1 Transnet National Ports Authority Port of Durban Relocation of Administrative Building and Passenger Terminal at A & B Berth Transport Impact Assessment July 2012 J31151 Arcus GIBB (Pty) Ltd Reg. 1992/007139/07 Head Office: Johannesburg, South Africa 14 Eglin Road, Sunninghill, 2191 Tel: Fax:

2 Port of Durban Relocation of Administration Building and Passenger Terminal at A & B Berth Transport Impact Assessment CONTENTS Chapter Description Page 1 INTRODUCTION Background 1 2 ROAD NETWORK AND LAND USE 4 3 ACCESSES 5 4 BACKGROUND TRAFFIC 7 5 TRIP GENERATION Current Passenger Terminal Facilities Current Transnet Administration Building facilities Trip Generation Rates 9 6 TRIP DISTRIBUTION AND TRAFFIC ASSIGNMENT 12 7 CAPACITY ANALYSIS Mahatma Gandhi and Camperdown Road intersection Mahatma Gandhi and Browns Road intersection Mahatma Gandhi and Signal Road intersection 18 8 PUBLIC TRANSPORT Bus and Minibus Taxi 20 9 NON-MOTORISED TRANSPORT Pedestrians Cycling PARKING Existing Facilities Proposed Facilities 25 P:\J31151 (Durban Port Terminal TIA)\TASKS\Port Project - Dbn\TIA Report

3 11 SIGNAGE CONCLUSION RECOMMENDATIONS 31 REFERENCES APPENDIX A P:\J31151 (Durban Port Terminal TIA)\TASKS\Port Project - Dbn\TIA Report

4 1 INTRODUCTION 1.1 Background Arcus GIBB (Pty) Ltd was appointed by the Transnet National Ports Authority to undertake a Transport Impact Assessment (TIA) for the new proposed passenger terminal and administration buildings at the Port of Durban. The objective of this TIA is to determine the impact the proposed development will have on the surrounding transport network. The impact of the proposed development on the port waterside operations was not part of the scope of this study. Currently, the existing Transnet administration buildings and the passenger terminal building operate from Durban Port Entrance 3 off Quayside Road and Margaret Mncadi Avenue (to the south). Figures 1.1 and 1.2 show the locality plan and site layout of the proposed site, with the three proposed T-junction intersections that are later envisaged to be upgraded to provide access to the new development. Currently only the Mahatma Gandhi / Southampton Road intersection provides access to this area. Figures 1.3a 1.3h show Transnet s proposed conceptual design and layouts of the new proposed passenger terminal and administration buildings. Two site visits were undertaken; on Saturday, 24 March 2012 and on the morning of Monday, 26 March 2012 to observe operations at both the existing and proposed sites. The first site visit coincided with the arrival and departure of the MSC Sinfonia cruise liner as well as the start of the Kwa-Zulu Natal Easter school holidays. The second visit was to assess the site and surrounds during the morning peak of a regular work day. This report includes the traffic operations noted during the visits and assesses the impact the proposed new Passenger Terminal and Administration Buildings will have on the external road network. The new proposed development, which consists of 31,000 m 2 gross leasable area (GLA), will comprise the following: Passenger terminal - 18,000 m 2 GLA, which comprises of 6,500 m 2 GLA retail of which the majority consists of take-away and small convenience shops related to the passenger terminal operations. Administration building including conference facility - 13,000 m 2 GLA Port of Durban - TIA REPORT - FINAL 1 July 2012

5 In response to queries from the ethekwini transport officials and following discussions with the relevant Transnet officials, the following proposals relating to the existing and proposed new facilities were confirmed: The new Passenger Terminal is expected to handle approximately passengers and provide parking for approximately 600 vehicles. Other types of land-use expected within the passenger terminal will be retail stores, cafe s, restaurants and so forth, very similar to those found within an Airport Terminal building. These retail stores will be open to the general public, however, the Client s intention is not for these retail stores to compete against other retail developments in the area, so as not to draw large numbers of non-passengers/employees to the development. The retail stores are envisaged to compliment the current Durban Point Waterfront Precinct area and the ushaka Marine World. Transnet s current staff component on site is approximately 300 people. The new administration building is expected to house 380 to 400 employees and provide parking for approximately 400 vehicles. The new facility therefore allows for some expansion, but mainly aims to consolidate all current administration tasks within one building. A & B Berth (the current dock for cruise ships) and the existing passenger terminal will be designated to ride-on ride-off (RORO) vehicle operations. RORO operations already take place within the port, and this will be seen as a site change only. Internally, the staging of the vehicles will change accordingly; however no additional strain is envisaged on the main entrance to the current site, ie at the Margaret Mncadi Avenue and Quayside Road intersection. Although internal port operations may be changed, this is not envisaged to influence the operation of the external road network. The Margaret Mncadi Avenue and Quayside Road intersection access will still be the main point of entry to the old site. Port of Durban - TIA REPORT - FINAL 2 July 2012

6

7

8 Figure 1.3a: Proposed new Passenger Terminal Building Figure 1.3b: Proposed new Transnet Administration Building Port of Durban - TIA REPORT - FINAL 3 July 2012

