District 2 Projects Scheduled for award during the period from 06/19/17 to 06/18/18 Sorted by PID

Size: px
Start display at page:

Download "District 2 Projects Scheduled for award during the period from 06/19/17 to 06/18/18 Sorted by PID"

Transcription

1 WOO Buck/Lime City Inters WOO Buck/Lime City Inters LUC SR Bridge Improve the intersection of Buck Rd and Lime City Rd in Wood. Based on the preferred alternative of the PDP process, this project could be a signalized intersection with dedicated turn lanes or rounabouts. The option with 2 roundabouts was selecte Improve the intersection of Buck Rd and Lime City Rd in Wood. Based on the preferred alternative of the PDP process, this project could be a signalized intersection with dedicated turn lanes or rounabouts. The option with 2 roundabouts was selecte Raise existing bridge profile and move abutments to increase both vertical and horizontal clearances over the RR track, redeck bridge, repair wingwall, paint structural steel, perform Bridge was split out from PID See PID CWOOCR00009**C TWOOTR00068**C SLUCSR00025**C ,970, ,981, WOO/LUC SR /0.0 A district allocation funded project to replace the existing Waterville bridge (SR-64) over the Maumee River with a new wider bridge; perform Improvement of intersection of SR-64/River Rd is funded with MPO CMAQ funds (See cancelle SWOOSR00064**C /27/17 22,277, WOO/LUC SR /0.0 A district allocation funded project to replace the existing Waterville bridge (SR-64) over the Maumee River with a new wider bridge; perform Improvement of intersection of SR-64/River Rd is funded with MPO CMAQ funds (See cancelle SLUCSR00064**C /27/ LUC Bancroft St Reconst A TMACOG funded project to rehabilitate the pavementon Bancroft St from Secor Rd to Parkside Blvd; Perform necessary related FIELD REVIEW conducted on 6/2/15. CLUCCR00022**C /11/17 10,351, SA 412/ /0.00 Res A district allocation funded project to resurface SR-412 from SR-51 to TR-274 and resurface SR 590 from the county line to US 6; perform SSASR00412**C ,395, SA 412/ /0.00 Res A district allocation funded project to resurface SR-412 from SR-51 to TR-274 and resurface SR 590 from the county line to US 6; perform SSASR00590**C SA 412/ /0.00 Res A district allocation funded project to resurface SR-412 from SR-51 to TR-274 and resurface SR 590 from the county line to US 6; perform SSASR00412**C SA US Resurf A district allocation funded project to resurface US-6 from CR-232 to Erie Line; perform SSAUS00006**C /16/18 4,946, SA US Resurf A district allocation funded project to resurface US-6 from CR-232 to Erie Line; perform SSAUS00006**C /16/ LUC SR 25/25D 10.17/0.00 An urban paving funded project to resurface Erie (B) (SR-25) from Lafayette to Cherry (SR-120) and on Michigan/Spielbusch (SB) (SR-25D) from Cherry (SR-120) to Madison; perform SLUCSR00025**C ,062, Page 1

