Engineering Technology
|
|
- Melanie Snow
- 5 years ago
- Views:
Transcription
1 Engineering Technology
2 Company presentation G Engineering Technology Group... A leading group of companies working in the field of Engineering, manufacturing and contracting of electromechanical projects and Services. The group if currently formulated of three companies: Engineering And Services Technology SAE EAST : The Heart, Engineering and Sales arm of the group Within EAST activities we have the products sales, projects sales and studies, Engineering development, application Software development, Technical Services and support, the productions facilities, electrical panels building, Steel works manufacturing, contracting services. the company has as well the central cooperate services of the group (for Accounting, Finance, Human resources and IT) Petroleum Services Technology Ltd. PST : The Group Arm in the field of oil, gas and petrochemical engineering related services, the company offers diverse services in both the midstream and downstream activities. Group CV 2 of 25
3 Company presentation Facts & Figures: EAST Joint stock company fully owned by The Abdel Malek Family EIT limited liability company 70 % own by EAST and 30 % by family private equities PST limited Liability company 50% owned by EAST 50% by other private equities issued Capital Paid capitals: Running investments: EGP EGP EGP Total Sales figures as per 2012: EGP ( Local + Agencies) approx. 10 M USD Man Power Resources: Number of Employees: 57 ( permanent) Number of Engineers: 20 Number of qualified Technician: 20 mostly are OSHA Certified Number of support team : 17 OUR MAIN ASS IS OUR PEOPLES EVEN WITH A SHORTAGE OF TOOLS WE ARE ABLE TO MAKE IT Locations: Headquarter (offices) 500 m2 Maadi Stores 300 m2 Maadi Open stores 500 m2 Maadi New factory ( under construction 2012) 4500 sqm Address: 30 St. 276 New Maadi Cairo Egypt Phone & Fax: Headquarter: /2 - Fax info@etg-eg.com Member of: Egyptian Trade Chamber Swiss Business association Engineering industries Chamber Egyptian industrial association Egyptian Association for construction and building German Arab Trade Chamber Arab Roads association Group CV 3 of 25
4 Company presentation In office resources Automation activity Technical reference library: We have access to the complete technical reference library of: ABB Industrial IT Moeller Sucosoft S40, Intellution fix 32, Intellution IFIX Step7 V5.4 WinCC WinCC Flexible EPLAN P8 Intouch Protool Hardware resources. We develop and configure mainly on PC s with off line tools, but we have also test unit for PLC s ABB AC 31, AC700F, ACS 550, ACS 800 Siemens S7-300, 200 M, S7-200, S7-400 Moeller VIPA interface cards AB Proface ESA SIEMENS Group CV 4 of 25
5 Company presentation Workshop resources Plant / Machines activity Cars Two double cabin cars ( Toyota) Two Single Cabin cars ( Toyota) Tools Full set of hand tools Generator / welding set Generator / power set Hydraulic filling / filtering pumps Fuel filling / filtering pumps Software Rexroth diagnostic tools Cummins Diagnostic tools Workshop resources contracting activity Machines Two Haullotte man lifts 10 m Two Haullotte scissor lift 12 m One Toyota electric forklift 2 t 6 m One Toyota diesel forklift 2t 6 m One Marina manual scissor lift 8 m Tools 25 Grinding machine Dewalte 5 Punching machines 30 Drill 5 electric welding machines 2 gas welding machines 50 set of hand tools (electric mechanical) Group CV 5 of 25
6 Company presentation Activities: 1) Engineering. - SCADA or DCS software using ABB Industrial IT, WIN CC and INTELLUTION, INTOUCH - Production control system design. - Batching and weighing control system - PLC programming. - Water gates & pumping station control. - Control Systems Cement, Glass, and limestone processing, furnace control systems - Control systems for Sewage works - Temperature control systems - Low voltage Power panels design - Motor control center - Drives and Motors integration systems - Power distribution panels, ATS, Synchronization panels 2) Assembling: - - Control panels and desks. - Power panels. 3) Maintenance & services A) Control system. - PLC - Speed control drives B) Mechanical work - Steel structure works - Piping works - Crushers, mills - Concrete plants supply and retrofits - Asphalt plants supply and retrofits. - Road construction Machineries ( compactors, rollers, pavers) - Forklifts backhoes - Food industries production lines - Cement production line supports - Glass production line supports C) Relocating and Packing services - Dismantling, seaworthy packing (special aluminum foil system) and container arrangements of complete production lines for different process 4) spare parts (Logistics) Supply all electric / electronic / mechanical components according to the clients request. Group CV 6 of 25
7 Company presentation 5) Representation. We are currently representing: Plant and machines Activities - AMMANN group of Switzerland for machinery - Yanmar france for mini excavators - Stema Pedex for Steel rebarring production lines - GIPO for mobile Crushers and screening units - Cukurova backhoe loaders and forklifts Electro-Automation Activities - Muller Industrie-Elektronik of Germany for instruments - Sartorius Germany for weighing applications - Camille Bauer of Switzerland for power monitoring devices. - Official System Integrator and distributor for ABB Frequency inverters, Motors, Up to 4 MW, DCS, Instrumentation and gas Analyzers - System integrator for Siemens Automation and drives applications - Sole Agent for Hyosung Motors Korea Group CV 7 of 25
8 Company presentation Rankings AMMANN group Asphalt plants sales market shares in Egypt 65% rank 1 Egyptian Market plant services (Asphalt) best performer AMMANN Pneumatic rollers market shares in Egypt 60% rank 1 EAST is the only ABB drives and motor application system integrator in the MENA Region Product EAST based on its long and professional field knowledge has its own Product solution for Green energy named EAS Energy Advanced Solutions By EAST EAS is a system solution to provide residential, commercial and industrial application with Solar energy both on grid and off grid configuration Group CV 8 of 25
9 Company presentation History 1954 First business approach to the Egyptian market with Roads building contracting company 1976 Starting the heavy Machineries business with CAT and AMMANN of Switzerland 1980 Joint Venture with the Swiss Geillenger for Steel fly over bridges manufacturing Several projects had been conducted in Egypt 1999 Establishing Engineering and Services technology... first time acting into the process automation business 2002 Establishing the special design instrumentation and Agency acquiring for Mueller Industrie GmbH Germany 2003 Merging the construction machineries of AMMANN group into the EAST company 2005 Establishing the new division of Mechatronics via cooperation with Sartorius Germany 2006 Establishing the Power system division via cooperation with Camille Bauer Switzerland 2006 Splitting the contracting and manufacturing arm to formulate EIT company 2006 Forming the Engineering Technology Group 2007 The New Holding company acquires EAST and EIT main shares 2007 Receiving the License from ABB Germany and Finland to integrate ABB frequency inverters into our systems 2008 Starting the project for our new production and workshop facilities over 4000 sqm in October city 2009 First biggest Asphalt plant in Egypt 2010 First Time complete control system Of electrical Furnaces 2011 EAST switch to Joint Stock company 2012 Establishing of PST ( Petroleum Services) Group CV 9 of 25
