGE

More information

Manufacturing operating and maintaining different rolling stock

Manufacturing operating and maintaining different rolling stock Manufacturing operating and maintaining different rolling stock Business model with a corporate centre and three different activity areas Renfe-Operadora Railway transport operator in Spain PASSENGERS:

More information

New generation of gauge changeover Facilities: The UNICHANGER Project

New generation of gauge changeover Facilities: The UNICHANGER Project New generation of gauge changeover Facilities: The UNICHANGER Project Dr. I.J. Iglesias High Speed Operations and Engineering Direction. Technical Coordination Director. ADIF. Summary 1. The problem of

More information

ETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments

ETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments ETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments Michel Van Liefferinge, UNISIG General Manager CCRCC 2012 6-7 November 2012, Lille UNIFE & UNISIG

More information

ERTMS Level 2 Trackside

ERTMS Level 2 Trackside Industry experience with ERTMS Level 2 Trackside Guillaume de TILIERE (ALSTOM ERTMS Standard) Content: 1. ERTMS L2 versus L1 2. ERTMS L2 Trackside Products 3. Projects and experience in commercial operation

More information

siemens.com/mobility Trainguard Full interoperability for rail traffic

siemens.com/mobility Trainguard Full interoperability for rail traffic siemens.com/mobility Trainguard Full interoperability for rail traffic Siemens we offer our customers optimized ETCS solutions One of the major challenges faced by society is to ensure mobility. To remain

More information

High speed innovation in Adif. Antonio Berrios Villalba ADIF (Spain)

High speed innovation in Adif. Antonio Berrios Villalba ADIF (Spain) Fast track to Sustainable Mobility High speed innovation in Adif Antonio Berrios Villalba ADIF (Spain) Topic 6 Innovations in Fixed and Mobile Equipment, Session D Technical developments in superstructure

More information

Rail Interoperability in Europe

Rail Interoperability in Europe Rail Interoperability in Europe BCN Rail, Barcelona November 19 th 2013 Dr. Eng I.J. Iglesias Deputy Director CEDEX Rail Interoperability Lab. Rail Interoperability in Europe SUMARY 1. What does interoperability

More information

ETCS in Switzerland Views and Learning from an early Investor

ETCS in Switzerland Views and Learning from an early Investor UIC ERTMS Conference 2006 - Budapest ETCS in Switzerland Views and Learning from an early Investor Signal to the future 1 UIC ERTMS Conference 2006 - Budapest Topics: 1. Ongoing ETCS Level 2 Projects 2.

More information

Power Supply Systems in Spain

Power Supply Systems in Spain New developments in High Speed Power Supply Systems in Spain Carlos RABANOS Rail Energy Systems Deputy Director High Speed Operations and Engineering Directorate, ADIF, Spain July 12th 2012, Session: Infrastructure

More information

Need, Strategy and Implementation of ERTMS

Need, Strategy and Implementation of ERTMS Need, Strategy and Implementation of ERTMS A contribution to interoperability, capacity enhancement and safety in Switzerland Jan Richard Strategy Manager ERTMS SBB Infrastructure UIC ERTMS Platform Plenary,

More information

Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation)

Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation) Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation) LILLE - Valenciennes, - E R A February, the 5 th - 2009 Overview 1. Italian ETCS high speed lines in

More information

Double gauge High-Speed. interoperability and scope

Double gauge High-Speed. interoperability and scope Double gauge High-Speed electric-diesel train: increasing interoperability and scope Victorino PÉREZ FERNÁNDEZ Manager of European Affairs, Renfe, Spain 12/07/2012, Session: Rolling Stock 4 Technical development

More information

ERTMS Platform Steering # 15 Brussels, 2 Dec Update on ERTMS MoU activities and on ERTMS implementations in Europe (from UIC data base)

ERTMS Platform Steering # 15 Brussels, 2 Dec Update on ERTMS MoU activities and on ERTMS implementations in Europe (from UIC data base) Update on ERTMS MoU activities and on ERTMS implementations in Europe (from UIC data base) The MoU signed on 17 March 2005 in Brussels between the European Commission and the European Railway associations

More information

ERTMS/ETCS braking curves Robert Dijkman EEIG ERTMS Users Group

ERTMS/ETCS braking curves Robert Dijkman EEIG ERTMS Users Group ERTMS/ETCS braking curves Robert Dijkman EEIG ERTMS Users Group 15-17 December 2004 UIC ERTMS Conference Rome 1 Why are braking curves an issue? SRS 222: 1. No feasible input defined to enable the driver