2 95816 LUC SR 25/25D 10.17/0.00 An urban paving funded project to resurface Erie (B) (SR-25) from Lafayette to Cherry (SR-120) and on Michigan/Spielbusch (SB) (SR-25D) from Cherry (SR-120) to Madison; perform SLUCSR00025*DC LUC SR Urban Pav An Urban Paving project to resurface Monroe/Summit (SR-51) from Lafayette to Collingwood; perform UPDATE: Included PID with this PID, Upgrade pedestrian markings, install back plates and upgrade signing at the intersection o SLUCSR00051**C ,858, LUC SR Urban Pav An urban Paving project to resurface Summit St (SR-65) from Lafayette to Lagrange; perform FIELD REVIEW REQUIRED. SLUCSR00065**C ,250, WIL US Culvert Reline existing culvert (60"x56'); perform necessary related Work update: After field review and scope meeting it was agreed to replace pipe and re-grade slopes SWILUS00127**C , WOO SR Resurf/B Resurface SR-579; perform UPDATE (12/1/14): added bridge (SF PID 92748) to this project as requested. SWOOSR00579**C ,350, WOO SR Resurf/B Resurface SR-579; perform UPDATE (12/1/14): added bridge (SF PID 92748) to this project as requested. SWOOSR00579**C SA CIT Bellevue SA CIT Bellevue SA CIT Bellevue SA CIT Bellevue LUC McCord Resurf of the CIT; perform HS waiver will of the CIT; perform HS waiver will of the CIT; perform HS waiver will of the CIT; perform HS waiver will Mill existing pavement, perform spot full depth repairs; reconstruct failed catch basins; place 2 course asphalt overlay; sidewalk repair/addition; perform FIELD REVIEW REQUIRED SSAUS00020**C CSACR00177**C TSATR00177A*C TSATR00177B*C CLUCCR00073**C /01/18 1,066, , LUC Ottawa River Rd Resur Resurface Ottawa River Rd in the City of Toledo; perform necessary related work; swmall project designated by TMACOG. FIELD REVIEW REQUIRED. CLUCCR00516**C /01/18 650, WOO SR Urban P LUC SR Resurf/St Resurface SR-65 in Rossford; perform Resurface and repair/replace storm sewer; project will likely need RW and utility coordination; perform necessary related SWOOSR00065**C SLUCSR00184**C /20/18 1,594, ,400, LUC SR Central/ A CMAQ funded project to imnprove the intersection by adding turn lanes; perform SLUCSR00120**C /01/18 1,310, Page 2

3 SA Fremont SRTS Infra A SRTS funded project to add school zone beacons, sinage upgrade with speed feedback, sidewalks, crosswalk...perform necessry related work CSACR00706**C /02/18 289, LUC SR 2/25/ Urb An urban paving project to resurface avarre Ave (SR-2) and Cherry St (SR-120) in Toledo; perform SLUCSR00002**C /22/18 1,525, LUC SR 2/25/ Urb An urban paving project to resurface avarre Ave (SR-2) and Cherry St (SR-120) in Toledo; perform SLUCSR00025**C /22/18 LUC SR 2/25/ Urb An urban paving project to resurface avarre Ave (SR-2) and Cherry St (SR-120) in Toledo; perform SLUCSR00120**C /22/ D02 PM F2018 A pavement marking maintenance contract; perform necessary related 09/04/17 2,200, D02 RPM F2018 A raised pavement markers (RPM) maintenance contract; perform 08/21/17 220, LUC SR Access Access management improvements of various intersections on Central Ave in Toledo; perform SLUCSR00120**C /30/18 944, LUC US Turn Lane Modifying turning lanes on AWT at Monclova Rd. in Maumee. Perform SLUCUS00024**C , WOO SR Carron Replace intersection at Carronade Road Extension with a modern roundabout. Carronade Rd. extension to a T-intersection with SR 199 to be completed by the City of Perrysburg prior to the beginning of this project. SWOOSR00199**C /24/17 1,000, OTT SR2/53 Deck Sealing Deck sealing of various bridges in Ottawa ; perform 10/30/17 628, D02 SIG F2018 Freeway systematic sign replacement at various locations throughout District 2; perform SLUCIR00075**C , D02 TSG F2018 A district allocation funded project to maintain/upgrade existing traffic signals distric wide; perform SWOOSR00051**C /22/18 250, D02 TSG F2018 A district allocation funded project to maintain/upgrade existing traffic signals distric wide; perform SWOOSR00051**C /22/ FUL/HE 66/ /17.66 Resurfacing existing FUL-SR66 and HE-SR108; perform , FUL/HE 66/ /17.66 Resurfacing existing FUL-SR66 and HE-SR108; perform SHESR00108**C FUL/HE 66/ /17.66 Resurfacing existing FUL-SR66 and HE-SR108; perform SHESR00108**C WOO SR Resurf WOO SR Resurf OTT/SA /6.55 Re Resurfacing SR 199 from slm to Resurfacing SR 199 from slm to Chip seal SR 590 in Ottawa from 4.02 to and in Sandusky from 6.55 to 10.06; perform SWOOSR00199**C SWOOSR00199**C SSASR00590**C , , OTT/SA /6.55 Re Chip seal SR 590 in Ottawa from 4.02 to and in Sandusky from 6.55 to 10.06; perform SOTTSR00590**C FUL US Resurfaci Resurfacing US 20 in Fulton from slm ; perform SFULUS00020**C , SE SR Resurfaci Resurfacing State Route 18 in Seneca ; perform SSESR00018**C ,431, Page 3