10 Company presentation Group Vision To create a company with High Engineering strength that provides customers with first Class solutions and services A WORLD OF SOLUTIONS Group CV 10 of 25
11 Company presentation Goals, Values and Beliefs Our goal at G is simple Extraordinary customer service as we meet our customer's needs in the targeted industries. We accomplish this by providing information and resources to them that frees them up to address the core goals of their business and production, and by partnering with organizations and companies who are as committed to quality as we are. Our goals are accomplished by the commitment of every employee. Our values and beliefs require that we: Treat each employee with respect and listen to their input on how to continually improve our service goals. Treat each employee fairly. G. does not tolerate discrimination of any kind and encourages all supervisors to involve employees in problem solving creativity. When problems arise, the facts are analyzed to determine ways to avoid similar problems in the future. Provide the most effective and efficient corrective action in resolving customer service issues to ensure our customers' satisfaction. Have an open door policy which encourages interaction, discussions and the exchange of ideas to improve the work environment, and increase our productivity. Deliver competitive, outstanding service to our customers and, where required, partner our customers with vendors who share our vision. Make "Do It Right The First Time" our commitment as a team Group CV 11 of 25
12 Company presentation Group Structure G EAST EIT PST Plants Machines Manufacturing Electro-mechanical Contracting Downstream Services Panel Building midstream Agencies / distributors Mechanical steel works Consultancies Electro-Automation Steel structures Projects, Services and Development Weighing bridges (Steel and concrete) Consultant Office 12 of 25
13 References Our staff has conducted the following projects 1- PASTA Lines control system ( Buhler AG Switzerland) commissioning and start-up of 12 Pasta Line with S7-400 PLC system, WINCC SCADA software and WAGO I/O interface., E+H instrumentation, 2- Ball Mill / crushing plant in Helwan- Egypt ( Nile Co roads and bridges) Design and implementation of a full control system for the Limestone Raw Ball mill 25 T/H using PLC system and OP with a total of 150 I/O and 400 KW ABB Frequency converter. 3- Ball Mill / crushing plant in Nouakshout- Mauritania ( AMMANN AG) Design and implementation of a full control system for the Silica Raw Ball mill 5 T/H using PLC system and OP with a total of 150 I/O and 400 KW ABB Frequency converter. 4- Asphalt Batch weighing system design and implementation of 5 system of Asphalt batch weighing system using PLC system and SCADA software package a total of 250 I/0 system. 5- Rise Hammer mill control system ( Buhler AG Switzerland) design and implementation of 3 rice hammer mill using PLC system and Danfos Frequency inverters ) 6- Floor Mill Control and Power system (Buhler AG Switzerland) Design and implementation of conventional control system for 75 motor in the milling process including mimics implementation cable supplies, cable laying, terminations, labeling,( complete plant installations) 7- slide gates control system (Suez cement company) ( 3 systems ) Design and implementation of control system for slide gates control system including panel building. 8- C5 Limestone Reclaimer 1 Upgrading (Suez cement company) Design and implementation of control system for slide gates control system including panel building. 9- Clay Stacker Control upgrade project ( Tourah cement company) Design and implementation of the new stacker control concept including panel building software programming and installation works.
14 10- Upgrade of the EB Fans DC Motor drives ( Suez Cement company ) Design and implementation of new DC Drive panels to control two EB fans motor that include new control concept using ABB DC drives / Siemens PLC s / Camille Bauer Video graphic recorders. 11- Supervision and consultancy for Fabric Home Care (P&G Nigeria Ltd.) Acting as consultant for one year for the Project executed by Orascom for the complete electrical installation of the plant, including rewiring of all control panel to be adapted to the line modification. 12- Industrial Telephone system (Procter and Gamble Nigeria ltd.) Design, implementation and installation a complete industrial telephone system with public addressing system for the factory complex. 13- New computer network system ( Kafr El Zayat pesticides company) design installation and commissioning of a complete 72 node computer network in two building including cable termination, switches and network start-up 14- New Industrial computer network (Egyptian Glass Company) Design, implement and start-up of the new Ethernet / TCP/IP network to connect the process controller and SCADA stations including Fiber optic links, Fiber optic Switches 15- Upgrade and SCADA adjustment (Egyptian Glass Company) upgrade and implementation of new configuration on the ABB Advant OCS system including, Controller and SCADA modifications ) 16- New Telephone PABX system (Organic company for fertilizers) Design, implementation, installation of a 6/16 Panasonic network including cable laying, termination, PABX programming and customization. 17- Upgrade Truck Scale 80 Tons (Menyia Cement Company) Upgrade the truck weighing bridge including new Load cells Sartorius new truck scale controller.. installation calibration 18- New Truck Scale 120 Tons ( El pharos rice milling) New steel weighing bridge 20 x 3 m complete with Sartorius load cells, and electronic including design.. Manufacturing, installation and calibration.
15 19- Power monitoring system (Suez Cement company ) monitoring of the power consumption for 123 motor each with a separate indicator ( Camille Bauer A210 ). The project includes the supply of product, engineering, panel assembly, erection and commissioning on site. 20- Kiln Drive upgrade ( Mineya Cement Company) upgrade and conversion of the Main Kiln drive motor from DC to AC with a new AC drive using ABB products, the project includes, engineering products supply and commissioning supervision 21- Cement Bags counter( Helwan Cement Company) Supply and install of a PLC based control system to count the produced bags from the all production line, (monitoring and counting local in at each bagging station, project includes supply of all material, installation, commissioning. 22- ID Fans Upgrade ( Tourah cement Plant line 7) Design and implementation of new DC Drive panels to control two ID fans motors that include new control concept using ABB DC drives 2500 Amp and 1200 Amp / Siemens PLC s / Camille Bauer Video graphic recorders. 23- Power monitoring system (Helwan Cement Company ) monitoring of the power consumption for 55 motor each with a separate indicator ( Camille Bauer A210 ). The project includes the supply of product, engineering, panel assembly, erection and commissioning on site. 24- ID Fans Upgrade ( Katameya cement Plant ) Design, implementation and installation of Two new DC Drive panels to control two ID fans motors that include new control concept using ABB DC drives 1900 Amp / Siemens PLC s / Camille Bauer Video graphic recorders. 25- Cooler Fans Upgrade ( Katameya cement Plant ) Design, implementation and installation of Three new DC Drive panels to control two ID fans motors that include new control concept using ABB DC drives 640 Amp / Siemens PLC s / Camille Bauer Video graphic recorders. 26- Kiln Drive upgrade ( Tourah Cement Company line7) upgrade the Main Kiln drive motor with a new DC drive using ABB products, the project includes, engineering products supply and commissioning supervision and training.
