California Solar Initiative Introduction Workshop. The slides for today s presentation can be downloaded/printed at

Size: px
Start display at page:

Download "California Solar Initiative Introduction Workshop. The slides for today s presentation can be downloaded/printed at"

Transcription

1 California Solar Initiative Introduction Workshop The slides for today s presentation can be downloaded/printed at

2 Content Introduction Overview of Energy Efficiency and Climate Smart Overview of California Solar Initiative (CSI) EPBB Calculator CSI Application Process CSI Field Inspections CSI Metering and Monitoring Other Solar Electric Generating Technologies Generation Interconnection Services (GIS) Billing and Rates Appendix Other Solar Incentive Programs Other Renewables Programs Q&A Session 2

3 Ground Rules Act in a safe manner and follow all safety guidelines Respect the presenter and fellow participants by limiting side conversations Do not interrupt the person talking, there is only one speaker at a time Ask only relevant questions or wait until the breaks if not related to the topic Silence cell phones or step out to make/take a call 3

4 Objective The purpose of this workshop is to provide a thorough understanding of the California Solar Initiative and its requirements. We will take you step by step through the application process and also give an overview of several related programs and services PG&E offers. **Please note: This is not an instructional class on how to install solar** If you are interested in learning to install solar or getting into the solar industry, please visit the following websites for information: Interstate Renewable Energy Council-Renewable Energy Training Catalog: The North American Board of Certified Energy Practitioners (NABCEP): Grid Alternative (non-profit providing hands-on training for volunteers) Also check with local community colleges and universities 4

5 About PG&E What we do: Deliver safe, reliable, and environmentally responsible gas and electricity to approximately 15 million Californians Employees 19,800 Electric and gas distribution customers Electric transmission circuits Gas transmission backbone Owned Electric generation capacity Total Peak Demand 5.1 MM electric 4.2 MM gas 18,610 miles 6,136 miles 6,000+ MW 20,000 MW 5

6 We serve 5% of the U.S. population but emit less than 1% of the total CO2 emitted by the utility sector. 6

7 PG&E is creating clean energy at our own facilities PG&E Service Center is sending energy back to the grid! 7

8 PG&E s Integrated Approach Energy Efficiency & Conservation Reduce Energy Use Climate Smart Neutralize Energy Use Renewable Power Supply Solar & Wind 8

9 Overview of Energy Efficiency and Climate Smart

10 Before installing solar Start with Energy Efficiency and Demand Management It is more cost effective to make your home more energy efficient before installing solar Educate yourself and your customers Analyze current energy usage Learn what to do by completing an audit Explore rate options and other PG&E programs Encourage Customers to Take Action to be Efficient Saves energy and money in 2 ways Less usage = smaller energy bills Reduced load = smaller solar system = lower cost 10

11 Residential 11

12 PG&E Offers a Variety of Rebates Available on electric and gas residential single family homes and multifamily properties: High-Efficiency Clothes Washers ENERGY STAR Dishwashers ENERGY STAR Room Air Conditioner Electric Storage Water Heaters Natural Gas Storage Water Heater Attic and Wall Insulation Cool Roof Low/Steep Slope Whole House Fan 92% & 94% AFUE Central Natural Gas Furnace Variable Speed Motor (VSM) Air Handler System Variable and 2-Speed Swimming Pool Pump and Motor 12

13 Retailer/Manufacturer Offered Rebates Appliance Recycling Free pick-up of older, working refrigerators They use up to up to three times as much energy as newer ones and add as much as $250 to your annual energy bill 98% of the fridge is recycled Air Duct Testing and Sealing Lighting Instant rebates on different products (discount included in price): Compact Fluorescent Lamps (including spiral as well as selected covered reflector lamps and dimmables) Fluorescent Interior Hardwired Fixtures Fluorescent Exterior Hardwired Fixtures (such as selected covered reflector lamps) Fluorescent Torchieres 13

14 Business 14

15 Energy Efficiency Rebates PG&E offers a variety of rebates on gas and electric products for businesses: Agricultural Products Appliances and General Improvement Food Service Heating, Ventilation and Air Conditioning (HVAC) Lighting Refrigeration Boilers and Water Heating Business Computing 15

16 (Non-Residential Retrofit - NRR) Incentives for the installation of high-efficiency equipment or systems Customized rebates that are calculated based on actual reduction in energy usage Non-Residential New Construction The program offers owners and their design teams analysis and resources to aid with energy-efficient facility design (10-15% above Title 24) of new nonresidential facilities, expansions, or any added load Offers Energy-Efficiency Design Assistance at no cost 16

17 Retrocommissioning (RCx) Systematic process for identifying less-than-optimal performance in an existing facility s equipment and control systems Focuses on making necessary repairs or enhancements to existing equipment and systems to save energy and cost Can reduce energy costs by 5-15% PG&E provides incentives, engineering resources Building owners must agree to implement measures within 12 months 17

18 Demand Response Programs Programs that offer incentives for businesses who reduce their energy load during peak demand Demand Response vs. Energy Efficiency 24-hour demand profile period for an office building Demand Response Standard Energy Efficient Watts per square foot

19 Example of Demand Response Program PeakChoice TM PeakChoice allows customers to create a semi-customized program by selecting options from a list of features Reduction Amount & Commitment Level How many kw you can reduce Making a best effort to reduce vs. committing to reduce Event Notification Lead Time Minimum notice you need before you reduce energy Maximum Number of Events Number of events you will participate in Event Duration Number of hours you have to reduce for each event Event Window What time of day an event can occur Number of Consecutive Event Days Number of consecutive event-days you can participate in 19

20 30+ Years of Energy Efficiency Success Energy efficiency programs have helped keep per capita electricity consumption in California flat since 1976 PG&E s programs alone have avoided the release of over 135 million tons of CO 2 into the atmosphere over the same period KWh/person 14,000 12,000 10,000 8,000 6,000 4,000 2, Courtesy Art Rosenfeld, California Energy Commission US CA Western Europe Note: are forecast data. 20

21 ClimateSmart The energy you use emits greenhouse gases, such as carbon dioxide (CO2), into the atmosphere. ClimateSmart is a voluntary program that enables customers to reduce their impact on climate change. Customers can pay a separate amount on their monthly energy bill PG&E will invest 100% of the payment in independently verified greenhouse gas emission reduction projects in California 21

22 ClimateSmart These projects absorb or reduce over time an equal amount of CO2 from the atmosphere, balancing out the climate impact of your energy use. Conserving and restoring forests Capturing methane gas from dairy farms and landfills Many more proposed Example of Projects: Forestry Dairy Methane Capture * Landfill Methane Capture ** Carbon sequestration Habitat preservation Watershed protection CA is losing 40,000 acres of forestland annually Reduce impact of methane Of 1900 dairies in CA, unless than 24 capture methane Reduce impact of methane * Pending CPUC approval. ** Requesting CPUC approval. 22

23 ClimateSmart Enrollment is easy and voluntary; customers can choose to enroll their electric or gas or both accounts Cost/Rates Based on actual usage (how many kwh and/or therms are used) Electric: $ per kwh Gas: $ per therm Less than $5 per month for a typical residential home Contributions are tax deductible Visit the PG&E website to enroll or for more information 23

24 Resources For more info and other programs, contact PG&E s Energy Efficiency Lines Residential: Smarter Energy Line veenergymoney or Small/Medium Commercial: Business Customer Center rgysavingsrebates or Large Commercial: Contact your assigned PG&E Account Manger or Representative 24

25 BONUS: What are the three parts of PG&E s Integrated Approach?

26 Overview of the California Solar Initiative (CSI)

27 SB 1 CPUC (CA Public Utilities Commission) CEC (California Energy Commission) Retrofit Residential Retrofit Commercial Commercial New Construction Retrofit Low Income Residential New Construction 1. California Solar Initiative (CSI) Low Income Solar (LISP) 4. New Solar Homes Partnership (NSHP) 2. Multi-family 3. Single Family Program Administrators Grid Alternatives Program Administrators PG&E SCE CCSE PG&E SCE SDG&E BVES 27

28 What is CSI? The California Solar Initiative provides a financial incentive for the installation of solar on a home or business. CSI incentives vary by incentive type, customer segment and system size. Incentive amounts gradually reduce over time. First funding is reserved, then once installation is complete, the incentive payment is made. 28

29 CSI Eligibility Project site must be in service area receiving retail electric service from Pacific Gas & Electric (PG&E), Southern California Edison (SCE) or San Diego Gas & Electric (administered by CCSE)* CSI incentive rate determined by customer s utility rate schedule Retrofit Residential Projects (Single Family & Multifamily homes)** Retrofit and New Construction Non-Residential Projects (Commercial, Industrial, Agricultural and Government) Must use new and eligible equipment approved on CEC list Note: Effective July 1, 2009 there is a new list for eligible PV modules based on testing standards New panels can be added to an existing inverter, if that inverter was previously rebated through the CSI (or program under SB1). Minimum System Size of 1 kw Maximum System Size of 5 MW Incentives will be capped to the First MW *Municipal electric utility customers, please check with your provider for any solar incentives or CSI updates. ** New construction residential projects are eligible under the New Solar Homes Partnership Program 29