4 SE SR Resurfaci Resurfacing State Route 18 in Seneca ; perform SSESR00018**C WIL SR /0.63 Pav/Br The project will replace the slab deck, abutments, and install rock channel protection. With a Limited Review (SF ); perform UPDATE ( ): Will add the resurfacing of WIL-SR (PID ) as part 2 to this project 1,181, LUC SR Dehumidify Install a dehumidification system for the existing cable with new round wire wrap at sections previously opened, new elastomeric wrap over the entire length of the cables and acoustic monitoring system; perform See PID for re 7,900, D02 Pile Encas/Slopes F1 A project to perform pile encasements and slope repairs on various bridges in D-2; perform Update (1-7-16): added LUC (SF ) for deck edge repl, approach slabs, WS which was deleted from PID LUC (SF480 12/11/17 552, SA SR sgnl Sfty Safety funded project to upgrade signal heads and support; modify signal timing; provide protected/permissive phasing for left turns from EB US-6 to B and SB SR-53; perform SSAUS00006**C /26/18 330, LUC Chessie Circle Conne Construct a bike path along the northeast side of University Hills Blvd; perform This project will connect the Chessie Circle Trail from Douglas Rd to Bancroft-Promenade Trail. CLUCCR00502**C /08/18 485, LUC SRTS Toledo Infra Sid Construct sidewalks, paint pedestrian crossings, and signal improvements for pedestrian crossings at various locations in the City of Toledo; perform CLUCCR00022**C /18/17 238, SA CR Resurfaci Resurface CR175 in Sandusky. Perform mill and fill with pavement repairs as needed. CSACR00175**C /18/17 1,540, HE ustrial Dr Reconst Reconstruct ustrial Dr. in the City of apoleon; perform CHECR00503**C /20/18 1,961, HE SR Resurf Resurface SR 281 in Henry from the Defiance county line to SR 108 and perform SHESR00281**C /26/18 1,013, Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all ,651, Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all FUL 108/ /14.88 res Resurface SR 108 from US 20A to US 20 and on SR 109 from US 20 to State line in Fulton ; Perform all necessary related SFULSR00108**C ,433, Page 4

5 FUL 108/ /14.88 res Resurface SR 108 from US 20A to US 20 and on SR 109 from US 20 to State line in Fulton ; Perform all necessary related SFULSR00109**C Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SLUCUS00020**C ,850, Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SWOOUS00020**C Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SLUCUS00020**C Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SWOOSR00025**C SE SR 19/ /1.64 Resurfacing State Route 19 and SR 101 in Seneca ; perform SSESR00019**C ,962, SE SR 19/ /1.64 Resurfacing State Route 19 and SR 101 in Seneca ; perform SSESR00101**C SE SR 19/ /1.64 Resurfacing State Route 19 and SR 101 in Seneca ; perform SSESR00101**C SE US /28.26 Microsurface SR 224 from.02 West of Tiffin East Corp to.13m East of SR 100 add US 224 in Attica; perform necessary related SSEUS00224**C /24/17 512, SE US /28.26 Microsurface SR 224 from.02 West of Tiffin East Corp to.13m East of SR 100 add US 224 in Attica; perform necessary related SSEUS00224**C /24/ WIL 6/ /9.87 A district allocation funded project to resurface US-6 From SR 49 to.4m east of SR 2 and SR 191 in West Unity; perform SWILUS00006**C ,109, WIL 6/ /9.87 A district allocation funded project to resurface US-6 From SR 49 to.4m east of SR 2 and SR 191 in West Unity; perform SWILSR00191**C WIL 6/ /9.87 A district allocation funded project to resurface US-6 From SR 49 to.4m east of SR 2 and SR 191 in West Unity; perform SWILUS00006**C D02 GR HS District-wide project to remove all A end anchors on the HS system. 01/22/18 747, Page 5

