1 Ohio Department of Transportation (ODOT) Rail Transit State Safety Oversight (SSO) Program Procedure SSO-003: Greater Cleveland Regional Transit Authority (GCRTA) Rail System and the Cincinnati Bell Connector Streetcar Reportable Event (Accident/Incident) Notifications to the ODOT SSO Program. Current Version: September 11, 2017 [Note: all older versions of this procedure should be discarded] Scope: This procedure provides the notification processes to be used by the Ohio Rail Transit Agencies (RTAs) GCRTA and Cincinnati Bell Connector Streetcar, and ODOT SSO, for reportable events (accidents/incidents) that occur on the GCRTA or Cincinnati Bell Connector Streetcar rail systems and rail-related property. GCRTA and Cincinnati Bell Connector Streetcar Reportable Event Notification Process: As defined in 49 CFR Part (a), notification shall be made to the ODOT SSO program staff (contact information below in table), by telephone, within two (2) hours for any safety event where one or more of the following occurs: A fatality at the scene; or where an individual is confirmed dead within thirty (30) days of a rail transit-related event A report of a serious injury to a person A collision involving a rail transit vehicle o o o o A collision between a rail transit vehicle and another rail transit vehicle A collision at a grade crossing A collision with a person A collision with an object A runaway train An evacuation for life safety reasons Any derailment of a rail transit vehicle, at any location, at any time, whatever the cause. Two definitions are needed for this set of criteria: Serious Injury means any injury which: o Requires hospitalization for more than 48 hours, commencing within 7 days from the date of the injury was received o Results in a fracture of any bone (except simple fractures of fingers, toes, or nose) o Causes severe hemorrhages, nerve, muscle, or tendon damage o Involves any internal organ o Involves second- or third-degree burns, or any burns affecting more than 5 percent of the body surface. Life Safety Reasons A situation, such as a fire, the presence of smoke or noxious fumes, a fuel leak, a vehicle fuel leak, an electrical hazard, a bomb threat, a suspicious item, or other hazard that constitutes a real or potential danger to any person. (from NTD Glossary) Both GCRTA and Cincinnati Bell Connector Streetcar must notify the ODOT SSO program staff of the following state-defined events (these will be marked other on the notification form). The ODOT SSO program has the authority to require these additional event types per 49 CFR Part (c) and (d). Page 1 of 8
2 1. Near mishap collision This event type includes near train-on-train collisions or train-onautomobile/truck (or automobile/truck-on-train) (this does NOT include near train-on-pedestrian or bicyclist, but the RTAs are required to track these occurrences for risk monitoring). For GCRTA, this also is any time that two opposing trains are unexpectedly or uncontrolled with movement heading towards each other (e.g., block-on-block). This topic also includes nonrevenue rail vehicles, on the main line, and in yard areas. 2. Near mishap collision with workers out on the right of way (or in yards). For Cincinnati Bell Connector Streetcar, this event type includes trains as well as cars or trucks, since the right of way is on the street. This category is intended to monitor work zones and significant issues related to the Right-of-way Worker Protection (RWP). 3. Evacuations of passengers to the right-of-way this definition includes any time that passengers are evacuated from trains for non-life-threatening reasons to the right-of-way/street level and not to a waiting train to pick them up at the scene of the disabled/stopped train. This includes evacuation to a station for reasons other than rail equipment going out of service for maintenance. 4. Any significant pantograph and OCS problems on the mainline or yards that cause an overhead line pull down, any pantograph entanglement, or multiple (more than three or four) pantographs being damaged. 5. Yard control and movement problems these are hard couples in the yard, switch problems into and out of the yard, and yard control problems. This includes revenue and non-revenue vehicles. 