LATHE INSTALLATION INSTRUCTIONS. Machine footprints and operating dimensions are available in the brochure and Pre-Installation Guide

Size: px
Start display at page:

Download "LATHE INSTALLATION INSTRUCTIONS. Machine footprints and operating dimensions are available in the brochure and Pre-Installation Guide"

Transcription

1 LATHE INSTALLATION INSTRUCTIONS Machine footprints and operating dimensions are available in the brochure and Pre- Guide General Requirements Operating Temperature Range 41 F to 104 F (5 to 40 C) Storage Temperature Range -4 F to 158 F (-20 to 70 C) Ambient Humidity: 20% 95% relative humidity, non-condensing Altitude: ft. (Do not operate machine in explosive atmospheres (explosive vapors and/or particulate matter) Electricity Requirements IMPORTANT! REFER TO LOCAL CODE REQUIREMENTS BEFORE WIRING MACHINES. All machines require: Three phase 50 or 60Hz power supply. Line voltage that does not fluctuate more than +/-5% 15 HP System Voltage Requirements High Voltage Requirements SL-10 ( V) ( V) Power Supply 50 AMP 25 AMP Haas Circuit Breaker 40 AMP 20 AMP If service run from elec. panel is less than 100' use: 8 GA. WIRE 12 GA. WIRE If service run from elec. panel is more than 100' use: 6 GA. WIRE 10 GA. WIRE 20 HP System Voltage Requirements High Voltage Requirements 1 SL-20, TL-15, GT-20 ( V) ( V) Power Supply 50 AMP 25 AMP Haas Circuit Breaker 40 AMP 20 AMP If service run from elec. panel is less than 100' use: 8 GA. WIRE 12 GA. WIRE If service run from elec. panel is more than 100' use: 6 GA. WIRE 10 GA. WIRE HP System Voltage Requirements High Voltage Requirements 2 TL-15BB, SL-20BB, SL-30, SL-30BB, 1 SL-40, SL-40BB ( V) ( V) Power Supply 100 AMP 50 AMP Haas Circuit Breaker 80 AMP 40 AMP If service run from elec. panel is less than 100' use: 4 GA. WIRE 8 GA. WIRE If service run from elec. panel is more than 100' use: 2 GA. WIRE 6 GA. WIRE 55HP System Voltage Requirements High Voltage Requirements 1 SL-40, SL-40BB, SL-40L ( V) ( V) Power Supply 170 AMP Must use an external transformer Haas Circuit Breaker 150 AMP If service run from elec. panel is less than 100' use: 1 GA. WIRE If service run from elec. panel is more than 100' use: 1/0 GA. WIRE A 1

2 WARNING! A separate earth ground wire of the same conductor size as the input power is required to be connected to the chassis of the machine. This ground wire is required for operator safety and for proper operation. This ground must be supplied from the main plant ground at the service entrance, and should be routed in the same conduit as the input power to the machine. A local cold water pipe, or ground rod adjacent to the machine cannot be used for this purpose. Input power to the machine must be grounded. For wye power, the neutral must be grounded. For delta power, a central leg ground or one leg ground should be used. The machine will not function properly on ungrounded power. (This is not a factor with the External 480V Option) The rated horsepower of the machine may not be achieved if the imbalance of the incoming voltage is beyond an acceptable limit. The machine may function properly, yet may not deliver the advertised power. This is noticed more often when using phase converters. A phase converter should only be used if all other methods cannot be used. The maximum leg-to-leg or leg-to-ground voltage should not exceed 260 volts, or 504 volts for high-voltage machines with the Internal High Voltage Option. 1 The current requirements shown in the table reflect the circuit breaker size internal to the machine. This breaker has an extremely slow trip time. It may be necessary to size the external service breaker up by 20-25%, as indicated by power supply, for proper operation. 2 The high-voltage requirements shown reflect the Internal 400V configuration which is standard on European machines. Domestic and all other users must use the External 480V option. Air Requirements The CNC Lathe requires a minimum of 100 PSI at 4 scfm at the input to the pressure regulator on the back of the machine. This should be supplied by at least a two horsepower compressor, with a minimum 20-gallon tank, that turns on when the pressure drops to 100 PSI. Machine Type Main Air Regulator Input Airline Hose Size GT / SL / TL-Series 85 psi 3/8" I.D. The recommended method of attaching the air hose is to the barb fitting at the back of the machine with a hose clamp. If a quick coupler is desired, use at least a 3/8". NOTE: Excessive oil and water in the air supply will cause the machine to malfunction. The air filter/regulator has an automatic bowl dump that should be empty before starting the machine. This must be checked for proper operation monthly. Also, excessive contaminants in the air line may clog the dump valve and cause oil and/or water to pass into the machine. NOTE: The nipple between the air filter/regulator and the Bijur oil lubricator (See illustration in "Air Connection" section) reservoir tank below the control box on the back of the machine is for the optional rotary table. DO NOT use this as a connection for an auxiliary air line. Auxiliary connections should be made on the left side of the air filter/regulator A

3 Moving the Crate TOOLS REQUIRED Precision bubble level ( inch per 10") Test indicator (0.0005) 1 1/8" hex wrench or ratchet 3/4" wrench 1 1/2" wrench Claw hammer A forklift capable of lifting more than 9,000 pounds (14,000 pounds for the SL-30, 23,000 pounds for SL-40), with forks at least 5' long by 6" wide (6' by 6" wide for SL-30 and 8' by 8" wide for SL-40, SL-40L). MATERIALS REQUIRED Wire and air hose or piping as specified in the Service Requirements section A small amount of grease Way lube for the lubricator (Vactra #2) Warning! THE LATHE CRATE CAN ONLY BE MOVED WITH A FORKLIFT. FORK FORK CAUTION! The fork positions are marked on the crate. (Also, note that there are three skids at each side of the pallet. The heavy part of the machine [the back] is positioned over the two skids that are closest together.) If the fork positions are ignored, there is a good chance that the retaining bolts will be sheared off by the forks and also that the machine will tip over when it is picked up A 3

4 Unpacking the Lathe Uncrating 1. Remove the cover. CAUTION! Do not put undue pressure on the top of the machine as you remove the cover. 2. Remove the coolant tank. Remove the cleats that held them in place. Set Screw Shipping Bracket Coupler Assembly Pallet Shock Mount Rubber Pad All set screws are needed for installation DO NOT DISCARD! 3. Remove the ¾" bolts holding the base to the pallet and the plastic thread protecting sleeve from the base. 4. Remove the nuts, on the leveling screws, holding the shipping bracket to the base casting. Remove the shipping brackets. 5. Lift the machine off the pallet. Leveling the Lathe Setting in Place CAUTION! Do not lift the machine any farther than necessary off the floor when moving it, and move as slowly and cautiously as possible. Dropping the machine, even from a height of a few inches, can cause injury, result in expensive repairs, and void the warranty. 1. Unbolt clamp plates. Lift the machine until the bolts clear the pallet. 2. Thread leveling screws through casting until thread is approximately 3/8" above the top of the casting. If a screw is excessively hard to turn, remove it, dress the threads in the hole with a 1-14 tap, and inspect the screw. If the screw has dings, dress the threads with a 60o V file. Install the lock nuts on the leveling screws, but do not tighten. SL-20 machines require the lock nuts to be installed under the leveling foot. 3. Move the machine to where it will be located. Take leveling pads out of the tote kit, grease the dimple in each pad, and locate them under the leveling screws at the four corners. Lower the machine. 4. Remove all banding and packing material around the control panel, monitor and doors. 5. Remove foot switches from inside machine and attach cable to socket located at left end of front support beam, with cable facing downward A

5 ST-Series Leveling The lathe should be in place, on the leveling pads and power should be applied to the machine. 1. Remove the back panel from the machine. 2. The only screws that should be in contact with the pads are the four corners. The two middle screws should be backed away from the leveling pad. 3. Jog the tool turret to the middle of travel in both X and Z axis. 4. Place a machinist s level on the back right Z-axis guide as shown 5. Level the lathe in the Z-axis, by adjusting the two left leveling screws. 6. Use the leveling tool (T-2119A), or a ground block across the rear Z-axis linear guide and place the machinist s level on it. The level will now be parallel to the X-axis. 7. Level the machine using only the two front leveling screws. 8. Jog the turret to home in the Z-axis only. 9. Pop-out (disengage) the turret and jog until one of OD surfaces is level. To do this change parameter 43 bit 18 from 1 to 0. Go to MDI and enter M43 and press Cycle Start. Go to jog mode, enter A to jog the turret. 10. Put the machinist s level on the top of the turret as shown. Handle jog the turret forward 6 at a time and use the front leveling screws to remove any twist (.0005 max deviation). 11. Lower the middle two leveling screws and torque to 25 ft lb. Jog the Z-axis back and forth to check for twist in the axis. If necessary loosen the front middle leveling screw to remove the twist. 12. Tighten the jam nuts. 13. Reset parameter 43 bit 18 to 1. Zero return the A-axis. Step 5 To level in Z-axis Ground plate or leveling tool Turret Machinist's Level Step 7 To level in X-axis Front A 5