6 D02 GR F2018 A district wide guardrail maintenance contract; perform 08/07/17 500, SE TAP Ped & Bi Improve sidewalks on SR 18 ( Market St & Perry St) between Rock Creek & Circular St SSESR00018**C /08/18 812, LUC TR FLAP Resurface TR185 (Veler) in Jerusalem Township, Lucas ; perform TLUCTR00185**C /21/17 90, D02 LG F2018 D02 Landscape F2018 Lighting maintenance contract A district wide landscaping contract; perform necessary related 09/18/17 375, , LUC/OTT 65/163 F2018 O A contract to operate the Craig and Port Clinton lift bridges; perform 09/18/17 438, LUC/OTT 280/65/163 F18 LUC VGCS F18 Maint An electrical maintenance contract for 3 bridges. A maintenance contract of the VGCS bridge; perform 09/04/17 11/13/17 175, , LUC Overland Trail This.9 mile project would replacement the pavement on the old Ottawa Park trail. The project begins at Bancroft St and runs to Monroe St along Ottawa Pky & Southcove Blvd. CLUCCR00521**C /01/18 563, LUC CR Main St Full-depth reconstruction of Main Street including storm sewer replacement. Remove and replacesidewalks on both sides including widening on the east side to be a 10 wide multi-path to better connect the Sylvania River Trail with Downtown Sylvania. Vehi CLUCCR01572**C /25/18 695, OTT TR 16 (Balduf) FLAP A FLAP funded project to reconstruct TR-16 (Balduf) in Erie Township; perform TOTTTR00016**C /11/17 180, WOO SR PHB Install a marked crosswalk with pedestrian hybrid beacon (PHB), lighting and two-stage Z crossing median refuge island at Founders Hall and at the Stroh Center SWOOSR00064**C /04/17 379, FUL/WOO 64/ /10.0 Microsurface SR 235 from Maplewood to Euler Rd in Wood county and SR 64 from Swanton Corp to US-20 in Fulton county.; Microsurfacing is to correct low skid numbers. SFULSR00064**C /03/17 430, FUL/WOO 64/ /10.0 Microsurface SR 235 from Maplewood to Euler Rd in Wood county and SR 64 from Swanton Corp to US-20 in Fulton county.; Microsurfacing is to correct low skid numbers. SWOOSR00235**C /03/ FUL Wilson St Bridge Repl Full replacement of Wilson Street bridge over Bad Creek in Delta Ohio 08/15/17 507, $115,701,290 Page 6

Local Market Update February 2013

Local Market Update February 2013 Local Market Update February 213 February sales of single-family homes reported in Lucas and Upper Wood County by the Toledo Board of REALTORS totaled 315. This was unchanged compared to February of 212.

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

NORTHWEST OHIO HOUSING MARKET 2nd Quarter Contact Your Realtor To Find Out What s Happening In Your Neighborhood.

NORTHWEST OHIO HOUSING MARKET 2nd Quarter Contact Your Realtor To Find Out What s Happening In Your Neighborhood. Local Market Update NORTHWEST OHIO HOUSING MARKET 1,627 Unchanged $244k Total Volume +8 Increase $124,100k Median Sales Price +8 Increase 3.48 Average Interest Rate Buying Power Contact Your Realtor To

More information

Local Market Update 2012 Year In Review

Local Market Update 2012 Year In Review Northwest Area Home Sales for the Year 2012 Sales of single-family homes reported in Toledo and the surrounding area by the Toledo Board of REALTORS totaled 6,793. This was an increase of 6% compared to

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build 1 2013 Planned s System Route UPC Category Locality Project Description 395 98836 Bridge Arlington Clean/Re-Paint 7 Bridges I-395 Corridor Arlington/Alexandria 4/9/2013 $ 3.45 HOT Lanes Bicycle/Pedestrian

