1 Transportation Improvement Program (TIP) Candidate List for Public Review

2 Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit Transit Purchase bus for Handi Wheels for City of transit Shop equipment for hybrid buses for City of transit Amendment Amendment Transit Purchase bus shelters for City of transit Amendment Transit Land Acquisition for future expansion for City of transit Amendment Estimated Cost Actual Cost FTA FTA FTA 5309/ FTA 5309 Transit Miscellaneous bus support equipments Programmed FTA 5309 Transit Transit Transit th St S th Street Senior Services Purchase three hybrid expansion fixed route transit buses Auto bus stop announcements for City of transit Replace paratransit vehicles (#1170, #1171 and #1172) Construction of shared use path and bridge along 36th St S from 40th Ave S to 38th Ave S and along 38th Ave S from 36th St S to 34th St S Reconstruct and Widen 's 45th Street from 26th Avenue South to 52nd Avenue South Programmed 1, FTA 5309 Amendment FTA 5309 Programmed Programmed /TE Programmed 18, ARRA & /U Transit New Senior Services Transit Building Programmed 1, FTA th Ave N Landscaping along 12th Ave N Programmed /TE I Install high mast lighting fixtures from Drain 21 Programmed 3, to 45th Street I Reconstruct SB lanes from N Int N to Sheyenne River Programmed 8, I-94/45th Street Interchange Main Avenue th Street N Reconstruction and widening of I-94 interchange. includes multi use path. The includes addition of auxillary lanes to I-94 from 45th St interchange to the I-29 interchange and WB off ramp modifications. Purchase ROW for the reconstruction of Main Ave from I-94 to 45th Street in West. includes pedestrian sidewalk/multi use path. Rehabilitate 10th St from 8th Ave S to 2nd Ave N underpass to repair pavement, retaining walls, sidewalks and lighting Programmed 8, / Programmed 5, /R Programmed 3, /R Actual Total Cost (To Date) Estimated Total Cost 51, Wednesday, December 02, 2009 Section 1 15

3 Table 2 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 Minnesota s Number I Unbonded Overlay from TH 336 to Downer (WB) TH Milling and bituminous surfacing of TH 10 EB and WB from East limit of TH 75 to East limits of Dilworth Transit Purchase Paratransit Computer Software Amendment Transit New Freedom Funds for Accessible Pedestrian Amendment Signal at 7th Ave and Hwy 75 Estimated Cost Actual Cost Programmed 7, Programmed 4, ARRA FTA 5317 & State Transit Preventive Maintenance Programmed Actual Total Cost (To Date) Estimated Total Cost 12, Wednesday, December 02, 2009 Section 1 18

4 Table 3 Four Year Summary of North Dakota Candidate s Total Cost (Thousands) Transit Funds for Mobility Manager: connected with Transit # Illustrative FTA 5317 Transit Miscellaneous bus support equipments Illustrative FTA 5309 Transit Transit Planning Programmed Transit Operation of fixed routes, paratransit, GTC, Programmed 3, preventative maintenance, and misc. capital items Transit Replace 2008 vehicle # 1190 and 1155 for Illustrative FTA 5309 Senior Services 1st Avenue North Reconstruct and widen 1st Ave to 3 lanes between University Drive and 25th St in. Programmed 5, /U nd Ave S Landscaping 52nd Ave S from I-29 to University Dr Candidate TE I-94 I-94 eastbound concrete pavement repair from drain Candidate #21 east to 1 mile west of 45th Street I-94 I-94 westbound concrete pavement repair from drain Candidate #21 east to 1 mile west of 45th Street I-94 I-94 eastbound concrete pavement repair from near Candidate West to Horace Rd I-94 I-94 westbound concrete pavement repair from near Candidate West to Horace Rd University Drive Landscaping along University Dr South from 52nd Ave S to 40th Ave S Programmed /TE Main Avenue Purchase ROW for the reconstruction of Main Ave Programmed 2, from 45th St to 5th St Street in West. includes pedestrian sidewalk/multi use path. /R Various Metro Area Funds for Regional Bicycle Safety Education Program Candidate Transit Funds for Mobility Manager: connected with Transit # Illustrative FTA 5317 Transit Miscellaneous bus support equipment Illustrative FTA 5309 Transit Operation of fixed routes, paratransit, GTC, Programmed 3, preventative maintenance, and misc. capital items Transit Transit Planning Programmed Transit Replace 6 paratransit vehicle #s Programmed ,1178,1179,1180,1181 and 1182 (2008 vehicles) 52nd Ave S Bridge reconstruction and widening at Drain 27 Programmed 2, BR Wednesday, December 02,

