SOUTH TEXAS COMMISSION MEETING
|
|
- Elizabeth Ray
- 6 years ago
- Views:
Transcription
1 SOUTH TEXAS COMMISSION MEETING September 26, 2013 Pharr District Commission Meeting
2 Pharr District: Overview The Pharr District plans, designs, builds, operates and maintains the state transportation system within its eight counties. The district is a coastal district, has 11 international crossings and is a NAFTA corridor. Population 1,291,048 Area (Sq. Miles) 8,812 Lane Miles 6, Daily Vehicle Miles 18, Registered Vehicles 898,491 TxDOT Employees 294 Pharr District Commission Meeting 2
3 Pharr District: Major Projects Underway US 83 Super 2 highway (Zapata County, cost: $18.5 M) US 281 Expressway Relief Route (Falfurrias-Brooks County, cost: $68 M) FM 396 (Anzalduas International Bridge to I-2, cost: $23.4 M) BSIF at US customs Port of Entry (South of Pharr, cost: $20.1 M) I-69E Expressway Facility (Willacy County, cost: $25.7 M) I-69E & SH 550 Direct Connectors (Cameron County, cost: $43.9 M) Pharr District Commission Meeting 3
4 Pharr District: Planned Major Projects 2 nd Access to South Padre Island FY 14 Environmental clearance, est. cost $600 M SH 365/ SH 68/IBTC SH 365 FY 16 at $138 M & SH 68 at $55 M IBTC ENV stages, est. cost $145 M US 83 RELIEF ROUTE AT LA JOYA/PENITAS FY 15 at est. cost $85 M STARR CO. SL 195 FY 16 beginning of 17-mile relief route, est. cost $168 M Pharr District Commission Meeting 4
5 Improve Economic Development Create A Better Quality Of Life For All Improve Mobility Relieve Congestion Ensure Efficient Trade Corridors
6 6
7 CCRMA Project Development List September 2013 Project Name Project Limits Project Costs Complete/ Under Const. Status TOLL ROADS OPEN SH 550 Phase I Overpass at UPRR and FM 1847 $ 7 Million $ 7.0 Million Phase 1 Toll Road Open SH 550 North Port Spur FM 3248 to SH 48/New Port Entrance $ 34 Million $ 34.0 Million Phase 2 Toll Road Open PROJECTS COMPLETED Olmito Switchyard Phase I North Brownsville/Olmito $ 22 Million $ 17.0 Million Construction Complete Port Access Road SH 48/SH 550 to Capt. Donald Foust Road $ 3 Million $ 3.0 Million Construction Complete Veterans International Bridge Expansion Over Rio Grande River at I-69E $ 6 Million $ 6.0 Million Construction Complete UNDER CONSTRUCTION West Railroad Relocation I-69E and Olmito Switchyard into Mexico *$ 80 Million $ 80.0 Million 85% Complete Olmito Switchyard Phase II North Brownsville/Olmito $ 3.6 Million $ 3.6 Million 95% Complete CE Spur 56 Willacy County FM 1018 to FM 3168 $ 28 Million $ 28.0 Million 70% Complete I-69E Sarita Overpass Sarita School Area $ 12 Million $ 12.0 Million 75% Complete SH 550 Direct Connectors I-69E to SH 48 $ 44 Million $ 44.0 Million 30% Complete ENVIRONMENTALLY CLEARED I-69E Brownsville to Corpus Christi $ 350 Million $ Million $165 Million to Complete / EA Cleared ENVIRONMENTAL STUDIES SH 32 East Loop Port of Brownsville to Veterans Bridge $ 90 Million EA Clearance 2014/$37M PTT Funds General Brant Road FM 1847 to FM 510 $ 15 Million FY 2014 Letting South Padre Island 2nd Access Mainland over Laguna Madre to Park Road 100 $ 465 Million FEIS in Progress West Parkway I-69E to B&M Bridge $ 160 Million On Hold FM 803 I-69E to SH 100 $ 6 Million EA at TxDOT Funds in Place North Cameron County Switchyard North of Harlingen near I-69E $ 25 Million Pending CE Preparation North Railroad Relocation North Cameron County to SH 106 $ 60 Million Preliminary Study Complete Outer Parkway I-69E near N. County Line to FM 1847 $ 180 Million Study in Progress FM 509 Extension Outer Parkway to Current Section of FM 509 $ 7 Million EA Process in Progress CORRIDOR STUDIES Port Isabel Access Road SH 48 to Port of Port Isabel $ 3 Million Project under Design 281 Connector County Line to FM 1577 to I-69E & SH 100 $ 140 Million Planning Phase Port International Bridge Project Port of Brownsville/East Loop into Mexico $ 50 Million Planning Phase with Mexico TOTAL: $ 1.7 Billion $ Million
8
9
10 CCRMA Project Needs