16 27- Kiln Drive Upgrade ( Katameya Cement Plant ) Design, implementation and installation of New DC drives ( two parallel drive units) for the Main Kiln drives using new control and drive system from ABB, type DCS Amp each.. Including Siemens PLC.. Video graphics recorders Camille Bauer 28- New Rice Mill plant ( El pharana Rice Milling Damitta ) The project is concerned of engineering, supplying, commissioning and installation of the complete electrical package for the Rice milling plant - Main distribution panel - Main MCC panel - IN-feeding MCC panel - Cable routing and cable laying - motors connections - dry test and on load test 29- New office building electromechanical works ( YKK- plant Egypt) all electrometrical works for the new office building includes: - New AC system - New electric network, computer networks, PABX system with IP telephony - New Power distribution system - Dismantling all old installed systems - All lighting system - Earthing system - Raised floor and selling works - Drainage system for the AC units - Supply all cables, cable ducting, cable trays for the whole project 30- New Crusher Plant (Cemex Egypt Attaka quarry) all electric installations at the quarry supply and install: - All project cables - Cable trays, cables roots excavations - ATS Panel - Main distribution panel - Earthing system - Lighting towers - Street Lighting - Cables connections for all crushing plants motors.. terminations and labeling - complete truck scale system 120 Ton 31- Rehabilitation of the LV Distribution panels (EFACO) Complete dismantling of the ( units LV Air Circuit breaker of the 3 Transformers Renewing the Busbar system of the panels Supply, Installation and connection of the New Air Circuit breaker ( Merlin
17 Gerin) renewing the control circuit put into operation the complete system 32- Dismantling and relocation of Pampers production line (P&G) in cooperation with TEC Germany ; we have assists for the complete dismantling, transporting rehabilitation, crating, Container storage, Containers shipping for a complete production line P&G Egypt to Morocco. 33- Upgrade of Additives stacker and reclaimer (Mineya cement plant) Upgrade of the Additives Stacker control system from April PLC system to S7-300 Siemens PLC in addition to operator Touch screen TP270 from Siemens. 34- Dismantling and relocation of Pampers production line (P&G) in cooperation with PSP Germany ; we have assists for the complete dismantling, transporting rehabilitation, crating, Container storage, Containers shipping for a complete production line P&G Egypt to Nigeria. 35- Upgrade of Limestone circular type stacker and reclaimer ((Mineya cement plant) Upgrade of the Additives Stacker control system from April PLC system to S7-300 Siemens PLC in addition to operator Touch screen TP270 from Siemens. 36- Remote evacuation system ( Cemex Plant - Assiut) Design and implement of a new concept remote evacuation system to guide the works during the evacuation process in case of fire the system includes manual calling units, sounders and controllers. 37- Fault recording system for power stations ( Damanhour Power station) The project includes material supply, engineering, implementation and installation of the complete project. The supplies include 5 units of Camille Bauer Video Graphics recorders with 36 channel each for a total of 180 channel to be monitored 38- Power Monitoring System (EFACO) Complete Engineering, supplies of Power monitoring and Analysis system including the dismantling of the old system, erection and commissioning of the new 19 inch rack monitoring and Power calculation and Analysis devices from Camille Bauer that cover to melting furnace. All products supplied from Camille Bauer, Switzerland total signal of 120 signal
18 39- Truck Scale weighing bridge (SINAI Cement) complete design, construction of two weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3.. with our own EAST Software package.. communication between controller and PC over Ethernet protocol 40- Truck Scale weighing bridge (RoyaI Cement) complete design, construction of One weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3.. with our own EAST Software package.. Communication between controller and PC over Ethernet protocol 41- Installation of Oil filling machine ( Misr Petrolium) Erection and commissioning support of a packing machine.. within the scope of work was a manufacturing and installation of stainless Steel buffer tank and pumping system. 42- Truck Scale weighing bridge (PLACO Egyptian Gypsyum Saint Goban) complete design, construction of One weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X Upgrade of Cement Mills system ( Tourah Cement ) Design, implementation, erection and commissioning of a complete control and power system to upgrade the Cement Mills at Line 7 Tourah Cement The project includes: cable Trays supply, routing design and install cables Supply and install Steel Bridges manufacturing and install Power panels Design, manufacturing and install Control Panels Design, manufacturing and install Transformer supply and Install Medium voltage cables supply and install Control system ABB Industrial IT design, supply, install and start-up HMI development Project documentation connections for all projects equipments 44- Truck Scale weighing bridge (Lafarge Quaries) complete design, construction of two weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3.. with our own EAST Software package.. communication between controller and PC over Ethernet protocol
19 45- Electrical works of Cold repair of the Furnace and cutting Line ( EGC Egypt) complete electrical repair of the plant dismantling all control panel to be replaced by Siemens Control systems Renovating all control instrumentation for the furnace, bath and lehr Supply and install necessary SO2 flow meters, special high temperature cables. Supply and install new weighing controllers 46- Truck Scale weighing bridge (Arabian Cement) complete design, construction of Five weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3.. with our own EAST Software package.. communication between controller and PC over Ethernet protocol 47- Automation system for Furnace control (EFACO- Egypt) Design, implementation, erection and commissioning of a complete control and power monitoring system for Two furnaces for each line the project includes: Three control system PLC based ( S7-300) programmed via CFC Connection between the system via Ethernet using Hirshmann self diagnostic switches. Four Scada packages from Intouch each 1000 Tag license Power monitoring and analysis racks from Camille Bauer HMI development Project documentation and client training connections for all projects equipments 48- Electrical panels upgrades for three production lines ( ECC Lafarge - Egypt) Design, manufacturing and installation of new low voltage main breakers panels including adaptation of bus bar system, connection of control circuit and integrating the new addition into the plant network. The job was done in three stage (each stage for one production line) and in a very short time frame during lines shutdowns. 49- Scada Developing and Complete factory panel labeling (Sphinx glass Egypt) developing and connecting one Scada package ( Intouch 1000 Tag) to the current factory network to monitor parts of the batch plant The project comprise as well developing a numbering schema for all the control panels in the factoring.. re-edit all the electrical drawing to include the new numbering schema and to install the new numbers on all the panels wires.