9 Figure 1.3c Insert: FIGURE 1.3c Port of Durban - TIA REPORT - FINAL 4 July 2012

10 Port of Durban - TIA REPORT - FINAL 5 July 2012 Figure 1.3d

11 Port of Durban - TIA REPORT - FINAL 6 July 2012 Figure 1.3e

12 Insert: FIGURE 1.3g Figure 1.3f Port of Durban - TIA REPORT - FINAL 7 July 2012

13 Port of Durban - TIA REPORT - FINAL 4 July 2012 Figure 1.3g

14 2 ROAD NETWORK AND LAND USE The following existing roads, shown in Figure 2.1, serve the north-east section of the Port of Durban: Margaret Mncadi Avenue Dr Langalibalele Dube Street Bay Ter Shepstone Road Mahatma Gandhi Road (Previously Point Road) Southampton Road Quayside Road Marine Terminal Street Camperdown Road Browns Road Signal Road The Durban Point Development Area includes the ushaka Marine World and extends from Bell Street to the harbour entrance and from the beachfront to Mahatma Gandhi Road. The site measures 55ha of which ushaka Marine World takes up 10ha while the balance of the 45ha is to be developed as a series of precincts collectively known as Durban Point. The land owner of ushaka Marine World is Durban Marine Theme Park (Pty) Ltd while the land of Durban Point is the Durban Point Development Company (Pty) Ltd. The land on the harbour side of Mahatma Gandhi Road, as well as the current harbour entrance area, is owned by Transnet National Ports Authority. During the site visit, it was observed that there was no significant congestion on any of the roads to the north of the proposed development. It was noted that the only significant land use that could generate congestion was the ushaka Marine World Aquarium and Water theme park. The site visit on Saturday, 24 March 2012, coincided with the start of the Kwa-Zulu Natal school holidays; this was not observed to impact negatively on the Level of Service (LOS) of any of the intersections in question. The three T-junction road intersections, shown in Figure 2.1, that are considered for possible future access to the proposed development do not currently provide any access to Transnet s adjoining properties. Port of Durban - TIA REPORT - FINAL 4 July 2012

15

16 3 ACCESSES The Transnet property precinct is currently accessed via the main entrance at Durban Port Entrance 3, off the intersection with Quayside Road (Class 5 - Major access road) and Margaret Mncadi Avenue (Class 3 - Secondary arterial). Transnet property has strict access control and all vehicles and drivers are screened before they are allowed to enter. Figure 3.1 below shows the access control point on Quayside Road (off Margaret Mncadi Avenue). Figure 3.1: Existing Transnet access control point on Quayside Road The port also has an access at the intersection of Mahatma Gandhi and Southampton Road. This is not open to the public, is access controlled and is used by Transnet operations only, as shown in Figure 3.2 below. The approximate stacking space between the gate and the intersection is 12 m. Figure 3.2: Transnet Multi Purpose Terminal entrance off Mahatma Ghandi / Southampton Road intersection Port of Durban - TIA REPORT - FINAL 5 July 2012

17 The proposed development will require access off the lower portion of Mahatma Gandhi Road, which is a Class 4 Local Distributor road, located within the Durban Point Development Area. Mahatma Gandhi Road mainly provides access to adjacent businesses, residential developments and recreational facilities in the area. Three intersections are proposed to provide access to the future development (refer to Figure 1.2 for details): Mahatma Gandhi / Camperdown Road Mahatma Gandhi / Browns Road Mahatma Gandhi / Signal Road The spacing between the abovementioned accesses and the nearest signalised intersection is shown in Figure 3.3. The Signal Road access will serve only as an entrance and the Browns Road access will serve only as an exit to the Passenger Terminal building. The proposed design of the Administration Building is envisaged to take access of the Camperdown road intersection. This entrance will be access controlled and intended for Transnet employees, Transnet visitors and exit only for delivery vehicles originating from behind the Passenger Terminal building, as shown in Figure 1.3b. Port of Durban - TIA REPORT - FINAL 6 July 2012

18

19 4 BACKGROUND TRAFFIC Full traffic counts were undertaken on Thursday, 22 March 2012 during the AM (06:30 08:30) and PM (16:00-18:00) peak periods at each of the three proposed development intersections viz: Mahatma Gandhi / Browns Road Mahatma Gandhi / Camperdown Road Mahatma Gandhi / Signal Road The Background Traffic for both the AM and PM peak hours of each intersection are shown in Figures 4.1 and 4.2. The AM and PM peak hours were determined to be 07:15 08:15 and 16:15 17:15 respectively. The Manual for Traffic Impact Studies (Department of Transport) 1 recommends that for developments generating more than 150 trips in the peak hour, a five year projection of base traffic should also be analysed. A number of developments have been approved within the immediate vicinity of the study area and it was thus decided to apply an average annual growth rate of 2.5% to the background traffic when forecasting the projected 2017 (5 year) scenario. It should be noted that at the time of the count, construction was taking place on Mahatma Gandhi Road (between the Browns and Signal Road intersection), which resulted in a temporary road closure of this section. The vehicle counts and distribution obtained for the Browns and Signal Roads intersections were therefore considered unrepresentative of the traffic flow at those intersections. Traffic was therefore re-distributed from the Browns Road intersection to the Signal Road intersection. Furthermore, due to the higher traffic volumes along Mahatma Gandhi Road, it was assumed that 80% of right turning vehicles at the Camperdown Road approach would re-route to the nearest signalised intersection. The adjusted 2017 Background Traffic for both the AM and PM peak hours are shown in Figures 4.3 and 4.4. The assumptions for distribution were applied to the AM and PM 2017 projected background traffic. Refer to Appendix A for re-distributed volumes. Port of Durban - TIA REPORT - FINAL 7 July 2012

20

21

22

23

24 5 TRIP GENERATION 5.1 Current Passenger Terminal Facilities The Saturday site visit coincided with the arrival and departure of the MSC Sinfonia cruise liner on its pen-ultimate voyage of the 2011/2012 season, before returning to Italy. The current passenger terminal facilities can accommodate 2500 passengers at two berths. An information desk and two take-away cafés are present within the passenger terminal building. Currently passengers have the option of utilising a drop & go or a long term parking facility located within close proximity to the terminal building. 5.2 Current Transnet Administration Building facilities Transnet currently have three administration buildings on the existing site which house a total of approximately 300 staff members. Table 5.1: Transnet Staff allocation Building Current Staff Numbers Ocean Terminal Building 190 Durmarine Building 60 Bay Terrace 50 Normal office working hours are from 7:30 to 16:30. A large staff parking facility is provided close to the Durmarine Building. Investigations show that this parking area is fully utilised on a normal work day. A small number of parking bays are also available alongside the Ocean Marine Terminal and in front of the Durmarine Building; these are mainly used by the management of Transnet as well as visitors. Figure 5.6 below shows the parking area below the Durmarine Building. Port of Durban - TIA REPORT - FINAL 8 July 2012