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Local Public Agency Obligated Projects SFY 2018

Local Public Agency Obligated Projects SFY 2018 Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated

More information

Middle Georgia Regional Investment List

Middle Georgia Regional Investment List MGRC 003 Baldwin Kings Road Safety Enhancements $6,579,700 x MGRC 005 Baldwin Log Cabin Road Widening $11,109,500 x MGRC 154 Baldwin Widen & Resurface N. Jefferson St. $6,897,900 x MGRC 155 Baldwin Widen

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

DISTRICT/ATP 6 Data Input Worksheet Final STIP

DISTRICT/ATP 6 Data Input Worksheet Final STIP DISTRICT/ATP 6 Data Input Worksheet Final STIP 2015 2018 STIP FTA State TH DIST C TH TH Bond Other 2015 232,801,042 2,296,420 87,853,654 1,461,075 91,611,149 18,781,608 18,781,608 12,800,880 12,800,880

More information

Ohio's Transportation Stimulus Projects. County Project Description Stimulus Funds

Ohio's Transportation Stimulus Projects. County Project Description Stimulus Funds District 1 Allen City of Lima; Rail Highway Safety Upgrade $ 11,000,000 Allen ODOT; Repair/Replace Deteriorated Median Barrier on I 75 and Hancock 68 $ 839,000 Defiance City of Defiance; Roadway/Bridge

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

2040 Metropolitan Transportation Plan -- Table XVII-1

2040 Metropolitan Transportation Plan -- Table XVII-1 C:\7. \Projects\ 2040MTP Project List_Nov16-16.xlsx ID # NAME LIMITS DESCRIPTION COST () AGENCY PROJECT TYPE* 2017 1 B Dr S and Capital Ave SW B Dr S from 3.5 Mile Rd eastward to M-66 (1.7 mi); Capital

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

ALIGN THE RAPID S TRANSIT IMPROVEMENT STUDY. Tech Memo #4: Phase 1 Project List. Prepared By:

ALIGN THE RAPID S TRANSIT IMPROVEMENT STUDY. Tech Memo #4: Phase 1 Project List. Prepared By: ALIGN THE RAPID S TRANSIT IMPROVEMENT STUDY Tech Memo #4: Phase 1 Project List Prepared By: & Phase 1 Project List As shown in the chart below, the initial (Phase 1) evaluation will consider investment

More information

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 SFY 2022-2023 Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 DES NUM LPA PROJECT TITLE TYPE TOTAL SCORE FUND TYPE SFY FEDERAL COST LOCAL COST

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) PUTNAM COUNTY Highways: State Highways 4135331 D2-PUTNAM COUNTY TRAFFIC SIGNAL

More information

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual - 2023 Proposed Capital Maintenance Improvement Program (CMIP) Fund/Departm ent New Original Amended 2019 2020 2021 2022 2023 FY18-23 110 - City - General Fund Chief Knowledge Office 1 9 AUTO - 1997 -

More information

Lucas County Engineers Office Keith G. Earley, P.E., P.S., Lucas County Engineer

Lucas County Engineers Office Keith G. Earley, P.E., P.S., Lucas County Engineer Lucas County Engineers Office Keith G. Earley, P.E., P.S., Lucas County Engineer Whiteford Road - Sylvania Ave. to Summerfield Rd. Yondota Rd. & Seaman Rd. - Culvert # 1445/1446 Brint Road - Lathrop Rd.

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

Local Public Agency Obligated Projects SFY 2015

Local Public Agency Obligated Projects SFY 2015 Local Public Agency Obligated Projects SFY 2015 Des# Project Description/Location Sponsor Project Type Funding Type Previously Obligated (Prior to SFY 2015) SFY 2015 Obligated Total Obligation Unobligated

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

Historical count data from Page 7-14

Historical count data from Page 7-14 Project Background The annual Lawrence count data was collected following the National Bicycle & Pedestrian Documentation Project (NBPDP) methodology (http://bikepeddocumentation.org). The project aims

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.

