VILLAGE OF KENILWORTH, ILLINOIS

Size: px
Start display at page:

Download "VILLAGE OF KENILWORTH, ILLINOIS"

Transcription

1 INDEX OF COVER GENERAL NOTES SUMMARY OF QUANTITES AND LEGEND ALIGNMENT, TIES AND BENCHMARKS EXISTING UTILITY AND PLAN PROPOSED ATER MAIN PLAN AND PROFILE EROSION CONTROL AND RESTORATION PLAN DETAILS, ILLINOIS PROJECT BEGIN STA 3+15 KENILORTH TERRACE PROJECT ENDS STA 33+ KENILORTH TERRACE LAKE MICHIGAN PROJECT ENDS STA 5+75 STERLING ROAD PROJECT BEGIN STA 2+2 INNETKA AVE STERLING ROAD SHERIDAN RD INDIAN HILL PROJECT BEGIN STA KENILORTH AVENUE CLUB RIDGE RD PARK DR MELROSE AVE KENILORTH AVE ARICK RD PROJECT ENDS STA GLENDENNING RD ST ST GREENOOD AVE CHESTNUT AVE 13TH ST 12TH ST 11TH ST MALLINCKRODT PARK GREENOOD AVE ALNUT AVE GLENDENNING RD GREENOOD AVE FOREST AVE 1' 2' 3' 1' 2' 3' 1''= 1' 1''= 1' GREEN BAY RD LU K E M ATTSO N 9493 LICENSED PROFESSIONAL ENGINEER LAKE AVE I L L I OF N O I S 5' 5' 5' 1' 1' 5' 1''= 5' 1''= 4' 1' 1''= 3' 1' 1''= 2' LOCATION MAP (NOT TO SCALE) :12/6/218 SEAL EXPIRES:11/3/219 FULL SIZE PLANS HAVE BEEN PREPARED USING STANDARD ENGINEERING SCALES. REDUCED SIZED PLANS ILL NOT CONFORM TO STANDARD SCALES. IN MAKING MEASUREMENTS ON REDUCED PLANS, THE ABOVE SCALES MAY BE USED. J.U.L.I.E. JOINT UTILITY LOCATION INFORMATION FOR EXCAVATION OR 811 KENILORTH/ GREENOOD AVE GROSS LENGTH = 1411 FEET (.27 MILES) GROSS LENGTH = 1573 FEET (.3 MILES) KENILORTH TERRACE = 36 FEET (.6 MILES) NET LENGTH = 329 FEET (.62 MILES) DESIGN FIRM REGISTRATION NUMBER SUITE 42, 557 NORTH CUMBERLAND AVE CHICAGO, ILLINOIS 6656 :: (773) 77549