5 Table 3 Four Year Summary of North Dakota Candidate s Total Cost (Thousands) 9th St E/I-94 Ramp revisions EB & WB for City of West (AC Programmed 3, payback for 2009 construction) th Avenue Bridge deck replacement at 7th Ave/I-29. also Programmed 1, includes widening of 7th Avenue from 36th St to 39th St N for pedestrian facility /U Main Avenue Main Avenue (I-94 to 45th St in West ) Programmed 16, construction project. includes pedestrian sidewalk/multi use path. /R th Street N Reconstruct 10th Street North in from 12th Programmed 3, Avenue North to 17th Avenue North /R Main Avenue ROW for Main Avenue reconstruction from 5th St to Programmed 3, th St in West /R Transit Miscellaneous bus support equipment Illustrative FTA 5309 Transit Funds for Mobility Manager: connected with Illustrative FTA 5317 Transit # Transit Replace three fixed route transit vehicles in 2013 (units Illustrative 1, FTA , 1127, and 1128) Transit Replace two 2009 senior services vans Programmed FTA 5307/5309 Transit Transit Planning Programmed Transit Operation of fixed routes, paratransit, GTC, Programmed 3, preventative maintenance, and misc. capital items Transit Resealing and Maintenance of GTC deck Programmed / Main Avenue Purchase ROW for the reconstruction of Main Ave Programmed 3, from I-94 to 45th Street in West. includes pedestrian sidewalk/multi use path. /R I-94 Concrete pavement repair for I-94 from 1 mile west of Programmed th St to near 42nd St in I-94 Concrete pavement repair for I-94 from 25th St Programmed interchange to Red River in I-94 Concrete pavement repair for I-94 from 0.5 mile east Programmed of I-29 east to the Red River in West Main Avenue Landscaping from Sheyenne St to 45th St Programmed /TE West th Ave E Rebuild as urban 3-lane roadway from 17th St E to Programmed 2, th St SW /U 2014 Wednesday, December 02,

6 Table 3 Four Year Summary of North Dakota Candidate s West Total Cost (Thousands) Transit Planning Activities for Transit Candidate Transit Operations Assistance for Transit Candidate 3, th St S 25th St S reconstruction and widening including Candidate 9, U bridge widening from 13th Ave S to 24th Ave S 13th Ave E Reconstruct existing lighting system from Sheyenne St Candidate to 17th St E Estimated Total Cost 72, Wednesday, December 02,

7 Table 4 Four Year Summary of Minnesota Candidate s STIP # Total Cost (Thousands) TRF Transit Operating Assitance for flex-route and Programmed commuter service throughout FTA CR 12 Milling and bituminous surfacing on CR 12 Programmed south of (Tied to ) Local AC I-94 Unbonded Overlay from TH 336 to Downer Programmed 1, (WB) AC Payback for TH 75 Roundabout at Junction TH 75 and Clay CR 12 Programmed 1, south of (Tied to SP ) Transit Funds for Mobility Manager (tied to Illustrative #411080) FTA TRF A Transit Paratransit Operating Assistance and Metro Programmed Senior Ride Operations TRF B Transit Operation of fixed routes, evening service, and Programmed 1, GTC TRF C TRF D TRS Transit Transit Planning Programmed Transit Preventive Maintenance Programmed Transit Replacement of paratransit vehicle #1150 Programmed & Transit General Public Demand Response Service Illustrative FTA th Ave S Construct 28th Ave S from 20th St S to 26th St Programmed 1, S in th St S Construct pedestrian underpass at 40th Avenue S Programmed th Ave S Grade and surfacing of 50th Avenue South Programmed 2, Parkway in (East bound lanes from 1.38 miles west of TH 75 - TH 75). /TE TRS TRF Transit Purchase 1 Class 500 Bus Programmed Transit Operating Assitance for flex-route and Programmed commuter service throughout FTA CSAH 52 Unbonded concrete overlay from CSAH 4 to Programmed 2, Sabin near CO Rd TH 75/TH 10 Pedestrian and Bike Improvements along TH 75 from 40th Ave S to Main Ave and along TH 10 from Red River to E jct of TH 75 Candidate State I-94 I-94 Buffalo River Bridge and Programmed 5, redecking and painting BH Transit Funds for Mobility Manager (Tied to Illustrative # ) FTA TRF A Transit Paratransit Operating Assistance and Metro Programmed Senior Ride Operations TRF B Transit Operation of fixed routes, evening service, and Programmed 2, GTC TRF C Transit Transit Planning Programmed Tuesday, December 01,