6 SL-Series Leveling Leveling the machine is required to provide proper coolant and lubrication drainage and to ensure equal loading on all four of the casting feet for consistent cutting performance. Please read through entire sequence before starting. 1. Position the turret close to the chuck (shipping position). Remove right-end rear panel to access the Z-axis linear guide rails. 2. Place a machinist's level across linear guides to level front-to-back. Place level along linear guides to level machine left-to-right.take care to avoid damage to linear guide rails. 3. Level machine by rotating leveling screws. Adjust adjacent screws alternately to maintain proper loading. 4. Adjust machine height (see figure). Verify that each leveling screw requires approximately the same torque to turn. This will ensure proper loading. Tighten lock nuts. min. OK Initial Setup WARNING! At this point, there should be NO electrical connection to the machine. The electrical panel should be closed and secured. Set the main switch at the upper right of the electrical panel on the back of the machine to OFF. Using a screwdriver to unlock the two latches on the panel door, unlock the cabinet with the key, and open the door. Main Switch Take sufficient time to check all the components and connectors associated with the circuit boards. With the power off, push on them gently to make sure that they are seated in their sockets. Look for any cables that have become disconnected, look for any signs of damage and loose parts in the bottom of the panel box. If there are any signs that the machine was mishandled, be extremely careful in powering up the machine (be ready to shut it off IMMEDIATELY). Or if there are obvious problems, call the factory BEFORE proceeding A

7 Support Arm End Cap The tote kit Supplied will include one support arm end cap with an O-ring. The end cap is placed on the machine end of the controller support arm. End Cap Thin Pendant The thin pendant assembly is shipped in place on the front of the lathe, covered with corrugated cardboard padding. When unpacking, remove the cardboard and shipping bolt (accessed through the glove box). Pendant Leveling The pendant leveling feature allows the adjustment of the pendant angle. 1. Rotate the pendant to the position in the following figure for proper leveling. Loosen the two (2) screws on the end cap.use a wrench on the leveling screw to change the pendant angle. Loosen These Two Screws, Before Adjusting Leveling Screw. Leveling Screw Leveling Screw Monitor Leveling Screw 90º Hard Stop TopView 2. Tighten the two (2) screws on the end cap once the pendant is level. 3. Rotate the pendant 90 forward and check the level again. Repeat the procedure if necessary. Air Connection CAUTION! Working with air service required for the lathe can be hazardous. Be sure that pressure has been removed from the air line before you connect it to the machine, disconnect it from the machine, or service parts of the air system. 1. When the machine leaves the factory, the air filter is in place, and air lubricator and the lubricator reservoir tank are full. They should be checked and serviced before compressed air is supplied to the machine A 7

8 Air Pressure Regulator Oil Pressure Gauge Water Oil Pump Separator Oil Reservoir Air Nozzle Air Line MAX MIN Oil Filter 2. With the pressure off in the air line, connect the air supply to the hose barb next to the air filter/ regulator (below the electrical panel). If the fitting supplied is not compatible, simply replace it. 3. Start the compressor, set it between 100 and 150 PSI. Set the regulator on the machine to 85 to 90 PSI. 4. Prime the lubricator to make sure it is working. To prime the lubrication system, pull up on the handle on top of the reservoir tank. DO NOT push down on the primer handle. NOTE: Depending on the position of the cam that drives it, the lubrication system may not activate until a few minutes after the machine is started. However, if there is a problem with the system, an alarm will stop the machine. Electrical Connections CAUTION! Working with electrical services required for the lathe can be extremely hazardous. The electrical power must be off and steps taken to ensure it is not turned on while working. In most cases this means turning off a circuit breaker in a panel, then locking the panel door. However, if this is not the case or are not sure how to do this, check with appropriate personnel or otherwise obtain the necessary help before contining. NOTE: The machine must have air pressure at the air gauge, or a "Low Air Pressure" alarm will be present on power up. WARNING! The electrical panel should be closed and secured at all times except during installation and service. At those times, only qualified electricians should have access to the panel. When the main circuit breaker is on, there is high voltage throughout the electrical panel (including the circuit boards and logic circuits) and some components operate at high temperatures. Therefore, extreme caution is required. Ground Line L1 L2 L3 Main Circuit Breaker 1. Hook up the three power lines to the terminals on top of the main circuit breaker at upper right of electrical panel. Connect the separate ground line to the ground bus to the left of the terminals A

9 NOTE: Make sure that the service wires actually go into the terminal-block clamps. (It is easy to miss the clamp and tighten the screw. A poor connection will cause the machine to run intermittently or have other problems, such as servo overloads.) To check, simply pull on the wires after the screws are tightened. 2. After the line voltage is connected to the machine, make sure that main circuit breaker (at top-right of rear cabinet) is OFF. Turn ON the power at the source. Using a digital voltmeter and appropriate safety procedures, measure the voltage between all three pair phases at the main circuit breaker and write down the readings. The voltage must be between 195 and 260 volts (360 and 480 volts for high voltage option). NOTE: Wide voltage fluctuations are common in many industrial areas; minimum and maximum voltage supplied to a machine while it is in operation must be known. U.S. National Electrical Code specifies that machines should operate with a variation of +5% to -5% around an average supply voltage. If problems with line voltage occur, or low line voltage is suspected, an external transformer may be used. If you suspect voltage problems, voltage should be checked every hour or two during a typical day to be sure it does not fluctuate more than +5% or -5% from an average. CAUTION! Make sure the main circuit breaker is set to OFF and power is off at your supply panel BEFORE you change the transformer connections. Make sure that all three black wires are moved to the correct terminal block and that they are tight. 3. Check the connections on the transformer at the bottom-right corner of the rear cabinet. The three black wires labeled 74, 75, and 76 must be moved to the terminal block triple which corresponds to the average voltage measured in step 2 above. There are four positions for the input power for the 260 volt transformer and five positions for the 480 volt transformer. The labels showing the input voltage range for each terminal position is shown in the following illustration: T5 Transformer Ouput Power Main Circuit Breaker V V V V T5 24VAC WARNING: MEASURE VOLTAGEATMAIN CIRCUIT BREAKER AND CONNECT SUPPLIED SHORTING PLUG TO CORRESPONDING CONNECTOR ON THIS TRANSFORMER TB2 240V OUT V V V V V V V V V DANGER!!! HIGH VOLTAGE DANGER!!! INCOMING LINE VOLTAGE TAPS (74, 75, 76) Input Power V TB1 120V OUT 4. Transformer T5 supplies 24VAC used to power the main contactor. The transformer has two input connectors located about two inches from the transformer, which allow it to be connected to either 240V or 200V. Users that have 220V-240V RMS input power should use the connector labeled 240V, while users with V input power should use the connector labeled 200V. Failure to use the correct input connector will result in either overheating of the main contactor or failure to reliably engage the main contactor A 9

10 V V T5 24 VAC WARNING: V V MEASURE VOLTAGE AT MAIN CIRCUIT BREAKER AND CONNECT SUPPLIED SHORTING PLUG TO CORRESPONDING CONNECTOR V ON THIS TRANSFORMER 5. Set the main circuit breaker to ON. Check for evidence of problems, such as the smell of overheating components or smoke. If such problems are indicated, immediately set the main circuit breaker to OFF and call the factory. PHASE DETECT (FOR 3 PHASE ONLY) PASS FAIL NE6 NE5 Warning! High Pressure Coolant (HPC) pump is three phase and must be phased correctly. Improper phasing will damage the HPC pump and void the warranty. Refer to the HPC start up section, if equipped. 6. After the power is on, measure the voltage across the bottom terminals on the main circuit breaker. It should be the same as the measurements where the input power connects to the main breaker. If there are any problems, check the wiring. 7. Apply power to the control by pressing the Power-On switch on the front panel. Check the high voltage buss on the Vector Drive (pin 2 with respect to pin 3 on the terminal bus at the bottom of the drive). It must be between 310 and 360 volts. If the voltage is outside these limits, turn off the power and recheck steps 2 and 3. If the voltage is still outside these limits, call the factory. Next, check the DC voltage displayed in the second page of the Diagnostic data on the display. It is labeled DC BUS. Verify that the displayed voltage matches the voltage measured at pins 2 and 3 of the Vector Drive +/- 7 VDC. If the displayed voltage exceeds the measured voltage by 12 volts or more, install a ferrite EMI filter ( ) to the current command cable near its connection to the vector drive. Secure with a cable tie (See photo). Recheck voltage A

11 8. Electrical power must be phased properly to avoid damage to your equipment. The Power Supply Assembly PC board incorporates a "Phase Detect" circuit with neon indicators. When the orange neon is lit (NE5), the phasing is incorrect. If the green neon is lit (NE6), the phasing is correct. If both neon indicators are lit, you have a loose wire; check the connections. Adjust phasing by swapping L1 and L2 of the incoming power lines at the main circuit breaker. WARNING! ALL POWER MUST BE TURNED OFF AT THE SOURCE PRIOR TO ADJUST- ING PHASING. 9. Turn off the power and set the main circuit breaker to OFF. Close the door, lock the latches, and turn the power back on. 10. Remove the key from the control cabinet and give it to the shop manager. Procedure for External 480V Transformer Introduction The external transformer adds to overall machine reliability and performance, however it does require extra wiring and a place to locate it. The external transformer provides electrostatically shielded isolation. This type of transformer acts to isolate all common mode line transients and improve EMI conducted emissions. The external transformer has a 45 KVA rating. It is a 480V 60Hz only transformer. The transformer should be located as close to the machine as possible. The input and output wiring of the transformer should conform to the local electrical codes and should be performed by a licensed electrician. The following is for guidance only, and should not be construed to alter the requirements of local regulations. The input wire should not be smaller than the 6AWG for the 45KVA transformer. Cable runs longer than 100 will require at least one size larger wire. The output wire size should be 4 AWG. The transformer is 480V to 240V isolation transformers with delta wound primary and secondary windings. The primary windings offer 7 tap positions, 2 above and 4 below the nominal input voltage of 480V. The primary side should be wired as follows: Input Voltage Range Tap (504) (492) (480) (468) (456) (444) (432) This should produce a voltage on the secondary side of V RMS L-L. Verify this and readjust the taps as required. At the machine, connect the cables at the input of the internal 230V transformer to the V taps. Apply power to the machine and verify that the DC voltage between pins 2 and 3 of the Vector Drive (2nd and 3rd pins from the left) is VDC. If not, return to the 480V isolation transformer and readjust the taps as required. Do not use the taps on the internal 230V transformer to adjust the voltage A 11