30 CSI Eligibility Installation contractors must have valid A, B, C-10 or C-46 license and be listed with the California Energy Commission, unless it is a self-installation Can be verified by contacting the California State License Board at or System production must serve onsite electric load For system 5kW or greater: Estimated production from EPBB calculator must be < previous 12 month usage history (kwh) If system cannot be justified by historical usage, one of the following documentation must be provided: 1. Square Footage (only system size of kw), will be used to calculate allowable size (2 watts x square feet = maximum CEC-AC system size) 2. Comprehensive list of new and/or old appliances/equipment, wattage and expected usage or hours of operation 3. Other: engineering calculations, Title 24 (no older than 3 years), or building simulation reports such as equest, EnergyPro, etc 30

31 Energy Efficiency Requirements Energy Audit must be completed CSI Eligibility All Customers must sign a Disclosure Agreement* Acknowledgement that usage history/building information, energy efficiency measures and recommendations have been provided. Benchmarking (only for Non-Res over 100,000 sq/ft, EPBB only)* Comparison of energy consumption of a similar building to determine a rating/performance score If customer s rating is less than 75, retrocommissioning must be completed. Customers required to sign Commitment Agreement Commits customer to perform retrocommissioning and complete improvements identified in assessment Improvements must be completed before a project is paid Non-Residential New Construction must be 15% above current Title 24 Standards* *Effective July 1,

32 CSI Incentive Structure There are two types of Incentives: Expected Performance-Based Buydown (EPBB) EPBB is a one time, up-front payment based on an estimate of the system's future performance Or Performance-Based Incentives (PBI)* PBI are monthly payments for 5 years based on actual performance of the system as measured by a separate performance meter *Any system larger than 50 kw are required to select for the PBI Incentive **Effective January 1, 2010 any system larger than 30kW are required to select the PBI Incentive 32

33 CSI Incentive Rates Incentive structure: 10 step program with a predetermined number of MegaWatts dedicated to each Step Level Rebates automatically decline based upon reservations approval Higher rebates for non-taxable entities (Government/Non Profit) PG&E (MW) EPBB Payments (per Watt) PBI Payments (per kwh) Step Res Non- Res Residential Commercial Gov't / Nonprofit Residential Commercial Gov't / Nonprofit n/a n/a n/a n/a n/a n/a $2.50 $2.50 $3.25 $0.39 $0.39 $ $2.20 $2.20 $2.95 $0.34 $0.34 $ $1.90 $1.90 $2.65 $0.26 $0.26 $0.37 Res Non Res $1.55 $1.55 $2.30 $0.22 $0.22 $ $1.10 $1.10 $1.85 $0.15 $0.15 $ $0.65 $0.65 $1.40 $0.09 $0.09 $ $0.35 $0.35 $1.10 $0.05 $0.05 $ $0.25 $0.25 $0.90 $0.03 $0.03 $ $0.20 $0.20 $0.70 $0.03 $0.03 $

34 1 2 3 Trigger Tracker * 9* *To determine approximate MW left in step, subtract column 9 from column 8 34

35 Solar to Date PG&E territory represents more grid-tied solar systems than any other utility in the United States CSI Program success Approximately 18,500 Applications Received Over 12,500 Projects Completed totaling over $275 Million in incentives paid Continuous improvements made to streamline process and to make PowerClerk user friendly Reduced paperwork by more than 50% Working towards going paperless in the future 35

36 BONUS: What is the maximum and minimum system size to be eligible for a CSI incentive?

37 EPBB Calculator

38 EPBB Calculator Online tool that estimates the expected production of the system and is used to determine the CSI incentive amount Takes into consideration equipment, location, orientation, tilt, shading effects and standoff height Measures the proposed system against an optimal system Derates the proposed system by a certain percentage (0-100%), referred to as the Design Factor, for any factors affecting the expected performance. 38

39 Filling Out the EPBB Calculator Required Field Measurements Standoff Height Shading Tilt True Azimuth 39

40 Standoff Height Standoff Height - perpendicular distance from roof to the bottom of the module frame If not parallel to roof, use average height as shown below 6 (SMAX) Frame (6 +3 )/2=4.5 Mounting Method Choices: 0 >0 to 1 >1 to 3 >3 to 6 >6 (SMIN) 3 Please note: If the Mounting Method is not selected on the EPBB Calculator, it will automatically default to greater than 6 which can result in an incorrect design factor 40

41 Minimal Shading and Solar Access Obstructions such as trees, chimneys or nearby buildings can cast shadows on PV systems, which can reduce the system s sun access thereby reducing the amount of electricity the system will generate. You must indicate on the EPBB Calculator whether there is shading that will have an impact or not. Option 1: Minimal Shading Minimal Shading-requires at least a 2:1 distance to height ratio of any object within the orientation of sun to the panels. A > (2 X B) For example, if line B is 13 feet, then line A has to be 26 feet or more A B 41

42 Minimally Shaded? YES 40 Feet 10 Feet Object Height is 10 feet above the array. Object Distance is 40 feet from the array. 2 x Height (above the modules) = 2 x 10 feet = 20 feet 2 x Height < Distance = Minimal Shading Is 20 feet < 40 feet? Is this Minimal Shading? NO SHADE IMPACT REQUIRED 42

43 Minimally Shaded? NO 15 Feet 25 Feet Object Height is 15 feet above the array. Object Distance is 25 feet from the array. 2 x Height (above the modules) = 2 x 15 feet = 30 feet 2 x Height < Distance = Minimal Shading Is 30 feet < 25 feet? Is this Minimal Shading? SHADE IMPACT REQUIRED 43

44 If Not Minimal Shading Option 2: Not Minimal Shading, Enter Solar Access Values If a system does not satisfy the minimal shading requirement, a shading analysis needs to be performed to generate monthly solar access values. Solar access can be measured with tools such as the Solar Pathfinder or Solmetric SunEye (available at Pacific Energy Center to loan, visit Measurements should be take at every major corner, but should not be more than 40 feet apart. 44

45 Sample Reading 45

46 Shade Impact Comparison: EPBB vs PBI PBI Incentive based on actual kwh generation Since entire year s system availability affects kwh generation, all shade including winter shade affects incentive EPBB Only summer months (May-October) solar access affects incentive Winter shade has no impact on incentive 46

47 Tilt Tilt - Angle at which the modules are mounted relative to 0º (flat horizontal surface) Modules that are installed on a flat roof will have a 0º tilt Frame Ex. 30º tilt angleº 47

48 What is True Azimuth? True Azimuth the angle, usually measured in degrees( ), between a reference point (True North Point 0 ) and the direction of interest (direction panels are facing) The magnetic azimuth is measured using a compass, which does not represent the true north point because of the Earth s magnetic fields Therefore, the magnetic azimuth must be corrected by adding (in Western U.S.) the magnetic declination of a specific location to give true azimuth Magnetic Declination Magnetic North on a Compass 48

49 Magnetic Declination Correction Look up magnetic declination for specific location at: ( Enter in zip code, and it will calculate the magnetic declination for that location. For example: If you are in San Francisco and your compass shows you a reading of 180, you would look up the zip code (e.g ) and add the given correction for magnetic declination of 14 to get a true azimuth of 194 On EPBB Calculator, enter the azimuth as

50 Tips for Determining Azimuth Try to stay ft away from metal, motors, rooftop package units or magnets Store compasses away from cell phones and magnets Do not place compass directly on module or racking in case there are any magnetic fields present Check reading against tools like GoogleEarth. There is no azimuth function, but it can be used to provide sanity check for azimuth. 50

51 EPBB Tool Demonstration We will show how to input a sample system EPBB Tool explanation sheet can be found online at 51

52 Using the EPBB Calculator: Incentive Amounts EPBB Incentive = EPBB Incentive Rate x CSI rating CSI rating = CEC-AC Rating x Design Factor PBI Incentive = PBI Incentive Rate X Actual monthly kwh output* EPBB calculator will give estimate of the incentive for PBI by calculating estimated annual output (annual kwh) x the incentive rate x 5 years * As reported monthly by a separate performance meter 52

53 Field Verification Field measurements should be verified pre and post installation for accuracy If changes have been made after installation is complete, a new EPBB calculator must be submitted The following measurements must also be verified in the field post installation by the contractor* Primary Method Solar Irradiance Temperature Inverter Output Compare to Field Verification Output Table (next page) Secondary Method (trained/certified professionals only) Polarity of all source circuits is correct Open circuit voltages of source circuits have been tested and measured to be within 2% of each other Short circuit currents have been tested and measured to be within 5% of each other *Effective for Reservation Request Applications first received on or after July 1,