6. Selected significant hazardous conditions these are somewhat ad hoc in nature, so this topic will continue to be a discussion. Contact Person Organization Telephone Number When Notified Kevin Chandler Vital Assurance immediately Josh Gearhardt Vital Assurance immediately Don Eldredge Vital Assurance immediately Brian Kummerer ODOT (cell) (office) Dave Seech ODOT (cell) (office) Page 2 of 8 immediately immediately * Vital Assurance is under contract with the Ohio Department of Transportation (ODOT) to serve as the contact for receiving safety event reports. Vital Assurance staff can be reached by cell phone numbers listed above. If the event is reportable to the FTA (49 CFR Part 674), the ODOT SSO program staff will notify FTA with initial information, as required by FTA and also within the 2-hour time period, when possible. The following information shall be provided to the ODOT SSO program staff (Brian.Kummerer@dot.ohio.gov and chandler@vitalassurance.com) at the earliest available opportunity after making the initial notification of the event via telephone. If the information is not pertinent to the event (accident/incident), the item should be identified as non-applicable (N/A). RTA Notification Form Required Content Name of the Rail Transit Agency; Name and job title of person reporting; Event type (fatality, injuries, property damage, evacuation, derailment or other); Location, time, and date; Fatalities;
3 Injuries; Rail transit vehicle(s) involved (type, vehicle numbers, rail line); Property damage estimate; Notified to NTSB, report number; If shared corridor with freight railroad, note if railroad contacted or has made contact; RTA primary person conducting the investigation (name, title, telephone and fax numbers, address); Description of the event being notified. When the event being notified is required by FTA, ODOT SSO staff will forward the RTA notification form to FTA at Note: GCRTA or Cincinnati Bell Connector Streetcar must also notify the National Transportation Safety Board (NTSB) by telephone as appropriate and required. Note: GCRTA or Cincinnati Bell Connector Streetcar must also notify the Transportation Security Administration (TSA) as appropriate and required. Updates: February 25, 2016 Updated to include Cincinnati Streetcar and to add State reportable events with definitions. September 12, 2016 Updated to clarify the State reportable event definitions and to indicate that two of the State reportable events will be reportable accidents under Part 674. October 11, 2016 Updated to clarify state reportable criteria and to change responsibility for telephone notification of the ODOT TMC to the ODOT SSO staff, except the initial notification form will continue to be delivered to the ODOT TMC via by the RTAs. December 27, 2016 Minor clarifications for notification and follow-up with ODOT TMC and FTA, as well as thresholds. April 12, 2017 Removed any requirements for notifying or information to be provided to the ODOT TMC. Also, removed phone number for FTA notification, since FTA has not yet fully developed their notification process (information provided by FTA). ODOT SSO will continue to be the point of contact for any FTA notifications. September 11, 2017 Change notification thresholds from Part 659 to Part 674, and fully remove reference to contacting the ODOT Transportation Management Center (TMC) from the notification forms. Page 3 of 8
4 GCRTA Rail System Description: GCRTA Heavy and Light Rail Service Map The heavy rail Red Line consists of a single route 19 miles of double track in length, extending from the Cleveland Hopkins International Airport on the west and to Louis Stokes Station in East Cleveland on the east, generally alongside private railroad rights-of-way. The active, revenue service rolling stock consists of 40 cars built by Tokyu Car Corporation. Heavy rail schedules require 24 cars during morning and afternoon rush hours. Rail service operates approximately 21 hours per day, 7 days per week, all year. The light rail system (Blue and Green Lines) of GCRTA, formerly known as Shaker Rapid is a twotrack line between Shaker Heights and the Lakefront Municipal Parking Lot (South Harbor). The system has a fully grade-separated route for six miles between downtown Cleveland and Shaker Square. The line has two branches east of Shaker Square in the landscaped median strips of Van Aken Boulevard (Blue Line) and Shaker Boulevard (Green Line). West of Tower City the line turns north through the Flats (Waterfront Line). The total line length is 15.3 miles of double track. The equipment consists of 34 cars manufactured by Breda Costruzioni Ferroviarie. Light rail service operates approximately 21 hours per day, 7 days per week, all year. Rail-related facilities: Integrated Communications Center (ICC) Main Office Building (1240 W. Sixth St.); Rail Headquarters Building (5400 Grand Ave); Rail Service Building (6000 Grand Ave); Central Rail Maintenance Facility (6200 Grand Ave); Main Yard at E. 55 th as part of Grand Ave Buildings/Facilities; Brookpark Shop and yard (18305 Brookpark Road). Page 4 of 8