12 50Hz s The external transformers are 60Hz rated, and cannot be used at 50Hz without derating the input voltage. For these applications, the internal 230V transformer should be tapped on the lowest setting ( V RMS). The external transformer should be tapped according to the following table. If these tap settings do not produce a DC bus voltage between pins 2 and 3 on the Vector Drive between 320 and 345VDC, readjust the taps on the external transformer as required. Do not move the taps on the internal transformer from the lowest position. Input Voltage Range Tap (504) (492) (480) (468) (456) (444) (432) Optional Chip Auger installation 1. Unpack the auger and discharge tube. 2. Slide the auger into the discharge tube opening and then slip opposite end onto motor hub. Fasten to motor hub with the 5/16-18 x 2½ bolt. Motor Hub Auger Set Screw 3. Install gasket and slide the discharge tube into the opening. Attach the discharge tube with bolts and locking washers and tighten uniformly. 4. After machine start-up, check the operation of the auger to ensure the direction of rotation will move the chips toward the discharge tube. If the auger is turning so that the chips are not being moved toward the discharge tube, change PARAM 209 bit 12 from 1 to 0 or 0 to 1 to establish a new forward direction A

13 SL-10 Chip Auger Discharge Tube 1. Remove the screws that secure the inner front and rear wings. Remove the inner front and rear wings. Slide the chip auger assembly towards the rear of the machine. 2. Unpack the discharge tube. Install gasket and slide the discharge tube into the opening. Attach the discharge tube with bolts and locking washers and tighten uniformly. 3. Slide the chip auger assembly back into its original location. Reinstall the inner front and rear wings using the BHCS removed in step After machine start-up, check the operation of the auger to ensure the direction of rotation will move the chips toward the discharge tube. If the auger is turning so that the chips are not being moved toward the discharge tube, change PARAM 209 bit 12 from 1 to 0 or 0 to 1 to establish a new forward direction. SL-10 Parts Basket Place the parts basket tray over the chip auger trough. Set the parts basket on the parts catcher tray. Position the basket underneath the chuck A 13

14 Optional Chip Conveyor P38 1. Unpack the chip conveyor and locate the conveyor discharge cover. Remove the side and nose wings from the conveyor pickup area. 2. Attach a lift to the hoist loops, raise the conveyor and reorient the caster wheels in the operating position. 3. Slide conveyor into opening on the right side of the machine until the incline start point is near the machine enclosure. Adjust caster wheels to support the conveyor 1/8 to1/4 above the lip of the enclosure pan. 4. Install the side and nose wings, and discharge cover. 5. Route the chip cable through the hole in the bottom of the control cabinet. Thread it in and back out of the central cable trough. Plug the connector to the I/O Board at input P38 and close the cabinet door. NOTE: On a machine with a safety circuit, the chip conveyor will only run with the door closed regardless of the Conveyor Door Override bit. Foot Switch To connect the foot switch assembly, remove the retaining cover, plug in the foot switch, then replace the cover. NOTE: A replacement foot switch cable (RJ12 6P6C Straight Wiring Coil Cord) is packed in the lathe s control cabinet A

15 Coolant System Coolant Tank 1. Position the coolant tank at the front of the machine. Connect the coolant pump and the auger cables to the connectors located on the control cabinet 2. The Coolant Level Float Assembly is shipped in a separate box. It consists of a housing, float and cable. Install the Coolant Level Float Assembly by lowering the float through the tank lid. Line up the slots in the housing with the dimples on the side of the tank and press down so the float assembly clips onto the tank. 3. Insert a plastic push wire mount into the hole in the tank lid, then route the cable towards the right side of the lathe. Use the plastic push wire-mounts as needed to ensure the cable does not get damaged. Tie wrap the coolant float cable to other cables, when available, when routing from the coolant tank. 4. Connect the cable to the Coolant Level Gauge receptacle on the right side panel. Remove the cover from the RJ-12 style connector, plug in the coolant level sensor cable, and replace the cover. 5. Select the Current Commands screen on the operator's pendant and move the float up and down to ensure that the display reflects a corresponding change in the coolant level. 6. Attach the coolant hose to the pump fitting located at the base of the coolant pump. 7. Slide the coolant tank into place beneath the machine. Insure the cables and hoses are not damaged as the coolant tank is pushed in. 8. Fill the tank with the approximately 35 gallons of coolant (50 gallons for SL-30, 75 gallons for the SL-40). Fill with water based coolant only.* *Mineral cutting oils will damage rubber based components throughout the machine and void the warranty. SL-10 Coolant Pump Priming the Coolant Pump After machine installation, or extended periods of non-use, add coolant to inlet side of the pump until full. Add Coolant A 15

16 Auxiliary Filter for Standard Coolant Systems Auxiliary Filter Assy Filter Inlet Hose Coolant Hose From Machine 1. Place the Auxiliary Filter system next to the coolant tank of the machine. Connect the output of the Standard Coolant pump to the input of the Auxiliary Filter. Connect the Auxiliary Filter output hose to the coolant hose of the machine. 2. The Auxiliary Filter tank must be filled with coolant before use. To fill the Auxiliary Filter tank from the Standard Coolant tank, turn on the Standard Coolant Pump. Open the ball valve, located on the top of the Auxiliary Filter tank. Wait for coolant to appear in the drain-back hose. Close the ball valve; the Auxiliary Filter tank is full. Optional High Pressure Coolant System 1. Connect the intake filter hose to the coolant pickup connection next to the coolant pump on the coolant tank. 2. Route the 1/4" OD plastic hose attached to the high pressure coolant pump down into the coolant tank. Insert it in to the 1/4" OD connector next to the coolant pickup. Route the 3/8" OD plastic hose from the bottom of the HPC unit to the 3/8" OD push-in elbow next to the coolant pump. 3. Attach the 1/2" braided hose to the standard coolant pump. Prime the high pressure coolant system. 4. Run the standard coolant pump and check all connections for leaks. 1/2 Braided Hose Intake Hose 1/4 OD Plastic Hose High Pressure Coolant Pump Filter Gage Coolant Pickup 3/8 OD Plastic Hose Standard Coolant Pump 3/4 Braided Intake Hose Intake Filter High Pressure Hose Installed High Pressure Coolant System A

17 Optional Auxiliary Filter for High Pressure Coolant Coolant Pickup Auxiliary Filter Assembly 1/4 O.D. Plastic Hose Reducer Push-in Elbow Street Tee Cable Tie Filter Outlet 45 Elbow 1/4" O.D. Plastic Hose Push-in Elbow Standard Filtration Setup Auxiliary Filter Priming System 1. Attach the hose from the top of the auxiliary filter to the hose connector on the coolant pickup. 2. Disassemble the fittings on the primary coolant pump. Reassemble with two (2) 1/2 45 fittings, a male to male 1/2 fitting, a cross fitting, and a 1/2 hose fitting on the other end of it. On one of the two remaining sides of the cross fitting, install a 1/2 to 1/4 reducer and a 1/4 push-in elbow. On the other side, install a 1/2 plug. (See Auxiliary Filter Priming System figure.) Note that the illustration shows the cross fitting rotated 90 ccw for clarity. The 1/4 push-in elbow should face the Auxiliary Filter. 3. Insert 1/4" OD plastic hose into the push-in elbow on the pump. Route the hose along the intake filter hose and around the intake line of the auxiliary filter. Trim the plastic hose to length and insert it into the push-in elbow at the top of the filter. Secure the plastic hose to the inlet hose with the supplied cable ties. 4. Attach the hose from the bottom of the auxiliary filter to the inlet of the high pressure pump. 5. Check that the filter lid is securely closed. 6. Run the primary coolant system for ten minutes to prime the auxiliary filter before using the high pressure system. NOTE: The intake filter on high pressure coolant is not used when the auxiliary filter is installed Psi High Pressure Coolant Place the 1000psi HPC assembly next to the standard coolant pump. Standard Coolant Hose Bypass Hose Priming Tube Vacuum Gage Intake Hose A 17