2 A. GENERAL 1. EARTHORK AND PAVING SPECIFICATIONS THE ILLINOIS DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", ADOPTED JANUARY 1, 216 AND ALL ADDENDA THERETO, SHALL GOVERN THE PAVING ORK UNDER THIS CONTRACT, EXCEPT AS MODIFIED BY THESE SPECIFICATIONS. 2. UNDERGROUND SPECIFICATIONS THE "STANDARD SPECIFICATIONS FOR ATER AND SEER MAIN CONSTRUCTION IN ILLINOIS", LATEST EDITION, SHALL GOVERN THE UNDERGROUND ORK UNDER THIS CONTRACT, EXCEPT AS MODIFIED BY THESE SPECIFICATIONS. 3. PROCUREMENT OF ALL NECESSARY PERMITS, AND PAYMENT THEREOF, SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 4. DURING THE CONSTRUCTION OPERATION HEN ANY LOOSE MATERIAL IS DEPOSITED IN THE FLO LINE OF DITCHES, GUTTERS, OR DRAINAGE STRUCTURES SO THE NATURAL FLO OF ATER IS OBSTRUCTED, THE MATERIAL SHALL BE REMOVED AT THE CLOSE OF EACH ORKING DAY. AT THE CONCLUSION OF THE CONSTRUCTION OPERATIONS ALL DRAINAGE STRUCTURES SHALL BE FREE FROM ALL DIRT AND DEBRIS. THIS ORK SHALL NOT BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCLUDED IN THE CONTRACT. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN EXISTING FIELD CONDITIONS PRIOR TO BIDDING ON THIS PROJECT. NO ADDITIONAL COMPENSATION ILL BE ALLOED FOR FAILURE TO VERIFY EXISTING DIMENSIONS OR CONDITIONS. 6. THE CONTRACTOR SHALL LIMIT HIS CONSTRUCTION ACTIVITIES TO THE ORK AREAS DESIGNATED ON THE PLANS. ANY DAMAGE TO AREAS OUTSIDE OF THESE LIMITS SHALL BE REPAIRED BY THE CONTRACTOR AT HIS ON EXPENSE TO THE SATISFACTION OF THE ENGINEER. A) ALL EMPLOYEES ON THE ORK AND OTHER PERSONS AND ORGANIZATIONS HO MAY BE AFFECTED THEREBY; B) ALL THE ORK AND THE MATERIALS AND EQUIPMENT TO BE INCORPORATED THEREIN, HETHER IN STORAGE ON OR OFF THE SITE; C) OTHER PROPERTY AT THE SITE OR ADJACENT THERETO, INCLUDING TREES, SHRUBS, LANS, ALKS, PAVEMENTS, ROADAYS, STRUCTURES, UTILITIES, AND UNDERGROUND FACILITIES NOT DESIGNATED FOR, RELOCATIONS, OR REPLACEMENT IN THE COURSE OF CONSTRUCTION; AND D) EACH CONTRACTOR AND SUBCONTRACTOR SHALL DESIGNATE A RESPONSIBLE REPRESENTATIVE AT THE SITE HOSE DUTY SHALL BE THE PREVENTION OF ACCIDENTS. THIS PERSON SHALL BE THE CONTRACTOR'S SUPERINTENDENT UNLESS OTHERISE DESIGNATED IN RITING BY THE CONTRACTOR TO THE ONER 12. EXISTING ELEVATIONS AND LOCATIONS EVERY CONTRACTOR AND SUBCONTRACTOR SHALL VERIFY THE ELEVATIONS AND LOCATIONS OF ALL EXISTING INFORMATION AS SHON ON THE PLANS AND NOTIFY THE ENGINEER OF ALL DISCREPANCIES PRIOR TO THE COMMENCEMENT OF THE ORK. EXISTING UNDERGROUND UTILITIES SHALL BE EXPOSED BY THE CONTRACTORS AND SUBCONTRACTORS PRIOR TO THE START OF CONSTRUCTION TO DETERMINE IF A PROBLEM OR CONFLICT EXISTS ITH THE PROPOSED IMPROVEMENTS AND TO AVOID DELAYS IN THE PROGRESS OF THE ORK ONCE THE ORK COMMENCES. 13. NOTIFICATION THE SHALL BE NOTIFIED BY EVERY CONTRACTOR AND SUBCONTRACTOR AT LEAST TO (2) ORKING DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 14. COMPLIANCE ITH LAS AND REGULATIONS GENERAL NOTES EVERY SIGN RELOCATION MUST BE REERECTED AT A TEMPORARY LOCATION IN A ORKMANLIKE MANNER AND BE VISIBLE TO TRAFFIC FOR HICH IT AS INTENDED. ALL SUCH SIGNS MUST BE MAINTAINED STRAIGHT AND CLEAN FOR THE DURATION OF TEMPORARY SETTING. THIS ORK INCLUDES PROVIDING A SIGN POST FOR THE TEMPORARY LOCATION, SHOULD SUCH A POST BE NECESSARY. ALL SIGNS SHALL BE REERECTED IN THE ORIGINAL LOCATION AS THE IMPROVEMENTS ARE COMPLETE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SIGNS DAMAGED BY HIS/HER CONSTRUCTION ACTIVITIES AND ILL REPLACE THEM AT NO COST TO THE VILLAGE. THIS ORK SHALL BE CONSIDERED INCLUDED IN THE CONTRACT. 3.. DRIVEAY APRON REPAIRS PROPOSED HMA DRIVEAY APRON REPAIRS ADJACENT TO PROPOSED SIDEALK SHALL BE THREE FEET IN LENGTH UNLESS INDICATED OTHERISE ON THE PLANS OR BY THE ENGINEER IN THE FIELD. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT EXISTING PCC DRIVEAY APRONS DURING ATER MAIN INSTALLATION. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY DAMAGE TO EXISTING DRIVEAY D. ATER MAIN FRAMES, LIDS AND GRATES OF EXISTING CATCH BASINS, INLETS, MANHOLES AND VALVE VAULTS HICH ARE TO BE ABANDONED OR REPLACED IN THIS PROJECT SHALL BE SALVAGED AND REMAIN THE PROPERTY OF THE. THE CONTRACTOR SHALL DELIVER THESE CASTINGS TO A FACILITY DESIGNATED BY THE VILLAGE. EXISTING SEERS OR ATER MAINS TO BE ABANDONED THAT INTERFERE ITH THE PROPOSED IMPROVEMENTS SHALL BE REMOVED AND DISPOSED OF OFF SITE. THE COST OF THIS ORK SHALL BE CONSIDERED INCLUDED IN THE CONTRACT. ALL FRAMES ITH CLOSED LIDS FURNISHED AS PART OF THIS CONTRACT FOR CONSTRUCTION, ADJUSTMENT OR RECONSTRUCTION OF ANY MANHOLE, CATCH BASIN, VALVE VAULT OR METER VAULT SHALL HAVE CAST INTO THE LID ONE OF THE FOLLOING: ALL LIDS TO BE USED ON STORM SEER STRUCTURES SHALL BEAR THE ORDS "KENILORTH STORM"; SANITARY LIDS SHALL BEAR THE ORDS "KENILORTH SANITARY"; ATER SYSTEM LIDS SHALL BEAR THE ORDS "KENILORTH ATER". THIS SHALL BE CONSIDERED INCLUDED IN THE UNIT COST OF THE FRAME AND LID SPECIFIED. APRONS. 4. ALL FRAMES AND GRATES DAMAGED BY THE CONTRACTOR DURING 22. CONTRACTOR TO FIELD CHECK EACH EXISTING STRUCTURE TO BE CONSTRUCTION ILL BE REPLACED BY THE CONTRACTOR AT HIS EXPENSE. REPLACED AND DETERMINE THE NUMBER OF PIPES, THEIR SIZE, AND INVERT ELEVATION PRIOR TO ORDERING EACH REPLACEMENT STRUCTURE. 5. THE CONTRACTOR SHALL BE REQUIRED TO MOVE ANY DECORATIVE THIS ORK AND ALL CONNECTIONS INCLUDING LENGTH OF PIPE TO EACH ROCKS, PAVER BRICKS, OR LANDSCAPE ITEMS THAT INTERFERE ITH NE STRUCTURE SHALL BE INCLUDED IN THE UNIT PRICE FOR EACH NE CONSTRUCTION. UPON COMPLETION OF THE CONSTRUCTION, THE CON STRUCTURE TYPE. TRACTOR SHALL MOVE THESE ITEMS BACK TO THEIR ORIGINAL LOCATION AND IN THEIR ORIGINAL CONDITION. THIS ORK ILL BE CONSIDERED B. PAVING INCLUDED IN THE CONTRACT. 1. THE PAVING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING 6. THE CONTRACTOR SHALL BE REQUIRED TO PRESERVE AND RESTORE ANY PROPER DRAINAGE ON THE PROPOSED PAVEMENT. HERE THE DECORATIVE GROUND COVER IN THE PARKAY THAT INTERFERES CONTRACTOR IS IN DOUBT ABOUT THE PROPER DIRECTION OF ITH THE CONSTRUCTION. THE COST OF THIS ORK SHALL BE DRAINAGE, HE SHALL REQUEST ASSISTANCE FROM THE VILLAGE. CONSIDERED AS INCLUDED IN THE CONTRACT. = 12/6/218 11:22:7 AM tbl FILE NAME = N:\PROJ\295.1\Design\Misc_Sheets\2839.1gennote1.dgn 7. PROPER DRAINAGE SHALL BE MAINTAINED IN THE IMPROVEMENT AREA DURING CONSTRUCTION. THE COST OF THIS ORK SHALL BE CONSIDERED INCLUDED IN THE CONTRACT. 8. ORK ORK SHALL MEAN THE FURNISHING OF ALL LABOR, MATERIAL, EQUIPMENT, AND OTHER INCIDENTALS NECESSARY OR CONVENIENT TO THE SUCCESSFUL COMPLETION OF THE IMPROVEMENTS BY THE ENGINEER AND SHON ON THIS SET OF PLANS. ORK SHALL ALSO INCLUDE CARRYING OUT OF ALL THE DUTIES AND OBLIGATIONS IMPOSED BY THE AGREEMENT BETEEN THE ONER AND THE CONTRACTOR FOR THE PROPER INSTALLATION AND ACCEPTABLE OF THE IMPROVEMENTS BY THE ENGINEER AND SHON ON THIS SET OF PLANS. 9. COMPLIANCE ITH LOCAL ORDINANCES ALL ORK PERFORMED UNDER THIS CONTRACT SHALL BE IN ACCORDANCE ITH THE ORDINANCES AND STANDARDS 1. EXISTING UTILITIES HEN THE PLANS OR SPECIAL PROVISIONS INCLUDE INFORMATION PERTAINING TO THE LOCATION AND ELEVATIONS OF UTILITY FACILITIES, SUCH INFORMATION REPRESENTS ONLY THE OPINION OF THE ENGINEER AS TO LOCATION AND ELEVATION OF SUCH UTILITIES AND IS ONLY INCLUDED FOR THE CONVENIENCE OF THE BIDDERS. THE ENGINEER AND THE ONER ASSUME NO RESPONSIBILITY HATSOEVER IN RESPECT TO THE SUFFICIENCY OR ACCURACY OF THE INFORMATION SHON ON THE PLANS RELATIVE TO THE LOCATION AND ELEVATION OF UTILITY FACILITIES, NOR THE MANNER IN HICH THEY ARE TO BE REMOVED OR ADJUSTED. IT IS EACH CONTRACTOR'S AND SUBCONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND DETERMINE THE ACTUAL LOCATION AND ELEVATION OF ALL UTILITIES. EACH CONTRACTOR AND SUBCONTRACTOR SHALL OBTAIN FROM THE RESPECTIVE UTILITY COMPANIES DETAILED INFORMATION RELATIVE TO THE LOCATION AND ELEVATION OF THEIR FACILITIES AND THE ORKING SCHEDULES OF THE UTILITY COMPANIES FOR REMOVING OR ADJUSTING THEM. EACH CONTRACTOR AND SUBCONTRACTOR PERFORMING UNDERGROUND ORK SHALL CONTACT J.U.L.I.E. AT AT LEAST 48 HOURS PRIOR TO START OF ORK. 11. SAFETY OF ORK EACH CONTRACTOR AND SUBCONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION ITH THE ORK. EACH CONTRACTOR AND SUBCONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE SAFETY OF, AND SHALL PROVIDE THE NECESSARY PROTECTION TO PREVENT DAMAGE, INJURY, OR LOSS TO: 557 North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax PLOT SCALE = 1. ' / in. = 12/6/218 EVERY CONTRACTOR SHALL COMPLY ITH ALL LOCAL AND STATE SAFETY LAS, REGULATIONS, AND ORDINANCES; AND FEDERAL SAFETY REGULATIONS AS OUTLINED IN THE LATEST REVISIONS OF THE FEDERAL CONSTRUCTION SAFETY STANDARDS AND ITH ALL PROVISIONS AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS. EACH CONTRACTOR AND SUBCONTRACTOR IS RESPONSIBLE FOR PROVIDING A SAFE ORKING PLACE FOR HIS EMPLOYEES. EACH CONTRACTOR AND SUBCONTRACTOR IS RESPONSIBLE FOR THE SUPERVISION, DIRECTION, AND CONDUCT OF THEIR EMPLOYEES, AGENTS, MATERIALS SUPPLIERS, AND VENDORS. 15. PAVEMENT DISTURBED DURING CONSTRUCTION 16. ITEMS NOT SPECIFICALLY SHON ALL ITEMS THAT ARE NOT SPECIFICALLY SHON ON THE PLANS OR IN THE SUMMARY OF QUANTITIES BUT CAN REASONABLY BE INTERPRETED TO BE INCLUDED IN THE ORK DESCRIBED SHALL BE CONSIDERED INCLUDED IN THE COST OF THE CONTRACT. 17. FINAL FRAME ADJUSTMENTS THE PAVING CONTRACTOR SHALL MAKE ALL NECESSARY FINAL ADJUSTMENTS TO EXISTING AND PROPOSED FRAMES, GRATES, LIDS, AND STRUCTURES TO MEET FINAL FINISHED GRADES. 18. RECORD DRAINGS 19. CONTRACTOR(S) 2. ANY SIGN LOCATED IN THE PUBLIC RIGHTOFAY HICH ANY EXISTING ROADAY PAVEMENT OR SHOULDER DISTURBED DURING CONSTRUCTION SHALL BE RESTORED IN ACCORDANCE ITH I.D.O.T. AND STANDARDS. EACH CONTRACTOR AND SUBCONTRACTOR SHALL MAINTAIN AND KEEP UP TO A SET OF "RECORD DRAINGS" SHOING ALL CHANGES FROM THE ORIGINAL PLANS. ALL CONTRACTORS AND SUBCONTRACTORS SHALL DELIVER THE "RECORD DRAINGS" TO THE VILLAGE'S REPRESENTATIVE AT THE CONCLUSION OF THE PROJECT. THE VILLAGE'S REPRESENTATIVE ILL TRANSFER THE INFORMATION TO THE ORIGINAL PLANS. FOR THE PURPOSE OF THESE SPECIFICATIONS, THE TERMS CONTRACTOR AND SUBCONTRACTOR SHALL MEAN ANY PERSON OR ENTITY THAT PROVIDES ORK FOR THE IMPROVEMENTS AS SHON ON THESE PLANS. THE VILLAGE, ONER, AND THE ARCHITECT ARE NOT CONSIDERED CONTRACTORS OR SUBCONTRACTORS. INTERFERES ITH CONSTRUCTION OF THE PROPOSED ATER MAIN THAT IS INTENDED TO BE MAINTAINED SHALL BE RELOCATED. THIS ORK IS CONSIDERED INCLUDED IN THE CONTRACT. ALL ORK INVOLVING SIGN SHALL BE GOVERNED BY THE FOLLOING REQUIREMENTS 9/19/ FULL DEPTH SA CUTS SHALL BE USED TO REMOVE EXISTING PAVEMENT, CURB AND GUTTER, SIDEALK, DRIVEAYS, BUTT JOINTS, AND APPURTENANCES FROM MATERIAL TO REMAIN, IN ACCORDANCE ITH 44 OF THE "STANDARD SPECIFICATIONS". THE COST OF THE SAING SHALL BE INCLUDED IN THE COST OF THE ITEM REMOVED. BASE COURSE SHALL NOT BE PLACED ADJACENT TO CURB AND GUTTER UNTIL THE CURB AND GUTTER HAS BEEN PROPERLY BACKFILLED TO THE SATISFACTION OF THE ENGINEER. C. RESTORATION AND TREE PRESERVATION PRIOR TO PLACING HOTMIX ASPHALT ADJACENT TO EXISTING PAVEMENT TO REMAIN, THE EXPOSED EDGE SHALL BE CLEANED OF LOOSE MATERIAL AND SACUT SQUARE TO THE SATISFACTION OF THE ENGINEER. THIS ORK SHALL BE CONSIDERED INCLUDED IN THE COST OF THE HOTMIX ASPHALT BEING PLACED. THE CONTRACTOR SHALL NOT USE TRACK EQUIPMENT ON BASE COURSE OR EXISTING PAVEMENT NOT SCHEDULED TO BE REMOVED. PRIME COAT PRIME COAT MUST BE INSTALLED NO EARLIER THAN TENTYFOUR (24) HOURS PRIOR TO PLACEMENT OF HOTMIX ASPHALT. THE CONTRACTOR SHALL VERIFY THAT A MINIMUM OF 4" OF SUBBASE GRANULAR MATERIAL REMAINS AFTER PAVEMENT AND PREPARATION OF THE BASE FOR THE 9" OF HMA. IF THE SUBBASE IS LESS THAN 4", THE CONTRACTOR SHALL SALVAGE THE EXISTING GRANULAR MATERIAL AND EXCAVATE THE SUBGRADE TO ACHIEVE THE MINIMUM SUBBASE THICKNESS. THE COST OF THE EARTH EXCAVATION PLACEMENT OF SALVAGED AND NE AGGREGATE BASE COURSE TO ACHIEVE THE 4" THICKNESS SHALL BE INCLUDED IN PAVEMENT. CURB AND GUTTER SHALL TRANSITION TO MATCH EXISTING CURB AND GUTTER AS APPROVED BY THE ENGINEER. COST SHALL BE INCLUDED IN THE CURB AND GUTTER OF THE TYPE SPECIFIED. ALL DISTURBED LAN AREAS ITHIN THE PUBLIC RIGHTOFAY/ EASEMENTS ILL BE RESTORED ITH 4" OF TOPSOIL AND SALT TOLERANT SOD HERE SHON ON THE PLANS BASED ON PLAN QUANTITIES. ADDITIONAL RESTORATION OF DISTURBED AREAS, OUTSIDE OF THESE IDENTIFIED LIMITS, SHALL NOT BE PAID FOR SEPARATELY, BUT SHALL BE COSIDERED INCLUDED IN THE CONTRACT. ALL PARKAY TREES NOT IDENTIFIED FOR SHALL BE PRESERVED. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY DAMAGE TO SUCH TREES AND SHALL PROVIDE TEMPORARY FENCES AND OTHER MEASURES AS NECESSARY, ITH ALL SUCH MEASURES CONSIDERED INCLUDED IN THE CONTRACT ONLY PRECAST ADJUSTMENT RINGS ILL BE ALLOED FOR THE ADJUSTMENTS OF CATCH BASINS, MANHOLES, VALVE VAULTS, AND INLETS. NO MORE THAN 2 RINGS FOR ADJUSTMENT OF 8 INCHES ILL BE ALLOED. THE CONTRACTOR SHALL USE ALL NECESSARY PRECAUTIONS AND PROTECTION MEASURES REQUIRED TO MAINTAIN EXISTING UTILITIES, SEERS, AND APPURTENANCES THAT MUST BE KEPT IN OPERATION. IN PARTICULAR, THE CONTRACTOR ILL TAKE ADEQUATE MEASURES TO PREVENT THE UNDERMINING OF UTILITIES AND SEERS HICH ARE STILL IN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT EXCAVATION TRENCHES DURING THE INSTALLATION OF STORM SEER, ATER MAIN, AND SANITARY SEER TO INCLUDE ANY SHORING OR DEATERING EQUIPMENT NECESSARY. THE COST OF THIS ORK SHALL BE CONSIDERED INCLUDED IN THE CONTRACT. REQUIREMENTS FOR THE PROTECTION OF ATERMAIN AND ATER LINES FROM SANITARY SEERS, STORM SEERS, AND HOUSE SEERS SHALL COMPLY ITH IEPA SEPARATION REQUIREMENTS. 1. ALL TRENCHES FOR ATER MAIN SHALL BE CONSTRUCTED IN ACCORDANCE 11. ITH DIVISION II 2 PER THE STANDARD SPECIFICATIONS FOR ATER AND SEER MAIN CONSTRUCTION IN ILLINOIS, LATEST EDITION ESPECIALLY CONCERNING BACKFILLING AS SOON AS PRACTICALLY POSSIBLE FOR PROTECTION. ALL ATER MAIN FITTINGS, BENDS, TEES AND VALVES SHALL BE MECHANICAL JOINT ITH JOINT RESTRAINTS AND SHALL BE RAPPED ITH POLYETHYLENE. THIS SHALL BE CONSIDERED INCLUDED IN THE COST OF THE CONTRACT. 12. ALL CONNECTIONS TO DOMESTIC ATER SYSTEMS MUST BE PERFORMED BY A LICENSED PLUMBER ACCORDING TO ILLINOIS DEPARTMENT OF PUBLIC HEALTH (IDPH) REQUIREMENTS. 13. DISTANCES HAVE BEEN APPROXIMATED ON THE PLANS FOR RESIDENTIAL ATER S BASED UPON THE ALIGNMENT OF THE NE ATER MAIN AND THE EXISTING PROPERTY LINES. ACTUAL LENGTHS SHALL BE VERIFIED IN THE FIELD AND NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED BASED UPON THE DIFFERENCES IN THE PLAN ESTIMATES AND FIELD DISTANCES. PAYMENTS FOR TRENCHED COPPER S SHALL BE MEASURED AND PAID PER EACH, OF THE DIAMETER SPECIFIED, AS DESCRIBED IN THE SPECIAL PROVISIONS. SCALE: 1" = 2' 5' OF STA. TO STA. 2 GENERAL NOTES CONTRACT 295.1