More information

ATLAS: The road to Baseline3. Fernández Suárez, Enrique Rodríguez, Antonio

ATLAS: The road to Baseline3. Fernández Suárez, Enrique Rodríguez, Antonio 25 número 5 - junio - 2018. Pág 105-115 ATLAS: The road to Baseline3 Fernández Suárez, Enrique Rodríguez, Antonio Abstract European Rail Traffic Management System (ERTMS) development started several years

More information

KEYNOTE Michel Ruesen Jaime Tamarit Abstract

KEYNOTE Michel Ruesen Jaime Tamarit Abstract 25 número 5 - junio - 2018. Pág 85-91 The role of the ertms users group in the consolidation of the ERTMS technical specification for baselines 2 and 3 Michel Ruesen Jaime Tamarit ERTMS Users Group Abstract

More information

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010 Interoperability TSIs applicable to Railway vehicles Innotrans, 21-24 September, 2010 1. Purpose of the presentation 2. Geographical scope (Directives and TSIs) 3. Technical scope of TSIs 4. TSIs applicable

More information

The Voice of European Railways POSITION PAPER. Revision of Appendix T of TSI OPE (decision /EU) January 2013

The Voice of European Railways POSITION PAPER. Revision of Appendix T of TSI OPE (decision /EU) January 2013 POSITION PAPER Revision of Appendix T of TSI OPE (decision 2012-757/EU) January 2013 1. REFERENCE DOCUMENTS Commission Decision 2012-757/EU concerning the technical specification for interoperabilityrelating

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-020 Issue 02 Date:

More information

In the report various scenario s are presented, which have been investigated. The figure below shows the scope of the three (main) senario s:

In the report various scenario s are presented, which have been investigated. The figure below shows the scope of the three (main) senario s: National Implementation Plan of ERTMS in The Netherlands 1. Decision making process April 2014: Preference decision In April 2014 the Dutch Parliament agreed with the Dutch Government to implement its

More information

Precision Station Stopping Progress Update

Precision Station Stopping Progress Update Washington Metropolitan Area Transit Authority Precision Station Stopping Progress Update Presented to: The Board of Directors; Customer Service, Operations and Safety Committee By PlanninghDevelopmenthEngineeringhConstruction

More information

Connecting Europe Facility. Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes

Connecting Europe Facility. Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes Connecting Europe Facility AUTOCITS Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes AUTOCITS PROJECT AUTOCITS is an European Project coordinated by INDRA,

More information

Industry experience with ERTMS projects in Switzerland

Industry experience with ERTMS projects in Switzerland Industry experience with ERTMS projects in Switzerland The challenge of Interoperability Friedrich HAGEMEYER () Chairman of UNIFE ETCS Steering Committee UIC ERTMS World Conference Bern, 12 September 2007

More information

POSITION PAPER Version 3.0

POSITION PAPER Version 3.0 POSITION PAPER Version 3.0 Revision of the Technical Specification for Interoperability / Energy (ENE) Brussels, September 26 th, 2012 1. REFERENCE DOCUMENT UNION RAIL SYSTEM - SUBSYSTEM Energy - TSI Energy

More information

CEDEX Rail interoperability Lab (RIL) Main activities and tests performed

CEDEX Rail interoperability Lab (RIL) Main activities and tests performed CEDEX Rail interoperability Lab (RIL) Main activities and tests performed September 2017 Ignacio Jorge Iglesias Ph.D. RIL Director Summary 1. CEDEX: A Public Research Centre for Civil Engineering 2. ERTMS

More information

Safety Assessment & Approval System of Shanghai Maglev Demonstration Line and its Practice

Safety Assessment & Approval System of Shanghai Maglev Demonstration Line and its Practice Safety Assessment & Approval System of Shanghai Maglev Demonstration Line and its Practice Wu Tao Shanghai High-Speed Transrapid Project Construction Headquarters, 2520 Long Yang Road, Pudong, 201204,

More information

System. Antenna JRU. Mobile Gateway EVC STM. Cold Movement Detection. Pulse Generator. Safety ETCS