LEGEND FULL DEPTH PAVEMENT 2 MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15. 0 5 10 Feet 15 MATCHLINE DELMAR BLVD. STA. 18+50.00 LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY MATCHLINE DELMAR BLVD. STA. 13+00.00 END NSTRUCTION 54.76 LT. MATCH EXISTING SIDEWALK PROPOSED CURB RAMP

More information

SCHEDULE OF CAPITAL PROJECTS BY FUND

SCHEDULE OF CAPITAL PROJECTS BY FUND CIP Project Funding Summary 5 7 8 9 10 11 Streets & Highways Fund 3,950,541 2,148,259 1,250,000 1,290,000 1,250,000 9,888,800 Prop C Fund 20,936,435 700,000 700,000 700,000 700,000 23,736,435 Measure R

More information

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM TO: FROM: Indianapolis Regional Transportation Council Policy Committee Anna M.

More information

Recommended Transportation. Capital Improvement Program

Recommended Transportation. Capital Improvement Program Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM 2016 2021 TRANSPORTATION IMPROVEMENT PROGRAM 25 21 12 1 24 C B 26 13 29 30 3 6 19 7 27 14 18 17 15 16 28 22 11 10 9 A 7 D E 4 23 5 2 8 20 PROJECTS ON THE TIP PROJECTS ADDED TO THE TIP MAP I.D. PROJECT

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION WICHITA AREA METROPOLITAN PLANNING ORGANIZATION March 18, Stephanie Watts Bureau of Transportation Planning Kansas Department of Transportation 700 S.W. Harrison Street Topeka, KS 66603 3754 Dear Ms. Watts:

More information

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6 U.S. Department of Transportation Federal Transit Administration Federal Highway Administration 901 Locust Street, Suite 404 6111 SW 29 th Street, Suite 100 Kansas City, MO 64106 Topeka, KS 66614-4271

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC DISTRICT/ATP 6 Data Input Worksheet STIP 2014 2017 Needed for 10 yr workplan Needed for 10 yr workplan YEAR # of Projects STIP Total Other FHWA Target FHWA Total FHWA FTA State TH DIST C TH Total TH Bond

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

APPENDIX G. Greenhouse Gas and Climate Change Analysis

APPENDIX G. Greenhouse Gas and Climate Change Analysis APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13

More information

US 10 Corridor Performance

US 10 Corridor Performance Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

I-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013

I-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013 I-225 Rail Line 13 th Avenue Station Information Meeting July 25, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager 2 The RTD FasTracks Plan 122 miles of rail 18 miles

More information

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

Brent Spence Bridge Design Exceptions - Alternative I

Brent Spence Bridge Design Exceptions - Alternative I s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight

More information

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike 3275 South to 2625 South $ 839,800 $ 666,408 The 1200 West roadway is a very narrow road just enough for two lanes of traffic and

More information

City of University Place

City of University Place City of University Place City Engineering Department Six Year Transportation Improvement Plan Amended November 10, 2008 Resolution No. 604 City of University Place, Washington SIX-YEAR TRANSPORTATION PLAN

More information

Caltrans Shopp Lump Sum Projects and Backup List

Caltrans Shopp Lump Sum Projects and Backup List appendix d Caltrans Shopp Lump Sum Projects and Backup List 46 Tahoe Regional Planning Agency - Federal Transportation Improvement Program (Dollars in Whole) State Highway System DIST: PPNO: 03 COUNTY:

More information

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018 Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

6-YEAR CAPITAL IMPROVEMENT PROGRAM

6-YEAR CAPITAL IMPROVEMENT PROGRAM OFFICE OF THE LUCAS COUNTY 6-YEAR CAPITAL IMPROVEMENT PROGRAM 2018 2023 KEITH G. EARLEY, P.E., P.S. LUCAS COUNTY 1049 S. MCCORD ROAD HOLLAND, OHIO 43528 (419) 213-2860 March 2018 TABLE OF CONTENTS LIST

More information

PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION

PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION TESTER ROAD WATER MAIN UPGRADE PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION The City will be replacing an aging water main under Tester Road this year. The project will begin