11 MASTER PLAN ANZALDUAS INT L BRIDGE HIDALGO-REYNOSA INT L BRIDGE DEVELOP THE INFRASTRUCTURE TO SERVE A POPULATION OF APPROXIMATELY 800,000 RESIDENTS AND FIVE INTERNATIONAL PORTS OF ENTRY PHARR-REYNOSA INT L BRIDGE ALLIANCE (DONNA-RIO BRAVO) INT L BRIDGE PROGRESO INT L BRIDGE 11
12 SH 365 PROJECT PROGRESS LIMITS PH1: FM 396/ANZALDUAS HWY TO US 281/MIL HWY (15.28 MI) MILESTONES: EA ENV CLASSIFICATION DRAFT EA LOCAL DISTRICT BID DATE: 09/2015 CONST DATE: 12/2015 OPENING DATE: 08/2018 LIMITS PH2: FM 1016/CONWAY AVE TO FM 396/ANZALDUAS HWY (2.65 MI) 12
13 SH 365 PROJECT DETAIL 13
14 IBTC PROJECT PROGRESS MILESTONES: UPDATED SCHEMATIC WITH LOW-LEVEL FLIGHT: OCT LOCAL ENVIRONMENTAL CLEARANCE: EARLY 2014 BID DATE: 12/2016 CONST DATE: 04/2017 LIMITS: FROM US 83 (0.63 MI E OF FM 1423/VAL VERDE RD) TO FM 3072 (DICKER RD) AND TO FM 493 (1.5 MI N OF US 281). (12.60 MI) OPENING DATE: 11/
15 IBTC PROJECT DETAIL 15
16 OVERWEIGHT CORRIDOR ANZALDUAS INT L BRIDGE MILESTONES (EST.): TEXAS HB 474 MADE IT EFFECTIVE: 09/2013 DEVELOP WEB-BASED PERMIT SYSTEM: 11/2013 TXDOT ADMINISTRATIVE AGREEMENT BY: 12/2013 ISSUING PERMITS: 01/2014 PHARR-REYNOSA INT L BRIDGE 16
17 OVERWEIGHT CORRIDOR IMPLEMENTATION Goal is to allow HCRMA to issue oversize and overweight permits online via HCRMA s website for trucks so that they may be in compliance with weights and measures as well with safety requirements. Agreement with TxDOT (01/2014): HCRMA needs to negotiate an agreement with TXDOT for issuance of permits for the movement of overweight/oversize cargo and to collect a fee. HCRMA has reviewed existing overweight corridor agreements and will look to the Commission s proposed guidelines from the 09/2013 meeting. Implementation of Web-based Permitting System (12/2013): HCRMA working with ProMiles to design and implement online permitting system to be made available through the HCRMA website. Weight Scales in Mexico (03/2014): Getting scales in Mexico installed and operational - Obtaining certification from PROFECO in Mexico for the weight scales about 1 month after installation. Weight scale operators/owners in Reynosa should also obtain certification from either Texas Dept. of Agriculture or one of their certified contractors to certify and calibrate weight scale. This can be done shortly after installation. Border Safety Inspection Facility at the Pharr POE (04/2014) 17
18 State Highway (SH) mile, four-lane divided rural highway from US 83 (I-2) to FM 1925 North-south mobility corridor in central Hidalgo County Will improve mobility and relieve congestion on US 281/I-69C and US 83/I-2. Total estimated cost: $85 M $55 M for construction $6.5 M for PE $23.5 M for ROW/Utility Proposed funding: Category 12 Estimated Construction Start Date: Mid-2016 Pharr District Commission Meeting 18
19 US 83 La Joya Relief Route Four-lane rural divided highway Direct connectors provide nonstop access to and from existing US 83 at both termini Will provide improved east-west travel and allow for through traffic to bypass congested urban areas. Estimated Cost: $83.5 M Proposed Funding: Engineering $2.2 M, Category 12 Construction $57.8 M ($34.54 M, TMFB Category 3, $ M, CBI) ROW/Compensable Utilities $23.5 million ($ million Category 12, $0.235 million Local) Estimated Letting: April 2015 Pharr District Commission Meeting 19
20 Starr County Relief Route (State Loop 195) Will significantly improve mobility between the Rio Grande Valley and Laredo. Four-Lane divided rural non-toll road with future overpasses at select locations. Estimated Cost: $168 M Proposed Partial Funding: $ 6.0 M border infrastructure funds Estimated Letting: June 2016 (Phase I from FM 755 to FM 3167) Pharr District Commission Meeting 20
21 US 83 (I-2) US 281 (I-69) Interchange Expand the approaches to the interchange to two lanes. Two alternatives are being considered to accommodate twolane direct connectors: (1) leave the direct connector bridges in place and re-stripe them to two lanes or (2) reconstruct the bridges to accommodate two lanes and wider shoulders. Phase 1: Edinburg to McAllen and McAllen to Edinburg directions (west side of interchange) Phase 2: Edinburg to Harlingen and Harlingen to Edinburg directions (east side) Estimated Letting: Early 2016 Pharr District Commission Meeting 21