18 1. Connect the power cable for the pump assembly to an external source in order to power the motor. Note that the CNC control does not provide power to the pump motor. Customer supplied external power must be supplied at the time of installation. Power required is volt 3-phase 50/60Hz, protected by a 20-amp circuit breaker. The pump assembly is pre-wired with a NEMA L15-20 plug. The pump assembly can also use an alternate power source, these are: V 20A or 480V 10A To power the pump assembly from an alternate source, first replace the plug at the end of the cable with an appropriate plug for the voltage being used. Then, rewire the pump motor according to the directions on the side of the motor. 2. Connect the 1" diameter intake hose from the HPC pump to the cover plate assembly on the coolant pump mount. Connect the 1/2" diameter bypass hose from the pressure regulator to the coolant tank. 3. Insert the 1/4" diameter nylon tubing from the HPC pump to the connector on the standard coolant pump. ½ Diameter Bypass Hose 1/4 Diameter Nylon Tubing 1 Diameter Hose Initial Start-Up Ensure that a correct style tool is in place; a tool and tooling block with coolant passages. Before using the 1000psi system the auxiliary filter must be primed. Run the standard coolant pump for 5 minutes, this will fill the auxiliary tank, through the priming hose. To reduce wear and prolong the life of the auxiliary filter, the 1/4" nylon hose is connected between the standard coolant pump and the auxiliary filter which will maintain the coolant level in the filter tank. Pressure Regulator Adjustment The pressure regulator has been set at 1000psi and tested at the factory. No further adjustment is required. However, to change the pressure, loosen the regulator jam nut. Turn the adjusting bolt clockwise to increase the pressure or counter clockwise to decrease the pressure. (Note, the system does not need to be on to change pressure) Tighten the regulator nut once the pressure has been set A

19 Optional Auxiliary Filter for HPC System 1. Hang the auxiliary filter assembly from the coolant tank handle and secure it with two 1/4-20 screws as shown. To Spindle Head Standard Pump Gate Filter To TSC Filter From TSC Pump (1) 1 To TSC Filter 2 TSC Pump Gate Filter To TSC Pump (2) Standard Filtration Setup 2. Connect the hose attached to the spindle head to the hose connection on the Standard Coolant Pump. 3. Separate the hoses coming from the Auxiliary Filter. They have been connected together for shipping. 4. Attach the Auxiliary Filter male connector (top hose) to female connector on the HPC Coolant Pump Assembly (Items labeled 1 in the previous illustration). 5. Attach the Auxiliary Filter female connector (bottom hose) to the short hose with the male connector on the HPC Coolant Pump Assembly (Items labeled 2 in the previous illustration). 6. Connect the plastic tubing (shipped tied to the Auxiliary Filter) from the small elbow fitting on the top of the Auxiliary Filter to the small elbow fitting on the Standard Coolant Pump hose connector. 7. Connect the hose attached to the HPC Coolant Pump Assembly to the HPC Filter Assembly. 8. Make sure the filter lid is securely closed. 9. Run the primary coolant system for ten minutes to prime the bag filter housing before using the HPC system A 19

20 1000 Psi High-Pressure Coolant Place the 1000psi HPC assembly next to the coolant tank behind the machine with the hose connections facing the back of the machine. Use the following coolant schematic as an aid for hose routing. TO MACHINE RA CC TSC COOLANT FLOW TSC CABLE FROM J-BOX PA P/AFA AF GA PRIMING TUBE INTAKE HOSE CIA COOLANT INTAKE ASSEMBLY MTR STANDARD COOLANT MOTOR CP COVER PLATE GA SUCTION GAGE, INTAKE FILTER AF AF TANK ASSEMBLY P/AFA COOLANT PUMP &TANK ASSEMBLY PA COOLANT PUMP CC CONTROL CABINET RA PRESSURE REGULATOR CIA MTR CP BYPASS HOSE TO COOLANT TANK COOLANT TANK 1. Connect the power cable for the pump assembly to an external source in order to power the motor. Note that the CNC control does not provide power to the pump motor. Customer supplied external power must be supplied at the time of installation. The power required is volt 3-phase 50/60Hz, and have a 20-amp circuit breaker. The pump assembly is pre-wired with a NEMA L15-20 plug. The pump assembly can also use an alternate power source, these are: V 20A or 480V 10A To power the pump assembly from an alternate source, first replace the plug at the end of the cable with an appropriate plug for the voltage being used. Then, rewire the pump motor according to the directions on the side of the motor. 2. Plug the HPC cable from HPC junction box (J-box) to the HPC amphenol port on the side of the control cabinet. 3. Connect the hose attached to the coolant connection on the spindle head to the hose connection on the Standard Coolant Pump. 4. Connect the hose attached to the HPC input on the machine s head to the connector labeled 1000 psi Out on the HPC1000 connector panel (located on the side opposite the handle). 5. Attach the supply hose from the coolant tank lid to the connector labeled Supply In on the HPC1000 connector panel (items labeled 1 in the following illustration). 6. Connect the filter drain line from the coolant tank lid to the connector labeled Filter Drain on the HPC1000 connector panel (items labeled 2 in the following illustration). 7. Connect the plastic tubing (ships tied to the Auxiliary Filter) from the connector labeled Prime Line on the HPC1000 connector panel to the small elbow fitting on the Standard Coolant Pump hose connector (items labeled 3 in the following illustration) A

21 3 2 3 (Elbow on Standard Pump Outlet) TSC1000 /HPC1000 Setup Initial Start-Up Before using the 1000psi system the auxiliary filter must be primed. There are two ways to do this. The first is to run the standard coolant pump for 5 minutes. This will fill the auxiliary tank, through the priming hose. The second method is to attach the wash down hose to the standard coolant pump. Turn on the standard coolant system (press MDI, then Coolant ). It may be necessary to turn the valve(s) on the standard coolant pump to divert coolant to the hose. Open the auxiliary filter tank cover and use the wash down hose to fill the auxiliary filter with coolant. Replace the auxiliary tank cover and tighten securely. NOTE: To ensure the HPC pump does not lose its priming, a 1/4 nylon hose is connected between the standard coolant pump and the auxiliary filter to maintain the coolant level in the filter tank.pressure Regulator Adjustment Machine Power On WARNING! DO NOT press POWER UP/RESTART on the control panel while the shipping bracket is in place. With the main switch on the electrical panel set to ON, press and release POWER ON at the upper left of the control panel. After a few seconds, the display will appear on the screen. Hydraulic Unit Phasing The achine must be phased properly. Improper phasing will cause damage to the hydraulic unit and void the warranty. 1. Press and release the RESET button twice (or until all alarms are cancelled) to turn the axis motors on. (The message ALARM appears at the lower right of the screen if one or more alarms are in effect.) NOTE: The hydraulic pump runs whenever the axis motors are energized A 21

22 2. Check the pump pressure gauge on the hydraulic unit. The hydraulic pump is located on the left side of the lathe. If the pressure reads zero, immediately power off the machine. CAUTION! If the hydraulic pump is allowed to run for more than 30 seconds in this condition, serious damage will occur. When pressure reads zero, it means the machine is not properly phased, and the pump is rotating backward. If the pressure gauge shows a proper pressure, the phasing is correct, and no further action is required. 3. To properly phase the machine: Make sure there is no power at the input side (top) of the main circuit breaker. MEASURE THE VOLTAGE! Exchange any two wires at the input side (top) of the main circuit breaker Close the control box. Return to Step 1 and retest for proper phasing. Removing Shipping Bracket 1. With a 1 1/4" box wrench, remove the 3/4-10" x 7" HHB, nut and spacer. 2. Press ZERO RET key, Z key, then ZERO SINGL AXIS key (the turret will move away from the spindle). Do not press power up/restart. 3. Remove the three 3/8"-16 x 1" SHCS then remove the shipping bracket (see figure). Replace the three 3/8"-16 x 1" SHCS with the three 3/8"- 16 x 1/2" BHCS that are in bag attached to the turret. Shipping bracket Tool holder wrench fixed in tool holder 3/8"-16 x1" SHCS (3) 3/4" Nut Spacer Chuck wrench 3/4"-10 x7" HHB Tool holder 4. Unclamp the chuck, to release the chuck wrench. Loosen and release the tool holder wrench from the tool holder on the turret. 5. Press the SETNG/GRAPH key. Then page down to the last page (press Page Down several times). Cursor to Setting 53, Jog w/o Zero Return (with the cursor down key). To turn this setting on, press and release the right cursor key and then press and release the Write key at the extreme lower right of the control panel. Turning on Jog w/o Zero Return bypasses the zero return interlock A

23 6. Press and release the Reset button twice, or until there are no alarms, to turn the axis motors on. (The message Alarm appears at the lower right of the screen if one or more alarms are in effect.) NOTE: If any alarms are present and cannot be cleared with the Reset button, press and release ALARM/MESGS for more information on the alarms. If you are unable to clear the alarms, write down the alarm numbers and call the factory. 7. Press and release the Handle Jog button and check the screen for the Jogging Z Axis Handle.001 message. Verify that the carriage travels slowly (not more than inch per impulse the ".001" part of the Z-axis message). If the message does not read.001, press and release the.001 button next to Handle Jog. 8. Once you are certain that the Z-axis is working correctly. Make sure that all alarms are clear by checking for the Alarm message at the lower right of the screen. Next, close the doors and press and release the Zero Return button followed by the Auto All Axes button. The Z-axis moves to the right slowly. Then, after it has reached its home position, the X- axis moves to its home position. Optional Tool Probe The Tool Probe is secured in place for shipping with a cable tie. Before operating the turning center, cut the cable tie. Remove screw holding cable clamp in place, remove cable clamp and re-install the screw. SL-10 Leveling 1. Remove all weight from the right-front (RF) leveling screw. Place a machinist s level on the leveling tool as shown. If the lathe has a VDI turret, install a VDI tool holder and clamp the leveling tool in the tool holder. Then place a machinist s level on the leveling tool. Use the remaining 3 leveling screws to put the machine base within the measuring range of the level. 4 3 SL-10 TopView 5 2 LR RR 6 1 Leveling Tool LF RF Leveling Screw Terms and Locations 2. Jog the Z-axis back and forth and adjust the pressure on the RF screw to remove roll from the Z-axis. Maximum acceptable roll deviation is /10 throughout the entire Z-axis travel. Crane Arm Instructions for SL-30 and SL Remove crane arm from the shipping base A 23

