1 APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

2

3 Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach, CA Phone (661) May 25, 2017 Ms. Jennifer M. Daw Restaurant Development Chick-fil-A, Inc Alton Parkway, Suite 350 Irvine, CA RE: Parking and Queueing Assessment for Proposed Chick - fil - A Restaurant (740 N. Sepulveda Boulevard, El Segundo CA) Dear Ms. Daw, As requested, Overland Traffic Consultants has prepared this parking and queueing assessment to assist in the development of a proposed Chick - fil - A restaurant to be located at 740 N. Sepulveda Boulevard in the City of El Segundo. The project site is currently occupied by a FedEx Employees Credit Association vacant building and parking structure, as shown in the following aerial photo, Figure 1. The focus of this assessment is to evaluate the parking generation created by the proposed Chick - fil - A restaurant using industry data and to evaluate the potential vehicle queue for the drive thru operation using survey data of several Chick-fil-A restaurants in Southern California. Project Description The project includes demolition of the existing FedEx Employees Credit Association building (approx. 8,100 s.f.) and drive thru service canopy for the proposed construction of a new Chick - fil - A restaurant and small surface parking lot. The existing structured parking will remain. The proposed Chick - fil - A restaurant consists of approximately 4,996 square feet of fast food restaurant floor area (118 seats) with a drive thru window / service lane and 60 parking spaces. The drive thru window is served by a double stacked drive thru lane of approximately 380 feet in total length and will accommodate approximately 19 vehicles on-site. A Traffic Engineering and Transportation Planning Consulting Services Compa

4 PROJECT SITE PROJECT SITE CHICK - FIL- A RESTAURANT 740 N. SEPULVEDA BOULEVARD FIGURE 1 Overland Traffic Consultants, Inc Main Street, #202, Santa Clarita, CA /2017 chick fil a el segundo

5 Overland Traffic Consultants, Inc. Project Vehicle Access The site is currently served by one two-way driveway on Maple Avenue, one two-way driveway on Sepulveda Boulevard and one exit only driveway on Sepulveda Boulevard. Sepulveda Boulevard is a divided highway which allows right turn ingress and egress only. Below are the proposed modifications to the site access: 1. It is proposed that the Maple Avenue driveway will be converted to an entry only driveway to serve the drive - thru operation and to provide access to the ground level parking spaces (20 parking spaces). 2. The existing southerly Sepulveda Boulevard exit only driveway will remain but modified (reduced width) to only serve the drive thru operation. 3. A new exit only driveway on Sepulveda Boulevard is proposed to serve traffic entering from Maple Avenue and the 20 parking spaces including 3 ADA parking spaces. 4. The existing northerly two - way driveway will remain and serve the second level parking deck with 40 parking spaces. This driveway, however, will no longer serve the parking spaces fronting Sepulveda Boulevard. It is recommended that the driveway width be reduced to better align with the second level ramp and create separation from the proposed Sepulveda Boulevard driveway discussed above. Figure 2 illustrates the proposed Chick - fil - A site plan. A Traffic Engineering and Transportation Planning Consulting Services Company

6 GROUND LEVEL SECOND LEVEL PARKING CHICK - FIL- A RESTAURANT 740 N. SEPULVEDA BOULEVARD FIGURE 2 Overland Traffic Consultants, Inc Main Street, #202, Santa Clarita, CA /2017 chick fil a el segundo

7 Overland Traffic Consultants, Inc. The City of El Segundo Zoning Code (Access and Circulation) Zoning Code Section A. establishes the access and circulation design requirements as follows: Design: Parking facilities must be designed so that a car within a facility will not have to enter a street to move from one location to any other location within the same facility. The current design does not comply with this design requirement because the existing deck parking is not connected to the site s existing or future surface parking. Section A.3 allows for the director of planning and building safety to approve administrative adjustments from the site access and circulation standards as provided in chapter 24, "Adjustments", of this title. Deviation from the development standards are allowed for reasonable access accommodations. A Traffic Engineering and Transportation Planning Consulting Services Company

