1 Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009

2 Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) was retained by the Naperville Park District to provide traffic impact and site access studies for both the West Street Garden Plots improvements and the proposed DuPage River Park Garden Plots development. The West Street Garden Plots are located on the west side of West Street, roughly between Martin Avenue and Emerald Drive in Naperville, Illinois. Currently, there are 587 garden plots. As proposed, two multi-purpose athletic fields with an approximate 120-space surface parking lot are to be located at the southern portion of the site and will replace approximately 101 garden plots. Approximately 478 garden plots will remain at the site. The garden plots are currently served by three, full access roadways. As part of the proposed improvements, the existing southern access drive will be realigned to intersect West Street opposite Osler Drive, becoming the west/fourth leg to this existing T-intersection of West Street and Osler Drive. The DuPage River Park Garden Plots proposed development will be located in the southeast quadrant of the intersection of Washington Street and Royce Road in Naperville, Illinois. The development will include approximately 332 garden plots in addition to a Park District maintenance driveway. Also, a ten-foot wide multi-use trail will be constructed near the proposed location. Access to this development will be served by a full access driveway on Royce Road, in alignment with Apple River Lane, becoming the fourth/south leg to this existing T-intersection and a restricted right-turn in/right-turn out driveway on Royce Road. The purpose of these studies was to examine the impact each of these proposed developments would have on the surrounding roadway network in conjunction with regional growth, and planned future roadway and traffic control improvements for Year 2010 conditions. Section A of this report provides the traffic impact and access study relating to the West Street Garden Plots improvements. The conclusions and recommendations of this study are located on Page A-24. Section B of this report provides the traffic impact and access study relating to the proposed DuPage River Park Garden Plots development. The conclusions and recommendations of this study are located on Page B-17. Naperville Park District Naperville, Illinois i

3 Section A West Street Garden Plots Redevelopment Introduction This section of the report summarizes the methodologies, results and findings of a site traffic analysis conducted for the proposed redevelopment of the West Street Garden Plots located on the west side of West Street, roughly between Martin Avenue and Emerald Drive in Naperville, Illinois. Figure A-1 shows the location of the site in relation to the area roadway system. Figure A-2 shows an aerial view of the site area. Per the direction of the City of Naperville, the following seven intersections were analyzed as part of this study: 1. Hillside Road and West Street 2. Martin Avenue and West Street 3. Osler Drive and West Street 4. Emerald Drive and West Street 5. North Garden Plot Access and West Street 6. Middle Garden Plot Access and West Street 7. South Garden Plot Access and West Street The following sections of this report present the following: Existing roadway conditions, including traffic volumes for the weekday midday, weekday evening, and Saturday midday peak hours A detailed description of the proposed redevelopment Vehicle trip generation for both the multi-purpose athletic fields and the remaining garden plots Directional distribution of development-generated traffic Regional ambient growth in traffic Traffic analyses conducted for the weekday midday and evening and Saturday midday peak hours for the following three conditions: 1. Existing Conditions - Analyzes the capacity of the existing roadway system using currently recorded traffic volumes in the surrounding area. 2. No-Build Conditions (Year 2010) This condition includes increasing the existing traffic volumes by a regional growth factor in addition to the traffic generated by the existing garden plots. This condition does not include the traffic generated by the proposed multi-purpose athletic fields. Naperville Park District Naperville, Illinois A-1

4 ^ North SITE Site Location Figure A-1 Naperville Park District Naperville, Illinois A-2

5 Aerial View of Site Location Figure A-2 Naperville Park District Naperville, Illinois A-3

6 3. Projected Conditions (Year 2010) This condition includes the No-Build condition projected traffic volumes in addition to the traffic generated by the two proposed multi-purpose athletic fields. Future transportation conditions, including access to and from the site and planned roadway improvements. The purpose of this study was to examine the impact this proposed development would have on the surrounding roadway network in conjunction with regional growth for both Year 2010 No-Build and Year 2010 Projected conditions. Existing Conditions Existing traffic and roadway conditions were documented based on field visits and traffic counts conducted by KLOA, Inc, as well as previously conducted traffic counts provided by the City of Naperville. The following provides a detailed description of the physical characteristics of the roadways including geometry and traffic control, adjacent land uses and peak hour traffic flows along area roadways. Description of Study Area The area surrounding the site is composed of a mixture of land uses. Naperville Central High School (NCHS) is located in the northeast quadrant of the intersection of West Street and Hillside Road. Various Naperville Park District parks and athletic fields are located north and east of the site and the Edward Hospital Campus is located east of the site. Lastly, residential neighborhoods are located south and west of the site. Existing Roadway System Characteristics The characteristics of the existing roadways that surround the proposed development are illustrated in Figure A-3 and described below. West Street is a four-lane north-south arterial with a posted speed limit of 30 mph. West Street is under the jurisdiction of the City of Naperville. Parking is prohibited on both sides of the roadway. Sidewalks are provided on both sides of the roadway. A pedestrian signal crossing, complete with advanced warning signage and pedestrian signal heads is provided between Martin Avenue and Osler Drive, just south of the Middle Garden Plot access driveway. At its signalized intersection with Hillside Road, West Street provides a left-turn lane and two through lanes on the north approach, and a through lane and a shared through/right-turn lane are provided on the south approach. Crosswalks are provided on the north and east legs of the intersection and the traffic signal is equipped with pedestrian signals and call button features. At its signalized intersection with Martin Avenue, a left-turn lane, through lane, and a shared through/right-turn lane are provided on both the north and south approaches on West Street. Crosswalks are provided on both Naperville Park District Naperville, Illinois A-4