25 Figure 5.6: Staff parking facility 5.3 Trip Generation Rates The proposed development will result in general traffic currently utilising the Durban Port Entrance 3 off Quayside Road and Margaret Mncadi Avenue to be re-distributed to the proposed accesses off Mahatma Gandhi Road. Trip generation rates were determined for each land-use in the proposed development. A normal Friday weekday with the arrival / departure of one cruise ship coinciding with any one peak hour was assumed. The Department of Transport s South African Trip Generation Rates 5 was used as the base to estimate the trips generated by the retail and administration building portions of the proposed development during the peak hours. Administration Building: The manual states a person trip rate of 4 / 100m² for General Offices (CBD), this was converted to vehicle trips using an assumed average vehicle occupancy of 1.5 persons to yielding a trip generation rate 2.7 trips / 100m² GLA. Passenger Terminal: The estimation of the vehicle trips generated by the passenger terminal was determined using a comparison between a rate derived from traffic counts conducted during the site visit and Trip Generation, Vol 2, 7th Ed (Institute of Transportation Engineers) 2. The manual states that the Waterport / Marine Terminal weekday rate is / berth. The derived rate was calculated to be 646 for the new passenger terminal (the existing facility has 2 berths). The new development is also proposed to have 2 berths. The derivation of the passenger terminal is shown in Figure 5.7 However, only one berth is expected to be utilized during any one peak hour. It is unlikely that two vessels would berth simultaneously while coinciding with the peak of the adjacent street traffic. To assume two cruise ships berthing simultaneously may Port of Durban - TIA REPORT - FINAL 9 July 2012

26 result in grossly over-compensating for traffic, resulting in unnecessary and underutilised infrastructure improvements. Therefore a rate of 323 / berth was used, ie 50% of the derived rate. Retail: A hypothesis of 25% of the Shopping Centre trip generation rate of x GLA = 11.4 (Friday Peak) was assumed for the PM Peak retail rate, and the AM rate was assumed to be 50% of the new PM rate, as shown below in Table 5.2. Table 5.2: Modified DoT Trip Generation Rate for Shopping Centres Land Use Proposed Retail Size Unit Friday AM Peak Rate Friday PM Peak Rate Shopping Centre 6, m This assumption is to be considered as a worst case scenario since the majority of trips generated by the retail will be shared with the passenger terminal and/or the administration building. The retail provided by the new development is not intended to be destination retail as it will mainly be used by staff and passengers. The total results of all required rates are shown in Table 5.3 below. Port of Durban - TIA REPORT - FINAL 10 July 2012

27 Table 5.3: Trip Generation Rates for Proposed Development Land Use Size Unit AM Rate PM Rate Directional split Primary Trips Generated AM Peak PM Peak AM Peak PM Peak In Out In Out In Out Total In Out Total Passenger Terminal* 1 berths % 50% 50% 50% Retail m % 33% 50% 50% Admin Building m % 25% 25% 75% TOTAL *Note: One berth to be utilised during any one peak hour **Note: PM retail rate is 25% of the original rate 11.4, and AM retail rate is 50% of new PM rate, as it is supporting retail (not destination retail) and is expected to be used predominantly by staff and passengers Port of Durban - TIA REPORT - FINAL 11 July 2012

28

29 6 TRIP DISTRIBUTION AND TRAFFIC ASSIGNMENT To determine the traffic impact of the proposed development on the surrounding road network, the proposed development s generated trips were distributed onto the existing road network. The access configuration of the development will comprise a full access exclusively for the Administration Building at Camperdown Road intersection and an entrance and exit at Signal and Browns Roads respectively, exclusively for the Passenger Terminal Building. The trip distribution for the Administration Building assumes that 90% of the trips will originate from or travel towards the CBD (western approach of the Mahatma Gandhi road), 8% will originate from or travel towards the ushaka Marine World (northern approach) and the remaining 2% trips were assumed to originate from or travel towards the eastern approach of Mahatma Gandhi road. The trips generated from the Passenger Terminal Building were distributed at the Browns and Signal Road intersections assuming that 95% of the trips will originate from or travel towards the CBD, 3% will originate from or travel towards the ushaka Marine World and the remaining 2% trips were assumed to originate from or travel towards the eastern approach of Mahatma Gandhi road. The delivery vehicles entering at Signal Road and exiting at the Camperdown intersections with Mahatma Gandhi Road were not taken into account as the volume of delivery vehicles during the adjacent street peak periods are considered to be negligible. Refer to Appendix A for the AM and PM distributed traffic volumes. The 2012 background traffic volumes (surveyed) were grown by 2.5% per annum to estimate the 2017 projected background traffic volumes. Figures 6.1 and 6.2 below show the 2017 AM and PM Peak Total Traffic distribution. This is a combination of the 2017 background traffic growth and the AM and PM distributed traffic volumes. The delivery vehicles entering at Signal Road and exiting at Camperdown Road intersections were not taken into account as the volume of delivery vehicles during the adjacent street peak periods are not considered significant. Port of Durban - TIA REPORT - FINAL 12 July 2012