5 ODOT SSO Program Phone K. (614) K. Chandler - chandler@vitalassurance.com Cc: B. Kummerer-Brian.Kummerer@dot.ohio.gov Contact the NTSB: NTSB Number (800) Date of Accident: Location of Accident: Reported by: Phone: Fax: (216) Time of Accident: Title: Within 2 Hours: Passenger or employee fatality (except suicide and exclude trespassers) Two or more passengers or crewmembers seriously injured or hospitalized Accident requiring emergency evacuation of passengers from the train Fatality at Grade Crossing Time ODOT notified via phone: NTSB Notified: Yes No Report No. Line: Red Green Blue Waterfront OOS Train: Run No. Block No. Heavy Rail: Light Rail: Car Number(s): Work Train/Equipment: Type of Accident: Fatality at the scene or where an individual is confirmed dead within 30 days of a rail transit related incident Narrative: A report of a Serious Injury to a person A collision involving a rail transit vehicle including with another rail vehicle, rail equipment, at a grade crossing, with a person, or with an object A runaway train An evacuation for life safety reason Any derailment of a rail transit vehicle, at any location, at any time, whatever the cause Other, State Reportable, explain as part of Narrative. Within 4 Hours: Accident damage of $25,000 or more to a passenger train and railroad and non-railroad property *check appropriate box above and provide detail below Number of cars derailed: Hazardous Materials: Number of Fatalities: Number of Injuries: Estimated Damage: Additional information available by RTA can be obtained from: Name: Phone: Call received at NTSB by: Name: Phone:. Official time report received by NTSB: Page 5 of 8
6 Cincinnati Bell Connector Streetcar System Description: Cincinnati Bell Connector Streetcar Route Map Page 6 of 8
7 The Cincinnati Bell Connector Streetcar is a modern streetcar system designed to link major employment centers in Downtown and Uptown, connecting through Cincinnati's historic Over the Rhine (OTR) neighborhood, with revenue service starting on September 9, The Cincinnati Bell Connector Streetcar rail system includes 3.6 miles of one directional single track along a figure-eight route from Second Street (on the south) to Henry Street (on the north) and will have 18 stops. The City of Cincinnati is the owner of the rail system and vehicles. The Southwest Ohio Regional Transit Authority (SORTA) is responsible for operations and maintenance, and accomplishes those responsibilities through an operations and maintenance contractor (Transdev) for this rail system. Hours of operation Monday-Thursday 6:30 a.m. midnight Friday 6:30 a.m. 1:00 a.m. Saturday 8:00 a.m. 1:00 a.m. Sunday and holidays 9:00 a.m. 11:00 p.m. How often it will operate Mon.-Fri. 11:00 a.m. - 7:00 p.m. Every 12 minutes All other days/times Every 15 minutes Rail-related facilities: The Maintenance and Operation Facility (MOF) is located on the route at the southwest corner of Race and Henry Streets. Page 7 of 8
8 Cincinnati Bell Connector Streetcar ODOT Notification Form ODOT SSO Program Phone K. (614) K. Chandler - chandler@vitalassurance.com B. Kummerer - Brian.Kummerer@dot.ohio.gov Date of Accident: Location of Accident: Reported by: Phone: Time ODOT notified via phone: NTSB Notified: Yes No Line: Time of Accident: Title: Report No. Cincinnati Bell Connector Streetcar Streetcar Number: Car Number(s): Work Train/Equipment: Type of Accident: Fatality at the scene or where an individual is confirmed dead within 30 days of a rail transit related incident Narrative: A report of a Serious Injury to a person A collision involving a rail transit vehicle including with another rail vehicle, rail equipment, at a grade crossing, with a person, or with an object A runaway train An evacuation for life safety reason Any derailment of a rail transit vehicle, at any location, at any time, whatever the cause Other, State Reportable, explain as part of Narrative. Contact the NTSB: NTSB Number (800) Within 2 Hours: Passenger or employee fatality (except suicide and exclude trespassers) Two or more passengers or crewmembers seriously injured or hospitalized Accident requiring emergency evacuation of passengers from the train Fatality at Grade Crossing Within 4 Hours: Accident damage of $25,000 or more to a passenger train and railroad and non-railroad property *check appropriate box above and provide detail below Number of cars derailed: Hazardous Materials: Number of Fatalities: Number of Injuries: Estimated Damage: Additional information available by RTA can be obtained from: Name: Phone: Call received at NTSB by: Name: Phone:. Official time report received by NTSB: Page 8 of 8