7 the north and east legs of the intersection and the traffic signal is equipped with pedestrian signals and call button features. At its unsignalized intersection with Osler Drive, a left-turn lane and two through lanes are provided on the north approach, and a through lane and a shared through/right-turn lane are provided on the south approach. At its all-way stop controlled intersection with Emerald Drive, a left-turn lane and two through lanes are provided on the north approach, and a through lane and a shared through/right-turn lane are provided on the south approach. Crosswalks are provided on both the north and east legs of this intersection. Hillside Road is a two-lane east-west road that terminates at West Street. Parking is permitted on both sides of the roadway. At its signalized intersection with West Street, a left-turn lane and a right-turn lane are provided. As noted, pedestrian crosswalks are provided on both the north and east legs of this intersection. Hillside Road is under the jurisdiction of the City of Naperville and has a posted speed of 25 mph. Martin Avenue is a two-lane east-west road that terminates at West Street. The west leg of this intersection is the access driveway to the Sportsman s Park parking lot. The Martin Avenue approach provides a separate left-turn lane and a shared through/right-turn lane. As noted, pedestrian crosswalks are provided on both the north and east legs of this intersection. Martin Avenue has a posted speed of 30 mph. Parking is restricted to a four-hour limit between 6:00A.M. and 6:00 P.M. on both sides of the roadway. Martin Avenue is under the jurisdiction of the City of Naperville. Osler Drive is a two-lane east-west local road that terminates at West Street and serves the Edward Hospital Campus. The Osler Drive approach provides a left-turn lane and a right-turn lane and is under stop sign control. The posted speed limit is 25 mph, and parking is permitted on both sides of the roadway. Osler Drive is a private road. Emerald Drive is a two-lane local road that T-intersects West Street from the East, providing a single lane at its all-way stop intersection with West Street. As noted, pedestrian crosswalks are provided on both the north and east legs of this intersections. The posted speed limit is 25 mph, and parking is permitted on both sides of the roadway. Emerald Drive is under the jurisdiction of the City of Naperville. North Garden Plot Access is located at the north end of the West Street Garden Plot development, between Martin Avenue and Osler Drive. At its T-intersection with West Street, a single lane approach is provided, allowing left- or right-turn movements onto West Street. Middle Garden Plot Access is located south of North Access, aligning with the parking lot access driveway to Knoch Park, located on the east side of West Street. South Garden Plot Access is located just south of Osler Drive, providing a single-lane approach at its T-intersection with West Street. Naperville Park District Naperville, Illinois A-5

8 HILLSIDE RD 25 MPH NOT TO SCALE LEGEND - TRAVEL LANE - TRAFFIC SIGNAL - STOP SIGN - PEDESTRIAN CROSSWALK MARTIN AVE 30 MPH NORTH ACCESS MIDDLE ACCESS - PED-XING SITE OSLER DR 25 MPH SOUTH ACCESS EMERALD 25MPH WEST ST 30M PH DR PROJECT: TITLE: PROJECT NO: WEST ST GARDEN PLOTS NAPERVILLE, ILLINOIS EXISTING ROADWAY CHARACTERISTICS FIGURE NO: A-3

9 Existing Traffic Volumes Manual turning movement traffic counts were conducted on a weekday midday between 11:00 A.M. and 4:00 P.M., and evening 4:00 P.M. and 7:00 P.M. periods and on a Saturday midday period between 10:00 A.M. and 4:00 P.M. at the following intersections: West Street and Osler Drive West Street and Emerald Drive West Street and North Garden Plot Access West Street and Middle Garden Plot Access West Street and South Garden Plot Access In addition, previous traffic counts conducted by the City of Naperville were provided for the intersections of West Street and Hillside Road and West Street and Martin Avenue. These two intersections were not evaluated for the Saturday midday peak hour condition since the school traffic and pedestrian activity is significantly lower compared to a weekday, and the volumes on West Street are lower compared to a weekday, especially the weekday evening peak hour. From the manual turning movement count data, it was determined that the weekday midday peak hour occurs between 3:00 and 4:00 P.M., the weekday evening peak hour occurs between 5:00 and 6:00 P.M., and the Saturday midday period occurs between 2:00 and 3:00 P.M. Per the direction from the City of Naperville, the signalized intersections of West Street and Hillside Road and West Street and Martin Avenue were not analyzed for the Saturday midday peak hour period. Figure A-4 shows the existing peak hour traffic volumes at the respective intersections. It should be noted that minimal traffic volumes were recorded at the West Street Garden Plots access driveways since the counts were conducted during the off-peak growing season. As will be shown further in this study, traffic for peak growing season was included when projecting for both Year 2010 No-Build and Year 2010 Total Traffic conditions. Lastly, per the request of the City of Naperville, the Saturday counts conducted in March 2009 were compared to previous counts conducted in June A review of the counts indicates that West Street experiences a minor increase in traffic between March and June. Naperville Park District Naperville, Illinois A-7

10 00 NOT TO SCALE HILLSIDE RD LEGEND - WEEKDAY MIDDAY PEAK HOUR 50 (70) 660 (805) 120 (170) 150 (190) 100 (175) MARTIN AVE PROJECT: TITLE: PROJECT NO: WEST ST GARDEN PLOTS EXISTING TRAFFIC VOLUMES NAPERVILLE, ILLINOIS FIGURE NO: WEST ST 430 (500) [420] 30 (25) [20] DR EMERALD 175 (140) [90] 20 (25) [20] OSLER DR MIDDLE ACCESS SOUTH ACCESS NORTH ACCESS (00) [00] - WEEKDAY PM PEAK HOUR - SATURDAY MIDDAY PEAK HOUR SITE 0 (0) [0] 0 (0) [0] 0 (0) [0] 0 (0) [0] 0 (0) [0] 565 (895) [400] 215 (180) [115] 780 (1075) [515] 635 (980) [425] 25 (25) [45] 0 (0) [0] 605 (640) [510] 540 (545) [425] 0 (0) [0] 615 (605) [505] 65 (95) [85] 0 (0) [0] 0 (0) [0] 0 (0) [0] 660 (1005) [470] 0 (0) 0 (5) 0 (0) 0 (0) [0] 660 (1005) [470] 0 (0) [0] 615 (605) 5 (0) [505] 560 (560) 50 (45) 5 (0) 580 (850) 175 (130) 680 (665) 170 (175) 5 (0) 80 (155) 75 (60) [80] 145 (95) [90] A-4