3 ITEM # DESCRIPTION UNIT ITEM # DESCRIPTION UNIT LEGEND 2111 TREE TRUNK PROTECTION EACH X56176 ATER MAIN, FOOT 12 EXISTING PROPOSED 2815 TRENCH BACKFILL CU YD 93 X56178 ATER MAIN, FOOT 15 SANITARY SEER 11 TOPSOIL FURNISH AND PLACE, 4" SQ YD 16 X ATER CONNECTION (SHORT) EACH 25 STORM SEER COMBINED SEER SODDING, SALT TOLERANT SQ YD 16 X ATER CONNECTION (LONG) EACH 2 ATER MAIN 2522 SUPPLEMENTAL ATERING UNIT 7 X5636 CUT AND CAP EXISTING ATER MAIN EACH 1 GAS LINE ELECTRIC LINE 2851 INLET FILTERS EACH 23 X FIRE HYDRANT COMPLETE EACH 9 CABLE TV 4241 PORTLAND CEMENT CONCRETE SIDEALK 4 INCH SQ FT 3611 X716 TRAFFIC CONTROL AND PROTECTION, (SPECIAL) L SUM 1 TELEPHONE FIBER OPTIC 4248 DETECTABLE ARNINGS SQ FT 8 XX147 VALVE VAULTS TO BE ABANDONED EACH 7 R.O CLASS B PATCHES, TYPE IV, 9 INCH SQ YD 76 XX3435 PORTLAND CEMENT CONCRETE DRIVEAY AND REPLACEMENT SQ YD 7 ABOVE GROUND POER LINE (OE) FENCE LINE CLASS D PATCHES, TYPE I, 9 INCH SQ YD 4 XX3516 CONNECTION TO EXISTING ATER MAIN (NONPRESSURE) EACH 2 CONTOUR CLASS D PATCHES, TYPE II, 9 INCH SQ YD 14 XX3517 CONNECTION TO EXISTING ATER MAIN (NONPRESSURE) EACH 6 PIPE TO BE ABANDONED CLASS D PATCHES, TYPE III, 9 INCH SQ YD 35 XX3668 PRECONSTRUCTION VIDEO TAPING L SUM 1 PIPE CLASS D PATCHES, TYPE IV, 9 INCH SQ YD 239 XX677 GATE VALVE AND BOX EACH 2 ITEM 446 SIDEALK SQ FT 3611 XX6241 GATE VALVE AND BOX EACH 1 SILT FENCE ATT PEDESTAL 5512 STORM SEER FOOT 15 XX6947 HOTMIX ASPHALT DRIVEAY AND REPLACEMENT SQ YD FIRE HYDRANT 5513 STORM SEER FOOT 22 XX7776 REMOVE AND ABANDON VALVE BOX EACH 1 LIGHT POLE BBOX 5514 STORM SEER 1" FOOT 51 XX7968 PVC CASING PIPE 12" FOOT 139 MANHOLE 5616 ATER MAIN FOOT 111 XX949 REMOVE AND REPLACE CURB AND GUTTER (SPECIAL) FOOT 146 CATCH BASIN 5617 ATER MAIN FOOT 843 XX9157 ATER MAIN (SPECIAL) FOOT 2287 END INLET/2' CATCH BASIN 5645 FIRE HYDRANTS TO BE REMOVED EACH 7 Z743 TEMPORARY SIDEALK SQ FT PERMANENT DRAINAGE EASEMENT 6711 MOBILIZATION L SUM 1 Z13798 CONSTRUCTION LAYOUT L SUM 1 TEMPORARY CONSTRUCTION EASEMENT SPECIAL ASTE DISPOSAL CU YD 65 Z5664 STORM SEER (ATER MAIN REQUIREMENTS) 8 INCH FOOT 22 K15863 TREE ROOT PRUNING EACH Z5666 STORM SEER (ATER MAIN REQUIREMENTS) 1 INCH FOOT 51 X FLAGSTONE SIDEALK SQ FT 54 Z56642 STORM SEERS, TYPE 1, ATER MAIN QUALITY PIPE, FOOT 15 X SANITARY SEER AND REPLACEMENT EACH 22 KEN1 ATER MAIN (SPECIAL) EACH 24 X TEMPORARY PATCHING SQ YD KEN2 SANITARY SEER (ATER MAIN REQUIREMENTS) 8 INCH FOOT 22 = 12/11/218 6:2:6 AM tbl FILE NAME = N:\PROJ\295.1\Design\Misc_Sheets\295.1soq1.dgn X84 SANITARY SEER FOOT North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax = lmattson PLOT SCALE = 1. ' / in. = 12/11/218 9/19/218 KEN3 POST CONSTRUCTION TELEVISING OF SANITARY SEER S EACH 27 SUMMARY OF QUANTITIES AND LEGEND SCALE: N.T.S. OF STA. TO STA. 3 CONTRACT 295.1

