1 Institute of Transportation Engineers at Montana State University
2 Table of Contents Table of Contents Chapter 1. Introduction Scope of Work Site Description... 2 Chapter 2. Study Methodology Level of Efforts... 4 Chapter 3. Study Results Vehicle Traffic Pedestrian Traffic Bicycle Traffic Parking Chapter 4. Conclusion Special Thanks Appendix A. Trip Generation Forms Appendix B. Parking Forms... 27
3 Introduction Chapter 1. Introduction This report summarizes the work performed by MSU for the ITE Western District Student Data Collection Program. The project was performed in southwest Montana s city of Bozeman. Although MSU has a storied history, we have been fairly dormant over the last few years due to a high level of student turnover. However, the club currently has a strong base of students passionate in transportation engineering and we are excited for what our future holds. In the fall semester, we hosted ITE International President-elect, Michael Sanderson, for a large transportation presentation. We also held an informational session by representatives from the design and planning firm, Kittelson & Associates. The club was able to reach out to middle school students in town at an interactive station at MSU s annual Engineer-A-Thon. For the first time in our club s history, we sent student members to the ITE Student Leadership Summit. We are also thrilled to be further involved with the upcoming annual conferences of the ITE Western District and the ITE Intermountain Section. We are currently involved in a pilot project involving the addition of bike lanes at Montana State University on existing campus sidewalks. With all the new knowledge our members will gain from these events and projects, we plan on giving back to our university by supporting transportation initiatives such as bike safety, better parking, and additional public transportation. Multiple members of the club were involved with this data collection project, as provided in section 4.1 of this report Scope of Work This project included two main activities: Collection of continuous trip generation data for vehicles, bicycles, and pedestrians, grouped into 15-minute intervals. Collection of parking lot occupancy every hour throughout the duration of study. This work occurred over three different days of study, Wednesday February 21 st, Thursday February 22 nd, and Saturday February 24 th. Data collection occurred between 7 AM and 6 PM. 1
4 Vehicle Introduction 1.2. Site Description The study site was the apartment complex, following Land Use Code 225: Off-Campus Student Apartment. As shown in Figure 1, the complex is located directly west of the MSU football stadium on South 11th Avenue. It is a half mile south of the intersection of S. 11th Ave. and W. Grant St., the major intersection on the southwest corner of the MSU campus. This apartment complex was built in 2015 and serves primarily as offcampus student lodging. It currently houses approximately 500 residents and encompasses an area of six city blocks. also has a sandwich shop on the first floor facing S. 11th Ave. There is on-street public parking along S. 11 th Ave and private, permit-only parking for residents on-site. N Kagy Blvd Vehicle Apartments Vehicle 11 th Ave To MSU Ped/Bike Figure 1: Site Overview (image taken from Google Maps). Bozeman s only public transportation system, the Streamline bus service, does not serve the complex. The nearest bus stop is one mile away at MSU s student union building. Because most bus routes in south Bozeman are designed to service the university, the complex was deemed too close to justify being included in a route. This site was of interest because MSU, and Bozeman in general, has a rising population trend. Bozeman was recently ranked as the fastest growing micropolitan area in the United States (2018 U.S. Census Bureau). In addition, MSU set the 10 th straight spring enrollment record in 2018, at a growth rate of 37% (February 14, 2018 Bozeman Daily Chronicle). New housing developments will continue to be built around the city, creating new concentrations of trip generations. In addition to ITE, the data collected will be helpful to planners who seek to incorporate popular modes of transportation into new developments. Table 1: Statistics of Apartments Buildings 8 Stories 3 Apartments (approx.) 130 Residents (approx.) 500 Parking Spaces 515 Bike Racks* 10 * Bike racks each hold approximately 10 bicycles. 2
