1 Design & Preconstruction - Spent & Encumbered / Available Budget District School Security Construction Estimates Estimated Totals Facility Name Fencing Access Control Total School Security Budget Spent & Enc. through March 7 Net Available Fencing Access Control Total Proposed Security Cost Delta with Net Available Security-Related Construction Costs Total Proposed Cost Comments/Status Atlantis Elementary $ 154,051 $ 28,871 $ 182,921 $ 26,941 $ 155,980 $ 84,260 $ 43,932 $ 128,192 $ 27,788 $ $ 128,192 Unused funds will go to contingency for reallocation Cambridge Elementary $ $ 21,041 $ 21,041 $ 5,362 $ 15,679 $ $ 28,807 $ 28,807 $ (13,128) $ $ 28,807 Challenger 7 $ 70,742 $ 26,980 $ 97,722 $ 14,659 $ 83,063 $ 91,061 $ 32,182 $ 123,243 $ (40,180) $ $ 123,243 Coquina Elementary $ $ 20,161 $ 20,161 $ 5,239 $ 14,922 $ $ 37,483 $ 37,483 $ (22,561) $ $ 37,483 Croton Elementary $ 68,655 $ 17,740 $ 86,395 $ 13,891 $ 72,504 $ 48,812 $ 37,942 $ 86,754 $ (14,250) $ $ 86,754 Enterprise Elementary $ 44,981 $ 28,216 $ 73,196 $ 11,082 $ 62,114 $ 62,219 $ 34,218 $ 96,437 $ (34,323) $ $ 96,437 Golfview Elementary $ 43,880 $ 21,776 $ 65,655 $ 10,601 $ 55,054 $ 43,650 $ 35,359 $ 79,009 $ (23,955) $ 12,395 $ 91,404 New sidewalk needed for clinic access within perimeter Imperial Estates Elementary $ $ 27,125 $ 27,125 $ 5,239 $ 21,886 $ $ 36,164 $ 36,164 $ (14,278) $ $ 36,164 Johnson Middle $ 5,390 $ 36,623 $ 42,013 $ 6,629 $ 35,384 $ 16,703 $ 40,108 $ 56,811 $ (21,427) $ $ 56,811 Madison Middle $ 12,339 $ 28,705 $ 41,044 $ 6,401 $ 34,643 $ 7,122 $ 38,670 $ 45,792 $ (11,149) $ $ 45,792 McNair Magnet $ 40,078 $ 23,978 $ 64,056 $ 9,512 $ 54,544 $ 44,070 $ 36,002 $ 80,072 $ (25,528) $ 3,252 $ 83,324 Concrete ramp needed from parking to new gate Rockledge High $ 2,995 $ 64,176 $ 67,171 $ 10,749 $ 56,421 $ 80,953 $ 31,231 $ 112,184 $ (55,763) $ 3,037 $ 115,221 Concrete landing required for ped access to new gate Stevenson Elementary $ 5,500 $ 15,415 $ 20,915 $ 3,346 $ 17,569 $ 3,498 $ 43,060 $ 46,557 $ (28,988) $ $ 46,557 Totals $ 448,611 $ 360,806 $ 809,416 $ 129,652 $ 679,765 $ 482,348 $ 475,158 $ 957,505 $ (277,740) $ 18,684 $ 976,189 Net available not including surplus (Atlantis) $ 651,976 Total over Attachment F budget - from $400,000 allocation $ 324,213 Front entry remote lock down (included in $305,529) $ 65,000 Updated 3/8/2017

2 EXHIBIT C GUARANTEED MAXIMUM PRICE AMENDMENT TO AGREEMENT FOR DESIGN BUILD SERVICES BY AND BETWEEN WHARTON-SMITH, INC. AND SCHOOL BOARD OF BREVARD COUNTY 2700 JUDGE FRAN JAMIESON WAY VIERA, FL PHONE: (321) FAX: (321) FOR THE CONSTRUCTION OF: DISTRICT SCHOOL SECURITY (13 SITES) RFP #17-P-029-DR March 7, 2017 GMP Amendment Exhibit C District School Security (13 Sites)/RFP#17-P-029-DR Page 1 of 4

3 ARTICLE 1. GUARANTEED MAXIMUM PRICE (GMP) 1.1 Guaranteed Maximum Price (GMP): Design Builder guarantees that it shall not exceed a Guaranteed Maximum Price (GMP) of Nine Hundred Seventy-Six Thousand, One Hundred Eighty- Nine Dollars ($976,189.00) for the identified Sub-Project. 1.2 Basis of the GMP: Construction Documents: The Scope of Work for the GMP shall be as defined in the Contract Construction Documents, prepared by Design Builder. See attached Exhibit C-1, Section 02, List of Contract Documents for document titles and dates List of Construction Documents identified in Article 7 of this Guaranteed Maximum Price Amendment Exceptions, Clarifications and Exclusions: The Scope of Work defined in the Construction Contract Documents and/or Design Criteria package shall be modified and/or clarified as identified in Article 8 of this Guaranteed Maximum Price Amendment. ARTICLE 2. PROJECT TIME 2.1 Substantial Completion Date: Substantial Completion of the Work shall be achieved by January 5, Final Completion Date: Final completion of the Work shall be achieved by March 9, Project Schedule: Attached to this Amendment will be a schedule identifying the above noted completion times and intermediate milestone dates estimated for the Project. The proposed schedule shall be integrated into the Design Builder s Schedule upon approval of this Guaranteed Maximum Price Amendment. ARTICLE 3. DESIGN BUILDER FEE 3.1 Design Builder Fee: The Design Builder Fee for the Project shall be a Lump Sum of Forty- Three Thousand, Five Hundred Twenty-Three Dollars ($43,523.00). ARTICLE 4. REIMBURSABLE GENERAL CONDITIONS COSTS 4.1 General Conditions: General Conditions costs for the Project shall not exceed One Hundred Sixty Thousand, Nine Hundred Forty-Eight Dollars ($160,948.00). General Conditions costs shall be reimbursed at Design Builder s actual cost. General Conditions costs shall be in compliance with the General Conditions to the Agreement for Design Build Services (Exhibit A) and are identified in the attached document prepared by the Design Builder. ARTICLE 5. LIQUIDATED DAMAGES 5.1 Substantial Completion: Design Builder shall pay Owner One Thousand Dollars ($1,000.00) as liquidated damages for each day that Substantial Completion extends beyond the Substantial Completion Date. GMP Amendment Exhibit C District School Security (13 Sites)/RFP#17-P-029-DR Page 2 of 4

4 5.2 Final Completion: Design Builder shall pay Owner Five Hundred Dollars ($500.00) as liquidated damages for each day that Final Completion extends beyond the Final Completion Date. ARTICLE 6. PROJECT REPRESENTATIVES 6.1 Owner s Representative: Owner designates the individual listed below as its Owner s Project Manager to provide direct interface with Design Builder with respect to Owner s responsibilities. James Hudson Owner s Project Manager 6.2 Design Builder s Representative: Design Builder designates the individual listed below as its Design Builder s Representative to provide direct interface with Owner with respect to Design Builder s responsibilities. Johnathan Wilkes Design Builder s Project Manager ARTICLE 7. LIST OF CONSTRUCTION CONTRACT DOCUMENTS 7.1 Drawings: Listed below are the Drawings developed by the Design Builder and their issue Date which is the basis of this Guaranteed Maximum Price Amendment: See attached Guaranteed Maximum Price Proposal dated March 7, Specifications: Listed below are the Specification Sections developed by the Design Builder and their issue Date which is the basis of this Guaranteed Maximum Price Amendment: See attached Guaranteed Maximum Price Proposal dated March 7, 2017 ARTICLE 8. EXCEPTIONS, EXCLUSIONS AND CLARIFICATIONS 8.1 Exceptions and Exclusions: Listed below are specific Exceptions and Exclusions identified by the Design Builder during the development of this Project Design and Bidding: See attached Guaranteed Maximum Price Proposal dated March 7, Clarifications: Listed below are specific Clarifications identified by the Design Builder during the development of this Project Design and Bidding: See attached Guaranteed Maximum Price Proposal dated March 7, 2017 GMP Amendment Exhibit C District School Security (13 Sites)/RFP#17-P-029-DR Page 3 of 4

5 SIGNATURE PAGE: THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA: DESIGN BUILDER: WHARTON-SMITH, INC. By: Misty Belford, Chairperson ATTEST (WITNESS): By: es mo n d K. Blackburn, Ph.D. Superintendent Date: Title: \ 9(L ; Date:_?>_ J _ l.-\'1 ATTEST (WITNESS): By Q)Y\MM Print Name: ki)v\ idj fi,fy)w( Title: a{ END OF EXHIBIT C GMP Amendment - Exhibit C - District School Security (13 Sites)/RFP#17-P-029-DR Page 4 of 4

6 GUARANTEED MAXIMUM PRICE PROPOSAL FOR SCHOOL BOARD OF BREVARD COUNTY Design Build Services for Brevard County School District, District School Security Program as Outlined in the Sales Surtax Funded List GMP #1 (Revision 2) Atlantis Elementary School Cambridge Elementary School Coquina Elementary School Challenger 7 Elementary School Croton Elementary School Enterprise Elementary School Golfview Elementary School Imperial Elementary School Johnson Middle School Madison Middle School McNair Magnet Middle School Rockledge High School Stevenson Elementary School SUBMITTED BY: WHARTON-SMITH, INC. DATE: March 7, 2017