4 PT Sta PT Sta PC Sta POT Sta S.E. RUN = S.E. RUN = P.C. STA. = P.C. STA. = P.T. STA. = P.T. STA. = EX EX KENILORTH AVE EXIST. CURVE KENILORTH 3 EXIST. CURVE KENILORTH 4 POT Sta 1+. PC Sta KENILORTH PRC Sta RIDGE RD 12 PT Sta PC Sta KENIL ORTH AVE POT Sta 2+. PC Sta PT Sta TEMPORARY BM "B" CONTROL POINT 72 CONTROL POINT 73 CONTROL POINT 79 KENIL ORTH AVE GREENOOD AVE CONTROL POINT 78 V POT Sta KENILORTH9 EXIST. CURVE KENILORTH 7 CONTROL POINT 71 PROJECT COORDINATES KENILORTH AVENUE DESCRIPTION STATION NORTHING EASTING P.O.T P.C P.R.C NOTE: MAP COORDINATES REFLECT STATE PLANE COORDINATE SYSTEM EAST ZONE NAD 83 (211) VALUES P.T P.C P.T P.O.T ELEVATIONS REFLECT NAVD 88 VALUES 13 KENIL ORTH AVE PT Sta PC Sta CONTROL POINT 72 EX 34 CONTROL POINTS COORDINATES POINT # NORTHING EASTING ELEVATION STATION OFFSET CONTROL POINT EXIST. CURVE STERLING 6 PC Sta POT Sta PC Sta CONTROL POINT PT Sta PT Sta POT Sta V V PT Sta = 12/6/218 11:22:8 AM tbl FILE NAME = N:\PROJ\295.1\Design\Misc_Sheets\295.1alignties1.dgn GREEN OOD AVE TEMPORARY BM "B" EX KENILORTH AVE KENIL ORTH AVE 557 North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax EXIST. CURVE STERLING 3 CONTROL POINT 73 PLOT SCALE = 6. ' / in. = 12/6/218 EARLSTON RD PROJECT COORDINATES STERLING ROAD DESCRIPTION STATION NORTHING EASTING P.O.T P.C P.T P.C P.T P.C P.R.C P.T P.O.T /19/218 NG131 TBM "A" TBM "B" BENCHMARKS NGS MONUMENT NG131 LOCATED AT THE S CORNER OF THE INTER OF GREEN BAY RD AND PARK BLVD. ELEV = NE BOLT OF FHYD AT N CORNER OF AND PARK BLVD ELEV = SE BOLT OF FHYD ON SOUTH SIDE OF KENILORTH AVE ACCROSS FROM ELEV = PC Sta CONTROL POINT 76 EXIST. CURVE STERLING 9 PARK BLVD EXIST. CURVE STERLING 1 TEMPORARY BM "A" CONTROL POINT 77 ALIGNMENT, TIES AND BENCHMARKS SCALE: 1" = 6' OF STA. TO STA. PRC Sta PT Sta V EXIST. CURVE STERLING_3 PI STA. = R = 5.' T = 25.49' L = 5.93' E =.65' P.C. STA. = P.T. STA. = EXIST. CURVE STERLING_6 PI STA. = R = 12.' T = 67.53' L = 123.1' E = 17.69' P.C. STA. = P.T. STA. = MELROSE AVE V EXIST. CURVE STERLING_9 PI STA. = R = 6.' T = 82.23' L = ' E = 5.61' P.C. STA. = P.T. STA. = EXIST. CURVE STERLING_1 PI STA. = R = 49.5' T = 43.2' L = 85.72' E = 2.26' P.C. STA. = P.T. STA. = 2.76 CONTRACT

5 SA MH RIM = ST INLET INV =.31 (N)(S) RIM = RIM = INV = 63.8 (N) 1 LF ATER MAIN, 135 V RIM = TP = V TP = V 185 SF SIDEALK FIRE HYDRANTS TO BE REMOVED VALVE VAULTS TO BE ABANDONED 52 SF SIDEALK LF ATER MAIN TO BE ABANDONED, 1389 ST CB RIM = ST CB RIM = INV = (S)(NE) 98 ST RIM = 62 INV = LF ATER TO BE ABANDO 168 SA MH RIM = INV = (E) INV = (NE) 169 ST INLET RIM = INV = () INV = (S) 12 LF ATER MAIN TO BE ABANDONED, 164 SA MH RIM =.6 INV = NOTES: 1. HMA PAVEMENT SHALL BE INCLUSIVE OF CLASS D PATCH 9". 2. PCC PAVEMENT SHALL BE INCLUSIVE OF CLASS B PATCH 9". 3. CURB SHALL BE INCLUSIVE OF REMOVE AND REPLACE CURB AND GUTTER (SPECIAL). 4. SEE PROPOSED ATER MAIN PLAN AND PROFILE FOR SANITARY AND REPLACEMENT. 5. PCC DRIVEAY SHALL BE INCLUSIVE OF PORTLAND CEMENT CONCRETE DRIVEAY AND REPLACEMENT. 6. HMA DRIVEAY SHALL BE INCLUSIVE OF HOT MIX ASPHALT DRIVEAY AND REPLACEMENT. RIDGE RD LF STORM SEER, 13 KENILORTH AVE 11 SY HMA DRIVEAY (SEE NOTE6) RIM = INV =.13 (E) 1374 ST MH RIM = INV = (N) 1395 ST MH INV = (S) 1373 ST MH RIM = LF CURB (SEE NOTE 3) SEE NOTE 4 INV = () INV = (E) 14 VALVE VAULTS TO BE ABANDONED 1738 V RIM = TP = FIRE HYDRANTS TO BE REMOVED SY HMA PAVEMENT (SEE NOTE 1) LF STORM SEER, 1678 SA MH RIM = SY PCC DRIVEAY (SEE NOTE 5) 992 SF SIDEALK MATCHLINE STA SY HMA DRIVEAY (SEE NOTE6) 2' 4' INV = (E) SA MH RIM = INV = ()(E) INV = (S) INV = (N) 273 ST CB RIM = INV = () INV = (E) ST CB RIM = INV = () INV = (E) KENIL ORTH AVE 18 ST CB RIM = INV = (E) INV = (S) 1847 ST MH RIM = 62.1 INV = () INV = (E) 74 V RIM = TP = ' 4' 545 = 12/6/218 11:22:9 AM tbl FILE NAME = N:\PROJ\295.1\Design\Removal\2951KENREM1.dgn MATCHLINE STA North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax PLOT SCALE = 2. ' / in. = 12/6/ LF ATER MAIN TO BE ABANDONED, 9/19/ LF ATER MAIN, ST MH RIM = INV = (E) 53 SF SIDEALK LF CURB FIRE HYDRANTS TO BE REMOVED 117 SF SIDEALK 1389 ST CB RIM = INV = (SE) GREENOOD AVE 1" 198 ST CB RIM = INV = (N)(SE) EXISTING UTILITY AND PLAN 782 LF ATER MAIN TO BE ABANDONED, SCALE: 1" = 2' OF STA. TO STA. A163 SA MH RIM = INV = ()(E) SEE NOTE 4 5 SF SIDEALK A1228 ST CB RIM = INV = 61.9 ()(E) INV = (S) CONTRACT A163 RIM = INV =

6 MATCHLINE STA A163 ST CB INV = (N)(S) RIM = INV = ()(E) SEE NOTE 4 37 LF CURB (SEE NOTE 3) 54 SF FLAGSTONE SIDEALK 112 GREENOOD AVE " V A1335 ST MH RIM =.79 A174 ST CB RIM =.16 INV = SF SIDEALK A1734 SA MH RIM = A174 SA MH RIM = " INV = (NE)(S) INV = (NE)() 1" 1" 15" GLENDENNING RD 1" 1 LF ATER MAIN, A173 V RIM =.97 TP = VALVE VAULTS TO BE ABANDONED 76 SY PCC PAVEMENT (SEE NOTE 2) A172 ST MH RIM = 616. TP = (S)(SE)(N) A1484 ST CB RIM =.31 INV = SF SIDEALK FIRE HYDRANTS TO BE REMOVED A1484 ST INLET RIM =.19 INV = A172 ST MH RIM =.89 TP = ()(N) A1484 SA MH RIM =.83 INV = LF CURB (SEE NOTE 3) 2949 SA M H 2' 4' RIM = INV = (NE)(S ) 295 ST M H RIM = INV =.32 (NE)(S ) 27 LF ATER MAIN TO BE ABANDONED, 4" A1935 SA MH RIM = INV = (S)()(N) = 12/6/218 11:22:9 AM tbl FILE NAME = N:\PROJ\295.1\Design\Removal\2951GREENKENTERREM2.dgn 17 LF ATER MAIN, V 557 North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax REMOVE AND ABANDON VALVE BOX V 4" PLOT SCALE = 2. ' / in SY HMA PAVEMENT (SEE NOTE 1) = 12/6/218 SEE NOTE 4 4" /19/218 A1935 ST MH RIM = INV =.8 (E) INV = (S)()(N)(N) INV = (S) KENILORTH TERRACE 2 LF SANITARY 14 SY HMA PAVEMENT (SEE NOTE 1) SEER, V SY HMA PAVEMENT (SEE NOTE 1) NOTES: HMA PAVEMENT SHALL BE INCLUSIVE OF CLASS D PATCH 9". PCC PAVEMENT SHALL BE INCLUSIVE OF CLASS B PATCH 9". CURB SHALL BE INCLUSIVE OF REMOVE AND REPLACE CURB AND GUTTER (SPECIAL). SEE PROPOSED ATER MAIN PLAN AND PROFILE FOR SANITARY AND REPLACEMENT. EXISTING UTILITY AND PLAN SCALE: 1" = 2' OF STA. TO STA ST CB RIM = 62.2 INV = (NE)(S) 2' 4' 291 ST M H RIM = SF SIDE ALK REM OVAL CONTRACT INV =.81 (N