11 Accident Data Accident data from January 1, 2005 through December 21, 2007 was provided by the City of Naperville for the various intersections in the study area. The following summarizes the accident data. The intersection of West Street and Hillside Road experienced a total of 32 accidents in the three year period. The intersection of West Street and Martin Avenue experienced a total of 20 accidents in the three year period. The intersection of West Street and Osler Drive experienced a total of 11 accidents in the three year period. The intersection of West Street and Emerald Drive experienced a total of 13 accidents in the three year period. Traffic Characteristics of the West Street Garden Plots Redevelopment To evaluate the impact of the subject development on the area roadway system, it was necessary to quantify the number of vehicle trips the site will generate during the weekday midday, evening, and Saturday midday peak hours and then determine the directions from which this traffic will approach and depart the site. Proposed West Street Garden Plots Redevelopment Currently, the West Street Garden Plots provides 587 garden plots. As part of the improvements, approximately 478 garden plots will be provided in addition to two multi-purpose athletic fields. As proposed, the athletic fields will be used by both the Naperville Park District, as well as students from Naperville Central High School (which is located in the northeast quadrant of the intersection of West Street and Hillside Road). Multi-purpose Athletic Fields The two fields will be located at the south end of the parcel. On weekday evenings, the two fields will be used for football and lacrosse practice by NCHS students. On the weekends, typically throughout the day, the fields will primarily be used for soccer, football, or lacrosse games for Naperville Park District related programs. According to the Naperville Park District, most of the NCHS students will walk to/from the campus to these athletic fields. As noted, the area provides numerous facilities to accommodate pedestrians. These pedestrian facilities include sidewalks on both sides of West Street, established crosswalks at the signalized intersections of both Martin Avenue and Hillside Road, and a formal pedestrian crossing signal, located just south of the Middle Garden Plot access driveway. Naperville Park District Naperville, Illinois A-9

12 West Street Garden Plots The garden plots are used primarily in late Spring through early Fall (growing season) and are typically accessible from dawn to dusk, seven days a week. Based on a survey conducted in November 2008 by the Naperville Park District, approximately 83% of the respondents indicated that they travel to/from the Garden Plots by automobile, and that 64% of the respondents maintain only one garden plot. In addition, 80% of the respondents have been using these garden plots for two years (or two growing seasons) or more. As such, the motorists accessing these plots are quite familiar with the surrounding area roadway network and pedestrian-related facilities. Site Access Access to the site is proposed to be provided as follows: North Garden Plot Access driveway will remain open and in its current location, providing full access to/from West Street. Middle Garden Plot Access driveway will remain open and in its current location, opposite the parking lot serving Knoch Park, providing full access to/from West Street. South Garden Plot Access driveway will be relocated to align with Osler Drive, becoming the fourth/west leg to this existing T-intersection with West Street. This access will continue to provide full access to/from West Street, as well as Osler Drive. Parking An approximate 120-space surface parking lot will be added to serve the proposed multi-purpose athletic fields. The City of Naperville s parking ordinance requires 35 parking spaces per athletic field. Therefore, the proposed parking has an excess capacity of 50 parking spaces, which will be sufficient to accommodate parking turnover during game transitions. Directional Distribution of Site Traffic The directional distribution of how traffic will approach and depart the site was estimated based on existing travel patterns in the area, as well as the direction and proximity of established residential neighborhoods that may use both the garden plots and the multi-purpose athletic fields. The anticipated directional distribution is tabulated in Table A-1 and illustrated in Figure A-5. Naperville Park District Naperville, Illinois A-10

13 40% NOT TO SCALE LEGEND HILLSIDE RD 10% 00% - PERCENTAGE DISTRIBUTION MARTIN AVE 15% NORTH ACCESS MIDDLE ACCESS SITE ACCESS OSLER DR 0% WEST ST 20% EMERALD 15% DR PROJECT: TITLE: PROJECT NO: WEST ST GARDEN PLOTS NAPERVILLE, ILLINOIS EXISTING DIRECTIONAL DISTRIBUTION FIGURE NO: A-5

14 Table A-1 DIRECTIONAL DISTRIBUTION OF SITE-GENERATED TRAFFIC Direction To/From Percentage Distribution North on West Street 40% South on West Street 20% East on Hillside Road 10% East on Martin Avenue 15% East on Emerald Drive 15% East on Osler Drive 0% Total: 100% Site Traffic Generation West Street Garden Plots As noted, the existing traffic counts were conducted in March 2009 during off-peak growing season, thereby recording minimal traffic accessing the garden plots. Based on information provided by the Naperville Park District, trip generation estimates were developed for the weekday midday, evening, and Saturday midday peak hour periods during peak growing season. The trip estimates are based on the planting season which represents the peak activity of the garden plots, thereby providing a conservative estimate of vehicle trips. These trip estimates are tabulated in Table A-2. Table A-2 ESTIMATED WEST STREET GARDEN PLOTS TRAFFIC VOLUMES (PEAK GROWING SEASON) Peak Hour Period In Out Total Weekday Midday Weekday Evening Saturday Midday As shown in Table A-2, the West Street Garden Plots generates a low volume of traffic during each of the three studied peak hours. The Saturday midday peak hour is estimated to generate the highest volume of traffic with an expected 80 two-way vehicle trips. Naperville Park District Naperville, Illinois A-12

15 Site Traffic Generation Multi-Purpose Athletic Fields The estimates of traffic to be generated by the proposed multi-purpose athletic fields was estimated using data published in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 8 th Edition. It should be noted that the Trip Generation Manual does not provide rates for the weekday midday peak period. As such, the Saturday midday peak period were used which provides for a very conservative (worst case) analysis. Table A-3 tabulates the total trips anticipated with this development for the weekday midday, weekday evening, and Saturday midday peak hours. Table A-3 ESTIMATED MULTI-PURPOSE ATHLETIC FIELDS TRAFFIC VOLUMES Peak Hour Period In Out Total Weekday Midday Weekday Evening Saturday Midday As noted, the athletic fields will be used by NCHS students, where a majority of them will walk to/from the campus and athletic fields. However, the trip generation has not been reduced to consider pedestrian activity, thereby also providing a conservative study. Site Traffic Assignment The peak hour traffic volumes projected to be generated by the two multi-purpose athletic fields (refer to Table A-3) were assigned to the area roadways based on the directional distribution analysis (Figure A-5). Figure A-6 shows the assignment of the site-generated peak hour traffic volumes. Regional Traffic Growth To obtain Year 2010 traffic volumes, the existing traffic volumes (Figure A-4) were increased by an overall regional growth factor of three percent per year applied for one year (2009 to 2010). It should be noted that a one to one and a half percent per year regional growth factor is typical for this area. However, a greater growth factor was used to account for any additional traffic that may be generated by the Naperville Central High School expansion, to compensate for the previously recorded traffic volumes that were conducted in Year 2007 and Year 2008, and the fact that the updated traffic counts were conducted in March. Naperville Park District Naperville, Illinois A-13