5 Study Methodology Table 1 shows relevant statistics of the apartment complex. There are a variety of apartment sizes within the complex including studio, 1, 2, 3, 4, and 5-bedrooms. The exact number of each apartment size was not readily available, however there are approximately 3.8 bedrooms per apartment. The vast majority of bedrooms within the complex contain only one resident. Therefore, it was assumed that there are approximately 500 bedrooms within the complex. Due to the high demand for housing in Bozeman, the complex has been fully occupied since it opened. Chapter 2. Study Methodology For the three days of data collection, members of MSU volunteered to collect data in shifts ranging between one hour and six hours. There were always two members on site, each performing one of two roles. The first role consisted of observing pedestrians, vehicles, and cyclists from the position indicated in Figure 2. This position allowed the observer to record the entire flow of traffic in and out of the complex, as both the north and northeast entrances were clearly in the line of sight of the observer while looking southwest. Pedestrians, vehicles, and cyclists were recorded by their respective mode of transportation and whether they were entering or exiting the complex. Observation Location Apartments The second role filled by club members consisted of 11 th Ave To MSU Figure 2: Observation Location (image taken from Google Maps). N Figure 3: View from the observation location (taken from recording the total volume of vehicles within the complex. One volume was recorded for each hour throughout the duration of the study. A drone was used for some of the counts as it allowed the user to quickly get an aerial view of the complex and record the total volume of vehicles. When the drone was not used, the counts were performed on foot, bike or by car. 3
6 Study Methodology In February, Montana was the only state whose average temperature was rated by NOAA as much below average. Montana experienced its sixth coldest February on record with a monthly temperature of 9.7 F below average, being the coldest for the state since Even though no precipitation occurred during the collection days, it is important to note that Montana s statewide precipitation (snowfall) was rated as much above average for the entire month. Due to the cold temperatures during each day of study, all data collection (with the exception of some hourly manual parking counts) was performed within a heated car parked at the study location indicated in Figure 2. Table 2: Weather during days of study (NOAA). Day Maximum Minimum Average Precipitation Temperature Temperature Wind Speed Sunrise Sunset Wednesday 15 F -15 F 0 In 2.4 MPH 7:17 AM 6:00 PM Thursday 18 F -5 F 0 In 3.5 MPH 7:15 AM 6:02 PM Saturday 32 F 13 F 0 In 8.9 MPH 7:12 AM 6:04 PM Although the weather during the 3 days of study may have impacted how residents decided to commute to school, the complex s proximity to the university makes driving impractical under any conditions. Unless a resident were to drive to the university earlier than 7:30, the closest available parking is only several hundred feet from the complex (and still about a 10-minute walk from most university buildings). Therefore, the vast majority of residents still walk to the university regardless of the weather conditions. Because of icy conditions, some residents may have opted to walk instead of bike Level of Efforts Each day of study lasted for 11 hours with at least 2 students always on site. Therefore, 66 total hours were spent on data collection. The project manager spent an additional 4 hours preparing for the study by building data collection sheets, outlining study instructions, and consulting with MSU s professional mentor. The final 10 hours were spent analyzing the data and writing this report. Preparation of this report was performed by 5 MSU members. 4
7 AM Peak (trips/h) PM Peak (trips/h) Daily Rate (trips/h) Total Trips AM Peak (trips/h) PM Peak (trips/h) Daily Rate (trips/h) Total Trips AM Peak (trips/h) PM Peak (trips/h) Daily Rate (trips/h) Total Trips Study Results Chapter 3. Study Results A full summary of counted trips by mode and day can be seen in Table 3. Note that the numbers reflect 11 hours of total data collection (7 AM 6 PM) for each day. The total number of trips generated over the three-day period is 3,568. The number of vehicles (2,110) and pedestrians (1,360) are far greater than those on bicycles (98). The different modes of transportation percentages are summarized in Table 4. The weekdays had much larger trip generation (1,297 on Wednesday and 1,581 on Thursday) than the weekend (690). Note that for the vehicle trips in Table 