1 Fukushima Daiichi Accident Technical Causal Factor Analysis 2012 TECHNICAL REPORT

2

3 Fukushima Daiichi Accident Technical Causal Factor Analysis Final Report, March 2012 EPRI Project Manager K. Huffman This document does NOT meet the requirements of 10CFR50 Appendix B, 10CFR Part 21, ANSI N and/or the intent of ISO-9001 (1994) ELECTRIC POWER RESEARCH INSTITUTE 3420 Hillview Avenue, Palo Alto, California PO Box 10412, Palo Alto, California USA

4 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES THIS DOCUMENT WAS PREPARED BY THE ORGANIZATION(S) NAMED BELOW AS AN ACCOUNT OF WORK SPONSORED OR COSPONSORED BY THE ELECTRIC POWER RESEARCH INSTITUTE, INC. (EPRI). NEITHER EPRI, ANY MEMBER OF EPRI, ANY COSPONSOR, THE ORGANIZATION(S) BELOW, NOR ANY PERSON ACTING ON BEHALF OF ANY OF THEM: (A) MAKES ANY WARRANTY OR REPRESENTATION WHATSOEVER, EXPRESS OR IMPLIED, (I) WITH RESPECT TO THE USE OF ANY INFORMATION, APPARATUS, METHOD, PROCESS, OR SIMILAR ITEM DISCLOSED IN THIS DOCUMENT, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, OR (II) THAT SUCH USE DOES NOT INFRINGE ON OR INTERFERE WITH PRIVATELY OWNED RIGHTS, INCLUDING ANY PARTY'S INTELLECTUAL PROPERTY, OR (III) THAT THIS DOCUMENT IS SUITABLE TO ANY PARTICULAR USER'S CIRCUMSTANCE; OR (B) ASSUMES RESPONSIBILITY FOR ANY DAMAGES OR OTHER LIABILITY WHATSOEVER (INCLUDING ANY CONSEQUENTIAL DAMAGES, EVEN IF EPRI OR ANY EPRI REPRESENTATIVE HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES) RESULTING FROM YOUR SELECTION OR USE OF THIS DOCUMENT OR ANY INFORMATION, APPARATUS, METHOD, PROCESS, OR SIMILAR ITEM DISCLOSED IN THIS DOCUMENT. REFERENCE HEREIN TO ANY SPECIFIC COMMERCIAL PRODUCT, PROCESS, OR SERVICE BY ITS TRADE NAME, TRADEMARK, MANUFACTURER, OR OTHERWISE, DOES NOT NECESSARILY CONSTITUTE OR IMPLY ITS ENDORSEMENT, RECOMMENDATION, OR FAVORING BY EPRI. THE FOLLOWING ORGANIZATIONS PREPARED THIS REPORT: Electric Power Research Institute (EPRI) Lucius Pitkin, Inc. THE TECHNICAL CONTENTS OF THIS DOCUMENT WERE NOT PREPARED IN ACCORDANCE WITH THE EPRI NUCLEAR QUALITY ASSURANCE PROGRAM MANUAL THAT FULFILLS THE REQUIREMENTS OF 10 CFR 50, APPENDIX B AND 10 CFR PART 21, ANSI N AND/OR THE INTENT OF ISO-9001 (1994). USE OF THE CONTENTS OF THIS DOCUMENT IN NUCLEAR SAFETY OR NUCLEAR QUALITY APPLICATIONS REQUIRES ADDITIONAL ACTIONS BY USER PURSUANT TO THEIR INTERNAL PROCEDURES. NOTE For further information about EPRI, call the EPRI Customer Assistance Center at or askepri@epri.com. Electric Power Research Institute, EPRI, and TOGETHER SHAPING THE FUTURE OF ELECTRICITY are registered service marks of the Electric Power Research Institute, Inc. Copyright 2012 Electric Power Research Institute, Inc. All rights reserved.

5 ACKNOWLEDGMENTS The following organizations prepared this report: Electric Power Research Institute (EPRI) 1300 West W.T. Harris Blvd. Charlotte, NC Principal Investigator K. Huffman Lucius Pitkin Inc. 304 Hudson St. New York, NY Principal Investigators P. Bruck T. Esselman P. Streeter This report describes research sponsored by EPRI. This publication is a corporate document that should be cited in the literature in the following manner: Fukushima Daiichi Accident Technical Causal Factor Analysis. EPRI, Palo Alto, CA: iii

6

7 ABSTRACT On March 11, 2011, the Fukushima Daiichi nuclear power plant experienced a seismic event and subsequent tsunami. The accident and the ensuing mitigation and recovery activities occurred over several days, involved a number of incidents, and might provide several opportunities for lessons learned. The objective of this report is to determine the fundamental causative factors for the loss of critical systems at the Fukushima Daiichi reactors that resulted in core damage and subsequent radioactive release. The analytical approach used structured event information to support the identification of causal factors; this information can be used in root cause analysis and corrective action determinations. The technical analysis traced the cause for the eventual loss of all practical cooling paths for the reactors to the tsunami s flooding of the plant protection. Specifically, the analysis identified the significant difference between the design basis tsunami height and the actual tsunami height, as well as the limitations of beyond-design-basis tsunami protection or mitigation that could address the effects of the actual event. From a causal analysis perspective, these were caused by a methodology that specified that the rupture of combinations of geological fault segments in the vicinity of the plant need not be considered in establishing the design basis tsunami height. The tsunami that occurred was caused by a combined rupture of multiple fault segments. Keywords Earthquake Fukushima Daiichi Tsunami v

8

9 CONTENTS 1 INTRODUCTION Background ACCIDENT TIMELINES Unit Unit Unit SEISMIC AND TSUNAMI DESIGN BASES Seismic Tsunami MARCH 11 SEISMIC EVENT MARCH 11 TSUNAMI PLANT CAPABILITIES AND RESPONSE Operational Capabilities and Response Seismic Capabilities and Response Tsunami Capabilities and Response CAUSAL ANALYSIS Plant Protection Actual Event Comparison of Design Basis and Actual Event Causal Analysis CONCLUSIONS REFERENCES vii

10

11 LIST OF FIGURES Figure 1-1 Arrangement of Fukushima Daiichi Units Figure 2-1 Flow Diagram of Cooling Systems, Unit 1, with ECCS Highlighted Figure 2-2 Flow Diagram of Cooling Systems, Units 2 and 3, with ECCS Highlighted Figure 2-3 High Pressure Coolant Injection (HPCI) Flow Diagram, Units Figure 2-4 Isolation Condenser (IC) Flow Diagram, Unit Figure 2-5 Reactor Core Isolation Cooling (RCIC) Flow Diagram, Units 2 and Figure 2-6 Residual Heat Removal Flow Diagram, Units 2 and Figure 2-7 Reactor Shutdown Cooling (SHC) Flow Diagram, Unit Figure 2-8 Main Steam Safety Relief Valve (MSRV) Flow Diagram, Unit Figure 2-9 Main Steam Safety Relief Valve (MSRV) Flow Diagram, Units 2 and Figure 2-10 DC Power Supply System, Unit Figure 2-11 DC Power Supply System, Units 2 and Figure 3-1 Comparison of Original Seismic Spectra with Revised Seismic Spectra Figure 4-1 Measured Horizontal East-West Seismic Spectra Compared to the Design Basis Spectra for Units 2, 3, and Figure 5-1 Plan View of Site (Units 1 to 4 Only) Showing Flooded Regions Following the Tsunami Figure 5-2 Section View (Approximate) through Unit 1 Showing Flood Depth Figure 5-3 Photos at Points A and B in Figure Figure 5-4 Photos at Point C Showing Flooding Progression Figure 5-5 Photos Showing Seawall During the Tsunami Figure 7-1 Causal Chart ix

12

13 LIST OF TABLES Table 1-1 Comparison of Units 1 to Table 2-1 Units 1-3 Power Source Unavailability Following the Earthquake/Tsunami Table 2-2 Status of Electrical Supply after Tsunami Table 4-1 Maximum Measured Acceleration Values Compared to the Design Basis Acceleration Values Table 6-1 Timeline of Key Cooling Systems Failures xi

14

15 1 INTRODUCTION On March 11, 2011, the Fukushima Daiichi nuclear power plant experienced a seismic event and subsequent tsunami. This event has been broadly reported [1-6]. The objective of this report is to determine the fundamental causative factors for the loss of critical systems at the Fukushima Daiichi reactors that resulted in core damage and subsequent uncontrolled release of radioactive materials to the environment. An events and causal factors analysis approach was used that structures event information and supports identification of causal factors that can then be used in root cause and corrective action determinations [13]. The purpose for determining these causal factors is to ensure that: (1) the most important factors that caused the accident are highly evident; and (2) this knowledge will support identification of safety improvements that are meaningful and appropriate. This report accomplishes the first of these two purposes. The plant response after the loss of critical systems at Fukushima Daiichi is not described here because the intent of this report is to identify the factors that led to loss of critical systems that then resulted in core damage. Because only Units 1 through 3 were operating at the time of the events, the primary focus of this report is on Units 1 through 3. Background Fukushima Daiichi consists is located along the northeast coast of Japan, bordering the western edge of the Pacific Ocean. Initial siting occurred between 1967 and 1973, with each of the six units coming on-line between 1971 and Operational startup dates, power output, and general design information are shown in Table 1-1 [2]. Table 1-1 Comparison of Units 1 to 6 Unit Startup MWe Output Reactor Type, Containment High Pressure Cooling* BWR-3, Mark I IC, HPCI BWR-4, Mark I RCIC, HPCI BWR-4, Mark I RCIC, HPCI BWR-4, Mark I RCIC, HPCI BWR-4, Mark I RCIC, HPCI BWR-5, Mark II RCIC, HPCS * IC: Isolation Condenser HPCI: High Pressure Coolant Injection RCIC: Reactor Core Isolation Cooling HPCS: High Pressure Core Spray 1-1