54 Field Verification Output Table 54

55 Multiple EPBB Calculators Multiple EPBB Calculators are needed when there are multiple arrays that differ in one or more of the following: Stand-off Height Shading Tilt True Azimuth Panel manufacturer and/or model Inverter manufacturer and/or model 55

56 Case Study 1 One array with the same: modules and inverter(s) stand-off height shading azimuth tilt 1 Take 4 SunEye Snapshots, one at each corner of the array panels: Azimuth - South 180º Tilt - 21º from horizontal Neighbor s tree 56

57 Case Study 1: Calculate Solar Access Averages Each snapshot will generate 12 monthly Solar access values Array 1: Solar access values are averaged for points 1-4 Jan 84% Feb 89% Mar 92% Apr 93% May 94% June 95% July 97% Aug 96% Sept 94% Oct 92% Nov 91% Dec 89% 57

58 Case Study 1: Calculate Impact Because entire array has the same stand-off height, shading, azimuth, tilt and equipment, it is fine to complete only one EPBB Calculator using averaged monthly solar access values from the 4 points. Array has 28 panels 58

59 Case Study 2 Two arrays with the same module types and same inverter(s) Two arrays with different shading, azimuths and tilts panels: Take 8 SunEye Snapshots, one at each corner of each array Azimuth - East 90º Tilt - 17º from horizontal panels: Azimuth - South 180º Tilt Neighbor s tree - 21º from horizontal 59

60 Array 1: Solar access values are averaged for points 1-4 Case Study 2: Calculate Solar Access Averages Each snapshot will generate 12 monthly Solar access values Jan 89 Feb 90 Mar 92 Apr 93 May 94 June 95 July 97 Aug 96 Sept 94 Oct 92 Nov 91 Dec 89 Array 2: Solar access values are averaged for points 5-8 Jan 90 Feb 91 Mar 92 Apr 93 May 94 June 95 July 96 Aug 96 Sept 95 Oct 93 Nov 92 Dec 91 60

61 Case Study 2: Calculate Impact Because the two arrays have the different shading azimuths and tilts, two separate EPBB Calculator submittals are required - one for each array of unique orientation. Array #1 has 9 panels Array # 2 has 21 panels 61

62 BONUS: What is the current incentive rate for EPBB and PBI for both Residential and Commercial?

63 CSI Application Process

64 Application Terminology: Before Applying Host Customer: the utility customer of record (person listed on the bill) at the location where the generating equipment will be located. System Owner: the owner of the generating equipment at the time the incentive is paid. Applicant: is the entity/person that completes and submits the CSI Program application and serves as the main contact person for the CSI Program. Project Site: the physical site where the system is going to be installed as listed with PG&E. If there is a separate mailing address, this can be indicated under the Host Customer section. 64

65 2 Step vs 3 Step Applications 2 Step All Residential retrofit projects All retrofit and new Non- Res projects < 10 kw Commercial Industrial Agricultural Government Non-Profit 3 Step All Non-Res retrofit and new construction projects > 10 kw Commercial Industrial Agricultural Government Non-Profit 65

66 2 Step Application Process

67 2 Step Application All Residential Retrofit and All Non-Res Projects < 10 kw Step 1. Reserve the Funding Step 2. Claim your Incentive RRF ICF Submit Reservation Request Form Submit Incentive Claim Form

68 Step 1 of 2: Reservation Request Required Documents 1. Completed Reservation Request Form and Program Contract with Signatures Application listing the customer, installer, project site, requested incentive amount, etc 2. Documentation of an Energy Efficiency Audit (or Title 24 documentation or other exemptions) Can be done on PG&E website, phone or mail 3. Printout of EPBB Tool Calculation ( Each array requires a separate printout to determine correct incentive 4. Copy of Executed Agreement of Solar System Purchase and Installation Purchase/installation contract between involved parties 5. Copy of Signed Disclosure Agreement* Acknowledgement of energy efficiency information provided *Effective July 1,

69 Step 1 of 2: Additional Required Documents, IF APPLICABLE If Existing EPBB Customer with Commercial Building >100,000 sq ft & Benchmarking < Copy of Commitment Agreement Commits customer to perform retrocommissioning If No Historical Usage or Annual kwh on EPBB Calculator > Previous 12 Month Usage history 7. Electrical System Sizing Documentation Square footage, list of new equipment/appliances with wattage and expected use, or engineer calculations If the Owner of the System is Not the PG&E Customer 8. Copy of Executed Alternative System Ownership Agreement Listing involved parties, terms, length of time, signatures, etc. *Effective July 1,

70 Step 1 of 2: Additional Required Documents, IF APPLICABLE If New Construction (Non-Res only)* 9. PERF-1 Form Certificate signed by a CEPE* Proof of compliance of 15% above current Title 24 standards 10. Building Site Plan* 11. Copy of New Construction Building Permit* If Government, Non-Profit or Public Entity 12. Certification of tax-exempt status If certification is unavailable, letter from the CFO or equivalent *Effective July 1,

71 Step 2 of 2: Incentive Claim Required Documents 1. Complete Incentive Claim Form with Signatures Application indicating payee, installed as-built equipment, final incentive amount, etc 2. Performance Monitoring & Reporting Service (PMRS) Documentation: If PBI: Copy of Executed Performance Data Provider (PDP) contract Performance Meter make, model & serial number; name of provider, terms & conditions, etc. Communication to the performance meter should be completed prior to ICF If EPBB and no eligible PMRS is installed (exempt): PMRS Cost Cap Exemption Documentation Proof of exemption such as copy of quote from eligible PMRS provider showing cost 3. Signed Field Verification Certification Form** To be signed by contractor verifying field measurements **Effective for Reservation Request Applications first received on or after July 1,

72 Step 2 of 2: Incentive Claim Required Documents If Existing EPBB Customer with Commercial Building >100,000 sq ft & Benchmarking < Copy of Retrocommissioning Report Agreement* Proof that customer has performed retrocommissioning and completed improvements to put them above a rating of 75 If Any Changes have been made to the System 5. Updated EPBB Calculation Printout Required if installed system is different than proposed system in approved in Reservation (Step 1) *Effective July 1,

73 2 Step Process and Timeframe All Retrofit Residential and All Non-Res Projects < 10 kw Reservation PG&E Review Reservation Complete Installation Incentive PG&E Review Incentive Request Form Within 30 days* Confirmation Notification Claim Form Within 30 days* Approval Notification Due 1 year from date Reservation Approved for retrofit Residential Due 18 months from date Reservation Approved for all Non-Residential Please note: Timeframes are approximate. *Missing or Incorrect information/documents cause indefinite delays.

74 3 Step Application Process

75 3 Step Application All Non-Residential Projects > 10 kw Step 1. Reserve Funding Step 2. Show Progress Step 3. Claim Incentive RRF PPM ICF Submit Reservation Request Form Submit Proof of Project Milestone Submit Incentive Claim Form

76 Application Fee for 3 Step Application Fee required for all non-residential applications > 10 kw based on CEC-AC rating kw > kw < FEE = $1, = $2, = $5, = $10, ,000 = $20,000 Fee refunded upon project completion Fee forfeited if project is cancelled after being reserved/confirmed 76

77 Step 1 of 3: Reservation Request Required Documents 1. Completed Reservation Request Form and Program Contract with Signature 2. Documentation of an Energy Efficiency Audit (or Title 24 documentation or other exemptions) 3. Printout of EPBB Tool Calculation ( 4. Copy of Disclosure Agreement* Additional Documents Required for 3 Step Applications 5. Application Fee for non-residential projects > 10kW Make payable to PG&E or CSI Program *Effective July 1,

78 Step 1 of 3: Reservation Request Required Documents, IF APPLICABLE Only required if applicable 6. Copy of Commitment Agreement* 7. Certification of tax-exempt status 8. PERF-1 Form Certificate signed by a CEPE* 9. Building Site Plan* 10. Copy of New Construction Building Permit* *Effective July 1,

79 Step 2 of 3: Proof of Project Milestone Required Documents 1. Completed Proof of Project Milestone Checklist Checklist to assist in completion of information materials required for review of Proof of Project Advancement 2. Copy of Executed Agreement of Solar System Purchase and Installation 3. Copy of Executed Alternative System Ownership Agreement, if applicable 4. Revised EPBB Calculation Printout, if applicable If Gov t, Non-profit, and Public Entities Due within 60 days of Reservation Reserved 5. Copy of Request For Proposal (RFP) of Solicitation Notice to Invite Bids or similar solicitations for the installation, lease, and/or purchase of the system proposed 79

80 Same as 2 Step Applications Step 3 of 3: Incentive Claim Required Documents 1. Complete Incentive Claim Form with Signatures 2. Performance Monitoring & Reporting Service (PMRS) Documentation: If PBI: Copy of Executed PDP Contract, of If EPBB and no eligible PMRS is installed (exempt): PMRS Cost Cap Exemption Documentation 3. Signed Field Verification Certification Form** 4. Copy of Retrocommissioning Report Agreement, if applicable* 5. Updated EPBB Calculation Printout, if applicable *Effective July 1, 2009 **Effective for Reservation Request Applications first received on or after July 1,

81 3 Step Process and Timeframe New Construction and Retrofit Non-Residential Projects > 10 kw Reservation Request Form PG&E Review Within 30 days* Reserved Reservation Notification Proof Of Project Milestone PG&E Review Within 30 days* Confirmed Reservation Notification Due 60 Days from Reservation Reserved Complete Installation Incentive Claim Form PG&E Review Within 30 days* Incentive Approval Notification Due 18 months from Reservation Reserved *Please note: Timeframes are approximate and cannot be guaranteed. Missing or Incorrect information/documents cause indefinite delays.

