1 2 March 2015 OUR REF: TO3205TOB00 Conseil des écoles catholiques du Centre-Est (CECCE) 4000 rue Labelle Ottawa, Ontario K1J 1A1 Attention: Maguy Eustache Dear Maguy: Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview 1. Introduction From the information provided, it is our understanding that CECCE is in the process of obtaining Site Plan Approval for a proposed addition to the existing Sainte-Geneviève Elementary School located at 2198 Arch Street in the Alta Vista Community of Ottawa, ON. The school is located in the northwest quadrant of the Canterbury/Arch intersection. Adjacent land uses include Sainte-Geneviève Church, residential homes, a small retail plaza/restaurant fronting the east side of Arch Street, as well as Canterbury Community Centre/Brian Kilrea Arena (2185 Arch Street), and Arch Street Public School (2129 Arch Street) located further to the north. For context, these land uses, as well as the subject school site, are identified in Figure 1 and the proposed Site Plan is provided as Figure 2. Figure 1: Site Context

2 Figure 2: Proposed Site Plan

3 STOP Page 3 It was confirmed with City staff that a formal Transportation Impact Assessment is not required for this site redevelopment as the proposed addition would result in negligible change to the on-site parking supply and no change to the location of the existing site driveway connections. However, the proposed Site Plan includes a formalized bus lay-by on Arch Street and City Staff have requested that a Transportation Overview be prepared to address concerns associated with the proposed lay-by. As such, this Transportation Overview will focus on the following relevant transportation issues: existing traffic conditions surrounding the school at drop-off and pick-up times; an assessment of the lay-by from a traffic operational and safety perspective; and address the transportation related comments from the City s initial circulation. 2. Existing Conditions 2.1 Existing Road Network Arch Street is a local roadway with a two-lane cross section. The unposted speed limit is understood to be 50 km/h; and during the hours just prior and after school class time the posted speed limit is 40 km/h (7AM to 9AM and 2PM to 5PM). No stopping signs are posted along the east side of the road from Canterbury Avenue to Bangor Drive and along the west side of the road from Canterbury Avenue to Fleming Avenue. The public ROW along Arch Street is approximately 20 m, with an approximate 8.5 m wide roadway. Canterbury Avenue is a collector roadway with an unposted speed limit understood to be 50 km/h. It has a two-lane cross-section and on-street parking is restricted at certain areas along both sides of the road. 2.2 Existing Traffic Volumes Illustrated as Figure 3, are the most recent weekday morning and afternoon school peak hour traffic volumes (7:45AM to 8:45AM & 2PM to 3PM) conducted by Parsons (February 2015) at the Arch/Canterbury intersection. Weekday school peak hour traffic volumes are included as Attachment #1. Figure 3: Existing School Peak Hour Traffic Volumes School Site Arch Canterbury 94(42) 32(29) 37(16) 216(95) 28(26) 121(71) xx (yy) AM School Peak Hour Volumes PM School Peak Hour Volumes It can be seen from Figure 3 that the two-way vehicle volume along Arch Street is approximately 190 and 115 veh/h during the morning and afternoon peak school hours, respectively. This equates to approximately 2 to

4 Page 4 3 vehicles every minute. During the peak fifteen minutes in the morning (8:00 to 8:15AM), approximately 75 two-way vehicles were observed along Arch Street. This equates to approximately 5 vehicles every minute, which is the busiest fifteen minutes along the roadway adjacent to the subject school. 2.3 Existing Traffic - School Zone School Buses The school bus drop-off/pick-up currently occurs curb side along Arch Street between the school s southern property line and Fleming Avenue. A total of seven (7) buses arrive between 7:50 AM and 8:10 AM at a nonuniform rate from the north. Buses are required to idle until the students are unloaded with the supervision of school staff (approximately 8:05/8:10 AM). During the afternoon pick-up period, a total of seven (7) buses arrive between 2:10 PM and 2:30 PM and dwell on-site until classes are completed at 2:35 PM. All students are escorted from the school directly to their respective buses by school staff. Buses then leave the site together at approximately 2:40 PM, when all children have been loaded onto buses. Signage is posted along Arch Street in front of the school indicating the school bus loading zone. No stopping signage is posted between Fleming Avenue and the school s northern property boundary to give priority to the two buses that are required to stop curb side north of the school s property line (just south of Fleming Avenue). Figure 4 shows the existing curb side school bus drop-off/pick-up along Arch Street. Figure 4: Existing Bus Drop-off/Pick-up Parent Drop-off/Pick-up Parent drop-off/pick-up currently occurs off-site during the same time as the school bus drop-off/pick-up time period (approximately 7:50-8:15AM and 2:10-2:40PM). Vehicles were observed stopping/parking along Arch