24 DUAL DRIVE 2. Slide the Top Flange Bearing onto the shaft of the boom with the flange facing the bearing stop. Slide the Lower Bearing onto the shaft and fasten in place with the Ø.38 pin. 3. Lift crane arm into position over crane pivot weldment. There is a hole in the boom especially for lifting. 4. Lower the crane arm into place inside the crane pivot weldment. Bearing Stop Top Flange Bearing Bearing Sleeve Crane Pivot Weldment Boom Ø3/8 Pin Crane Arm Capacity 300 Lbs. Max. 20HP VECTOR TAIL STOCK Note: Does not include lift chain device or trolly. Cable Handling/Storage Complete the machine installation by looping and storing the extra lengths of electrical cables. Use the following techniques when dealing with excessive cable length. Loop cables individually, being careful to not force the cable into too sharp a bend and tie-wrap the loop. The cable bend radius should not be less than 4 times the diameter of the cable. Place the loop in the cable out of sight, hidden by the machine sheet metal, if possible. Do NOT allow the cables to rest on the floor. Do NOT coil a cable around another piece of machinery (such as a pump motor) A

Machine footprints and operating dimensions are available in the brochure and the anchoring addendum

Machine footprints and operating dimensions are available in the brochure and the anchoring addendum VERTICAL MILL INSTALLATION INSTRUCTIONS Machine RequiReMents Machine footprints and operating dimensions are available in the brochure and the anchoring addendum GeneRal RequiReMents Operating Temperature

More information

Section 03: Installation Procedures

Section 03: Installation Procedures Section 03: Installation Procedures Machine Installation & Hook-Up! IMPORTANT Before beginning the Machine Installation & Hook-Up it is important to review the entire Pre-Installation section. Unpacking

More information

Haas Hydraulic Power Unit - Troubleshooting Guide

Haas Hydraulic Power Unit - Troubleshooting Guide Haas Technical Documentation Haas Hydraulic Power Unit - Troubleshooting Guide Scan code to get the latest version of this document Translation Available A: Haas HPU for most lathes made before 2016. B:

More information

Mizer Single Pump and Starter Box

Mizer Single Pump and Starter Box Mizer Single Pump and Starter Box Table of Contents Line Diagram... 2 Overview... 3 Booster Pump Specifications... 3 Water... 3 Electrical... 3 Models... 3 Mounting... 4 Electrical... 6 Motor Rotation...

More information

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER Form 5063T, 06-05 Supersedes Form 5063T, 02-04 INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER This document provides the information needed to install the DSP9600/9100 Wheel Balancer. NOTE:

More information

SL-10/20/30, ST-10/10Y - Motor Coupling - Alignment

SL-10/20/30, ST-10/10Y - Motor Coupling - Alignment Haas Technical Documentation SL-10/20/30, ST-10/10Y - Motor Coupling - Alignment Applies to machines built from: January, 1995 Scan code to get the latest version of this document Translation Available

More information

Section 7 - Troubleshooting Guide

Section 7 - Troubleshooting Guide Section 7 - Troubleshooting Guide Section 7 - Troubleshooting Guide IMPORTANT While this troubleshooting guide provides information to aid in troubleshooting problems with the range, it does not contain

More information

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited. SERVICE MANUAL ELECTRIC BRAISING PANS (30 & 40 GALLON) VE30 VE40 ML-126849 ML-126850 VE40 SHOWN - NOTICE - This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used

More information

Coolant Refill - Installation

Coolant Refill - Installation Haas Technical Documentation Coolant Refill - Installation AD0171 Rev I Applies to machines built from: March, 2015 Scan code to get the latest version of this document Translation Available Coolant Refill

More information

MODEL NUMBER: MEDIUM DUTY ONBOARD AIR SYSTEM

MODEL NUMBER: MEDIUM DUTY ONBOARD AIR SYSTEM MODEL NUMBER: 10003 MEDIUM DUTY ONBOARD AIR SYSTEM IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using

More information

Gearbox - Troubleshooting Guide

Gearbox - Troubleshooting Guide LAST UPDATED: 09/20/2018 Gearbox - Troubleshooting Guide Gearbox Assembly Diagram 50-taper Gearbox 1. Gearbox oil pump 2. High/low gear proximity sensors or mechanical switches 3. Spindle encoder 4. Spindle

More information

PRODUCT INFORMATION BULLETIN #3365 DIGITAL MOTOR CONTROL PLATTER SYSTEMS For Serial Number and After

PRODUCT INFORMATION BULLETIN #3365 DIGITAL MOTOR CONTROL PLATTER SYSTEMS For Serial Number and After PRODUCT INFORMATION BULLETIN #3365 DIGITAL MOTOR CONTROL PLATTER SYSTEMS For Serial Number 28640996 and After Record Platter System Identification Numbers Here: Model # Serial # Table of Contents Program

More information

LEAK TEST PROCEDURE APPLICABLE TO DC3 INTELLI-GRIP LIFTERS MODELS MRT4-DC3, MRTA8-DC3, MRTALP8-DC3 AND PC/P1-DC3 SERIES

LEAK TEST PROCEDURE APPLICABLE TO DC3 INTELLI-GRIP LIFTERS MODELS MRT4-DC3, MRTA8-DC3, MRTALP8-DC3 AND PC/P1-DC3 SERIES LEAK TEST PROCEDURE APPLICABLE TO DC3 INTELLI-GRIP LIFTERS MODELS MRT4-DC3, MRTA8-DC3, MRTALP8-DC3 AND PC/P1-DC3 SERIES TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON KEEP FOR FUTURE REFERENCE

More information

CONTROL FEATURES AVAILABLE OPTIONS

CONTROL FEATURES AVAILABLE OPTIONS Vari Speed A2000 TABLE OF CONTENTS Control Features Options Application Data Operating Condition s Control Ratings Chart Mounting Dimensions Installation and Wiring Typical Wiring Diagram Schematic (Block

More information

This information covers the proper procedure for replacing the Volvo D16F engine in a VT or VNL chassis.

This information covers the proper procedure for replacing the Volvo D16F engine in a VT or VNL chassis. Volvo Trucks North America Greensboro, NC USA Engine, Replacement DService Bulletin Trucks Date Group No. Page 10.2007 210 139 1(47) Engine, Replacement Volvo D16F VNL, VT W2005773 This information covers

More information

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference.

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference. AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference. MODEL MC 3000 SPECIFICATION Input Volts: 208-230/430 VAC, 60Hz, 3 Phase

More information

MODEL MA4210 Installation and Operation Manual Important:

MODEL MA4210 Installation and Operation Manual Important: MODEL MA4210 Installation and Operation Manual Important: This manual contains specific cautionary statements relative to worker safety. Read this manual thoroughly and follow as directed. It is impossible

More information

C40008 & C40009 EXHAUST BRAKES

C40008 & C40009 EXHAUST BRAKES EXHAUST BRAKES C40008 & C40009 1995 2003 Ford F250 / F350 7.3 L Powerstroke Diesel with manual transmissions 1995 1998 Ford F250 / F350 7.3 L Powerstroke Diesel with automatic transmission* *Requires the

More information

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines Installation and Users Manual For the following Prelube Kits: VARNA Products P/N 6423 Kit for 208 VAC 3 Phase VARNA Products

More information

Instruction Sheet. Subject: Installations Instructions. Air Compressor Kits. Importan

Instruction Sheet. Subject: Installations Instructions. Air Compressor Kits. Importan MULTIPLEX 2100 FUTURE, SELLERSBURG, IN 47172 800-367-4233 WWW.MANITOWOCBEVERAGE.COM/US Instruction Sheet Subject: Installations Instructions Importan Read the following warnings before beginning an installation.

More information

HP COOL TECH, INC. COOLANT PUMP. PowerPump. INSTALLATION MANUAL HANWHA XD20 Series 10000/11000

HP COOL TECH, INC. COOLANT PUMP. PowerPump. INSTALLATION MANUAL HANWHA XD20 Series 10000/11000 HP COOL TECH, INC. COOLANT PUMP PowerPump INSTALLATION MANUAL HANWHA XD20 Series 10000/11000 1 TABLE OF CONTENTS Page Topic 3 Introduction 3 Specifications 3 Warning 4 Safety 5, 6, 7 Installation 8 Use

More information

Installation Instructions. QuickSilver Shifter. Fits: GM, Ford, Chrysler Transmissions See Application Guide for Specific Applications Part # 80683

Installation Instructions. QuickSilver Shifter. Fits: GM, Ford, Chrysler Transmissions See Application Guide for Specific Applications Part # 80683 Installation Instructions QuickSilver Shifter Fits: GM, Ford, Chrysler Transmissions See Application Guide for Specific Applications Part # 80683 WORK SAFELY! For maximum safety, perform this installation

More information

Installation Instructions Z-Gate Shifter

Installation Instructions Z-Gate Shifter Installation Instructions Z-Gate Shifter Part Number 80681 1998, 2001 by B&M Racing and Performance Products The B&M Z-Gate shifter can be used in vehicles equipped with most popular three speed automatic

More information

2014+ FORD FIESTA ST DIRECT-FIT OIL COOLER KIT PARTS LIST AND INSTALLATION GUIDE CAUTION PARTS INCLUDED NOTE TOOLS NEEDED INSTALL PROCEDURE

2014+ FORD FIESTA ST DIRECT-FIT OIL COOLER KIT PARTS LIST AND INSTALLATION GUIDE CAUTION PARTS INCLUDED NOTE TOOLS NEEDED INSTALL PROCEDURE PARTS LIST AND PARTS INCLUDED 3PC APPLICATION-SPECIFIC MOUNTING BRACKETS & SPACER 1PC 19-ROW OIL COOLER 1PC 4 ', X 1'' BRAIDED HOSE W/90-10AN FITTINGS 1PC 3'' X 2.5 '' BRAIDED HOSE W/45 AND 90-10AN FITTINGS

More information

ON DEMAND INSTALLATION GUIDE

ON DEMAND INSTALLATION GUIDE ON DEMAND INSTALLATION GUIDE PICTOGRAMS Each Signifier displayed here is specific to this User Manual. Menu Previous Advance Note Tip Example Barcode Scanner Rotary Heads Drum & Frame Pump Stations Control

More information

ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL

ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL EFFECTIVE JANUARY 10, 2018 Superseding All Previous Parts Lists. The Company reserves the right to make substitution

More information

TABLE OF CONTENTS SPECIFICATIONS 3 INSTALLATION 4. Direct Mount 4. Ducted Installations 5. Installing Plenum 5. Machine Mount Stand 5.