82 3 Step Process and Timeframe Government and Non-Profit Projects > 10 kw Reservation Request Form PG&E Review Within 30 days* Reservation Reserved Notification Request for Proposal (RFP) PG&E Review Within 30 days* RFP Approval Notification Due 60 Days from Reservation Reserved Proof Of Project Milestone PG&E Review Within 30 days* Reservation Confirmed Notification Complete Installation Incentive Claim Form PG&E Review Within 30 days* Incentive Approval Notification Due 240 Days from Reservation Reserved Due 18 months from Reservation Reserved *Please note: Timeframes are approximate. Missing or Incorrect information/documents cause indefinite delays.

83 Reservation Request Packet Common Mistakes Missing or Incorrect Energy Audit documentation (e.g. wrong zip code, etc.) Project Site Address does not match physical address in PG&E database Missing Tax Exemption Letter (Gov t, Non-Profit, Public Entities) Missing signatures for all parties involved Proper selection not made on EPBB Calculator, causing it to use defaults (i.e. stand-off height) Incentive Claim Packet Revised EPBB not submitted to reflect changes in installed equipment Equipment does not match information submitted to Generation Interconnection Dept. Missing PMRS documentation Tax Status and Tax ID inconsistent or incorrect from previous submittals 83

84 CSI Applications Received Total RRFs Received: 18,905 Total ICFs Received: 13, JAN 07 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC RRFs Received JAN 08 FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV ICFs Received DEC JAN 09 FEB MAR APR MAY JUN JUL AUG SEP

85 How to Apply Download Excel forms from website* Access online database PowerClerk Track status of all applications Ability to pre-fill certain sections with stored data * Please note that new forms are available as of July 16, 2009 and must be used 85

86 Resources Applications: Energy Efficiency: Residential EPBB Calculation Tool: Business California Energy Commission: 86

87 BONUS: What is the criteria for minimal shading according to the CSI Program?

88 CSI Field Inspection Process

89 CSI Field Verification Inspections Purpose To verify that the project is installed as represented in the Incentive Claim Form, is operational, is interconnected and meets the eligibility criteria of the CSI Program. 89

90 Selection of CSI Projects for Site Inspections Projects <50 kw: First two Incentive Claim Forms submitted by a contractor will be inspected After two successful inspections, projects will be randomly chosen for inspection Random means approximately 1 in 7 applications per applicant Projects >50 kw: Program administrator s discretion 90

91 Module & Inverter Equipment CSI Inspection Verification Inspectors will verify the following: Installation Parameters Verified Operation - Manufacturer - Model Number - Quantity *If module nameplate is not visible, invoice is necessary to verify manufacturer and model Measure: - Tilt - Azimuth - Standoff Height - Shading of array(s) -System is operational, and output is reasonable for conditions at time of inspection 91

92 Coordination of Inspections Applicants are not required to attend inspections, though they are highly encouraged to do so, especially For first time Applicants For projects with significant shading Inspector will require physical access to the equipment and will contact the Applicant to coordinate this with the Host Customer If Applicant prefers, the Inspector can coordinate with the Host Customer directly. 92

93 Access Issues to Modules If issues exist that prohibit access, such as Weather conditions that may render it unsafe to mount roof Roof that are too steep or have other structural issues, etc. The Inspector will require assistance from Applicant by Providing their shading analysis for EPBB Calculator Providing an invoice indicating the module manufacturer, model and quantity The Inspector will still verify if the system output from the inverter is reasonable given the conditions during the inspection 93

94 Inspection Results Inspector will verify measurements are within the following tolerances: Tilt +/- 3º Azimuth +/- 5º Shading +/- 5% If inspection results fall within tolerances Inspector will accept EPBB calculator as submitted with the Incentive Claim Form and send report to PG&E PG&E will pay incentive as requested in the Incentive Claim Form If inspection results fall outside of tolerances Inspector will communicate discrepancies to Applicant onsite, if present during inspection Inspector will run a new EPBB calculator to get a revised CSI rating and incentive amount Inspector will send it along with the report to PG&E for further evaluation 94

95 Inspection Results Cont d PG&E will compare recalculated incentive to submitted incentive amount in Incentive Claim Form/EPBB Calc. If incentive amount discrepancy is within 5% PG&E will pay revised incentive amount based on new EPBB Calculator from inspection If incentive amount discrepancy is 5% or more PG&E will issue a failure If a failure is issued, the following two options will be communicated to the Applicant and Host Customer and a decision must be made within 30 days: 1. Applicant can accept new recalculated incentive amount 2. Applicant can dispute the accuracy of results/measurements If installed equipment is different (manuf/model or quantity) than that submitted in the ICF/EPBB Calc, new EPBB calculator will be run if it effects CSI rating/incentive 95

96 Failed Inspections Low volume Installer (< 200 systems per year Statewide) 1 failure = warning 2 failures = 100% inspection for Applicant s projects 3 failures = Disqualification for 1 year from CSI Program High volume Installer (> 200 systems per year Statewide) 4 failures = 100% inspection 5 failures = Disqualification for 1 year All failures removed after good standing for 1 year of last failure 96

97 How to Prevent Failed Inspections Make sure Incentive Claim Form and EPBB Calculator accurately reflect as-built system If any changes occur, send updated EPBB Calculator to Program Administrator before the inspection occurs Revised EPBB Calculators will not be accepted by Inspectors on-site Attend the inspection to familiarize yourself with the inspection process and program requirements 97

98 BONUS: What is the two customer criteria that distinguishes a project as 3 step?

99 CSI Performance Metering and Monitoring

100 Performance Metering and Monitoring CPUC requires all projects to have Performance Monitoring and Reporting Services (PMRS), unless exemption criteria are met EPBB and PBI Projects Performance Meter: is a meter separate from and in addition to the utility s revenue meter (can be inverter integrated) and records system performance at an accuracy of +/-5%. Performance Monitoring and Reporting Service (PMRS): is a service that a customer can purchase to track the performance of their system through the performance meter or a NGOM. PBI Only Net Generation Output Meter (NGOM): is a meter separate from and in addition to the utility s revenue meter and records performance (output) data at accuracy of +/-2%. Performance Data Provider (PDP): the entity that collects performance data from the NGOM and provides it to PG&E. This is used for calculating monthly PBI payments and can also be used to provide customer performance data. Data for PBI payments is collected once a month 100

101 CSI Application Requirements EPBB Projects: must include proof of exemption (if exempt, see chart below) Copy of quote from eligible provider showing total cost PBI Projects: must include a copy of an executed contract with a PMRS/PDP provider for 5 years and must show Provider name, project site, cost and all other terms CEC approved meter make, model and serial number Copy of signatures for all involved parties Please Note: All metering systems are paid for at the System Owner s expense including some form of communications (internet), performance monitoring and reporting capability. 101

102 EPBB Metering and Monitoring Set-Up PV Panels Project Site Inverter (with Integrated meter +/- 5%) Performance Monitoring and Reporting Service (PMRS) Customer NEM Utility Meter (Bidirectional) For Billing 102

103 PBI Metering and Monitoring Set-Up Project Site NEM Utility Meter (Bi-directional) PV Panels Inverter (with Integrated Meter +/- 5%) For Billing Performance Monitoring and Reporting Service (PMRS) Customer Net Generation Output Meter (NGOM +/- 2%) Performance Data Provider (PDP) For PBI Payments 103

104 Additional Requirements All PMRS/PDP providers must be listed on the CEC Website and be approved by each Program Administrator A list is available at Note: In most cases, the PMRS provider and PDP provider will be the same entity. Meter and equipment must be on approved CEC list If the following message is displayed on the EPBB calculator, the selected inverter does not have a +/-5% integrated meter and/or an output display. Therefore, an additional meter or component must be installed Meters must have a one-year warranty Performance meters can be installed by the utility or a qualified 3 rd party (PBI Only) See CSI Handbook: Appendix B, Section 11 and for more information 104

105 BONUS: What are the four field measurements we verify during an inspection?

106 Other Solar Electric Generating Technologies (Non-PV)

107 Other Solar Electric Generating Technologies All solar technologies other than flat-plate non-concentrating modules Category Electric Generating Electric Displacing Technology Examples Dish stirling Solar trough Dish and lens Concentrating solar ( CPV )* Solar water heating Solar space & process heating Solar driven cooling Incentive Basis Amount of electricity generated (like with PV) minus ancillary loads Amount of electricity that would have otherwise been consumed, assuming minimum equipment efficiencies *only technology currently CSI eligible 107