5 Page 5 Street within the on-street parking zone and within the no-stopping zone. Vehicles were also observed using the Canterbury Community Centre driveway and parking lot to drop-off/pick-up their children. It is understood that approximately 80 parents use private vehicles to drop-off their children during the morning peak drop-off period and approximately 50 parents pick-up their children during the afternoon peak pick-up period Adjacent Land Use Traffic During the morning and afternoon drop-off/pick-up periods, minimal traffic was observed entering/exiting the adjacent land uses (Church, Community Centre, retail plaza). In addition, no school bus/pick-up/drop-off traffic associated with the Arch Street Public School was observed during the Sainte-Geneviève School s drop-off/pick-up periods. Notably, Arch Street during school drop-off/pick-up periods was reduced to one travel lane as buses blocked the western side of the narrow roadway. Occasionally a vehicle was required to yield to an oncoming vehicle within the school bus drop-off zone. 3. Proposed School Bus Lay-by As shown on the proposed Site Plan (Figure 2), the revised school site will provide an approximate 70 m school bus lay-by between the two existing site driveway connections to Arch Street. The lay-by is proposed along the public ROW and will replace the approximate 3 m grass median that currently exists between the street line and the sidewalk. The lay-by dimensions provide storage space for approximately 5 school buses. It is understood that two buses will continue to park curb side along Arch Street between the school s northern property line and Fleming Avenue. Given the narrow ROW of Arch Street, it is considered beneficial to provide additional width along this section of the roadway to allow two-way traffic to continue unimpeded during periods of on-street school bus activity. The proposed lay-by will reduce the spacing between the existing sidewalk and the roadway. As the lay-by will be used by school buses only and as school staff is present during school bus loading and unloading, this reduction in buffering space is considered acceptable. In addition, based on observation, the loading/unloading is completed in an efficient manner and students do not linger on the sidewalks for any extended period of time. 4. City Comments Transportation comments were received from the City based on the proposed Site Plan. The following transportation related comments, with corresponding responses from Parsons, address any additional concerns from the City that were not addressed in the letter above. Comment 1: Through a use agreement, could the adjacent church parking be used for bus lay-by and student drop-off? Response 1: It is understood that there have been discussions on this subject between the school and the church, and the church is not in a position to accommodate the request given the programming of various activities at the church throughout the day. Comment 2: The proposed 2 metre sidewalk along the proposed lay-by may be too narrow to provide standing space for bus loading as well as circulation. Evaluate and provide sufficiently wider space to address student circulation and loading in this area.

6 Page 6 Response 2: School bus unloading and loading is done in a quick and efficient manner. Students are led by school staff off the bus and directly into the school. Similarly during the afternoon, students are led from the school to their respective buses in an organized manner. The proposed 2 m width of the sidewalk is sufficient for this unloading and loading process as students do not linger on the sidewalk for any extended period of time. Comment 3: Regardless if the lay by is granted or not, the sidewalk in front of the school should be upgraded to provide safe and accessible circulation and the boulevard area required for bus loading must also be paved. Response 3: Noted and the proponent has been advised. However, if the lay-by is granted, there is no longer a boulevard between the curb and the sidewalk. Comment 4: On street lay-by for school bus operations should be discouraged. Opportunities for unloading busses on site should be explored with the Coordinator, School Zone Traffic Safety in the Traffic Services Branch. Response 4: We are advised that the school has insufficient space for on-site bus operations without impacting the playground area. The proposed lay-by represents an improvement from the existing on-street bus operations. Comment 5: The proposed lay-by requires road widening and removal of the grass boulevard. It is understood that maintenance of this area becomes the responsibility of the City once constructed. Response 5: Agreed. Comment 6: If the lay-by is approved, an RMA report will be required. Response 6: Agreed and the proponent has been advised. 5. Findings, Conclusions and Recommendations Based on the foregoing, the following transportation-related findings, conclusions and recommendations are offered: The proposed revisions to the existing school site do not warrant a formal Transportation Impact Study (TIS) as there is no change in the existing driveway connections and negligible change in the existing parking supply. However, as the proposed Site Plan includes an on-street school bus lay-by, this Transportation Overview has been prepared to address concerns associated with this proposed change; Current traffic volumes along the school s frontage are approximately 190 and 115 veh/h during the morning and afternoon peak school hours, respectively. During the busiest fifteen minute period in the morning (8:00 to 8:15AM), approximately 75 two-way vehicles were observed along Arch Street; There is negligible traffic accessing/egressing the adjacent land uses (church, retail, residential and Arch Street School) during the Sainte-Geneviève School s peak drop-off/pick-up hours;