20 50- Kiln Drive Upgrade ( Helwan Cement Plant ) Design, implementation and installation of New DC drives ( two parallel drive units) for the Main Kiln drives using new control and drive system from ABB, type DCS Amp each.. Including Siemens PLC.. Video graphics recorders Camille Bauer 51- Upgrade of Clay linear type stacker and reclaimer (kattameya cement plant) Upgrade of the Additives Stacker and reclaimer control systems from ABB CS31 PLC system to S7-300 Siemens PLC in addition to operator Touch screen MP270 from Siemens, including engineering, software development, hardware upgrade, commissioning and start-up 52- Electrical Installation for Paper production line Line 17&18 (P&G - Egypt) complete installation electrical works, installation material supplies, equipments rentals up to the stage of commissioning and start-up a complete production line P&G Egypt 53- Control system for continuous sub-base plants ( AMMANN DE) design, material purchasing, manufacturing and assembling, commissioning and start-up of 6 fully automatic control systems for Sub-base production pant with capacity of 400 T/h 54- Complete road building Package ( Arab Contractors Egypt) supply and support of one Asphalt plant JB240 ( 240 t/h ), Soil compactors, tandem rollers, excavator, vibratings plates, total 20 machine a complete package of construction equipments from one project from one source. 55- Complete road building Package ( Arab Contractors Chad) supply and support of one Asphalt plant CB180( 180 t/h ), Soil compactors, tandem rollers, pneumatic rollers, total 12 machine a complete package of construction equipments from one project from one source. 56- Complete control system for water plant ( Orascom Egypt) Engineering, procurement and construction of a complete control system managing a water pump station in northern part of Cairo, the deliveries includes, PLC control panel, pressure and flow measurements, power and motor protections. Site erection, commissioning, start-up and documentation. 57- Crane system upgrade in Gold mines ( Nestra- Ghana) complete engineering, assembling and installation of crane control system using ABB ACS 850 Inverter with Crane application modules. 58- Tank Gauging system ( Shell Egypt ) design, material purchasing, manufacturing and assembling, Software Developing, commissioning and start-up of 21 raw material tanks monitoring system using Siemens S7-300 System, with wireless Ethernet network and WinCC V11 package to control the tank filling from the laboratory base.
21 59- Tanks weighing system ( Ascom Egypt ) Supply and commissioning of 6 Sartorius tank weighing system each 200 Tons complete with Load cell, mounting kits, weighing transmitters 60- Tank belt weighing system ( Alexfert Egypt ) Supply and commissioning of One Sartorius tank weighing system 200 Tons complete with Load cell, mounting kits, weighing transmitters and two belt weighing system including all necessary components and controllers 61- Automation system for Turbine control (NPC- Egypt) Design, implementation, erection and commissioning of a complete control and r monitoring system for One turbine the project includes: One DCS control system full redundant ABB AC800 M, and 800 XA stations Connection between the system via Ethernet using Hirshmann self diagnostic switches. 3 Video Graphics records with a total 50 loading and alarming channels HMI development Project documentation and client training connections for all projects equipments
22 Major Customer reference: Assiut Cement Company.(CEMEX) Procter and Gamble Nigeria Procter and Gamble - Egypt Arab Contractors Egypt Arab Contractors Mauritania Arab Contractors Chad Arab contractors - Kuwait Arab contractors Ethiopia Arab contractors - Nigeria Arabian Contracting Company (MMM). Green Valley contracting company Egyptian Cement Company (Lafarge) Egyptian Glass Company (EGC-Guardian) Sphinx glass company Nissan Egypt. FIAT AUTO Egypt Nile co. for Roads constructions. Nile co. for Roads and Bridges Nile co. for Construction & Pavement. GAPCO. Oriental petrochemical (OPC) North Cairo Electrical power station Khalda Petroleum Company. Qaroun Petrolium Company Andalos for food industries Gefco for rice milling Gafco for rice milling Pharos for rice milling Metal Tubes Tony tube manufacturing Buhler AG (Switzerland) Noell (Germany) Suez Cement Company (italcementi group) Alexandria Cement company (Titan) Ameriya Cement Company ( Cimpor) Beni sweif cement Company ( Titan) Egyptian Ferro Alloy Company ( EFACO) Misr Aluminum company Egypt Alexandria Fertilizers ( Uhde) Helwan Fertilizer ( Uhde) Misr Petroleum Egypt Tourah cement Company (italcementi group) Henkel - Egypt Alkan Pharma Egypt YKK Egypt Egyptian Sugar company Upper Egypt Milling company North Cairo Electricity power plant
23 Mineya municipality Egypt Assiut Municipality Egypt Bel Egypt Ascom Egypt Royal cement South Valley cement Fayoum Sugar Company Nobareya Sugar Company Delta Sugar Company
24 Export Countries - Jordan - Kuwait - Nigeria - Ghana - Cameron - Chad - Ethiopia - South Sudan - North Sudan - Syria
25
بتروتك للمقاوالت PETROTEC
GM Message Since our beginning in 2002 we concentrate for not to be the largest but to be the best service provider in our field of interest through cooperation with high qualified expertise and implementing
More informationAswan high dam - Distributed control system AUTOMATION
Aswan high dam - Distributed control system AUTOMATION Power System Overview Aswan High Dam (AHD) -Hydro Power Plant was erected and commissioned in 1972. At the time it was the world's greatest, as well
More informationABB solar inverters Product portfolio
BU LV Drives, 05/2012 ABB solar inverters Product portfolio April 10, 2013 Slide 1 Solar inverter offering Remote monitoring portal Solar inverter PC tools (sizing and product selection) April 10, 2013
More informationABB Wind Care Service Offering
ABB Wind Care Service Offering ABB Wind Care Service Offering ABB is the largest supplier of electrical components, systems, and services to the wind power industry. With continued investment and expansion
More informationProviding Cutting Edge Service Worldwide
Providing Cutting Edge Service Worldwide First page All names and logos of partners and clients used in this presentation are registered trademarks and are used for presentational reasons only, and don
More informationABB in Mining & Mineral Processing Business Unit Mining
Business Unit Mining, 2013 ABB in Mining & Mineral Processing Business Unit Mining May 10, 2013 Slide 1 Business Unit Mining Agenda ABB Structure Overview of BU Mining Product Groups Electrification, Control
More informationProfile. Company Presentation. Supply details. Plants and. The Workshop. The References. Contacts and. Network
Company Presentation THE COMPANY AIS was founded in 2003 and its operations are in Vicenza, in the heart of the Italian northern east region, one of the most important European industrial districts.