More information

City of Palm Coast 5 Year Capital Improvement Plan

City of Palm Coast 5 Year Capital Improvement Plan CAPITAL PROJECTS FUND FY 16 Budget FY 16 Projected FY 17 FY 18 FY 19 FY 20 FY 21 Prior Year Carry over 4,760,593 4,760,593 3,958,193 470,836 411,836 784,956 831,338 Ad Valorem Taxes 284,600 284,600 141,418

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

HURON COUNTY ENGINEER S OFFICE

HURON COUNTY ENGINEER S OFFICE HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Middle Georgia Transportation Executive Committee. September 27, 2017

Middle Georgia Transportation Executive Committee. September 27, 2017 Middle Georgia Transportation Executive Committee September 27, 2017 Project Discussions MACON BIBB, CRAWFORD, MONROE Project List Development Process to Date Cities, Counties and MPOs submitted projects

More information

Current Corridor Characteristics. MN 62 Corridor Performance

Current Corridor Characteristics. MN 62 Corridor Performance Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM CITY OF LANCASTER ADOPTED FY 2016-2017 & FY 2017-2018 BUDGET & PROJECTED FY 2018-2019 THROUGH 2020-2021 CITY OF LANCASTER FISCAL YEARS 2017 & 2018 ADOPTED BUDGET 199 FY 2016

More information

Pennsylvania Turnpike Commission 03/30/ YEAR CAPITAL PLANNING PROCESS

Pennsylvania Turnpike Commission 03/30/ YEAR CAPITAL PLANNING PROCESS Pennsylvania Turnpike Commission 3/3/29 1 YEAR CAPITAL PLANNING PROCESS PRIORITIZED LISTING OF FINAL COPY FOR FISCAL YEAR 27-28 FOR ALL EXCEPT INDEPENDENTLY FUNDED PROGRAM, ALL TYPES, ALL PHASES (in $)

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Population Trends. US 12 Corridor Performance

Population Trends. US 12 Corridor Performance Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

Chapter 4 COLLISION REDUCTION PROGRAM

Chapter 4 COLLISION REDUCTION PROGRAM Chapter 4 COLLISION REDUCTION PROGRAM Table of Contents 4.0 Background...4-3 4.1 Safety Improvement Projects SHOPP 201.010 Program...4-3 4.1.1 Spot Improvements..4-3 4.1.2 Wet Improvements...4-4 4.1.3

More information

Columbia County Road Department. Department Presentation June, 2013 By David Hill

Columbia County Road Department. Department Presentation June, 2013 By David Hill Columbia County Road Department Department Presentation June, 2013 By David Hill Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

APPENDIX A Basis of Design and Design Criteria Memorandum

APPENDIX A Basis of Design and Design Criteria Memorandum APPENDIX A Basis of Design and Design Criteria Memorandum Job No: Y01-500 Files are stored in: Engineering / Client / Yolo/Y01500 Buckeye and Rumsey/Rumsey CR 41 over Cache Creek, CAD files stored in:

More information

TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS

TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015 Overview Transportation Alternatives Program (TAP) overview MPO TAP Scoring

More information

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT PROJECT CONTEXT 510 Hicks L A C E Y Mullen Rd SE Thurston County Fairgrounds Rd SE Carpenter Long Woodland Elementary Rd SE Marvin Old Paci c H w y 510 Reservation Rd SE Nisqually Indian Community Nis

More information

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM 2007/2008 2011/2012 MRION COUNTY TRNSPORTTION IMPROVEMENT PRORM MRION COUNTY BORD O COUNTY COMMISSIONERS TIP2007 STN McCLIN, CHIRMN TBLE O CONTENTS Board Members and Staff 2 Summary..3 Phase/unding s...

More information

Three Year Engineering Factors, SFY 2017 Report: Overhead Costs per Total Construction Costs

Three Year Engineering Factors, SFY 2017 Report: Overhead Costs per Total Construction Costs Three Year Factors, SFY 2017 Report: Overhead Costs per Costs 1/9/2018 Report Key: Projects are group by Work Type 1, and then work types are used to group projects into categories: qry01makekey 12/11/2017

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information