State Safety Oversight Program
State Safety Oversight Program Maps and Charts September 2015 Table of Contents States and Rail Fixed Guideway Public Transportation Systems (RFGPTS)... 3 RFGPTS by State and Mode... 4 RFGPTS Unlinked
More informationRail safety statistics
Rail safety statistics STATISTICS FOR THE SIX MONTHS PERIOD ENDED 31 DECEMBER 2013 Prepared by Financial, Economic and Statistical Analysis, Ministry of Transport Rail safety statistics January 2014 This
More informationRail safety statistics
Rail safety statistics QUARTERLY STATISTICS FOR THE PERIOD ENDED 31 MARCH 2013 Prepared by Financial, Economic and Statistical Analysis, Ministry of Transport Rail safety statistics April 2013 This report
More informationTABLE OF CONTENTS SECTION TITLE PAGE NUMBER
Worker Falls from Trailer Type of Incident: Fatality Date of Incident: January 29, 2009 TABLE OF CONTENTS SECTION TITLE PAGE NUMBER 1.0 DATE AND TIME OF INCIDENT 3 2.0 NAME & ADDRESS OF PRINCIPAL PARTIES
More informationMETRO Light Rail Update
American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations
More informationCustomer Services, Operations, and Safety Committee Board Information Item III-A May 13, 2010 Safety Report
Customer Services, Operations, and Safety Committee Board Information Item III-A May 13, 2010 Safety Report Page 4 of 96 Washington Metropolitan Area Transportation Authority Board Action/Information Summary
More information2015 Community Report White Rock
5 White Rock Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2016 Community Report Los Alamos County
6 Los Alamos County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2016 Community Report Portales
6 Portales Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2016 Community Report Torrance County
6 Torrance County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2015 Community Report Torrance County
5 Torrance County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2015 Community Report Grants
5 Grants Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2016 Community Report De Baca County
6 De Baca County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2015 Community Report Las Vegas
5 Las Vegas Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2015 Community Report Tularosa
5 Tularosa Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2016 Community Report Santa Fe County
26 Santa Fe County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2015 Community Report Chaparral
5 Chaparral Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2016 Community Report Aztec
Aztec Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies, Traffic
More information2015 Community Report Aztec
25 Aztec Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2016 Community Report San Juan County
26 San Juan County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2015 Community Report San Juan County
25 San Juan County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2015 Community Report Doña Ana County
25 Doña Ana County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2015 Community Report Los Lunas
25 Los Lunas Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More informationRail safety statistics Six monthly statistics for the period ended 30 June August 2015
Rail safety statistics Six monthly statistics for the period ended 30 June 2015 August 2015 Disclaimer All reasonable endeavours are made to ensure the accuracy of the information in this report. However,
More information3.15 SAFETY AND SECURITY
3.15 SAFETY AND SECURITY Introduction This section describes the environmental setting and potential effects of the alternatives analyzed in this EIR with regard to safety and security in the SantaClara-Alum
More information2014 Community Report Portales
4 Portales Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2014 Community Report Luna County
4 Luna County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More informationGreater Cleveland Regional Transit Authority
Greater Cleveland Regional Transit Authority Summary of Proposed Award Vanpool Program Presented to: Operations Committee August 2, 2016 What is a Vanpool? A vanpool is a group of people (larger than 5)
More informationThe TSB is an independent agency operating under its own Act of Parliament. Its sole aim is the advancement of transportation safety.