TABLE OF CONTENTS SPECIFICATIONS 3 INSTALLATION 4. Direct Mount 4. Ducted Installations 5. Installing Plenum 5. Machine Mount Stand 5. TABLE OF CONTENTS PAGE SPECIFICATIONS 3 INSTALLATION 4 Direct Mount 4 Ducted Installations 5 Installing Plenum 5 Machine Mount Stand 5 Ceiling Mount 6 Pedestal Stand 7 Drain Installation 7 Electrical 8

More information

SERVICE MANUAL (INTERNATIONAL)

SERVICE MANUAL (INTERNATIONAL) SERVICE MANUAL (INTERNATIONAL) IMPINGER CONVEYOR OVENS MODEL 1421-000-E, 1454, 1455 WITH PUSH BUTTON CONTROLS Lincoln Foodservice Products, LLC 1111 North Hadley Road Fort Wayne, Indiana 46804 United States

More information

MODEL MC1500 Installation and Operation Manual Important:

MODEL MC1500 Installation and Operation Manual Important: MODEL MC1500 Installation and Operation Manual Important: This manual contains specific cautionary statements relative to worker safety. Read this manual thoroughly and follow as directed. It is impossible

More information

Z-Gate Universal Shifter

Z-Gate Universal Shifter Installation Instructions Z-Gate Universal Shifter Fits: GM, Ford, Lincoln and Chrysler Transmissions See Application Guide for Specific Applications Part #80681 Rev 06/01/2018 WORK SAFELY! For maximum

More information

MC2500. Installation and Operation Manual

MC2500. Installation and Operation Manual MC2500 Installation and Operation Manual Important: This manual contains specific cautionary statements relative to worker safety. Read this manual thoroughly and follow as directed. It is impossible to

More information

70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing

70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing Bulletin No. BK4775-3 (08/2016) 70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing Read carefully before attempting to assemble, install, operate or

More information

Installation and Service Manual

Installation and Service Manual RESIDENTIAL PLATFORM LIFTS RPL400 / RPL600 Installation and Service Manual WARNING! STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS IS REQUIRED to promote the safety of those installing this product,

More information

331-SV. User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER. Ashland, OH

331-SV. User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER. Ashland, OH 331-SV User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER Ashland, OH 800-363-5842 WWW.PRIMEXCONTROLS.COM Warranty void if panel is modified. Call factory with servicing

More information

99-04 GT. Hellion Power Systems Mustang GT Kit Instructions

99-04 GT. Hellion Power Systems Mustang GT Kit Instructions Hellion Power Systems 99-04 Mustang GT Kit Instructions Part 1 Hellion recommends that the front suspension system be installed either by trained professionals or by 5.Remove rack bolts K-Member Installation

More information

LAWN SPRINKLER, IRRIGATION PUMP

LAWN SPRINKLER, IRRIGATION PUMP LAWN SPRINKLER, IRRIGATION PUMP MODEL #, SP0P, SP5P, SP20P, EL0P, EL5P, EL20P SAFETY INFORMATION Please read and understand this entire manual before attempting to assemble, operate or install the product.

More information

Priming Systems Installation Instructions

Priming Systems Installation Instructions Priming Systems Installation Instructions System Components: Single Priming Pump: Single VAP Valve Systems: Control Panel Activated... 2 Auto Prime (Pressure Switch) Activated... 3 Multiple VAP Valve Systems...

More information

70 Series 8700 End Mount Three Phase Brake Instructions IP56 (NEMA 4) Housing

70 Series 8700 End Mount Three Phase Brake Instructions IP56 (NEMA 4) Housing Bulletin No. BK4773-3 (08/2016) 70 Series 8700 End Mount Three Phase Brake Instructions IP56 (NEMA 4) Housing Read carefully before attempting to assemble, install, operate or maintain the product described.

More information

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Supersedes IL 33-858-4 Dated 05/02 Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Digitrip Retrofit System for ITE K-3000, Digitrip Retrofit System for ITE K-3000, K-3000

More information

07 & UP GM 1500 PICKUP 2.0 FRONT 1.0 REAR LEVELING KIT INSTALLATION

07 & UP GM 1500 PICKUP 2.0 FRONT 1.0 REAR LEVELING KIT INSTALLATION INSTRUCTION PART NO 15265 LEVELING KIT NO 3813 07 & UP GM 1500 PICKUP 2.0 FRONT 1.0 REAR LEVELING KIT INSTALLATION READ INSTRUCTIONS/WARNINGS COMPLETELY THROUGH BEFORE STARTING. FAILURE TO ADHERE TO THE

More information

EZ LINER EXPRESS USERS MANUAL

EZ LINER EXPRESS USERS MANUAL EZ LINER EXPRESS 2013 Vehicle Service Group CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies warrants for one year from date of installation and/or purchase any components of

More information

BX7460P Allure Tow Bar Operator Manual & Installation Instructions. ALLURE Tow Bar (10,000 lb) Pintle Coupler

BX7460P Allure Tow Bar Operator Manual & Installation Instructions. ALLURE Tow Bar (10,000 lb) Pintle Coupler Operator Manual & Installation Instructions ALLURE Tow Bar (10,000 lb) Pintle Coupler Hooking Up to Towed Vehicle 1. Position the towing vehicle on a level surface with a straight driveway ahead and engage

More information

L5000 Plus. Installation & Setup Guide

L5000 Plus. Installation & Setup Guide L5000 Plus Page 1 of 16 JDE1945 IssB s1 May 2009 Contents Description Page Safety... 3 Installation Standards 4 Specification. 4 Installation Procedure Pump Box. 6 Auxiliary Pump Boxes... 7 Connecting

More information

Copper Sleeve, Unit Injector, Replacement

Copper Sleeve, Unit Injector, Replacement Volvo Trucks North America Greensboro, NC USA This service bulletin replaces SB 237-46, Copper Sleeve, Unit Injector, Replacement dated 6.2007, publication no. PV776-20177417. DService Bulletin Trucks

More information

CABINET REEL OPERATING INSTRUCTIONS

CABINET REEL OPERATING INSTRUCTIONS CABINET REEL OPERATING INSTRUCTIONS MODELS 15, 25, 40 & 60 SERIES RAPID-AIR CORPORATION 4601 KISHWAUKEE ST. ROCKFORD, IL 61109-2925 Phone: (815) 397-2578 Fax: (815) 398-3887 Web Site: www.rapidair.com

More information

HALLMARK INDUSTRIES INC

HALLMARK INDUSTRIES INC Performance Part No. HP. CONVERTIBLE JET PUMP USER S MANUAL GPH of Water @ Total Discharge Pressure of 40 psi Max. Pressure Max suction (shallow well) Max Suction (deep well) Max GPM (@0 head) Max Discharge

More information

C I R R U S DISTRIBUTION DESCRIPTION

C I R R U S DISTRIBUTION DESCRIPTION MODELS SR AND SRT DISTRIBUTION. DESCRIPTION This section contains information on the distribution system. The fuel distribution system consists of electric and mechanical (engine-driven) fuel pumps, fuel

More information

Items # and #

Items # and # D I S P E N S E R T E C H N I C A L M A N U A L Items #91160-00 and #91161-00 1. System Description... 1 2. Equipment Included with the Green Earth II XL System... 2 3. Components Included with Green Earth

More information

VALVE AND PLUMBING KIT NEW HOLLAND 7310 LOADER NEW HOLLAND TRACTORS

VALVE AND PLUMBING KIT NEW HOLLAND 7310 LOADER NEW HOLLAND TRACTORS ASSEMBLY MANUAL Keep With Operator s Manual VALVE AND PLUMBING KIT NEW HOLLAND 73 LOADER NEW HOLLAND TRACTORS MODEL 2WD FWA LESS CAB WITH CAB TT55 X X X TT75 X X X Valve and plumbing kit can be installed

More information

CRD610 Automatic Fitting Inserter

CRD610 Automatic Fitting Inserter CRD610 Automatic Fitting Inserter OPERATIONS MANUAL VERSION 1.2 LAST EDITED 12.12.2018 cleanroomdevices.com 1 Table of Contents Title Page. 1 Table of Contents...2 1.0 General Product & Safety Information....3

More information

TILLOTSON LTD., CLASH INDUSTRIAL ESTATE, TRALEE, CO. KERRY, IRELAND PHONE: FAX:

TILLOTSON LTD., CLASH INDUSTRIAL ESTATE, TRALEE, CO. KERRY, IRELAND PHONE: FAX: TILLOTSON LTD., CLASH INDUSTRIAL ESTATE, TRALEE, CO. KERRY, IRELAND PHONE: +353 66 7121911 FAX: +353 66 7124503 e-mail: sales@tillotson.ie SERIES SERVICE MANUAL INTRODUCTION The gasoline engine industry

More information

HEAVY DUTY ONBOARD AIR SYSTEM PART NO

HEAVY DUTY ONBOARD AIR SYSTEM PART NO IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using this product. SAVE THIS MANUAL FOR FUTURE REFERENCE

More information

WEBER CARBURETOR TROUBLESHOOTING GUIDE

WEBER CARBURETOR TROUBLESHOOTING GUIDE This guide is to help pinpoint problems by diagnosing engine symptoms associated with specific vehicle operating conditions. The chart will guide you step by step to help correct these problems. For successful

More information

Operating Instructions - Electric Pow'r-Riser Models

Operating Instructions - Electric Pow'r-Riser Models ADivisionOf Templeton, Kenly& Co., Inc. Operating Instructions - Electric Pow'r-Riser Models Table of Contents 1.0 Recieving Instructions 2.0 Safety 3.0 Specifications 4.0 Initial Installation Before Operating

More information

Fisher 657 Diaphragm Actuator Sizes and 87

Fisher 657 Diaphragm Actuator Sizes and 87 Instruction Manual 657 Actuator (30-70 and 87) Fisher 657 Diaphragm Actuator Sizes 30 70 and 87 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Installation... 3 Mounting

More information

Operations and Service Manual. X30208 Load Bank

Operations and Service Manual. X30208 Load Bank Operations and Service Manual Read all instructions before using the load bank Contents 1. Components... 3 Total Assembly... 3 2) Specifications... 4 a)... 4 3) Receiving... 5 4) Safety... 5 a) Ground

More information

Solstice Electric Fryers SE Series Service Manual

Solstice Electric Fryers SE Series Service Manual Solstice Electric Fryers SE Series Service Manual L22-330 R1 (10/12) Notice In the event of problems or questions about your order, contact the Pitco Frialator factory at (603) 225-6684. In the event of

More information

INSTRUCTION MANUAL ACTUATOR CLASSE I TYPE MA, MB

INSTRUCTION MANUAL ACTUATOR CLASSE I TYPE MA, MB ACTUATOR CLASSE I TYPE MA, MB CONTENTS Page : 2/13 PRODUCT DESCRIPTION General description 3 Product specification 5 INSTALLATION Storage 6 Unpacking 7 Handling 7 Installation : Mechanical 7 Installation

More information

High Frequency SineWave Guardian TM

High Frequency SineWave Guardian TM High Frequency SineWave Guardian TM 380V 480V INSTALLATION GUIDE FORM: SHF-IG-E REL. January 2018 REV. 002 2018 MTE Corporation High Voltage! Only a qualified electrician can carry out the electrical installation

More information

MODEL ELC-12/40-CVM-D BATTERY CHARGER

MODEL ELC-12/40-CVM-D BATTERY CHARGER NATIONAL RAILWAY SUPPLY MODEL ELC-12/40-CVM-D BATTERY CHARGER Installing, Operating and Service Instructions for the ELC-12/40-CVM-D Solid State Charger PLEASE SAVE THESE IMPORTANT SAFETY AND OPERATING

More information

3 Phase Smart Controller

3 Phase Smart Controller 3 Phase Smart Controller Installation and Owner s Manual STP-SCIII 208-230 VAC, 60Hz, 120 Volt Coil Franklin Fueling 3760 Marsh Rd. Madison WI 53718 USA Tel: +1 608 838 8786 800 225 9787 Fax: +1 608 838

More information

E.S.P. Embedded Sensing Probes for Motor Brushes

E.S.P. Embedded Sensing Probes for Motor Brushes E.S.P. Embedded Sensing Probes for Motor Brushes 2/13 Installation & Operating Manual MN609 Any trademarks used in this manual are the property of their respective owners. Important: Be sure to check www.baldor.com

More information

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS ASTRO ENVELOPE FEEDER AMC-2000-5 FOR RYOBI 3302 / ITEK 3985 (2 COLOR) INSTALLATION AND OPERATING INSTRUCTIONS INTRODUCTION Thank you for purchasing the Astro Envelope Feeder. It is fast, efficient, reliable,

More information

Assembly Instructions for A, A, A, & A

Assembly Instructions for A, A, A, & A Update Instructions Yield-Pro 1225/1625 Planter Used with: Yield-Pro 1225 Planter Yield-Pro 1625 Planter General Information! When you see this symbol, the subsequent instructions and warnings are serious

More information

DEMA 258BD-200C and 258BT-200C DRAIN MASTER Jr. INSTALLATION INSTRUCTION SHEET

DEMA 258BD-200C and 258BT-200C DRAIN MASTER Jr. INSTALLATION INSTRUCTION SHEET I-736 Pg. 1 of 10 Summary The 258BD-200C Drain Master is designed to feed chemicals into drains and grease traps to break up grease, detergent buildup and eliminate odors. The 258BT-200C Trash Master is

More information

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support:

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support: INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) 02-14 Turbo Subaru and 2015+ STi Document# 19-0102 Support: info@radiumauto.com These instructions are based on a vehicle with an OEM turbocharger

More information

Installation Instructions For Motor Control Center (MCC) Units

Installation Instructions For Motor Control Center (MCC) Units s Page 1 of 8 Installation Instructions December, 2013 Installation Instructions For Motor Control Center (MCC) Units Hazardous voltage. Will cause death or serious injury. Always de-energize and ground

More information

Section 10: Rotary Tables

Section 10: Rotary Tables Section 10: Rotary Tables Rotary Tables, 4th Axis Figure 10-1 Rotary Table Pre-installation Remove the top of the shipping crate: 1) With a large screwdriver gently pry the clips from the bottom of the

More information

HYDRAULICS. TX420 & & lower. Hydraulic Tandem Pump Removal. 4. Remove the LH side panel (Fig. 0388).

HYDRAULICS. TX420 & & lower. Hydraulic Tandem Pump Removal. 4. Remove the LH side panel (Fig. 0388). TX420 & 425 240000299 & lower 4. Remove the LH side panel (Fig. 0388). Hydraulic Tandem Pump Removal Note: Cleanliness is a key factor in a successful repair of any hydraulic system. Thoroughly clean all

More information

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

SERVICE MANUAL (DOMESTIC & INTERNATIONAL) SERVICE MANUAL (DOMESTIC & INTERNATIONAL) DUAL TECHNOLOGY FINISHER MODEL 1960 & 1980 SERIES Lincoln Foodservice Products, LLC 1111 North Hadley Road Fort Wayne, Indiana 46804 United States of America Telephone:

More information

Maintenance Manual 13 AMPERE POWER SUPPLY 19A704647P1-P3. Mobile Communications LBI-31801C

Maintenance Manual 13 AMPERE POWER SUPPLY 19A704647P1-P3. Mobile Communications LBI-31801C C Mobile Communications 13 AMPERE POWER SUPPLY 19A704647P1-P3 CAUTION THESE SERVICING INSTRUCTIONS ARE FOR USE BY QUALI- FIED PERSONNEL ONLY. TO AVOID ELECTRIC SHOCK DO NOT PERFORM ANY SERVICING OTHER

More information

JODALE PERRY. Parts List & Mounting Instructions. Jacobsen HR9016 JDP BUILT FOR LIFE

JODALE PERRY. Parts List & Mounting Instructions. Jacobsen HR9016 JDP BUILT FOR LIFE JODALE PERRY Parts List & Mounting Instructions Jacobsen HR9016 JDP BUILT FOR LIFE Jacobsen HR9016 Mounting Instructions Standard Parts 1 - LH Rear Mounting Bracket 1 - RH Rear Mounting Bracket 1 - Front

More information

HEAVY DUTY ONBOARD AIR SYSTEM

HEAVY DUTY ONBOARD AIR SYSTEM HEAVY DUTY ONBOARD AIR SYSTEM PART NO. 10005 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using this

More information

INSTALLATION INSTRUCTIONS FOR SYMCOM'S MODEL 777-HVR-SP ELECTRONIC OVERLOAD RELAY

INSTALLATION INSTRUCTIONS FOR SYMCOM'S MODEL 777-HVR-SP ELECTRONIC OVERLOAD RELAY CONNECTIONS INSTALLATION INSTRUCTIONS FOR SYMCOM'S MODEL 777-HVR-SP ELECTRONIC OVERLOAD RELAY BE SURE POWER IS DISCONNECTED PRIOR TO INSTALLATION!! FOLLOW NATIONAL, STATE AND LOCAL CODES! READ THESE INSTRUCTIONS

More information

MOTORIZED FOLDING CAMPER WINCH

MOTORIZED FOLDING CAMPER WINCH OWNER'S MANUAL MOTORIZED FOLDING CAMPER WINCH With 1200lb Lift Capacity The 12 Volt Motorized Folding Camper Winch is used to raise and lower folding campers with the touch of the switch, eliminating hand

More information

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH IS NOT FOR "DO-IT-YOURSELF" INSTALLATION. It must be installed by

More information

PBA Series Prelube Controls

PBA Series Prelube Controls VARNA Products Engineered Innovation PBA Series Prelube Controls Simple, Compact, Industrial Full featured control for running prelube from the control or from a remote station Easy internal wiring connections

More information

Val-Matic Air / Oil Hydraulic Panel Pump Control System. Operation, Maintenance and Installation Manual

Val-Matic Air / Oil Hydraulic Panel Pump Control System. Operation, Maintenance and Installation Manual Manual No. 5AOP-OM1-2 Val-Matic Air / Oil Hydraulic Panel Pump Control System Operation, Maintenance and Installation Manual INTRODUCTION... 1 RECEIVING AND STORAGE... 1 DESCRIPTION OF OPERATION... 1 INSTALLATION...