7 March 7, 2017 Mr. Jim Hudson School Board of Brevard County 2700 Judge Fran Jamieson Way Viera, FL Re: Design Build Services for Brevard County School District, District School Security Program as Outlined in the Sales Surtax Funded List Guaranteed Maximum Price (GMP) #1 Sir: Attached is our Sub Project GMP #1 for District School Security Program as Outlined in the Sales Surtax Funded List for your review and approval. The following thirteen (13) schools listed below have been included; Atlantis Elementary School Cambridge Elementary School Coquina Elementary School Challenger 7 Elementary School Croton Elementary School Enterprise Elementary School Golfview Elementary School Imperial Elementary School Johnson Middle School Madison Middle School McNair Magnet Middle School Rockledge High School Stevenson Elementary School Please contact me with any questions regarding this GMP. We look forward to working with you on this project. Sincerely, Wharton-Smith, Inc. Johnathan Wilkes Senior Project Manager 750 Monroe Road, Sanford, FL I Phone: (407) I Fax: (407) Mailing Address: P.O. Box , Lake Monroe, FL AL I FL - CG C I GA GCCO I LA I MS 18232MC I NC I SC G97817 I TN I VA A

8 1 School Board of Brevard County Design Build Services for Brevard County School District, District School Security Program as Outlined in the Sales Surtax Funded List TABLE OF CONTENTS Exhibit C GMP Summary... Section 01 Exhibit C-1 List of Contract Documents... Section 02 Exhibit C-2 Description of Work... Section 03 Specification Listing Qualifications and Assumptions Exclusions Value Engineering Recommendations Allowance Schedule Add Alternate Schedule ODP Schedule GMP Cost Summary... Section 04 Master Project Schedule... Section 05 RFP #17-P-029-DR Page 1 of 72 03/06/17

9 1 SECTION 01 GMP Summary The project consists of the following District School Security Program enhancements of thirteen (13) schools located in Brevard County for Brevard Public Schools: 1. Atlantis Elementary School This project consists of providing fencing and public access control. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. 2. Cambridge Elementary School This project consists of providing public access control only. The existing fencing creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. 3. Challenger 7 Elementary School This project consists of providing fencing and public access control. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, two wireless AD400 locksets with hard wired push buttons and two remote release buttons per opening. 4. Coquina Elementary School This project consists of providing public access control only. The existing fencing creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. 5. Croton Elementary School This project consists of providing fencing and public access control. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. RFP #17-P-029-DR Page 2 of 72 03/06/17

10 2 6. Golfview Elementary School This project consists of providing fencing, public access control and miscellaneous sitework. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. The miscellaneous sitework is required due to a necessary change in traffic pattern for students entering and leaving the clinic during school hours. A new concrete sidewalk will be installed to provide access to the Clinic from within the secured interior perimeter of the school. 7. Enterprise Elementary School This project consists of providing fencing and public access control. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. 8. Imperial Elementary School This project consists of providing public access control only. The existing fencing creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. 9. Johnson Middle School This project consists of providing fencing and public access control. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. 10. Madison Middle School This project consists of providing fencing and public access control. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. 11. McNair Magnet Middle School This project consists of providing fencing, public access control and miscellaneous sitework. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. The miscellaneous sitework is required due to the new fencing/gate necessary to secure the school perimeter between Building 03 & 13. A concrete landing/ramp must be installed to the NE teacher parking lot which will provide ingress/egress at the new gate access to the parking lot. RFP #17-P-029-DR Page 3 of 72 03/06/17

11 3 12. Rockledge High School This project consists of providing fencing, public access control and miscellaneous sitework. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. The miscellaneous sitework is required due to the new fencing/gate necessary to secure the East side of the school perimeter. A concrete landing must be installed to provide ingress/egress at the new pedestrian gate access securing the Bus Loop. 13. Stevenson Elementary School This project consists of providing fencing and public access control. The fencing scope of work creates a secure perimeter around the school, such that any access to classrooms or children is only through the front office. The access control scope of work consists of creating a single point of access in the front office for all arriving visitors of the school whom which upon entering will be required to follow a check-in procedure. Access control also consists of one camera with mount, one TV with mount, new desk with ADA compliant counter, remote lock down of front entry, one wireless AD400 lockset with hard wired push button and two remote release buttons. RFP #17-P-029-DR Page 4 of 72 03/06/17

12 1 Exhibit C-1 SECTION 02 LIST OF CONTRACT DOCUMENTS Sheet No Sheet Title Date of Issue Atlantis Elementary School A1.0 Site Plan 12/23/2016 A2.0 Floor Plan 12/23/2016 Cambridge Elementary School A01 Site Plan 1/9/2017 Challenger 7 Elementary School A1.0 Site Plan 12/23/2016 A2.0 Floor Plan 12/23/2016 Coquina Elementary School A01 Site Plan 1/9/2017 Croton Elementary School A0.0 Cover Sheet / Schedule of Drawings 2/16/2017 A0.1 General Note & Specification 2/16/2017 A1.0 Site Plan 2/16/2017 A1.01 Fencing Details 2/16/2017 A1.02 Fencing Details 2/16/2017 A2.0 Interior Security Renovation 2/16/2017 Enterprise Elementary School A01 Site Plan 1/9/2017 Revised Golfview Elementary School A-2.1 Site Plan 12/21/2016 A-3.1 Floor Plan 12/21/2016 Imperial Estates Elementary School A1.0 Site Plan 12/23/2016 A2.0 Floor Plan 12/23/2016 Johnson Middle School A1.0 Site Plan 12/30/2016 A2.0 Floor Plan 12/30/2016 RFP #17-P-029-DR Page 5 of 72 03/06/17

13 2 Sheet No Sheet Title Date of Issue Madison Middle School A1.0 Site Plan 12/23/2016 A2.0 Floor Plan 12/23/2016 McNair Magnet Middle School A01 Site Plan 1/9/2017 A02 Enlarged Plans 1/9/2017 Rockledge High School A-2.1 Site Plan 12/23/2016 A-3.1 Floor Plan 12/23/2016 Stevenson Elementary School A0.0 Cover Sheet / Schedule of Drawings 2/10/2017 A1.0 Site Plan 2/10/2017 A2.0 Interior Security Renovations 2/10/2017 Revised RFP #17-P-029-DR Page 6 of 72 03/06/17

14 1 SECTION 03 Description of Work 3.1 Specification Listing Specification Listing (including exclusions, substitutions, modifications, etc.) is as follows: Division Section Description - All specifications as shown on the drawings Exclusions, Substitutions, Modifications, Etc. RFP #17-P-029-DR Page 7 of 72 03/06/17

15 1 SECTION 03 Description of Work 3.2 Qualifications and Assumptions The following is a summary of additional Qualifications and Assumptions including the Qualifications and Assumptions listed in the specification listing: 1 No allowances for hazardous materials abatement have been included. In keeping with other projects where School Board of Brevard County (SBBC) has indicated any and all materials requiring abatement will be handled by SBBC, as required by the Design-Builder s project schedule; 2 Emergency Exit Signage and Fire Alarm modifications are included only where indicated; 3 New and impacted existing finish surfaces shall be completed in a manner to match existing conditions. Flooring and base repairs will be subject to available attic stock materials and product availability. Wall base basis of design shall be 4 Mercer Standard Wall Base Stock 1/4CL or equal, per the BPS Design Standards; 4 New interior doors shall be provided as field painted solid core doors with ½ lite. New door frames shall be provided as 14 gauge hollow metal knock down. Door hardware shall be installed per the BPS Design Standards and will contain egress hardware only where indicated; 5 Retrofitted Casework to receive new ADA compliant counter shall be coordinated with the Owner to match the existing laminate as closely as possible. Locations where casework finish cannot be matched shall receive a solid complimentary color as selected by the Owner. RFP #17-P-029-DR Page 8 of 72 03/06/17

16 1 SECTION 03 Description of Work 3.3 Exclusions The following is a listing of additional Exclusions included in the specification listing, plus all exclusions not related to the specifications; 1. All hazardous material testing, abatement and monitoring; 2. Repair or replacement of any existing conditions not shown on the contract documents or identified specifically within the scope of this contract; 3. Any modifications to existing Fire Sprinkler system. RFP #17-P-029-DR Page 9 of 72 03/06/17

17 1 SECTION 03 Description of Work 3.4 Value Engineering Recommendations RFP #17-P-029-DR Page 10 of 72 03/06/17

18 1 SECTION 03 Description of Work 3.5 Allowance Schedule ATLANTIS ELEMENTARY SCHOOL 1. Fencing... $60, Access Control... $31,563 CAMBRIDGE ELEMENTARY SCHOOL 1. Fencing... $0 2. Access Control... $20,028 CHALLENGER 7 ELEMENTARY SCHOOL 1. Fencing... $65,302 Access Control...$23,078 COQUINA ELEMENTARY SCHOOL 1. Fencing... $0 2. Access Control... $26,078 CROTON ELEMENTARY SCHOOL 1. Fencing... $34, Access Control... $26,958 ENTERPRISE ELEMENTARY SCHOOL 1. Fencing... $44, Access Control... $24,395 RFP #17-P-029-DR Page 11 of 72 03/06/17