8 Table 4 Four Year Summary of Minnesota Candidate s STIP # Total Cost (Thousands) TRF D Transit Preventive Maintenance Programmed Transit General Public Demand Response Service Illustrative FTA th Street Reconstruct 20th Street in from 6th Programmed 1, Avenue South to 12th Avenue South TRF Transit Operating Assitance for flex-route and Programmed commuter service throughout FTA Transit Funds for Mobility Manager (tied to Illustrative #413020) FTA TRF A Transit Bus Related Equipment Illustrative Transit General Public Demand Response Service Illustrative FTA 5316 Transit Paratransit Operating Assistance and Metro Programmed Senior Ride Operations TRF B Transit Operation of fixed routes, evening service, and Programmed 2, GTC TRF C TRF D TRF E Transit Transit Planning Programmed Transit Preventive Maintenance Programmed Transit Replacement of 2008 Paratransit expansion Programmed vehicle (Class 400) FTA 5307/ TRF G Transit Purchase two 2009 vans for Metro Senior Ride Programmed TH 75 Bituminous overlay on TH 75 from Wilkin county line to Rd 12 Candidate SE Main Ave Resurfacing SE Main Ave from Oak Way to I-94 Candidate 2, Transit Transit Planning for Transit Candidate Transit Funds for Mobility Manager Candidate Transit Preventive Maintenance for Transit Candidate Transit Replace Vehicle System Candidate FTA Transit Replacement of Paratransit Vehicles Candidate (Units 1202 and 1203) FTA 5307/ Transit General Public Demand Response Service Illustrative FTA 5316 Transit Operation of Paratransit and Metro Senior Ride Candidate Services Transit Operation of fixed route, evening service and Candidate 1, GTC Estimated Total Cost 31, Tuesday, December 01,

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6 U.S. Department of Transportation Federal Transit Administration Federal Highway Administration 901 Locust Street, Suite 404 6111 SW 29 th Street, Suite 100 Kansas City, MO 64106 Topeka, KS 66614-4271

More information

2040 Metropolitan Transportation Plan -- Table XVII-1

2040 Metropolitan Transportation Plan -- Table XVII-1 C:\7. \Projects\ 2040MTP Project List_Nov16-16.xlsx ID # NAME LIMITS DESCRIPTION COST () AGENCY PROJECT TYPE* 2017 1 B Dr S and Capital Ave SW B Dr S from 3.5 Mile Rd eastward to M-66 (1.7 mi); Capital

More information

Current Corridor Characteristics. MN 62 Corridor Performance

Current Corridor Characteristics. MN 62 Corridor Performance Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

Recommended Transportation. Capital Improvement Program

Recommended Transportation. Capital Improvement Program Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number

More information

DISTRICT/ATP 6 Data Input Worksheet Final STIP

DISTRICT/ATP 6 Data Input Worksheet Final STIP DISTRICT/ATP 6 Data Input Worksheet Final STIP 2015 2018 STIP FTA State TH DIST C TH TH Bond Other 2015 232,801,042 2,296,420 87,853,654 1,461,075 91,611,149 18,781,608 18,781,608 12,800,880 12,800,880

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

Population Trends. US 12 Corridor Performance

Population Trends. US 12 Corridor Performance Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 SFY 2022-2023 Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 DES NUM LPA PROJECT TITLE TYPE TOTAL SCORE FUND TYPE SFY FEDERAL COST LOCAL COST