16 Introduction The plant is designed such that grouped units share some common facilities and structures, such as control rooms, and vent stacks. This commonality applies to Units 1 and 2, Units 3 and 4, and Units 5 and 6. In addition to individual unit spent fuel pools, the plant also has a shared spent fuel pool and a shared dry cask storage facility. The shared pool and the dry cask storage are for all six units, with older spent fuel having been transferred from the individual unit pools to the shared pool or dry cask storage on a periodic basis. The shared spent fuel pool is located on the inland side (west) of Unit 4. The dry cask storage facility is located between Units 1 and 5 along the coast. The general relation between the units prior to the earthquake and the tsunami is shown in Figure 1-1. Figure 1-1 Arrangement of Fukushima Daiichi Units 1-2

17 2 ACCIDENT TIMELINES An overview of the events as they occurred is presented here, noting only those items considered of significance relative to the times when critical systems were lost. The overview of the events provides the timeline on a per Unit basis. Within each unit, the timeline is further broken down by system, as appropriate, with key events/actions indicated. The timelines are not inclusive, but focus on systems that could provide cooling functions. The timelines continue until the safety systems become unavailable. Flow diagrams extracted from [1] are included as Figures 2-1 to 2-9 and these apply to Units 1, 2, and 3 as identified on each figure. Systems identified as being with the emergency core cooling system (ECCS) are identified on the overall cooling system flow diagrams in Figures 2-1 and 2-2. The time of the first seismic ground motion is considered the baseline and all subsequent events are identified both in real plant time and differential time from this baseline. Timeline data are taken from [1], [4], [5], and [6]. Equipment elevation data (where identified) are taken from [1]. For reference, all elevations are given with respect to the base tide level used for original construction and are identified as O.P. referring to Onahama Peil (level). Thus, the base water level is O.P. 0.0m and site grade for Units 1 to 3 is approximately O.P m. A key to understanding the inability of critical systems to function is the unavailability of power sources following the earthquake and tsunami. To this end, information from [1], [5] and [6] are summarized in Table 2-1. This table describes the unavailability causes of the normal site power sources for each unit. Table 2-2 extracted from [6] repeats some of the information from Table 2-1 but in a different fashion. Figures 2-10 and 2-11 show DC power supply diagrams for Unit 1 and Units 2/3, respectively extracted from [1]. All off-site AC power was lost as a result of the earthquake. The loss of on-site AC power was caused by the submergence of the emergency diesel generators and electrical distribution system equipment inside the plants. Loss of DC power in Units 1 and 2 was caused by submergence of electrical distribution system equipment. The loss of DC power in Unit 3 to some systems was caused by submergence of electrical distribution system equipment and then eventually by full discharge of the batteries. 2-3

18 Accident Timelines Unit 1 UNIT 1: ISOLATION CONDENSER (IC) (location: Reactor Building (RB) 4 th floor, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ Emergency diesel generators (EDGs) start on loss of offsite power 3/11/ IC's start automatically 3/11/ IC's manually removed from service 3/11/ IC(A) restarted 3/11/ IC(A) stopped 3/11/ IC(A) restarted 3/11/ IC(A) stopped 3/11/ first tsunami hits 3/11/ IC(A) restarted 3/11/ IC(A) stopped 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ valve status of IC lost on control panel 3/11/ partial DC power returned, IC(A) placed in service (steam observed from condenser) 3/11/ IC(A) removed from service 3/11/ IC(A) placed in service (steam observed) 3/12/ IC(A) stopped (diesel-driven fire protection pump failed) UNIT 1: HIGH PRESSURE CORE INJECTION (HPCI) (location: RB basement, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ HPCI determined to be non-functional 2-4

19 Accident Timelines UNIT 1: OTHER HIGH PRESSURE SYSTEMS -- STANDBY LIQUID CONTROL (SLC), CONTROL ROD DRIVE (CRD) WATER (location SLC: unknown) (location CRD: unknown) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ SLC, CRD non-functional due to loss of AC power UNIT 1: OTHER POTENTIAL COOLING SYSTEMS CONTAINMENT COOLING (CCS), CLOSED COOLING SEA WATER (CCSW), MAKEUP WATER (MUWC), FIRE PROTECTION, SPENT FUEL POOL (SFP) COOLING (location CCS: RB basement, elev = O.P m) (location CCSW: outdoors, elev = O.P m) (location MUWC: TB basement, elev = O.P m) (location fire protection: unknown) (location SFP: RB 3 rd floor, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ CCS, CCSW, MUWC, SFP, motor-driven fire protection pump non-functional due to loss of AC power 2-5

20 Accident Timelines Unit 2 UNIT 2: REACTOR CORE ISOLATION COOLING (RCIC) (location RCIC: RB basement, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ RCIC started by operators 3/11/ RCIC tripped due to high reactor water level 3/11/ RCIC started by operators 3/11/ first tsunami hits 3/11/ RCIC tripped due to high reactor water level 3/11/ second tsunami hits 3/11/ RCIC started by operators 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ RCIC operational status unknown 3/11/ RCIC operational status still unknown; no reactor water level indication 3/12/ RCIC apparently still running based on walkdown (sounds only) 3/12/ RCIC apparently still running based on RCIC discharge pressure being high 3/12/ RCIC water source changed from condensate storage tank to suppression chamber 3/12/ RCIC still operating 3/13/ RCIC still operating 3/13/ RCIC still operating 3/14/ RCIC assumed failed based on lowered reactor water level 2-6

21 Accident Timelines UNIT 2: HIGH PRESSURE CORE INJECTION (HPCI) (location HPCI: RB basement, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ HPCI determined to be non-functional UNIT 2: OTHER HIGH PRESSURE SYSTEMS -- STANDBY LIQUID CONTROL (SLC), CONTROL ROD DRIVE (CRD) WATER (location SLC: unknown) (location CRD: unknown) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ SLC, CRD non-functional due to loss of AC power 2-7

22 Accident Timelines UNIT 2: LOW PRESSURE SYSTEMS CORE SPRAY (CS), RESIDUAL HEAT REMOVAL (RHR), RESIDUAL HEAT REMOVAL SEAWATER (RHRS) (location CS: RB basement, elev = O.P m) (location RHR: RB basement, elev = O.P m) (location RHRS: outdoors, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ CS, RHR, RHRS non-functional due to loss of AC power UNIT 2: OTHER POTENTIAL COOLING SYSTEMS MAKEUP WATER (MUWC), FIRE PROTECTION, SPENT FUEL POOL (SFP) COOLING (location MUWC: Turbine Building (TB) basement, elev = O.P m) (location fire protection: unknown) (location SFP: RB 3 rd floor, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ MUWC, SFP, motor-driven fire protection pump nonfunctional due to loss of AC power 2-8

23 Accident Timelines Unit 3 UNIT 3: REACTOR CORE ISOLATION COOLING (RCIC) (location RCIC: RB basement, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs started 3/11/ RCIC manually started 3/11/ RCIC tripped on high reactor water level 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ RCIC manually restarted 3/12/ RCIC tripped 3/13/ RCIC could not be restarted UNIT 3: HIGH PRESSURE CORE INJECTION (HPCI) (location HPCI: RB basement, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ HPCI prepared for startup 3/12/ HPCI automatically started on low reactor water level 3/12/ HPCI injection continues 3/13/ HPCI tripped (all water injection sources lost) 3/13/ HPCI could not be restarted due to depleted batteries 2-9

24 Accident Timelines UNIT 3: OTHER HIGH PRESSURE SYSTEMS STANDBY LIQUID CONTROL (SLC), CONTROL ROD DRIVE (CRD) WATER (location SLC: unknown) (location CRD: unknown) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ SLC, CRD non-functional due to loss of AC power UNIT 3: LOW PRESSURE SYSTEMS CORE SPRAY (CS), RESIDUAL HEAT REMOVAL (RHR), RESIDUAL HEAT REMOVAL SEAWATER (RHRS) (location CS: RB basement, elev = O.P m) (location RHR: RB basement, elev = O.P m) (location RHRS: outdoors, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ CS, RHR, RHRS non-functional due to loss of AC power 2-10