16 10 (13) [10] NOT TO SCALE 2 (2) [2] HILLSIDE RD 00 (00) [00] LEGEND - WEEKDAY MIDDAY PEAK HOUR - WEEKDAY PM PEAK HOUR - SATURDAY MIDDAY PEAK HOUR 12 (15) [12] 14 (4) [14] 4 (1) [4] 3 (3) [3] MARTIN AVE NORTH ACCESS 18 (5) [18] MIDDLE ACCESS SITE ACCESS 12 (4) [12] 15 (18) [15] OSLER DR 7 (3) [7] 5 (1) [5] 5 (1) [5] 23 (6) [23] 10 (12) [10] 3 (3) [3] WEST ST 7 (9) [7] EMERALD DR PROJECT: TITLE: PROJECT NO: WEST ST GARDEN PLOTS NAPERVILLE, ILLINOIS SITE-GENERATED TRAFFIC VOLUMES (MULTI-PURPOSE ATHLETIC FIELDS) FIGURE NO: A-6

17 Year 2010 No-Build Traffic Volumes The Year 2010 No-Build condition includes the existing traffic volumes increased by the regional growth factor of three percent, as well as the traffic generated by the existing garden plots during peak growing season. Figure A-7 shows the estimated No-Build traffic volumes. Planned Roadway Improvements Christopher B. Burke Engineering, Ltd. (CBBEL) has been retained by the City of Naperville to prepare a feasibility study for the reconfiguration of the West Street/Emerald Drive and West Street/Osler Drive intersections to improve safety, access and traffic flow. Currently, both intersections carry a high volume of traffic and experience some operational problems during the peak periods. It is our understanding that both intersections meet the peak hour volume warrant for the installation of a traffic signal. As of the date of the traffic study, the feasibility study was not completed. Year 2010 Total Projected Traffic Conditions The Year 2010 Total Projected Traffic condition incorporates the Year 2010 No-Build traffic volumes (Figure A-7), and the proposed athletic fields generated traffic volumes (Figure A-6). Figure A-8 shows the total projected traffic volumes for Year 2010 conditions. This condition assumes the south access driveway is now in alignment with Osler Drive, and a new access driveway is in alignment with Emerald Drive. Naperville Park District Naperville, Illinois A-15

18 00 NOT TO SCALE HILLSIDE RD LEGEND - WEEKDAY MIDDAY PEAK HOUR 705 (700) 55 (75) 690 (837) 125 (175) 155 (195) 105 (180) MARTIN AVE PROJECT: TITLE: PROJECT NO: WEST ST GARDEN PLOTS NAPERVILLE, ILLINOIS FIGURE NO: WEST ST 456 (528) [451] 35 (30) [25] DR EMERALD 180 (145) [95] 25 (30) [25] OSLER DR MIDDLE ACCESS SOUTH ACCESS NORTH ACCESS (00) [00] - WEEKDAY PM PEAK HOUR - SATURDAY MIDDAY PEAK HOUR SITE 0 (0) [0] 0 (0) [0] 0 (5) [10] 5 (5) [10] 596 (925) [439] 220 (185) [120] 3 (4) [8] 633 (669) [538] 3 (4) [8] 664 (1009) [462] 0 (0) [0] 811 (1105) 30 (30) [50] 694 (1039) [549] [512] 563 (574) 0 (0) [0] 3 (4) [8] [458] 70 (100) [90] 643 (639) [543] 640 (635) [535] 5 (0) 585 (595) 55 (45) 5 (5) [10] 5 (5) [10] 3 (4) [8] 692 (1038) [510] 0 (0) 0 (5) 0 (0) 5 (0) 610 (882) 180 (135) 175 (180) 5 (0) 85 (160) 80 (65) [85] 150 (100) [95] YEAR 2010 NO-BUILD TRAFFIC VOLUMES A-7

19 00 HILLSIDE RD NOT TO SCALE LEGEND - WEEKDAY MIDDAY PEAK HOUR 59 (76) 700 (850) 125 (175) 155 (195) 107 (182) MARTIN AVE PROJECT: TITLE: PROJECT NO: WEST ST GARDEN PLOTS YEAR 2010 TOTAL TRAFFIC VOLUMES NAPERVILLE, ILLINOIS FIGURE NO: WEST ST 463 (537) [458] 35 (30) [25] DR EMERALD 183 (148) [98] 25 (30) [25] SITE OSLER DR MIDDLE ACCESS 0 (0) [0] 0 (0) [0] ACCESS 18 (22) [23] 607 (933) [450] 661 (1005) [454] 225 (186) [125] 30 (30) [50] 5 (5) [10] 5 (5) [10] NORTH ACCESS 3 (4) [8] 709 (1057) [527] 13 (16) [18] 0 (0) [0] 3 (4) [8] 563 (569) [448] 666 (645) [566] 663 (641) 5 (0) 70 (100) [90] [558] 603 (600) 60 (46) 80 (65) [85] 150 (100) [95] 3 (4) [8] 707 (1056) [525] (00) [00] - WEEKDAY PM PEAK HOUR - SATURDAY MIDDAY PEAK HOUR 0 (0) 0 (5) 0 (0) 23 (11) [33] 17 (9) [22] 5 (0) 622 (897) 180 (135) 724 (780) 175 (180) 5 (0) 88 (163) A-8