More information

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC DISTRICT/ATP 6 Data Input Worksheet STIP 2014 2017 Needed for 10 yr workplan Needed for 10 yr workplan YEAR # of Projects STIP Total Other FHWA Target FHWA Total FHWA FTA State TH DIST C TH Total TH Bond

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

December 12, Dear Secretary Foxx:

December 12, Dear Secretary Foxx: Chair Pete White City Councilmember Vice-Chair Jay Adams Mustang Mayor Secretary/Treasurer Matt Dukes Midwest City Mayor association of central oklahoma governments Executive Director John G. Johnson December

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara

More information

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments

More information

I-35W Past, Present, and Future: METRO Orange Line

I-35W Past, Present, and Future: METRO Orange Line I-35W Past, Present, and Future: METRO Orange Line 2018 State Public Transportation Partnerships Conference Charles Carlson Director, BRT Projects Metro Transit Charles.Carlson@metrotransit.org Metro Transit:

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA11 FTA SECTION 5337 Federal Formula 5-5 $182,250 $123,591 4349801, 4349811, 4368891, 4387361, 4349771, 4349791, 4409221, 4409321 FTA Sec 5337 State of

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Background PSRC s 2017 funding: Rural Town Centers and Corridor program Regional FTA competition May - Board released projects

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) PUTNAM COUNTY Highways: State Highways 4135331 D2-PUTNAM COUNTY TRAFFIC SIGNAL

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

I-394 Corridor Performance

I-394 Corridor Performance Population Trends Corridor Context The corridor runs from edge of Hennepin County to downtown Minneapolis and serves the cities of Delano, Independence, Medina, and Wayzata. City Population 2000 2010 2,088

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information

Janice Fortunato Senior Director Business Partnerships

Janice Fortunato Senior Director Business Partnerships Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

District 7 10-Year Capital Highway Investment Plan ( )

District 7 10-Year Capital Highway Investment Plan ( ) District 7 10-Year Capital Highway Investment Plan (2018-2027) Cover Picture DRAFT JUNE 2017 Prepared by Office of Transportation System Management DISTRICT 7 10-YEAR CHIP OVERVIEW District 7 s 10-Year

More information

The Smart Growth Countywide Transit Master Plan

The Smart Growth Countywide Transit Master Plan Choose the Future The Smart Growth Transit Master Plan What is the Transit Master Plan? A robust and integrated plan to establish countywide public transportation priorities over the next thirty years

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

Transportation Infrastructure Investment Program moving

Transportation Infrastructure Investment Program moving moving CALGARY What is TIIP? Ten Year Transportation Capital Program Last approved by Council in 2005 Defines: Major infrastructure projects Lifecycle programs What is TIIP? Represents current planned

More information

Annual Listing of Projects Receiving Federal Funds

Annual Listing of Projects Receiving Federal Funds Communities working together to meet Chittenden County s transportation needs CHITTENDEN COUNTY METROPOLITAN PLANNING ORGANIZATION Annual Listing of s Receiving Federal Fiscal Year 2007 October 1, 2006

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Transportation Improvement Program

Transportation Improvement Program FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION CITY OF FLAGSTAFF COCONINO COUNTY ARIZONA DOT Office: 100 West Birch Avenue Flagstaff, Arizona 86001 Mail: 211 West Aspen Avenue Flagstaff, Arizona 86001 Phone:

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Local Public Agency Obligated Projects SFY 2015

Local Public Agency Obligated Projects SFY 2015 Local Public Agency Obligated Projects SFY 2015 Des# Project Description/Location Sponsor Project Type Funding Type Previously Obligated (Prior to SFY 2015) SFY 2015 Obligated Total Obligation Unobligated

More information

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION WICHITA AREA METROPOLITAN PLANNING ORGANIZATION March 18, Stephanie Watts Bureau of Transportation Planning Kansas Department of Transportation 700 S.W. Harrison Street Topeka, KS 66603 3754 Dear Ms. Watts:

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM TO: FROM: Indianapolis Regional Transportation Council Policy Committee Anna M.