3, the numbers shown represent only the number of vehicles that were counted and does not consider the occupancy of each vehicle. Vehicle occupancy was not counted in this study, however the average occupancy rate was likely close to 1. Table 3: Summary of peak hour and daily averages of trips/h. Wednesday, February 21 Thursday, February 22 Saturday, February 24 Mode Vehicle Walking Bicycle All Modes Table 4: Percentage of transportation modes for each day. Mode Split Day Vehicle Walking Bicycle Wednesday 49 % 47% 4% Thursday 55% 42% 3% Saturday 87% 12% 1% Among the ITE Trip Generation Data Forms, part 2 had cells to provide AM and PM Peak Hour of adjacent street traffic. The peak hours were determined by data collection done by Sanderson Stewart (civil engineering design firm) on Wednesday, January 11 th, The counts were collected at the intersection of S. 11 th Ave. and W. Kagy Blvd., just north of Apartments. 5
8 Trips Study Results 3.1. Vehicle Traffic The number of vehicles per hour is summarized in figures 4, 5, and 6. The weekday AM peak hour is between 10:45 and 11:45 with an average rate of 71 trips/h. The PM peak is 16:15 17:15 respectively, at a rate of 98 trips/h. The weekend peak hours are similar with an AM peak at 10:30 11:30, and a PM peak at 16:45 17:45. Weekend peak rates were lower than weekday in the morning at 61 trips/h, but higher in the evening at 101 trips/h. More vehicles are departing than arriving the apartment complex in the morning, while the number of vehicles arriving and departing are more equal in the evening. Wednesday Vehicle Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 4: Wednesday vehicle trips. 6
9 Trips Trips Study Results Thursday Vehicle Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 5: Thursday vehicle trips. Saturday Vehicle Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 6: Saturday vehicle trips Pedestrian Traffic The amount of pedestrian traffic is equal to that of vehicles on the weekdays but is significantly lower on the weekend. The amount of foot traffic arrivals and departures throughout the day is summarized in figures 7, 8, and 9. During the mornings, there is a greater number of people departing the apartments, while in the evening there is a larger number of people arriving at the complex. AM peak hour for 7
10 Trips Trips Study Results pedestrians is 9:30 10:30 at peak rate of 75 trips/h. The PM peak hour is at 15:15 16:15 at a rate of 71.5 trips/h. The peak hour rates for the weekend are much lower. The AM peak hour is 10:30 11:30 with a rate of 13 trips/h and the PM is 16:15 17:15 at a rate of 12 trips/h. Wednesday Pedestrian Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 7: Wednesday pedestrian trips. Thursday Pedestrian Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 8: Thursday pedestrian trips. 8
11 Trips Trips Study Results Saturday Pedestrian Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 9: Saturday pedestrian trips Bicycle Traffic The amount of bicycle traffic had much lower trip generation compared to the other two modes of transportation. The AM peak hour during the week is at 9:00 10:00 with a rate of 8 trips/h. The PM peak hour is at 14:15 15:15 at a rate of 7 trips/h. There was minimal bicycle traffic during the weekend with a total of 5 trips throughout the day Wednesday Bicycle Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 10: Wednesday bicycle trips. 9
12 Trips Trips Study Results Thursday Bicycle Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 11: Thursday bicycle trips. Saturday Bicycle Trips :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time Enter Exit Figure 12: Saturday bicycle trips Parking There is a general downward trend for parking occupancy throughout the day (Figure 13). As seen in Table 5, the parking lot never reached over 67% full (indicating that almost a third of residents may not own a vehicle). Over the course of the three days studied, there are on average less cars parked over the 10