System. Antenna JRU. Mobile Gateway EVC STM. Cold Movement Detection. Pulse Generator. Safety ETCS ETCS System ETCS Safety François Melchior ETCS is the European Train Control System promoted by the European Commission for use in Europe to replace national Train Control Systems and allows interoperability,

More information

UNISIG * EEIG ERTMS USERS GROUP * UNIFE

UNISIG * EEIG ERTMS USERS GROUP * UNIFE ERTMS/ETCS REF: VERSION: DATE: 17/12/15 Page 1/18 Modification history Issue number date Draft 27.07.99 Draft 01 30.08.99 0.1.1 24.09.99 1.0.0 11.10.99 1.0.1 31.01.2000 1.0.2 14.02.2000 1.0.3 22.02 1.1.0

More information

High Speed Passenger Rail Interoperability in North America

High Speed Passenger Rail Interoperability in North America High Speed Passenger Rail Interoperability in North America APTA Rail Conference - Boston Thomas Peacock Larry D. Kelterborn June15, 2011 Discussion Topics The New Transportation Vision Meaning of Interoperability

More information

Cars and vans CO2 regulations: even ambitious EU standards deliver less than half transport emission reductions needed to meet 2030 climate targets

Cars and vans CO2 regulations: even ambitious EU standards deliver less than half transport emission reductions needed to meet 2030 climate targets Cars and vans CO2 regulations: even ambitious EU standards deliver less than half transport emission reductions needed to meet 2030 climate targets October 2017 Summary Road transport is one of the few

More information

ABB life cycle services Uninterruptible power supplies

ABB life cycle services Uninterruptible power supplies ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 6 September 2016 Original: English Economic Commission for Europe Inland Transport Committee World Forum for Harmonization of Vehicle Regulations

More information

Date of occurrence Location name Near Santiago de Compostela Local time 20:41

Date of occurrence Location name Near Santiago de Compostela Local time 20:41 Occurrence Summary What Location Date of occurrence 24-07-13 Location name Near Santiago de Compostela Local time 20:41 station (La Coruña) Latitude 42:51:35 North Event type Railway vehicle movement events

More information

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport Office of the Minister of Energy and Resources PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

More information

Measure Evaluation Results

Measure Evaluation Results Measure Evaluation Results BOL 8.1 Motorbike Pollution Reduction Mirco Armandi Daniela Cocchi Date: February 2013 Executive Summary Since 2003 an automatic system to control the main entrance point to

More information

European Bus System of the Future

European Bus System of the Future European Bus System of the Future Project Experience Brussels, 13 th November 2013 1 Research and Innovation in Public Transport Innovation in PT = high investments / bad ROI Financial risk sharing welcome

More information

FENEBUS POSITION PAPER ON REDUCING CO2 EMISSIONS FROM ROAD VEHICLES

FENEBUS POSITION PAPER ON REDUCING CO2 EMISSIONS FROM ROAD VEHICLES FENEBUS POSITION PAPER ON REDUCING CO2 EMISSIONS FROM ROAD VEHICLES The Spanish Federation of Transport by Bus (Fenebús) is aware of the importance of the environmental issues in order to fully achieve

More information

Intermediate results

Intermediate results Intermediate results 11th UIC Sustainability Conference Madrid June 17th 2010 17.06.2010 1 Mads Bergendorff Macroplan Consulting Presentation overview Latest results of the project Simulation and evaluation

More information

Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them

Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them Project Team João ALMEIDA (CP - jcdalmeida@mail.cp.pt ) David DE

More information

Annex A. to Technical Specification "Operations and traffic management" adopted by

Annex A. to Technical Specification Operations and traffic management adopted by Document version : 1 Annex A to Technical Specification "Operations and traffic management" adopted by Commission Decision 2008/231/EC of 1 st February 2008 concerning the technical specification of interoperability

More information

The Global Evolution of HSR. Lessons from the Spanish Experience. Application to U.S. High Speed Rail Acknowledgements CONTENT

The Global Evolution of HSR. Lessons from the Spanish Experience. Application to U.S. High Speed Rail Acknowledgements CONTENT High-Speed Rail: HighI t International ti l Case C Studies St di Wh t llessons can th What the U.S. U S learn l from the Spanish experience? Al Engel, PE, Vice President, Director HSR, AECOM CONTENT The

More information

Signalling Programme. Presentation of Banedanmarks ERTMS programme Programme Diretor Morten Søndergaard