More information

PARTIAL PROGRAM OF PROJECTS FFY

PARTIAL PROGRAM OF PROJECTS FFY PARTIAL PROGRAM OF PROJECTS FFY 2016-17 The proposed Partial Program of Projects for FFY 2016-17 is attached. The proposed Partial Program of Projects was introduced at the SCTA Board at its meeting on

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MOTION NO. M2018-161 Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION

More information

Swift Green Line April 11, 2019

Swift Green Line April 11, 2019 Swift Green Line April 11, 2019 Overview Swift BRT Overview Swift Green Line Project Snohomish County Partnership Early Results Swift Washington s first BRT Overlay BRT Stations approx. 3/4-1 mile apart

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike 3275 South to 2625 South $ 839,800 $ 666,408 The 1200 West roadway is a very narrow road just enough for two lanes of traffic and

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Reston Transportation Strategy July 9, 2018

Reston Transportation Strategy July 9, 2018 Reston Transportation Strategy July 9, 2018 Background: On February 11, 2014, the Board of Supervisors adopted the Reston Phase I Comprehensive Plan Amendment for the core areas of Reston between Sunset

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Kalamazoo Area Transportation Study FY Transportation Improvement Program 10/1/2016 (05/30/18)

Kalamazoo Area Transportation Study FY Transportation Improvement Program 10/1/2016 (05/30/18) Agency Project Name Limits Length Primary Work Project Description Phase Phase MDOT Job ID 2017 Various MDOT Trunkline Highway Preservation Regionwide Trunkline Highway Preservation CON 0 612 M 612 01/25/17

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

US 10 Corridor Performance

US 10 Corridor Performance Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics

More information

Central Loop Bus Rapid Transit

Central Loop Bus Rapid Transit Central Loop Bus Rapid Transit Transportation Goals of the Chicago Central Area ACTION Plan, page 2-6 Central Area Plan Improve Transit in Central Area Improve Pedestrian Environment Manage Traffic Circulation

More information

2040 REGIONAL TRANSPORTATION PLAN

2040 REGIONAL TRANSPORTATION PLAN 2040 REGIONAL TRANSPORTATION PLAN Your RTC. Our Community. 1] 2040 Regional Adopted Transportation May Plan 18, 2017 The 2040 Regional Transportation Plan (RTP) identifies the long-term transportation

More information

Strategies to keep people and goods moving in and through Seattle

Strategies to keep people and goods moving in and through Seattle Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 DON Information Session Department of Transportation Delridge Community Center November

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP

More information

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action MOTION NO. M2018-160 Purchase of Thirteen 42-foot Double Deck Expansion Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee PROPOSED ACTION 12/06/2018 12/20/2018 Recommend to Final

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY Anderson Area Transportation Study ANATS Transportation Improvement Plan FY 2017-2022 www.cityofandersonsc.com Table of Contents Introduction 1 Process 2 Products 3 Funding 4 Certification 6 Financial

More information

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016) Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement s Awarded in Fiscal Year 2016 (July 2015 - June 2016) Region 1 STA 0703-426 20510 I-70:WB EJMT to MM 218 SMA PG 76-28 11930 N/A N/A ER 0703-424 20351

More information

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis

More information

LACEY CITY COUNCIL MEETING July 09, 2015

LACEY CITY COUNCIL MEETING July 09, 2015 LACEY CITY COUNCIL MEETING July 09, 2015 SUBJECT: 2016-2021 Six-Year Transportation Improvement Plan and Mitigation List RECOMMENDATION: Adopt Resolution approving the proposed 2016-2021 Six- Year Transportation

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III Capital Programs & Construction SFMTA Shari Tavafrashti Principal Engineer SFCTA 1 Project Purpose and Need Improve transit reliability,

More information

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000.

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000. Urban Transit Agencies SEPTA - Philadelphia Elwyn-Wawa Service Restoration Project $7,300,000 SEPTA - Philadelphia Construction of New Signage $4,792,000 SEPTA - Philadelphia New Tunnel Lighting $2,044,800

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1 Snelling Bus Rapid Transit May 13, 2013 Technical Advisory Committee Meeting #1 1 Today s meeting TAC Introductions Project Overview Arterial BRT Concept Background Snelling Corridor Plan, Funding & Schedule

More information

Local Public Agency Obligated Projects SFY 2018

Local Public Agency Obligated Projects SFY 2018 Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated

More information

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning

More information

1 Downtown LRT Connector: Draft Concept

1 Downtown LRT Connector: Draft Concept Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information