7 (S )(NE) 98 ST MH RIM = ST CB RIM = INV = (N) INV = (S) 2397 SA MH RIM = INV = (N)(S) 14 INV = (N)(S) 2223 ST MH RIM = INV = (N)(S) 2654 ST CB RIM = 6.17 INV = (N)(S) ST CB RIM = INV = (N) 2294 ST CB RIM = INV = (N) 2554 V INV = (S) RIM = 622. TP = TP = RIM = RIM = 6.39 INV = (E) 1738 V SA M H RIM = INV = (E) 168 SA M H 187 LF ATER MAIN TO BE ABANDONED, 195 LF ATER MAIN TO BE ABANDONED, 113 SF SIDEALK 91 V RIM = TP = UNKNON (FILLED ITH GRAVEL) LF SEER, 1" VALVE VAULTS TO BE ABANDONED FIRE HYDRANTS TO BE REMOVED 2 LF ATER MAIN, 36 SY HMA PAVEMENT (SEE NOTE 1) VALVE VAULTS TO BE ABANDONED V EARLSTON RD " 2471 ST CB RIM = INV = (NE)(S) MATCHLINE STA ST CB RIM = 6.15 INV = 617. (N) 2' 4' = 12/6/218 11:22:1 AM tbl FILE NAME = N:\PROJ\295.1\Design\Removal\2951STERREM3.dgn MATCHLINE STA North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax OTHER ATER (SUMP PUMP?) RIM = 6.4 INV = UNKNON USE PLOT SCALE = 2. ' / in SA MH RIM = 6.7 INV = (N)(S) = 12/6/ ST CB RIM = 62.2 INV = (NE)(S) LF ATER MAIN TO BE ABANDONED, 9/19/ SF SIDEALK 1" FIRE HYDRANTS TO BE REMOVED 291 ST MH RIM = INV =.81 (NE)(S) V 2819 ST CB RIM = INV =.96 (NE)(S) EXISTING UTILITY AND PLAN SCALE: 1" = 2' OF STA. TO STA SA MH RIM = INV = (NE)(S) 295 ST MH RIM = INV =.32 (NE)(S) ST CB RIM = " INV = (NE)(S) " 7 SEE MATCHLINE STA ST CB RIM = NOTES: INV = (NE) INV = UNKNON (S) HMA PAVEMENT SHALL BE INCLUSIVE OF CLASS D PATCH 9". PCC PAVEMENT SHALL BE INCLUSIVE OF CLASS B PATCH 9". CURB SHALL BE INCLUSIVE OF REMOVE AND REPLACE CURB AND GUTTER (SPECIAL). SEE PROPOSED ATER MAIN PLAN AND PROFILE FOR SANITARY AND REPLACEMENT. 2' 4' CONTRACT

8 V V 3224 ST CB RIM = INV = (NE) 1" 3112 SA MH RIM = ST CB RIM = LF STORM SEER, 1" 88 SY HMA PAVEMENT (SEE NOTE 1) 383 ST CB RIM = INV = (NE) INV = UNKNON (S) 1 INV = (NE)(S) 25 SF SIDEALK INV = (E) 3962 V RIM = TP = V 3942 ST CB RIM = INV = (E) RIM = TP = " 3522 ST MH RIM = INV = ()(E) 18 SY HMA PAVEMENT (SEE NOTES 1) 1" 35 V RIM = TP = ST CB RIM = INV = (S) 3519 V RIM = TP = LF CURB (SEE NOTE 3) FIRE HYDRANT 44 TO BE REMOVED 25 LF ATER MAIN TO BE ABANDONED, 353 ST CB RIM =.58 INV = 61.8 (E) 281 LF ATER MAIN TO BE ABANDONED, ST CB RIM = INV = (E) INV = 68.7 () 393 V RIM = TP = CUT AND CAP EX ATER MAIN 6 SF SIDEALK 12" 1" 122 SF SIDEALK 3398 ST CB RIM = SF SIDEALK INV = (NE) INV = ()(S)(S) LF CURB 2 1 LF CURB (SEE NOTE 3) 12" 1 4 SY HMA PAVEMENT (SEE NOTE 1) VALVE VAULTS TO BE ABANDONED 45 LF ATER MAIN, 15" (SEE NOTE 3) 386 SA MH 3523 SA MH RIM = INV = ()(E) INV = 69.6 (S) 27 SY HMA PAVEMENT (SEE NOTE 1) 1 LF CURB (SEE NOTE 3) 18 LF ATER MAIN TO BE ABANDONED RIM =.29 INV = ()(E) 3817 ST CB RIM = INV = 68.5 ()(N)(E) INV = (S) 3991 ST CB 1 LF CURB (SEE NOTE 3) 1 LF CURB (SEE NOTE 3) RIM = INV = (S) INV = (SE) INV = () 3449 ST CB RIM = INV = (N) 3489 ST MH RIM = INV = ()(E) INV = (S) 1" " PARK DR 3554 V RIM = TP = ST CB RIM =.75 INV = (E) 12" MELROSE AVE V RIM =.78 TP = NOTES: = 12/6/218 11:22:1 AM tbl FILE NAME = N:\PROJ\295.1\Design\Removal\2951STERREM4.dgn 557 North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax PLOT SCALE = 2. ' / in. = 12/6/218 9/19/ HMA PAVEMENT SHALL BE INCLUSIVE OF CLASS D PATCH 9". 2. PCC PAVEMENT SHALL BE INCLUSIVE OF CLASS B PATCH 9". 3. CURB SHALL BE INCLUSIVE OF REMOVE AND REPLACE CURB AND GUTTER (SPECIAL). 4. SEE PROPOSED ATER MAIN PLAN AND PROFILE FOR SANITARY AND REPLACEMENT EXISTING UTILITY AND PLAN SCALE: 1" = 2' OF STA. TO STA. 2' 4' 8 CONTRACT 295.1

9 PLAN SURVEYED B.M. NOTED 51 KENILORTH NOGAP RIDGE RD ' MIN ATER MAIN, 34 LF GATE VALVE AND BOX, STA 11+6, 45 V X 6' REDUCER 45 CONNECTION TO EXISTING ATER MAIN (NONPRESSURE), FIRE HYDRANTCOMPLETE STA 11+7, O/S 26.4' LT FLG = SEE NOTE ATER CONNECTION (LONG) TYP SANITARYSEER AND REPALCEMENT (TYP) ATER SERVI CONNECTION ( TYP SEE 13 FOR IMPROVEMENTS ALIGNMENT RT. OF AY CADD FILE NAME BY NOTES: ATER MAIN (SPECIAL) LIMITS SHALL BE MEASURED FORM THE FRONT EDGE OF THE DRILLING AND S. ADDITIONALOR ALTERNATIVE DRILLING SETUPS SHALLBE APPROVED BYTHE VILLAGE'S REPRESENTATIVE. COST OF ADDTIONALDRILLING SETUPS SHALLBE CONSIDERED INCLUDED IN BID UNIT PRICING FOR ATER MAIN (SPECIAL). FITTINGS HAVE BEEN CALLED OUT ON THE PLAN FOR INFORMATIONALPURPOSES. THE COST OF FITTINGS (TEES, BENDS, REDUCERS, COUPLING, CAPS) SHALLBE INCLUDED IN THE COST OF ATER MAIN AND ATER MAIN CONNECTIONS PAYITEMS. COORDINATE ITH VILLAGE AT PROPERTY OF 633 KENILORTH AVE FOR FINAL ALIGNMENT. O/S 26.5' LT RIM = TP = LF 45 AND ATER MAIN, ATER MAIN, (SPECIAL) 17 LF LF DRILLING ATER MAIN, ATER MAIN QUALITY PIPE, 83 LF 13 ZONE KENILORTH AVE STORM SEER, TYPE 1 TRANSITION PIT ATER MAIN, 56 LF 63 5 HORIZONTAL DRILLSETUP LF X8' TEE GATE VALVE AND BOX, STA 14+66, O/S 29.2' LT RIM = TP = DEFL ATER MAIN, 9 LF 7 ATER CONNECTION (SHORT) TYP TYP FIRE HYDRANTCOMPLETE STA 15+4, O/S 23.5' RT FLG = ' 4' GRAPHICSCALE 645 ATER MAIN, (SPECIAL) 645 BY 64 GATE VALVE AND BOX, STA 11+6, O/S 26.5' LT RIM = TP = EX M BP = EX CABLE ATER MAIN (SPECIAL) 63 ATER MAIN, 34 LF GROUND PROFILE OVER STATIONING BP = 6.42 BP = EX STORM SEER EX SAN TP = ATER MAIN, 56 LF ATER MAIN, 12 LF 63 PROFILE SURVEYED GRADES STRUCTURE NOTAT'NS CH'KD FILE NAME = N:\PROJ\295.1\Design\Proposed_Plan\2951PNP_KEN1.dgn 62 CONNECTION TO EXISTING ATER MAIN (NONPRESSURE), 45 HOR BEND X TEE TO HYDRANT STA ATER MAIN, 54 LF ATER MAIN, (SPECIAL) 17 LF EX GAS BP = EX SAN TP = 617. DRILLING PIT GATE VALVE AND BOX, STA 14+66, O/S 29.2' LT RIM = TP =.93 X TEE TO HYDRANT STA 15+4 RECEIVING PIT HOR BEND HOR BEND HOR BEND = 12/6/218 11:22:11 AM CONNECTION RJ VER BEND HOR BEND (ROLLED HOR BEND IN VERTICALPLANE) (ROLLED IN VERTICAL X TEE PLANE) RJ EX SAN TP =.3 ATER MAIN,, 9 LF tbl 557 North Cumberland Avenue, Suite 42 Chicago, Ilinois 6656 Tel Fax =ddasilva PLOT SCALE = 2. ' / in. =12/6/ /19/218 VILLAGEOFKENILORTH STERLING ATERMAIN REPLACEMENT PROPOSED ATERMAIN PLAN AND PROFILE 1" = 2' TO STA. SCALE: OF STA. CONTRACT