108 Other Solar Electric Generating Technologies Technology examples Dish Stirling Source: Source: Concentrating PV Solar Trough Source: Solar Thermal Heating/Cooling 108

109 Other Solar Electric Generating Technologies All Other Solar Electric incentives are PBI As with PV, products must be certified for CSI eligibility Only four products are certified to-date List available at CSI calculator for Concentrating PV is available Determines incentive based on user estimate of annual kwh (can be obtained from vendor calculations) Forms available on CSI website Reservation Request Form Reservation application guide Two Other Solar Electric Reservation Request (Concentrating PV) received 109

110 BONUS: What is the cost cap exemption for a 35kW PBI system?

111 Generation Interconnection Services (GIS)

112 Interconnection Overview Interconnection is the physical connection of the solar system to the utility grid. GIS Role Coordinates interconnection activities, including: engineering reviews, metering access issues special facilities execute contracts and administer Assures that safety protocols are adhered to for the protection of the utility workers and the generator is installed as designed and operating according to Rule 21. Issues Permission to Operate (PTO). Provides for two types of solar interconnections (Rule 21): NEM (exporting) and non- 112 NEM (non-exporting) options for the customer.

113 Total PG&E NEM Interconnections 113

114 Interconnection Application vs. CSI Application Submit CSI Application Review Incentive Paid Submit Interconnection Application Review & Approve Interconnect to grid Interconnection Application is a separate, but parallel process to CSI/SGIP Application. Equipment submitted with the CSI application and the Interconnection Application must match. Permanent Service must be established (No Temporary). GIS Field Inspection and Interconnection Agreement must be complete and PTO granted before paid for CSI Incentive. 114

115 GIS Application Common Issues Final building permit (BP) does not match application or is missing. Single Line Diagram (SLD) has no equipment information: make, model, rating, or how many PV modules are connected to each inverter. Name on application does not match name on PG&E Blue Bill account. (Call: to add name to acct). Reprogramming fee of $228 for Time of use (TOU) not included. Website has availability and exceptions. 115

116 Other Common Issues System Upgrades: New Application is necessary showing all generation on site. Fax coversheet with Reference/Application number is not included when faxing docs (building permits) to GIS. Customer/Vendor requesting courtesy calls upon PG&E receipt of final City/County Building Inspection. Appointments for installation of a PG&E lockbox to gain access not discussed with customer by the vendor. 116

117 #1 Issue Disconnect Access: Customer s bi-directional meter must be installed in a safe, 24/7 PG&E-accessible location, unobstructed by locked gates or pets. Meter access must be maintained at all times for reading/system maintenance. Any animals owned by the customer, including pet dogs, should not have access to these areas to avoid hindering PG&E service personnel from completing their work. PG&E Rule 21(D.1.e) requires PG&E to have a visible, lockable, accessible A/C disconnect device for each generator. It is not required if the customer has a self contained meter that can be utilized as the A/C disconnect for the generator. (98% of PG&E meters are self contained). 117

118 Net Energy Metering (NEM) The utility grid is a two-way street. Electricity can be exported to the grid by the customer. PG&E can provide any extra electricity or back-up power the customer may need. Eliminates the need for batteries Reduces cost and maintenance. Ensures a constant supply of electricity. X 118

119 Net Energy Metering (NEM) The intent of the NEM program is that the generation is primarily to offset part or all of the customer s own electrical requirements. The electric grid acts as a "battery" for the customer and their meter measures the net usage ("spins backwards" when the customer is exporting electricity to the grid). In California, systems up to 1 MW can participate in the program; other states typically have a lower size limit. 119

120 Resources GIS Contact Information Website: Phone: Fax: Jack McDermott Senior Program Manager Phone:

121 BONUS: What are the two types of interconnections options (Rule 21) for customers?

122 Billing and Rates

123 How NEM Billing Works Meter runs forwards/backwards and only records net energy PG&E will not pay cash or issue a check for exporting to the grid Customer receives a monthly charge or credit based on electric rate schedule Charges/credits carry over each month for 12 months, referred to as True-Up Period 123

124 NEM Billing continued True-Up Period starts on date of interconnection and ends each anniversary At end of 12 month period, customer will receive True-Up bill, reconciling all the accumulated charges and credits Customer will still receive a monthly bill for minimum charge and if applicable, for gas Customer also receive a separate monthly NEM statement detailing reads and charges/credits to be owed at the end of the True-Up Period 124

125 Sample Bill and Statement Jane Sample 123 Main St San Jose, CA

126 NEM Not for Everyone Not every customer will benefit from participating in NEM Reasons: Will never export Demand charges are not eliminated 12 month billing cycle may be difficult for accounting or budgets Should be evaluated on a case by case basis 126

127 Residential Electric Rates Customers are billed on a tiered pricing structure. The 1 st Tier represents the essential amount of electricity called baseline Baseline amount is set by legislature and is based on: Geographic location (Territory) Season (Winter/Summer) Permanent Heating Source (Gas/Electric) 127

128 Residential Rate Options Basic rate E-1 Price does not vary by season or time of day Best for customer who are home during the day or cannot shift usage outside 1-7pm E6 Time of Use (TOU) rate Price varies by time of day 3 time periods: Peak Partial-Peak Off-Peak Solar Friendly 128

129 E-6 Time Periods 129

130 Example of Billing: E1 Customer lives in San Francisco (territory T) and has gas heating Baseline Quantity (kwh): Summer per day Winter per day 30 days in billing cycle = 30 x 8.3 = 249 kwh = monthly baseline E1 Customer s net usage is 400 kwh Net Tier 1 (Baseline): 249 x $ = $28.76 Tier 2 101%-130% of Baseline: 74.7 x $ = $9.81 Tier 3 131%-200% of Baseline: 76.3 x $ = $18.87 Tier 4 201% - 300% of Baseline: 0 x $ Tier 5 Over 300% of Baseline: 0 x $ Total = $

131 Example of Billing: E6 Same customer and usage as E1 example: monthly baseline = 249 kwh E6 Customer s Net Usage: Peak -200 Partial Peak 100 Off Peak 500 = 400 kwh Net Peak: -200 T1 Baseline: (-200/400)x249= x $ = -$36.48 T2 101%-130% of Baseline: x $ = -$11.53 T3 131%-200% of Baseline: x $ = -$16.19 Partial Peak: 100 T1 Baseline: (100/400)x249= x $ = $8.99 T2 101%-130% of Baseline: x $ = $2.99 T3 131%-200% of Baseline: x $ = $5.26 Off Peak: 500 T1 Baseline: (500/400)x249= x $ = $26.32 T2 101%-130% of Baseline: x $ = $9.37 T3 131%-200% of Baseline: x $ = $19.67 Total = $

132 Commercial Rate Options A-1 Basic rate for small commercial Best for low usage, under 50,000 kwh/year A-6 Time of Use (TOU) rate for small commercial Best if majority of usage is at night and weekends E-19 Voluntary TOU rate for large commercial with maximum demand* up to 499 kw E-19 Mandatory TOU rate for large commercial with maximum demand* between kw If demand > 1000, must be E-20 A-10 Demand rate for medium commercial Best if usage expected is over 50,000 kwh/year E-20 Mandatory TOU rate for large commercial with maximum demand* over 1000 kw demand monthly *Demand is the maximum amount of electricity drawn within a 15 min interval 132

133 A-6, E-19 & E-20 Time Periods 133

134 Resources Website To discuss rates Call the Solar Customer Service Center

135 BONUS: What are the two current electric rate options for residential customers and two rate options for small commercial?