25 Accident Timelines UNIT 3: OTHER POTENTIAL COOLING SYSTEMS MAKEUP WATER (MUWC), FIRE PROTECTION, SPENT FUEL POOL (SFP) COOLING (location MUWC: TB basement, elev = O.P m) (location fire protection: unknown) (location SFP: RB 3 rd floor, elev = O.P m) Date Time Diff (hrs) Event/Action 3/11/ seismic ground motions exceed setpoints 3/11/ scram signal initiated, control rods inserted 3/11/ EDGs start on loss of offsite power 3/11/ first tsunami hits 3/11/ second tsunami hits 3/11/ loss of all AC power 3/11/ loss of all DC power 3/11/ Makeup water, motor-driven fire protection pump, containment vessel cooling non-functional due to loss of AC power 2-11

26 Accident Timelines Table 2-1 Units 1-3 Power Source Unavailability Following the Earthquake/Tsunami Unit Power Source Description of Unavailability Cause Unit 1 Off-site power The receiving circuit breaker of the Ookuma Line 1L in the Unit 1 / 2 switchyard was damaged by the earthquake Emergency diesel generator 6.9 kv high voltage AC power supply 480V low voltage AC power supply 125V DC power supply Submergence of both emergency diesel generators due to the tsunami Submergence of the 6.9 kv high voltage AC power supply panels due to the tsunami Submergence of the 6.9 kv high voltage AC power supply panels due to the tsunami Submergence of the 480V low voltage AC power supply panels due to the tsunami Submergence of the 125V DC power supply panels due to the tsunami Unit 2 Off-site power source The receiving circuit breaker of the Ookuma Line 2L in the Unit 1 / 2 switchyard was damaged by the earthquake Emergency diesel generator 6.9 kv high voltage AC power supply 480V low voltage AC power supply 125V DC power supply The circuit breaker for the Ookuma Line 2L in the New Fukushima substation was damaged by the earthquake One emergency diesel generator was submerged in water due to the tsunami and the power source panels for another, air cooled emergency diesel generator, was submerged due to the tsunami Submergence of the 6.9 kv high voltage AC power supply panels due to the tsunami Submergence of the 6.9 kv high voltage AC power supply panels due to the tsunami Partial submergence of the 480V low voltage AC power supply panels due to the tsunami Submergence of the 125V DC power supply panels due to the tsunami Unit 3 Off-site power Ookuma Line 4L was damaged by the earthquake between the plant switchyard and the off-site substation, Ookuma Line 3L was out of service for planned renovation work Emergency diesel generator 6.9 kv high voltage AC power supply 480V low voltage AC power supply 125V DC power supply Submergence of both emergency diesel generators due to the tsunami Submergence of the 6.9 kv high voltage AC power supply panels due to the tsunami Submergence of the 6.9 kv high voltage AC power supply panels due to the tsunami Submergence of the 480V low voltage AC power supply panels due to the tsunami The DC power supply batteries were exhausted 2-12

27 Accident Timelines Table 2-2 Status of Electrical Supply after Tsunami EDG 6.9 kv Electrical Distribution 480V Power Centers (P/C) DC Power UHS 125V Non-Vital Vital Non-Vital Vital Unit 1 Unit 2 Unit 3 Equipment Name Status Equipment Name Status Equipment Name Status EDG 1A* X EDG 2A* X EDG 3A* X EDG 1B* X EDG 2B air EDG 3B* X X cooled*** M/C 1C** X M/C 2C* X M/C 3C* X M/C 1D** X M/C 2D* X M/C 3D* X M/C 2E* X M/C 1A X M/C 2A X M/C 3A X M/C 1B X M/C 2B X M/C 3B X M/C 1S X M/C 2SA X M/C 3SA X M/C 2SB X M/C 3SB X P/C 1C X P/C 2C P/C 3C X P/C 1D X P/C 2D P/C 3D X P/C 2E X P/C 1A X P/C 2A P/C 3A X P/C 2A-1 X P/C 1B X P/C 2B X P/C 3B P/C 1S X P/C 3SA P/C 2SB X P/C 3SB DC125V main bus A DC125V main bus B X X DC 125V P/C 2A DC 125V P/C 2B X X DC 125V main bus 3A DC 125V main bus 3B SW X RHR-S A X RHR-S A X RHR-S B X RHR-S B X O O Status: X = Damaged, O = Available Not Damaged by Earthquake or Tsunami Damaged/Flooded by Tsunami Electric Distribution System Damaged/Flooded by Tsunami EDG Emergency Diesel Generator M/C Metal-Clad Switch Gear P/C Power Center UHS Ultimate Heat Sink DC Direct Current SW Sea Water RHR Residual Heat Removal * - Location, Turbine Building Basement ** - Location, Turbine Building 1 st Floor *** - Location, Shared Spent Fuel Pool 1 st Floor 2-13

28 Accident Timelines 2-14 Excerpted from page IV-17 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, iaea_houkokusho_e.html. Partially modified by EPRI. Figure 2-1 Flow Diagram of Cooling Systems, Unit 1, with ECCS Highlighted

29 Accident Timelines Excerpted from page IV-17 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Partially modified by EPRI. Figure 2-2 Flow Diagram of Cooling Systems, Units 2 and 3, with ECCS Highlighted 2-15

30 Accident Timelines Excerpted from page IV-18 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Partially modified by EPRI. Figure 2-3 High Pressure Coolant Injection (HPCI) Flow Diagram, Units

31 Accident Timelines Excerpted from page IV-19 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Partially modified by EPRI. Figure 2-4 Isolation Condenser (IC) Flow Diagram, Unit

32 Accident Timelines Excerpted from page IV-20 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Partially modified by EPRI. Figure 2-5 Reactor Core Isolation Cooling (RCIC) Flow Diagram, Units 2 and

33 Accident Timelines Excerpted from page IV-24 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Figure 2-6 Residual Heat Removal Flow Diagram, Units 2 and

34 Accident Timelines Excerpted from page IV-23 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Figure 2-7 Reactor Shutdown Cooling (SHC) Flow Diagram, Unit

35 Accident Timelines Excerpted from page IV-21 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Partially modified by EPRI. Figure 2-8 Main Steam Safety Relief Valve (MSRV) Flow Diagram, Unit

36 Accident Timelines Excerpted from page IV-22 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Partially modified by EPRI. Figure 2-9 Main Steam Safety Relief Valve (MSRV) Flow Diagram, Units 2 and

37 Accident Timelines Excerpted from page 13 of Attachment IV-3 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Figure 2-10 DC Power Supply System, Unit

38 Accident Timelines Excerpted from page 14 of Attachment IV-3 of Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety - The Accident at TEPCO s Fukushima Nuclear Power Stations, Prime Minister of Japan and His Cabinet [Online], June, Figure 2-11 DC Power Supply System, Units 2 and

39 3 SEISMIC AND TSUNAMI DESIGN BASES Because seismic and tsunami events were important factors in the accident at Fukushima Daiichi the following sections summarize the methods used to define the design bases for seismic and tsunami hazards at the plant. Criteria, methods, guidance, standards and regulations referred to in this report are those associated with Japan. EPRI has accumulated significant experience with the Japanese nuclear industry in a number of technical areas such as maintenance, seismic, and water chemistry. This includes technical support provided to TEPCO, a member of EPRI s nuclear sector since 2002, following the Niigataken-Chuetsu-Oki Earthquake that affected TEPCO s Kashiwazaki-Kariwa nuclear power plant [14]. This experience provided background relevant to Japan seismic design basis and practice. Because EPRI had no experience with Japanese tsunami design basis or practice prior to the Fukushima Daiichi accident, the tsunami-related information used in this report derives from the references cited. The design bases discussions include evaluations that have been performed since the original design and any associated upgrades that may have been implemented. Note that treatment of the design bases differed for earthquake and tsunami. Changes in the original seismic design basis resulted from a revised Japanese Regulatory Guide issued in 2006 [8]. A tsunami assessment method document issued by the Japan Society of Civil Engineers (JSCE) in 2002 [10] did not result in changes to the original design bases, but TEPCO did perform a voluntary reassessment of the tsunami design bases and implemented some plant design modifications. Seismic Japanese regulators first issued general seismic design guidance in 1978, with subsequent revisions in 1981, 2001, and 2006 based in part on significant seismic events that occurred after 1978 [7, 8]. All plants, including Fukushima Daiichi, were required to be reviewed (and upgraded structurally if necessary) for conformance with this guidance. 3-1