22 Final Thoughts Questions? Pharr District Commission Meeting 22
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3
More informationSTATE LOOP 195 PUBLIC MEETING. Footer Text
STATE LOOP 195 PUBLIC MEETING STATE LOOP 195 From FM 755 to 1 mile west of Loma Blanca Rd Public Meeting Agenda Welcome & Introductions Octavio Saenz TxDOT Public Information Officer Technical Overview
More informationPORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting
PORTS-TO-PLAINS Corridor Planning Stakeholder Workshop - Agenda 1 Purpose of Stakeholder Workshops 3 2 Rural Transportation System Overview 4 3 Ports-to-Plains 8 4 5 6 7 I-27 Expansion Key Considerations
More informationsystem performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.
system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and
More informationTXDOT PLANNING CONFERENCE. Quincy D. Allen, P.E. Houston District Engineer June 16, 2016
TXDOT PLANNING CONFERENCE Quincy D. Allen, P.E. Houston District Engineer June 16, 2016 Welcome to Houston Show video...http://youtu.be/knchpl8sdfu Population Growth in Texas Texas added 1.3 million people
More informationPUBLIC INFRASTRUCTURE PROJECTS
PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationFinal Series of Public Meetings
Final Series of Public Meetings Public Meeting Locations City Date Jasper Monday, September 26 Livingston Tuesday, September 27 Huntsville Wednesday, September 28 Bryan Thursday, September 29 Eldorado
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationALTERNATIVE PROJECT DELIVERY
ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to
More informationMountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012
Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More information2016 PHARR DISTRICT TRAFFIC MAP
Jim Wells 359 Laredo 16 Webb 83 Laredo 16 77 Baffin Bay 2 Kenedy 3 285 Falfurrias Brooks Jim Hogg 16 Alazan Bay 285 1 Zapata Kleberg Duval Corpus Christi 77 83 4 5 6 77 Gulf of 1017 International Falcon
More informationI-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019
I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017 PROJECT OVERVIEW Environmental Impact Statement (EIS) Project divided into 3 Segments Segment 1: Beltway 8
More informationUS 81 Bypass of Chickasha Environmental Assessment Public Meeting
US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments
More informationVC a m e r o n San Benito
Laredo 359 16 El Cenizo Mae Cruz Calle Premont Premont Bravo El Cenizo Bravo Concepcion 339 Loyola Beach Ramirez Riviera Hebbronville 1 Zapata 16 Ygnacio Ramireno Falfurrias 285 Sarita Falfurrias Brooks
More informationALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002
ALAMEDA CORRIDOR A A Project of National Significance TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002 Top U.S. Container Ports (2001) LOS ANGELES 5.18 LONG
More informationRocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationTulsa Transportation Management Area. Urbanized Area Surface Transportation Program
Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha
More informationUS 70 Corridor Planning for the Future
New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session
More informationMaryland Gets to Work
I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast
More informationSEPULVEDA PASS CORRIDOR
SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000
More informationSH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD
SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD Lone Star College, Tomball Campus December 8, 2015 Open House 5:30-7:30 pm National Environmental Policy Act The environmental review,
More informationPurpose and Need Report
Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental
More informationArizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora
Arizona-Sonora Border Master Plan Plan Maestro para la Frontera Arizona-Sonora Project Objectives Develop and implement a plan for identifying, prioritizing, and promoting land port of entry (LPOE), multi-modal
More informationTURNPIKE SYSTEM. Summary information from: Texas Department of Transportation GENERAL INFORMATION & SYSTEM MAP JOA REALTY
GENERAL INFORMATION & SYSTEM MAP TURNPIKE SYSTEM Summary information from: Texas Department of Transportation www.texastollways.com Joa Realty JoaRealty.com Email: help@joarealty.com Office: 512.480.8384
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationThe Eastern Connector Study November, 2007 planning for the future
The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team
More informationOpen House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition
Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212
More informationProposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1
Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation
More informationClick to edit Master title style
P3s Come In All Shapes And Sizes Mr. Greg Slater, Administrator 7/26/2018 1 1 Customer-Driven Customer First TODAY S DISCUSSION Introduction to MDOT MDOT P3 Experience Full Delivery Stream Restoration
More informationLetter of Transmittal
Letter of Transmittal To: Chris Lovell City of Richmond Hill Date: 5/2/6 Job 2582 Re: Richmond Hill-South Bryan County Transportation STudy WE ARE SENDING YOU THE FOLLOWING ITEMS ( attached) ( under separate
More informationWest Broadway Reconstruction/LRT Design. March 19, 2015
West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian
More informationP3 PROJECT PIPELINE: STATUS - AUGUST 2016
FLAGSTAFF FACILITY Swap of current ADOT facilities in Flagstaff for new space in a repurposed Harkins theatre. Construction work on new ADOT facility will begin in fall. Expected move-in date for ADOT
More informationChapter 7: Corridor Visions
Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United
More informationWaco Rapid Transit Corridor (RTC) Feasibility Study
Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationNew Jersey Turnpike Authority Interchange 6 to 9 Widening Program
New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,
More informationGTA West Corridor Planning and EA Study Stage 1
GTA West Corridor Planning and EA Study Stage 1 Draft Development Strategy Presentation to Peel Goods Movement Task Force April 8 2011 Study Areas 2 Unique Approach Unprecedented two-stage EA process:
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationRoad User Cost Analysis
Road User Cost Analysis I-45 Gulf Freeway at Beltway 8 Interchange CSJ #500-03-382 1994 Texas Transportation Institute ROAD USER COST ANALYSIS CSJ #500-03-382 The Texas Department of Transportation (TxDOT)
More informationWestern ND Meeting. February 19, 2014 Grant Levi, NDDOT Director
Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide
More informationWest Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017
West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationState Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT
State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT April 2016 I. COST-EFFECTIVENESS ANALYSIS A Benefit-Cost Analysis (BCA) was conducted in conformance
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program
More informationUS 67 WIDENING PROJECT
US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationW&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)
W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE
More informationLandside Access Modernization Program (LAMP)
Landside Access Modernization Program (LAMP) LAX Los Angeles International Airport is the 2 nd busiest airport in the United States and is the largest airport in California. Since the start of the economic
More informationPremont. Falfurrias. Edinburg 69C. Alton. Mission. Alamo. Palmview Abram. Donna. Granjeno McAllen. Weslaco. Progreso. Hidalgo.