More informationELE-OS-E-2002 Start-up Shift Operation Engineer & Permit Coordinator PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS
101934-ELE-OS-E-2002 Start-up Shift Operation Engineer & Permit Coordinator Holds a B. Sc. and a Diploma in Electrical Power & Machines Engineering. Has about 15 years hands-on experience working in operation,
More informationSiemens BRI Summit 2018 Country Pavilion CC China
Siemens BRI Summit 2018 Country Pavilion CC China Siemens in Company in Siemens HQ Manufacturing Facilities: 1 NEM Alexandria Free Zone Healthineers Siemens GAMESA Mentor Graphics Employees: ~ 1100 Page
More informationAsia. Our export programme is manifold but yet specialized in medical consumables as well as premium articles mainly for the U.S. market.
Our business in Asia is reflecting import as well as export activities. Achelis Taiwan Co., Limited (ATCL) being the sole distributor of BOSCH Household Appliances and CARL ZEISS Consumer Optical Products
More informationAutomation in Mining. Underground mining automation project Mark Yseboodt Chile November siemens.com/mining. Restricted Siemens AG 2016
Automation in Mining Underground mining automation project Chile Restricted Siemens AG 2016 siemens.com/mining Automation in Mining: Underground project Table of content Introduction 3 Block Cave 6 Deep
More informationOMAR - Power Generation AUTOMATION
OMAR - Power Generation AUTOMATION SYRIA Power System Overview POWER GENERATION & DISTRIBUTION SYSTEM - OMAR in Al Furat oil fields - Omar, Syria Location: Gas Plant Generators: 2 Devices: 18 Large consumers:
More informationService and Rehabilitation Electrical Power Systems
Service and Rehabilitation Electrical Power Systems From water to wire 3 ANDRITZ HYDRO Electrical Power System Modernization and rehabilitation International technology group ANDRITZ is a globally leading
More informationOrlando, Florida March 25 th, 2013 Automation and Power World 2013 Investor Event
Orlando, Florida March 25 th, 2013 Automation and Power World 2013 Investor Event Safe-harbor statement This presentation includes forward-looking information and statements including statements concerning
More informationB. Sc., Mechanical power science Engineering, May 1987, Monofia University. - Construction Safety Health 30 hours Administration Training by (OSHA).
PM-SOM-E-0137-1987 Mechanical Commissioning Manager He is an expert in fossil fuel power generating plants operation and commissioning. He has 23 years of experience in this field (in Egypt, KSA, Syria
More informationCOMPANY PROFILE DOLCHE ENGINEERING POWER AND ENERGY. Where you get Unlimited Support!
COMPANY PROFILE DOLCHE ENGINEERING POWER AND ENERGY Where you get Unlimited Support! 2016 ABOUT DOLCHE ENGINEERING DOLCHE Engineering is an Ethiopian, domiciled company. The company involved diversified
More informationSolar Farm Electrical Control Buildings & Substation Build Project
Brock s Solar Farm Electrical Control Buildings & Substation Build Project PROJECT PROFILE Canadian Solar Inc. Recognized as a leading global solar manufacturer, Canadian Solar Inc. delivers high-efficiency
More informationMedium Voltage Drives. ABB Value Provider Program Partnership for growth and profit
Medium Voltage Drives ABB Value Provider Program Partnership for growth and profit Partnership for growth and profit As a company with international reach, we are committed globally and locally, to extend
More informationCapabilities Brochure
Eaton Corporation - Electrical Division Capabilities Brochure Australia and New Zealand An Introduction to Eaton Corporation Eaton Corporation is a diversified power management company with 2010 global
More informationUnderground mining seminar
Jan Classon and Mario Inostroza S. April, 2010 Underground mining seminar ABB in the future of underground mining April 12, 2010 Slide 1 AGENDA 1. ABB & Business Unit Overview 1. A global leader in power
More informationModular Standardized Electrical and Control Solutions for Fast Track Projects
Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive
More informationModernisation of a Bucket-Wheel Excavator at the Welzow-South lignite mine, Lausitzer Braunkohle AG, Germany (1996)
Open-pit mining Project report Modernisation of a Bucket-Wheel Excavator at the Welzow-South lignite mine, Lausitzer Braunkohle AG, Germany (1996) The task An SRs 6300.50/15.0+VR bucket-wheel excavator
More informationIntegrated Drive Systems by Siemens
Integrated Drive Systems by Siemens Shift your perspective and maximize your value and efficiency. Most companies spend too much time Managing multiple vendors for multiple components of the drive train
More informationApril 2009 Introducing ABB Bangladesh. ABB Group July 1, 2009 Slide 1
April 2009 Introducing ABB Bangladesh July 1, 2009 Slide 1 Facts about ABB Headquarters: Zurich, Switzerland About 120,000 employees in around 100 countries Orders in 2008: $38.3 billion Revenues in 2008:
More informationJ.N. ROBOTIC AUTOMATION PVT. LTD. Company Presentation
Deepak Sanwal J.N. ROBOTIC AUTOMATION PVT. LTD. Company Presentation JN ROBOTICS July 6, 2017 Slide 1 Company Introduction History & Milestones Constituted in the year 1998 Total employees: 60 approx.
More informationEL KONTROL EOOD Stara Zagora, Bulgaria COMPANY PRESENTATION. Professional Solutions in the Energy Sector
EL KONTROL EOOD Stara Zagora, Bulgaria 2019 COMPANY PRESENTATION Professional Solutions in the Energy Sector EL KONTROL EOOD is a private partnership founded in 1999 in Stara Zagora, Bulgaria. Company
More informationIntegrated Monitoring System Design of Hybrid Aircompressors
Available online at www.sciencedirect.com Procedia Engineering 15 (2011) 938 943 Advanced in Control Engineeringand Information Science Integrated Monitoring System Design of Hybrid Airs Huibin Liang a*,xuehua
More informationModernization of the Rüdersdorfer cement plant a quantum leap in technology
Modernization of the Rüdersdorfer cement plant a quantum leap in technology A large-scale modernization programme undertaken by German cement producer Rüdersdorfer Zement GmbH between 1991 and 1996 has
More informationPower Quality Solutions STATCOM, 100kVAr to 30MVAr Dynamic reactive power compensation
Power Quality Solutions STATCOM, 100kVAr to 30MVAr Dynamic reactive power compensation Dynamic Reactive Compensation Providing stability, security, and reliability to the grid Installing a STATCOM at one
More informationJose Moschioni, ABB Mining Sweden, 2016 ABB Mine to Market How to improve efficiency and safety. ABB Group February 19, 2016 Slide 1
Jose Moschioni, ABB Mining Sweden, 2016 ABB Mine to Market How to improve efficiency and safety February 19, 2016 Slide 1 The mining industry today Main challenges Four key mining industry requirements
More informationGEAR UNITS IN FOCUS. PROCESSES UNDER CONTROL.