13 Vehicles Study Results weekend than during the week. Note that with 515 spaces provided for 130 dwelling units, there is a parking supply ratio of 4 spaces per dwelling unit. ITE Parking Generation does not have student housing as a land use category. Land use category 221: Low/Mid-Rise Apartments for suburban land use has an 85 th percentile parking demand ratio of 1.94 vehicles/du, which is below the observed demand ratios for this site. Parking Occupancy Wednesday Thursday Saturday Average :00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 Time of Day Figure 13: Parking lot occupancy for each hour of study. Table 5: Maximum parking supply ratio for each day. Date Peak Parking Observed Parking Supply (# of spaces) Parking Occupancy % Parking Demand Ratio (Per Dwelling Unit) Wednesday % 2.7 Thursday % 2.4 Saturday % 2.4 * Parking Generation for Land Use Code 225 not found Below in Table 6 is the Vehicle Trip Generation Peak Hour Generator values using the 10 th Edition of the ITE Trip Generation Manual. This was done based Land Use Code 225: Off-Campus Student Apartment. Unfortunately there is no data from ITE that provides person trips for this specific land use. Therefore, only comparison between vehicle trips was done. 11
14 Conclusion Table 6: Vehicle Trip Generation Rate Vehicle Trips per Vehicle Trips per % Vehicles % Vehicles Exiting Bedroom Resident Entering ITE ITE ITE ITE Obs. Obs. Obs. Obs. Manual Manual Manual Manual AM Peak Hour % 35% 59% 65% PM Peak Hour % 46% 50% 54% Weekday Daily Rate % 43% 50% 57% Chapter 4. Conclusion To conclude, the data collection resulted in relatively comparable results when compared to ITE Trip Generation rates in the 10th Edition of the Trip Generation Manual. The observed weekday trip rates varied quite a bit from the ITE manual rates. This is because the observed weekday daily rates do not represent a 24-hour count. While the vehicle traffic observed from 7:00 to 18:00 represents a majority of the traffic, it is likely there were also students that did not return to the apartment complex within the study period of 7:00 to 18:00. More trips to and from the apartment complex beyond this time frame is very likely as well. Percent rates for vehicles entering and exiting during peak hours were all within 7% of the ITE Trip Generation rates for vehicle trips, showing little variance. ITE Parking generation rates for Land Use Code 225 were not found, but our values provided may help to produce rates for future editions of the manual. The data compiled and summarized may be used for future analysis for planners. 12
15 Conclusion 4.1. Special Thanks MSU would like to give special thanks to the following individuals for their valuable help in completing this project. Danae Giannetti - Project Mentor, Montana Dept. of Transportation-Bozeman Design Unit MSU Members Joey Beran Matthew Campbell Matthew Bell Alia Peterson Bryce Grame Madeline Pernat Jaden Stewart Aldo Videa Wilson D Souza Faculty Mentors MSU Ahmed Al-Kaisy Yiyi Wang Doug Smith - MSU Surveying Instructor Sanderson Stewart Bozeman, MT office ITE Professionals Lisa Fischer - Montana Chapter Vice President Cameron Waite - Intermountain District Past President MSU Students Sarah Forseth Abram French Daniel Smithgall Nathan Ellis Audrey Stoltzfus 13
16 Trip Generation Forms Appendix A. Trip Generation Forms 14
17 Trip Generation Forms 15
18 Trip Generation Forms 16
19 Trip Generation Forms 17
20 Trip Generation Forms 18
21 Trip Generation Forms 19
22 Trip Generation Forms 20
23 Trip Generation Forms 21
24 Trip Generation Forms 22
25 Trip Generation Forms 23
26 Trip Generation Forms 24
27 Trip Generation Forms 25
28 Trip Generation Forms 26
29 Parking Forms Appendix B. Parking Forms 27
30 Parking Forms 28
Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254
Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation
More informationTrip Generation and Parking Study New Californian Apartments, Berkeley
Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationTHE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO
THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,
More informationTrip and Parking Generation Study of the Peaks Ice Arena
Trip and Parking Generation Study of the Peaks Ice Arena Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed a trip and parking generation
More informationSummary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window. District 5 Tennessee Section: Memphis, TN
Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window District 5 Tennessee Section: Memphis, TN Submitted to: Ed Stollof, AICP Institute of Transportation
More informationConstruction Realty Co.
MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:
More informationIRSCH REEN Hirsch/Green Transportation Consulting, Inc.
IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip
More informationTrip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014
Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation
More informationDowntown Lee s Summit Parking Study
Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis
More informationEXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.
EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and
More informationTrip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station
Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Final Report 2013 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter at
More informationParks and Transportation System Development Charge Methodology
City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update
More informationAbstract. Executive Summary. Emily Rogers Jean Wang ORF 467 Final Report-Middlesex County
Emily Rogers Jean Wang ORF 467 Final Report-Middlesex County Abstract The purpose of this investigation is to model the demand for an ataxi system in Middlesex County. Given transportation statistics for
More informationTECHNICAL MEMORANDUM. Part A: Introduction
TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,
More informationTrip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair
Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter
More informationappendix 4: Parking Management Study, Phase II
appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.
More informationMILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND
MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,
More informationNational Household Travel Survey Add-On Use in the Des Moines, Iowa, Metropolitan Area
National Household Travel Survey Add-On Use in the Des Moines, Iowa, Metropolitan Area Presentation to the Transportation Research Board s National Household Travel Survey Conference: Data for Understanding
More informationU N I V E R S I T Y O F B R I T I S H C O L U M B I A. Fall 2008 Transportation Status Report
U N I V E R S I T Y O F B R I T I S H C O L U M B I A Fall 2008 Transportation Status Report 6 February 2009 U N I V E R S I T Y O F B R I T I S H C O L U M B I A Fall 2008 Transportation Status Report
More informationTIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:
TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive
More informationTraffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois
Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,
More informationIngraham High School Parking and Traffic Analysis
Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,
More informationPARKING OCCUPANCY IN WINDSOR CENTER
PARKING OCCUPANCY IN WINDSOR CENTER TOWN OF WINDSOR, CONNECTICUT REPORT JUNE 2017 CONTENTS Background... 3 Other Relevant Data... 3 Parking Survey Design... 6 Parking Supply Inventory... 6 Parking Demand
More information1 On Time Performance
MEMORANDUM: US 29 Travel Time & OTP To: From: Joana Conklin, Montgomery County DOT James A. Bunch, SWAI Subject: US 29 Travel Time and On Time Performance Analysis Date: This memorandum documents the US
More informationLAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS
LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...
More informationFebruary 2011 Caltrain Annual Passenger Counts Key Findings
February 2011 Caltrain Annual Passenger Counts Key Findings Key Findings February 2011 Caltrain Annual Passenger Counts The 2011 annual Caltrain passenger counts, which were conducted in February 2011,
More informationAddress Land Use Approximate GSF
M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected
More informationBARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:
BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.
More informationAppendix J Traffic Impact Study
MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing
More informationTRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA
TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)
More informationTraffic Engineering Study
Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested
More informationTRANSPORTATION REVIEW
TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE
More informationTable 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1
Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:
More informationCITY OF VANCOUVER ADMINISTRATIVE REPORT
Supports Item No. 1 T&T Committee Agenda May 13, 2008 CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: April 29, 2008 Author: Don Klimchuk Phone No.: 604.873.7345 RTS No.: 07283 VanRIMS No.: 13-1400-10
More informationLEED v4 Building Design and Construction Quiz #3 LT
LEED v4 Building Design and Construction Quiz #3 LT 1. How are walking and bicycling distance measured? A. Straight-line radius from a main building entrance B. Straight-line radius from any building entrance
More information2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS
2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak
More informationTRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site
TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734
More informationMorning Parking Utilization Trends
MEMORANDUM Date: November 6 th, 2015 Project #: 18130 To: From: Subject: Rebecca Houghtaling, Senior Planner, Oregon State University Lisa Scherf, Transportation Services Supervisor, City of Corvallis
More informationKing Soopers #116 Thornton, Colorado
Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company
More information2017 Adjusted Count Report February 12, 2018
A statewide multi-use trail user study and volunteer data collection program 2017 Adjusted Count Report February 12, 2018 The following report includes the final adjusted infrared (IR) counter data at
More informationFood Truck Consulting Study of Proposed Food Truck Regulations
Food Truck Consulting Study of Proposed Food Truck Regulations Introduction The City of San Diego is considering revisions to its mobile vending ordinance. The revised ordinance would, in part, 1) prevent
More informationTraffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)
Associates Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) 885-5121 Ms. Teri Ford, Associate 800 Boylston Street, Suite 1570 Boston, MA July
More informationTopeka, Kansas Bicycle and Pedestrian Documentation Data report 2013, 2014, 2015, 2016 & 2017
Topeka, Kansas Bicycle and Pedestrian Documentation Data report 2013, 2014, 2015, 2016 & 2017 In September 2013, Topeka joined with other cities nationwide in participating in annual bike counts, using
More informationAPPENDIX TR-1 PARKING AND QUEUING ASSESSMENT
APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,
More informationThis letter summarizes our observations, anticipated traffic changes, and conclusions.
Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationDenver Car Share Program 2017 Program Summary
Denver Car Share Program 2017 Program Summary Prepared for: Prepared by: Project Manager: Malinda Reese, PE Apex Design Reference No. P170271, Task Order #3 January 2018 Table of Contents 1. Introduction...
More informationAppendix B CTA Transit Data Supporting Documentation
RED ED-PURPLE BYPASS PROJECT ENVIRONMENTAL ASSESSMENT AND SECTION 4(F) EVALUATION Appendix B CTA Transit Data Supporting Documentation 4( Memorandum Date: May 14, 2015 Subject: Chicago Transit Authority
More informationDEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.
DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation
More informationANDERSON PROPERTY SITE ANALYSIS
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion
More informationMemorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017
Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:
More informationCitizens Committee for Facilities
Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on
More informationRE: 67/71 Marquette Avenue Redevelopment Transportation Overview
1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise
More informationFebruary 2012 Caltrain Annual Passenger Counts Key Findings
February 2012 Caltrain Annual Passenger Counts Key Findings Key Findings February 2012 Caltrain Annual Passenger Counts The 2012 annual Caltrain passenger counts, which were conducted in February 2012,
More informationRE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2
1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial
More informationDOWNTOWN PARKING STUDY AND STRATEGIC PLAN
INTRODUCTION This report includes a summary of several key components of the Rapid City Downtown Parking Study and Strategic Plan, including: Current Conditions Analysis (Inventory and Occupancy and Length
More informationOperations Center FAQs
RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue
More informationMINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015
5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers
More information2015 LRT STATION ACTIVITY & PASSENGER FLOW SUMMARY REPORT
LRT STATION ACTIVITY & PASSENGER FLOW SUMMARY REPORT CAPITAL and METRO LINES Project Team: ETS Transit Data Management Transportation Planning Strategic Monitoring and Analysis April, 2016 LRT STATION
More informationAPPENDIX VMT Evaluation
APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation
More informationKing County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.
King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...
More informationPOLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS
POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098
More informationTRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina
TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact
More informationTraffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project
Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality
More informationAPPENDIX B Traffic Analysis
APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,
More informationRE: A Traffic Impact Statement for a proposed development on Quinpool Road
James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront
More informationSan Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW
CHAPTER 4. PARKING Parking has been identified as a key concern among neighbors and employers in the area, both in terms of increased demand from potential new development and from SMART passengers that
More informationSouthern Windsor County 2016 Traffic Count Program Summary April 2017
Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern
More informationAttachment D Environmental Justice and Outreach
Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income
More informationProposed Service Plan
FY 2018-2022 Short Range Transit Plan Proposed Service Plan September 2017 Public Transit in Our Community To determine how public transit may better meet the short-term and longerterm needs of the community
More informationON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS
ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS TOWN OF WINDSOR, CT REPORT JUNE 2016 CONTENTS Parking Survey Design... 3 Parking Supply Inventory... 3 Parking Demand Survey... 3 Surveyed
More informationEngineering Dept. Highways & Transportation Engineering
The University College of Applied Sciences UCAS Engineering Dept. Highways & Transportation Engineering (BENG 4326) Instructors: Dr. Y. R. Sarraj Chapter 4 Traffic Engineering Studies Reference: Traffic
More informationAPPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS
APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix
More informationNovember 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS
161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for
More informationAppendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability
(http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement
More informationAmerican Driving Survey,
RESEARCH BRIEF American Driving Survey, 2015 2016 This Research Brief provides highlights from the AAA Foundation for Traffic Safety s 2016 American Driving Survey, which quantifies the daily driving patterns
More informationKauai Resident Travel Survey: Summary of Results
Kauai Resident Travel Survey: Summary of Results Kauai Multimodal Land Transportation Plan Charlier Associates, Inc. November 23, 2011 1 Table of Contents Executive Summary... 2 Survey Goals and Methodology...