10 561 KENIL ORTH AVE NOTES: ATER MAIN (SPECIAL) LIMITS SHALL BE MEASURED FORM THE FRONT EDGE OF THE DRILLING AND S. ADDITIONAL OR ALTERNATIVE DRILLING SETUPS SHALL BE APPROVED BY THE VILLAGE'S REPRESENTATIVE. COST OF ADDTIONAL DRILLING SETUPS SHALL BE BY X REDUCER 545 CONNECTION TO EXISTING ATER MAIN (NONPRESSURE) ATER MAIN, ATER CONNECTION (SHORT) TYP 3. CONSIDERED INCLUDED IN BID UNIT PRICING FOR ATER MAIN (SPECIAL). FITTINGS HAVE BEEN CALLED OUT ON THE PLAN FOR INFORMATIONAL PURPOSES. THE COST OF FITTINGS (TEES, BENDS, REDUCERS, COUPLING, CAPS) SHALL BE INCLUDED IN THE COST OF ATER MAIN AND ATER MAIN CONNECTIONS PAY ITEMS. ATER CONNECTION (LONG) 2' 4' SURVEYED ALIGNMENT RT. OF AY CADD FILE NAME PLAN 9 SEE MATCHLINE STA 16+ SANITARY SEER AND REPLACEMENT (TYP) 11 1 LF GREENOOD AVE 1" TYP MATCHLINE STA SEE X TEE ATER MAIN, ATER MAIN, (SPECIAL) 79 LF (SPECIAL) 251 LF FIRE HYDRANT COMPLETE STA 18+79, O/S.4' RT FLG = GATE VALVE AND BOX, STA 18+87, O/S 27.9' RT RIM = TP = ATER MAIN, (SPECIAL) 384 LF STORM SEER, TYPE 1 ATER MAIN QUALITY PIPE, LF BY PROFILE SURVEYED GRADES B.M. NOTED STRUCTURE NOTAT'NS CH'KD = 12/6/218 11:22:14 AM tbl FILE NAME = N:\PROJ\295.1\Design\Proposed_Plan\2951PNP_KEN2.dgn EX SAN TP = ' MIN EX SAN TP = North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax PLOT SCALE = 2. ' / in = 12/6/ ATER MAIN, (SPECIAL) 251 LF /19/ EX SAN BP = ATER MAIN, (SPECIAL) 79 LF X TEE EX SAN BP = X TEE TO HYDRANT STA 18+8 ATER MAIN, (SPECIAL) RJ GATE VALVE AND BOX, STA 18+87, O/S 27.9' RT RIM = TP = EX SAN BP = GROUND PROFILE OVER STATIONING EX SAN BP = ATER MAIN, (SPECIAL) 384 LF PROPOSED ATER MAIN PLAN AND PROFILE EX SAN BP = SCALE: 1" = 2' OF STA. TO STA EX SAN BP = EX STORM SEER BP = CONTRACT 295.1

11 BY 523 SANITARY SEER AND REPLACEMNT (TYP) 517 ATER MAIN, (SPECIAL) 29 LF X REDUCER ATER MAIN, 2 LF GATE VALVE AND BOX, STA , O/S 3.5' RT RIM =.85 TP = " GLENDENNING RD 45 1" CONNECTION TO EXISTING ATER MAIN (NON PRESSURE), NOTES: 1. ATER MAIN (SPECIAL) LIMITS SHALL BE MEASURED FORM THE FRONT EDGE OF THE DRILLING AND S. 2. ADDITIONAL OR ALTERNATIVE DRILLING SETUPS SHALL BE APPROVED BY THE VILLAGE'S REPRESENTATIVE. COST OF ADDTIONAL DRILLING SETUPS SHALL BE CONSIDERED INCLUDED IN BID UNIT PRICING FOR ATER MAIN (SPECIAL). SURVEYED ALIGNMENT RT. OF AY CADD FILE NAME PLAN 1 SEE MATCHLINE STA TRANSITION 17 ZONE PVC CASING PIPE, 12" LF ATER MAIN, 113 LF GREENOOD AVE " V 1" DRILLING PIT 71 1" 1" FITTINGS HAVE BEEN CALLED OUT ON THE PLAN FOR INFORMATIONAL PURPOSES. THE COST OF FITTINGS (TEES, BENDS, REDUCERS, COUPLING, CAPS) SHALL BE INCLUDED IN THE COST OF ATER MAIN AND ATER MAIN CONNECTIONS PAY ITEMS. REFER TO PLAN VIE FOR ATER MAIN CROSSING OF GREENOOD AVENUE. TO VERTICAL 45 FITTING SHALL BE REQUIRED NORTH OF CROSSING 72 AFTER CASING PIPE TO ACHIEVE A TOP OF PIPE ELEVATION OF AT THE 45 HORIZONTAL FITTING. FITTINGS MAY BE ROLLED IN THE VERTICAL AND HORIZONTAL PLANES TO ACHIEVE PLAN ALIGNMENT. GATE VALVE AND BOX, 9 FIRE HYDRANT COMPLETE STA , O/S 27.6' RT STA , O/S 2.7' RT RIM =.91 FLG =.77 TP = ATER CONNECTION (SHORT) TYP HORIZONTAL DIRECTION 2' 4' DRILL SETUP ATER MAIN, (SPECIAL) BY PROFILE SURVEYED GRADES B.M. NOTED STRUCTURE NOTAT'NS CH'KD = 12/6/218 11:22:15 AM tbl FILE NAME = N:\PROJ\295.1\Design\Proposed_Plan\2951PNP_KEN3.dgn EX SAN BP = North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax TEE TO HYDRANT STA GATE VALVE AND BOX, STA 2+71, O/S 27.6' RT RIM =.91 TP = PLOT SCALE = 2. ' / in = 12/6/ EX SAN BP = /19/ EX SAN BP = ' MIN EX SAN BP = ATER MAIN (SPECIAL) 29 LF EX SAN BP = DRILLING PIT ATER MAIN, 113 LF 45 HOR BEND (SEE NOTE 4) 45 VERT BEND 45 VERT BEND RJ CONNECTION GATE AND VALVE BOX, STA , O/S 3.5' RT RIM =.85 TP = ATER MAIN, 2 LF 9 HOR BEND (SEE NOTE 4) CONNECTION TO EXISTING GROUND PROFILE OVER STATIONING ATER MAIN (NONPRESSURE), PROPOSED ATER MAIN PLAN AND PROFILE SCALE: 1" = 2' OF STA. TO STA CONTRACT 295.1

12 GATE VALVE AND BOX, STA 14+53, O/S 24' 24.2' RT RT RIM = TP =.93 ATER CONNECTION (LONG) TYP ATER MAIN, 11 LF CONNECTION TO EXISTING ATER MAIN (NONPRESSURE), 2' 4' STORM SEER (ATER MAIN ATER MAIN, (SPECIAL) 34 LF REQUIREMENTS), 22 LF GATE VALVE AND BOX, STA 23+61, O/S 27.3' RT 14 RIM = 6.8 TP = BY SURVEYED ALIGNMENT RT. OF AY CADD FILE NAME PLAN ATER MAIN, 5" 5 LF ATER MAIN, 12 LF ATER CONNECTION (SHORT) 15+ TYP ATER MAIN, (SPECIAL) 339 LF X TEE STORM SEER (M REQ) 1" LF ATER MAIN, ATER MAIN, (SPECIAL) 339 LF 6 LF FIRE HYDRANT COMPLETE GATE VALVE AND BOX, STA 22+9, O/S 32.8' RT STA 23+28, O/S 32.6' RT FL = RIM = 6.92 TP = X REDUCER " EARLSTON RD V MATCHLINE STA SEE NOTES: ATER MAIN (SPECIAL) LIMITS SHALL BE MEASURED FORM THE FRONT EDGE OF THE DRILLING AND S. 3. FITTINGS HAVE BEEN CALLED OUT ON THE PLAN FOR INFORMATIONAL PURPOSES. THE COST OF FITTINGS (TEES, BENDS, ADDITIONAL OR ALTERNATIVE DRILLING REDUCERS, COUPLING, CAPS) SHALL BE BY 64 SETUPS SHALL BE APPROVED BY THE VILLAGE'S REPRESENTATIVE. COST OF ADDTIONAL DRILLING SETUPS SHALL BE CONSIDERED INCLUDED IN BID UNIT PRICING FOR ATER MAIN (SPECIAL). INCLUDED IN THE COST OF ATER MAIN AND ATER MAIN CONNECTIONS PAY ITEMS. 64 ATER MAIN, (SPECIAL) PROFILE SURVEYED GRADES B.M. NOTED STRUCTURE NOTAT'NS CH'KD = 12/6/218 11:22:16 AM tbl FILE NAME = N:\PROJ\295.1\Design\Proposed_Plan\2951PNP_STER4.dgn CONNECTION EX ELECTRICAL BP = 62.7 EX GAS BP = 62.7 EX ELECTRICAL BP = EX GAS BP = EX STORM SEER, BP = ATER MAIN,, 12 LF EX ATER MAIN, BP = ATER MAIN,, 12 LF RJ GATE AND VALVE BOX, STA 14+53, O/S 24' RT RIM = , TP = North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax PLOT SCALE = 2. ' / in = 12/6/ EX ELECTRICAL BP = EX M BP = /19/ ' MIN ATER MAIN, (SPECIAL) 339 LF EX SAN TP = EX 1" STORM SEER BP = EX GAS BP = EX SAN TP = EX M BP = BP = X TEE TO HYDRANT STA X TEE RJ GATE AND VALVE BOX, STA 23+61, O/S 27.3' RT RIM = 6.8 TP = EX GAS BP = ATER MAIN, (SPECIAL) 34 LF PROPOSED ATER MAIN PLAN AND PROFILE EX ELECTRICAL SCALE: 1" = 2' OF STA. TO STA ATER MAIN, (SPECIAL) 339 LF EX SAN TP = GROUND PROFILE UNDER STATIONING CONTRACT 295.1