8 Overland Traffic Consultants, Inc. Project Parking The project proposes 60 on - site parking spaces with 20 surface parking spaces and 40 spaces on the existing second level parking deck, see Figure 2 for the location of the parking spaces. On - street parking restriction on Sepulveda Boulevard and Maple Avenue are as follows: On - street parking is not allowed on Sepulveda Boulevard at any time. On - street parking is allowed approximately 60 east of the Maple Avenue driveway. On - street parking is not allowed west of the Maple Avenue driveway, there is a bus shelter and red curb between the driveway and Sepulveda Boulevard, however based on the transit records from MTA and Torrance there is no active bus stop at this location. The City of El Segundo Zoning Code (Automobile Spaces Required) Zoning Code Section A establishes the number of on-site parking spaces required for fast food and drive through restaurants at 1 space for each 75-square foot area, including outdoor dining areas. (Parking for outdoor dining areas is required only for the portion that exceeds 200 square feet or 20 percent of the indoor dining area, whichever is less.) The code required automobile parking is 67 parking spaces at 1 space per 75 square feet. As mention above, the project is providing 60 parking spaces, 7 spaces short of code. Section J.1 allows the director of planning and building safety to review and approve requests for administrative adjustments from the requirements of this chapter as provided in chapter 24, "Adjustments", of this title including, without limitation, the required number of parking spaces. The City of El Segundo zoning code (Section B. Bicycle Spaces Required) establishes the number of on - site bike spaces required for nonresidential uses at a minimum of 4 spaces for buildings up to 15,000 square feet, plus a minimum of 5 percent of the required vehicle spaces for the portion above 15,000 square feet. The project is providing 8 bike spaces, 4 bike spaces above code. A Traffic Engineering and Transportation Planning Consulting Services Company

9 Overland Traffic Consultants, Inc. Industry Parking Data for Fast Food Restaurants with Drive-Thru Facilities Parking data for many land uses has been complied by the Institute of Transportation Engineers and published in the ITE Parking Generation, 4 th Edition (2010) manual. This database was developed to be a source document to assist in estimating parking demand for different land uses. The document is based on parking demand studies submitted by public agencies, consulting firms, universities, developers and associations nationwide. The fast food restaurant with a drive through window database includes surveys from 51 sites on weekdays and 27 sites on Saturdays. The weekday peak parking demand occurred from 12 noon to 3 pm and 6 to 7 pm. The Saturday peak parking demand occurred from 12 noon to 2 pm. The parking demand represents all vehicles coming to and going from the restaurant including patrons, delivery vehicles and employees. These studies indicate that the average peak parking demand was 9.98 vehicles per 1,000 square feet on a weekday and 8.70 vehicles per 1,000 square feet on a Saturday for a fast food restaurant with a drive through window. The studies also show that the average peak parking demand using the number of seats was 0.40 vehicles per seat on a weekday and 0.35 vehicles per seat on a Saturday. The table below summaries the ITE average parking demand values using floor area and number of seats. Table 1 ITE Parking Demand Rates for Fast Food Restaurants with Drive-Thru Facilities Variable Parking Rate Parking Demand Parking Providing Parking Surplus 4,996 sq. ft weekday Saturday Seats (118) 0.40 weekday Saturday The ITE Parking Generation Handbook includes a 95% confidence interval which provides a measure of confidence in the statistical data to the average. It indicates the range within which there is 95% likelihood the average will fall. On a weekday, the confidence interval is 8.69 to A Traffic Engineering and Transportation Planning Consulting Services Company

10 Overland Traffic Consultants, Inc spaces per 1,000 square feet (43 to 56 spaces for this project) and 0.34 to 0.47 spaces per seats (40 to 56 spaces for this project). The ITE parking data shows that the project s proposed 60 parking spaces exceeds the 95% confidence interval using the floor area or number of seats as the measurable unit describing the study site. The ITE data for the weekday and weekend is attached. Another useful database for evaluating the peak parking by a land use has been developed by the Urban Land Institute (ULI) in its Shared Parking report. The database allows for the creation of hourly parking demand profiles. The creation of these hourly parking demand profiles provides the information necessary to more accurately evaluate the peak parking demand during different times of the day. The ULI adjustments include a 10% mode adjustment (non-auto and auto occupancy). The ULI hourly parking accumulation profiles for the Chick - fil - A restaurant shown in Table 2 for the weekday and weekend both show a peak parking demand of 60 parking spaces during the mid day dining period. A Traffic Engineering and Transportation Planning Consulting Services Company

11 Overland Traffic Consultants, Inc. Table 2 ULI Hourly Parking Demand PEAK MONTH: AUGUST -- PEAK PERIOD: 12 PM, WEEKEND Weekday Weekend Weekday Weekend Non- Non- Peak Hr Peak Mo Estimated Peak Hr Peak Mo Estimated Project Data Base Mode Captive Project Base Mode Captive Project Adj Adj Parking Adj Adj Parking Land Use Quantity Unit Rate Adj Ratio Rate Unit Rate Adj Ratio Rate Unit 12 PM August Demand 12 PM August Demand Fast Food Restaurant 4,996 sf GLA /ksf GLA /ksf GLA Employee /ksf GLA /ksf GLA Customer 51 Customer 51 Employee 9 Employee 9 Reserved 0 Reserved 0 Total 60 Total 60 Weekday Estimated Peak-Hour Parking Demand Monthly Adj 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM Fast Food Restaurant 99% Employee 100% Customer TOTAL DEMAND Employee Reserved August Weekend Estimated Peak-Hour Parking Demand 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM Fast Food Restaurant 99% Employee 100% Customer TOTAL DEMAND Employee Reserved A Traffic Engineering and Transportation Planning Consulting Services Company