More informationUS 81 Bypass of Chickasha Environmental Assessment Public Meeting
US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments
More informationNEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis
Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle
More informationTravel Time Savings Memorandum
04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING
IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,
More informationTraffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.
Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis
More informationKey Findings. February 2009 Caltrain Annual Passenger Counts
Key Findings February 2009 Caltrain Annual Passenger Counts The 2009 annual Caltrain passenger counts, which were conducted starting in late-january and were complete by mid-february, followed the same
More informationThe South Waterfront District and the Portland Aerial Tram
The South Waterfront District and the Portland Aerial Tram How infrastructure investment can catalyze redevelopment and remove barriers to healthy lifestyles Role of transportation infrastructure in creating
More informationRTCSNV CRASH ANALYSIS REPORT
2011-2015 RTCSNV CRASH ANALYSIS REPORT TABLE OF CONTENTS Summary... 3 Crash Types... 4 Time and Day of Crashes... 7 Crash Factors... 9 Fatalities... 10 Driver s Behavior... 11 Crash Locations... 15 Non-Motorized
More informationBryn Mawr. Parking Study Update First Draft Report. February 3, Bryn Mawr, PA
Bryn Mawr Bryn Mawr, PA Parking Study Update First Draft Report www.timhaahs.com 550 Township Line Road, Suite 100 Blue Bell, PA 19422 T: 484.342.0200 F: 484.342.0222 www.timhaahs.com TIMOTHY HAAHS & ASSOCIATES,
More informationHistorical count data from Page 7-14
Project Background The annual Lawrence count data was collected following the National Bicycle & Pedestrian Documentation Project (NBPDP) methodology (http://bikepeddocumentation.org). The project aims
More informationSpeed Evaluation Saw Mill Drive
Speed Evaluation Saw Mill Drive Prepared for: Mount Laurel Township Burlington County, New Jersey Prepared by: Dana Litwornia Litwornia & Associates, Inc. Transportation, Traffic & Environmental Engineering
More information2015 LRT PASSENGER COUNT. CAPITAL and METRO LINES
2015 LRT PASSENGER COUNT CAPITAL and METRO LINES Project Team: ETS Transit Data Management Transportation Planning Strategic Monitoring and Analysis April, 2016 2015 LRT PASSENGER COUNT Edmonton Transit
More information1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON
CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently
More informationTraffic Impact Study Speedway Gas Station Redevelopment
Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald
More informationIntroduction. School Overview TECHNICAL MEMORANDUM
TO: FROM: SUBJECT: Charles Hay, Tappe Architects Elizabeth Peart Melissa Restrepo DATE: May 30, 2018 HSH PROJECT NO.: 2017242 Introduction Howard Stein Hudson (HSH) has prepared this technical memorandum
More informationTransportation & Traffic Engineering
Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family
More informationDEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS
DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT
More informationNetworks of pedestrian's paths
Plan for Internal Circulation Road plans, land use plans, and facility arrangement plans are determined on an assumption that daily access to the new town railway stations for commuting to work to attend
More informationRICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.
RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting
More information- 1 - Minneapolis College of Art and Design Campus Parking & Transportation Guide
Minneapolis College of Art and Design Campus Parking & Transportation Guide Effective January 1, 2010, MCAD no longer has a contract with the Minneapolis Institute of Art for its students, employees, or
More informationProposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA
Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be
More information