30

31

32 7 CAPACITY ANALYSIS The SIDRA INTERSECTION 5.1 computer programme was used to analyse the following intersections: Mahatma Gandhi / Camperdown Road Mahatma Gandhi / Browns Road Mahatma Gandhi / Signal Road The following scenarios were analysed: 2012 Background Traffic (AM & PM) Total Traffic (AM & PM). The intersections were modified with an additional leg converting them from T-junctions into the appropriate four way intersections for the future scenario. The results indicate the level of service (LOS), the average control delay per vehicle and the 95 th percentile vehicle queues at the intersections for each scenario. These are shown in the Figures 7.1 to 7.4 below. Level of service is a measure used to assess the operation of existing transportation infrastructure as well as the effectiveness of infrastructure improvements. LOS is categorised in letters A to F, with A being the best and F being the worst, based on the average control delay experienced by vehicles at the intersection approaches. Broadly it can be defined as follows: A = Free flow B = Reasonably free flow C = Stable flow D = Approaching unstable flow E = Unstable flow F = Forced or breakdown flow Port of Durban - TIA REPORT - FINAL 13 July 2012

33

34

35

36

37 7.1 Mahatma Gandhi and Camperdown Road intersection (a) Existing layout and operation The existing geometry and aerial view of the intersection is shown in Figures 7.5 and 7.6 below. Figure 7.5: Intersection geometry Figure 7.6: Aerial View The intersection currently operates adequately with LOS A to C and minimal queues and delays. It is envisaged that at least 80% of right turning vehicles at the Camperdown Road approach will redistribute to the nearest signalised intersection to avoid delay along Mahatma Gandhi Road. The intersection was analysed using this assumption. (b) Future layout and operation The intersection will operate poorly during both peaks, with all movements at the northern approach experiencing LOS E to F. The southern approach will operate at LOS F for through and right turning movements, while the left turning movement is at LOS C. The poor LOS can be attributed to the increase in traffic along Mahatma Gandhi Road, causing long delays for the vehicles on the minor approaches. The 95 th percentile queues are adequate with queues ranging from 1 to 4 vehicles. It is also expected that trips not generated by this development will re-distribute to adjacent intersections, such as the Mahatma Gandhi / Southampton signalised intersection, instead of queuing at this intersection. It is proposed that the current stop controlled T-junction intersection be upgraded by providing a right turning lane along Mahatma Gandhi Road for vehicles turning into the proposed development, a median to facilitate safer two-stage crossing for right turning vehicles and a left turn yield slip lane from the development onto Mahatma Gandhi Road, as shown in Figure 7.7 below. Signalisation of this intersection is not recommended due to the close proximity, approximately 175m, to the adjacent Mahatma Gandhi / Southampton Road signalised intersection. Port of Durban - TIA REPORT - FINAL 14 July 2012

38 The performance of this intersection, in reality, is expected to be better than that which is illustrated by SIDRA, as the model does not adequately interpret the benefits of the median. Figure 7.7: Mahatma Gandhi & Camperdown Road 7.2 Mahatma Gandhi and Browns Road intersection This intersection is a main access for two large residential developments as well as overflow parking for the ushaka Marine World Aquarium and Water Theme park. The eastern leg of the intersection (in both directions) was closed due to construction, at the time of the survey. (a) Existing layout and operation The existing geometry and aerial view of the intersection is shown in Figures 7.8 and 7.9 Port of Durban - TIA REPORT - FINAL 15 July 2012

39 Figure 7.8: Intersection geometry Figure 7.9: Aerial View The intersection currently operates adequately with LOS A to B and minimal queues and delays. (b) Future layout and operation The intersection will operate poorly to adequately with the eastern and western approaches operating at LOS A to B. The southern approach operates at LOS B and D and all movements from the northern approach operate at LOS F. This can be attributed to extensive delays. The 95 th percentile queues vary from adequate to poor at 1 to 12 vehicles. The future layout is shown in Figure It is proposed that the current stop controlled T-junction intersection be upgraded to a signalised intersection as well as a median at the intersections with the geometry as proposed in Figure The signalisation will improve its operation, with an overall LOS B in the AM and PM peak hours. Port of Durban - TIA REPORT - FINAL 16 July 2012

40 Figure 7.10: Mahatma Gandhi & Browns Road Figure 7.11: Signalised Mahatma Gandhi & Browns Road Port of Durban - TIA REPORT - FINAL 17 July 2012

41 7.3 Mahatma Gandhi and Signal Road intersection The western leg of the intersection was closed due to construction at the time of the survey. (a) Existing layout and operation The existing geometry and aerial view of the intersection is shown in Figures 7.12 and 7.13 below. Figure 7.12: Intersection geometry Figure 7.13: Aerial View The intersection currently operates well during both peaks, at an overall LOS A with LOS B for the left and right turn exiting the residential and commercial area. (b) Future layout and operation The intersection in general will operate adequately during both peaks, with most movements at LOS A to B. The right turning movement at the northern approach will however operate at LOS D. The poor LOS for this movement can be attributed to the increase in traffic causing long delays for the few right turning vehicles. The 95 th percentile queues are adequate with queues ranging from 1 to 2 vehicles. It is proposed that the current stop controlled T-junction intersection be upgraded by adding a right turning lane along Mahatma Gandhi Road for vehicles turning into the development as well as a median at the intersection, as shown in Figure 7.14 below. Port of Durban - TIA REPORT - FINAL 18 July 2012

42 Figure 7.14: Mahatma Gandhi & Signal Road Port of Durban - TIA REPORT - FINAL 19 July 2012

43 8 PUBLIC TRANSPORT 8.1 Bus and Minibus Taxi The area along Mahatma Gandhi Road, adjacent to the proposed development site, is not a well used public transport route. There were mini-bus taxi s and buses observed, however not in high volumes. They were mainly observed in the vicinity of the ushaka Marine World in the early parts of the Saturday and Monday morning, possibly dropping people off for work. Figure 8.1 below shows buses parked at a bus stop along Mahatma Gandhi Road, outside ushaka Marine World. Buses were empty and no passengers were observed to be queuing. Figure 8.1: Buses parked at stop outside ushaka Marine World There were no other formalised bus or mini-bus taxi stops observed in the area. Minibus taxi s were observed using the internal road network adjacent to ushaka Marine World (Albert Ter Road, Eskine Ter Road, Ansion Road, Timeball Boulevard) and then return to the City Centre on Mahatma Gandhi Road via Camperdown and Browns Roads. The pick up/drop off point was observed to be the entrance to ushaka Marine World. This is indicative that the majority of the passengers either work at ushaka Marine World or were visiting there specifically. The Ethekwini Municipality s Current Public Transport Records (CPTR) compiled from a survey undertaken in 2003 / 2004 shows the existing public transport routes, as well as the current major public transport interchanges in the Durban CBD, as shown in Figure 8.2. Based on the CPTR, there are currently no recognised public transport routes nearby the proposed development site. It is expected that public transport usage by visitors to-and-from the proposed development will be relatively low. However it is anticipated that employees working at the proposed development will make use of such a service. This should be taken note of in future public transport planning exercises. Port of Durban - TIA REPORT - FINAL 20 July 2012