20 Traffic Evaluation The following provides an evaluation conducted for the weekday midday, weekday evening, and Saturday midday peak hour periods. The evaluation includes conducting capacity analyses to provide an indication of how well the existing roadway infrastructure accommodates the existing traffic volumes, as well as the anticipated traffic demands placed upon them for both Year 2010 No-Build and Year 2010 Total Traffic conditions. Traffic Analyses Roadway and adjacent or nearby intersection analyses were performed for the three peak hour periods for existing conditions, Year 2010 (No-Build condition) and Year 2010 (total traffic condition). The traffic analyses were performed using the methodologies outlined in the Transportation Research Board s Highway Capacity Manual (HCM), Synchro 6.0/SimTraffic software was used to perform the calculations. The analyses for the existing traffic-signal controlled intersections were accomplished using the existing signal phasings and cycle lengths to determine the average overall vehicle delay, volume-to-capacity ratios, and levels of service. The analyses for the unsignalized intersections determine the average delay a vehicle experiences at a stop sign controlled intersection. The delay (or control delay) is the elapsed time from a vehicle joining the queue at a stop sign (including the time required to decelerate to a stop) until its departure from the stop sign and resumption of free flow speed. The methodology analyzes each intersection approach controlled by a stop sign and considers traffic volumes on all approaches and lane characteristics. The ability of an intersection to accommodate traffic flow is expressed in terms of level of service, which is assigned a letter from A to F based on the average control delay experienced by vehicles passing through the intersection. Level of Service A is the highest grade (best traffic flow and least delay), whereas a Level of Service F is the lowest grade (oversaturated conditions, extensive delays). The Highway Capacity Manual definitions for levels of service and the corresponding control delay for both signalized and unsignalized intersections are included in the Appendix of this report. Summaries of the capacity analysis results for the three analyzed conditions are presented in Table A-4, Table A-5, and Table A-6, respectively. A discussion of the key intersections follows. As noted, the signalized intersections of Hillside Road and West Street and Martin Avenue and West Street were not analyzed for Saturday midday peak hour conditions. Naperville Park District Naperville, Illinois A-18

21 Table A-4 CAPACITY ANALYSES RESULTS EXISTING CONDITIONS Intersection Weekday Midday Peak Hour Weekday P.M. Peak Hour Saturday Midday Peak Hour Hillside Road at West Street (signalized) A 8.1 B 13.2 N/A Martin Avenue at West Street (signalized) A 8.2 B 11.4 N/A Osler Drive at West Street (TWSC) C 18.1 C 17.8 B 13.4 Emerald Drive at West Street (AWSC) C 16.8 E 38.2 B 10.8 TWSC = Two-way stop controlled intersection. AWSC = All-way stop controlled intersection. LOS represents the intersection as a whole for signalized intersections; for TWSC, the LOS is the minor approach under stop control. Delay is measured in seconds. Capacity analyses were not conducted for the Garden Plot access driveways because of the minimal volumes counted during off-peak growing season. N/A = Not Applicable. These intersections were not analyzed for this peak hour. Naperville Park District Naperville, Illinois A-19

22 Table A-5 CAPACITY ANALYSES RESULTS YEAR 2010 NO-BUILD CONDITIONS Intersection Weekday Midday Peak Hour Weekday P.M. Peak Hour Saturday Midday Peak Hour Hillside Road at West Street (signalized) A 8.3 B 13.4 N/A Martin Avenue at West Street (signalized) A 8.4 B 11.7 N/A Osler Drive at West Street (TWSC) C 19.4 C 18.9 B 14.2 Emerald Drive at West Street (AWSC) C 18.8 E 45.5 B 11.6 North Garden Plot Access at West Street B 13.2 C 16.6 B 12.5 Middle Garden Plot Access at West Street C 15.7 B 14.6 B 13.7 South Garden Plot Access at West Street B 12.4 C 18.1 B 12.4 TWSC = Two-way stop controlled intersection. AWSC = All-way stop controlled intersection. LOS represents the intersection as a whole for signalized intersections; for TWSC, the LOS is the minor approach under stop control. Delay is measured in seconds. N/A = Not Applicable. These intersections were not analyzed for this peak hour. Naperville Park District Naperville, Illinois A-20

23 Table A-6 CAPACITY ANALYSES RESULTS YEAR 2010 TOTAL PROJECTED CONDITIONS Intersection Weekday Midday Peak Hour Weekday P.M. Peak Hour Saturday Midday Peak Hour Hillside Road at West Street (signalized) A 8.4 B 13.9 N/A Martin Avenue at West Street (signalized) A 8.6 B 11.8 N/A Osler Drive/Access at West Street (TWSC) D 25.2 C 23.2 C 16.1 Emerald Drive at West Street (AWSC) C 19.7 E 47.8 B 11.9 North Garden Plot Access at West Street B 13.4 C 16.9 B 12.2 Middle Garden Plot Access at West Street C 16.0 C 20.4 B TWSC = Two-way stop controlled intersection. AWSC = All-way stop controlled intersection. Rdabt = Roundabout LOS represents the intersection as a whole for signalized intersections; for TWSC, the LOS is the minor approach under stop control. Delay is measured in seconds. N/A = Not Applicable. These intersections were not analyzed for this peak hour. Naperville Park District Naperville, Illinois A-21

24 Discussion and Recommendations Recommended geometric and traffic control improvements are identified below. Hillside Road and West Street The capacity analyses show that this intersection currently operates at an acceptable level of service for both the weekday midday and weekday evening peak hours and will continue to operate at an overall acceptable level of service for both the Year 2010 No-Build and Year 2010 Total Traffic conditions. Therefore, no geometric (i.e. widening of the roadway) or traffic control improvements are required in conjunction with the West Street Garden Plots redevelopment program. Martin Avenue and West Street Similar to the Hillside Road intersection, this intersection will continue to operate at the same level of service for both projected conditions. Therefore, no geometric (i.e. widening of the roadway) or traffic control improvements are required in conjunction with the West Street Garden Plots redevelopment program. Osler Drive/Access and West Street The access driveway in alignment with Osler Drive should provide one lane inbound and one lane outbound. West Street should provide a northbound left-turn lane, which can be striped from the existing cross-hatched center lane. A southbound right-turn lane on West Street is not required. The capacity analyses show that this intersection currently operates at an acceptable level of service. However, as noted, this intersection currently experiences some delay and queuing during the weekday evening peak hour due to heavy turning movements turning to/from Osler Drive. The capacity analyses show that this intersection will operate at an acceptable level of service as an unsignalized intersection with Osler Drive and the relocated Garden Plot Access driveway under stop sign control (West Street traffic remains a freeflow movement). As such, the intersection has sufficient capacity to accommodate the expected regional growth in traffic, as well as the additional traffic to be generated by the athletic fields. Other than the separate left-turn lane on West Street serving the access drive, no additional geometric or traffic control improvements are required in conjunction with the West Street Garden Plots redevelopment program. Naperville Park District Naperville, Illinois A-22