Laredo 83 359 16 Mae Cruz Calle 339 Bravo El Cenizo El Cenizo Concepcion Premont Premont Ramirez Bravo Loyola Beach Riviera Riviera Beach ebbronville La loria 85 85 Sarita Falfurrias 1 Ygnacio 83 Zapata
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationState Infrastructure Bank Approved Loans. Current as of 9/30/2011 Page 1 of 5
State Infrastructure Bank Approved Loans Loan Project Int Anthony S1999-003-01 Spur 6 ROW acquisition $76,950 $7,100,000 4.00% 5 App & Paid Off 3572-01-002 ELP Anthony S2001-009-02 Utility relocation on
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More informationHighways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST
More informationIH 35 FEASIBILITY STUDY
IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE
More informationConstruction Management Association of America (CMAA) Thursday, August 18, 2011 Frank Quon, PE Lan Saadatnejadi, PE
Metro s Highway Program Construction Management Association of America (CMAA) Thursday, August 18, 2011 Frank Quon, PE Lan Saadatnejadi, PE Los Angeles County Sources: Metro 2009 Long Range Transportation
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate
More informationREGIONAL REPORT PETITION: TEXAS DEPARTMENT OF TRANSPORTATION TYLER DISTRICT
April 30, 2009 REGIONAL REPORT PETITION: TEXAS DEPARTMENT OF TRANSPORTATION TYLER DISTRICT 1. Group Identification North East Texas Regional Mobility Authority (NET RMA) Chairman Jeff Austin, III 305 South
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The
More informationRail alignment and benefits (rab) study
Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create
More informationTransNet Dollars Keep San Diego Moving
TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.
More informationIs Lafayette ready for a traffic loop?
Page 1 of 5 Jessica Goff, jgoff@theadvertiser.com 8:55 a.m. CDT October 9, 2015 The push to transform U.S. 90 into a 160-mile interstate (/story/news/local/2015/10/06/overpass-throughdowntown-call--49-south-connector/73448276/)
More informationJanice Fortunato Senior Director Business Partnerships
Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these
More informationOttawa LRT Stage 2. McKellar Park Information Session
Ottawa LRT Stage 2 McKellar Park Information Session Stage 2 Background Approved unanimously by Ottawa City Council in July 2015 East to Place d Orléans, west to Bayshore and Baseline, and south to Bowesville
More informationIH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12
Mobility Investment Priorities Project Houston IH 45 IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) Current Conditions From IH 10 to IH 610 south, IH 45 is a 6- to 9-lane facility with three
More informationCROSSING RAIL PROJECT (P4) RAIL
GRAND CROSSING RAIL PROJECT (P4) Community Advisory Group October 10, 2012 1:30 pm Grand Crossing Park Field House 7655 S. Ingleside Avenue, Chicago GRAND CROSSING RAIL PROJECT (P4) Community Advisory
More informationARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423
ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423 This proposal represents recommended highway segments for alternative fuel corridors for the State of Arizona. Included in this document are the
More informationTRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT
MICHIGAN OHIO UNIVERSITY TRANSPORTATION CENTER Alternate energy and system mobility to stimulate economic development. Report No: MIOH UTC TS41p1-2 2012-Final TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION
More informationMAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina
Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response
More informationHelp shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary
Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County
More informationRichmond Area MPO Regional Priority Transportation Projects
Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia
More informationMaking Mobility Better, Together
Making Mobility Better, Together Austin Transportation Department Gordon Derr, P.E., for Robert J. Spillar, P.E Director, Austin Transportation Department 1 AUSTIN TRANSPORTATION DEPARTMENT Our Mission
More informationPomona Rotary December 19, 2017