12 Overland Traffic Consultants, Inc. Drive - Thru Storage Surveys Studies have been conducted at three existing Chick - fil - A restaurants to collect data on average drive through service times and maximum vehicle queues. The restaurants were surveyed in November 2013 and located at Valencia, Northridge and Lakewood. A 2-day follow up survey was collected in 2017 at Northridge to determine if conditions had significantly changed, which they did not. Each restaurant was surveyed for 1 hour for the breakfast, noon and dinner dining hours. The queue surveys show a maximum 5 vehicle queue observed during the morning breakfast hour. The highest queues were observed during the noon lunch hour with a maximum 15 vehicle queue. The afternoon dinner hour recorded a maximum queue of 11 vehicles. The observed drive - thru queues have been plotted for the three dining periods for the restaurants included in the surveys. These observations indicate that the maximum observed lunch hour queue of 15 vehicles can be contained on site and will not spill back onto Maple Avenue. The drive thru lane(s) is approximately 380 feet in length and will accommodate approximately 19 vehicles on-site, as shown in Figure 3. The results of the service time study indicate that service times will vary by location but on average during light dining hours the drive through service time will range between 3-4 minutes. During the heaviest dining hours, the drive through service times will range from 5-8 minutes. Once the arrival time of the vehicles exceeds the service time at the ordering window the queues will build exponentially. During these time periods, it is recommended that Chick - fil - A implement the advance ordering procedures with extra staffing in the drive thru lane to speed up the ordering service time per customer. A Traffic Engineering and Transportation Planning Consulting Services Compa

13 CHICK - FIL- A RESTAURANT DRIVE - THRU QUEUE AND PASS THRU FIGURE 3 Overland Traffic Consultants, Inc Main Street, #202, Santa Clarita, CA /2017 chick fil a el segundo

14 Overland Traffic Consultants, Inc. CHICK - fil - A DRIVE THRU SURVEY DATA SOUTHERN CALIFORNIA LARGEST QUEUE OBSERVED A Traffic Engineering and Transportation Planning Consulting Services Company

15 Overland Traffic Consultants, Inc. Summary 1. Based on the parking evaluation using the industry parking data, the proposed 60 on site parking spaces should accommodate the project s parking demand with a 95 % confidence level. 2. The queueing studies indicate that peak vehicle queues typically are less than 16 vehicles during the peak dining hours which can be accommodated on site with a queue capacity of 19 vehicles. Please call me if you have questions. Sincerely, Jerry T. Overland Attachments A Traffic Engineering and Transportation Planning Consulting Services Company

16

17

18

19

20

21

22

23

24

25 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: MAGIC MOUNTAIN PARKWAY, VALENCIA DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 08:00 AM TO 09:00 AM FILE: 3 AM MORNING OBSERVATIONS / HR:MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:04 08:03:15 3: :06:05 08:09:49 3: :07:12 08:12:12 5: :14:48 08:17:19 2: :28:10 08:30:40 2: :37:39 08:40:18 2: :39:40 08:42:07 2: :42:38 08:47:35 4: :44:06 08:48:41 4: :44:58 08:49:51 4: :46:20 08:51:28 5: :48:00 08:52:39 4:39 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

26 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: MAGIC MOUNTAIN PARKWAY, VALENCIA DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 12:00 PM TO 01:00 PM FILE: 2 MD MID DAY OBSERVATIONS / HR:MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:01 12:08:38 8: :03:50 12:10:01 6: :07:30 12:16:27 7: :09:15 12:13:59 4: :10:57 12:19:07 8: :12:30 12:21:10 8: :13:09 12:17:25 4: :15:09 12:21:03 5: :16:04 12:24:55 8: :17:50 12:23:10 5: :18:06 12:26:44 8: :21:18 12:30:09 8: :22:31 12:27:15 4: :24:00 12:32:35 8: :28:46 12:37:35 8: :32:50 12:40:20 7: :35:04 12:43:08 8: :34:00 12:38:26 4: :38:10 12:47:01 8: :40:32 12:45:14 4: :42:30 12:49:59 7: :45:15 12:48:56 3: :46:19 12:51:56 5: :48:23 12:51:28 3: :50:28 12:58:36 8: :51:20 12:55:53 4:33 1 THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