19 2 GOLFVIEW ELEMENTARY SCHOOL 1. Misc. Sitework... $12, Fencing... $29, Access Control... $26,678 IMPERIAL ESTATES ELEMENTARY SCHOOL 1. Fencing... $0 2. Access Control... $25,686 JOHNSON MIDDLE SCHOOL 1. Fencing... $11, Access Control... $28,606 MADISON MIDDLE SCHOOL 1. Fencing... $5, Access Control... $27,329 MCNAIR MAGNET MIDDLE SCHOOL 1. Misc. Sitework... $3, Fencing... $31, Access Control... $25,362 ROCKLEDGE HIGH SCHOOL 1. Misc. Sitework... $3, Fencing... $57, Access Control... $22,321 RFP #17-P-029-DR Page 12 of 72 03/06/17

20 3 STEVENSON ELEMENTARY SCHOOL 1. Fencing... $2, Access Control... $30,261 RFP #17-P-029-DR Page 13 of 72 03/06/17

21 1 SECTION 03 Description of Work 3.6 Add Alternate Schedule RFP #17-P-029-DR Page 14 of 72 03/06/17

22 1 SECTION 03 Description of Work 3.7 ODP Schedule The ODP Values for this project will be determined ASAP and submitted following GMP Approval. RFP #17-P-029-DR Page 15 of 72 03/06/17

23 1 SECTION 04 GMP Cost Summary See Attached RFP #17-P-029-DR Page 16 of 72 03/06/17

24 Brevard Public Schools District School Security Improvements GMP #1 OVERALL SUMMARY RFP #17-P-029-DR Page 17 of 72 03/06/17

25 District School Security Improvements Overall Summary GMP #1 WORKSHEET SUMMARY 09:43 PM 06-Mar-17 LINE DESCRIPTION Atlantis E.S. Cambridge E.S. Challenger 7 E.S. Coquina E.S. Croton E.S. Enterprise E.S. Golfview E.S. Imperial E.S. Johnson M.S. Madison M.S. McNair M.S. Rockledge H.S. Stevenson E.S. TOTAL 1 GENERAL REQUIREMENTS 3,415 1,319 2,943 1,697 2,887 2,708 1,976 1,111 1,578 1,569 2,926 2,950 1,780 28,859 2 MISCELLANEOUS SITEWORK , ,252 3,037 18,684 3 FENCING 60, , ,440 44,357 29, ,913 5,034 31,045 57,857 2, ,309 4 ACCESS CONTROL 31,563 20,028 23,078 26,078 26,958 24,395 26,678 25,686 28,606 27,329 25,362 22,321 30, ,343 5 TOTAL DIRECT 94,990 21,346 91,323 27,775 64,285 71,459 70,940 26,798 42,097 33,932 62,585 86,165 34, ,195 6 GENERAL CONDITIONS (12%) 13,985 3,143 13,445 4,089 9,464 10,520 8,619 3,945 6,198 4,996 8,735 12,238 5, ,455 7 CONSTRUCTION ADMIN (5%) 5,827 1,309 5,602 1,704 3,943 4,383 3,591 1,644 2,582 2,081 3,640 5,099 2,116 43,523 8 GENERAL LIABILITY INSURANCE (.41%) ,569 9 BOND (1.08%) 1, , , , TOTAL ADJUSTED COST 116,538 26, ,039 34,075 78,868 87,670 84,221 32,876 51,647 41,629 76, ,022 42, , FEE (5%) 5,827 1,309 5,602 1,704 3,943 4,383 3,591 1,644 2,582 2,081 3,640 5,099 2,116 43, CONTINGENCY (5%) 5,827 1,309 5,602 1,704 3,943 4,383 3,591 1,644 2,582 2,081 3,640 5,099 2,116 43, TOTAL CONSTRUCTION COST $128,192 $28,807 $123,243 $37,483 $86,754 $96,437 $91,404 $36,164 $56,811 $45,792 $83,324 $115,221 $46,558 $976,189 SALES SURTAX FUNDED CATEGORIES MISCELLANEOUS SITEWORK $0 $0 $0 $0 $0 $0 $12,395 $0 $0 $0 $3,252 $3,037 $0 $18, PERIMETER/ENTRY FENCING AND GATES $84,260 $0 $91,061 $0 $48,812 $62,219 $43,650 $0 $16,703 $7,122 $44,070 $80,953 $3,498 $482, BUILDING ACCESS AND SECURITY EQUIPMENT $43,932 $28,807 $32,182 $37,483 $37,942 $34,218 $35,359 $36,164 $40,108 $38,670 $36,002 $31,231 $43,060 $475,157 RFP #17-P-029-DR Page 18 of 72 03/06/17

26 GENERAL CONDITIONS EQUIP MAT'L SUBS UNIT TOTALS REMARKS DESCRIPTION QTY UNIT RATE AMOUNT U/P AMOUNT U/P AMOUNT PRICE PERMITS, FEES, INSURANCE, LEGAL, ETC Brevard Public Schools Building Permit Fee- BY OWNER $ BY OWNER Plan Review Fee-BY OWNER $ BY OWNER PROJECT MANAGEMENT TEAM Project Superintendent 280 HR , ,593 16,593 Asst. Project Superintendent 360 HR , ,620 19,620 Project Manager 360 HR , ,017 26,017 Asst. Project Manager 360 HR , ,608 17,608 Project Engineer 360 HR , ,852 12,852 Project Assistant 120 HR , ,554 3,554 Project Accountant 120 HR , ,750 3,750 Project Scheduler 62 HR , ,461 4, SUBTOTAL GENERAL CONDITIONS , ,455 SALES TAX SALES TAX 6.50% 0 TOTAL GENERAL CONDITIONS 104,455 RFP #17-P-029-DR Page 19 of 72 03/06/17

27 Brevard Public Schools District School Security Improvements Atlantis Elementary School RFP #17-P-029-DR Page 20 of 72 03/06/17

28 SBBC District School Security Atlantis Elementary School ESTIMATING WORKSHEET SUMMARY 09:43 PM 06-Mar-17 LINE DESCRIPTION TOTAL 1 GENERAL REQUIREMENTS 3,415 2 FENCING 60,012 3 ACCESS CONTROL 31,563 4 TOTAL DIRECT 94,990 5 GENERAL CONDITIONS (12%) 13,985 6 CONSTRUCTION ADMIN (5%) 5,827 7 GENERAL LIABILITY INSURANCE (.41%) BOND (1.08%) 1,259 9 TOTAL ADJUSTED COST $116, MARK-UP (5%) 5, CONTINGENCY (5%) 5, TOTAL CONSTRUCTION COST $128,192 ALTERNATES ALT1 UPGRADE GALV. CL TO VINYL (REJ) 1,863 ALT2 ALT3 ALT4 13 TOTAL CONSTRUCTION COSTS - NO ALTS $128,192 TOTALS BY GROUP/CATEGORY MISCELLANEOUS SITEWORK PERIMETER/ENTRY FENCING AND GATES $84, BUILDING ACCESS AND SECURITY EQUIPMENT $43,932 RFP #17-P-029-DR Page 21 of 72 03/06/17

29 SBBC District School Security Atlantis Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE 1 General Requirements 2 3 Builder's Risk 1 LS WS field office supplies 1 LS Postal service and office supplies 1 LS Small tools 1 LS Vehicle(s), fuel, oil, grease 1 EA ,148 1, ,148 8 Clean-up & temp. protection 1 LS Relocate office furnishings / repair office finishes 1 LS Dumpster(s) 1 EA Document control 1 LS Temp toilet(s) 1 EA Cellular phone(s) 1 EA Job site internet access 1 EA Computer / IT 1 EA Safety 1 LS ADJUST LS , Subtotal - General Requirements 0 3,415 3, Fencing Fence Demo & Rework Remove fence lf Remove gate(s) ea Remove gate & modify fence for new gates ea Reset exist galv metal fence lf Fence - Chain Link Galv Chain link 6' galv 262 lf , , Fence - Chain Link Vinyl Chain link 6' vinyl coated lf Gates - Chain Link Galv W x 6H CL w/padlock 1 ea W x 6H (dble 4') CL w/padlock ea x 6H (dble 6') CL w/padlock ea W x 6H (sgle swing) CL w/padlock & tire ea W x 6H (dble 7') CL w/padlock & tire ea W x 6H (dble 8') CL w/padlock & tire 1 ea ,200 2, , Fence - Architectural Aluminum Arch 6' aluminum 396 lf , , Concrete Coring 29 ea , , Gates - Architectural Aluminum W x 6H Arch w/ padlock ea W x 6H Arch w/ padlock 1 ea ,100 1, , Gates - Architectural Aluminum Egress W x 6H Arch egress 4 ea ,200 3, , W x 6H Arch egress ea W x 6H (dble 3') Arch egress 1 ea ,500 6, , W x 8H (dble 4') Arch egress 1 ea ,000 7, , Gates - Architectural Aluminum Sliding W x 6H Arch sliding ea W x 6H Arch 180deg swing 2 ea ,000 1, , Preconstruction phase contingency 57,154 $ , , ,012 $ BOND 60,012 $ ADJUST LS , RFP #17-P-029-DR Page 22 of 72 03/06/17