136 Appendix

137 Other Solar Incentive Programs New Solar Homes Partnership (NSHP) Goal is to create a self sustaining market for new homes where builders incorporate high levels of energy efficiency AND high performing solar systems Provides financial incentives to home builders and developers for installing eligible solar photovoltaic (PV) on new residential homes: For more information, please visit Low Income Solar Program Provides education and incentives for installing solar PV systems in eligible low income structures There are two distinct programs: SASH: Single Family Affordable Solar Housing Administered statewide by GRID Alternatives MASH: Multifamily Affordable Solar Housing Administered by PG&E, SCE and CCSE For more information, visit 137

138 Other Renewables Programs Feed-in Tariffs Created in February 2008 to allow eligible renewable generators up to 1.5 MW to sell back power to PG&E Customers must sign a power purchase agreement of 10, 15 or 20 years and will be paid based on CPUC determined rate For more information, visit Power Procurement/Wholesale Electric To meet customer load, PG&E purchases wholesale electric energy and capacity from generators and suppliers. If you are interested in Request for Offers (RFOs), power purchase agreements or Qualifying Facilities (QFs), please visit or 138

139 BONUS: What are the four solar programs under the Senate Bill 1 (SB1)?

140 Resources The slides for today s presentation can be downloaded/printed at: Also available are the following supporting documents for the CSI Program: Reservation Request Form Punchlist Incentive Claim Form Punchlist Detailed Explanation of EPBB Calculator Calculating Baseline for NEM Customers Instructions for the Removal of Cookies 140

141 PG&E Classes & Webinars Mon, Oct 26 11:00 am-12:00 pm - PG&E and Low Income Programs Online Tue, Oct 27 6:00 pm- 8:00 pm - Solar Power Basics for Residential Customers - Belmont Tue, Oct 27 12:00 pm - 1:00 pm - Solar Billing - Online Fri, Oct 30 9:00 am - 4:30 pm Solar Water Heating Systems - SF PEC and Online Mon, Nov 2 11:00 am - 12:00 pm Path to Energy Savings - Residential New Construction - Online Tue, Nov 3 9:00 am - 4:30 pm - Basics of Photovoltaic (PV) Systems for Grid-Tied Application Eureka Tue, Nov 3 11:00 am - 12:00 pm - Guide to Using PowerClerk Online Wed, Nov 4 11:00 am - 12:00 pm - Path to Energy Savings - Existing Res and Small Comm - Online Wed, Nov 4 12:00 pm - 1:00 pm - Your Path to Energy Savings - Large Commercial - Online Thu, Nov 5 12:00 pm - 1:00 pm - Solar for the Entrepreneur - Online For a complete list of classes, please visit 141

142 Questions

California Solar Initiative Introduction Workshop. The slides for today s presentation can be downloaded/printed at

California Solar Initiative Introduction Workshop. The slides for today s presentation can be downloaded/printed at California Solar Initiative Introduction Workshop The slides for today s presentation can be downloaded/printed at www.pge.com/solareducation Content Introduction Overview of Energy Efficiency and Climate

More information

California Solar Initiative Introduction Workshop. The slides for today s presentation can be downloaded/printed at

California Solar Initiative Introduction Workshop. The slides for today s presentation can be downloaded/printed at California Solar Initiative Introduction Workshop The slides for today s presentation can be downloaded/printed at www.pge.com/solareducation 1 Ground Rules Act in a safe manner and follow safety guidelines

More information

PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar. March 26, 2009

PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar. March 26, 2009 PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar March 26, 2009 Goals Update of PG&E s CSI incentive program Overview of PG&E s NEM interconnection process What

More information

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009 SDG&E Customer Distributed Generation Programs Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009 About SDG&E... A regulated public utility that provides service in San Diego

More information

24. SOLAR INCENTIVE PROGRAM II

24. SOLAR INCENTIVE PROGRAM II 24. SOLAR INCENTIVE PROGRAM II A. General California Senate Bill 1 requires publicly owned utilities that sell electricity at the retail level, to adopt, implement, and fund a solar incentive program for

More information

Interconnection Process Simplification Webinar

Interconnection Process Simplification Webinar 12.02.09 Interconnection Process Simplification Webinar The slides for today s presentation can be downloaded/printed at www.pge.com/solareducation 2 Agenda Overview of PG&E s NEM interconnection process

More information

Interconnection Process Simplification Webinar

Interconnection Process Simplification Webinar Please stay tuned for the 1 Interconnection Process Simplification Webinar We will be starting momentarily last updated 3.4.13 2 Agenda Overview of PG&E s NEM Program What you need to know about NEM interconnections

More information

Lassen MUD PV BUYDOWN PROGRAM Photovoltaic Systems Guidelines

Lassen MUD PV BUYDOWN PROGRAM Photovoltaic Systems Guidelines Lassen MUD PV BUYDOWN PROGRAM Photovoltaic Systems Guidelines Lassen Municipal Utility District (LMUD) is committed to promoting and supporting renewable technologies and is offering its customers rebates

More information

Solar Electric Systems for Multi-Tenant Units. Presenters

Solar Electric Systems for Multi-Tenant Units. Presenters Solar Electric Systems for Multi-Tenant Units Pacific Energy Center Tuesday, October 21, 2008 Presenters Pete Shoemaker Renewables Education Coordinator Pacific Energy Center pjsy@pge.com Chuck Hornbrook

More information

Solar*Rewards Frequently asked questions system size and customer usage

Solar*Rewards Frequently asked questions system size and customer usage Solar*Rewards 1. Will a PV system work with my home? 2. Am I eligible to participate in the Solar*Rewards program? 3. What size system should I get? 4. Can a customer at a service location apply for the

More information

HydroGenerations PROGRAM HANDBOOK

HydroGenerations PROGRAM HANDBOOK HydroGenerations PROGRAM HANDBOOK TABLE OF CONTENTS Please ensure you are reading the most recent version of this handbook by visiting the NV Energy website, www.nvenergy.com/hydro. Contents HydroGenerations

More information

Municipality Generator Interconnection Application Single Meter Application Part I

Municipality Generator Interconnection Application Single Meter Application Part I Municipality Generator Interconnection Application Single Meter Application Part I New Application Revised Application A single customer interconnecting to a single meter at a single premise makes a new

More information

Thomas Alston Director of Business and Policy Development. Presented By N. Scottsdale Rd, Suite 410 Scottsdale Arizona 85257

Thomas Alston Director of Business and Policy Development. Presented By N. Scottsdale Rd, Suite 410 Scottsdale Arizona 85257 Residential Solar Workshop May 7 th 2008 Thomas Alston Director of Business and Policy Development Presented By 1475 N. Scottsdale Rd, Suite 410 Scottsdale Arizona 85257 Workshop Agenda An Overview of

More information

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less IMPORTANT NOTES: Customers may not operate their Generating Facility while interconnected to the PG&E system until they receive written permission from PG&E. For a non-exporting Generating Facility, RES-BCT

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

July 16, Dear Mr. Randolph:

July 16, Dear Mr. Randolph: July 16, 2012 Edward F. Randolph Director of Energy Division California Public Utilities Commission 505 Van Ness Ave., Room 4004 San Francisco, CA 94102 Re: Southern California Edison Company Report on

More information

Contents. Solar Select TM Frequently Asked Questions

Contents. Solar Select TM Frequently Asked Questions Solar Select TM Frequently Asked Questions Contents Program Overview and How Solar Select Works... 1 Participation Requirements... 3 Cost and Payment... 4 Solar Production... 5 Development, Equipment,

More information

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power 40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect

More information

Long Island Solar Installer Workshop

Long Island Solar Installer Workshop Long Island Solar Installer Workshop Jossi Fritz-Mauer February 3, 2016 1 Agenda Solar Basics Solar PV Technology NY-Sun Incentive Program Financial Considerations Return on Investment Purchase or Leasing

More information

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK 1 1 TABLE OF CONTENTS Please ensure you are reading the most recent version of this handbook by visiting the NV Energy website https://www.nvenergy.com/cleanenergy/electric-vehicles

More information

ALZ Electrical Solar Consumer Guide

ALZ Electrical Solar Consumer Guide ALZ Electrical Solar Consumer Guide ALZ Electrical Unit 6/3 Southern Cross Circuit, Urangan QLD 4655 T: (07) 4124 9552 E: admin@alzelectrical.net W: www.alzelectrical.net Why go solar? Solar power systems

More information

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority

More information

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less IMPORTANT NOTES: Customers may not operate their Generating Facility while interconnected to the PG&E system until they receive written permission from PG&E. For a non-exporting Generating Facility, RES-BCT

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options Effective 8-10-09, Public Act 096-0159 modified the Illinois Power Agency Act to include the Renewable

More information

Energy Efficiency Program Overview

Energy Efficiency Program Overview Energy Efficiency Program Overview Rick Tonielli Sr. Program Manager C O N F I D E N T I A L Who We Are and What We Do Help customers save money and energy Cash incentives Technical services Whole-building

More information

Appendix G - Danvers Electric

Appendix G - Danvers Electric Appendix G - Danvers Electric Energy Efficiency and Conservation Programs Revision ID Date Author Notes Approval (initials and date) 1.0 9-6-2011 Clint Allen The purpose of Version 1 is to release certain

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

Steps to Installing Solar for Residential Customers

Steps to Installing Solar for Residential Customers The Future is Clean Energy Steps to Installing Solar for Residential Customers Courtesy of DOE/NREL 1 Contact Information Pete Shoemaker 851 Howard St., CA 94103 (415) 973-8850 pjsy@pge.com 2 Just Another

More information

Solar for Homeowners Getting Started with Solar

Solar for Homeowners Getting Started with Solar Solar for Homeowners Getting Started with Solar 1 January 9, 2014 California Center for Sustainable Energy Mission: Accelerating the transition to a sustainable world powered by clean energy CCSE operates

More information

Solar-Wind Specific Request for Proposals

Solar-Wind Specific Request for Proposals Program Description Solar-Wind Specific Request for Proposals Power Production from Green Resources in North Carolina 04/19/2006 NC GreenPower (NCGP) is a statewide program designed to improve the quality