27 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: MAGIC MOUNTAIN PARKWAY, VALENCIA DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 05:00 PM TO 06:00 PM FILE: 3 PM EVENING OBSERVATIONS / HR:MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :01:09 05:09:45 8: :03:06 05:11:40 8: :07:15 05:15:09 7: :08:05 05:12:40 4: :10:55 05:19:07 8: :12:03 05:16:27 4: :14:19 05:19:07 4: :14:26 05:23:00 8: :16:01 05:24:06 8: :17:36 05:22:16 4: :19:10 05:27:17 8: :22:00 05:30:10 8: :23:29 05:27:34 4: :26:00 05:34:35 8: :33:10 05:37:15 4: :34:20 05:42:36 8: :36:30 05:40:32 4: :37:00 05:45:44 8: :40:20 05:48:00 7: :42:28 05:49:14 6: :43:55 05:51:28 7: :44:45 05:48:25 3: :46:48 05:55:13 8: :47:31 05:51:20 3: :48:39 05:57:34 8: :50:13 05:55:05 4: :52:43 06:00:42 7: :54:35 06:03:15 8:20 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

28

29 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 4895 CANDLEWOOD STREET, LONG BEACH DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 08:00 AM TO 09:00 AM FILE: 1 AM MORNING OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME ORIGIN :00:05 08:06:03 5: :02:27 08:07:07 4: :04:44 08:08:59 4: :06:55 08:10:54 3: :09:26 08:14:01 4: :11:37 08:15:26 3: :13:40 08:18:09 4: :14:56 08:19:06 4: :17:11 08:21:07 3: :19:58 08:24:36 4: :22:13 08:26:01 3: :25:26 08:30:17 4: :27:00 08:32:11 5: :29:34 08:33:58 4: :31:45 08:36:35 4: :33:00 08:37:02 4: :34:52 08:39:56 5: :37:16 08:41:32 4: :39:04 08:42:59 3: :42:15 08:48:04 5: :44:01 08:48:54 4: :46:22 08:50:17 3: :48:04 08:52:55 4: :49:55 08:55:20 5: :52:20 08:55:57 3: :55:33 09:00:12 4:39 2

30 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 4895 CANDLEWOOD STREET, LONG BEACH DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 12:00 PM TO 01:00 PM FILE: 1 MD MID DAY OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :59:45 12:03:30 3: :02:20 12:05:51 3: :04:45 12:08:59 4: :07:01 12:10:57 3: :09:51 12:13:26 5: :13:33 12:18:45 5: :15:21 12:19:19 3: :18:01 12:22:11 4: :19:56 12:23:44 3: :22:19 12:26:13 3: :25:01 12:29:50 4: :27:12 12:30:54 3: :29:03 12:34:07 5: :31:16 12:36:55 3: :33:36 12:37:34 3: :36:22 12:41:17 4: :38:53 12:42:45 3: :41:05 12:46:03 4: :44:23 12:48:12 3: :46:11 12:50:11 4: :48:32 12:52:19 3: :49:28 12:54:27 4: :51:13 12:55:09 3: :52:54 12:56:46 3: :54:01 12:57:52 3: :56:19 1:08:00 3:49 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY

31 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 4895 CANDLEWOOD STREET, LONG BEACH DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 05:00 PM TO 06:00 PM FILE: 1 PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:10 05:05:28 5: :02:16 05:06:22 4: :04:25 05:09:13 4: :06:37 05:10:59 4: :09:43 05:13:56 4: :12:33 05:18:02 5: :16:16 05:21:54 5: :18:29 05:23:49 5: :21:49 05:25:40 3: :22:35 05:27:47 5: :25:17 05:29:43 4: :28:24 05:32:27 4: :30:29 05:35:24 4: :33:31 05:38:32 5: :36:15 05:40:13 3: :39:02 05:44:26 5: :42:11 05:46:07 3: :44:16 05:49:55 5: :45:49 05:50:03 4: :47:08 05:52:37 5: :49:56 05:54:23 4: :51:37 05:55:37 4: :52:55 05:56:52 3: :55:32 06:00:43 5: :58:50 06:02:54 4:04 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY

32

33 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 8875 TAMPA, NORTHRIDGE DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 08:00 AM TO 09:00 AM FILE: 3 AM MORNING OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:04 08:03:24 3: :03:46 08:06:42 2: :05:26 05:07:30 2: :13:29 08:17:09 3: :15:06 08:17:43 2: :18:01 08:21:55 3: :20:56 08:25:28 4: :24:58 08:28:16 3: :27:30 08:32:07 4: :30:17 08:34:01 3: :34:26 08:37:28 3: :38:16 08:41:05 2: :40:09 08:43:50 3: :43:17 08:47:18 4: :44:32 08:49:03 4: :50:39 08:55:31 5: :53:11 08:57:41 4: :58:41 09:02:46 3:05 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

34 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 8875 TAMPA, NORTHRIDGE DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 12:00 PM TO 01:00 PM FILE: 2 MD MID DAY OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:50 12:06:59 6: :03:39 12:10:20 6: :05:49 12:11:11 5: :08:20 12:13:35 5: :09:55 12:18:56 7: :13:35 12:20:26 6: :15:09 12:23:00 7: :18:05 12:26:04 8: :22:50 12:31:19 8: :24:44 12:33:35 8: :26:19 12:35:15 8: :27:58 12:36:02 8: :30:22 12:38:22 8: :32:36 12:40:18 7: :35:37 12:43:47 8: :38:51 12:47:22 8: :40:14 12:48:28 8: :43:20 12:51:28 8: :44:20 12:51:27 7: :48:32 12:55:15 6: :50:41 12:57:36 6: :52:07 12:59:56 7: :55:01 01:02:33 7:32 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

35 CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 8875 TAMPA, NORTHRIDGE DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 05:00 PM TO 06:00 PM FILE: 3 PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:45 05:04:11 3: :02:21 05:07:48 5: :05:23 05:09:49 4: :08:11 05:14:16 6: :10:48 05:17:10 6: :14:54 05:19:11 5: :15:10 05:21:17 6: :17:05 05:22:30 5: :19:37 05:24:45 5: :20:59 05:27:48 6: :22:28 05:29:12 6: :24:37 05:29:16 4: :26:16 05:32:51 6: :30:28 05:37:36 7: :34:04 05:41:50 7: :38:31 05:45:34 7: :40:09 05:46:46 6: :42:35 05:48:28 5: :44:23 05:49:32 5: :46:42 05:51:44 5: :48:27 05:56:02 7: :49:53 05:58:01 8: :51:24 05:59:11 7: :53:38 05:59:37 5: :55:08 06:01:06 5:58 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

36 DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: WEDNESDAY, JANUARY 04, 2017 PERIOD: 08:00 AM TO 09:00 AM FILE: 1-AM MORNING OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT :00:01 8:03:55 0:03: :02:16 8:04:48 0:02:32 1 8:03:17 8:07:16 0:03:59 2 8:04:30 8:09:00 0:04:30 2 8:09:40 8:12:58 0:03:18 1 8:11:34 8:14:49 0:03:15 1 8:13:51 8:16:50 0:02:59 1 8:18:03 8:20:40 0:02:37 1 8:24:16 8:26:56 0:02:40 1 8:24:35 8:28:31 0:03:56 2 8:27:45 8:31:21 0:03:36 1 8:32:18 8:35:08 0:02:50 1 8:39:45 8:43:50 0:04:05 2 8:44:42 8:47:55 0:03:13 1 8:46:05 8:49:25 0:03:20 1 8:51:33 8:56:13 0:04:40 2 8:53:11 8:57:08 0:03:57 1 8:58:28 9:01:26 0:02:58 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

37 DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: WEDNESDAY, JANUARY 04, 2017 PERIOD: 12:00 PM TO 01:00 PM FILE: 1-MD MID-DAY OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT :03:16 12:08:11 0:04: :05:09 12:11:40 0:06: :09:40 12:15:41 0:06: :11:01 12:19:15 0:08: :14:16 12:20:01 0:05: :13:31 12:21:15 0:07: :15:46 12:23:20 0:07: :18:19 12:26:16 0:07: :20:53 12:29:40 0:08: :24:21 12:31:40 0:07: :27:30 12:33:36 0:06: :28:18 12:35:09 0:06: :29:55 12:37:57 0:08: :31:02 12:39:30 0:08: :35:02 12:41:53 0:06: :37:00 12:44:08 0:07: :40:11 12:46:21 0:06: :41:50 12:51:01 0:09: :45:16 12:52:51 0:07: :48:18 12:55:21 0:07: :50:37 12:59:30 0:08: :53:36 13:01:30 0:07: :55:50 13:02:00 0:06: :57:43 13:03:37 0:05:54 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