25 Emerald Drive and West Street The capacity analyses show that this intersection generally operates at an acceptable level of service. However, during the weekday evening peak hour, the intersection currently operates at a Level of Service E. Further, as noted, this intersection currently experiences some delay and queuing during the weekday evening peak hour. This intersection will continue to operate at the same levels of service for each of the respective peak hours analyzed with the additional regional growth in traffic and the expected traffic from the multi-purpose athletic fields. The low volume of additional traffic generated by the multi-purpose athletic fields will have a limited impact on the operation of this intersection. As such, no widening improvements or traffic control improvements are needed at this intersection to accommodate the proposed West Street Garden Plots redevelopment program. Sight-Distance Field observations have shown that West Street has a very level/flat vertical profile which indicates that the existing access driveways have sufficient sight distance to observe vehicles traveling along West Street. The traffic signal at Hillside Road and the all-way stop sign controlled intersection at Emerald Drive helps platoon the through traffic on West Street, providing sufficient gaps in the West Street traffic stream for vehicles to enter/exit the relocated southern access drive. This is evident in the results of the capacity analysis for projected conditions, which indicate the intersection of Osler Drive and West Street will operate at an acceptable level of service. Naperville Park District Naperville, Illinois A-23

26 Conclusion The West Street Garden Plots development proposes to provide two multi-purpose athletic fields and maintain 478 garden plots. Access to the overall site will be provided from the existing north access, the existing middle access (in alignment with the parking lot to Knoch Park), and the realignment of the southern access driveway opposite Osler Drive. Based on this study, the following is concluded with respect to the proposed West Street Garden Plot improvements: The proposed West Street Garden Plot improvements (which include the two proposed multi-purpose athletic fields) will have a limited traffic impact on the surrounding roadway network. This is due to the limited volume of additional traffic projected to be generated by the multi-purpose athletic fields, particularly during the weekday evening peak hour. The capacity analyses show that all of the intersections will continue to either operate at an acceptable level of service or the same level of service with the proposed West Street Garden Plots improvements. Further, the additional traffic generated by the proposed West Street Garden Plots improvements will have a limited impact on the operation of the various cross road approaches with West Street. The Year 2010 No-Build conditions (which assume no improvements are done to the existing garden plots) indicate that no improvements (i.e. no widening of the roadway) are required on West Street. Other than the improvements associated with the relocation of the southern access drive, no roadway widening improvements on West Street are required to accommodate the proposed West Street Garden Plots improvements, which include the addition of the two multi-purpose athletic fields. A northbound left-turn lane on West Street will be required to serve the relocated southern access driveway and can be provided within the existing striped median. The proposed 120-space surface parking lot meets the City s parking ordinance, which requires 35 parking spaces per athletic field. The residual 50 parking spaces are sufficient to accommodate parking turnover during game transitions. The traffic signal at Hillside Road and the all-way stop sign controlled intersection at Emerald Drive helps platoon the through traffic on West Street, providing sufficient gaps in the West Street traffic stream for vehicles to enter/exit the relocated southern access drive. This is evident in the results of the capacity analysis for projected conditions, which indicate the intersection of Osler Drive and West Street will operate at an acceptable level of service. Naperville Park District Naperville, Illinois A-24

27 Introduction Section B DuPage River Park Garden Plots Development This section of the report summarizes the methodologies, results and findings of a site traffic analysis conducted for the proposed DuPage River Park Garden Plots development to be located in the southeast quadrant of the intersection of Washington Street and Royce Road in Naperville, Illinois. Figure B-1 shows the location of the site in relation to the area roadway system. Figure B- 2 shows an aerial view of the site area. Per the direction of the City of Naperville, the following three intersections were analyzed as part of this study: 1. Washington Street and Royce Road 2. Royce Road and Apple River Lane 3. Royce Road and Fox River Lane The following sections of this report present the following: Existing roadway conditions, including traffic volumes for the weekday midday, weekday evening, and Saturday midday peak hours A detailed description of the proposed development Vehicle trip generation for proposed garden plots Directional distribution of development-generated traffic Regional ambient growth in traffic Traffic analyses conducted for the weekday midday and evening and Saturday midday peak hours for the following two conditions: 1. Existing Conditions - Analyzes the capacity of the existing roadway system using currently recorded traffic volumes in the surrounding area. 2. Projected Conditions (Year 2010) This condition includes the existing traffic volumes increased by a regional growth factor in addition to the traffic generated by the proposed DuPage River Park development. Future transportation conditions, including access to and from the site and planned roadway improvements. The purpose of this study was to examine the impact this proposed development would have on the surrounding roadway network in conjunction with regional growth for Year 2010 Projected traffic conditions. Naperville Park District Naperville, Illinois B-1

28 ^ North SITE Site Map Figure B-1 Naperville Park District Naperville, Illinois B-2