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No. 137 NET METERING SERVICE APPLICABILITY This net energy-metering schedule is applicable to residential, small

More information

Contents. 04 Overview. 05 Residential Energy Efficiency Program. 07 Heating Ventilation and Air Conditioning (HVAC) Systems

Contents. 04 Overview. 05 Residential Energy Efficiency Program. 07 Heating Ventilation and Air Conditioning (HVAC) Systems Contents 04 Overview 05 Residential Energy Efficiency Program 07 Heating Ventilation and Air Conditioning (HVAC) Systems 08 Custom Energy Efficiency Program 08 New Construction and Major Tenant Renovation

More information

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board Policy Description: In an effort to ensure fair treatment of all of its customers,

More information

2012 INSTALLERS MEETING UES INSTALLER S MEETING

2012 INSTALLERS MEETING UES INSTALLER S MEETING 2012 INSTALLERS MEETING UES INSTALLER S MEETING Agenda Welcome & Introductions 2011 Overview Policies and Procedures 2012 Program Overview Program Incentives Questions & Answers UES Conservation and Renewable

More information

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016 Considerations for Municipal Solar Projects Ben Frevert Larsen Engineers November 16, 2016 Topic Areas Benefits of going green / solar Actions local governments can take Programs and incentives Implementation

More information

What is Solarize Westchester?

What is Solarize Westchester? What is Solarize Westchester? Solar. Simple. Together. Makes solar simple, affordable and accessible to Ossining and Briarcliff homeowners and commercial property owners. Model has been implemented across

More information

Lighting and Lighting Controls Energy Savings Opportunities Technical Training Series

Lighting and Lighting Controls Energy Savings Opportunities Technical Training Series Lighting and Lighting Controls Energy Savings Opportunities 2017 Technical Training Series Agenda Solutions for Business: Overview & Successes Program Rebates: What Qualifies? Submitting an Application:

More information

2014 RENEWABLE ENERGY PHOTOVOLTAIC Fact Sheet

2014 RENEWABLE ENERGY PHOTOVOLTAIC Fact Sheet Own your own power generation protect the environment Colorado Springs Utilities ( Springs Utilities ) is committed to being an environmentally friendly utility. Bringing clean, renewable energy to our

More information

Electric Vehicle Basics for Your Business

Electric Vehicle Basics for Your Business Welcome to Electric Vehicle Basics for Your Business Electric Vehicle Basics for Your Business What You Need to Know About EVs and Charging September 25, 2013 1 Agenda 7788 Copyright 2012, -800-990- SCE

More information

Montana Renewable Energy Association

Montana Renewable Energy Association Montana Renewable Energy Association Mission & Focus areas: Education and Outreach Policy and Advocacy Industry Engagement www.montanarenewables.org SolSmart Solar Ready communities making process of going

More information

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Eligible Renewable Generation (ERG) Application INSTRUCTIONS INSTRUCTIONS THIS DOCUMENT CONTAINS: ERG Application INSTRUCTIONS ERG Application INFORMATION ERG Application FORM ERG Application CHECKLIST Please read the INSTRUCTIONS and INFORMATION before completing

More information

Net Metering & Compensation Seminar

Net Metering & Compensation Seminar Net Metering & Compensation Seminar November 2, 2017 Eversource Energy Hadley, MA Changes Are Here Market Net Metering Credit was introduced: 60% Market equal to 60% of distribution, transition, transmission

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

LET S GO TOGETHER. A STEP-BY-STEP GUIDE TO SOLAR and other renewable options

LET S GO TOGETHER. A STEP-BY-STEP GUIDE TO SOLAR and other renewable options LET S GO SOLAR TOGETHER A STEP-BY-STEP GUIDE TO SOLAR and other renewable options At SDG&E, we re proud to be a leader in delivering clean, renewable energy to our customers. Did you know that around 45%

More information

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 Canceling P.S.C. Mo. No. 5 Sec. 4 Original Sheet No. 23 PURPOSE: The purpose of this Rider SR is to implement the solar rebate established through 393.1030

More information

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Consumer Guidelines for Electric Power Generator Installation and Interconnection Consumer Guidelines for Electric Power Generator Installation and Interconnection Habersham EMC seeks to provide its members and patrons with the best electric service possible, and at the lowest cost

More information

Electrical District No. 3 SOLAR Q & A

Electrical District No. 3 SOLAR Q & A D3 Electrical District No. 3 SOLAR Q & A What are some things I should consider before going solar? Leasing verses owning: Know the Pros and Cons of each, as well as the Short-term and Long-Term effects

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

Michigan Renewable Energy Case Study

Michigan Renewable Energy Case Study Michigan Renewable Energy Case Study NARUC ENERGY REGULATORY PARTNERSHIP WITH GEORGIAN NATIONAL ENERGY AND WATER SUPPLY REGULATORY COMMISSION TBILISI, GEORGIA JANUARY 27-31, 2014 GREG R. WHITE, COMMISSIONER

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

2018 Solar Home & Solar Share Home Program Manual

2018 Solar Home & Solar Share Home Program Manual 2018 2018 Solar Home & Solar Share Home Program Manual Version 02022018 This Program Manual is intended to serve as a reference for Santee Cooper s residential Customers that are interested in learning

More information

Do It Yourself Solar Photovoltaic (PV) Workshop. Jack Barnett Blair Buselli

Do It Yourself Solar Photovoltaic (PV) Workshop. Jack Barnett Blair Buselli Do It Yourself Solar Photovoltaic (PV) Workshop Jack Barnett Blair Buselli 1 Agenda Tonight: Economics and Cost Intro to Photovoltaic (PV) Solar Systems Paperwork & Permitting Roofs and How to Mount Sizing

More information

All of Texas Has Excellent Solar Resources. United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35.

All of Texas Has Excellent Solar Resources. United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35. All of Texas Has Excellent Solar Resources United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35.962 GW Benefits of Solar Investing in Solar Creates Good Local

More information

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW) City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems

More information

2019 BQDM Extension Auction Frequently-Asked Questions Updated January 29, 2018

2019 BQDM Extension Auction Frequently-Asked Questions Updated January 29, 2018 2019 BQDM Extension Auction Frequently-Asked Questions Updated January 29, 2018 See 2019 BQDM Extension Auction Technical Requirements for definitions of terms in bold. General Auction Questions 1. How

More information

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. 39 PURPOSE: The purpose of the Solar Subscription Pilot Rider (Program) is to provide a limited number of

More information

PART 2 GUIDELINES. To be eligible to receive a financial incentive, the following conditions must be met:

PART 2 GUIDELINES. To be eligible to receive a financial incentive, the following conditions must be met: PART 2 GUIDELINES 1. Program Objective and Scope The objective of the Business Incentive Program ("BIP") is for Toronto Hydro-Electric System Limited ("Toronto Hydro") to provide financial incentives to

More information

COMMERCIAL HVAC REBATES

COMMERCIAL HVAC REBATES 6 COMMERCIAL HVAC REBATES HOW TO APPLY FOR COMMERCIAL REBATES READ THE GENERAL REQUIREMENTS to determine if you are eligible for a rebate. REVIEW THE REBATE REQUIREMENTS to make sure your new equipment

More information

This presentation was given as part of a workshop on February 7, Presenters were:

This presentation was given as part of a workshop on February 7, Presenters were: This presentation was given as part of a workshop on February 7, 2018. Presenters were: Andrew Valainis, Montana Renewable Energy Association Bryan Von Lossberg, Renewable Energy Consultant Paul Herendeen,

More information

Heating, Ventilation and Air Conditioning Rebate Catalog Saving energy for a brighter future

Heating, Ventilation and Air Conditioning Rebate Catalog Saving energy for a brighter future Pacific Gas and Electric Company Energy Efficiency s for Your Business Heating, Ventilation and Air Conditioning Catalog Saving energy for a brighter future Customers may be eligible to participate in

More information

CALIFORNIA PUBLIC UTILITIES COMMISSION

CALIFORNIA PUBLIC UTILITIES COMMISSION CALIFORNIA PUBLIC UTILITIES COMMISSION ADVICE LETTER FILING SUMMARY ENERGY UTILITY MUST BE COMPLETED BY LSE (Attach additional pages as needed) Company name/cpuc Utility No. Liberty Utilities (CalPeco

More information

December 2018 RenewableGenerations Monthly Report

December 2018 RenewableGenerations Monthly Report 2018 RenewableGenerations Monthly Report Ecosystem of Clean Energy Programs Contractor Training Webinar Table of Contents Solar Electric... 3 Solar Thermal Heating (Northern Nevada Gas Customers)... 5

More information

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions 1 What did Black Hills Energy file? We submitted a Phase 2 Rate Review proposal to the Colorado Public Utilities Commission (PUC) to complete the two-step process of updating electric rates, which were