38 DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: WEDNESDAY, JANUARY 04, 2017 PERIOD: 05:00 PM TO 06:00 PM FILE: 1-PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:37 5:05:45 0:05: :01:18 5:09:55 0:08:37 2 5:03:24 5:12:34 0:09:10 2 5:07:34 5:15:51 0:08:17 2 5:10:44 5:16:17 0:05:33 1 5:11:55 5:19:01 0:07:06 2 5:14:50 5:20:00 0:05:10 1 5:17:19 5:22:06 0:04:47 1 5:21:46 5:26:48 0:05:02 1 5:24:31 5:31:58 0:07:27 2 5:26:30 5:35:16 0:08:46 2 5:28:05 5:37:46 0:09:41 2 5:32:25 5:38:33 0:06:08 1 5:35:29 5:42:43 0:07:14 2 5:38:18 5:43:31 0:05:13 1 5:40:11 5:45:11 0:05:00 1 5:43:16 5:51:43 0:08:27 2 5:45:50 5:54:37 0:08:47 2 5:48:13 5:55:02 0:06:49 1 5:49:07 5:57:05 0:07:58 2 5:53:23 5:59:15 0:05:52 1 5:55:14 6:00:01 0:04:47 1 5:57:04 6:05:13 0:08:09 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

39 DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: THURSDAY, JANUARY 05, 2017 PERIOD: 08:00 AM TO 09:00 AM FILE: 2-AM MORNING OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT :00:08 8:05:33 0:05: :06:14 8:09:10 0:02:56 1 8:08:11 8:11:33 0:03:22 1 8:12:24 8:15:37 0:03:13 1 8:13:25 8:16:08 0:02:43 1 8:16:05 8:19:11 0:03:06 1 8:19:54 8:23:38 0:03:44 1 8:20:32 8:24:45 0:04:13 2 8:21:58 8:28:27 0:06:29 2 8:25:16 8:29:00 0:03:44 1 8:27:30 8:30:28 0:02:58 1 8:32:48 8:35:39 0:02:51 1 8:37:15 8:40:55 0:03:40 1 8:41:34 8:44:04 0:02:30 1 8:44:17 8:47:38 0:03:21 1 8:47:37 8:51:55 0:04:18 2 8:53:20 8:56:04 0:02:44 1 8:58:36 9:02:46 0:04:10 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

40 DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: THURSDAY, JANUARY 05, 2017 PERIOD: 12:00 PM TO 01:00 PM FILE: 2-MD MID-DAY OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT :02:20 12:08:13 0:05: :03:31 12:12:50 0:09: :08:05 12:15:09 0:07: :10:00 12:16:00 0:06: :11:12 12:19:25 0:08: :13:17 12:23:15 0:09: :17:33 12:24:22 0:06: :18:27 12:26:55 0:08: :20:20 12:27:27 0:07: :23:04 12:29:30 0:06: :25:41 12:34:33 0:08: :29:21 12:37:17 0:07: :30:16 12:39:19 0:09: :32:51 12:40:10 0:07: :35:15 12:41:52 0:06: :37:30 12:45:46 0:08: :41:13 12:48:18 0:07: :43:43 12:52:34 0:08: :45:57 12:53:10 0:07: :47:49 12:54:00 0:06: :48:03 12:57:17 0:09: :50:32 12:57:59 0:07: :51:28 12:58:21 0:06: :54:09 13:03:24 0:09: :58:43 13:07:04 0:08:21 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

41 DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: THURSDAY, JANUARY 05, 2017 PERIOD: 05:00 PM TO 06:00 PM FILE: 2-PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT :00:47 5:05:34 0:04: :01:33 5:07:48 0:06:15 2 5:03:01 5:08:45 0:05:44 1 5:06:05 5:13:33 0:07:28 2 5:10:23 5:16:40 0:06:17 2 5:13:40 5:18:19 0:04:39 1 5:16:42 5:21:50 0:05:08 1 5:23:58 5:31:50 0:07:52 2 5:24:35 5:32:29 0:07:54 2 5:27:09 5:37:05 0:09:56 2 5:29:15 5:37:50 0:08:35 2 5:32:04 5:38:03 0:05:59 1 5:33:36 5:38:31 0:04:55 1 5:34:59 5:41:44 0:06:45 2 5:36:21 5:43:30 0:07:09 2 5:39:14 5:44:25 0:05:11 1 5:40:21 5:47:39 0:07:18 2 5:42:26 5:50:55 0:08:29 2 5:45:56 5:51:40 0:05:44 1 5:49:05 5:54:15 0:05:10 1 5:51:16 5:57:50 0:06:34 1 5:54:35 6:03:11 0:08:36 2 5:57:03 6:06:10 0:09:07 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA

42

43 APPENDIX TR-2 TRAFFIC IMPACT ASSESSMENT

44

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

Appendix S. Shared Parking Analysis

Appendix S. Shared Parking Analysis Appendix S Shared Parking Analysis PARKING DEMAND ANALYSIS 2 ND + PCH PROJECT Long Beach, California April 10, 2017 April 10, 2017 Mr. Stephanie Eyestone-Jones Eyestone Environmental 6701 Center Drive

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station

Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Final Report 2013 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter at

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) Associates Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) 885-5121 Ms. Teri Ford, Associate 800 Boylston Street, Suite 1570 Boston, MA July

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out October 24, 218 Mr. Justin D. Bridges, AIA, LEED AP Davidson A+E 431 Indian Creek Parkway Overland Park, KS 6627 RE: Dear Mr. Bridges, Trip Generation Overland Park, Kansas As requested, Priority Engineers,

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Trip and Parking Generation Study of the Peaks Ice Arena

Trip and Parking Generation Study of the Peaks Ice Arena Trip and Parking Generation Study of the Peaks Ice Arena Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed a trip and parking generation

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee

More information

Transportation Land Development Environmental S e r v i c e s

Transportation Land Development Environmental S e r v i c e s Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA 01803 Date: September 23, 2013 Project

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Revised Strategy for Downtown Parking

Revised Strategy for Downtown Parking Revised Strategy for Downtown Parking December 4, 2017 Council Workshop Presented by Jennifer McCoy, P.E., City Traffic Engineer City-Owned Parking Today 3,500 metered parking spaces Parking meters charge

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN INTRODUCTION This report includes a summary of several key components of the Rapid City Downtown Parking Study and Strategic Plan, including: Current Conditions Analysis (Inventory and Occupancy and Length

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT TO: FROM: Parking and Public Improvements Commission Marisa Lundstedt, Director of Community Development Erik Zandvliet T.E., City Traffic Engineer

More information

Napa Meritage Resort Expansion

Napa Meritage Resort Expansion Parking Study Napa Meritage Resort Expansion BOH 4,117 SF Prepared By: Prepared For: City of Napa Department of Public Works 332 Pine Street, Floor 4 San Francisco, CA 94104 July 2015 Parking Study Napa

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

370 Queen Elizabeth Drive Transportation Overview

370 Queen Elizabeth Drive Transportation Overview December 8, 2014 OUR REF: TO3193TOA BY EMAIL: Ashley@rocahomes.ca 2253644 Ontario Inc. c/o BassCon 24 George Street West Ottawa, ON K1S 3J2 Attention: Ashley Lepine Dear Ashley: Re: 370 Queen Elizabeth

More information

MEMORANDUM TO: Oak Park and River Forest High School District 200. Kenig, Lindgren, O Hara, Aboona, Inc.

MEMORANDUM TO: Oak Park and River Forest High School District 200. Kenig, Lindgren, O Hara, Aboona, Inc. 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 MEMORANDUM TO: Oak Park and River Forest High School District 200 FROM: Kenig, Lindgren, O Hara, Aboona, Inc.

More information

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW CHAPTER 4. PARKING Parking has been identified as a key concern among neighbors and employers in the area, both in terms of increased demand from potential new development and from SMART passengers that

More information

3.15 SAFETY AND SECURITY

3.15 SAFETY AND SECURITY 3.15 SAFETY AND SECURITY Introduction This section describes the environmental setting and potential effects of the alternatives analyzed in this EIR with regard to safety and security in the SantaClara-Alum

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family

More information

This letter summarizes our observations, anticipated traffic changes, and conclusions.

This letter summarizes our observations, anticipated traffic changes, and conclusions. Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the

More information

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION The following Section presents a summary of the Traffic Study for the Proposed Civic Center/Metlox Development Project in the City of Manhattan

More information

Town of Newmarket. Parking Directions Report. Prepared for: Town of Newmarket

Town of Newmarket. Parking Directions Report. Prepared for: Town of Newmarket Town of Newmarket Parking Directions Report Prepared for: Town of Newmarket April, 2010 TOWN OF NEWMARKET: PARKING DIRECTIONS APRIL, 2010 P:\73\28\01\Reports\APR 19 2010 - Parking Directions_ckc.doc TABLE

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Key Findings and Recommendations Introduction and Overview Task 1 Existing Conditions Analysis Task 2 Parking Demand Analysis...