40 Seismic and Tsunami Design Bases The 2006 requirements for seismic event definition and qualification are specified in the Japan Nuclear Safety Commission (NSC) Regulatory Guide NSCRG: L-DS-I.02, entitled Regulatory Guide for Reviewing Seismic Design of Nuclear Power Reactor Facilities [8]. An English version of this document is available from the NSC website but readers are referred to the official version in Japanese for all questions regarding meaning and phrasing. The English version discusses basic policy and establishes the concept of residual risks which contemplates an earthquake stronger than the one specified in the design basis as follows: The seismic design shall be based on the principle to avoid any risks of serious radiological exposure to the public in the vicinity of the Facilities due to the external disturbance initiated by an earthquake, by appropriately formulating the ground motion for the seismic design, which could be postulated appropriately to occur with a very low probability in the service period of the Facilities and could have serious affects to the Facilities. Therefore, every effort should be made, at the design of the Facilities (in the basic design stage and subsequent stages), to minimize the residual risks to the extent as low as practically possible by appropriate attention to the possibility of ground motions exceeding the formulated design basis. The earthquakes that were defined for Fukushima Daiichi were upgraded after the issuance of NSCRG: L-DS-I.02. Three events postulated (1) Ss-1 inland crustal/interplate earthquakes, (2) Ss-2 oceanic intra-plate earthquakes, and (3) Ss-3 ground motion by unspecified source [9]. Each is shown in Figure 3-1 along with the original design earthquakes [9]. The new earthquakes are much stronger than the original earthquakes in the region with periods greater than 0.2 seconds (frequencies less than 5 Hz). The zero period accelerations are approximately 500 cm/s 2, which is approximately 0.5 g. The probability of occurrence of these earthquakes, an approach to quantifying residual risks, has also been reported. The annual probability of exceedance for the response spectra was reported to be 10-4 to 10-6 [1]. 3-2

41 Seismic and Tsunami Design Bases Source: Excerpted with permission from Slide 15 of Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station, Seismic Ground Motion Due to Great East Japan Earthquake and Seismic Ground Motion Accounted for in Seismic Safety Assessments, Tokyo Electric Power Company. Figure 3-1 Comparison of Original Seismic Spectra with Revised Seismic Spectra 3-3

42 Seismic and Tsunami Design Bases Tsunami When the original licenses were issued for Fukushima Daiichi, Japanese regulatory guidance only stated that (the effect of the) tsunami should be considered in design [10]. There were no specific tsunami assessment numeric simulation methods available. For design purposes, therefore, the tsunami height was set at 3.1 meters above sea level, based on the observed wave height at Onahama port from the Chilean earthquake and tsunami of May 24, Current Japanese regulatory guidance (in NSCRG L-DS-I.02 [8]) states that the Safety functions of the Facilities shall not be significantly impaired by tsunami which could be reasonably postulated to hit in a very low probability in the service period of the Facilities. More detailed technical guidance for nuclear power plants in Japan was provided in 2002 by the Japan Society of Civil Engineers (JSCE) [10] to effect implementation of this regulatory guidance. The methodology used historic records, if reliable, as the basis for the tsunami. The overall procedure from the English version of reference [10] obtained from the JSCE web site is as follows: (1) Tsunami source for the design tsunami Among possible scenario tsunamis, the one causing the maximum water rise and fall at the site is selected as the design tsunami. The design water level is defined as the sum of the design tsunami and an appropriate tidal condition. (2) A consideration policy with regard to the uncertainties of scenario tsunamis In order to account for uncertainties regarding a tsunami source model, a large number of numerical calculations are carried out under various conditions within a reasonable range. Results from the parametric study are referred to as scenario tsunamis. This is referred to as a parametric study. Each results of the parametric study are termed as scenario tsunamis. For the model to the target site, the tsunami causing the greatest damage to the target site is selected among the scenario tsunamis. (3) Method for verifying the design tsunami The design tsunami is verified by using the following criteria. The design tsunami height exceeds all recorded and calculated historical tsunami heights at the target site. In the vicinity of the target site, the envelope of the scenario tsunami heights exceeds all the recorded and calculated historical tsunami heights. (4) Method for verifying the assessment procedure based on historical tsunamis Before the above mentioned steps are carried out, a numerical calculation system is verified by performing numerical calculations on historical tsunamis. An important aspect of the 2002 JSCE guidance was that it did not consider as credible that a tsunami could be caused by ruptures across several fault segments in the vicinity of the plant. This was based on specific guidance provided in the 2002 JSCE document defining standard fault model parameters to use in establishing the design basis tsunami for nuclear power plants in Japan [10]. The JSCE guidance stated that combined fault segments did not need to be 3-4

43 Seismic and Tsunami Design Bases considered for faults along the Japan Trench (the Japan Trench passes through the sea area off the coast of Japan that encompasses the region of Fukushima) [10, 16]. The March 11 earthquake occurred across numerous of the geological fault segments within the Japan Trench, resulting in a larger-than-expected tsunami [1, 4, 5, 6, 15]. It is also noted that the original and the revised guidance in the 2002 JSCE document addressed tsunami inundation height and that evaluation of loading conditions that could occur by the hydrodynamic effects (forces of moving water) of the tsunami was acknowledged but not specifically required [1, 10]. TEPCO applied the methods described in [10] considering tsunamis generated from eight different near-field sources off the coast of Japan. From this, it was determined that the wave height could reach 5.7m at Fukushima Daiichi. As these changes in criteria were voluntary, the licensing basis was not changed, although TEPCO made changes to assure that all vital seawater pump motors were installed higher than 5.7m. In conjunction with the revised Japan seismic Regulatory Guide [8] issued in 2006 TEPCO conducted a tsunami reevaluation using the methods in [10]. From this reevaluation, that incorporated updated submarine topography and tide level data, it was determined that the wave height could reach 6.1m at Fukushima Daiichi and additional plant actions such as sealing of pump motors were taken [17]. In 2006, TEPCO evaluated the probability of occurrence of a credible tsunami. The study estimated the probability of the coast near the Fukushima Daiichi plant experiencing a tsunami greater than 6m to be less than 10-2 in the following 50-year period [6]. This is equivalent to an annual probability of exceedance of more than 2 x10-4. In 2008, calculations by TEPCO to characterize a potential tsunami source without an established wave source model resulted in an estimated tsunami wave height of up to 10.2m and a resulting flood inundation height of over 15m at Fukushima Daiichi. Since a large earthquake had not occurred along the Japan Trench off the coast of Fukushima, a wave source from another location was applied off the coast of the Fukushima Daiichi plant to provide the most strict wave source for use in this estimate [17]. Another method that applied a wave source model of the Jogan tsunami in 869 A.D. resulted in an estimated wave height exceeding 9m [11]. 1 Because the 10.2m wave height estimate was from a wave source model not characteristic of the Japan Trench off the coast of Fukushima that had been analytically transposed to a location off the coast of the plant and the 9m height estimate was from a source model that had not yet been finalized neither of these estimated results were applied [11, 17]. In 2009, the Nuclear and Industrial Safety Agency (NISA) asked that operators take into account the Jogan earthquake for evaluating tsunami height when new knowledge on the tsunami of the Jogan earthquake is obtained [4]. The difficulties in establishing credible tsunami heights in the area from historical records are explained in more detail in [12]. Reference [17] discusses Jogan tsunami deposit surveys conducted by TEPCO in the Fukushima Prefecture. The survey results were reported in January 2011 and were inconsistent with the estimate using the Jogan tsunami wave source model used in earlier calculations; therefore TEPCO considered that it was necessary to conduct further investigation to determine the Jogan tsunami wave source [17]. 1 The specific values of 9m and 15m are given in the cited reference. In the second report to the IAEA by the Japanese government, the calculated value is identified as 10m or higher (chapter II of [4]). 3-5

44

45 4 MARCH 11 SEISMIC EVENT The earthquake on March 11 occurred at 14:46 local time. The Magnitude 9 earthquake was the fourth largest in recorded world history. The epicenter was 111 miles (178 km) from the Fukushima Daiichi site. The peak ground acceleration in the horizontal direction was 0.56 g and in the vertical direction was 0.31 g as measured at Unit 2. Table 4-1 provides the maximum zero period accelerations measured at each plant [6]. Also presented are peak east-west spectral accelerations (all frequencies) as measured and as given within the design basis data (note that these values are scaled from plots in [6] and, as such, are approximate). All accelerations in this table are given in g s (values in [6] are in Gals 2 ). Ratios between measured and design basis values are also indicated. Ratios greater than 1.00 are highlighted. Table 4-1 Maximum Measured Acceleration Values Compared to the Design Basis Acceleration Values Measured (g) Max Design Basis (g) Ratio of Measured to Design Basis Unit NS EW VERT Peak EW NS EW VERT Peak EW NS EW VERT Peak EW The units in operation at the time of the event automatically shutdown as a result of motions caused by the earthquake. Automatic shutdown of the units was set to occur when in-plant monitors reached horizontal accelerations of 0.14 g s (or vertical accelerations of 0.10 g s). The response spectra at the sites are important indicators of the severity of the earthquake. The response spectra at Units 2, 3, and 5 are provided in Figure 4.1. Units 2, 3, and 5 had the largest spectral discrepancy (exceedance of the actual acceleration over the design acceleration) of the six units. Note that the exceedance of the actual spectra over the design spectra occurs primarily at frequencies between 2.5 and 5 Hz. (periods between 0.2 and 0.4 seconds). These are considered low frequencies and only a small amount of safety-related equipment that has natural frequencies in this range Gal = 1 g; 1 Gal = 0.01 m/s². 4-1

46 March 11 Seismic Event The tsunami occurred approximately 41 minutes after the earthquake. The time elapsed between the seismic event and the first tsunami allowed clear indications of the response of the plants to the seismic event. Off-site AC power was also lost at all six units. Reports of the event indicate that the plants responded appropriately following the earthquake prior to the tsunami [6]. Control rods were inserted, diesel generators started, and all normal operator actions were being taken to respond to the automatic plant shutdown. Figure 4-1 Measured Horizontal East-West Seismic Spectra Compared to the Design Basis Spectra for Units 2, 3, and 5 4-2