13 BY SURVEYED ALIGNMENT RT. OF AY CADD FILE NAME PLAN MATCHLINE STA 25+5 SEE FLG = FIRE HYDRANT COMPLETE STA 25+52, O/S 23.4' RT DRILLING PIT TRANSITION ZONE 353 CAP ATER MAIN, 5 LF ATER MAIN, 99 LF " DRILL SETUP 49 ATER MAIN, 3 LF HORIZONTAL DIRECTIONAL V X TEE ATER MAIN 5 LF GATE VALVE AND BOX, STA 28+14, O/S 23.5' LT RIM = TP =.17 FIRE HYDRANT COMPLETE STA 28+4, O/S 2.2' LT FLG = " ATER CONNECTION (SHORT) TYP 51 SANITARY SEER SANITARY SEER AND REPLACEMENT AND REPLACEMENT 381 ATER MAIN (SPECIAL), 27 LF 52 NOTES: 1. ATER MAIN (SPECIAL) LIMITS SHALL BE MEASURED FORM THE FRONT EDGE OF THE DRILLING AND S. 2. ADDITIONAL OR ALTERNATIVE DRILLING SETUPS SHALL BE APPROVED BY THE VILLAGE'S REPRESENTATIVE. COST OF ADDTIONAL DRILLING SETUPS SHALL BE CONSIDERED INCLUDED IN BID UNIT PRICING FOR ATER MAIN (SPECIAL). 3. FITTINGS HAVE BEEN CALLED OUT ON THE ATER PLAN FOR INFORMATIONAL PURPOSES. CONNECTION (LONG) THE COST OF FITTINGS (TEES, BENDS, TYP REDUCERS, COUPLING, CAPS) SHALL BE INCLUDED IN THE COST OF ATER MAIN AND ATER MAIN CONNECTIONS PAY ITEMS. 38 1" 1 13 MATCHLINE STA 1+ SEE 2' 4' BY 63 ATER MAIN, (SPECIAL) 63 PROFILE SURVEYED GRADES B.M. NOTED STRUCTURE NOTAT'NS CH'KD = 12/6/218 11:22:18 AM tbl FILE NAME = N:\PROJ\295.1\Design\Proposed_Plan\2951PNP_STER5.dgn X TEE TO HYDRANT STA EX TELEPHONE BP = DRILLING PIT EX SAN TP = ATER MAIN, 99 LF 22.5 HOR BEND EX ELECTRICAL BP = EX SAN 27+6 RJ EX ELECTRICAL BP = TP = HOR BEND RJ RJ North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax PLOT SCALE = 2. ' / in = 12/6/ /19/ X TEE RJ ATER MAIN, 5 LF HOR BEND X TEE TO HYDRANT STA 28+4 EX SAN TP = ATER MAIN, (SPECIAL) 27 LF PROPOSED ATER MAIN PLAN AND PROFILE EX SAN TP = ATER MAIN, (SPECIAL) SCALE: 1" = 2' OF STA. TO STA. GROUND PROFILE OVER STATIONING ' MIN EX SAN TP = CONTRACT 295.1

14 1" V 1 V 1" " BY 53 SANITARY SEER AND REPLACEMENT 1 SEE 12 MATCHLINE STA " 56 PVC CASING PIPE, 12" 22 LF CONNECTION TO EXISTING ATER MAIN (NONPRESSURE), X REDUCER ATER MAIN, 5 LF PVC CASING PIPE, 12" 28 LF 61 ATER MAIN,, 3 LF STORM SEER (ATER MAIN REQUIREMENT), 1", 11 LF GATE VALVE AND BOX, STA 2+98, O/S 48.5 LT RIM = TP = ATER MAIN,, 2 LF X CROSS FIRE HYDRANT COMPLETE STA 3+8, O/S 33.6 LT FLG = NOTES: 1. ATER MAIN (SPECIAL) LIMITS SHALL 3. FITTINGS HAVE BEEN CALLED OUT ON THE BE MEASURED FORM THE FRONT EDGE PLAN FOR INFORMATIONAL PURPOSES. OF THE DRILLING AND S. THE COST OF FITTINGS (TEES, BENDS, 2. ADDITIONAL OR ALTERNATIVE DRILLING REDUCERS, COUPLING, CAPS) SHALL BE SETUPS SHALL BE APPROVED BY THE INCLUDED IN THE COST OF ATER MAIN VILLAGE'S REPRESENTATIVE. COST OF AND ATER MAIN CONNECTIONS PAY ITEMS. ADDTIONAL DRILLING SETUPS SHALL BE CONSIDERED INCLUDED IN BID UNIT PRICING FOR ATER MAIN (SPECIAL). TRANSITION ZONE ATER MAIN,, 4 LF DRILLING PIT CONNECTION TO EXISTING ATER MAIN (NONPRESSURE), 1" 12" 2' 4' HORIZONTAL DIRECTIONAL DRILL SET UP SURVEYED ALIGNMENT RT. OF AY CADD FILE NAME TRANSITION ZONE ATER RECONNECTION (SHORT) TYP DRILLING PIT BEND " ATER MAIN,, 3 LF ATER MAIN,, 22 LF CONNECTION TO EXISTING ATER MAIN (NONPRESSURE), " PLAN HORIZONTAL DIRECTION DRILL SET UP X REDUCER 12" MELROSE AVE PVC CASING PIPE, 12" LF 55 ATER MAIN, 151 LF GATE VALVE AND BOX, PARK DR ATER MAIN, (SPECIAL) 2 LF STA 2+93, O/S 28.5' LT RIM = 617. TP = 612. BY PROFILE SURVEYED GRADES B.M. NOTED STRUCTURE NOTAT'NS CH'KD = 12/6/218 11:22:2 AM tbl FILE NAME = N:\PROJ\295.1\Design\Proposed_Plan\2951PNP_STER6.dgn CONNECTION RJ 1+66 RJ RJ EX SAN ATER MAIN, (SPECIAL) TP= PIT EX GAS BP =.33 EX ELECTRICAL BP = DRILLING EX M BP = VERT BEND 45 HOR BEND 45 VERT BEND PVC CASING PIPE, 12" North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax EX SAN TP = PLOT SCALE = 2. ' / in = 12/6/ EX STORM SEER BP = EX 1" STORM SEER BP = SEER EX STORM SEER BP = EX SAN BP = PVC CASING PIPE, 12" /19/ PVC CASING PIPE, 12" ATER MAIN, 151 LF EX GAS BP = VERT BEND EX 1 STORM SEER BP = VERT BEND EX 1" SAN SEER BP = GATE AND VALVE BOX, STA 2+93, O/S 28.5' LT RIM = 617. TP = 612. X CROSS ATER MAIN, 5 LF X TEE TO HYDRANT STA ATER MAIN, 3 LF EX ELECTRICAL BP = EX TELEPHONE BP = ATER MAIN, (SPECIAL) EX CABLE BP = ATER MAIN, (SPECIAL) 2 LF 4 LF PROPOSED ATER MAIN PLAN AND PROFILE ATER MAIN, SCALE: 1" = 2' OF STA. TO STA. 5' MIN EX VALVE/VAULT DRILLING PIT CONNECTON TO EXISTING ATER GROUND PROFILE OVER STATIONING MAIN (NONPRESSURE), CONTRACT 295.1