Signalling Programme. Presentation of Banedanmarks ERTMS programme Programme Diretor Morten Søndergaard Signalling Programme Presentation of Banedanmarks ERTMS programme 12.02.2013 Programme Diretor Morten Søndergaard Background of the Signalling Programme Rail Data 3.000+ trains/day 38.000 daily departures

More information

The Regional Municipality of York. Purchase of Six Battery Electric Buses

The Regional Municipality of York. Purchase of Six Battery Electric Buses 1. Recommendations The Regional Municipality of York Committee of the Whole Transportation Services January 10, 2019 Report of the Commissioner of Transportation Services Purchase of Six Battery Electric

More information

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Directorate D - Logistics, maritime & land transport and passenger rights D.3 Road Transport Brussels, 29 January 2016 ARES (2015) 6558037

More information

INSERO QUARTERLY, Q4 2014

INSERO QUARTERLY, Q4 2014 INSERO QUARTERLY, Q4 20 - Nordic electric vehicle market overview with the latest sales figures, infrastructure overview and the main market tendencies FEBRUARY 2015 INSERO QUARTERLY, Q4 20 3 INTRODUCTION

More information

Der ERTMS-Markt außerhalb Europas

Der ERTMS-Markt außerhalb Europas Der ERTMS-Markt außerhalb Europas DR. KLAUS MINDEL www.thalesgroup.com ETCS worldwide market Africa 2 ETCS worldwide market Near middle far East 3 ETCS worldwide market middle south America More information?

More information

Using ERTMSFormalSpecs to model ERTMS braking curves

Using ERTMSFormalSpecs to model ERTMS braking curves Using ERTMSFormalSpecs to model ERTMS braking curves Laurent Ferier (laurent@ertmssolutions.com) ERTMS SOLUTIONS Brussels Svitlana Lukicheva (svitlana@ertmssolutions.com) ERTMS SOLUTIONS Brussels Stanislas

More information

The criteria of choice for new High Speed fleet

The criteria of choice for new High Speed fleet Amsterdam, March 17-19th, 2008 The criteria of choice for new High Speed fleet Emilio Maestrini CONTENTS 1. DRIVERS 2. MAIN FACTORS ON HIGH SPEED MARKET 3. EVOLUTION OF HIGH SPEED SYSTEM 4. INTEROPERABILITY

More information

Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania

Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania Teodor Gradinariu UIC Burkhard Stadlmann Wels University, Austria Ioan Nodea RCCF, Romania

More information

2014 ERA FOLLOW UP OF ERTMS EU FUNDED PROJECTS ERA Follow Up of ERTMS EU- funded projects FINAL REPORT /9

2014 ERA FOLLOW UP OF ERTMS EU FUNDED PROJECTS ERA Follow Up of ERTMS EU- funded projects FINAL REPORT /9 2014 ERA FOLLOW UP OF ERMS EU FUNDED PROJECS 2014 ERA Follow Up of ERMS EU- funded projects FINAL REPOR 2014 1/9 2014 ERA FOLLOW UP OF ERMS EU FUNDED PROJECS INDEX 1. Introduction 3 2. Overview of the

More information

Measurement made easy. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry

Measurement made easy. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry Measurement made easy Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry ABB s Predictive Emission Monitoring Systems (PEMS) Experts in emission monitoring ABB

More information

HDV CO2 emission certification 1 st meeting of the Editing board

HDV CO2 emission certification 1 st meeting of the Editing board HDV CO2 emission certification 1 st meeting of the Editing board DG Growth Maciej Szymański 2.03.2015 Internal market, Industry, Entrepreneurship and SMEs Meeting agenda Work of the Editing board: Objectives

More information

REPORT BUS TENDER STRUCTURE 3EDITION INCLUDING TENDERING FOR E-BUSES UITP TENDER STRUCTURE 1

REPORT BUS TENDER STRUCTURE 3EDITION INCLUDING TENDERING FOR E-BUSES UITP TENDER STRUCTURE 1 REPORT BUS TENDER STRUCTURE rd 3EDITION INCLUDING TENDERING FOR E-BUSES UITP TENDER STRUCTURE 1 UITP and the editors would like to thank each one of the authors for their contributions and acknowledge

More information

Please find enclosed a letter from François Bellot, Minister for Mobility, regarding the above matter. [complimentary close]