47 5 MARCH 11 TSUNAMI At 15:27, 41 minutes after the seismic event, the first of a reported seven tsunami waves arrived at the site. By observing the height of water marks left on the buildings after the event TEPCO estimated that the maximum tsunami inundation height was 14 to 15 meters. The design basis height, as described in Section 3, was 6.1 meters. The height of the tsunami exceeded the design basis because of the unexpected size of the seismic dislocation area, which was approximately 400 km (250 miles) north-south by 200 km (125 miles) east-west that involved rupture of multiple geological fault segments [1, 4, 15]. Units 1 to 4 were flooded to a depth of 4 to 5 meters above grade. There was extensive damage to site buildings and the turbine and reactor buildings were flooded. The intake structures at all six units were damaged by debris and flooding; and experienced electrical faults. All AC power was lost at Units 1 to 5 when the diesel generator units and switchgear were flooded. DC power was lost at Units 1 and 2. The seawater intake structures were damaged. One of the diesel generators, an air-cooled diesel generator, remained functional at Unit 6. The extent of flooding is shown in Figures 5-1 through 5-5 [3, 18]. 5-1

48 March 11 Tsunami Figure 5-1 Plan View of Site (Units 1 to 4 Only) Showing Flooded Regions Following the Tsunami 5-2

49 March 11 Tsunami Figure 5-2 Section View (Approximate) through Unit 1 Showing Flood Depth Source: Excerpted with permission from Result of the Investigation on Tsunami at Fukushima Daiichi Nuclear Power Station Appendix 1, Press Release Tokyo Electric Power Company, April 9, Figure 5-3 Photos at Points A and B in Figure

50 March 11 Tsunami Source: Excerpted with permission from Slide 9 of IEEE Nuclear Power Engineering Committee Meeting - Fukushima Nuclear Accident Interim Report: Effects of the Earthquake and Tsunami on the Fukushima Daiichi and Daini Nuclear Power Stations, especially on electric and I&C systems and equipments, Kawano, Akira, Tokyo Electric Power Company, July 27, Figure 5-4 Photos at Point C Showing Flooding Progression 5-4

51 March 11 Tsunami Source: Excerpted with permission from Slide 8 of IEEE Nuclear Power Engineering Committee Meeting - Fukushima Nuclear Accident Interim Report: Effects of the Earthquake and Tsunami on the Fukushima Daiichi and Daini Nuclear Power Stations, especially on electric and I&C systems and equipments, Kawano, Akira, Tokyo Electric Power Company, July 27, Figure 5-5 Photos Showing Seawall During the Tsunami 5-5

52

53 6 PLANT CAPABILITIES AND RESPONSE The Fukushima Daiichi units had various structures, systems, and components (SSC) in place to respond to the events of March 11, For purposes here, these SSCs are grouped into operational, seismic, and tsunami capabilities. Operational Capabilities and Response There were various systems designed to bring the reactors into and maintain them at safe shutdown conditions. Primary among these is the emergency core cooling systems (ECCSs), which is a composite of several high and low pressure systems with core cooling potential, intended to provide cooling during the decreasing pressure stages of a shutdown. There are additional systems which could have provided core cooling capabilities based on various valve lineups. However, as seen in the timeline descriptions in Chapter 2, all these systems were lost, most shortly after arrival of the second tsunami. The only exceptions to this near immediate loss were the IC system of Unit 1, the RCIC systems on Units 2 and 3, and the HPCI system on Unit 3. But even for these exceptions, the lack of electrical power eventually affected their ability to function. The time of failure of each of these systems relative to the initial seismic event and second tsunami are summarized in Table 6-1. Also shown in Table 6-1 is the point in time where lack of core cooling led to conditions believed to be sufficient to produce catastrophic failures, explosions and loss of primary containment. Table 6-1 Timeline of Key Cooling Systems Failures Unit System Hrs Action All Earthquake All Second tsunami wave 1 IC Unit 1 IC lost Unit 1 reactor building hydrogen explosion 2 RCIC Unit 2 RCIC lost Unit 2 loss of primary containment 3 RCIC Unit 3 RCIC lost 3 HPCI Unit 3 HPCI lost Unit 3 reactor building hydrogen explosion 6-1

Seismic Damage Information (the 120th Release) (As of 15:00 April 29, 2011)

Seismic Damage Information (the 120th Release) (As of 15:00 April 29, 2011) Extract April 29, 2011 Nuclear and Industrial Safety Agency Seismic Damage Information (the 120th Release) (As of 15:00 April 29, 2011) Nuclear and Industrial Safety Agency (NISA) confirmed the current

More information

TEPCO NUCLEAR SAFETY REFORM PLAN PROGRESS REPORT 1 ST QUARTER FY 2014 EXECUTIVE SUMMARY

TEPCO NUCLEAR SAFETY REFORM PLAN PROGRESS REPORT 1 ST QUARTER FY 2014 EXECUTIVE SUMMARY Introduction TEPCO NUCLEAR SAFETY REFORM PLAN PROGRESS REPORT 1 ST QUARTER FY 2014 EXECUTIVE SUMMARY TEPCO established its Nuclear Safety Reform Plan (full text of the plan may be viewed at http://www.tepco.co.jp/en/press/corp

More information

Fukushima Accident and Safety Assurance Measures for TEPCO NPP

Fukushima Accident and Safety Assurance Measures for TEPCO NPP Fukushima Accident and Safety Assurance Measures for TEPCO NPP IEEE NPEC N12-02 San Diego July 25, 2012 Yasushi Nakagawa Tokyo Electric Power Company All Rights Reserved 2012The Tokyo Electric Power Company,

More information

Current Status of Fukushima Daiichi Nuclear Power Station & Lessons Learned from Experiences of the Great East Japan

Current Status of Fukushima Daiichi Nuclear Power Station & Lessons Learned from Experiences of the Great East Japan These materials may contain sensitive information from TEPCO or other companies. Therefore, the usage of these materials outside of their intended goal is prohibited, alongside the showing or publication

More information

Seismic Damage Information (the 144th Release) (As of 15:00 May 20, 2011)

Seismic Damage Information (the 144th Release) (As of 15:00 May 20, 2011) Extract May 20, 2011 Nuclear and Industrial Safety Agency Seismic Damage Information (the 144th Release) (As of 15:00 May 20, 2011) Nuclear and Industrial Safety Agency (NISA) confirmed the current situation

More information

Report regarding Collection of Reports pursuant to the Provisions of Article 106, Paragraph 3 of the Electricity Business Act

Report regarding Collection of Reports pursuant to the Provisions of Article 106, Paragraph 3 of the Electricity Business Act Report regarding Collection of Reports pursuant to the Provisions of Article 106, Paragraph 3 of the Electricity Business Act May 16 th, 2011 Tokyo Electric Power Company Contents 1. Record of damages

More information

The IAEA does not normally maintain stocks of reports in this series.

The IAEA does not normally maintain stocks of reports in this series. IAEA-TECDOC- The IAEA does not normally maintain stocks of reports in this series. However, microfiche copies SAFETY ASPECTS OF STATION BLACKOUT AT NUCLEAR POWER PLANTS IAEA, VIENNA, 1985 IAEA-TECDOC-332

More information

Fukushima Nuclear Accident Analysis Report <Summary Attachment> June 20, 2012 Tokyo Electric Power Company, Inc.

Fukushima Nuclear Accident Analysis Report <Summary Attachment> June 20, 2012 Tokyo Electric Power Company, Inc. Fukushima Nuclear Accident Analysis Report June 20, 2012 Tokyo Electric Power Company, Inc. This material reorganizes the contents of the Summary of the Fukushima Nuclear Accident

More information

Impact of the Niigata Chuestu-oki Earthquake on the Tokyo Electric Power Company (TEPCO) Kashiwazaki-Kariwa Nuclear Power Station and Countermeasures

Impact of the Niigata Chuestu-oki Earthquake on the Tokyo Electric Power Company (TEPCO) Kashiwazaki-Kariwa Nuclear Power Station and Countermeasures Impact of the Niigata Chuestu-oki Earthquake on the Tokyo Electric Power Company (TEPCO) Kashiwazaki-Kariwa Nuclear Power Station and Countermeasures September 2007 The Tokyo Electric Power Company, Inc.