30 SBBC District School Security Atlantis Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE Subtotal - Fencing 0 60,012 60, Access Demolition 74 Remove counter 3 lf Create opening in ext masonry wall for new door ea Cabinetry 78 Infill side doorway ea Relocate/modify reception counter 1 ea Modify reception counter for ADA approach 1 ea Doors & frames 83 HM Fr ea SC WD Dr ea Hdwe 1 ea Install 1 ea Keypad access new door 1 ea ,100 1, , Pushbutton release Admin 1 ea ,500 1, , Dutch door & shelf upcharge ea Windows & Glass 92 Modify storefront for electric buzzer ea /2 glass lite 1 ea Modify storefront for new door ea Walls, Floors & Ceilings 97 Metal stud wall to above ceiling 10 lf , , Repair acoustical ceiling system sf Repair flooring/base 1 ls Relocate Bookkeeper 1 ls ,000 5, , Paint walls 160 sf Paint door & frame 1 ea Specialties Repair tack board 1 ea Electrical Emergency exit sign - surface mount 1 ea Wall mounted security monitor 1 ea ,000 2, , Ceiling mounted security camera 1 ea ,400 2, , Rework electrical in cabinets 1 ea ,500 1, , Electric strike with push button for exterior gate 1 ea ,000 5, , Front Entry Lockdown Allowance 1 ea ,000 5, , Preconstruction phase contingency 30,060 $ , , ,563 $ BOND 31,563 $ ADJUST LS , Subtotal - Access 0 31,563 31, TOTAL DIRECT COST 0 94,990 94,990 94, GENERAL CONDITIONS 12.00% 13, CONSTRUCTION ADMIN 5.00% 5, GENERAL LIABILITY INSURANCE 0.41% BOND 1.08% 1, TOTAL ADJUSTED COST 116, MARK-UP 5.00% 5, CONTINGENCY 5.00% 5, TOTAL CONSTRUCTION COST $128,192 RFP #17-P-029-DR Page 23 of 72 03/06/17

31 Brevard Public Schools District School Security Improvements Cambridge Elementary School RFP #17-P-029-DR Page 24 of 72 03/06/17

32 SBBC District School Security Cambridge Elementary School ESTIMATING WORKSHEET SUMMARY 09:43 PM 06-Mar-17 LINE DESCRIPTION TOTAL 1 GENERAL REQUIREMENTS 1,319 2 FENCING 0 3 ACCESS CONTROL 20,028 4 TOTAL DIRECT 21,346 5 GENERAL CONDITIONS (12%) 3,143 6 CONSTRUCTION ADMIN (5%) 1,309 7 GENERAL LIABILITY INSURANCE (.41%) BOND (1.08%) TOTAL ADJUSTED COST $26, MARK-UP (5%) 1, CONTINGENCY (5%) 1, TOTAL CONSTRUCTION COST $28,807 ALTERNATES ALT1 ALT2 ALT3 ALT4 13 TOTAL CONSTRUCTION COSTS - NO ALTS $28,807 TOTALS BY GROUP/CATEGORY MISCELLANEOUS SITEWORK PERIMETER/ENTRY FENCING AND GATES BUILDING ACCESS AND SECURITY EQUIPMENT $28,807 RFP #17-P-029-DR Page 25 of 72 03/06/17

33 SBBC District School Security Cambridge Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE 1 General Requirements 2 3 Builder's Risk 1 LS WS field office supplies 1 LS Postal service and office supplies 1 LS Small tools 1 LS Vehicle(s), fuel, oil, grease 0.5 EA Clean-up & temp. protection 1 LS Relocate office furnishings / repair office finishes 1 LS Dumpster(s) EA Document control 1 LS Temp toilet(s) EA Cellular phone(s) 0.5 EA Job site internet access 1 EA Computer / IT 0.5 EA Safety 1 LS ADJUST LS , Subtotal - General Requirements 0 1,319 1, Fencing - Not Applicable Preconstruction phase contingency 0 $ $ BOND 0 $ ADJUST LS Subtotal - Fencing - Not Applicable Access Demolition 36 Remove counter lf Create opening in ext masonry wall for new door ea Cabinetry 40 Infill side doorway ea Relocate/modify reception counter ea Modify reception counter for ADA approach ea EXISTING Doors & frames 45 HM Fr ea SC WD Dr ea Hdwe 2 ea Install 2 ea Keypad access new door 1 ea ,100 1, , Pushbutton release option 1 ea ,000 5, , Dutch door & shelf upcharge ea Windows & Glass 54 Modify storefront for electric buzzer ea /2 glass lite 2 ea Modify storefront for new door ea Walls, Floors & Ceilings 59 Metal stud wall to above ceiling 4 lf Repair acoustical ceiling system sf Repair flooring/base 1 ls Relocate Bookkeeper ls Paint walls 84 sf Paint door & frame 1 ea Specialties Repair tack board ea RFP #17-P-029-DR Page 26 of 72 03/06/17

34 SBBC District School Security Cambridge Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE 69 Electrical Fire alarm pull station - surface mount ea Wall mounted security monitor 1 ea ,000 2, , Ceiling mounted security camera 1 ea ,400 2, , Rework electrical in cabinets ea Electric strike with push button for exterior gate ea Front entry lockdown allowance 1 ea ,000 5, , Preconstruction phase contingency 19,074 $ ,028 $ BOND 20,028 $ ADJUST LS , Subtotal - Access 0 20,028 20, TOTAL DIRECT COST 0 21,346 21,346 21, GENERAL CONDITIONS 12.00% 3, CONSTRUCTION ADMIN 5.00% 1, GENERAL LIABILITY INSURANCE 0.41% BOND 1.08% TOTAL ADJUSTED COST 26, MARK-UP 5.00% 1, CONTINGENCY 5.00% 1, TOTAL CONSTRUCTION COST $28,807 RFP #17-P-029-DR Page 27 of 72 03/06/17

35 Brevard Public Schools District School Security Improvements Challenger 7 Elementary School Page 47 RFP #17-P-029-DR Page 28 of 72 03/06/17

36 SBBC District School Security Challenger 7 Elementary School ESTIMATING WORKSHEET SUMMARY 09:43 PM 06-Mar-17 LINE DESCRIPTION TOTAL 1 GENERAL REQUIREMENTS 2,943 2 FENCING 65,302 3 ACCESS CONTROL 23,078 4 TOTAL DIRECT 91,323 5 GENERAL CONDITIONS (12%) 13,445 6 CONSTRUCTION ADMIN (5%) 5,602 7 GENERAL LIABILITY INSURANCE (.41%) BOND (1.08%) 1,210 9 TOTAL ADJUSTED COST $112, MARK-UP (5%) 5, CONTINGENCY (5%) 5, TOTAL CONSTRUCTION COST $123,243 ALTERNATES ALT1 ALT2 ALT3 ALT4 13 TOTAL CONSTRUCTION COSTS - NO ALTS $123,243 TOTALS BY GROUP/CATEGORY MISCELLANEOUS SITEWORK PERIMETER/ENTRY FENCING AND GATES $91, BUILDING ACCESS AND SECURITY EQUIPMENT $32,182 Page 48 RFP #17-P-029-DR Page 29 of 72 03/06/17

37 SBBC District School Security Challenger 7 Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE 1 General Requirements 2 3 Builder's Risk 1 LS WS field office supplies 1 LS Postal service and office supplies 1 LS Small tools 1 LS Vehicle(s), fuel, oil, grease 1 EA Clean-up & temp. protection 1 LS Relocate office furnishings / repair office finishes 1 LS Dumpster(s) 1 EA Document control 1 LS Temp toilet(s) 2 EA Cellular phone(s) 1 EA Job site internet access 1 EA Computer / IT 1 EA Safety 1 LS ADJUST LS , Subtotal - General Requirements 0 2,943 2, Fencing Fence Demo & Rework Remove fence lf Remove gate(s) ea Fence - Chain Link Galv Chain link 6' galv 823 lf , , Fence - Chain Link Vinyl Chain link 6' vinyl coated lf Gates - Chain Link Galv W x 6H CL w/padlock ea W x 6H (dble 4') CL w/padlock 3 ea ,600 1, , W x 6H (dble 6') CL w/padlock 2 ea ,000 1, , W x 6H (sgle swing) CL w/padlock & tire ea W x 6H (dble 7') CL w/padlock & tire ea W x 6H (dble 8') CL w/padlock & tire ea W x 6H (dble 12') CL w/padlock & tire 2 ea ,150 2, , W x 6H (cantilever) CL w/padlock & tire ea Gates - Chain Link Galv Egress W x 6H CL w/egress hdwe 4 ea ,000 3, , W x 6H (dble 3') CL w/egress hdwe ea W x 6H (dble 4') CL w/egress hdwe ea Fence - Architectural Aluminum Arch 6' aluminum 120 lf , , Concrete Coring 20 ea , , Gates - Architectural Aluminum Egress W x 6H Arch egress 5 ea ,000 3, , W x 6H Arch egress ea W x 6H (dble 3') Arch egress ea W x 8H (dble 4') Arch egress ea Preconstruction phase contingency 62,192 $ , , ,302 $ BOND 65,302 $ ADJUST LS , Subtotal - Fencing 0 65,302 65, Access Page 49 RFP #17-P-029-DR Page 30 of 72 03/06/17