Foreword This document provides users of Canadian railway safety data with an annual summary of selected statistics on rail occurrences. It covers federally regulated railways only. Provincial data reported
More information2014 Community Report Las Vegas
4 Las Vegas Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More information2014 Community Report Truth or Consequences
4 Truth or Consequences Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population
More information2014 Community Report Tularosa
4 Tularosa Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 8 by the University of New Mexico, Geospatial and Population Studies,
More information2014 Community Report Aztec
Aztec Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies, Traffic
More information2016 Community Report New Mexico
216 Produced for the Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 581 by the University of, Geospatial and Population Studies, Traffic Research Unit Distributed
More information2014 Community Report Los Lunas
4 Los Lunas Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,
More informationTrip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair
Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter
More informationPedestrians Road Safety
Pedestrians Road Safety Overview According to the World Health Organization, the World Bank, the FIA Foundation for the Automobile and Society and the Global Road Safety Partnership collaborative report
More informationWAKE TRANSIT PLAN Summer 2018
WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.
More informationRequest for Proposal for Trolley Security Services
Request for Proposal for Trolley Security Services April 6, 2018 Trolley Security Support Services The Loop Trolley Company The Loop Trolley Company (LTC) is requesting proposals for armed on-board security
More informationPedestrians Road Safety
Pedestrians Road Safety Overview Over the period 1996-2009, 5,323 people have been killed on Irish road. Out of this 22% (1162) were pedestrians. Additional 3863 pedestrians were seriously injured in the
More informationExpo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015
Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015 Meeting Purpose and Format Meeting Purpose and Format The purpose of tonight s meeting is to: Provide a final update
More informationCommunity Advisory Committee. October 5, 2015
Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical
More informationI-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager
I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives
More informationNational Household Travel Survey Add-On Use in the Des Moines, Iowa, Metropolitan Area
National Household Travel Survey Add-On Use in the Des Moines, Iowa, Metropolitan Area Presentation to the Transportation Research Board s National Household Travel Survey Conference: Data for Understanding
More informationMichigan. Traffic. Profile
June 2014 Revised 5/11/15 Michigan 2013 Traffic Crash Profile Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash
More informationSafety Performance Indicators
Customer Services, Operations, and Safety Committee Board Information Item V-B October 2, 28 Safety Performance Indicators Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationGreater Cleveland Regional Transit Authority. Joe Calabrese - General Manager
Greater Cleveland Regional Transit Authority Joe Calabrese - General Manager RTA Ridership by Mode! 500 Buses - 75 %! 60 Heavy Rail Vehicles - 10%! 24 RTV s (BRT) - 8%! 48 Light Rail Vehicles - 6%! Paratransit
More informationMichigan. Traffic. Profile
June 2014 Revised 5/11/15 Michigan 2013 Traffic Crash Profile Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More informationTrip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station
Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Final Report 2013 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter at
More informationCommuter Rail Safety Study
U.S. Department of Transportation Federal Transit Administration Commuter Rail Safety Study Prepared by: Federal Transit Administration, Office of Safety and Security FTA OFFICE OF SAFETY AND SECURITY
More informationAttachment D Environmental Justice and Outreach
Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income
More informationGreater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager
Greater Cleveland Regional Transit Authority Joe Calabrese CEO/General Manager Greater Cleveland RTA Overview Service Area Population of 1.5 million Customers Served 200,000 on a typical weekday 1.6 million
More informationRailyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY
Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)
More informationNew Jersey Turnpike Authority Interchange 6 to 9 Widening Program
New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,
More informationWhat is the Connector?