Pomona Rotary December 19, 2017 Los Angeles County s population will grow by 5.9% to 10.7 million by 2024 During that same period, the San Gabriel Valley will grow by 7.6% to more than 1.5 million; taking
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationUS 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)
Mobility Investment Priorities Project Houston US 59 US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Current Conditions From IH 610 West to SH 288, US 59 operates with four or five lanes
More informationBroward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA
Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional
More informationPoint A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017
Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master
More informationITEM 13 - NOTICE May 20, 2009
ITEM 13 - NOTICE May 20, 2009 Notice of Proposed Amendment to the 2009 CLRP and FY 2010-2015 TIP to include the Closure of the I-395 Southbound Exit Ramp to 3rd Street NW, the Reconfiguration of the Southbound
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationPeninsula Corridor Electrification Project (PCEP)
Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract
More informationTRAFFIC PARKING ANALYSIS
TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,
More informationMarch 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming
COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What
More informationCTA Blue Line Study Area
CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING
More informationAlamo Natural Gas Vehicle Consortium
Alamo Natural Gas Vehicle Consortium Overview of the Alamo Natural Gas Vehicle Consortium 10MAY12 Christopher Ashcraft 8700 Tesoro Dr., Suite 700 San Antonio, TX 78217 210-362-5228 cashcraft@aacog.com
More informationLEADING GATEWAY FOR U.S.-ASIA TRADE
PORT OF LONG BEACH LEADING GATEWAY FOR U.S.-ASIA TRADE 4 STATE TIDELANDS TRUST PROMOTE TRADE, BUILD PORT 6 PORT OF LOS ANGELES PORT OF LONG BEACH WORLD S 9 TH BUSIEST PORT COMPLEX *BASED ON 2017 CONTAINER
More informationMobility 2045 Plan Workshop
Mobility 2045 Plan Workshop Regional Transportation Council October 12, 2017 Agenda Mobility Planning Mobility 2045 Innovative Funding and Strategic Partnerships Public Outreach Efforts Next Steps 2 Mobility
More informationTransit Project Delivery Status Report. Significant Issues
Item 1 Transit Project Delivery Status Report Significant Issues Presented By K.N. Murthy Executive Director Construction Committee 1 I-405 Sepulveda Pass Closure Construction Committee I-405 Sepulveda
More informationRTID Travel Demand Modeling: Assumptions and Method of Analysis
RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel
More informationFasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016
July 29, 2013 Welcome to Inside RTD FasTracks a monthly e- update to keep you informed about the progress of the Regional Transportation District's FasTracks program. FasTracks News RTD s Eagle P3 Transit
More informationTRAVEL DEMAND FORECASTS
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components
More informationJanuary 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future
January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs
More informationArkansas State Highway and Transportation Department. ASCE Conference Wyndham Hotel North Little Rock Thursday, October 16, 2014
Arkansas State Highway and Transportation Department ASCE Conference Wyndham Hotel North Little Rock Thursday, October 16, 2014 Recent Voter Approved Programs November 2011 November 2012 Complete: 11 Miles:
More informationClick to edit Master title style
Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment
More informationRail alignment and benefits (rab) study
Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study June 5, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create
More informationCREATING CONNECTIONS IN WATERLOO REGION
CREATING CONNECTIONS IN WATERLOO REGION GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE CHRIS BURKE, DIRECTOR, SERVICE PLANNING ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX
More informationSunZia Southwest Transmission Project
SunZia Southwest Transmission Project SunZia Project Update for the Southern Arizona Economic Development Group September 12, 2017 SUNZIA SOUTHWEST TRANSMISSION PROJECT SEPTEMBER 12, 2017 0 SouthWestern
More information