38 SBBC District School Security Challenger 7 Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE Demolition 71 Remove counter/wall 6 lf Create opening in ext masonry wall for new door ea Cabinetry 75 Infill side doorway ea Relocate/modify reception counter ea Modify reception counter for ADA approach 1 ea ,050 1, , Doors & frames 80 HM Fr ea SC WD Dr ea Hdwe 1 ea Install 2 ea Keypad access new door 2 ea ,200 1, , Pushbutton release option 1 ea ,000 5, , Dutch door & shelf upcharge ea Windows & Glass 89 Modify storefront for electric buzzer ea /2 glass lite 1 ea Modify storefront for new door ea Walls, Floors & Ceilings 94 Metal stud wall to above ceiling 5 lf Repair acoustical ceiling system 35 sf Repair flooring/base 1 ls Paint walls 64 sf Paint door & frame 1 ea Specialties Repair tack board ea Electrical Fire alarm pull station - surface mount ea Wall mounted security monitor 1 ea ,000 2, , Ceiling mounted security camera 1 ea ,400 2, , Rework electrical in cabinets ea Front Entry Lockdown Allowance 1 ea ,000 5, , Preconstruction phase contingency 21,979 $ , , ,078 $ BOND 23,078 $ ADJUST LS , Subtotal - Access 0 23,078 23, TOTAL DIRECT COST 0 91,323 91,323 91, GENERAL CONDITIONS 12.00% 13, CONSTRUCTION ADMIN 5.00% 5, GENERAL LIABILITY INSURANCE 0.41% BOND 1.08% 1, TOTAL ADJUSTED COST 112, MARK-UP 5.00% 5, CONTINGENCY 5.00% 5, TOTAL CONSTRUCTION COST $123,243 Page 50 RFP #17-P-029-DR Page 31 of 72 03/06/17

39 Brevard Public Schools District School Security Improvements Coquina Elementary School RFP #17-P-029-DR Page 32 of 72 03/06/17

40 SBBC District School Security Coquina Elementary School ESTIMATING WORKSHEET SUMMARY 09:43 PM 06-Mar-17 LINE DESCRIPTION TOTAL 1 GENERAL REQUIREMENTS 1,697 2 FENCING 0 3 ACCESS CONTROL 26,078 4 TOTAL DIRECT 27,775 5 GENERAL CONDITIONS (12%) 4,089 6 CONSTRUCTION ADMIN (5%) 1,704 7 GENERAL LIABILITY INSURANCE (.41%) BOND (1.08%) TOTAL ADJUSTED COST $34, MARK-UP (5%) 1, CONTINGENCY (5%) 1, TOTAL CONSTRUCTION COST $37,483 ALTERNATES ALT1 ALT2 ALT3 ALT4 13 TOTAL CONSTRUCTION COSTS - NO ALTS $37,483 TOTALS BY GROUP/CATEGORY MISCELLANEOUS SITEWORK PERIMETER/ENTRY FENCING AND GATES BUILDING ACCESS AND SECURITY EQUIPMENT $37,483 RFP #17-P-029-DR Page 33 of 72 03/06/17

41 SBBC District School Security Coquina Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE 1 General Requirements 2 3 Builder's Risk 1 LS WS field office supplies 1 LS Postal service and office supplies 1 LS Small tools 1 LS Vehicle(s), fuel, oil, grease 0.5 EA Clean-up & temp. protection 1 LS Relocate office furnishings / repair office finishes 1 LS Dumpster(s) 0 EA Document control 1 LS Temp toilet(s) 0 EA Cellular phone(s) 0.5 EA Job site internet access 1 EA Computer / IT 0.5 EA Safety 1 LS ADJUST LS , Subtotal - General Requirements 0 1,697 1, Access Cabinetry 25 Relocate/modify reception counter 1 ea ,200 1, , Doors & frames 28 HM Fr ea SC WD Dr ea Hdwe 1 ea ,450 1, , Install 1 ea Keypad access new door 1 ea ,100 1, , Pushbutton release option 1 ea ,000 5, , Windows & Glass 36 1/2 glass lite 1 ea Walls, Floors & Ceilings 39 Metal stud wall to above ceiling 6 lf Repair acoustical ceiling system 40 sf Repair flooring/base 1 ls ,500 1, , Paint walls 96 sf Paint door & frame 1 ea Electrical Emergency exit sign - surface mounted 1 ea Wall mounted security monitor 1 ea ,000 2, , Ceiling mounted security camera 1 ea ,400 2, , Rework light fixtures 1 ea Relocate electrical/data for visitor management computer 1 ea Front Entry Lockdown Allowance 1 ea ,000 5, , Preconstruction phase contingency 24,836 $ , , ,078 $ BOND 26,078 $ ADJUST LS , Subtotal - Access 0 26,078 26, TOTAL DIRECT COST 0 27,775 27,775 27, GENERAL CONDITIONS 12.00% 4, CONSTRUCTION ADMIN 5.00% 1, GENERAL LIABILITY INSURANCE 0.41% BOND 1.08% TOTAL ADJUSTED COST 34, MARK-UP 5.00% 1, CONTINGENCY 5.00% 1, TOTAL CONSTRUCTION COST $37,483 RFP #17-P-029-DR Page 34 of 72 03/06/17

42 Brevard Public Schools District School Security Improvements Croton Elementary School RFP #17-P-029-DR Page 35 of 72 03/06/17

43 SBBC District School Security Croton Elementary School ESTIMATING WORKSHEET SUMMARY 09:43 PM 06-Mar-17 LINE DESCRIPTION TOTAL 1 GENERAL REQUIREMENTS 2,887 2 FENCING 34,440 3 ACCESS CONTROL 26,958 4 TOTAL DIRECT 64,285 5 GENERAL CONDITIONS (12%) 9,464 6 CONSTRUCTION ADMIN (5%) 3,943 7 GENERAL LIABILITY INSURANCE (.41%) BOND (1.08%) TOTAL ADJUSTED COST $78, MARK-UP (5%) 3, CONTINGENCY (5%) 3, TOTAL CONSTRUCTION COST $86,754 1 ALTERNATES ALT1 ADTL' BUSLOOP 3' SWING GATE W/ PADLOCK (REJ) 832 ALT2 ADTL' PARKING LOOP 12' SWING GATE W/ PAD (REJ) 1,953 ALT3 ALT4 13 TOTAL CONSTRUCTION COSTS - NO ALTS $86,754 TOTALS BY GROUP/CATEGORY MISCELLANEOUS SITEWORK PERIMETER/ENTRY FENCING AND GATES $48, BUILDING ACCESS AND SECURITY EQUIPMENT $37,942 RFP #17-P-029-DR Page 36 of 72 03/06/17

44 SBBC District School Security Croton Elementary School DIRECT COST WORKSHEET 09:43 PM 06-Mar-17 LINE DESCRIPTION QTY UNIT MAT'L SUB UNIT TOTALS COMMENTS U/P AMOUNT U/P AMOUNT PRICE 1 General Requirements 2 3 Builder's Risk 1 LS WS field office supplies 1 LS Postal service and office supplies 1 LS Small tools 1 LS Vehicle(s), fuel, oil, grease 1 EA Clean-up & temp. protection 1 LS Relocate office furnishings / repair office finishes 1 LS Dumpster(s) 1 EA Document control 1 LS Temp toilet(s) 1 EA Cellular phone(s) 1 EA Job site internet access 1 EA Computer / IT 1 EA Safety 0 LS ADJUST LS , Subtotal - General Requirements 0 2,887 2, Fencing Fence Demo & Rework Remove fence 472 lf 0 7 3, , Remove gate(s) 5 ea Remove gate & modify fence for new gates ea Reset exist galv metal fence lf Fence - Chain Link Galv Chain link 6' galv 914 lf , , Fence - Chain Link Vinyl Chain link 6' vinyl coated lf Gates - Chain Link Galv W x 6H CL w/padlock 2 ea , , W x 6H CL w/padlock ea W x 6H (dble 4') CL w/padlock ea x 6H (dble 6') CL w/padlock ea W x 6H (sgle swing) CL w/padlock & tire ea W x 6H (dble 7') CL w/padlock & tire ea W x 6H (dble 8') CL w/padlock & tire 1 ea ,200 2, , W x 6H (dble 18') CL w/padlock & tire 1 ea ,300 2, , W x 6H (dble 12') CL w/padlock & tire ea W x 6H (Cantilever) CL w/padlock ea Gates - Chain Link Galv Egress W x 6H CL w/egress hdwe ea W x 6H (dble 3') CL w/egress hdwe 2 ea ,400 5, , Fence - Architectural Aluminum Arch 6' aluminum lf Concrete Coring 8 ea Gates - Architectural Aluminum W x 6H Arch sliding ea Gates - Architectural Aluminum Egress W x 6H Arch egress ea W x 6H Arch egress ea W x 6H (dble 3') Arch egress ea W x 6H (dble 4') Arch egress ea Preconstruction phase contingency 32,800 $ , , ,440 $ BOND 34,440 $ ADJUST LS , Subtotal - Fencing 0 34,440 34,440 RFP #17-P-029-DR Page 37 of 72 03/06/17

Attachment 1. Freezer Cooler Replacement Project Project Cost Elements. Total Project Budget. Polar King ITB #14 B 113 AL

Attachment 1. Freezer Cooler Replacement Project Project Cost Elements. Total Project Budget. Polar King ITB #14 B 113 AL Attachment 1 Freezer Cooler Replacement Project Project Cost Elements Polar King ITB #14 B 113 AL Canaveral Construction GMP Administration and Permitting Total Project Budget Audubon Elementary $ 52,771.04

More information

BISCAYNE POINT ROW IMPROVEMENTS

BISCAYNE POINT ROW IMPROVEMENTS NEIGHBORHOOD & PROJECT NAME FUNDING SOURCE NO. 1 BISCAYNE POINT NEIGHBORHOOD BISCAYNE POINT ROW IMPROVEMENTS BISCAYNE POINT AREA STREETSCAPE G.O. BONDS IMPROVEMENTS WATER & SEWER BISCAYNE POINT WATER LINE

More information

ADDENDUM NO. ADD-01 Page 1 Rio Vista Security System Upgrade Door Locks Project Santa Clarita, California May 30, 2017

ADDENDUM NO. ADD-01 Page 1 Rio Vista Security System Upgrade Door Locks Project Santa Clarita, California May 30, 2017 ADDENDUM NO. ADD-01 Page 1 Rio Vista Security System Upgrade Door Locks Project Santa Clarita, California May 30, 2017 NOTICE TO BIDDERS: Amend the Proposal Request to the above referenced project as follows.