29 Aerial View Figure B-2 Naperville Park District Naperville, Illinois B-3

30 Existing Conditions Existing traffic and roadway conditions were documented based on field visits and traffic counts conducted by KLOA, Inc, as well as previously conducted traffic counts provided by the City of Naperville. The following provides a detailed description of the physical characteristics of the roadways including geometry and traffic control, adjacent land uses and peak hour traffic flows along area roadways. Description of Study Area The areas surrounding the site are primarily composed of residential neighborhoods and open green space. The River Sports Complex is located on the west side of Washington Street. Existing Roadway System Characteristics The characteristics of the existing roadways that surround the proposed development are illustrated in Figure B-3 and described below. Washington Street is a north-south arterial roadway providing two through lanes in each direction. At its signalized intersection with Royce Road, a left-turn lane, through lane, and a shared through/right-turn lane are provided on both the north and south approaches. The posted speed limit is 45 mph, and parking is prohibited on both sides of the roadway. Washington Street is under the jurisdiction of the City of Naperville. Royce Road is an east-west arterial roadway providing one travel lane in each direction and T- intersects Washington Street from the east. At its signalized intersection with Washington Street, a left-turn lane and shared through/right-turn lane are provided on both the east and west approaches. The west approach serves a parking lot for the River Sports Complex. An eastbound left-turn lane is provided at both its unsignalized intersections with Fox River Lane and Apple River Drive. The posted speed limit is 35 mph, and parking is prohibited on both sides of the roadway. Royce Road is under the jurisdiction of the City of Naperville. Apple River Drive is a north-south local residential roadway that T-intersects Royce Road from the north. At its approach with Royce Road, it is under stop sign control and provides a single lane to make left- or right-turn movements onto Royce Road. The posted speed limit is 25 mph and parking is permitted on both sides of the roadway. Apple River Drive is under the jurisdiction of the City of Naperville. Fox River Lane is a north-south local residential roadway that T-intersects Royce Road from the north. At its approach with Royce Road, it is under stop sign control and provides a single lane to make left- or right-turn movements onto Royce Road. The posted speed limit is 25 mph and parking is permitted on both sides of the roadway. Fox River Lane is under the jurisdiction of the City of Naperville. Naperville Park District Naperville, Illinois B-4

31 FO X RIVER LN 25 MPH APPLE RIVER DR NOT TO SCALE ROYCE RD 35 MPH WASHINGTON ST SITE 45 MPH LEGEND - TRAVEL LANE - TRAFFIC SIGNAL - STOP SIGN PROJECT: TITLE: PROJECT NO: DUPAGE RIVER PARK NAPERVILLE, ILLINOIS EXISTING ROADWAY CHARACTERISTICS FIGURE NO: B-3

32 Existing Traffic Volumes Manual turning movement traffic counts were conducted on a weekday midday between 11:00 A.M. and 4:00 P.M., and evening 4:00 P.M. and 7:00 P.M. periods and on a Saturday midday period between 10:00 A.M. and 4:00 P.M. at the following intersections: Royce Road and Fox River Lane Royce Road and Apple River Drive In addition, previous traffic counts conducted by the City of Naperville were provided for the intersection of Royce Road and Washington Street. From the manual turning movement count data, it was determined that the weekday midday peak hour occurs between 3:00 and 4:00 P.M., the weekday evening peak hour occurs between 5:00 and 6:00 P.M., and the Saturday midday period occurs between 2:00 and 3:00 P.M. Figure B-4 shows the existing peak hour traffic volumes at the respective intersections. Field observations during these traffic counts noted minimal pedestrian activity during these peak hour periods. Accident Data Accident data from January 1, 2005 through December 21, 2007 was provided by the City of Naperville for the various intersections in the study area. The following summarizes the accident data. The intersection of Washington Street with Royce Road experienced a total of 45 accidents in the three year period. The intersection of Royce Road and Fox Rive Lane experienced a total of three accidents in the three year period. The intersection of Royce Road and Apple River Road experienced a total of two accidents in the three year period. Naperville Park District Naperville, Illinois B-6

33 15 (30) [20] 1070 (1490) [1055] 95 (135) [105] 15 (10) [25] 5 (5) [10] 5 (10) [15] 120 (290) [100] 5 (10) [10] 270 (505) [250] 10 (25) [10] 1000 (1150) [1010] 195 (250) [245] FO X 5 (15) [15] RIVER 5 (5) [5] 5 (20) [25] 290 (370) [335] LN 5 (15) [5] 390 (790) [345] 15 (15) [5] 10 (10) [15] 15 (15) [20] 280 (360) [320] APPLE RIVER DR 10 (20) [10] 385 (795) [335] NOT TO SCALE ROYCE RD WASHINGTON ST SITE LEGEND 00 (00) [00] - WEEKDAY MIDDAY PEAK HOUR - WEEKDAY PM PEAK HOUR - SATURDAY MIDDAY PEAK HOUR PROJECT: TITLE: PROJECT NO: DUPAGE RIVER PARK NAPERVILLE, ILLINOIS EXISTING TRAFFIC VOLUMES FIGURE NO: B-4

34 Traffic Characteristics of the DuPage River Park Development To evaluate the impact of the subject development on the area roadway system, it was necessary to quantify the number of vehicle trips the site will generate during the weekday midday, evening, and Saturday midday peak hours and then determine the directions from which this traffic will approach and depart the site. Proposed DuPage River Park Development The development is proposed to be located in the southeast quadrant of the intersection of Washington Street and Royce Road in Naperville, Illinois. The development proposes 332 garden plots and a Park District maintenance driveway. In addition, a ten-foot wide multi-use trail is planned to traverse through the site. Site Access The current site plan shows a proposed full access driveway in alignment with Apple River Drive, becoming the fourth/south leg to the existing T-intersection on Royce Road. It is our understanding that a second access driveway, restricted to right-in/right-out only turning movements is planned for the west end of the development, located between Fox River Lane and Apple River Drive on Royce Road. For the purposes of this study, and to provide for a conservative analysis, all site-generated traffic was assigned to the full access proposed at Apple River Drive. The garden plots are used primarily in late Spring through early Fall (growing season) and are typically accessible from dawn to dusk, seven days a week. Based on a survey conducted in November 2008 by the Naperville Park District, approximately 83% of the respondents indicated that they travel to/from existing garden plots by automobile, and that 64% of the respondents maintain only one garden plot. Therefore, minimal pedestrian activity is expected to traverse Royce Road to access this garden plot development. Directional Distribution of Site Traffic The directional distribution of how traffic will approach and depart the site was estimated based on existing travel patterns in the area, as well as the direction and proximity of established residential neighborhoods that may use the garden plots. The anticipated directional distribution is tabulated in Table B-1 and illustrated in Figure B-5. Naperville Park District Naperville, Illinois B-8