Please find enclosed a letter from François Bellot, Minister for Mobility, regarding the above matter. [complimentary close] Letter from: Jan Hoogmartens, Deputy Permanent Representative of Belgium to the European Union Date: 5 July 2017 To: Violeta Bulc, Commissioner for Transport; copies to: K. Fitch, DG MOVE; A, Cordeiro

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 30, 2010 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT - LOW FLOOR LIGHT RAIL VEHICLE OPTIONS: SURFACE VEHICLE SAFETY

More information

Railway Engineering: Track and Train Interaction COURSE SYLLABUS

Railway Engineering: Track and Train Interaction COURSE SYLLABUS COURSE SYLLABUS Week 1: Vehicle-Track Interaction When a railway vehicle passes over a track, the interaction between the two yields forces on both vehicle and track. What is the nature of these forces,

More information

Why the original concept of HSL adopted in different countries has. differentiated situation.

Why the original concept of HSL adopted in different countries has. differentiated situation. Why the original concept of HSL adopted in different countries has evolved towards a more differentiated situation. Content Brief overview of the different HSL concepts throughout the world. Why departing

More information

Modernising the Great Western railway

Modernising the Great Western railway Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western

More information

Defending public transport, defending equality

Defending public transport, defending equality Defending public transport, defending equality European Parliament, Brussels GUE/NGL 28th June, 2018 The access to transports and public investments in infrastructures Ricard Riol Jurado President of PTP

More information

Pre Commercial Procurement Austrian Pilot Calls

Pre Commercial Procurement Austrian Pilot Calls Pre Commercial Procurement Austrian Pilot Calls MLE Innovation Procurement, November 29th 2017, Madrid Jeannette Klonk, Austrian Research Promotion Agency ANCHORING PCP IN THE AUSTRIAN R&I POLICY CONTEXT

More information

Green emotion Development of a European framework for electromobility

Green emotion Development of a European framework for electromobility Green emotion Development of a European framework for electromobility Green emotion joint forces for joint progress Green emotion overall goals Demonstrating an integrated European approach to deploy electromobility

More information

Propeller Blade Bearings for Aircraft Open Rotor Engine

Propeller Blade Bearings for Aircraft Open Rotor Engine NTN TECHNICAL REVIEW No.84(2016) [ New Product ] Guillaume LEFORT* The Propeller Blade Bearings for Open Rotor Engine SAGE2 were developed by NTN-SNR in the frame of the Clean Sky aerospace programme.

More information

SUMMARY OF THE IMPACT ASSESSMENT

SUMMARY OF THE IMPACT ASSESSMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 13.11.2008 SEC(2008) 2861 COMMISSION STAFF WORKING DOCUMT Accompanying document to the Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL

More information

NATIONAL REPORT: SPAIN. At 31/12/2015

NATIONAL REPORT: SPAIN. At 31/12/2015 NATIONAL REPORT: SPAIN At 31/12/2015 Network length Spain is the European country with the longer high capacity road network, reaching 16,705 km. Nevertheless, only 3,404 km out of the total are toll motorways

More information

Offshore Application of the Flywheel Energy Storage. Final report

Offshore Application of the Flywheel Energy Storage. Final report Page of Offshore Application of the Flywheel Energy Storage Page 2 of TABLE OF CONTENTS. Executive summary... 2 2. Objective... 3 3. Background... 3 4. Project overview:... 4 4. The challenge... 4 4.2

More information

Milestones for the implementation of SMART TACHOGRAPHS according Reg.EU 165/2014 and 799/2016

Milestones for the implementation of SMART TACHOGRAPHS according Reg.EU 165/2014 and 799/2016 Milestones for the implementation of SMART TACHOGRAPHS according Reg.EU 165/2014 and 799/2016 1 Regulation (EU) No 165/2014 New Technical Annex From current Digital Tachograph GEN 1 To Smart Tachographs

More information

Innovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016

Innovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016 Capacity for Rail Innovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016 Miguel Rodríguez Plaza Adif Introduction C4R WP 1.2: VHST 2 Objectives: To identify market

More information

ABB MEASUREMENT & ANALYTICS. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry

ABB MEASUREMENT & ANALYTICS. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry ABB MEASUREMENT & ANALYTICS Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry 2 P R E D I C T I V E E M I S S I O N M O N I T O R I N G S Y S T E M S M O N