FLENDER SERVICES GEAR UNITS IN FOCUS. PROCESSES UNDER CONTROL. DIAGNOSTEX: sensors, diagnostics, services flender.com DIAGNOSTEX Securing process stability requires condition-based maintenance of the drive
More informationTruck Scale Description
NUWEIGH RIDGE SERIES TRUCK SCALE DATA SHEET Description The NUWEIGH Ridge Series has been manufactured to the highest standards and will provide you with a long term solution, the truck scale has been
More informationICX-CMOS-S-2004 Senior I&C Technician PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
102068-ICX-CMOS-S-2004 Senior I&C Technician Holds an Industrial Diploma and has about 14 years hands-on experience working as I&C Technician at several Power Plants and other industrial projects. PERSONAL
More informationINCREASED THE MACHINE PERFORMANCES OF
Tecnolo ecnologia ENGAGED ON PAPER ELECTRONIC AUTOMATION FIELD, SINCE EVER, SAEL HAS REBUILT THE 350-2150 DD2 SINCHRO JAGEMBERG SHEETER DATED 1999 AT PAPIERGARDA PLANT.THE OLD CABINETS HAVE BEEN RENEWED,
More informationA new static DC drive system with AFE for mining excavators
A new static DC drive system with AFE for mining excavators W.M.E.A. Conference in Edmonton, Alberta, Canada June 12 th, 2003 Walter Koellner Siemens Energy & Automation, Alpharetta, USA Requirements for
More informationABB in primary aluminium From mine to market
ABB in primary aluminium From mine to market 2 ABB IN PRIMARY ALUMINIUM FROM MINE TO MARKET Efficiency, availability, productivity and profits Price fluctuations, intense competition, and demands for improved
More informationUnit C of the Scholven Power Plant Automated with System 800xA
Unit C of the Scholven Power Plant Automated with The plant Originally, the plant was intended to serve as a power generation facility supplying auxiliary power to a mine located in a Gelsenkirchen district.
More informationOur new name is. TITAN Double Shaft Hammer Crusher. ThyssenKrupp Industrial Solutions
Our new name is ThyssenKrupp Industrial Solutions www.thyssenkrupp-industrial-solutions.com TITAN Double Shaft Hammer Crusher ThyssenKrupp Industrial Solutions 2 TITAN Double Shaft Hammer Crusher by are
More informationPRODUCT GUIDE INDUSTRIAL AUTOMATION ROBOTS / DRIVE PRODUCTS / SAFETY PRODUCTS / ELECTRICAL PRODUCTS INDUSTRIAL GROUP
INDUSTRIAL GROUP PRODUCT GUIDE Service N Solutions... it s in the name! SNS Industrial Group is NOT just another company which sells products. We are people working with people to explore and provide the
More informationCHEMICALS AND REFINING. ABB in chemicals and refining A proven approach for transforming your challenges into opportunities
CHEMICALS AND REFINING ABB in chemicals and refining A proven approach for transforming your challenges into opportunities 2 ABB in Chemicals and Refining A proven approach for transforming your challenges
More informationCONSTRUCTION EQUIPMENT
Your Preferred One Stop Shop for over 43 Years CONSTRUCTION EQUIPMENT CONCRETE POWER & AIR MATERIAL HANDLING QUARRYING WASTE MANAGEMENT SERVICE & PARTS DUBAI ABU DHABI AL-AIN BASRA - IRAQ cmcgulf.com CONSTRUCTION
More informationTEMPORARY POWER FOR PERMANENT GROWTH
TEMPORARY POWER FOR PERMANENT GROWTH INTERNATIONAL ELECTRICITY RENTAL GenRent is a leading global provider of temporary power solutions including development, planning, rental, installation and operation
More informationApril 2009 Introducing ABB Mauritius. ABB Group July 1, 2009 Slide 1
April 2009 Introducing ABB Mauritius July 1, 2009 Slide 1 Facts about ABB Headquarters: Zurich, Switzerland About 120,000 employees in around 100 countries Orders in 2008: $38.3 billion Revenues in 2008:
More informationBU Power Conversion, 03/2013 ABB solar inverters Product portfolio. ABB Group June 19, 2013 Slide 1
BU Power Conversion, 03/2013 ABB solar inverters Product portfolio June 19, 2013 Slide 1 PV application ABB solar inverters - product portfolio Solar inverter offering Power plants Commercial and industrial
More informationDKR Intelligent Digital AC Vector Drives 35 to 330 hp (26 to 245 kw)
Industrial Hydraulics Electric Drives and Controls Linear Motion and Assembly Technologies Pneumatics Service Automation DKR Intelligent Digital AC Vector Drives 35 to 330 hp (26 to 245 kw) The Drive &
More informationKontakt. Turnkey solutions for hydropower plants An overview of the ABB portfolio
Kontakt Turnkey solutions for hydropower plants An overview of the ABB portfolio ABB is the world s leading provider of products and integrated solutions for power and automation technologies for hydropower
More informationAutomotive Sector - Q Report. Automotive. 1 (2018) Report. American Chamber of Commerce in Egypt - Business Information Center.