Key Findings and Recommendations Introduction and Overview Task 1 Existing Conditions Analysis Task 2 Parking Demand Analysis... Table of Contents Introduction and Overview... 1 Key Findings and Recommendations... 1 Task 1 Existing Conditions Analysis... 1 Task 2 Parking Demand Analysis... 1 Task 3 Facilities Cost Analysis... 2

More information

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation TRAFFIC IMPACT DATA For Dillons #98 On-Site Relocation COMMERCIAL DEVELOPMENT 1740 Massachusetts Street Lawrence, KS Revised April 6, 2011 Prepared by: Pickering Firm, Inc. Introduction The project site

More information

11 October 12, 2011 Public Hearing APPLICANT:

11 October 12, 2011 Public Hearing APPLICANT: 11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /

More information

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply MEMO DATE: March 22, 2016 PROJECT O: 4241-44 PROJECT: 1550 Alberni Street SUBJECT: Transportation Design Rationale for Rezoning Application (Update with Design Package) TO: Dave Leung, 1550 Alberni Limited

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY Planned Development Application 1450 Sherman Avenue Evanston, IL 60201 14 TRAFFIC CIRCULATION IMPACT STUDY Traffic Impact Study 1454 Sherman Mixed-Use Development Evanston, Illinois Prepared for Prepared

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

FOR SALE Lancaster Avenue- Bryn Mawr, PA SALE PRICE: $1,095,000.00

FOR SALE Lancaster Avenue- Bryn Mawr, PA SALE PRICE: $1,095,000.00 FOR SALE 610-612 Lancaster Avenue- Bryn Mawr, PA 19010 Description Location! Location! Location! Great Main Line Restaurant /Bar on Route 30 in Bryn Mawr, PA. Two buildings converted into one. Successful

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i EXECUTIVE SUMMARY MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project site located at 25 SE 4th Avenue, Delray Beach, Florida (PCN

More information

Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016

Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016 Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016 Mercer Island Town Center Parking Study Study Area Town Center Bordered by Sunset Way, Island Crest Way, SE 32 nd Street,

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

ARTICLE 501 OFF-STREET PARKING AND LOADING

ARTICLE 501 OFF-STREET PARKING AND LOADING ARTICLE 501 OFF-STREET PARKING AND LOADING Sec. 501.01 Applicability. (a) Zoning districts. These requirements for adequate off-street parking, and loading shall be provided in all zoning districts. Such

More information

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT Located at southeast corner of Winnetka Avenue and Prairie Street In the City of Los Angeles Prepared for: Sky Tech Management & Construction

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window. District 5 Tennessee Section: Memphis, TN

Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window. District 5 Tennessee Section: Memphis, TN Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window District 5 Tennessee Section: Memphis, TN Submitted to: Ed Stollof, AICP Institute of Transportation

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

PARKING OCCUPANCY IN WINDSOR CENTER

PARKING OCCUPANCY IN WINDSOR CENTER PARKING OCCUPANCY IN WINDSOR CENTER TOWN OF WINDSOR, CONNECTICUT REPORT JUNE 2017 CONTENTS Background... 3 Other Relevant Data... 3 Parking Survey Design... 6 Parking Supply Inventory... 6 Parking Demand

More information

ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS

ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS TOWN OF WINDSOR, CT REPORT JUNE 2016 CONTENTS Parking Survey Design... 3 Parking Supply Inventory... 3 Parking Demand Survey... 3 Surveyed

More information

Mineola Village Green

Mineola Village Green Traffic Impact Analysis Report Mineola Village Green 199 2 nd Street Mineola, New York Prepared for Mineola Metro LLC c/o Lalezarian Properties 1999 Marcus Avenue, Suite 310 Lake Success, NY 11042 Prepared

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009

DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009 DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009 Prepared for: Manhard Consulting, Ltd. 900 Woodlands Parkway Vernon Hills, Illinois 60061 Prepared

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS 6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS 6.16.1 Off-Street Parking Off-street parking and loading spaces shall be required for all land uses as set forth in this section. A. Minimum Parking Space

More information

STANDARD LIMITATIONS

STANDARD LIMITATIONS STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc. (the Client). The disclosure of any information contained in this report is the sole responsibility

More information

METRO Light Rail Update

METRO Light Rail Update American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

CENTENE CLAYTON CAMPUS CLAYTON, MO

CENTENE CLAYTON CAMPUS CLAYTON, MO CENTENE CLAYTON CAMPUS CLAYTON, MO Prepared for: CUSHMAN & WAKEFIELD on behalf of: Centene Corporation JUNE 27, 2016 PROJECT NO. 31-7956.00 TITLE SDD SUBMITTAL OF REPORT PARKING STUDY PROJECT CENTENE NAME

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING 2 Site Plan Modifications From SPRC #1 &2 3 Current 4.1 Submission

More information