What is the Connector? The Connector is a plan for a high-capacity transit system from northeast to south Ann Arbor, connecting major destinations including downtown, commercial, and residential areas,
More informationLeadership NC. November 8, 2018
v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the
More information6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION
June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More informationCrenshaw/LAX Transit Corridor. Transit Coalition Meeting June 26, 2012
Transit Coalition Meeting June 26, 2012 Measure R Projects 8 ½ mile light rail line from Exposition/Crenshaw Blvds. to Metro Green Line s Aviation/LAX station Six stations with two optional stations carried
More informationRTD Commuter Rail System APTA Rail Conference June 23, 2015
RTD Commuter Rail System APTA Rail Conference June 23, 2015 RTD Eagle & North Metro Commuter Rail System Today s Presentation Eagle Design, Construction, Systems Commuter Rail Vehicles and CRMF/OCC EC
More informationCROSSING RAIL PROJECT (P4) RAIL
GRAND CROSSING RAIL PROJECT (P4) Community Advisory Group October 10, 2012 1:30 pm Grand Crossing Park Field House 7655 S. Ingleside Avenue, Chicago GRAND CROSSING RAIL PROJECT (P4) Community Advisory
More informationCentral City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014
Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing July 24, 2014 Project Description The Central City Line is a High Performance Transit project that will extend from Browne
More informationTroost Corridor Transit Study
Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit
More informationCommittee Report. Transportation Committee. Business Item No
Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope
More informationGreen Line opens June 14
Winter 2014 Green Line opens June 14 To-do list for METRO Green Line s grand opening Yours: Study safety tips at www.centralcorridor.org/safety Learn about planned Metro Transit bus service changes on
More informationAttachment A. BATA Resolution No. 128 BAY AREA TOLL AUTHORITY TOLL SCHEDULE FOR TOLL BRIDGES (EFFECTIVE JANUARY 1, 2019)
Page 1 of 6 BAY AREA TOLL AUTHORITY TOLL SCHEDULE FOR TOLL BRIDGES (EFFECTIVE JANUARY 1, 2019) BRIDGES AND TOLLS 2 AXLE VEHICLES Antioch Bridge, Benicia-Martinez Bridge, Carquinez Bridge, Dumbarton Bridge,
More informationTRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury
TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based
More informationWorker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal
Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal TABLE OF CONTENTS SECTION TITLE PAGE 1.0 DATE AND TIME OF INCIDENT 4 2.0 NAME & ADDRESS OF PRINCIPAL PARTIES 4 2.1 Employer
More informationUNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION
MAI-2009-15 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION Surface Nonmetal Mine (Construction Sand and Gravel)
More informationAlberta Speeding Convictions and Collisions Involving Unsafe Speed
Alberta Speeding Convictions and Collisions Involving Unsafe Speed 2004-2008 Overview This document was prepared under the Alberta Traffic Safety Plan, Strategic Research Plan for 2008-2010, with the objective
More informationTrip Generation and Parking Study New Californian Apartments, Berkeley
Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter
More informationFigure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd
Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the
More informationCHAPTER 5 CAPITAL ASSETS
CHAPTER 5 CAPITAL ASSETS This chapter describes the capital assets of GCTD, including revenue and nonrevenue vehicles, operations facilities, passenger facilities and other assets. VEHICLE REVENUE FLEET
More informationPAG Environmental Planning Advisory Committee Sun Link Streetcar Update May 1, 2015
PAG Environmental Planning Advisory Committee Sun Link Streetcar Update May 1, 2015 Project Facts 4-mile route, 23 stops 8 made in USA modern streetcars All electric and green Voter-approved project Connects
More information2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS
2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak
More informationClick to edit Master title style
Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment
More informationHelp shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary
Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County
More informationPlattsburgh Downtown Parking Study