15 5' MIN 1 MIN ATER CONENCTION (LONG) TYP CONENCTION TO EX ATER MAIN (NON PRESSURE), ATER MAIN, 1 LF GATE VALVE AND BOX, STA 3+24, O/S 4.5' RT RIM = , TP = SANITARY SEER REPLACEMENT ATER MAIN QUALITY 2 LF NOTES: BY SURVEYED ALIGNMENT RT. OF AY CADD FILE NAME X TEE V ATER MAIN, 23 LF V 4" 24 KENILORTH TERRACE 4" ATER ATER MAIN, (SPECIAL) 24 LF TRANSITION ZONE DRILLING HORIZONTAL DIRECTIONAL V PIT DRILL SETUP ATER MAIN, LF CAP FIRE HYDRANT COMPLETE STA 33+19, O/S 12.9' RT FLG = ATER MAIN (SPECIAL) LIMITS SHALL BE MEASURED FORM THE FRONT EDGE OF THE DRILLING AND S. ADDITIONAL OR ALTERNATIVE DRILLING SETUPS SHALL BE APPROVED BY THE VILLAGE'S REPRESENTATIVE. COST OF ADDTIONAL DRILLING SETUPS SHALL BE CONSIDERED INCLUDED IN BID UNIT PRICING FOR ATER MAIN (SPECIAL). FITTINGS HAVE BEEN CALLED OUT ON THE PLAN FOR INFORMATIONAL PURPOSES. THE COST OF FITTINGS (TEES, BENDS, REDUCERS, COUPLING, CAPS) SHALL BE INCLUDED IN THE COST OF ATER MAIN AND ATER MAIN CONNECTIONS PAY ITEMS. PLAN SANITARY SEER AND REPLACEMENT (TYP) CONNECTION (SHORT) TYP 363 2' 4' GATE VALVE 645 AND BOX, STA 3+24, 645 O/S 4.5O' RT ATER MAIN, (SPECIAL) BY 64 RIM = , TP = EX GAS EX CABLE BP = BP = ATER MAIN, 23 LF ATER MAIN, (SPECIAL) 24 LF GROUND PROFILE 64 PROFILE SURVEYED GRADES B.M. NOTED STRUCTURE NOTAT'NS CH'KD TERR AP = 12/6/218 11:22: AM tbl FILE NAME = N:\PROJ\295.1\Design\Proposed_Plan\2951PNP_KEN_TERR7.dgn EX ELECTRICAL BP = ATER MAIN, 1 LF CONNECTION TO EXISTING ATER MAIN (NONPRESURE), RJ CONNECTION North Cumberland Avenue, Suite 42 Chicago, Illinois 6656 Tel Fax PLOT SCALE = 2. ' / in = 12/6/ EX SAN BP = /19/ EX SAN BP = EX CABLE BP = OVER STATIONING DRILLING PIT ATER MAIN, 7 LF EX ELECTRICAL BP = RJ 33+7 CAP X TEE TO HYDRANT STA EX SAN SERER TP = PROPOSED ATER MAIN PLAN AND PROFILE SCALE: 1" = 2' OF STA. TO STA CONTRACT 295.1

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

CENTENNIAL PARK EXPANSION

CENTENNIAL PARK EXPANSION 2 working days CITY ELKO EXISTING LEGEND PROPOSED CENTENNIAL PARK EXPANSION SEET LIGHT POWER POLE ELECICAL BOX 1-800-227-2600 AVOID CUTTING UNDERGROUND UTILITIES WATER VALVE GAS VALVE FIRE HYDRANT OWNER/DEVELOPER:

More information

WHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON

WHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON WHITE OAK RIDGE D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

2011 LOCAL STREET IMPROVEMENTS

2011 LOCAL STREET IMPROVEMENTS 11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

3. Application Fees, Certificate Of Insurance & Performance Bond

3. Application Fees, Certificate Of Insurance & Performance Bond SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner

More information

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal. ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois

More information

DOCUMENTATION WORKBOOK FY 2017

DOCUMENTATION WORKBOOK FY 2017 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9. LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

SECTION 17 FIRE HYDRANT ASSEMBLIES General

SECTION 17 FIRE HYDRANT ASSEMBLIES General SECTION 17 FIRE HYDRANT ASSEMBLIES 17-1.01 Scope 17-1 General This section describes the requirements for furnishing and installing as appurtenances to treated water mains. These requirements include the

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

ARTICLE 4 RIGHT-OF-WAY UTILIZATION

ARTICLE 4 RIGHT-OF-WAY UTILIZATION RIGHT-OF-WAY UTILIZATION Index 4.01 GENERAL 4.02 DEFINITIONS 4.03 EXCLUSIONS 4.04 GENERAL REGULATIONS 4.05 RESTORATION AND MAINTENANCE 4.06 UTILITY ACCOMMODATION 4.07 INSPECTION 4.08 OPERATIONAL SAFETY

More information

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

PERMANENT RESIDENTIAL UNDERGROUND SERVICE CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG. SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD, 2017-2018 FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 39104 BIDS

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

SITE PLANS ASSISTED LIVING REDEVELOPMENT

SITE PLANS ASSISTED LIVING REDEVELOPMENT SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5026 2017 SMP MERRY ANN DR. FROM FRANCES JEAN TO DEAD END G:\TXC\Projects\SAWS\SAWS - Merry Ann\03_CADD\01_Sheets\Merry Ann_Water\01_Sheets\1 MANN WATR CVR.dwg

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

UTILITY CROSSING DETAIL

UTILITY CROSSING DETAIL 6" OF CSBC COMPACTED TO A FIRM AND UNYIELDING CONDITION. NOTE: - SILT FENCE SHALL CONFORM TO 8-01.3(9)A - SILT FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE. - POST SPACING MAY BE INCREASED

More information

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38

More information

VALVES, FIRE HYDRANTS, AND APPURTENANCES

VALVES, FIRE HYDRANTS, AND APPURTENANCES VALVES, FIRE HYDRANTS, AND APPURTENANCES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Butterfly Valves B. Gate Valves C. Tapping Valve Assemblies D. Fire Hydrant Assemblies E. Flushing Devices (Blowoffs)

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

SANITARY SCHEDULE ALIGNMENT CODES: 'ES'= EAU CLAIRE AVENUE SB UTILITY REPLACEMENT WITH STREET RESURFACING - 2015 PROJECT NO. 53W1793 EAU CLAIRE AVE SANITARY SEWER SCHEDULE SHEET NO. U-6 CITY OF MADISON

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

UBC Watermain as shown on Sheet 202 : Sub total 97,050

UBC Watermain as shown on Sheet 202 : Sub total 97,050 Preliminary Cost Estimate Brock Commons Phase 1 Watermain replacement UBC Portion of Works only Replace existing 150mm dia CI and 200mm dia AC watermain with 200mm & 250mm dia DI (ductile iron) watermain

More information

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

ADDENDUM NO REFERENCE: FORM OF AGREEMENT, Schedule 2 List of Contract Drawings C C C C

ADDENDUM NO REFERENCE: FORM OF AGREEMENT, Schedule 2 List of Contract Drawings C C C C ADDENDUM NO. 1 PROJECT: Olalla Water System Upgrades Phase 2; RDOS-17-PW-3 The Contract Documents for this work are revised as noted herein. All such revisions become a part of the work and shall be included

More information

TITLE 17 REFUSE AND TRASH DISPOSAL 1 CHAPTER 1. REFUSE. 2. RESIDENTIAL YARD WASTE, APPLIANCES AND OTHER DEBRIS. CHAPTER 1 REFUSE

TITLE 17 REFUSE AND TRASH DISPOSAL 1 CHAPTER 1. REFUSE. 2. RESIDENTIAL YARD WASTE, APPLIANCES AND OTHER DEBRIS. CHAPTER 1 REFUSE Change 14, June 13, 2017 17-1 TITLE 17 REFUSE AND TRASH DISPOSAL 1 CHAPTER 1. REFUSE. 2. RESIDENTIAL YARD WASTE, APPLIANCES AND OTHER DEBRIS. CHAPTER 1 REFUSE SECTION 17-101. Refuse defined. 17-102. Residential

More information

CP #CP218 NAIL SOFT GROUND N= E= ELEV= GUY WIRE. + WV CP #CP175 Old Magnail N= E= ELEV=858.

CP #CP218 NAIL SOFT GROUND N= E= ELEV= GUY WIRE. + WV CP #CP175 Old Magnail N= E= ELEV=858. O R IG IN A T O R : C IT Y OF M A D IS O N, S T R E E T S DIV IS IO N 805 4906 802 813 4910 821 825 DELAWARE LN 1 2 3 EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY

More information

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way IONIA COUNTY ROAD COMMISSION 170 E. Riverside Drive; P.O. Box 76, Ionia MI 48846 (616) 527-1700 (office) or (616) 527-8848 (fax) APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove

More information

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

SOUTH COVE PARK MULTI-COURT IMPROVEMENTS FOR OCONEE COUNTY PARKS, RECREATION AND TOURISM SENECA, SOUTH CAROLINA FEBRUARY 2018

SOUTH COVE PARK MULTI-COURT IMPROVEMENTS FOR OCONEE COUNTY PARKS, RECREATION AND TOURISM SENECA, SOUTH CAROLINA FEBRUARY 2018 Pursuant to agreement between, Inc. (HMW) and the party for which these documents have been prepared, these documents and all data, plans, specifications and other information contained herein are the

More information

County of Santa Cruz 0579

County of Santa Cruz 0579 County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

CHAPTER 3. Driveways (Rev. 9/04, Ord )

CHAPTER 3. Driveways (Rev. 9/04, Ord ) CHAPTER 3 Driveways (Rev. 9/04, Ord. 2004-6) 6-3-1 Driveway Permit Required 6-3-2 Driveway Location, Design and Construction Requirements 6-3-3 Driveway Aprons Installation/Replacement Improvement Policy

More information

CHAPTER 140 DRIVEWAYS

CHAPTER 140 DRIVEWAYS CHAPTER 140 DRIVEWAYS 140.01 Purpose 140.10 Driveway Location 140.02 Definitions 140.11 Driveway Maintenance 140.03 Driveway Construction 140.12 Failure To Maintain 140.04 Driveway Surfaces 140.13 Permit

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Temporary Sales Trailer Application

Temporary Sales Trailer Application Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with

More information

AMENDED CULVERT POLICY WITH MAIL BOX POLICY

AMENDED CULVERT POLICY WITH MAIL BOX POLICY AMENDED CULVERT POLICY WITH MAIL BOX POLICY REVISED MARCH 28, 2017 COMMISSIONERS COURT ORDER NO. 17-03-168 POLICY ACCEPTANCE AGREEMENT This page is to be signed by the Requesting Party and returned in

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information