Automotive 1 (2018) Report 1 of 6 Special Remarks The Automotive Q1 2018 report provides a comprehensive overview of the Automotive sector with focus on top tenders, big projects and important news. Tenders
More informationSINAMICS SM150. 4/2 Overview. 4/2 Benefits. 4/2 Design. 4/6 Function. 4/8 Selection and ordering data. 4/8 Options
/2 Overview /2 Benefits /2 Design /6 Function /8 Selection and ordering data /8 Options Technical data /1 General technical data /15 Control properties /15 Ambient conditions /16 Installation conditions
More informationPrecision meets innovation custom-made assembly systems
Precision meets innovation custom-made assembly systems bwm line concept bwm assembly lines enable different versions of complex components to be produced, with the option of increasing component variety
More informationProduct overview. Phone Fax
Product overview Arneburger Str. 37n 39590 Tangermünde Germany tangermuende@minda.de Phone +49 39322 996-0 Fax +49 39322 996-66 MINDA Tangermünde Your expert for complex solutions For more than two decades,
More informationABB life cycle services Uninterruptible power supplies
ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you
More informationPPT EN. Industrial Solutions
PPT2015.04.07.00EN Solving complexity of renewable energy production Reliability of supply Wind and photovoltaic are non-dispatchable generators. Production is dictated by weather conditions, not users
More informationApril 18 25, National Exhibition and Convention Center (Shanghai)
April 18 25, 2019 National Exhibition Convention Center (Shanghai) Organizers China Association of Automobile Manufacturers China Council for the Promotion of International Trade, Shanghai Sub-Council
More informationTraining. instrumentation. Maintenance. Installation. Services
Spares parts Automation Training instrumentation Maintenance Installation Services Automelec is a company specialized in consulting, study, programming, erection and commissioning in tradesof: Electrical
More informationMicrogrid solutions Delivering resilient power anywhere at any time
Microgrid solutions Delivering resilient power anywhere at any time 2 3 Innovative and flexible solutions for today s energy challenges The global energy and grid transformation is creating multiple challenges
More informationCONTENTS. TECHNOLOGY FOR THE FUTURE... 3 Kongsberg EmPower... 4 GLOBAL CUSTOMER SUPPORT... 7
Kongsberg EmPower OUR MISSION We shall earn the respect and recognition for our dedication to provide innovative and reliable marine electronics that ensure optimal operation at sea. By utilising and integrating
More informationSMALL CONSTRUCTION EQUIPMENTS
SMALL CONSTRUCTION EQUIPMENTS SR NO CONCRETE MIXERS 1 [CM-1] FULL BAG CONCRETE MIXER WITH MECHANICAL HOPPER MOUNTED ON [500 19] TYRES CONCRETE MIX 200 LTS A] 6 HP AIR COOLED DIESEL B] 3PH 5 HP ELECTRIC
More informationUNITROL 6800 excitation systems Proven performance solutions
UNITROL 6800 excitation systems Proven performance solutions Setting the standard ABB is the world leading volume supplier of UNITROL automatic voltage regulators (AVR) and static excitation systems (SES)
More informationReprinted from JANUARY Amreyah Cimpor Cement Co., Egypt. Create value Integrated solutions for cement with ABB Industrial IT
Reprinted from JANUARY 2004 Amreyah Cimpor Cement Co., Egypt Create value Integrated solutions for cement with ABB Industrial IT History The Egyptian Public National Cement Industry founded Amreyah Cement
More information1 - Hydraulic Crane 5 tm 80 tm 2 - Aerial lift 265 kg 365 kg 3 - Lifting platform 265 kg 1500 kg 4 - Winding-Unrolling 400 dan
1 Superstructures 1 - Hydraulic Crane mini : 5 tm 2 maxi : 80 tm 2 - Aerial lift Capacity mini : 265 kg 3 maxi : 365 kg 3 - Lifting platform Capacity mini : 265 kg maxi : 1500 kg 4 - Winding-Unrolling
More informationCompany presentation COR-GN-PR-EN-21
Company presentation COR-GN-PR-EN-21 45 years of history 1966 1969 1973 1983 1993 Creation of SDMO by the MEUNIER Group SDMO focuses on the manufacture of generating sets Office established in Paris and
More informationTOWER CRANES PASSENGER HOISTS GENERATORS SPARE PARTS
TOWER CRANES PASSENGER HOISTS GENERATORS SPARE PARTS C O N T E N T S About the Company Overview Quality Policy ISO Certificate Services Mission Statement Core Value Our People Our Equipment Our Products
More informationDAEWOO HEAVY INDUSTRIES & MACHINERY
www.dhiltd.co.kr DAEWOO HEAVY INDUSTRIES & MACHINERY November 2003 Our projections in this document are based on current economic conditions and DHIM s current management policy. www.dhiltd.co.kr CONTENTS
More informationZPMC Lanka Company (Pvt) Ltd
ZPMC Lanka Company (Pvt) Ltd ZPMC Lanka Company (Private) Limited is a BOI approved company, established in 2013 to provide services to the port sector of Sri Lanka and the region. It is a joint venture
More informationGuri Dam. Ingenuity and energy
Guri Dam Modernization of the Guri hydroelectric plant s control, protection and instrumentation system Eduardo Colmenares, Daniel Rubinstein, Miguel Florez In 2005, ABB was awarded a contract to design,
More informationReference catalogue
12 / 2011 Reference catalogue 2011-2012 Slip-ring induction motors High voltage motors Competent Service From stock Quality Engaging Three-phase motors Know-How Gear motors Guidance Reliability DC motors
More informationMedium voltage drive for single or multimotor applications, 3 27 MW
MV Drives, ATD, October 2009 ACS 6000 Medium voltage drive for single or multimotor applications, 3 27 MW September 19, 2012 Slide 1 Features and benefits Modular drive for single or multi-motor applications,
More informationRAPIDMIX 400CW. Length of Machine (19.5m) Length when erected Width of Machine 9-10 (3.00 m) Width Same
Machinery Manufacturers to the Concrete Industry RAPIDMIX 400CW The Rapidmix 400CW has been designed to be totally mobile and completely self-contained with its own power source. It is also completely
More informationProtection & Control / Commissioning Engineer
Protection & Control / Commissioning Engineer Are you ready to be a technology pioneer? Oil and gas factories 3000 meters underwater, heavy locomotive traction motors, electric vehicle chargers that deliver
More informationProduct Overview. Soft Starters Motor Protection Control and Measurement. Solcon Industries Ltd.
Product Overview Soft Starters Motor Protection Control and Measurement Solcon Industries Ltd. Medium Voltage Soft Starters HRVS-DN Medium Voltage Soft Starter, 50-2500A, 1500-15000V Incorporating microprocessor
More information01 Contents. Introduction Products
Company profile. Introduction Products - Low Voltage Switch Boards - Distribution Boards - Motor Control Center (MCC) - Automatic Transfer Switches ( ATS Panels) - Capacitor Banks - Synchronizing Panels
More informationElectrical Energy Engineering Program EEE
Faculty of Engineering Cairo University Credit Hours System Electrical Energy Engineering Program EEE June 2018 Electrical Engineers: What they do? Electrical engineers specify, design and supervise the
More informationCompany Profile. Al-Moughrabi & Al-Solh Trading Co. (L.L.C.)