More information

Overview of Regulations for Autonomous Vehicles

Overview of Regulations for Autonomous Vehicles Overview of Regulations for Autonomous Vehicles Anders Eugensson, Director, Government Affairs, Volvo Car Corporation 1 Legal Overview The legal framework affecting autonomous driving can be divided into:

More information

The Role of Infrastructure Connected to Cars & Autonomous Driving INFRAMIX PROJECT

The Role of Infrastructure Connected to Cars & Autonomous Driving INFRAMIX PROJECT The Role of Infrastructure Connected to Cars & Autonomous Driving INFRAMIX PROJECT 20-11-18 1 Index 01 Abertis Autopistas 02 Introduction 03 Road map AV 04 INFRAMIX project 05 Test site autopistas 06 Classification

More information

HYLIFT-DEMO DELIVERABLE 8.4

HYLIFT-DEMO DELIVERABLE 8.4 HYLIFT-DEMO DELIVERABLE 8.4 MIDTERM DISSEMINATION WORKSHOP FOR EUROPEAN ACTORS Work package 8 Lead Beneficiary: HyRaMP/EHA Dissemination Level: PU Date: June 2014 Acknowledgement This project is co-financed

More information

Eress Forum 2016 Highlights

Eress Forum 2016 Highlights Eress Forum 2016 Highlights 638264345212619823672356354493482983612514638264345126198236723563784235635449348298361251457986068647547253651243563874685635778964543212255677879898977544957534235635 449348298361251

More information

Late Starter. Tuesday, November 6, 2018

Late Starter. Tuesday, November 6, 2018 Late Starter Tuesday, Please note the following item(s) was not included with your agenda as this item(s) was received after the agenda package was printed. Planning and Works Committee Report TES-RTS-18-09,

More information

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface English version of Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr. 1127 af 30. november 2012) Preface Please note that the English version is for informational

More information

The Signalling Programme

The Signalling Programme The Signalling Programme Jan Schneider-Tilli, Programme Director 1. June 2016 - DTU 1 Agenda 1. Background to the Signalling Programme 2. ERTMS 3. Way ahead 4. Programme Management, Collaboration & MSP

More information

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids CENELEC TC 8X/WG 06 System Aspects of HVDC Grids Best Paths Dissemination Event Paris, 5 November 2015 Frank Schettler (Siemens, Convenor) Overview Introduction to CLC TC 8X/WG 06 Scope and present status

More information

Connecting Europe Facility. Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes:

Connecting Europe Facility. Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes: Connecting Europe Facility AUTOCITS Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes: AUTOCITS PROJECT AUTOCITS is an European Project coordinated by

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE September 7, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE PURPOSE To update Council on Kamloops

More information

Fuel Cell Application in a New Configured Aircraft PUBLISHABLE REPORT

Fuel Cell Application in a New Configured Aircraft PUBLISHABLE REPORT Fuel Cell Application in a New Configured Aircraft PUBLISHABLE REPORT Document Reference CELINA Publishable Report Contract Nr. AST4-CT-2005-516126 Version/Date Version 1.3 January 2009 Issued by Airbus

More information

Q&A ON EMISSIONS TESTING

Q&A ON EMISSIONS TESTING Q&A ON EMISSIONS TESTING 1. How does ACEA react to the VW situation?... 1 2. How does the current lab test work?... 1 3. Why are there differences between the lab tests and real-world emissions?... 3 4.

More information

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0 CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects October 2015 Version 1.0 Introduction Aerodynamic loads on the trackbed generated by the passing of trains at high speed may cause individual

More information

THE WAY TO HIGHLY AUTOMATED DRIVING.

THE WAY TO HIGHLY AUTOMATED DRIVING. December 15th, 2014. THE WAY TO HIGHLY AUTOMATED DRIVING. DR. WERNER HUBER, HEAD OF DRIVER ASSISTANCE AND PERCEPTION AT BMW GROUP RESEARCH AND TECHNOLOGY. AUTOMATION IS AN ESSENTIAL FEATURE OF THE INTELLIGENT

More information

Labelling Smart Roads DISCUSSION PAPER 4/2015

Labelling Smart Roads DISCUSSION PAPER 4/2015 DISCUSSION PAPER 4/2015 December 2015 TABLE OF CONTENTS 1. Introduction... 3 2. The Smart Roads of the Future... 3 3. : Sustainability of road infrastructure... 4 4. : Sustainability in mobility management