Plattsburgh Downtown Parking Study Study Update October 2017 Powered by Purpose of Study Engage Community in Parking Discussion Assess Current Conditions Parking Demand Patron Service Levels Administration
More informationPARKING OCCUPANCY IN WINDSOR CENTER
PARKING OCCUPANCY IN WINDSOR CENTER TOWN OF WINDSOR, CONNECTICUT REPORT JUNE 2017 CONTENTS Background... 3 Other Relevant Data... 3 Parking Survey Design... 6 Parking Supply Inventory... 6 Parking Demand
More informationEUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT
EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING
More informationFederal Railroad Administration. 49 CFR Part 228. Passenger Hours of Service. Do not distribute outside the FRA
Federal Railroad Administration 49 CFR Part 228 Passenger Hours of Service Do not distribute outside the FRA Title 49 CFR 228 SUBPART F COVERED EMPLOYEES PROVISIONS CARRIED OVER FROM THE OLD LAW TO THE
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS
More informationNOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION
More informationDATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC
PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager
More information6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION
June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More informationADDENDUM NO. 3 BID NO TRANSIT VEHICLE ADVERTISING
600 S. Grand Central Parkway, Suite 350 Las Vegas, Nevada 89106-4512 702-676-1500 Fax: 702-676-1518 Tina Quigley, General Manager May 15, 2013 ADDENDUM NO. 3 BID NO. 13-053 TRANSIT VEHICLE ADVERTISING
More informationPolicy Number: Effective Date: Date Reviewed: Date Revised:
Classification: Subject: Contact Position: Page: 1 of 7 Administration Parking and Traffic Control: Environment of Care policy Facility Director Policy Number: Effective Date: Date Reviewed: Date Revised:
More informationCAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016
50 ( only) CAMPUS CONNECTOR Bayberry North Shuttle & 48 North & South Shuttles 531 539 543 546 549 552 607 601 609 613 616 619 622 637 613 621 625 628 631 634 649 625 633 637 640 643 646 701 637 645 649
More informationKent County Traffic Crash Data & Year Trends. Reporting Criteria
May 2015 Revised 3/16/2016 2014 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data
More information4.0 TIER 2 ALTERNATIVES
4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation
More informationElected Officials Briefing North Metro Rail Line Update. November 10, 2016
Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April
More informationNewport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes
Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes Newport News Shipbuilding Page 1 CRANES 1. Hazard and Reference The use of cranes at NNS presents a serious
More information2004 Utility Electric Contact Incident Report. Regarding Personal Injury Incidents Reported to the OPUC in 2003
2004 Utility Electric Contact Incident Report Regarding Personal Injury Incidents Reported to the OPUC in 2003 The Oregon Public Utility Commission does not discriminate on the basis of race, color, national
More informationScript. Visual. Narrative. Module 6C Carrier Requirements (Rail)
Script Visual Narrative 1 Module 6C Carrier Requirements (Rail) 2 Hazardous materials shipments by rail must comply with the requirements of Part 174 as well as those contained in Parts 171, 172, 173 and
More informationWelcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people
December 2014 Welcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people FasTracks News I hear the train a- comin RTD s first electric commuter rail cars arrive in Denver
More informationReconstruction and Electrification of Trolley Track. City of Kingston, New York November 8, 2007
Reconstruction and Electrification of Trolley Track City of Kingston, New York November 8, 2007 Trolley Museum of New York Founded in 1955 Moved to Kingston in 1983 Operates Over City-Owned Former Ulster
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal
More informationCollision Analysis Safety Tables
Crash Severity Geography of Geography of Time and Date of Crash Conditions Features Features.. Queries Selected: Town(Hartford), Date(Year:All or //05 to 9/7/06), Severity(All), Route Class(Interstate),
More informationDowntown Lee s Summit Parking Study
Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis
More informationTraffic Accident Statistics
2000 Missouri State Highway System Traffic Accident Statistics Missouri State Highway System Traffic Accident Statistics Table of Contents Subject Chapter 1: Statewide Traffic Accident Statistics, Introduction
More information