Company Profile THE POWER AT YOUR CHOICE table of contents about us products services product quality company registration projects archive 04 06 10 13 14 15 03 about us, also known as (mte), prides itself
More informationPower Conversion System The Best Technology for your photovoltaic and storage system
The Best Technology for your photovoltaic and storage system The Best Technology for your photovoltaic and storage system EEI. Experience and Reliability since 1978 EEI s mission started in 1978 coming
More informationRevamp of an Electric Shovel with variable frequency drives in IGBT technology iron-ore mine Peña Colorada, Mexico (1999)
Open-pit mining Project report Revamp of an Electric Shovel with variable frequency drives in IGBT technology iron-ore mine Peña Colorada, Mexico (1999) Kohlemisch- und Stapelplatz mit Neubaukraftwerk
More informationHigh Efficiency Drives. Systems Integration State-of-the-art solutions for any system
High Efficiency Drives Systems Integration State-of-the-art solutions for any system 02 Introduction 03 REEL are expert System Integrators Our product offering About us REEL was founded over 30 years ago
More informationActivity of YASKAWA for Industrie 4.0 -Focus on Robotics-
Activity of YASKAWA for Industrie 4.0 -Focus on Robotics- 1.Introduction of our company and products. 2.Concept for Our Industrie 4.0. 3.YASKAWA s Industrie 4.0 for Robotics. 4.Expectation for Industry
More informationIntroduction worldcement.com 41
Vietnam s largest cement production plant, the Cam Pha Cement plant of the Vietnam Construction and Import- Export Corporation (Vinaconex), has been electrified by ABB. Max Tschurtschenthaler, Project
More informationLow Voltage Systems MNS platform
Low Voltage Systems MNS platform MNS a long successful history ABB is worldwide leader in the production of low voltage switchgears with more than 1.4 million of MNS systems installed since the introduction
More informationPV Off-Grid Market Trends and Business Opportunities in Southeast-Asia
PV Off-Grid Market Trends and Business Opportunities in Southeast-Asia Project Development Programme (GIZ), Regine Dietz www.renewables-made-in-germany.com Brief Introduction to the Project Development
More informationNIDEC INDUSTRIAL SOLUTIONS. Innovation for Cool Earth Forum 5th Annual Meeting Tokyo Japan. Franck GIRARD 11 th October, 2018
NIDEC INDUSTRIAL SOLUTIONS Innovation for Cool Earth Forum 5th Annual Meeting Tokyo Japan Franck GIRARD 11 th October, 2018 Nidec Company Introduction Microgrid in Chile Microgrid in Chad 1/18 Nidec Corporation
More informationATS CHEM EQUIPMENTS PVT. LTD.,
ATS CHEM EQUIPMENTS PVT. LTD., AN ISO 9001:2015 CERTIFIED COMPANY Unit 1, C 27, SIDCO Industrial Estate, Hosur 635 126, Tamil Nadu, India. Phone No: 04344 276731, Mail ID: atschem@gmail.com Unit II, 16
More informationIntegrated Solutions for LNG operations. Kongsberg Maritime
Integrated Solutions for LNG operations Kongsberg Maritime International high-tech solutions, from deep sea to outer space Advanced solutions and applications for the maritime, oil & gas, defence and space
More informationTo Our Business Partners
CSR CSR > Social Performance > To Our Business Partners To Our Business Partners We build relationships of trust by engaging in open communication, with mutual prosperity as our goal. To Our Dealers Basic
More informationDriving the road to greater productivity through automation
Peter Terwiesch Chief Technology Officer ABB Automation Technologies Driving the road to greater productivity through automation ABB Group - 1 - The ABB Automation Technologies landscape Process Automation
More informationSlide 1. ABB September 9, 2015
Tarak Mehta, Head of Low Voltage Products, ABB Ltd., Capital Markets Day, Next Level Stage 2 New Electrification Products division: Power & Automation for the site Slide 1 Important notices Presentations
More informationAce Automation Engineers
+91-8071801471 Ace Automation Engineers https://www.indiamart.com/aceautomationengineer/ We manufacture and supply Hydraulic Power Packs, Oil Pumping Skids, Hydraulic Cylinders, Systems for Dam Gates,
More informationGE Energy. Variable Frequency Transformers Grid Inter-tie
GE Energy Variable Frequency Transformers Grid Inter-tie Variable Frequency Transformers GE Energy revolutionizes the world of transmission solutions with its new Variable Frequency Transformer (VFT).
More informationPower Electronics
www.nidec-industrial.com Power Electronics NIS. A Tradition in Excellence. Nidec Industrial Solutions: destined to be number one in industrial drive solutions With over 150 years of experience in the
More informationSiemens Com www.alfazalengineering.com Company Introduction Al-Fazal Engineering is Authorized Dealer of Siemens Components supply and Services also we are electrical construction material manufacturing
More informationZhengzhou Dingsheng Engineering Technology Co.,Ltd
Zhengzhou Dingsheng Engineering Technology Co.,Ltd dscrusher@yahoo.cn www.dscrusher.com 1 Roller Crusher overview Our company has introduced advanced roller crusher technology from abroad and combined
More informationELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS
104660-ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has about 14 years hands-on experience in low, medium voltage and
More informationProduct brochure. Medium voltage AC drive ACS 2000, kva, kv
Product brochure Medium voltage AC drive ACS 2000, 400 1000 kva, 6.0 6.9 kv 2 ACS 2000 brochure ABB ACS 2000 simple and reliable motor control The ACS 2000 is the latest member of the ABB medium voltage
More informationLiebherr Troubleshoot Advisor
Liebherr Troubleshoot Advisor Worldclass support everywhere, every day 2 Liebherr Troubleshoot Advisor As a global mining solutions provider, Liebherr is more than a mining equipment manufacturer. Ensuring
More informationCorporate Profile Edition. as of April 28, 2017
Corporate Profile 2017 Edition as of April 28, 2017 Contents 1. Profile 2. The DENSO Philosophy 3. History of DENSO 4. Organization 5. Business Group 6. Main products : Automotive Fields 7. Main products
More informationHEAVY EQUIPEMENTS R.C.DAS ENGINEERING
MANUFACTURING HEAVY EQUIPEMENTS R.C.DAS ENGINEERING Engineering Excellence PRODUCTS CLINKER HAMMER CRUSHER Clinker is a Lump or Nodules (usually 3-25mm diameter) which is produced by sintering Limestone
More information596 Rectifier Retrofit
PRODUCT OVERVIEW 596 Rectifier Retrofit Overview GE Energy has offered the 596 family of rectifiers from the early 1990s. 596 rectifiers can be found in the GPS4812, 2424, PXS Shelves, and OCS Cabinet
More informationINTRODUCTION HISTORY. Enfocus Software - Customer Support
INTRODUCTION Address : No. 7-2, San-Hu Li, Yangmei City 32669, Taoyuan, Taiwan Date of Incorporation : January 11, 1966 Capital : NT$362 Million (US$ 11 Million) President : Ming-Yih Cheng Products: Mining
More informationAmpl2m. Kamil Herman Author of Ampl2m conversion tool. Who are you looking at
Who are you looking at Kamil Herman Author of conversion tool Senior automation engineer Working in Automation with ABB control systems since 1995 6 years in ABB Slovakia 2 year working for ABB Mannheim,
More informationForce Control for Machining Applications
Bernd Kuhlenkötter Head of Product Management & Technology 10.01.2008 Force Control for Machining Applications Robotics - 1 July 2007 Facts about ABB Robotics - 2 October 2007 Headquarters: Zurich, Switzerland
More information