7 Page 7 The existing bus drop-off/pick-up consists of seven school buses parked along the Arch Street curb (west side) for approximately minutes each weekday morning and afternoon while students are loaded and unloaded; Observations did reveal that when school buses are parked curbside on Arch Street, there is insufficient roadway width remaining to permit two-way operations, and vehicles yield to facilitate 1- way operation through the bottleneck; The proposed school bus lay-by along Arch Street will provide storage space for 5 of the 7 school buses. The lay-by is considered beneficial to provide additional width along this section of the roadway to allow two-way traffic to continue unimpeded; The proposed lay-by will eliminate the boulevard between the existing sidewalk and the roadway. As the lay-by will be used by school buses only and as school staff is present during school bus loading and unloading procedures, this reduction in buffering space is considered acceptable and would not compromise the safety of pedestrians/school children; As the lay-by is proposed within the City s ROW, the maintenance of the lay-by would be the responsibility of the City and given the existing curb alignment is being modified, a Roadway Modification Approval (RMA) process will need to be completed. Based on the foregoing, the proposed school bus lay-by on Arch Street serving the Sainte-Geneviève Elementary School is recommended from a transportation perspective. If there are any questions, please contact the undersigned. Prepared By: Reviewed By: André Jane Sponder, B.A.Sc. Analyst, Transportation Division Ottawa Operations Mark A. Baker, P.Eng. Manager, Traffic and Transportation Planning Ottawa Operations

8 Attachment #1 Existing School Peak Hour Counts

9 Intersection: Date: Observer: Weather: Time: Arch St & Canterbury Ave February 24, 2015 Alex Buck Clear, Sunny 7:45 AM - 8:45 AM Arch Canterbury Canterbury Arch TIME NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 7:45 AM :00 AM :15 AM :30 AM TOTAL Notes:

10 Intersection: Date: Observer: Weather: Time: Arch St & Canterbury Ave February 24, 2015 Alex Buck Clear, Sunny 2:00 PM - 3:00 PM Arch Canterbury Canterbury Arch TIME NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 2:00 PM :15 PM :30 PM :45 PM TOTAL Notes:

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study 19 May 2015 BY EMAIL: asaggarwal@gmail.com Manor Park Management 231 Brittany Drive, Suite D Ottawa, ON K1K 0R8 Attention: Mr. Anand Aggarwal RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

This letter summarizes our observations, anticipated traffic changes, and conclusions.

This letter summarizes our observations, anticipated traffic changes, and conclusions. Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise

More information

267 O Connor Street Residential Development

267 O Connor Street Residential Development M a y 2014 267 O Connor Street Residential Development Transportation Brief Google 2014 Bing 2014 Prepared for: MASTERCRAFT STARWOOD Prepared by: Study 267 O'Connor Type Street May 2014 Study Residential

More information

The Re:Queen and Sparks Traffic Brief - Addendum #2

The Re:Queen and Sparks Traffic Brief - Addendum #2 June 11, 2015 Ashcroft Homes 18 Antares Drive Ottawa, ON K2E 1A9 EMAIL: mpham@ashcrofthomes.com Attention: May Pham Development Planner Dear May, Re: The Re:Queen and Sparks Traffic Brief - Addendum #2

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information

Wellington Street West

Wellington Street West Transportation Brief prepared for: 185 Davenport Road Suite 300 Toronto, ON M5R 1J1 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 November 5, 2013 TO3131TOH Transportation Brief November

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

1140 Wellington Street West Transportation Brief

1140 Wellington Street West Transportation Brief 1140 Wellington Street West Transportation Brief October 2013 Study 1140 Wellington Type Street West October 2013 Study Transportation Name Brief February 2011 TB Check List TIS / TB/ CTS Check List prepared

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 2014 UPDATED

More information

370 Queen Elizabeth Drive Transportation Overview

370 Queen Elizabeth Drive Transportation Overview December 8, 2014 OUR REF: TO3193TOA BY EMAIL: Ashley@rocahomes.ca 2253644 Ontario Inc. c/o BassCon 24 George Street West Ottawa, ON K1S 3J2 Attention: Ashley Lepine Dear Ashley: Re: 370 Queen Elizabeth

More information

CENTRAL VIRGINIA LONG RANGE TRANSPORTATION PLAN. Appendix F

CENTRAL VIRGINIA LONG RANGE TRANSPORTATION PLAN. Appendix F Data Collection Traffic turning movement data were obtained from the Virginia Department of Transportation (VDOT) Southwestern Region Lynchburg District Traffic Engineering Section. However, 12-hour traffic

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

Technical Memorandum

Technical Memorandum To: Copy: From: Wally Dubyk Jennifer Murray André Sponder/Christopher Gordon, P.Eng. Re: Southminster Church 1040 Bank Street Residential Development Parking Review Technical Memorandum Date: Project:

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

RE: INNES / TRIM RETIREMENT RESIDENCE TRANSPORTATION OVERVIEW

RE: INNES / TRIM RETIREMENT RESIDENCE TRANSPORTATION OVERVIEW IBI GROUP 400 333 Preston Street Ottawa ON KS 5N4 Canada tel 63 225 3 fax 63 225 9868 ibigroup.com April 4, 207 Asad Yousfani, M.Eng., P.Eng. Project Manager, Infrastructure Approvals, Transportation City

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Minto Mahogany Stage 2

Minto Mahogany Stage 2 Minto Mahogany Stage 2 Transportation Impact Study prepared for: Minto Developments Inc 200-180 Kent Street Ottawa, ON K1P 0B6 prepared by: 1223 Michael Street Suite 100 Ottawa, ON K1J 7T2 June 27, 2017

More information

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by: 700 Hunt Club Road Transportation Impact Study - Addendum #1 Submitted by: 14 June 2013 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com 14 June 2013

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use Transportation Impact Study City of Guelph Prepared for: Armel Corporation August 2018 Table of Contents 1 Introduction...

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

Village of Richmond Transportation Brief

Village of Richmond Transportation Brief Village of Richmond Transportation Brief GENIVAR Project Number 111-18482-00 June 21 st, 2011 www.genivar.com GENIVAR 15 Fitzgerald Road, Suite 100 Ottawa, Ontario, CANADA K2H 9G1 Telephone: 613-829-2800

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. CastleGlenn Consultants Inc. Engineers, Project Managers & Planners March 11 th, 2013 Domenic Idone, P. Eng Planning Manager R.W. Tomlinson Ltd. 5597 Power Road Ottawa, Ontario K1G 3N4 Dear Mr. Idone:

More information

CitiGate Retail Development

CitiGate Retail Development CitiGate Retail Development Transportation Impact Study prepared for: Trinity Development Group Inc. Sun Life Financial Centre, East Tower 3250 Bloor Street West, Suite 1000 Toronto, ON M8X 2X9 prepared

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe,

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe, Our Ref: Contact: CG120569:VG Valentine Gnanakone Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC 3145 Attention: Joseph Nasr Dear Joe, 690 DERRIMUT ROAD PROPOSED RESIDENTIAL SUBDIVISION Further to our

More information

Trim Road, Commercial Development, City of Ottawa

Trim Road, Commercial Development, City of Ottawa HARDEN REALTIES July 2016 Trim Road, Commercial Development, City of Ottawa Transportation Impact Study Trim Road, Commercial Development, City of Ottawa Transportation Impact Study prepared for: Harden

More information

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief Barrhaven Honda Dealership Dealership Drive, Ottawa, ON Transportation Brief Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September, 2015 File: 115136 Ref: R-2015-152

More information

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES)

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) 0 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) C O TRANSPORTATION ANALYSIS STUDY March th, 0 APPLICANT: Alexandria City Public Schools Educational Facilities Department Operational & Maintenance

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

(A) Project Manager, Infrastructure Approvals

(A) Project Manager, Infrastructure Approvals February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project

More information

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering.

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering. ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INITIATED BY: INVESTIGATOR: REQUEST: Speed Limit Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1 Traffic Engineering

More information

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida Summary Report June 2008 Prepared by: 12909 N 56 th Street # 201 Tampa, FL 33617 Ph: (813) 988-3180 Fax: (813) 343-6854 Morgan Road

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID Wellings Communities Holding Inc and Extendicare (Canada) Inc. 5731 Hazeldean Road Transportation Impact Study Ottawa, Ontario Project ID 160401195 Prepared by: Stantec Consulting Ltd. March 2016 WELLINGS

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois Proposed Office Building Traffic Impact Study 1714-1720 Chicago Avenue Evanston, Illinois Prepared For: HOLABIRD & ROOT, LLC Prepared by: Eriksson Engineering Associates, Ltd. 145 Commerce Drive, Ste A,

More information

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits CITY CLERK Clause embodied in Report No. 9 of the, as adopted by the Council of the City of Toronto at its Special Meeting held on July 30, 31 and August 1, 2002. 10 Warrants for All-Way Stop Sign Control

More information

City of Kingston Report to Council Report Number

City of Kingston Report to Council Report Number To: From: Resource Staff: City of Kingston Report to Council Report Number 18-111 Mayor and Members of Council Jim Keech, President and CEO, Utilities Kingston Sheila Kidd, Deputy Commissioner Operations

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

700 Hunt Club Road. Transportation Impact Study. Submitted by:

700 Hunt Club Road. Transportation Impact Study. Submitted by: 700 Hunt Club Road Transportation Impact Study Submitted by: December 2012 700 Hunt Club Road Transportation Impact Study prepared for: Lone Star Group of Companies 472 Morden Road Unit 101 Oakville, ON

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group