44

45 Durban s People Mover has a route nearby the proposed development along Prince and Gillespie streets, as shown in Figure 8.3. The acceptable walking distance to public transport facilities according to the Pedestrian and Bicycle facilities Guideline 3 should be 500m. The access points of the proposed development are well over 500m away from the closest People Mover stops and are therefore not within reasonable walking distance. The proposed development and its likely popularity as a tourist hub could in future warrant the need to include a stop within reasonable walking distance. This should be taken note of in future public transport planning exercises. Port of Durban - TIA REPORT - FINAL 21 July 2012

46

47 9 NON-MOTORISED TRANSPORT 9.1 Pedestrians The new proposed development site borders the Durban Point Waterfront Precinct area. This area has been developed to embody the following concepts: An urban intensity of scale and an urban character of development. A structure based on canals, water bodies, boulevards, vistas, urban squares, avenues, lanes and parks, all creating memorable places. An emphasis on easy, safe, convenient and pleasant pedestrian movement with access to well located, safe parking areas An emphasis on mixed-use developments which encourages the integration of retail, commercial, office, entertainment and residential activities. Figure 9.1 below shows the paved pedestrian sidewalks provided along both the northern and southern sides of Mahatma Gandhi Road. Figure 9.1: Pedestrian sidewalks along Mahatma Gandhi Road at the Camperdown Road intersection The proposed development and surrounds are well provisioned with pedestrian facilities, such as demarcated pedestrian crossings, surfaced sidewalks and so forth. No major pedestrian activity was observed in the vicinity of the proposed site. Most people who visit the area either arrive in private vehicles, buses or minibus taxis. Port of Durban - TIA REPORT - FINAL 22 July 2012

48 A grade separated pedestrian bridge across Mahatma Gandhi Road is proposed. This will improve safety by reducing the level of conflict between pedestrians and vehicles as well as improve the linkage between the proposed development and the adjacent land use. Pedestrian facilities for the Administration and Passenger Terminal buildings will be linked. 9.2 Cycling No bicycle lanes or associated facilities were observed within the vicinity of the proposed site. However the Durban Point Waterfront Precinct area may have plans to later incorporate this into the area. The current road network and lane geometry will not pose a problem to implement cycle lanes. Port of Durban - TIA REPORT - FINAL 23 July 2012

49 10 PARKING 10.1 Existing Facilities A drop & go area is currently located north of the current Passenger Terminal, within short walking distance of the entrance. The majority of the passengers were observed to be dropped off by family or friends in private vehicles. Metered taxi holding facilities are also provided within this area and observed to be a well utilised option for passengers being dropped off. This area has 25 bays allocated for metered taxi s and approximately 102 for private vehicles. The internal circulation within the site is poor as many people parked and waited with passengers, which causes congestion within the drop & go area. Figure 10.1 shows the drop & go area. Figure 10.1: Drop & Go area MSC currently leases undercover parking facilities from Transnet. For a once-off fee, passengers are able to utilise this facility as a self-drive option, for the duration of the cruise. The undercover parking facility is located to the north-east of the Passenger Terminal. The undercover facility can accommodate approximately 400 vehicles. On 24 March 2012, MSC reported that 286 vehicles utilised the facility for the weekend cruise. Passengers also had the option of using a MSC bus shuttle service that operated between the King Shaka International Airport and major hotels within the Durban CBD. These shuttles were observed to arrive at 15 minute intervals from 9am to 12pm. Figure 10.2 below shows the bus shuttle holding area provided alongside the existing Passenger Terminal building. Port of Durban - TIA REPORT - FINAL 24 July 2012

50 Figure 10.2: MSC bus shuttle holding area Transnet s current administration building has a large staff parking facility provided close to the Durmarine Building. There are approximately 153 parking bays available. Investigations show that these are fully utilised on a normal work day. Further parking bays (approximately 103), which also appear to be well utilised, are also available alongside the Ocean Marine Terminal, in front of the heli-pad and in front of the Durmarine Building. These are mainly used by the management of Transnet as well as visitors Proposed Facilities A parking ratio was derived from the known information at the current site. Table 10.1 below shows the calculation. Table 10.1: Current parking rate calculation Land Use Size Unit Parking Bays utilised Rate Passenger Terminal 2223 Passengers Admin Building 300 Employees Transnet have indicated that the proposed development is estimated to have approximately 400 parking bays allocated to the new Administration building and 600 parking bays to the new Passenger Terminal. Table 10.2 below shows the factored number of parking bays required using the current parking utilisation rates and applying it to the projected handling capacity of each building in the proposed development. Port of Durban - TIA REPORT - FINAL 25 July 2012