More information

Model 802 Center Mount Adapter For New Holland 9030 & TV140 Bi-Directional Tractors PARTS CATALOG

Model 802 Center Mount Adapter For New Holland 9030 & TV140 Bi-Directional Tractors PARTS CATALOG Model 802 Center Mount Adapter For New Holland 9030 & TV140 Bi-Directional Tractors 1 PARTS CATALOG TABLE OF CONTENTS Frame & Tractor Linkage...2,3 Header Linkage & Float Group...4,5 Header Drive Hydraulics

More information

BX88175 Installation Instructions ToadStop II Vacuum Brake System

BX88175 Installation Instructions ToadStop II Vacuum Brake System BX88175 Installation Instructions ToadStop II Vacuum Brake System Serial No. Customer supplied tools & supplies Utility knife, 12VDC tester, drill & bits: (1/8", 1/4", 5/8 ), ¼ socket drive bit, punch,

More information

MICROGUARD 500 EXTENSION REEL TRAINING MANUAL. Greer Company. Greer Company Crane Systems 1 OF18

MICROGUARD 500 EXTENSION REEL TRAINING MANUAL. Greer Company. Greer Company Crane Systems 1 OF18 MICROGUARD 500 EXTENSION REEL TRAINING MANUAL 1 OF18 TABLE OF CONTENTS MICROGUARD 500 SERIES EXTENSION REEL TRAINING MANUAL EXTENSION REEL OVERVIEW...3 REEL-OFF CABLE LAYERING...3 CHECKING THE REEL-OFF

More information

Eclipse GEN 2.0 CAFSystem, Model 150-ECL CAFS PTO Kit Installation Instructions

Eclipse GEN 2.0 CAFSystem, Model 150-ECL CAFS PTO Kit Installation Instructions Eclipse GEN 2.0 CAFSystem, Model 150-ECL CAFS PTO Kit Installation Instructions Read Read through the the safety installation information instructions overhaul carefully instructions before carefully beginning

More information

Installation Instructions Right Hand Drive Megashifter

Installation Instructions Right Hand Drive Megashifter Installation Instructions Right Hand Drive Megashifter Part Number 80685 1995, 2001, 2006, 2010 by B&M Racing & Performance Products The B&M Right Hand Drive Megashifter is designed specifically for vehicles

More information

Eclipse GEN 2.0 CAFSystem, Model 150-ESECL as used with TC20 Series PTO Installation Instructions

Eclipse GEN 2.0 CAFSystem, Model 150-ESECL as used with TC20 Series PTO Installation Instructions Eclipse GEN 2.0 CAFSystem, Model 150-ESECL as used with TC20 Series PTO Installation Instructions Read Read through the the safety installation information instructions overhaul carefully instructions

More information

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING Matrix AP 400V 690V INSTALLATION GUIDE FORM: MAP-IG-E REL. May 2017 REV. 002 2017 MTE Corporation WARNING High Voltage! Only a qualified electrician can carry out the electrical installation of this filter.

More information

Kysor On/Off Rear Air Fan Drive

Kysor On/Off Rear Air Fan Drive . Proper precautions must be taken to prevent personal injury from contact with moving parts, unintended engine start, or other hazards present when working with powered equipment. Refer to the vehicle

More information

Easy Cover. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Easy Cover. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered. Serving the Truck & Trailer Industry Since 944 Easy Cover Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 00-3-94 www.aeroindustries.com Indianapolis,

More information

BL7000 SYSTEM OPERATING MANUAL

BL7000 SYSTEM OPERATING MANUAL BL7000 SYSTEM OPERATING MANUAL REV 2.0 208 / 230V COPYRIGHT 1995 Xenotech, Inc. PAGE 1 POWER INPUT CONNECTOR WIRING INSTRUCTIONS THE INPUT POWER REQUIREMENTS FOR A 7 KW POWER SUPPLY ARE AS FOLLOWS. VOLTAGE

More information

Purging Air From Divider Block Lubrication Systems

Purging Air From Divider Block Lubrication Systems FROST ENGINEERING SERVICE Purging Air From Lubrication Systems A D I V I S I O N O F G E C S E Y S A L E S & S E R V I C E DESCRIPTION Divider block lubrication systems operate correctly only when all

More information

TCA34 Series Tire Changer

TCA34 Series Tire Changer OPERATION INSTRUCTIONS Form 5734-T, 07-10d TCA34 Series Tire Changer Copyright 2008-2011 Hunter Engineering Company OWNER INFORMATION Model Number Serial Number Date Installed Service and Parts Representative

More information

AIR/HYDRAULIC INJECTION GUN MODEL INSTRUCTIONS

AIR/HYDRAULIC INJECTION GUN MODEL INSTRUCTIONS I. OPERATION & DESCRIPTION The Air / Hydraulic Injection Gun is a high-pressure tool that should be used with caution and according to these instructions. IMPORTANT: The Gun is 0,000 psi rated. Do not

More information

70 Series 8700 End Mount Three Phase Brake Instructions IP43 (NEMA 2) Housing

70 Series 8700 End Mount Three Phase Brake Instructions IP43 (NEMA 2) Housing Bulletin No. BK4772S-3 (6/2017) 70 Series 8700 End Mount Three Phase Brake Instructions IP43 (NEMA 2) Housing Read carefully before attempting to assemble, install, operate or maintain the product described.

More information

Power Break II Circuit Breaker Accessories Motor Operator Mechanism

Power Break II Circuit Breaker Accessories Motor Operator Mechanism g GEH 6281E Power Break II Circuit Breaker Accessories Motor Operator Mechanism Introduction The Motor Operator Mechanism, shown in Figure 1, can be installed in 800 4000 A frame Power Break II circuit

More information

BULLDOG WHEEL BRUSH INSTALLATION MANUAL Part # WHEELBRUSHHYD01 - WHEELBRUSHHYD02 WHEELBRUSHELC01 - WHEELBRUSHELC02

BULLDOG WHEEL BRUSH INSTALLATION MANUAL Part # WHEELBRUSHHYD01 - WHEELBRUSHHYD02 WHEELBRUSHELC01 - WHEELBRUSHELC02 BULLDOG WHEEL BRUSH INSTALLATION MANUAL Part # WHEELBRUSHHYD01 - WHEELBRUSHHYD02 WHEELBRUSHELC01 - WHEELBRUSHELC02 TABLE OF CONTENTS Equipment Utilities Page: 1 Equipment Specifications Page: 1 List of

More information

1 M-3000-H4 F150 4X4 Lowering Kit

1 M-3000-H4 F150 4X4 Lowering Kit READ INSTRUCTIONS COMPLETELY THROUGH BEFORE STARTING. IT IS RECOMMENDED THAT INSTALLATION BE DONE BY A QUALIFIED MECHANIC. REPLACE ALL STOCK PARTS THAT ARE DAMAGED OR WORN. ALWAYS WEAR EYE PROTECTION.

More information

L DODGE CUMMINS BD FLOWMAX LIFT PUMP KIT

L DODGE CUMMINS BD FLOWMAX LIFT PUMP KIT 6/15/2016 #1050311D 2010-12 6.7 Dodge Cummins FlowMAX Lift Pump Kit (I-00329) - 1-2010-12 6.7L DODGE CUMMINS BD FLOWMAX LIFT PUMP KIT Installation Instructions P/N # 1050311D PLEASE READ ALL INSTRUCTIONS

More information

SHORT-STOP. Electronic Motor Brake Type G. Instructions and Setup Manual

SHORT-STOP. Electronic Motor Brake Type G. Instructions and Setup Manual Electronic Motor Brake Type G Instructions and Setup Manual Table of Contents Table of Contents Electronic Motor Brake Type G... 1 1. INTRODUCTION... 2 2. DESCRIPTION AND APPLICATIONS... 2 3. SAFETY NOTES...

More information

MODELS CMA-180/180TALL Including 480V MACHINES PARTS MANUAL Rev 2.08A

MODELS CMA-180/180TALL Including 480V MACHINES PARTS MANUAL Rev 2.08A MODELS CMA-180/180TALL Including 480V MACHINES PARTS MANUAL Rev 2.08A C M A D I S H M A C H I N E S 1 2 7 0 0 K N O T T A V E N U E GARDEN GROVE, CALIFORNIA 92841 800-8 5 4-6 4 1 7 FAX 714-895-2141 www.cmadishmachines.com

More information

Safe-T-element Installation Instructions

Safe-T-element Installation Instructions Safe-T-element Installation Instructions For: PTI STEZA (2x2 Burner Configuration) & PTI STEZB (3x1 Burner Configuration) Revision K (May. 3 2012) TABLE OF CONTENTS 1. PREPARATION... 3 1.1 General Safety

More information

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present TOMMY GATE OWNER'S / OPERATOR'S MANUAL 650 Series 650 LB Capacity 650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present Installing the Base Plate 1. Examine the interior and exterior

More information