More information

MCE Napa County Cleaner energy and lower rates. Honig Winery, Rutherford

MCE Napa County Cleaner energy and lower rates. Honig Winery, Rutherford MCE Napa County Cleaner energy and lower rates Honig Winery, Rutherford Public Power by Community Choice Communities collectively purchase electricity as an alternative to investor-owned utility power

More information

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Presentation Outline Understanding LPEA s expenses and what drives them Economics of net metering

More information

Shedding Light on S lar Overview of Solar Finance

Shedding Light on S lar Overview of Solar Finance OBAR Climate Action Committee PG&E Pacific Energy Center Thank you! Shedding Light on S lar Overview of Solar Finance 3/10/2017 Doug McKenzie dmckenzie@norcalsolar.org Solar Finance Two types of Residential

More information

This presentation was given as part of a workshop on November 14, Presenters were:

This presentation was given as part of a workshop on November 14, Presenters were: This presentation was given as part of a workshop on November 14, 2017. Presenters were: Andrew Valainis, Montana Renewable Energy Association Bryan Von Lossberg Paul Herendeen, Missoula Federal Credit

More information

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION SAMPLE ORDINANCE 3/5/2012 Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION Section 1: Applicable Service Territory Net metering and electrical system interconnection is available on a first-come,

More information

2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019

2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019 2019 NYC Solar Installer Workshop: Solar and Storage March 18, 2019 2 ConEdison Activity Since MW Block Redesign Commercial MW Block Activity 3 15 MW submitted since redesign - 6/17/2018 10 rooftop canopy

More information

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

City Title.  . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact. To be completed by Solar Electric Design Ally and Project Owner Don't Forget to Include Project Owner and Design Ally Signatures Site Layout Sun Chart Wiring Schematic Program Use Only FastTrack ID Project

More information

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Ordinance No. 743 Exhibit A City of Washington, Kansas Electric Department Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Page 1 of 7 1. INTRODUCTION The provisions of this

More information

The Rebate Program can change without notice. CPS Energy reserved the right to discontinue the program at any time.

The Rebate Program can change without notice. CPS Energy reserved the right to discontinue the program at any time. COMMERCIAL & INDUSTRIAL CUSTOMERS Program Overview The CPS Energy Rebate Program for Commercial and Industrial Customers (Rebate Program) was developed to provide incentives for the new installation and

More information

Energy Savings through Solar Energy for Municipalities

Energy Savings through Solar Energy for Municipalities Energy Savings through Solar Energy for Municipalities May 2015 2014 Sunvestment Group www.sunvestmentgroup.com Solar Market Growth U.S. US Capacity and Generation: Solar Source: National Renewable Energy

More information

NEM Aggregation Tariff Overview

NEM Aggregation Tariff Overview 1 NEM Aggregation Tariff Overview Harold Hirsch, Sr. Regulatory Analyst Maggie Dimitrova, Expert Program Manager June 17 th, 2014 Agenda Overview Eligibility Interconnection Billing Other programs and

More information

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. First Revision of Sheet No. 135.1 P.S.C.U. No. 50 Canceling Original Sheet No. 135.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 135 STATE OF UTAH Net Metering Service Closed to Applications for

More information

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for December 2009 [Amended Version]

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for December 2009 [Amended Version] Monthly Report On Interruptible Load and Demand Response Programs for December 2009 [Amended Version] April 21, 2010 ( PG&E ) hereby resubmits this report on Interruptible Load and Demand Response Programs

More information

Consumer guide. be brighter. actewagl.com.au/solar

Consumer guide. be brighter. actewagl.com.au/solar be brighter. Consumer guide. Your guide on how solar works, how much you can save on your electricity bills and how to choose the right provider and system for you. actewagl.com.au/solar solar@actewagl.com.au

More information

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources Ordinance No. Exhibit A ----------------------------------------- City of, Kansas Electric Department Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources -------------------------------------

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

Household Renewable Energy

Household Renewable Energy Household Renewable Energy Commissioner Richard Campbell May 23, 2012 Renewable Energy Promotion Methods for Households Net Metering Interconnection Rules Subsidies Tax Credits 2 Net Metering Net metering

More information

INDUSTRIAL EQUIPMENT INCENTIVES FOR OREGON BUSINESS CUSTOMERS

INDUSTRIAL EQUIPMENT INCENTIVES FOR OREGON BUSINESS CUSTOMERS INDUSTRIAL Standard Incentives INDUSTRIAL EQUIPMENT INCENTIVES FOR OREGON BUSINESS CUSTOMERS SAVE MONEY AND ENERGY NOW AND FOR YEARS TO COME EFFECTIVE JANUARY 2018 INCENTIVES ARE SUBJECT TO AVAILABILITY

More information

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING Third Revised Sheet 55a Cancels Second Revised Sheet 55a A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 17 NET ENERGY METERING Net energy metering is available to eligible customer-generators, defined as, permanent

More information

Summer Reliability Assessment Report Electric Distribution Companies Perspective

Summer Reliability Assessment Report Electric Distribution Companies Perspective Energy Association of Pennsylvania Summer Reliability Assessment Report Electric Distribution Companies Perspective to the Pennsylvania Public Utility Commission June 9, 2011 Harrisburg, PA Terrance J.

More information

VOUCHER INCENTIVE PROGRAM. Application Package

VOUCHER INCENTIVE PROGRAM. Application Package Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist. Complete one application for each

More information

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY Virtual Net Metering Application Effective November 18, 2016 This application form addresses virtual net

More information

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Grocery and Convenience Stores October 11, 2012

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Grocery and Convenience Stores October 11, 2012 Pepco & Delmarva Power Commercial & Industrial Energy Savings Program Grocery and Convenience Stores October 11, 2012 Housekeeping The presentation will be emailed to you after the webinar. If you have

More information

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER Page 1 of 5 ACCEPTED FOR RUHR RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER APPLICABILITY Unless specifically excluded within this Schedule, all of the Cooperative's Terms

More information

The Geli Guide to SGIP April 26, 2017

The Geli Guide to SGIP April 26, 2017 The Geli Guide to SGIP 2017 April 26, 2017 Agenda What is Geli? Intro to SGIP Case Study How to Apply ESyst Demo Next Steps 2 What is Geli? Software that maximizes the value of energy storage Geli s solutions

More information

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT January 1, 2016 CA Public Utilities Commission Energy Division Attention: Tariff Unit 505 Van Ness Avenue, 4thFloor San Francisco, CA 94102-3298 Advice Letter LCE 001-E RE: LANCASTER CHOICE ENERGY S BIENNIAL

More information

Manager of Market Strategy and Planning September 22, 2008

Manager of Market Strategy and Planning September 22, 2008 One Utility s Perspective on Investment in Clean Energy Frederick Lynk Manager of Market Strategy and Planning September 22, 2008 6,400 employees N W 2.1M electric customers S 1.7M gas customers 24/7 operation

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

2018 Program Manual CoolSaver

2018 Program Manual CoolSaver 2018 Program Manual CoolSaver PREPARED BY: CLEAResult 1 Allied Dr. Suite 1600 Little Rock, AR 72202 Contact: Joe Kuonen Phone: 501-221-4002 Email: jkuonen@clearesult.com TABLE OF CONTENTS PROGRAM OVERVIEW...

More information

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

SERVICE CLASSIFICATION CEF COMMUNITY ENERGY FACILITY P.S.C. Del. No. 8 - Electric Original Leaf No. 95a SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY A Community Energy Facility (CEF) consists of one or more generators located in Company s service

More information

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018 William F. Stephens Director (804) 371-9611 FAX (804)371-9350 PO Box 1197 Richmond, Virginia 23218-1197 DIVISION OF May 22, 2018 Mr. Eric M. Page Ecker Seamans Cherin & Mellott, LLC 919 East Main Street

More information

Zero Emission Bus Impact on Infrastructure

Zero Emission Bus Impact on Infrastructure Zero Emission Bus Impact on Infrastructure California Transit Association (CTA) Fall Conference Nov 17, 2016 Russ Garwacki Director, Pricing Design & Research 626.302.6673 Russell.Garwacki@sce.com Barbara

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT OFF-ROAD FORKLIFT COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT OFF-ROAD FORKLIFT COMPONENT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM OFF-ROAD FORKLIFT COMPONENT ELECTRIC FORKLIFT NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San Joaquin

More information

Impact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load

Impact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load Impact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load Mike Keesee, Sacramento Municipal Utility District Rob Hammon, ConSol ABSTRACT One of the advertised benefits of distributed solar

More information

INNOVATIONS IN SOLAR AND ENERGY RETROFITS

INNOVATIONS IN SOLAR AND ENERGY RETROFITS INNOVATIONS IN SOLAR AND ENERGY RETROFITS JEFFREY LESK NH&RA JULY 2017 LIHTC + SOLAR ITC UNDER ONE ROOF 9% LIHTC 4% LIHTC * Solar Panel Cost $1,000,000 $1,000,000 Solar Credit (30%) $300,000 $150,000 (assumes

More information