51 Table 10.2: Projected number of parking bays required Land Use Size Unit Calculated Rate Equivalent Parking Bays Allocated Parking Bays Passenger Terminal 5000 Passengers Admin Building 400 Employees At the current projection, the new proposed passenger terminal parking provision will most probably not be able to cater for the increased handling capacity, provided parking can be shared between the offices and terminal building. The administration building has an adequate number of parking bays allocated for the new development The Parking Generation, Vol, 3 rd Ed (Institute of Transportation Engineers) 6 was used for comparative rates to verify the assumption made in the parking ratio rate derivation. There were no studies documented for a cruise ship passenger terminal, therefore the rate for a commercial airport was used instead, as the operations are similar to that of a cruise ship passenger terminal, with the exception of the average length of stay. Rates range from 0.21 to The lowest rate was used to determine the parking required for the passenger terminal given the longer average vessel trip lengths of passengers compared to that of air travel. The National Department of Transport s parking rate for offices was used for the administration building component. Table 10.3 below shows the rates and the required parking. Table 10.3: Parking Generation manual rates Land Use Unit Size Rate Equivalent Parking Bays Allocated Parking Bays Commercial Airport vehicles/enplanement Admin Building 100m 2 GLA The manual s rate shows that the new passenger terminal will not be able to cater for the increased handling capacity. It is therefore proposed that the parking provision for the proposed site be increased to allow for at least 650 bays for the new proposed passenger terminal and one bay per employee plus visitors parking for the administration building, as shown in Table Port of Durban - TIA REPORT - FINAL 26 July 2012

52 Table 10.4: Proposed Required Parking Rates Land Use Unit Size Rate Equivalent Parking Bays Allocated Parking Bays Commercial Airport vehicles/enplanement Admin Building 100m 2 GLA Port of Durban - TIA REPORT - FINAL 27 July 2012

53 11 SIGNAGE Should the proposal for the new development be approved, changes to the existing directional signage will be required. This will need to be done to alert motorists to the changes in the location of the passenger terminal. A detailed signage plan and design will be required as part of the road design for external road upgrades. Port of Durban - TIA REPORT - FINAL 28 July 2012

54 12 CONCLUSION It can therefore be concluded that: Mahatma Gandhi Road intersections, adjacent to the proposed new development site currently experience low traffic volumes during the peak periods and operate well. The proposed development access configuration will consist of a full access at Camperdown Road intersection, exclusively for the Administration Building, and an entrance and exit at Signal and Browns Roads for the Passenger Terminal Building. Camperdown Road intersection will operate poorly with the 2017 development traffic during the AM and PM peak periods experiencing LOS B to F along the northern and southern approaches. The poor LOS is specifically due to few vehicles at the minor approaches experiencing long delays due to the increased through traffic volumes along Mahatma Gandhi Road. Queue lengths are however adequate ranging 1 to 4 vehicles. Browns Road intersection will operate adequately with the 2017 development traffic during the AM and PM peak periods. The Browns Road northern approach will however operate poorly at LOS F. Queue lengths are however adequate ranging 1 to 5 vehicles. Signal Road intersection will operate well with LOS A at the eastern and western approaches and LOS B to C at the northern approach. All the traffic generated by the proposed new development can be accommodated with the following upgrades: o o o o At Camperdown Road intersection, provide a right turning lane along Mahatma Gandhi Road for vehicles turning into the development and a left turn slip lane from the development onto Mahatma Gandhi Road Browns Road intersection be upgraded to a restricted access (out only from proposed development) signalised intersection At Signal Road intersection, provide a right turning lane along Mahatma Gandhi Road for vehicles turning into the development A median be introduced along Mahatma Gandhi Road at all the access road intersections to facilitate right turning for vehicles There were no other formalised bus or mini-bus taxi stops observed in the area. The Ethekwini Municipality s Current Public Transport Records shows that there are currently no recognised public transport routes nearby the proposed development site. In general it is expected that public transport usage in the area will be relatively low. However it is anticipated that employees working at the proposed development will make use of such a service. This should be taken note of in future public transport planning exercises. The proposed development and surrounds are well provisioned with pedestrian facilities. A grade separated pedestrian bridge across Mahatma Gandhi Road is proposed. This will improve the linkage between the proposed development and the adjacent land uses. The proposed development is estimated to have approximately 400 parking bays allocated to the new Administration building and 600 parking bays to the new Port of Durban - TIA REPORT - FINAL 29 July 2012

55 Passenger Terminal. Analysis shows that the proposed parking provision is insufficient to meet the expected demand. Should the proposal for the new development be approved, changes to the existing directional signage will be required. This will need to be done to alert motorists to the changes in the location of the passenger terminal. Port of Durban - TIA REPORT - FINAL 30 July 2012

56 13 RECOMMENDATIONS It is therefore recommended that: The Camperdown Road intersection is upgraded to provide a right turning lane on Mahatma Gandhi Road for vehicles turning into the development and a left turn slip lane from the development onto Mahatma Gandhi Road, as shown in Figure 13.1 below: Figure 13.1: Camperdown Road Proposed Upgrade The Browns Road intersection is upgraded to a signalised intersection, as shown Figure 13.2 below: Figure 13.2: Browns Road Proposed Upgrade Port of Durban - TIA REPORT - FINAL 31 July 2012

57 The Signal Road intersection is upgraded to provide a right turning lane on Mahatma Gandhi Road for vehicles turning into the development, as shown in Figure 13.3 below: Figure 13.3: Signal Road Proposed Upgrade A median is provided along the length of Mahatma Gandhi Road within the vicinity of the development to facilitate right turning vehicles The internal layout and operation of the proposed development be investigated as soon as sufficient information becomes available and specifically the entering and exiting arrangements, sharing of parking and drop-off facilities be addressed. Future public transport planning exercises should include the proposed development site. The proposed parking provision for the Passenger Terminal building should be increased from 600 to 650 parking bays to meet the expected demand. The proposed development and surrounds are well provisioned with pedestrian facilities and no further provisions are envisaged. A detailed signage design is undertaken as part of the road design for external road upgrades. Port of Durban - TIA REPORT - FINAL 32 July 2012

58 REFERENCES 1. Department of Transport: Manual for Traffic Impact Studies. October Institute of Transportation Engineers: Trip Generation, Vol 2, 7th Edition Department of Transport: Pedestrian and Bicycle facilities Guidelines CSIR, Division of Building Technology: Guideline for the Provision of Engineering Services and Amenities in the Residential Township Development City of Cape Town: Guidelines for the Public Transport Component for Public Transport Impact Assessments. December Institute of Transportation Engineers: Parking Generation, Vol 3, 3rd Edition. 2004

59 List of Assumptions Percentage Trip Distribution Trip Distribution per Building APPENDIX A

60 List of Assumptions The following assumptions were made during the completion of the report: The two highest peak hours for the day occur during the AM and PM peak periods An annual average growth rate of 2.5% was applied to through traffic along Mahatma Gandhi Drive to predict the 2017 growth Due to the road closure along Mahatma Gandhi Drive, between Browns and Signal Roads, no through traffic was able to use the link. To more accurately describe the 2017 traffic situation the background traffic was re-distributed to better represent normal traffic operations as follows: o Of the eastbound vehicles that were originally turning left toward Browns Road (X), 50% was assumed to continue towards Signal Road, where it is further distributed o Of the vehicles that were originally turning right from Browns Road (Y), 50% were redistributed to the Signal Road intersection o All vehicles turning right toward Signal Road (Z) were assumed to continue towards Browns Road, where it is further distributed o A detailed description is shown below:

61 It was assumed that 80% of right turning vehicles at the Camperdown Road approach would reroute to the nearest signalised interscetion The majority of traffic generated by this development during the AM and PM peak hours was assumed to originate from / terminate at the CBD The peak hour trip generation rate used for the proposed Passenger Terminal building was derived from the MSC Sinfonia embarking / disembarking passengers at the existing passenger terminal on Saturday, 24 th March 2012 It was assumed that only one berth is expected to be utilized during any one peak hour and that it is unlikely that two vessels would berth simultaneously while coinciding with the peak of the adjacent street traffic A normal Friday weekday with the arrival / departure of one cruise ship coinciding with any one peak hour was assumed for the capacity analysis An average vehicle occupancy of 1.5 persons was assumed to calculate the trip generation rate of 2.7 trips / 100m² GLA for the Administrative Building Twenty-five percent of the Shopping Centre trip generation rate of x GLA = 11.4 (Friday Peak) was assumed for the PM Peak retail rate, and the AM rate was assumed to be 50% of the new PM rate The parking requirement for the proposed development would be accommodated by the existing parking utilisation rate

62 File original in relevant section in the Quality File. Rev 2 / March 2008

63 File original in relevant section in the Quality File. Rev 2 / March 2008

64 File original in relevant section in the Quality File. Rev 2 / March 2008

65 File original in relevant section in the Quality File. Rev 2 / March 2008

66 File original in relevant section in the Quality File. Rev 2 / March 2008

67 File original in relevant section in the Quality File. Rev 2 / March 2008

68 DOCUMENT CONTROL SHEET (FORM IP180/B) CLIENT : TRANSNET: NATIONAL PORTS AUTHORITY PROJECT NAME : Port of Durban Administration Building and Passenger Terminal TIA TITLE OF DOCUMENT : ELECTRONIC LOCATION : Draft NAME Port of Durban Administration Building and Passenger Terminal TIA P:\J31151 (Durban Port Terminal TIA)\TASKS\Port Project - Dbn\TIA Report\Port of Durban - TIA REPORT - FINAL.docx Approved By Reviewed By Prepared By Andrew Bulman NAME Karin Liebenberg PROJECT No. : NAME J31151 Pravanyaa Pillay DATE 27 June 2012 SIGNATURE SIGNATURE SIGNATURE Original Approved By Reviewed By Prepared By NAME NAME NAME Andrew Bulman Karin Liebenberg Sergei Kiewiet DATE 31 July 2012 SIGNATURE SIGNATURE SIGNATURE Approved By Reviewed By Prepared By NAME NAME NAME DATE SIGNATURE SIGNATURE SIGNATURE Approved By Reviewed By Prepared By NAME NAME NAME DATE SIGNATURE SIGNATURE SIGNATURE This report, and information or advice, which it contains, is provided by Arcus GIBB solely for internal use and reliance by its Client in performance of Arcus GIBB duties and liabilities under its contractt with the Client. Any advice, opinions, or recommendations within this report should be read and relied upon only in the context of the report as a whole. The advice and opinions in this report are based upon the information made available to Arcus GIBB at the date of this report and on current SA standaroads, codes, technology and construction practices as at the date of this report. Following final delivery of this report to the Client, Arcus GIBB will have no further obligations or duty to advise the Client on any matters, including development affecting the information or advice provided in this report. This report has been prepared by Arcus GIBB in their professional capacity as Consulting Engineers. The contents of the report do not, in any way, purport to include any manner of legal advice or opinion. This report is prepared in accoroadance with the terms and conditions of the Arcus GIBB contract with the Client. Regaroad should be had to those terms and conditions when considering and/or placing any reliance on this report. Should the Client wish to release this report to a Thiroad Party for that party's reliance, Arcus GIBB may, at its discretion, agree to such release provided that: (a) Arcus GIBB written agreement is obtained prior to such release, and (b) By release of the report to the Thiroad Party, that Thiroad Party does not acquire any rights, contractual or otherwise, whatsoever against Arcus GIBB and Arcus GIBB, accoroadingly, assume no duties, liabilities or obligations to that Thiroad Party, and (c) Arcus GIBB accepts no responsibility for any loss or damage incurred by the Client or for any conflict of Arcus GIBB interests arising out of the Client's release of this report to the Thiroad Party. Arcus GIBB (Pty) Ltd Postal Address : Contact Person : Telephone No. : Website : Physical Address : Address : Fax No. : File original in relevant section in the Quality File. Rev 2 / March 2008

Cornubia Retail and Business Park Development

Cornubia Retail and Business Park Development Development July 2013 Tongaat Hulett Development (Pty) Ltd Tel. No.: 031 560 1900 Contact Person: Karen Petersen 21 West Riding Row, Sherwood Tel: 031 240 7300 Andrew McKune Andrew.McKune@smec.com SMEC

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA 20 March 2014 Report prepared by: Corli Havenga Transportation Engineers

More information

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018 54 Parkway Drive, Rosedale Proposed Residential / Commercial Development Transportation Assessment Report 30 April 2018 Project: Report title: Document reference: 54 Parkway Drive, Rosedale Transportation

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0 TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE October 2013 Revised: 2.0 Quality Management Issue/revision Issue 1 Issue 2 Remarks Draft Final Date 30

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe,

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe, Our Ref: Contact: CG120569:VG Valentine Gnanakone Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC 3145 Attention: Joseph Nasr Dear Joe, 690 DERRIMUT ROAD PROPOSED RESIDENTIAL SUBDIVISION Further to our

More information

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK Traffic Impact Assessment LOCATED ERF 1692 IN FRANSCHHOEK, WESTERN CAPE Project No. : STUR0202 NOVEMBER 2017 PREPARED BY: STURGEON

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

4. Transportation Plan

4. Transportation Plan The sizes of the most suitable sites are indicated in Table 4.3.6.2. Table 4.3.6.2: Site Sizes and Potential Development Area Potential Development Site Site Size (m 2 ) Area m 2 (3 Floors) D1 29,000 87,000

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION Reference Number: TR 50-18 Location:, Brooklyn Bus Hub - Brooklyn Proposal: Information: To provide new bus stops to create a Bus hub location on Cleveland Street, Brooklyn, as part of Wellington s new

More information

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN 12 September 2017 Iain McManus Civitas Planning Consultants PO Box 47020 Ponsonby AUCKLAND 1144 Dear Iain, TRAFFIC ENGINEERING ASSESSMENT 43-45 45 MOUNT EDEN ROAD, MOUNT EDEN As requested, we have prepared

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN INTRODUCTION This report includes a summary of several key components of the Rapid City Downtown Parking Study and Strategic Plan, including: Current Conditions Analysis (Inventory and Occupancy and Length

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview 2 March 2015 OUR REF: TO3205TOB00 Conseil des écoles catholiques du Centre-Est (CECCE) 4000 rue Labelle Ottawa, Ontario K1J 1A1 Attention: Maguy Eustache Dear Maguy: Re: Sainte-Geneviève Elementary School

More information

4 Circulation & Transportation

4 Circulation & Transportation 4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Residential Development Bearna Engineering Services Report

Residential Development Bearna Engineering Services Report Residential Development Bearna Engineering Services Report APPENDIX D Job No: B861G TRAFFIC REPORT TRAFFIC IMPACT ASSESSMENT RESIDENTIAL DEVELOPMENT, BEARNA, CO. GALWAY Burkeway Homes Project No. B861

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

November

November November 13 2008 4509.04 Mr. Rob Siddoo Siddoo Holdings 105 2277 West 2 nd Avenue Vancouver BC V6K 1H8 Dear Mr. Siddoo: Re: Transportation Assessment: 1030 Denman Street, Residential Conversion, Vancouver

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Technical Note 02 - N2/M41 AIMSUN Micro-simulation Tongaat Hullette Developments Cornubia Phase 2 Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Prepared by: 18/11/14 Justin Janki Date Approvals

More information

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN as Trustee for C & B Unit Trust ABN 27 623 918 759 Our Ref: 20 July, 2017 TR/10419/jj Transport Planning Traffic Studies Parking Studies Frasers Property Australia PO Box 4148 SHELLHARBOUR NSW 2529 Attention:

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO P.O. 61992 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION SEPTEMBER 5, 218 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Resident Permit and Visitor Permit Guidelines

Resident Permit and Visitor Permit Guidelines OPERATING GUIDELINES Resident Permit and Visitor Permit Guidelines Approved by: GM, City Services May 2003 Subsequent Amendments: 9 September 2016 Associate Director (Vanessa Godden) Amended to reflect

More information

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, 2016-17 through 2018-19 Introduction Transportation and Parking Services (TAPS) proposes a three-year series of annual increases to most Parking fees and

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

Winstone Aggregates. Three Kings Quarry Filling, Mt Eden Road, Auckland TRANSPORTATION ASSESSMENT REPORT. June 2008

Winstone Aggregates. Three Kings Quarry Filling, Mt Eden Road, Auckland TRANSPORTATION ASSESSMENT REPORT. June 2008 Winstone Aggregates Three Kings Quarry Filling, Mt Eden Road, Auckland TRANSPORTATION ASSESSMENT REPORT PO Box 2592 Auckland Phone : +64 9 302 0901 New Zealand June 2008 www.tdg.co.nz Winstone Aggregates

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

Submission to Greater Cambridge City Deal

Submission to Greater Cambridge City Deal What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

BETHLEHEM MISSIONS TRUST CAMPUS

BETHLEHEM MISSIONS TRUST CAMPUS BETHLEHEM MISSIONS TRUST CAMPUS Prepared For: Prepared By: Wasley Knell Consultants PO Box 5015, Mount Maunganui, 3150 BruceWRobinson@msn.com/(027) 4515685 Table of Contents Introduction... 3 Site Vicinity...

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

Mississauga Bus Rapid Transit Preliminary Design Project

Mississauga Bus Rapid Transit Preliminary Design Project Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.

More information

I101 Motorsport Precinct

I101 Motorsport Precinct I101. Motorsport I101.1. Precinct description The Motorsport Precinct applies to three of Auckland s motorsport parks: Colin Dale Park; Rosebank Road; and Waikaraka Park. The precinct does not include

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

Findings from the Limassol SUMP study

Findings from the Limassol SUMP study 5 th European Conference on Sustainable Urban Mobility Plans 14-15 May 2018 Nicosia, Cyprus Findings from the Limassol SUMP study Apostolos Bizakis Deputy PM General Information The largest city in the

More information

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information