More information

Masaru Takei - The Tokyo Electric Power Company, Inc. Executive Vice President

Masaru Takei - The Tokyo Electric Power Company, Inc. Executive Vice President Meeting Transcript (Presentation) Event Date/Time: August 9, 2011 / 06:00PM JST Event Name: TEPCO Investor Meeting for FY2011 1 st Quarter Earnings Results Corporate Participants: Masaru Takei The Tokyo

More information

AP1000 European 7. Instrumentation and Controls Design Control Document

AP1000 European 7. Instrumentation and Controls Design Control Document 7.3 Engineered Safety Features AP1000 provides instrumentation and controls to sense accident situations and initiate engineered safety features (ESF). The occurrence of a limiting fault, such as a loss

More information

Updated information of Fukushima Daiichi NPP. October Ki Sig Kang 1

Updated information of Fukushima Daiichi NPP. October Ki Sig Kang 1 Updated information of Fukushima Daiichi NPP October 18 2011 Ki Sig Kang 1 Tsunami Phenomenon 2 3 TEPCO ; Kashiwazaki Kariwa Nuclear Power Plants in Japan Tohoku EPC ; Higashidori J-Power EPDC ; Ohma Hokkaido

More information

LESSONS LEARNED FORSMARK EVENT Presented To IEEEE

LESSONS LEARNED FORSMARK EVENT Presented To IEEEE LESSONS LEARNED FORSMARK EVENT Presented To IEEEE Thomas Koshy Member of the Task Group on Forsmark Chief of Mechanical & Electrical Engineering Office of Research, USNRC Thomas.Koshy@nrc.gov 1 Agenda

More information

Fuel removal from the spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 3

Fuel removal from the spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 3 Fuel removal from the spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 3 July 26, 2018 Tokyo Electric Power Company Holdings, Inc. Fukushima Daiichi D&D Engineering Company 1. Outline of

More information

Next Phase of Fukushima Daiichi D&D (Enhanced institutional and technical efforts by Team Japan )

Next Phase of Fukushima Daiichi D&D (Enhanced institutional and technical efforts by Team Japan ) Nuclear Damage Compensation and Decommissioning Facilitation Corporation Next Phase of Fukushima Daiichi D&D (Enhanced institutional and technical efforts by Team Japan ) IAEA General Conference Side Event

More information

Streamlined RI-ISI. Patrick O Regan EPRI

Streamlined RI-ISI. Patrick O Regan EPRI Streamlined RI-ISI Patrick O Regan EPRI poregan@epri.com Introduction Background Streamlined RI-ISI Methodology Results Discussion, Lessons Learned, Improvements Summary Background GOAL: Based upon the

More information

Nuclear L.L. C. 10 CFR 50.55a

Nuclear L.L. C. 10 CFR 50.55a 'I PSEG Nuclear LLC P.O. Box 236,, Hancocks Bridge, NJ 08038-0236 LR-N09-0046 March 05, 2009 0 PSEG Nuclear L.L. C. 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington,

More information

Evaluation of sealing performance of metal. CRIEPI (Central Research Institute of Electric Power Industry)

Evaluation of sealing performance of metal. CRIEPI (Central Research Institute of Electric Power Industry) 0 Evaluation of sealing performance of metal gasket used in dual purpose metal cask subjected to an aircraft engine missile CRIEPI (Central Research Institute of Electric Power Industry) K. SHIRAI These

More information

Beyond Design Basis Analysis:

Beyond Design Basis Analysis: Executive Beyond Design Basis Analysis: Developments in UK s Approach and Perspective IAEA International Expert s Meeting on Severe Accident Prof. Ali Tehrani Principal Inspector Nuclear Safety March 2014

More information

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD June 1, 2018 Table of Contents 1.0 Introduction...3 2.0 Summary...3 3.0 Purpose...3 4.0 Definitions...4 5.0 Analysis...5

More information

Progression of the Fukushima Accident

Progression of the Fukushima Accident Workshop on Advances in Understanding the Progression of Severe Accidents in Boiling Water Reactors Progression of the Fukushima Accident ~ Accident Progression at Unit 2 ~ July 17-21, 2017 Shinichi KAWAMURA,

More information

Gas Turbine Aircraft Engines

Gas Turbine Aircraft Engines ASME PTC 55-2013 Gas Turbine Aircraft Engines Performance Test Codes AN AMERICAN NATIONAL STANDARD ASME PTC 55-2013 Gas Turbine Aircraft Engines Performance Test Codes AN AMERICAN NATIONAL STANDARD Two

More information

JAMES F. GLEASON, P.E. CHAIRMAN QUALIFICATION COMMITTEE

JAMES F. GLEASON, P.E. CHAIRMAN QUALIFICATION COMMITTEE JAMES F. GLEASON, P.E. CHAIRMAN QUALIFICATION COMMITTEE Presented ese ted at NPEC C Ju July y 27, 7, 2011 0 NPEC Most Nuclear Power Countries Use IEEE NPEC Standards Administrative Qualification Operations,

More information

Fukushima Daiichi NPP. May , Ki Sig Kang

Fukushima Daiichi NPP. May , Ki Sig Kang Fukushima Daiichi NPP May 26 2011, Ki Sig Kang Tsunami Phenomenon 2 3 Nuclear Power Plants in Japan TEPCO ; Kashiwazaki Kariwa Tohoku EPC ; Higashidori Hokkaido EPC ; Tomari J-Power EPDC ; Ohma Hokuriku

More information

Alternative Fuel Price Report

Alternative Fuel Price Report July 2016 Natural Gas Ethanol Propane Biodiesel CLEAN CITIES Alternative Fuel Price Report Welcome to the July 2016 issue! The Clean Cities Alternative Fuel Price Report is a quarterly report designed

More information

A Study of Lead-Acid Battery Efficiency Near Top-of-Charge and the Impact on PV System Design

A Study of Lead-Acid Battery Efficiency Near Top-of-Charge and the Impact on PV System Design A Study of Lead-Acid Battery Efficiency Near Top-of-Charge and the Impact on PV System Design John W. Stevens and Garth P. Corey Sandia National Laboratories, Photovoltaic System Applications Department

More information

ams.t.andard REVIEW PLAN.

ams.t.andard REVIEW PLAN. NUREQ-0800 (Formerly NUREG-75/087) US. NUCLEAR REGULATORY COMMISSION t ams.t.andard REVIEW PLAN. OFFICE OF NUCLEAR REACTOR REGULATION 7.6 INTERLOCK SYSTEMS IMPORTANT TO SAFETY REVIEW RESPONSIBILITIES Primary

More information

Abstract. Background and Study Description

Abstract. Background and Study Description OG&E Smart Study TOGETHER: Technology-Enabled Dynamic Pricing Impact Evaluation Craig Williamson, Global Energy Partners, an EnerNOC Company, Denver, CO Katie Chiccarelli, OG&E, Oklahoma City, OK Abstract

More information

Determination of Spring Modulus for Several Types of Elastomeric Materials (O-rings) and Establishment of an Open Database For Seals*

Determination of Spring Modulus for Several Types of Elastomeric Materials (O-rings) and Establishment of an Open Database For Seals* Determination of Spring Modulus for Several Types of Elastomeric Materials (O-rings) and Establishment of an Open Database For Seals* W. M. McMurtry and G. F. Hohnstreiter Sandia National Laboratories,

More information

Fukushima Daiichi Status Report 27 July 2012

Fukushima Daiichi Status Report 27 July 2012 Fukushima Daiichi Status Report 27 July 2012 The IAEA issues regular status reports to the public on the current status of the Fukushima Daiichi Nuclear Power Plant, including information on environmental

More information

East Japan Earthquake on March 11, 2011 and Emergency Response at Fukushima Daini Nuclear Power Plant

East Japan Earthquake on March 11, 2011 and Emergency Response at Fukushima Daini Nuclear Power Plant East Japan Earthquake on March 11, 2011 and Emergency Response at Fukushima Daini Nuclear Power Plant March, 2014 Naohiro Masuda Former Site Superintendent at Fukushima Daini NPP Overview of Fukushima

More information

MASTER \ C. Idaho National Engineering Laboratory. INEL 96J014t we.l~%/0o/60 PREPRINT. MOTOR-OPERATOR GEARBOX EFFICIENCY 5 i u.

MASTER \ C. Idaho National Engineering Laboratory. INEL 96J014t we.l~%/0o/60 PREPRINT. MOTOR-OPERATOR GEARBOX EFFICIENCY 5 i u. INEL 96J014t we.l~%/0o/60 PREPRINT \ C Idaho National Engineering Laboratory MOTOR-OPERATOR GEARBOX EFFICIENCY 5 i u.^ 1 Q Kevin G. DeWall, John C. Watkins, Donovan Bramwell The Fourth NRC/ASME Symposium

More information

STANDARD REVIEW PLAN

STANDARD REVIEW PLAN NUREG-0800 (Formerly NUREG-75/087),jEt R E14 t STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION, U.s NUCLEAR REGULATORY COMMISSION 8.1 ELECTRIC POWER - INTRODUCTION REVIEW RESPONSIBILITIES Primary

More information

*TATSUYA KUNISHI, HITOSHI MUTA, KEN MURAMATSU AND YUKI KAMEKO TOKYO CITY UNIVERSITY GRADUATE SCHOOL

*TATSUYA KUNISHI, HITOSHI MUTA, KEN MURAMATSU AND YUKI KAMEKO TOKYO CITY UNIVERSITY GRADUATE SCHOOL Methodology of Treatment of Multiple Failure Initiating Events for Seismic PRA (2)Success Criteria Analysis for Multiple Pipe Break Accidents of a PWR *TATSUYA KUNISHI, HITOSHI MUTA, KEN MURAMATSU AND

More information

TANK RISER SUSPENSION SYSTEM CONCEPTUAL DESIGN (U)

TANK RISER SUSPENSION SYSTEM CONCEPTUAL DESIGN (U) Revision 0 TANK RISER SUSPENSION SYSTEM CONCEPTUAL DESIGN (U) R. F. Fogle September 15, 2002 Westinghouse Savannah River Company LLC Savannah River Site Aiken, South Carolina 29802 This document was prepared

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD May 1, 2017 Table of Contents 1.0 Introduction...3 2.0 Summary...3 3.0 Purpose...3 4.0 Definitions...4 5.0 Analysis...5

More information

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015 TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 AN AEMO POWER SYSTEM OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET Published: August 2016 IMPORTANT

More information

Vehicle Replacement Policy - Toronto Police Service

Vehicle Replacement Policy - Toronto Police Service STAFF REPORT June 21, 2000 To: From: Subject: Policy and Finance Committee Chairman, Toronto Police Services Board and City Auditor Vehicle Replacement Policy - Toronto Police Service Purpose: The purpose

More information

APR1400 Electric System Design. KHNP KEPCO E&C November 29, 2017

APR1400 Electric System Design. KHNP KEPCO E&C November 29, 2017 APR1400 Electric System Design KHNP KEPCO E&C November 29, 2017 Contents 1. Introduction 2. Offsite Power System Design 3. Onsite Power System Design Auxiliary Power System DC & IP System Onsite Power

More information

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design Presented at the 2018 Transmission and Substation Design and Operation Symposium Revision presented at the

More information

A comparison of the impacts of Euro 6 diesel passenger cars and zero-emission vehicles on urban air quality compliance

A comparison of the impacts of Euro 6 diesel passenger cars and zero-emission vehicles on urban air quality compliance A comparison of the impacts of Euro 6 diesel passenger cars and zero-emission vehicles on urban air quality compliance Introduction A Concawe study aims to determine how real-driving emissions from the

More information

Information to ASB2013/02/18 Containment Risk for NA and NR Turbochargers. MAN Diesel & Turbo SE Business Unit Turbocharger

Information to ASB2013/02/18 Containment Risk for NA and NR Turbochargers. MAN Diesel & Turbo SE Business Unit Turbocharger Containment Risk for NA and NR Turbochargers MAN Diesel & Turbo SE Business Unit Turbocharger MAN Diesel & Turbo BU Turbocharger 19.08.2014 < 1 > Agenda 1 Why has MAN released ASB2013/02/18 and Supplement

More information

AIR POLLUTION AND ENERGY EFFICIENCY. Update on the proposal for "A transparent and reliable hull and propeller performance standard"

AIR POLLUTION AND ENERGY EFFICIENCY. Update on the proposal for A transparent and reliable hull and propeller performance standard E MARINE ENVIRONMENT PROTECTION COMMITTEE 64th session Agenda item 4 MEPC 64/INF.23 27 July 2012 ENGLISH ONLY AIR POLLUTION AND ENERGY EFFICIENCY Update on the proposal for "A transparent and reliable

More information

METRO NORTH TRANSMISSION STUDY ELECTRIC AND MAGNETIC FIELD PROFILES (VILLAGE OF ANMORE)

METRO NORTH TRANSMISSION STUDY ELECTRIC AND MAGNETIC FIELD PROFILES (VILLAGE OF ANMORE) METRO NORTH TRANSMISSION STUDY ELECTRIC AND MAGNETIC FIELD PROFILES (VILLAGE OF ANMORE) File: T2016-6004 METRO NORTH TRANSMISSION STUDY ELECTRIC AND MAGNETIC FIELD PROFILES METRO NORTH TRANSMISSION STUDY

More information

Cost Benefit Analysis of Faster Transmission System Protection Systems

Cost Benefit Analysis of Faster Transmission System Protection Systems Cost Benefit Analysis of Faster Transmission System Protection Systems Presented at the 71st Annual Conference for Protective Engineers Brian Ehsani, Black & Veatch Jason Hulme, Black & Veatch Abstract

More information

The B&W mpower TM Small Modular Reactor I&C Design, Architecture and Challenges

The B&W mpower TM Small Modular Reactor I&C Design, Architecture and Challenges The B&W mpower TM Small Modular Reactor I&C Design, Architecture and Challenges IAEA Technical Meeting May 23, 2013 B.K. Arnholt 2013 Generation mpower LLC All rights reserved. Agenda Introduction to the

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Seabrook Substation Reliability Improvement Project

Seabrook Substation Reliability Improvement Project New England Division Seabrook Substation Reliability Improvement Project 1. Project Summary Description Seabrook Substation is critical to ISO-New England as a Pool Transmission Facility, to grid availability

More information

Mobile and Locomotive Cranes

Mobile and Locomotive Cranes ASME B30.5-2014 (Revision of ASME B30.5-2011) Mobile and Locomotive Cranes Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings AN AMERICAN NATIONAL STANDARD ASME B30.5-2014

More information

Presented at SC-2, Meeting October 5-6, 2010,, Seattle, WA

Presented at SC-2, Meeting October 5-6, 2010,, Seattle, WA U.S. EPR EQ Program Update Nissen M. Burstein Technical Consultant Presented at SC-2, Meeting 10-02 October 5-6, 2010,, Seattle, WA EPR is a trademark of the AREVA Group. Overview of U.S. EPR Reactor Redundant

More information

April 23, U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC

April 23, U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC Cwnsunme, EIneIUY A CMS Energy Compan}y Daniel J. Malone foireotor, Ffgineeung April 23, 2001 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 DOCKET 50-255 - LICENSE

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Event sequences Fukushima

Event sequences Fukushima Event sequences Fukushima 11032011 Event sequences in Fukushima Dai-ichi and Dai-ni following the Tohoku-Chihou-Taiheiyou-Oki earthquake on 11.03.2011 Fukushima 37 25 26.57 N, 141 1 56.87 E 11.03.2011

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

GE ABWR & ESBWR. Jeff Suggs ESBWR I&C April 17, Copyright 2006 by GE Energy / Nuclear

GE ABWR & ESBWR. Jeff Suggs ESBWR I&C April 17, Copyright 2006 by GE Energy / Nuclear GE ABWR & ESBWR Jeff Suggs ESBWR I&C April 17, 2007 Copyright 2006 by GE Energy / Nuclear GE Energy Gas Cleaner Coal Hydro Nuclear Wind Solar Biomass Fuel Cells Copyright 2006 by GE Energy / Nuclear 2

More information

Earthquake & Smart Society

Earthquake & Smart Society 1 ICT as a Tool for Smart Society and Better Life Earthquake & Smart Society Toyota Info Technology Center, Co., Ltd. and The Telecommunication Technology Committee yuji@ttc.or.jp yuji@jp.toyota-itc.com

More information

Additional examination of station black-out due to tsunami

Additional examination of station black-out due to tsunami Attachment Earthquake-tsunami-2 Additional examination of station black-out due to tsunami 1. Introduction Relationships between the tsunami arrival time and loss of power sources have been examined and

More information

ASTM D4169 Truck Profile Update Rationale Revision Date: September 22, 2016

ASTM D4169 Truck Profile Update Rationale Revision Date: September 22, 2016 Over the past 10 to 15 years, many truck measurement studies have been performed characterizing various over the road environment(s) and much of the truck measurement data is available in the public domain.

More information

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea.

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea. A.2 Norway Volumes of Associated Gas Flared on Norwegian Continental Shelf Norway is a major oil producer, and its oil fields are located offshore in the Norwegian Continental Shelf (NCS). 81 In 2002,

More information

Probabilistic Risk Assessment for Spent Fuel Pool Decommissioning in the J. Bohunice V1 NPP

Probabilistic Risk Assessment for Spent Fuel Pool Decommissioning in the J. Bohunice V1 NPP Probabilistic Risk Assessment for Spent Fuel Pool Decommissioning in the J. Bohunice V1 NPP by Zoltán Kovács, Robert Spenlinger and Helena Novakova RELKO Ltd, Engineering and Consulting Services Račianska

More information

Metallic Gaskets for Pipe Flanges

Metallic Gaskets for Pipe Flanges ASME B16.20-2012 (Revision of ASME B16.20-2007) Metallic Gaskets for Pipe Flanges Ring-Joint, Spiral-Wound, and Jacketed AN AMERICAN NATIONAL STANDARD ASME B16.20-2012 (Revision of ASME B16.20-2007) Metallic

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Hybrid Electric Vehicle End-of-Life Testing On Honda Insights, Honda Gen I Civics and Toyota Gen I Priuses

Hybrid Electric Vehicle End-of-Life Testing On Honda Insights, Honda Gen I Civics and Toyota Gen I Priuses INL/EXT-06-01262 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Hybrid Electric Vehicle End-of-Life Testing On Honda Insights, Honda Gen I Civics and Toyota Gen I Priuses TECHNICAL

More information

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants Operational Experience with Startup Optimization for E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants Starting up economically BoilerMax is a predictive boiler load-margin computer implementing