35 50% FO X -% RIVER LN 10% APPLE RIVER DR NOT TO SCALE ROYCE RD 20% WASHINGTON ST SITE 20% LEGEND 00% - - PERCENTAGE DISTRIBUTION - LESS THAN 5 PERCENT PROJECT: TITLE: PROJECT NO: DUPAGE RIVER PARK NAPERVILLE, ILLINOIS ESTIMATED DIRECTIONAL DISTRIBUTION FIGURE NO: B-5

36 Table B-1 DIRECTIONAL DISTRIBUTION OF SITE-GENERATED TRAFFIC Direction To/From Percentage Distribution North on Washington Street 50% South on Washington Street 20% East on Royce Road 20% North on Apple River Drive 10% Total: 100% Site Traffic Generation Using information provided by the Naperville Park District, trip generation estimates were developed for the weekday midday, evening, and Saturday midday peak hour periods during peak growing season for 332 garden plots. The trip estimates are based on the planting season which represents the peak activity at the garden plots. These trip estimates are tabulated in Table B-2. Table B-2 ESTIMATED DUPAGE RIVER PARK GARDEN PLOTS TRAFFIC VOLUMES (PEAK GROWING SEASON) Peak Hour Period In Out Total Weekday Midday Weekday Evening Saturday Midday As shown in Table B-2, this development generates a low volume of traffic during each of the three studied peak hours. The Saturday midday peak hour is estimated to generate the highest volume of traffic with an expected 60 two-way vehicle trips. Site Traffic Assignment The peak hour traffic volumes projected to be generated by the 332 garden plots (refer to Table B-2) were assigned to the area roadways based on the directional distribution analysis (Figure B- 5). Figure B-6 shows the assignment of the site-generated peak hour traffic volumes. Naperville Park District Naperville, Illinois B-10

37 2 (3) [6] 1 (2) [3] 7 (10) [21] 5 (7) [15] FO X RIVER LN 1 (2) [3] APPLE RIVER DR 2 (3) [6] NOT TO SCALE ROYCE RD 5 (7) [15] 2 (3) [6] 7 (10) [21] 7 (10) [21] 7 (10) [21] 2 (3) [6] WASHINGTON ST SITE LEGEND 00 (00) [00] - WEEKDAY MIDDAY PEAK HOUR - WEEKDAY PM PEAK HOUR - SATURDAY MIDDAY PEAK HOUR PROJECT: TITLE: PROJECT NO: DUPAGE RIVER PARK NAPERVILLE, ILLINOIS ESTIMATED SITE-GENERATED TRAFFIC VOLUMES FIGURE NO: B-6

38 Regional Traffic Growth The existing traffic volumes (Figure B-4) were increased by an overall regional growth factor of three percent. It should be noted that a one to one and a half percent per year regional growth factor is typical for this area. However, a greater growth factor was used to account for the previously recorded traffic volumes that were conducted in Year 2008 at the signalized intersection of Washington Street and Royce Road. Year 2010 Total Traffic Volumes The Year 2010 Total Traffic condition includes the existing traffic volumes increased by the regional growth factor of three percent, as well as the traffic generated by the proposed 332 garden plots during peak growing season. Figure B-7 shows the estimated Year 2010 total traffic volumes. Traffic Evaluation The following provides an evaluation conducted for the weekday midday, weekday evening, and Saturday midday peak hour periods. The evaluation includes conducting capacity analyses to provide an indication of how well the existing roadway infrastructure accommodates the existing traffic volumes, as well as the anticipated traffic demands placed upon them for Year 2010 Total Traffic conditions. Traffic Analyses Roadway and adjacent or nearby intersection analyses were performed for the three peak hour periods for existing conditions and Year 2010 total traffic conditions. The traffic analyses were performed using the methodologies outlined in the Transportation Research Board s Highway Capacity Manual (HCM), Synchro 6.0/SimTraffic software was used to perform the calculations. The analyses for the existing traffic-signal controlled intersection (Washington Street and Royce Road) were accomplished using the existing signal phasings and cycle lengths to determine the average overall vehicle delay, volume-to-capacity ratios, and levels of service. Naperville Park District Naperville, Illinois B-12

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY Planned Development Application 1450 Sherman Avenue Evanston, IL 60201 14 TRAFFIC CIRCULATION IMPACT STUDY Traffic Impact Study 1454 Sherman Mixed-Use Development Evanston, Illinois Prepared for Prepared

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT

TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION FINAL REPORT TRAFFIC IMPACT ANALYSIS RIZZO CONFERENCE CENTER EXPANSION Chapel Hill, North Carolina FINAL REPORT Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. December 2010

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

MEMORANDUM TO: Oak Park and River Forest High School District 200. Kenig, Lindgren, O Hara, Aboona, Inc.

MEMORANDUM TO: Oak Park and River Forest High School District 200. Kenig, Lindgren, O Hara, Aboona, Inc. 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 MEMORANDUM TO: Oak Park and River Forest High School District 200 FROM: Kenig, Lindgren, O Hara, Aboona, Inc.

More information

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By:

TRAFFIC IMPACT ANALYSIS FOR. Prepared For: Din/Cal 3, Inc Richmond Avenue, Suite 200 Houston, Texas Prepared By: TRAFFIC IMPACT ANALYSIS FOR STERLING 5 th STREET APARTMENTS PROJECT Davis, CA Prepared For: Din/Cal 3, Inc. 3411 Richmond Avenue, Suite 200 Houston, Texas 77046 Prepared By: KD Anderson & Associates, Inc.

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information

4131 Chain Bridge Road

4131 Chain Bridge Road Traffic Impact Study 4131 Chain Bridge Road City of Fairfax, VA 05/04/16 May 4, 2016 Prepared for: Paradigm 1415 North Taft Street Suite 100 Arlington, VA 22201 This report is printed on environmentally

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study )

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) D-bar-A Project Traffic Impact Study November 3 rd, 2015 1427

More information

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma. Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE