1 IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for Constellation Boulevard Residential Project, prepared by Kaku Associates, October The traffic technical report, contained in Appendix C of this Draft EIR, analyzes the potential impact of the Project on the surrounding street system, including the Project s driveway access points. This section is a summary of that report and includes an evaluation of the traffic conditions on the existing street and highway network serving the Project site and the impact of traffic generated by the Project on future roadway conditions. The traffic impact analysis is based on occupancy of the proposed Project in ENVIRONMENTAL SETTING The Project site is located approximately 10 miles west of downtown Los Angeles and approximately 6 miles east of the Pacific Ocean in the Century City area of the City of Los Angeles. Freeway access to Century City and the Project site is provided by the San Diego Freeway (I-405), located approximately 2 miles to the west of Century City, and the Santa Monica Freeway (I-10), located approximately 2 miles to the south of Century City. The following are descriptions of the regional freeway and local street systems having the Project site. a. Regional Freeway System The Santa Monica Freeway (I-10) runs in an east-west direction, extending from the Pacific Ocean through downtown Los Angeles and beyond. In the vicinity of the Project study area, the freeway provides four lanes in each direction plus auxiliary lanes. Interchanges are provided at Overland Avenue, National Boulevard (to and from the east only), and Robertson Boulevard. The San Diego Freeway (I-405) runs in a north-south direction, extending from the northern part of the San Fernando Valley through Los Angeles County and into Orange County. In the vicinity of the Project site, the freeway provides four lanes in each direction plus auxiliary lanes. Surface street access is provided via interchanges at Santa Monica Boulevard and Pico Boulevard/Olympic Boulevard (to and from the north only). Page 141

2 b. Local Street System East-West Streets Santa Monica Boulevard, a Class I major highway (State Route 2), is located to the north of the Project site. In the Project area, Santa Monica Boulevard consists of two roadways, North Santa Monica Boulevard and Little Santa Monica Boulevard. North Santa Monica Boulevard, the larger of the two roadways, provides two to three lanes in each direction in addition to leftturn lanes at all major intersections. Little Santa Monica Boulevard provides two to four lanes plus left-turn lanes in the Project area. North Santa Monica Boulevard and Little Santa Monica Boulevard are currently being reconstructed and combined into the Santa Monica Transit Parkway. The Santa Monica Transit Parkway will extend from Sepulveda Boulevard on the west to the boundary, east of Century Park East, on the east. Detailed discussion of the future configuration of the Santa Monica Transit Parkway is contained in Section IV.B.3.c.(2), on page 162. Olympic Boulevard is a Class II major highway, which transects Century City to the south of the Project site. Olympic Boulevard provides three lanes in the eastbound direction and four lanes in the westbound direction in addition to left-turn lanes at intersections south of the Project site. The Olympic Boulevard/Avenue of the Stars intersection is grade-separated with cloverleaf ramps connecting the two streets. Pico Boulevard is a Class II major highway, which borders the south edge of Century City to the south of the Project site. Pico Boulevard provides three lanes of traffic in each direction in addition to left-turn lanes at most intersections. Wilshire Boulevard is a Class I major highway, which is located to the north of Century City in the Project area. Wilshire Boulevard provides three to four lanes in each direction in addition to left-turn lanes at intersections. Constellation Boulevard, a secondary highway located entirely within Century City, extends from Century Park West on the west to Century Park East on the east. Constellation Boulevard, which provides three lanes in addition to left-turn lanes in each direction, borders the south side of the Project site and provides vehicular access to the Project site at two of the three proposed access locations. Galaxy Way is a collector street located south of Olympic Boulevard within Century City. Galaxy Way connects Avenue of the Stars and Century Park East, south of the Project site. Page 142

3 Empyrean Way is a collector street located within Century City, north of Pico Boulevard. Empyrean Way connects Avenue of the Stars and Century Park East, south of the Project site. Manning Avenue is a collector street located west and southwest of Century City. Manning Avenue is a local street north of Pico Boulevard and a secondary highway south of Pico Boulevard. North-South Streets Overland Avenue is a Class II major highway located to the west of Century City. Overland Avenue provides two lanes in each direction in addition to left-turn lanes. Overland Avenue, which terminates at Santa Monica Boulevard, is a designated secondary highway between Pico Boulevard and Santa Monica Boulevard. Beverly Glen Boulevard is a Class II major highway located to the west of Century City. Beverly Glen Boulevard, which terminates at Pico Boulevard, provides two lanes in each direction in addition to left-turn lanes. Century Park West is a secondary highway located entirely within Century City. Located to the west of the Project site, Century Park West extends from North Santa Monica Boulevard on the north to Olympic Boulevard on the south. It provides two to four lanes, including turning lanes, in each direction. Avenue of the Stars is a Class II major highway bounding the west side of the Project site. Extending between North Santa Monica Boulevard on the north and Pico Boulevard on the south, Avenue of the Stars is located entirely within Century City. Avenue of the Stars, which consists of three lanes in each direction in addition to left-turn lanes, provides restricted rightturn-in and right-turn-out vehicular access to the Project site. Century Park East is a secondary highway located to the east of the Project site. Century Park East provides three lanes in each direction, in addition to left-turn lanes. Extending between North Santa Monica Boulevard on the north and Pico Boulevard on the south, Century Park East is located entirely within Century City. Motor Avenue is located south of Century City, beginning just south of Pico Boulevard. Between Pico Boulevard and Manning Avenue, Motor Avenue serves as a collector street and, south of Manning Avenue, Motor Avenue serves as a secondary highway. Motor Avenue provides two lanes in each direction between Pico Boulevard and Monte Mar Drive, and one lane in each direction to Manning Avenue. Page 143

4 Patricia Avenue, located southwest of Century City, is a collector street south of Pico Boulevard and a local street north of Pico Boulevard. street. Spalding Drive, located in the City of Beverly Hills and east of Century City, is a local c. Existing Service Levels In order to identify streets and intersections most likely to be impacted by Project traffic, the following 32 intersections were identified in consultation with the Los Angeles Department of Transportation (LADOT). Figure 19 on page 145 depicts the regional street network and the study intersections. The 32 intersections that have been analyzed are as follows: 1. Beverly Glen Boulevard & Wilshire Boulevard; 2. Overland Avenue & Santa Monica Boulevard (North); 3. Overland Avenue & Santa Monica Boulevard (South); 4. Beverly Glen Boulevard & Santa Monica Boulevard (North); 5. Beverly Glen Boulevard & Santa Monica Boulevard (South); 6. Century Park West & Santa Monica Boulevard (South); 7. Club View Drive & Santa Monica Boulevard (North); 8. Avenue of the Stars & Santa Monica Boulevard (North); 9. Avenue of the Stars & Santa Monica Boulevard (South); 10. Century Park East & Santa Monica Boulevard (North); 11. Century Park East & Santa Monica Boulevard (South); 12. Wilshire Boulevard & Santa Monica Boulevard (North); 13. Wilshire Boulevard & Santa Monica Boulevard (South); 14. Century Park West & Constellation Boulevard; 15. Avenue of the Stars & Constellation Boulevard; 16. Century Park East & Constellation Boulevard; Page 144

5 N Not to scale Source: KAKU Associates Figure 19 Location of Study Intersections Page 145

6 17. Overland Avenue & Olympic Boulevard; 18. Beverly Glen Boulevard & Olympic Boulevard; 19. Century Park West & Olympic Boulevard; 20. Avenue of the Stars & Olympic Boulevard (WB Ramps); 21. Avenue of the Stars & Olympic Boulevard (EB Ramps); 22. Century Park East & Olympic Boulevard; 23. Spalding Drive & Olympic Boulevard; 24. Avenue of the Stars & Galaxy Way; 25. Avenue of the Stars & Empyrean Way; 26. Overland Avenue & Pico Boulevard; 27. Patricia Avenue & Pico Boulevard; 28. Beverly Glen Boulevard & Pico Boulevard; 29. Motor Avenue & Pico Boulevard; 30. Avenue of the Stars & Pico Boulevard; 31. Century Park East & Pico Boulevard; and 32. Motor Avenue & Manning Avenue. All study intersections are signalized and, with the exception of five intersections, all study intersections are operated under the City s Automated Traffic Surveillance and Control (ATSAC) traffic control system and the City s Adaptive Traffic Control System (ATCS). The exceptions are as follows: Intersection No. 12: Santa Monica Boulevard (North) & Wilshire Boulevard (neither ATSAC nor ATCS); Intersection No. 13: Santa Monica Boulevard (South) & Wilshire Boulevard (neither ATSAC nor ATCS); Intersection No. 23: Spalding Drive & Olympic Boulevard (ATSAC only, not ATCS); Page 146

7 Intersection No. 25: Avenue of the Stars & Empyrean Way (neither ATSAC nor ATCS); Intersection No. 32: Motor Avenue & Manning Avenue (ATSAC only, not ATCS). Level of Service (LOS) values for A.M. and P.M. peak-hour conditions are summarized in Table 8 on page 148. As shown in Table 8, 14 of the 32 study intersections are operating at LOS E or worse during either A.M. and P.M. peak hours, or both. Service levels (LOS) for signalized intersections are defined in Table 9 on page 150. Base-year (2005) peak-hour traffic volumes are presented in the Project s traffic study (see Appendix C of this Draft EIR). Currently congested intersections (i.e., operating at LOS E or F) include the following: Intersection No. 1: Beverly Glen & Wilshire Boulevard (LOS E in the A.M. and P.M.); Intersection No. 2: Overland Avenue & Santa Monica Boulevard (North) (LOS E in the A.M. only); Intersection No. 4: Beverly Glen Boulevard & Santa Monica Boulevard (North) (LOS E in the A.M. and P.M.); Intersection No. 5: Beverly Glen Boulevard & Santa Monica Boulevard (South) (LOS E in the P.M. only); Intersection No. 8: Avenue of the Stars & Santa Monica Boulevard (North) (LOS F in the A.M. only); Intersection No. 12: Wilshire Boulevard/Santa Monica Boulevard (North) (LOS F in the A.M. and P.M.); Intersection No. 13: Wilshire Boulevard/Santa Monica Boulevard (South) (LOS F in the A.M. and P.M.); Intersection No. 17: Overland Avenue & Olympic Boulevard (LOS F in the A.M. and P.M.); Intersection No. 18: Beverly Glen Boulevard & Olympic Boulevard (LOS E in the A.M. and P.M.); Intersection No. 19: Century Park West & Olympic Boulevard (LOS F in the P.M. only); Intersection No. 23: Spalding Drive & Olympic Boulevard (LOS F in the A.M. and E in the P.M.); Page 147

8 Table 8 EXISTING BASE YEAR (2005) INTERSECTION LEVEL OF SERVICE ANALYSIS Existing Base Year Peak (Year 2005) Estimates No. Intersection Hour V/C or Delay LOS 1 Beverly Glen Blvd & A.M E Wilshire Blvd a P.M E 2 Overland Ave & A.M E Santa Monica Blvd (N) a, c P.M D 3 Overland Ave & A.M B Santa Monica Blvd (S) a, c P.M A 4 Beverly Glen Blvd & A.M E Santa Monica Blvd (N) a, c P.M E 5 Beverly Glen Blvd & A.M D Santa Monica Blvd (S) a, c P.M E 6 Century Park West & A.M A Santa Monica Blvd (S) a, c P.M A 7 Club View Dr & A.M B Santa Monica Blvd (N) a, c P.M C 8 Avenue of the Stars & A.M F Santa Monica Blvd (N) a, c P.M C 9 Avenue of the Stars & A.M A Santa Monica Blvd (S) a,, c P.M A 10 Century Park East & A.M D Santa Monica Blvd (N) a, c P.M C 11 Century Park East & A.M D Santa Monica Blvd (S) a,, c P.M B 12 Wilshire Blvd & (CMA) A.M F Santa Monica Blvd (N) d (ICU) A.M F (CMA) P.M F (ICU) P.M F 13 Wilshire Blvd & (CMA) A.M F Santa Monica Blvd (S) d (ICU) A.M F (CMA) P.M F (ICU) P.M F 14 Century Park West & A.M A Constellation Blvd a P.M A 15 Avenue of the Stars & A.M B Constellation Blvd a P.M C 16 Century Park East & A.M A Constellation Blvd a P.M A 17 Overland Ave & A.M F Olympic Blvd a P.M F 18 Beverly Glen Blvd & A.M E Olympic Blvd a P.M E 19 Century Park West & A.M D Olympic Blvd a P.M F Page 148

9 Table 8 (Continued) EXISTING BASE YEAR (2005) INTERSECTION LEVEL OF SERVICE ANALYSIS Existing Base Year Peak (Year 2005) Estimates No. Intersection Hour V/C or Delay LOS 20 Avenue of the Stars & A.M A Olympic Blvd (WB Ramps) a P.M A 21 Avenue of the Stars & A.M A Olympic Blvd (EB Ramps) a P.M A 22 Century Park East & A.M D Olympic Blvd a P.M D 23 Spalding Dr & (CMA) A.M F (ICU) A.M E Olympic Blvd b,d (CMA) P.M E (ICU) P.M F 24 Avenue of the Stars & A.M A Galaxy Way a P.M A 25 Avenue of the Stars & A.M A Empyrean Way e P.M A 26 Overland Ave & A.M F Pico Blvd a P.M F 27 Patricia Ave & A.M C Pico Blvd a P.M C 28 Beverly Glen Blvd & A.M C Pico Blvd a P.M B 29 Motor Ave & A.M F Pico Blvd a P.M F 30 Avenue of the Stars & A.M D Pico Blvd a P.M D 31 Century Park East & A.M C Pico Blvd a P.M B 32 Motor Ave & A.M E Manning Ave b P.M C a b c d e Intersection is currently operating under the ATSAC & ATSC system. V/C = volume to capacity Intersection is currently operating under ATSAC system only. Levels of service for intersections along Santa Monica Boulevard within the limits of the Santa Monica Transit Parkway construction zone have been calculated using the lane configurations and signal phasing that existed prior to commencement of construction. Intersections that are under the jurisdiction of the City of Beverly Hills. These intersections are analyzed using both the Critical Movement Analysis (CMA) methodology used by the City of Los Angeles, and the Intersection Capacity Utilization (ICU) methodology used by the City of Beverly Hills to determine intersection V/C ratio. Unsignalized intersection. Source: Kaku Associates, October Page 149

10 LOS A B C Table 9 LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS to Excellent. No vehicle waits longer than one red light and no approach phase is fully used. > to Very Good. An occasional approach phase is fully utilized; many drivers begin to feet somewhat restricted within groups of vehicles. > to Good. Occasionally drivers may have to wait through more than one red light; backups may develop behind turning vehicles. D > to Fair. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E > to Poor. The intersection approach is operating at capacity, with the maximum number of vehicles that can be accommodated; there may be long lines of waiting vehicles through several signal cycles. F > Failure. Backups from nearby locations or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches; tremendous delays with continuously increasing queue lengths. Source: Transportation Research Board, Highway Capacity Manual, Special Report 209, Intersection No. 26: Overland Avenue & Pico Boulevard (LOS F in the A.M. and P.M.); Intersection No. 29: Motor Avenue & Pico Boulevard (LOS F in the A.M. and P.M.); and Intersection No. 32: Motor Avenue & Manning Avenue (LOS E in the A.M. only). d. Existing Site Access The Project site presently contains private driveway easements and a private alley for vehicular access to the adjacent lots to the north of the Project site. These easements and alley are located on the easterly and northerly portions of the Project site. The private alley currently serves a number of uses, including: (a) access to and from the truck tunnel exit and the parking garage serving Santa Monica Boulevard and other properties to the north; (b) access to and from the Watt Tower garages to the north of the Project site; (c) access to and from the Watt Tower loading dock and delivery parking area immediately east of the Project site; (d) access to and from the parking lot serving the existing restaurant on the Project site; and (e) access to parking on other portions of the Project site. The alley intersects Constellation Boulevard along the eastern edge of the Project site. Page 150

11 e. Public Transportation Century City is well served by public transportation and a regional transit plaza, which is located at the MGM Plaza Building. This transit plaza is located at the north side of Constellation Boulevard directly across Avenue of the Stars from the Project site and within a short walking distance from the Project site. The Los Angeles County Metropolitan Transportation Authority (MTA), Los Angeles Department of Transportation (LADOT), the Santa Monica Big Blue Bus (SM), Culver City Bus (CC), Santa Clarita Transit (SC) and the Antelope Valley Transit Authority (AVTA) provide public transit service to the Century City area. The bus routes serving the Project area are described as follows: MTA 28/328 These transit lines are operated by the MTA and provide service between Century City and the downtown area of Los Angeles. Line 328 provides peak-hour express service. In the Project area, these lines travel on Olympic Boulevard, Avenue of the Stars, Santa Monica Boulevard, Century Park West and Constellation Boulevard, with stops on Constellation Boulevard and Avenue of the Stars adjacent to the Project site. MTA 316 This limited-stop line provides service between Cedars-Sinai Medical Center in the Beverly Hills area and the downtown area of Los Angeles. In the Project vicinity, the service provides a shortline extension loop from Santa Monica Boulevard via Century Park West to Constellation Boulevard to Avenue of the Stars with a stop on Avenue of the Stars at Constellation Boulevard adjacent to the Project site. MTA 16 This transit line provides service between Century City and the downtown area of Los Angeles. In the Project area, this line travels on Olympic Boulevard, Avenue of the Stars, Santa Monica Boulevard, and Century Park West with a late night and early morning loop on Constellation Boulevard. This line has stops along Avenue of the Stars adjacent to the Project site. LADOT 534 This Commuter Express line provides limited-stop westbound morning peak period express service to West Los Angeles and eastbound evening peak period express service to Union Station/downtown Los Angeles on weekdays. In the Project area, Line 534 travels on Olympic Boulevard and Century Park East and has stops at the intersection of Constellation Boulevard and Century Park East near the Project site. LADOT 573 This Commuter Express lines provides limited-stop extended southbound morning peak period express service to West Los Angeles and northbound evening peak period express service to Encino and Mission Hills on weekdays. In the Project area, Line 573 travels on Santa Monica Boulevard and loops into the Century City area with a stop at the intersection of Avenue of the Stars and Constellation Boulevard adjacent to the Project site. Page 151

12 SM 5 This bus line is operated by the Santa Monica Big Blue Bus and provides service between downtown Los Angeles, Santa Monica, and the Pico Boulevard Rimpau Transit Center. The SM 5 line travels along Olympic Boulevard in the Project area with a loop into Century City via Century Park West, Constellation Boulevard and Century Park East. This line provides a stop at the intersection of Constellation Boulevard and Avenue of the Stars adjacent to the Project site. CC 3 This bus line is operated by Culver City Bus and provides service between Century City and Fox Hills Mall south of Culver City. In the Project area, the line travels along Olympic Boulevard and loops into Century City via Century Park West, Constellation Boulevard and Century Park East and provides a stop along Constellation Boulevard adjacent to the Project site. SC 797 This bus line is operated by Santa Clarita Transit and provides express southbound morning peak period and northbound afternoon peak period commuter service to and from UCLA, Westwood and Century City. In the Project area, this line travels on Constellation Boulevard and provides a stop on Avenue of the Stars adjacent to the Project site. SC 792 This bus line is operated by Santa Clarita Transit and provides reverse express service northbound in the morning peak period and southbound in the afternoon peak period. In the study area, this line travels on Constellation Boulevard and provides a stop on Avenue of the Stars adjacent to the Project site. AVTA 786 This bus line is operated by Antelope Valley Transit and provides peak period express commuter service between Lancaster and Palmdale in the Antelope Valley and West Los Angeles including Century City. In the Project area, this line provides a bus stop at Avenue of the Stars and Constellation Boulevard adjacent to the Project site. 3. PROJECT IMPACTS a. Methodology (1) Construction Traffic On-site construction activities, as well as construction traffic (e.g., worker travel, hauling activities, and the delivery of construction materials), could affect existing traffic and emergency access in the Project vicinity. Construction impacts are analyzed based on the length of time and frequency of any street closures, the classification of the impacted street, use of the street by emergency vehicles, temporary loss of pedestrian and vehicle access to any adjacent parcels, Page 152

13 temporary loss of access to transit stops, and the availability of alternative or relocated transit stops within one-quarter mile of the Project site. (2) Intersection Capacity Analysis The Project s traffic study analysis has been prepared under the direction of the LADOT in accordance with LADOT guidelines and has been reviewed and accepted by the LADOT. The methodology for evaluating street capacity involves several steps, including the identification of existing base year (2005) traffic conditions, the calculation of ambient growth and traffic attributable to the identified related projects (see Section III.B of this Draft EIR) to determine future (2010) cumulative baseline conditions and the addition (without the Project s traffic), of Project traffic to identify the Project s potential traffic impacts in This analysis is based both on the quantity of traffic generated and the distribution of traffic to the various streets and freeways that serve the Project site. The following is a summary of the methodology used to assess the Project s potential traffic impacts. (a) Existing Base Traffic Volumes The Santa Monica Transit Parkway construction project currently underway is causing atypical and below average traffic conditions along Santa Monica Boulevard and other major streets in the area such as Wilshire Boulevard and Olympic Boulevard, including temporary changes in lane configurations along Santa Monica Boulevard, temporary reductions in traffic volumes along Santa Monica Boulevard, and shifts of traffic to other routes. 38 LADOT determined that traffic data from an approved traffic study would be used as the base data for the purpose of assessing operating conditions (as the traffic counts for this study were conducted prior to the commencement of construction activity on Santa Monica Boulevard), with the addition of conservative growth assumptions to account for ambient growth (1.5 percent per year) and growth from related projects actually constructed between the year the traffic counts were conducted and The A.M. and P.M. peak-hour traffic data obtained from the approved traffic study is presented in Appendix C of the Project s traffic study (see Appendix C of the Draft EIR). The list of related projects constructed between the year the traffic counts were conducted and 2005 is presented in Appendix D of the Project s traffic study (see Appendix C of the Draft EIR). 38 Recent traffic counts taken after the start of the Santa Monica Parkway construction indicate that peak period traffic volumes along Santa Monica Boulevard in the Century City area have declined from between 18 percent and 47 percent depending upon direction and peak hour. See Appendix B of the Project s traffic study which is presented as Appendix C of the Draft EIR. Page 153

14 (b) 2010 Conditions Without the Proposed Project (Cumulative Base Conditions) IV.B Traffic and Circulation Future traffic projections without the proposed Project were developed for the year The objective of this analysis is to project future traffic growth and operating conditions that are anticipated to result from ambient regional growth and related projects in the vicinity of the Project site. The cumulative base traffic forecasts reflect growth in traffic from two primary sources: (a) background or ambient growth, which reflects the effects of overall regional growth both in and outside of the study area; and (b) traffic generated by specific projects (related projects) located within the vicinity of the Project site that are anticipated to be completed by 2010, the year of the Project buildout. In accordance with historic trends, an ambient growth factor of 1.5 percent per year for the study area was established by the LADOT. Ambient growth in traffic is due to the combined effects of continuing development outside the Project study area, intensification of existing developments, and other factors independent of traffic generated by the identified related projects as well as Project traffic. The list of related projects that would contribute to the cumulative base traffic was prepared by obtaining data from various City sources, as well as from the City of Beverly Hills. A total of 49 related projects are identified within the study area. A list of the related projects is presented in Table 2 on page 89 in Section III.B, General Overview of the Environmental Setting, Cumulative Development, of this Draft EIR. Figure 13 on page 93 in Section III.B illustrates of the locations of the related projects and the general geographic area of the traffic study area. (c) Peak Traffic Periods Service level analyses are based on the peak traffic periods in the study area. Peak traffic periods (periods of heaviest traffic demand) are estimated to occur during the weekday A.M. and P.M. commute time periods. (d) Trip Generation Trip generation estimates for the Project and related projects incorporate a combination of trip generation rates contained in Trip Generation, 7th Edition (Institute of Transportation Engineers [ITE], 2003), as well as the CEQA documents prepared in support of some of the related projects. Page 154

15 Estimated trips for the Project are based on trips per dwelling unit. Existing uses are deducted from the Project s estimated trips to derive a net change in daily and A.M. and P.M. peak-hour trips. Trip credits taken for existing uses include the following: Commercial Bank Trip-generation estimates for this existing land use were calculated using ITE trip-generation rates for the daily and A.M. peak hour, while West Los Angeles Transportation Improvement and Mitigation Specific Plan (WLA TIMP) trip generation rates were used for the P.M. peak hour. A pass-by reduction of 20 percent was factored in to decrease the baseline of existing trips, consistent with LADOT s Traffic Study Policies and Procedures (revised March 2002). Office Trip-generation estimates for this existing land use were calculated using ITE trip-generation rates for the A.M. peak hour and WLA TIMP rates for the P.M. peak hour. Restaurant Trip-generation estimates for this existing land use were calculated using ITE trip-generation rates for the daily and the A.M. peak hour. No existing trip credits were used for the P.M. peak hour since the restaurant is presently open for lunch and in the evening as a nightclub, but is closed during the P.M. peak hour of traffic. To determine the total traffic volumes for year 2010, the trips generated by existing uses are subtracted from the Project s estimated trips, to derive a net increase in trips. The Project s net traffic volumes are added to the year 2010 cumulative base traffic projections, resulting in cumulative plus Project A.M. and P.M. peak-hour traffic volumes. (e) Traffic Distribution The geographic distribution of the traffic generated by the Project and related projects is dependent on several factors. These factors include the type and density of the proposed land uses, the geographic distribution of population from which the employees and potential patrons of the proposed developments are drawn, locations of employment and commercial centers to which residents of the Project or related residential projects would be drawn, characteristics of the street system serving the Project and the related projects, and the level of accessibility of the routes to and from the Project and related projects sites. The assignment of Project traffic takes into consideration left and right turns into and out of the main driveway on Constellation Boulevard, left and right turns into and out of the alley access driveway on Constellation Boulevard, and the restriction of the secondary driveway on Avenue of the Stars to right-turns-only. Page 155

16 (f) Level of Service Methodology Level of service (LOS) is a qualitative measure used to describe the condition of traffic flow on a street system. Service levels and a corresponding discussion of intersection conditions were previously described in Table 9 on page 150. The has established threshold criteria used to determine when significant traffic impacts occur for streets within its jurisdiction. For signalized intersections within the, the analysis was conducted in accordance with LADOT s Traffic Study Policies and Procedures (revised March 2002) and utilizes the Transportation Research Board s Critical Movement Analysis (CMA) methodology of intersection capacity calculation. The provides a 7 percent credit toward increased capacity at any intersection where ATSAC is implemented and an additional 3 percent credit toward increased capacity where ATCS is implemented. All but five of the study intersections operate under both ATSAC and ATCS control. The intersections of North Santa Monica Boulevard/Wilshire Boulevard and Little Santa Monica Boulevard/Wilshire Boulevard are located within the jurisdiction of the City of Beverly Hills and are evaluated in accordance with the Intersection Capacity Utilization (ICU) methodology, as required by the City of Beverly Hills as well as the CMA methodology used by the. The CMA and ICU methodologies are both based on intersection volume-to-capacity (V/C) ratios. To determine the V/C ratio, the total existing traffic, ambient growth, related projects traffic, and Project traffic are assigned to an intersection. The V/C ratio is subsequently assigned a Level of Service (LOS) for different traffic conditions. In general terms, LOS describes the quality of traffic flow. Through the use of the CMA methodology, a determination of the LOS at an intersection where traffic volumes are known or have been projected can be obtained through a summation of the critical movement volumes at that intersection (the highest combination of conflicting movements that must be accommodated at the intersection). The CMA values are calculated by dividing the sum of the critical movement volumes by the capacity value of the intersection, whereas ICU is calculated by dividing by roadway capacity and then adding the critical move volumes. Under both the CMA and ICU methods, the capacity of the intersection is the maximum total hourly movement of vehicles in the critical lanes, which have a reasonable expectation of passing through an intersection under prevailing roadway and traffic conditions. (3) Regional Transportation System Impact Analysis The evaluation of the impact of a project on the regional transportation system is guided by procedures outlined in The Los Angeles County 2004 Congestion Management Program (CMP) (Los Angeles County Metropolitan Transportation Authority). The CMP requires that, when an environmental impact report is prepared for a project, traffic and transit impact analyses must be conducted for select regional facilities based on the quantity of project traffic expected to use those facilities. Page 156

17 The CMP guidelines require the identification of CMP arterial monitoring intersections and CMP mainline freeway monitoring locations within a geographic area in which any CMP arterial monitoring station would receive 50 or more project trips during either the A.M. or P.M. weekday peak hours; or as any CMP mainline freeway monitoring station which would receive 150 or more project trips, in either direction, during either the A.M. or P.M. weekday peak hours. The EIR evaluates the number of additional trips that would be generated by the Project and compares these trips with the threshold criteria. Analysis of the impact of Project traffic is provided for the nearest CMP monitoring stations to the Project site. The following two study intersections are the nearest CMP arterial monitoring stations: Beverly Glen Boulevard/Wilshire Boulevard; and Santa Monica Boulevard (North)/Wilshire Boulevard. The following two freeway segments are the nearest CMP mainline freeway monitoring stations to the Project site: Santa Monica Freeway (I-10) east of Overland Avenue; and San Diego Freeway (I-405) north of Venice Boulevard. (4) Local Streets The impact on local streets is based on the potential for a project to increase the existing average daily trips (ADT) on a local street by a particular threshold percentage established by the LADOT. To calculate the potential for the Project to increase the existing ADT on local streets, the Project s estimated ADT is compared with existing conditions and the LADOT threshold. (5) Access The service level of the Project driveways is evaluated to determine the ability of the Project to accommodate traffic levels at the access points. Since all three Project site access points would be unsignalized and stop-controlled at the point they join the public street, access points are analyzed using the Two-Way Stop methodology from the 2000 Highway Capacity Manual (HCM). The HCM methodology determines the average vehicle delay to find the corresponding LOS, based on the definitions in Table 10 on page 158. Appendix D of the Kaku Associates report (October 2005) (Appendix C of this Draft EIR) contains the LOS worksheets for the proposed driveways. Page 157

18 Table 10 LEVEL OF SERVICE DEFINITIONS FOR STOP-CONTROLLED INTERSECTIONS Average Total Delay Level of Service (Seconds per vehicle) A Less than 10.0 B Greater than 10.0 and less than 15.0 C Greater than 15.0 and less than 25.0 D Greater than 25.0 and less than 35.0 E Greater than 35.0 and less than 50.0 F Greater than 50.0 Source: Transportation Research Board, Highway Capacity Manual, Special Report 209, To determine existing baseline conditions and future cumulative plus project baseline conditions at the Projects proposed driveways and private alley, manual counts of existing turning movements were conducted to obtain baseline conditions. Manual counts were conducted for the existing intersection of the private alley and Constellation Boulevard for two hours in the morning (7 to 9 A.M.) and two hours in the afternoon (4 to 6 P.M.) on Thursday, August 8, Manual count data are presented in Appendix B of the Project s traffic study (October 2005), which is presented in Appendix C of this Draft EIR. The traffic count data is separated into the various types of vehicles and land uses that the existing alley serves. Traffic for the following land uses was counted: Vehicles in and out of the restaurant parking lot immediately adjacent to Constellation Boulevard; Vehicles to and from the Watt Towers loading dock and delivery parking area; Vehicles to and from the truck tunnel and the Santa Monica Boulevard garage; Vehicles to and from the alley between the Santa Monica Boulevard garage and the Watt Towers garage; and Vehicles currently utilizing surface parking on the Project site. The analysis of access impacts reflects the forecasted Project A.M. and P.M. peak-hour volumes. Peak-hour turns are compared with the cumulative plus Project conditions on Avenue of the Stars and Constellation Boulevard. Cumulative base conditions include related projects, ambient growth and Project traffic. Peak-hour turning movements in and out of the private alley contributed by all the above-mentioned categories were included except for the vehicles in and Page 158

19 out of the restaurant parking lot and the vehicles currently utilizing surface parking on the Project site, since these uses would be replaced by the Project. (6) Regional Transit The analysis of Project traffic in relation to the regional transportation system is conducted according to the CMP. CMP Section D.8.4 provides a methodology for estimating the number of transit trips expected to result from a project based on the projected number of vehicle trips. This methodology assumes an average vehicle ridership (AVR) factor of 1.4 per vehicle in order to estimate the number of person trips to and from the Project site and provides guidance regarding the percent of person trips assigned to public transit depending on the type of use (commercial/other or residential) and the proximity to transit services. The CMP guidelines estimate that approximately 5 percent of project person trips may use public transit to travel to and from the Project site. This percentage is based on the quarter-mile proximity of the Project site to the Santa Monica Transit Parkway, the nearest designated CMP transit corridor. To calculate the impact of the Project on regional transit, the projected number of person trips on transit is compared to existing conditions. b. Thresholds of Significance (1) Construction Impacts The Project would have a significant traffic and circulation impact relative to construction, if construction traffic or activities cause the following: Substantial delays and disruption of existing traffic and pedestrian flow; and Temporary relocation of existing bus stops to more than one-quarter mile from their existing stops. (2) Operational Impacts (a) Intersection Capacity (i) Criteria Under the LADOT published traffic study guidelines, an intersection would be significantly impacted if an increase in V/C ratio equal to or greater than 0.04 for intersections operating at LOS C occurred, if an increase equal to or greater than 0.02 for intersections operating at LOS D occurred, or if an increase equal to or greater than 0.01 for intersections Page 159

20 operating at LOS E or F occurred after the addition of related projects, ambient growth, and Project traffic. Intersections operating at LOS A or B after the addition of Project traffic are not considered significantly impacted regardless of the increase in V/C ratio. The following summarizes the impact criteria: LOS Final V/C Ratio Project-Related Increase in V/C C >0.700 to Equal or greater than D >0.800 to Equal or greater than E, F >0.900 Equal or greater than (ii) City of Beverly Hills Criteria Under City of Beverly Hills significance thresholds, an intersection would be significantly impacted with an increase in V/C ratio equal to or greater than 0.04 for intersections operating at LOS D and equal to or greater than 0.02 for intersections operating at LOS E or F after the addition of project traffic. The following summarizes the impact criteria: LOS Final V/C Ratio Project-Related Increase in V/C D >0.800 to Equal or greater than E, F >0.900 Equal or greater than (b) Countywide Congestion Management Plan (CMP) Under the CMP, a significant traffic impact would occur if a project increases traffic demand on a CMP station by 2 percent of capacity (V/C ratio increase greater than, or equal to, 0.02), causing LOS F (V/C greater than 1.00). If the station is already LOS F, a significant impact would occur when a project increases traffic demand on a CMP facility by 2 percent of capacity (V/C ratio increase greater than, or equal to, 0.02). (c) Local Streets Under the CEQA Thresholds Guide, a local street would be significantly impacted if the Project s average daily traffic (ADT) constitutes a specified percentage in relation to the future ADT. The following summarizes this impact criteria: Page 160