More information

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets.

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets. Capital Project Description Capital Project Scopes Project Schedules Project Budgets Next Steps Page 1 Project Scope: Facilities Improvements District Wide Facilities Renovations Correct Drainage Issues

More information

Watauga County Schools Capital Improvement Plan 2015

Watauga County Schools Capital Improvement Plan 2015 Watauga County Schools Capital Improvement Plan 2015 WATAUGA COUNTY SCHOOLS CAPITAL IMPROVEMENT PLAN 2015 In an effort to meet the standards of the North Carolina Building Code and North Carolina Public

More information

ADDENDUM 3. C. Bidders are requested to attach a copy of this Addendum to the Project Manual in their possession.

ADDENDUM 3. C. Bidders are requested to attach a copy of this Addendum to the Project Manual in their possession. Network Operations Center Renovation 62 Swamp Road Newtown, PA 18940 ADDENDUM 3 To: For: Prepared For: ALL BIDDERS Network Operation Center Renovation 62 Swamp Road Newtown, PA 18940 Council Rock School

More information

APPENDIX C: COSTS BACK-UP

APPENDIX C: COSTS BACK-UP APPENDIX C: COSTS BACK-UP SECTION 2010-2015 Executive Recap DESCRIPTION MAC LTCP PLAN RANGE LOW HIGH Humphrey Terminal Expansion - Phase I (Add 17 Gates) $224,077,000 - $263,620,000 OTHER PHASE SCOPE

More information

School Board of Brevard County 2700 Judge Fran Jamieson Way, Viera, FL Brian T. Binggeli, Ed.D., Superintendent

School Board of Brevard County 2700 Judge Fran Jamieson Way, Viera, FL Brian T. Binggeli, Ed.D., Superintendent School Board of Brevard County 2700 Judge Fran Jamieson Way, Viera, FL 32940-6601 Brian T. Binggeli, Ed.D., Superintendent March 25, 2011 Affordable Automotive Equipment Inc. Attn: Michael Raymond 428

More information

District-Wide Prop 39, Interior LED Lighting Upgrades Pre-Conference Meeting Re-Bid No January 9 at 10:00 AM Las Positas College

District-Wide Prop 39, Interior LED Lighting Upgrades Pre-Conference Meeting Re-Bid No January 9 at 10:00 AM Las Positas College January 9 at 10:00 AM Las Positas College AGENDA I. Welcome & Introduction II. Project Overview III. Site, Constraints & Challenges IV. Bid Document Summary V. Bid Schedule II. Project Overview A. Project

More information

East Allen County Schools Facilities History Calendar Years October 5, 2015

East Allen County Schools Facilities History Calendar Years October 5, 2015 East Allen County Schools Facilities History Calendar Years 2007 2015 October 5, 2015 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and

More information

Fund 3XX Revenue vs Expenses

Fund 3XX Revenue vs Expenses Fund 3XX Capital Projects Fund 3XX Revenue vs Expenses $9,, $8,, $7,, $6,, $5,, $4,, $3,, $2,, Revenue ESPLOST Revenue Capital Projects-Phase II Expenses Capital Projects-Phase II Revenue Cap Proj-Facility

More information

CITY MANAGER MEMORANDUM. The Honorable Mayor Kelley and City Commissioners. John Noble, P.E., Acting City Engineer

CITY MANAGER MEMORANDUM. The Honorable Mayor Kelley and City Commissioners. John Noble, P.E., Acting City Engineer CITY MANAGER MEMORANDUM To: Through: From: The Honorable Mayor Kelley and City Commissioners Joyce A. Shanahan, City Manager John Noble, P.E., Acting City Engineer : August 11, 2011 Subject: Facility Lighting

More information

Appendix C. Cost Estimates

Appendix C. Cost Estimates O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master

More information

REQUEST FOR TRANSIT VEHICLE PRICE QUOTE (RFQ)

REQUEST FOR TRANSIT VEHICLE PRICE QUOTE (RFQ) REQUEST FOR TRANSIT VEHICLE PRICE QUOTE (RFQ) This is (check one): Initial Request for Quote (from Requesting Agency to Vendors) Due Date: January 12, 2019 Response to RFQ (from Responding Vendor back

More information

GREAT NECK UNION FREE SCHOOL DISTRICT

GREAT NECK UNION FREE SCHOOL DISTRICT GREA NECK UNION FREE SCHOOL DISRIC December March 13, 12, 2017 2016 RECOMMENDED BOND IEMS BBS ARCHIECS, LANDSCAPE ARCHIECS & ENGINEERS, P.C. BBS COS ELEMENS "A LIS" GREA NECK PUBLIC SCHOOLS BOND REFERENDUM

More information

1

1 1 2 3 4 5 6 7 8 9 10 11 12 Breakdown of License Changes Definitions First Draft ROW License Changes in Revised Draft Explanation of Change Dockless sharing Shared active transportation vehicle NACTO recommendation

More information

RLY AGENDA REPORT. Meeting Date: January 22, 2018 Item Number: E 9 To: From:

RLY AGENDA REPORT. Meeting Date: January 22, 2018 Item Number: E 9 To: From: RLY AGENDA REPORT Meeting Date: January 22, 208 Item Number: E 9 To: From: Honorable Mayor & City Council Chad Lynn, Assistant Director of Public Works Judi Tamasi, Senior Management Analyst Subject: AMENDMENT

More information

The Educational Special Purpose Local Option Sales Tax (ESPLOST II) went into effect on January 1, 2012.

The Educational Special Purpose Local Option Sales Tax (ESPLOST II) went into effect on January 1, 2012. Fund 3XX Capital Projects $12,, $1,, $8,, $6,, $4,, $2,, $ Fy 11 Fy 12 Fy 13 Fund 3XX Revenue vs Expenses FY14 Modified FY15 Adopted ESPLOST I Revenue ESPLOST I Expenditures Capital Projects - Facility

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 3/8/2011 RE: BID/RFP #: RFP-DOT-10/11-9031-LG BID/RFP TITLE: FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE OPENING DATE: March

More information

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action MOTION NO. M2018-160 Purchase of Thirteen 42-foot Double Deck Expansion Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee PROPOSED ACTION 12/06/2018 12/20/2018 Recommend to Final

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

Parking and Loading. Page 1 of 7

Parking and Loading. Page 1 of 7 Parking and Loading 21.03.020 Off-street parking and loading. A. Purpose. The purpose of this section is to ensure that sufficient off-street parking and loading areas are provided and properly designed

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

Mobile Food Vendors Policy. 1.0 Purpose. 2.0 Policy NO Virginia Polytechnic Institute and State University

Mobile Food Vendors Policy. 1.0 Purpose. 2.0 Policy NO Virginia Polytechnic Institute and State University Mobile Food Vendors Policy NO. 5810 Policy Effective Date: 1/23/2017 Last Revision Date: Policy Owner: Sherwood Wilson Policy Author: (Contact Person) Kayla Smith Affected Parties: Faculty Staff Other

More information

Guideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement

Guideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement Guideline for Square Footage Requirements for Educational Facilities 160-5-4-.16 (a) 4 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: July 25, 2010

More information

WINNER. Orange County Public Schools. 100% Design Community Meeting Hidden Oaks Elementary School February 21, 2017

WINNER. Orange County Public Schools. 100% Design Community Meeting Hidden Oaks Elementary School February 21, 2017 Welcome! Please sign in on your mobile device: http://communitymeeting.ocps.net/ WINNER 100% Design Community Meeting Hidden Oaks Elementary School February 21, 2017 Hidden Oaks Elementary School 100%

More information

NOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION

More information

Worcester Public Schools Student Transportation Contract Proposed Bid Specification Change Summary Sheet

Worcester Public Schools Student Transportation Contract Proposed Bid Specification Change Summary Sheet Worcester Public Schools 2020-2022 Student Transportation Contract Proposed Bid Specification Change Summary Sheet 1 for a five-year period beginning the First Day of Summer School 2015 and ending on the