More information

Sacramento Municipal Utility District s EV Innovators Pilot

Sacramento Municipal Utility District s EV Innovators Pilot Sacramento Municipal Utility District s EV Innovators Pilot Lupe Jimenez November 20, 2013 Powering forward. Together. Agenda SMUD Snapshot Pilot Plan v Background v At-a-Glance v Pilot Schedule Treatment

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Test Rig Design for Large Supercritical CO 2 Turbine Seals

Test Rig Design for Large Supercritical CO 2 Turbine Seals Test Rig Design for Large Supercritical CO 2 Turbine Seals Presented by: Aaron Rimpel Southwest Research Institute San Antonio, TX The 6th International Supercritical CO 2 Power Cycles Symposium March

More information

Case Study: Silver Lining in Plants Oil Analysis Program Prevents Catastrophic Generator Failure

Case Study: Silver Lining in Plants Oil Analysis Program Prevents Catastrophic Generator Failure Case Study: Silver Lining in Plants Oil Analysis Program Prevents Catastrophic Generator Failure Analysts, Inc. Contributing Authors: Tim Gibbons, Data Analysts, OMA I Kris Sherman, National Account Manager,

More information

Northeast Autonomous and Connected Vehicle Summit

Northeast Autonomous and Connected Vehicle Summit Northeast Autonomous and Connected Vehicle Summit June 12, 2018 Cathie Curtis, Director, Vehicle Programs AAMVA 1 1 Founded in 1933, the American Association of Motor Vehicle Administrators (AAMVA) represents

More information

VEHICLE FLEET MANAGEMENT AT THE IDAHO NATIONAL ENGINEERING AND ENVl RONMENTAL LABORATORY

VEHICLE FLEET MANAGEMENT AT THE IDAHO NATIONAL ENGINEERING AND ENVl RONMENTAL LABORATORY VEHICLE FLEET MANAGEMENT AT THE IDAHO NATIONAL ENGINEERING AND ENVl RONMENTAL LABORATORY March 1999 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

BLAST CAPACITY ASSESSMENT AND TESTING A-60 OFFSHORE FIRE DOOR

BLAST CAPACITY ASSESSMENT AND TESTING A-60 OFFSHORE FIRE DOOR BLAST CAPACITY ASSESSMENT AND TESTING Final Report December 11, 2008 A-60 OFFSHORE FIRE DOOR Prepared for: JRJ Alum Fab, Inc. Prepared by: Travis J. Holland Michael J. Lowak John R. Montoya BakerRisk Project

More information

Appendix G Examples and Recommended Methods

Appendix G Examples and Recommended Methods Reporting Outages to the Generating Availability Data System (GADS) Introduction The examples in this appendix illustrate the reporting of outages and deratings to GADS. They are based on a fictional 600

More information

Evaluation of a Gearbox s High-Temperature Trip

Evaluation of a Gearbox s High-Temperature Trip 42-46 tlt case study 2-04 1/13/04 4:09 PM Page 42 Case Study Evaluation of a Gearbox s High-Temperature Trip By Vinod Munshi, John Bietola, Ken Lavigne, Malcolm Towrie and George Staniewski (Member, STLE)

More information

TerraPower s Molten Chloride Fast Reactor Program. August 7, 2017 ANS Utility Conference

TerraPower s Molten Chloride Fast Reactor Program. August 7, 2017 ANS Utility Conference TerraPower s Molten Chloride Fast Reactor Program August 7, 2017 ANS Utility Conference Molten Salt Reactor Features & Options Key Molten Salt Reactor (MSR) Distinguishing Features Rather than using solid

More information

Abstract Process Economics Program Report 21F NEW GENERATION OXO ALCOHOLS (October 2012)

Abstract Process Economics Program Report 21F NEW GENERATION OXO ALCOHOLS (October 2012) Abstract Process Economics Program Report 21F NEW GENERATION OXO ALCOHOLS (October 2012) This report follows a series of Process Economics Program reports on the topic of oxo alcohols. The last report

More information

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 PREPARED BY: Electricity System Operations Planning and Performance DATE: 22 March 2012 FINAL

More information

Case Study: Silver Lining in Plants Oil Analysis Program Prevents Catastrophic Generator Failure

Case Study: Silver Lining in Plants Oil Analysis Program Prevents Catastrophic Generator Failure Case Study: Silver Lining in Plants Oil Analysis Program Prevents Catastrophic Generator Failure Analysts, Inc. Contributing Authors: Tim Gibbons, Data Analysts, OMA I Kris Sherman, National Account Manager,

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL ECE/TRANS/WP.29/AC.3/26 18 December 2009 Original: ENGLISH ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE World Forum for Harmonization

More information

Fleet Safety Initiative Status Summary

Fleet Safety Initiative Status Summary Fleet Safety Initiative Status Summary Deborah Majeski DTE Energy Company October 7, 2008 DTE Energy s Primary Subsidiaries are Gas and Electric Utilities 2 Non-Utility Energy Related Businesses 3 Impact

More information

Information (15:00), December 1, 2017

Information (15:00), December 1, 2017 Information (15:00), December 1, 2017 To All Missions (Embassies, Consular posts and International Organizations in Japan) Report on the discharge record and the seawater monitoring results at Fukushima

More information

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any Draft Version 1 Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation,

More information

Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage

Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage LLNL-CONF-497353 Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage G. R. Dreifuerst, D. B. Chew, H. L. Mangonon, P. W. Swyers September 1,

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

Specification for Sealless Horizontal End Suction Centrifugal Pumps for Chemical Process

Specification for Sealless Horizontal End Suction Centrifugal Pumps for Chemical Process ASME B73.3-2015 (Revision of ASME B73.3-2003) Specification for Sealless Horizontal End Suction Centrifugal Pumps for Chemical Process AN AMERICAN NATIONAL STANDARD ASME B73.3-2015 (Revision of ASME B73.3-2003)

More information

Thursday 1 November. Friday 2 November

Thursday 1 November. Friday 2 November Thursday 1 Report on the impact of the Niigata-Chuetsu Oki Earthquake on the Kashiwazaki-Kariwa Nuclear Plant and response by Tokyo Electric Power Company (TEPCO), national and local governments and other

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

Jerry Shoemaker Manager, Smart Grid PMO February 20, 2014

Jerry Shoemaker Manager, Smart Grid PMO February 20, 2014 PHI s Smart Grid Program Management Approach Lessons Learned Jerry Shoemaker Manager, Smart Grid PMO February 20, 2014 2 Acknowledgement "This material is based upon work supported by the Department of

More information

NYISO Tariffs. New York Independent System Operator, Inc. Document Generated On: 2/27/2013

NYISO Tariffs. New York Independent System Operator, Inc. Document Generated On: 2/27/2013 NYISO Tariffs New York Independent System Operator, Inc. NYISO Tariffs Document Generated On: 2/27/2013 Contents 15 ISO Market Administration and Control Area Service Tariff Rate Schedules... 8 15.1 Rate

More information

THE ALTERNATIVE FUEL PRICE REPORT

THE ALTERNATIVE FUEL PRICE REPORT THE ALTERNATIVE FUEL PRICE REPORT Alternative Fuel Prices Across the Nation August 8, 2002 T his is the seventh issue of the Clean Cities Alternative Fuel Price Report, a quarterly newsletter keeping you

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E8: Battery Condition Assessment E8.1 GENERAL Plant or station batteries are key components in hydroelectric powerplants and are appropriate for

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

Evaluating Generation Considering All Plant Losses and Efficiencies Duane H. Morris, P.E. Tennessee Valley Authority

Evaluating Generation Considering All Plant Losses and Efficiencies Duane H. Morris, P.E. Tennessee Valley Authority Evaluating Generation Considering All Plant Losses and Efficiencies Duane H. Morris, P.E. Tennessee Valley Authority James W. Brower Scientech a business unit of Curtiss-Wright Flow Control Company Evaluating

More information

REAL WORLD DRIVING. Fuel Efficiency & Emissions Testing. Prepared for the Australian Automobile Association

REAL WORLD DRIVING. Fuel Efficiency & Emissions Testing. Prepared for the Australian Automobile Association REAL WORLD DRIVING Fuel Efficiency & Emissions Testing Prepared for the Australian Automobile Association - 2016 2016 ABMARC Disclaimer By accepting this report from ABMARC you acknowledge and agree to

More information

Port of Long Beach. Diesel Emission Reduction Program

Port of Long Beach. Diesel Emission Reduction Program Diesel Emission Reduction Program Competition Port of Long Beach, Planning Division July 16, 2004 Contact: Thomas Jelenić, Environmental Specialist 925 Harbor Plaza, Long Beach, CA 90802 (562) 590-4160

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Evaluating Stakeholder Engagement

Evaluating Stakeholder Engagement Evaluating Stakeholder Engagement Peace River October 17, 2014 Stakeholder Engagement: The Panel recognizes that although significant stakeholder engagement initiatives have occurred, these efforts were

More information

Cranes and Monorails (With Underhung Trolley or Bridge)

Cranes and Monorails (With Underhung Trolley or Bridge) ASME B30.17-2015 (Consolidation of ASME B30.11 and B30.17) Cranes and Monorails (With Underhung Trolley or Bridge) Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings AN AMERICAN

More information