More information

Intelligent Vehicle Systems

Intelligent Vehicle Systems Intelligent Vehicle Systems Southwest Research Institute Public Agency Roles for a Successful Autonomous Vehicle Deployment Amit Misra Manager R&D Transportation Management Systems 1 Motivation for This

More information

FTAs with Japan and the US A perspective from the European rail industry. Philippe Citroën, UNIFE Director General 9 July 2013

FTAs with Japan and the US A perspective from the European rail industry. Philippe Citroën, UNIFE Director General 9 July 2013 FTAs with Japan and the US A perspective from the European rail industry Philippe Citroën, UNIFE Director General 9 July 2013 What is UNIFE? UNIFE represents the European Rail (Supply) Industry Based in

More information

DRAFT RECOMMENDATION N. 006REC1072

DRAFT RECOMMENDATION N. 006REC1072 Making the railway system work better for society. DRAFT RECOMMENDATION N. 006REC1072 OF THE EUROPEAN UNION AGENCY FOR RAILWAYS ON The amendment of Commission Regulation (EU) No 1304/2014 concerning the

More information

Planning of electric bus systems

Planning of electric bus systems VTT TECHNICAL RESEARCH CENTRE OF FINLAND LTD Planning of electric bus systems Latin American webinar: Centro Mario Molina Chile & UNEP 4 th of September, 2017 Mikko Pihlatie, VTT mikko.pihlatie@vtt.fi

More information

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update MEETING DATE: August 31, 2005 SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update RECOMMENDATION It is recommended that the Commission: i) Receive for information

More information

Charging Electric Vehicles in the Hanover Region: Toolbased Scenario Analyses. Bachelorarbeit

Charging Electric Vehicles in the Hanover Region: Toolbased Scenario Analyses. Bachelorarbeit Charging Electric Vehicles in the Hanover Region: Toolbased Scenario Analyses Bachelorarbeit zur Erlangung des akademischen Grades Bachelor of Science (B. Sc.) im Studiengang Wirtschaftsingenieur der Fakultät

More information

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda UNITED NATIONS Distr. GENERAL 11 July 2001 ENGLISH ONLY SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, 16-27 July 2001 Item 3 (b) of the provisional agenda REPORTS ON

More information

Convergence: Connected and Automated Mobility

Convergence: Connected and Automated Mobility Convergence: Connected and Automated Mobility Peter Sweatman Principal, CAVita LLC, Anaheim CA AASHTO CTE Denver June 19, 2018 1 Agenda New technology in mobility: CV, AV and CAV The transformational dynamic

More information

Toward the Realization of Sustainable Mobility

Toward the Realization of Sustainable Mobility GIES 2008 Toward the Realization of Sustainable Mobility March 13, 2008 Toyota Motor Corporation Senior Technical Executive Hiroyuki Watanabe 1 CO 2 Emission from Transportation Sector Distribution by

More information

Summary National behavioural survey: speed Research report N 2013-R-06-SEN

Summary National behavioural survey: speed Research report N 2013-R-06-SEN Summary Research report N 2013-R-06-SEN Author: François Riguelle Responsible editor: Karin Genoe Editor: Belgian Road Safety Institute Knowledge Center Road Safety Date of publication: November 2013 Complete

More information

DG system integration in distribution networks. The transition from passive to active grids

DG system integration in distribution networks. The transition from passive to active grids DG system integration in distribution networks The transition from passive to active grids Agenda IEA ENARD Annex II Trends and drivers Targets for future electricity networks The current status of distribution

More information

(Text with EEA relevance)

(Text with EEA relevance) L 150/10 COMMISSION REGULATION (EU) 2015/924 of 8 June 2015 amending Regulation (EU) No 321/2013 concerning the technical specification for interoperability relating to the rolling stock freight wagons

More information

WLTP Revision 1

WLTP Revision 1 WLTP-20-05 Revision 1 Cycle / Gearshifting Status report about the work of the task force on cycle and gearshift issues; proposals for adoption by the WLTP IWG Heinz Steven 27.09.2017 1 Audio-web telco

More information

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0 Annex 1: Amendments to the technical specification for interoperability relating to the rolling stock locomotives and passenger rolling stock subsystem of the rail system in the European Union (Annex to

More information

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING E MARINE ENVIRONMENT PROTECTION COMMITTEE 67th session Agenda item 5 MEPC 67/5 1 August 2014 Original: ENGLISH FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL

More information