More information

CITY OF MADISON, WISCONSIN

CITY OF MADISON, WISCONSIN CITY OF MADISON, WISCONSIN AN ORDINANCE Amending Section 1.08(3)(a) to increase bail deposit amounts and amending Sec. 8.14(3)(c) and (f), Sec. 8.16, Sec. 12.045(6), Sec. 12.79(1) and Sec. 12.141(10) of

More information

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015 1. Provide Storm Shelters at Maize High School - Grades 9-12 - 1,800 students + staff New Construction - North End (6,000 @ $190/SF) $ 1,140,000 - Expand athletic lobby - Concessions/Kitchen - Multipurpose

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

City of Surrey PLANNING & DEVELOPMENT REPORT File:

City of Surrey PLANNING & DEVELOPMENT REPORT File: City of Surrey PLANNING & DEVELOPMENT REPORT Planning Report Date: June 26, 2017 PROPOSAL: Development Variance Permit to vary the off-street parking requirement to permit placement of one portable classroom

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

FACILITY EXPANDABLE TO 780,000 SF PROPERTY HIGHLIGHTS RESEARCH DR. (PARCEL 43B)

FACILITY EXPANDABLE TO 780,000 SF PROPERTY HIGHLIGHTS RESEARCH DR. (PARCEL 43B) 520,000 SF ON 104.46 ACRES 460-480 RESEARCH DR. (PARCEL 43B) CENTERPOINT COMMERCE & TRADE PARK EAST PITTSTON TOWNSHIP, PA 18640 FACILITY EXPANDABLE TO 780,000 SF LERTA APPROVED! 10-YEAR, 100% REAL ESTATE

More information

Treasurer s Report. April 30, 2018

Treasurer s Report. April 30, 2018 Twelve Oaks Special District Board of Trustees P.O. Box 260352 Tampa, FL 33685-0352 Treasurer s Report as of April 30, 2018 Contents: 2018 Fiscal Budget compared to Actual Balance Sheet (Assets, Liabilities,

More information

METAL STUDS. TOTAL COST (Labor+ Material) UNIT COST (Labor+ Material) ITEM # DESCRIPTION QUANTITY UNIT TRADE COST GENERAL REQUIREMENTS

METAL STUDS. TOTAL COST (Labor+ Material) UNIT COST (Labor+ Material) ITEM # DESCRIPTION QUANTITY UNIT TRADE COST GENERAL REQUIREMENTS GENERAL REQUIREMENTS 1 Supervision (5%) 1.00 LS 0.00 $0 2 Permits (5%) 1.00 LS 0.00 $0 3 Final Cleanup (0.2 Per SF) 1.00 LS 0.00 $0 4 Mobilization Costs (5%) 1.00 LS 0.00 $0 5 Project Overheads (7.3%)

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative PRELIMINARY ORDER OF MAGNITUDE CAPITAL COST ESTIMATING METHODOLOGY Technical Memorandum December 2011 Prepared for: Metropolitan Atlanta Rapid Transit Authority Atlanta, GA

More information

B) The University shall check the installation of finish hardware at the completion of the Project.

B) The University shall check the installation of finish hardware at the completion of the Project. 08700 HARDWARE 1.0 General A) The University of California, Santa Barbara, uses IR Security & Safety Consultants (AHC) (626 585-9927) as its consultant for doors and door hardware. Contacts with the firm

More information

CONSTRUCT, INC. 11/21/2018

CONSTRUCT, INC. 11/21/2018 CONSTRUCT, INC. 11/21/2018 Great Rivers BHO, RTC Renovations Project No. 275-201 Change Order Proposal No. 09 Changes to Courtroom Labor Basic Wages 69.69 MH @57.18/hour 4,027.76 Supervision @15% 604.16

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

ARTICLE 501 OFF-STREET PARKING AND LOADING

ARTICLE 501 OFF-STREET PARKING AND LOADING ARTICLE 501 OFF-STREET PARKING AND LOADING Sec. 501.01 Applicability. (a) Zoning districts. These requirements for adequate off-street parking, and loading shall be provided in all zoning districts. Such

More information

Page 1 of 6 ADDENDUM NO. 1. January 11, Shuttle Bus Service RFP # H General

Page 1 of 6 ADDENDUM NO. 1. January 11, Shuttle Bus Service RFP # H General ADDENDUM NO. 1 January 11, 2018 Shuttle Bus Service RFP # H18-0002 1. This addendum revises RFP documents. This addendum is issued to respondents of record prior to execution of contract, and forms a part

More information

AMENDMENT NUMBER 1 (October 17, 2017) DEADLINE FOR RECEIPT OF PROPOSALS IS AS FOLLOWS: Submittal Due Date & Time: Tuesday, October 24, 2017 at 2:00 PM

AMENDMENT NUMBER 1 (October 17, 2017) DEADLINE FOR RECEIPT OF PROPOSALS IS AS FOLLOWS: Submittal Due Date & Time: Tuesday, October 24, 2017 at 2:00 PM AMENDMENT NUMBER 1 (October 17, 2017) RIO RANCHO PUBLIC SCHOOLS PURCHASING DEPARTMENT 500 LASER ROAD NE RIO RANCHO, NEW MEXICO 87508 TITLE: PURCHASE OF CHROMEBOOKS DEADLINE FOR RECEIPT OF PROPOSALS IS

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.

More information

Superintendent: NOTICE OF AWARD

Superintendent: NOTICE OF AWARD Procurement Services 29529 CR 561 Tavares FL 32778 (352) 253-6760 Fax: (352) 253-6761 http://lake.k12.fl.us Superintendent: School Board Members: Diane S. Kornegay, M.Ed. District 1 Bill Mathias District

More information

CONSTRUCTION MANAGER/GENERAL CONTRACTOR METHOD OF PAYMENT

CONSTRUCTION MANAGER/GENERAL CONTRACTOR METHOD OF PAYMENT Phase: OFF-SITE SERVICES AND STAFF 1 Corporate Executives 2 Principal in Charge 3 Project Executive 4 Legal (Basic Service) 5 Project Manager 6 Accounting 7 Added Accounting for Lender 8 Scheduling 9 Special

More information

Parking Investigation / San Antonio UDC

Parking Investigation / San Antonio UDC Parking Investigation / San Antonio UDC Parking requirements: Minimum 0.8 per room plus 1 per 800 sf of public meeting areas and restaurant space Maximum 1 per room plus 1 per 400 sf of public meeting

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200 PITTSBURGH SCHOOL DISTRICT 2017/2023 CAPITAL PROGRAM The following is the proposed 2017 / 2023 Capital Program. These projects have been identified as a result of Board Actions, input from Facilities,

More information

CONTRA COSTA COMMUNITY COLLEGE DISTRICT

CONTRA COSTA COMMUNITY COLLEGE DISTRICT ADDENDUM #1 CONTRA COSTA COMMUNITY COLLEGE DISTRICT Date: 11/15/2018 D 4014 Warehouse Demolition Project Diablo Valley College 321 Golf Club Road, Pleasant Hill, CA 94523 NOTICE TO ALL CONTRACTORS: You

More information

ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019

ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019 ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019 E-rate Year 22 RFP 2019-115 Cabling Fiber Optic Infrastructure, 4 Sites A. This Amendment shall be

More information

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS MSD OF WAYNE TOWNSHIP 2017-2018 SUSTAINABILITY PROJECTS 2017 Superintendent Goals #2 Continued work towards increasing revenue and reducing expenditures including a reduction in the M.S.D. of Wayne Township

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 H DATE: August 10, 2017 ****************************************************************************** SUBJECT: SDSU Pugsley Center Renovation

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MOTION NO. M2018-161 Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION

More information

CITY OF OAKLAND INTRODUCTION

CITY OF OAKLAND INTRODUCTION CITY OF OAKLAND CITY HALL ONE FRANK OGAWA PLAZA 3RD FLOOR OAKLAND CA 94612 City Administrator s ADA Programs Division (510) 238-4754 TDD: (510) 238-2007 : January 4, To: Mayor s Commission on Persons with

More information

ADDENDUM No. 1. BID No /15 Chevrolet Silverado Work Trucks

ADDENDUM No. 1. BID No /15 Chevrolet Silverado Work Trucks Purchasing Department 530 Water Street Oakland, CA 94607 Date: November 17, 2017 ADDENDUM No. 1 BID No. 17-18/15 Chevrolet Silverado Work Trucks This Addendum modifies the original BID Documents for the

More information

Table Station Elements

Table Station Elements The overall layout of the station in the Preferred Alternative (Modified Alternative 2) is described in Table 7.5-1. Table 7.5-1 Station Elements Ground Level Mezzanine Level Platform Level Existing/Upgraded

More information

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee

More information

Creative Bus Dba Getaway Bus REPRESENTING New England Wheels

Creative Bus Dba Getaway Bus REPRESENTING New England Wheels Creative Bus Dba Getaway Bus REPRESENTING New England Wheels ORDER PACKET Contract #TRIPS-15-MB-GB MiniBus with ADA Option CONTRACT # TRIPS-15-MB-GB ORDER PACKET FOR MiniBus with ADA Option Creative Bus

More information

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station 203 North LaSalle Street, Suite 2100 Chicago, IL 60601 (312) 558-1345 Fax: (312) 346-9603 E-Mail: cquandel@quandelconsultants.com www.quandel.com Scope of Services January 26, 2010 Project Development