21 Projected Average Daily Traffic with Project (Final ADT) Project-Related Increase in ADT 0 to percent or more of final ADT 1,000 to 1, percent or more of final ADT 2,000 to 2, percent or more of final ADT 3,000 or more 8 percent or more of final ADT (d) Access Under the CEQA Thresholds Guide, a project would have a significant access impact if any driveway intersection with the public street is projected to operate at LOS E or F during the A.M. or P.M. peak hour, under cumulative plus Project conditions. (e) Public Transit Based on the CEQA Thresholds Guide, a significant impact would occur if projected transit riders exceed available transit capacity. c. Analysis of Project Impacts (1) Project Design Features Access to the Project site would be via three driveways including two driveways on Constellation Boulevard and one driveway on Avenue of the Stars. The main driveway would be on Constellation Boulevard, approximately 100 feet west of the Project site s east boundary. The main driveway along Constellation Boulevard would lead to the central plaza and the drop-off areas at the main entrances of each of the residential structures. Valet services and a concierge would be located at each building entrance. The second driveway on Constellation Boulevard would be located on the eastern boundary in the area of the existing private alley. The existing alley would be widened and reconfigured to align with the eastern boundary of the Project site. A third driveway would be located on Avenue of the Stars on the northern boundary of the Project site. The Avenue of the Stars driveway, which would provide access to the underground parking and to the Project s central plaza, would be accessible from northbound Avenue of the Stars with access restricted to right turns in and right turns out only. In addition, the Project would provide an irrevocable offer to dedicate for future street widening an area along Constellation Boulevard at Avenue of the Stars. Page 161

22 Once on-site, access to the Project s three residential structures and the on-site parking facilities would be available as follows: The main driveway along Constellation Boulevard would lead to the central plaza and the drop-off areas at the main entrances of each residential structure. Valet services and a concierge would be located at each building entrance. The Constellation Boulevard main driveway would provide for both left and right turns into and out of the Project site. A driveway located along the eastern boundary of the site approximately 100 feet east of the main driveway would provide access to the Project s below-grade parking facility. This Project driveway would provide vehicular access to the Project site via a shared use of the existing private alley. The existing alley, which provides access to Watt Towers and the Santa Monica Boulevard building, would be widened and reconfigured to align with the eastern boundary of the Project site. Left and right turns into and out of the existing alley would continue, as under existing conditions. A driveway located on Avenue of the Stars along the northern boundary of the Project site would provide access to the below-grade parking facility and to the central plaza and drop-off areas. This driveway would be accessible from northbound Avenue of the Stars with access restricted to right turns in and right turns out only. The existing driveways serving the bank building parking lot, the bank drive-through facility, and the restaurant parking lot would be removed. (2) Future Roadway Improvements The completion of several key roadway improvements in or near the Project s traffic study area are anticipated by These improvements, either the result of local or regional capital improvement programs or mitigation for entitled related projects, would result in capacity changes at various locations throughout the study area. These changes would affect the operations of several study intersections. Proposed improvements may also result in changes to the existing traffic patterns in the study area and are assumed to be in place by The anticipated street improvements and related changes in existing traffic patterns are described below. (a) Santa Monica Transit Parkway Project The Santa Monica Transit Parkway is currently under construction in accordance with the Classic Boulevard design model. This design model is a multi-modal transportation improvement that will accomplish the following: (a) consolidate North Santa Monica Boulevard Page 162

23 and Little Santa Monica Boulevard; (b) provide three travel lanes in each direction with a center landscaped median; (c) provide bike lanes on both side of the median; and (d) provide side medians separating the boulevard from one-way local access streets. The Transit Parkway will also include freeway ramp and transit improvements. Little Santa Monica Boulevard will be maintained as a separate two-way street between Overland Avenue and Beverly Glen Boulevard to allow for local access. As such, Little Santa Monica Boulevard will be eliminated between Beverly Glen Boulevard on the west and Century Park East on the east. With the elimination of Little Santa Monica Boulevard, future traffic volumes on Little Santa Monica Boulevard will be shifted to the Transit Parkway. Appendix A of the Project s traffic study (September 2005) describes, in detail, improvements to various study intersections under the Santa Monica Transit Parkway project. (b) Other Roadway Improvements Other roadway improvements are required mitigation measures for other private projects, including the Fox Studios expansion and the Constellation Place project. The Fox Studios expansion project involved the implementation of a number of mitigation measures affecting intersections within the Project s traffic study area. Most of these mitigation measures have previously been implemented. The mitigation measure proposed at the Avenue of the Stars/ Constellation Boulevard intersection (modification of the northbound Avenue of the Stars approach to provide a shared northbound through/right-turn lane) is presently under construction and therefore has been assumed to be in place as part of the year 2010 future analysis. However, the mitigation measure proposed at the Avenue of the Stars/Pico Boulevard intersection has not been implemented and, to be conservative, has not been assumed to be in place as part of the year 2010 analysis. The Constellation Place project also implemented mitigation measures within the Project s traffic study area. These included improvements at the Avenue of the Stars/ Constellation Boulevard and Century Park West/Olympic Boulevard intersections and implementation of a sub-regional ATCS program. These mitigation measures have already been implemented and are reflected in the existing conditions analysis. In addition, the Century City Neighborhood Traffic Management Plan (NTMP), adopted July 2003 and consisting of a series of measures to enhance flow on arterial streets and discourage travel on residential streets, is being implemented in two phases. Where applicable, the Project s traffic study (Appendix C of the Draft EIR), to be conservative, assumes that the Century City NTMP measures would be in place by 2010 and thus are included in the Project s traffic analysis. Page 163

24 Appendix A of the Project s traffic study (September 2005) contains existing base year 2005 and future year 2010 intersection lane configurations and additional information regarding other proposed improvements in the study area. (3) Project Impacts (a) Construction Impacts (i) Worker Trips Project construction would generate traffic from construction worker travel, as well as the arrival and departure of trucks delivering construction materials to the site and the hauling of debris and exported soils generated by on-site demolition and excavation activities. Both the number of construction workers and trucks would vary throughout the construction process in order to maintain a reasonable schedule of completion. The number of on-site construction workers, based on the specific construction activity underway (i.e., demolition, excavation, building erection, etc.), would range from approximately 20 to 250, with the lower end of the range occurring during building demolition and the upper end of the range occurring during finishing work (i.e., drywall, paring, electrical, etc.) In general, it is anticipated that the majority of the construction workers would arrive and depart the site during off-peak hours (i.e., arrive prior to 7:00 A.M. and depart between 3:00 to 4:00 P.M.). The construction work force would likely be from all parts of the Los Angeles region and are, thereby, assumed to arrive from all directions. Consequently, the impact of construction worker traffic on peak-hour traffic in the vicinity of the site would be negligible. Given the off-peak nature of construction worker traffic, a less than significant impact is anticipated with regard to the local roadway network as well as the freeway mainline and on/off-ramps. Furthermore, construction-related traffic would be largely oriented toward major arterials and freeways and, as such, are anticipated to result in a less than significant traffic impact during peak commuter travel periods. (ii) Hauling Depending upon the specific nature of the construction activity (e.g., demolition, excavation, finish construction, landscaping), it is assumed that the majority of truck traffic would be distributed evenly across the workday. During construction, peak-hour uses from existing uses would be eliminated. It is anticipated that during peak excavation periods, Project construction would generate up to 240 daily haul trips (i.e., average of 25 haul trips per hour). As such, hauling activities during any hourly period would not exceed the level of peak-hour trips, including 116 A.M. peak-hour trips and 338 P.M. peak-hour trips, generated by existing uses Page 164

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION IV. ENVIRONMENTAL IMPACT ANALYSIS 1. INTRODUCTION This section is based on a traffic and parking impact study that was prepared for the proposed CSMC West Tower Project by Linscott, Law & Greenspan, Engineers,

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

4.4 Transportation and Circulation

4.4 Transportation and Circulation 4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Impact Study Health Sciences Campus Project, City of Los Angeles,

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Study for the Villa Marina Residential Project, prepared by Kaku

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic impacts were analyzed for both the

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

TRANSPORTATION 1. INTRODUCTION

TRANSPORTATION 1. INTRODUCTION IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRAFFIC, TRANSPORTATION, AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRAFFIC, TRANSPORTATION, AND PARKING IV. NVIRONMNTAL IMPACT ANALYSIS L. TRAFFIC, TRANSPORTATION, AND PARKING INTRODUCTION The following summarizes the information provided in the traffic report prepared by Hirsch/Green Transportation Consulting,

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION The following Section presents a summary of the Traffic Study for the Proposed Civic Center/Metlox Development Project in the City of Manhattan

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC 3.13 TRANSPORTATION / TRAFFIC As a result of the analysis undertaken in the Initial Study for the Los Angeles Mission College Facilities Master Plan, the (LACCD) determined that the proposed project may

More information

IV. Environmental Impact Analysis J. Traffic, Access, and Parking

IV. Environmental Impact Analysis J. Traffic, Access, and Parking IV. Environmental Impact Analysis J. Traffic, Access, and Parking 1. Introduction This section of the Draft EIR analyzes the proposed Project s potential impacts on traffic, access, and parking. This section

More information

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways. 4.7 Transportation and Circulation This report documents the results of a study of the potential traffic impacts created by the Whittier Main Oil Field Development Project. The study is included as Appendix

More information

ENVIRONMENTAL IMPACT ANALYSIS J. TRAFFIC, CIRCULATION AND ACCESS

ENVIRONMENTAL IMPACT ANALYSIS J. TRAFFIC, CIRCULATION AND ACCESS IV. ENVIRONMENTAL IMPACT ANALYSIS A traffic study was prepared for the Proposed Project by Linscott, Law & Greenspan, Engineers, dated August 5, 2008 (see Appendix I: Traffic Study). The traffic study

More information

Sherman Oaks Community Traffic Plan

Sherman Oaks Community Traffic Plan Sherman Oaks is a community that is geographically bound by the Santa Monica mountains on its southern boundary, and the ever-expanding San Fernando Valley on its western, northern, and eastern boundaries.

More information

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY IV.K TRANSPORTATION 1. INTRODUCTION This section provides an analysis of potential impacts associated with traffic, parking, and access. The analysis provides an overview of existing traffic conditions

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site Project Scoping Report Appendix B Project Web Site APPENDIX B Project Web Site WESTSIDE EXTENSION TRANSIT CORRIDOR STUDY February 4, 2008 News and Info of 1 http://metro.net/projects_programs/westside/news_info.htm#topofpage

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment 2.1.5 Traffic and Circulation This section addresses the potential impacts to traffic and circulation associated with construction and long-term operation of the proposed project. The traffic and circulation

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC The following summarizes the information provided in the traffic report prepared by Fehr & Peers/Kaku Associates entitled, Traffic Study for

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Replacement Project EIR Appendices TRAFFIC IMPACT ANALYSIS LAKE WOHLFORD DAM Escondido, California December 19,

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010)

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) TRANSPORTATION IMPACT ANALYSIS FOR THE LOYOLA MARYMOUNT UNIVERSITY MASTER PLAN PROJECT JUNE 2010 PREPARED FOR AECOM Design PREPARED BY

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Perris Apartments Traffic Impact Analysis City of Perris, California

Perris Apartments Traffic Impact Analysis City of Perris, California Perris Apartments Traffic Impact Analysis City of Perris, California Prepared for: JD Pierce Company, Inc. 2222 Martin St., Suite 100 Irvine, CA 92612 Prepared by: TJW ENGINEERING, INC. 540 N. Golden Circle

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information