More information

UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM A August 5, 2016

UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM A August 5, 2016 UNLV Animal Care Facility University of Nevada Las Vegas ADDENDUM A August 5, 2016 Owner: Architect: To: University of Nevada Las Vegas 4505 S. Maryland Parkway Las Vegas, Nevada 89154 Tate Snyder Kimsey

More information

Prepared by Transportation Workgroup members: Derek Lewis, Lisa Wells, Chuck Saylors, Lynda Leventis-Wells

Prepared by Transportation Workgroup members: Derek Lewis, Lisa Wells, Chuck Saylors, Lynda Leventis-Wells Prepared by Transportation Workgroup members: Derek Lewis, Lisa Wells, Chuck Saylors, Lynda Leventis-Wells Workgroup Purpose Appointed by Greenville County School Board Advocacy Committee Chair Joy Grayson

More information

Carson City School District Completed School Bond

Carson City School District Completed School Bond Carson City School District 2010 Completed School Bond Discussion Projects categorized and prioritized based on: Health safety & welfare Code compliance Energy and operational efficiency Educational program

More information

PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR

PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR CIP Title FINAL2:Layout 1 7/27/17 3:35 PM Page 9 PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 218 FY 218-222 Capital Improvement Program Description FY 217 FY 218 FY 219 FY 22 FY 221 FY 222

More information

Appendix G Aquilla Lake Pool Rise Recreational Resources

Appendix G Aquilla Lake Pool Rise Recreational Resources Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative

More information

Baker School District 5J LRFP Conceptual Estimates. LRFPC Presentation, December 13, 2017

Baker School District 5J LRFP Conceptual Estimates. LRFPC Presentation, December 13, 2017 Baker School District 5J LRFP Conceptual Estimates LRFPC Presentation, December 13, 2017 Meeting objective! Discuss estimates, assumptions and approach to estimating;! Review Conceptual Estimates for the

More information

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM This chapter presents the proposed Capital Improvement Program (CIP) for the District based on the findings of this Master Plan. The Master Plan primarily

More information

Design Guidelines and Standards Manual University of Cincinnati

Design Guidelines and Standards Manual University of Cincinnati SECTION 08710D - A. SPECIFICATIONS FORMAT 1. It is preferred that this section include all items of door hardware. Window hardware and operators should be specified in the window section. This approach

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

35 One Gateway Plaza Los Angeles, CA

35 One Gateway Plaza Los Angeles, CA 35 One Gateway Plaza Los Angeles, CA 90012-2952 2 13-9 2 2.2000 Tel metro. net SYSTEM SAFETY AND OPERATIONS COMMITTEE FEBRUARY 21, 2013 SUBJECT: ACTION: TURBOCHARGERS APPROVE CONTRACT AWARDS RECOMMENDATION

More information

County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total)

County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total) County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total) 1 CONSTRUCTION SCHEDULE 1 $2,000.00 LS $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00

More information

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,

More information

Energy Performance Information Request Timeline

Energy Performance Information Request Timeline Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Authorizing the Department of Public Works (DPW) to award DPW Contract

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

INVITATION TO BID. January 10, 2018

INVITATION TO BID. January 10, 2018 INVITATION TO BID January 10, 2018 The City of Bainbridge will receive sealed bids for ONE NEW PORTABLE TANDEM STATIC ROLLER to be LEASED FOR PURCHASE, as described in the attached specifications until

More information

Central Florida Regional Transportation Authority d.b.a.

Central Florida Regional Transportation Authority d.b.a. Central Florida Regional Transportation Authority d.b.a. 455 N. Garland Avenue Orlando, FL 32801 AMENDMENT OF SOLICITATION 1. AMENDMENT NO: 2. SOLICITATION NO: 3. SOLICITATION DATE: 4. EFFECTIVE DATE:

More information

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway)

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway) CITY of NOVI CITY COUNCIL Agenda Item K August 27, 2012 SUBJECT: Approval to award an amendment to the engineering services agreement with Spalding DeDecker Associates, Inc. related to the 2012 Pathway

More information

Denver Volunteer Fire Department. Insurance Services Office Rating: 5-9E. Number of Volunteers on Roster: 15

Denver Volunteer Fire Department. Insurance Services Office Rating: 5-9E. Number of Volunteers on Roster: 15 Denver Volunteer Fire Department Insurance Services Office Rating: 5-9E Number of Volunteers on Roster: 15 Number of Paid Staff (including Part-time): 42 Main Station Location: Sub-Station Location: Sub-Station

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on 74.4 + /- acres Toano, Virginia (PRELIMINARY) F9 LUMBER LIQUIDATORS 3000 JOHN DEERE DR STONEHOUSE COMMERCE PARK SIZE: GROUND: NUMBER

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR 9500 GILMAN DRIVE #0916 CAMPUS ARCHITECT- FACILITIES DESIGN

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

DIVISION 08 OPENINGS Openings Operation and Maintenance of Openings Operation and Maintenance of Metal Doors and Frames

DIVISION 08 OPENINGS Openings Operation and Maintenance of Openings Operation and Maintenance of Metal Doors and Frames DIVISION 08 OPENINGS 08 00 00 Openings 08 01 00 Operation and Maintenance of Openings 08 01 10 Operation and Maintenance of Doors and Frames 08 01 11 Operation and Maintenance of Metal Doors and Frames

More information

CITY OF SHARON 155 W. CONNELLY BLVD SHARON, PENNSYLVANIA SPECIFICATIONS and FORM OF PROPOSAL

CITY OF SHARON 155 W. CONNELLY BLVD SHARON, PENNSYLVANIA SPECIFICATIONS and FORM OF PROPOSAL CITY OF SHARON 155 W. CONNELLY BLVD SHARON, PENNSYLVANIA 16146 SPECIFICATIONS and FORM OF PROPOSAL RENTAL OF CHIPSEAL EQUIPMENT WITH OPERATORS AND LABORERS 2014 CITY OF SHARON Notice to Bidders RENTAL

More information

Regulation ECE Related Entries:

Regulation ECE Related Entries: Regulation ECE Related Entries: Responsible Office: ECE Associate Superintendent for Operations ECE-R: Traffic and Parking Procedures Las Cruces Public Schools TRAFFIC AND PARKING PROCEDURES I. PURPOSE

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89

More information

1776 Hooksett Rd. Hooksett, NH Phone: Fax:

1776 Hooksett Rd. Hooksett, NH Phone: Fax: fr, tl!d 6'J1 1/ l7 ljr5dpm@ 1776 Hooksett Rd. Hooksett, NH 03109 Phone: 603-485-4205 Fax: 603-485-5323 PROPOSAL SUBMITTED TO: Concord Family YMCA Attention: Matthew Bolton Phone: (603) 717-6038 Fax: ()

More information

ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS

ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.01 STORAGE IN FRONT YARD Nothing in this Ordinance shall permit the storage or parking of any vehicle or non-permanent structure within the required

More information

Investment Portfolio. 48 Spiller Dr & 600 County Rd Westbrook, ME Property Highlights. Property Description. For Sale Industrial Buildings

Investment Portfolio. 48 Spiller Dr & 600 County Rd Westbrook, ME Property Highlights. Property Description. For Sale Industrial Buildings For Sale Industrial Buildings $12,500,000 Investment Portfolio 48 Spiller Dr & 600 County Rd Westbrook, ME 04092 Property Highlights 134,000± SF Building on 9.47± acres 28,580± SF Building on 3.06± acres

More information

REQUEST FOR PROPOSALS EAGLE COUNTY RECYCLE DROP-OFF COLLECTION CONTAINER HAULING

REQUEST FOR PROPOSALS EAGLE COUNTY RECYCLE DROP-OFF COLLECTION CONTAINER HAULING REQUEST FOR PROPOSALS EAGLE COUNTY RECYCLE DROP-OFF COLLECTION CONTAINER HAULING INTRODUCTION August 27, 2010 Eagle County is soliciting proposals from qualified service providers to haul collected recyclable

More information

College Car Park Policy

College Car Park Policy College Car Park Policy Responsible officer: Deputy Principal, Finance and Resources Date: September 2016 Review date: September 2017 (unless preceded by legislation) Procedure available: Cloud D Midson-Brown

More information

4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW.

4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW. 4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED SIGNED BID / SIGNED ADDENDUM Yes / Yes Yes / Yes Yes / Yes YEARS EXPERIENCE 25 Years 24 Years,

More information

SCHOOL BOARD OF BREVARD COUNTY, FLORIDA BOARD AGENDA ITEM March 13, 2018

SCHOOL BOARD OF BREVARD COUNTY, FLORIDA BOARD AGENDA ITEM March 13, 2018 SCHOOL BOARD OF BREVARD COUNTY, FLORIDA BOARD AGENDA ITEM March 13, 201 PURCHASING SOLICITATION ITB 1-B-0-NC: (ITB) Invitation To Bid (ITN) Invitation To Negotiate (PB) Piggyback (RFP) Request For Proposal

More information

ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES

ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES Section 1000. Off-Street Automobile Parking and Loading and Unloading Spaces Required Off-street automobile parking and loading

More information

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications.

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications. ADDENDUM 2 PROJECT: POKAGONEK AWAT HARTFORD CLIENT: ISSUE DATE: JUL 1, 2015 The following clarifications and changes shall be included in the Plans and Specifications for the above referenced project,

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information