1 OIL HANDLING SYSTEMS Oil is treated and stored at HI 376 A before it is pumped through a LACT unit to the Departing Oil Pipeline. The Oil Handling System is composed of the Primary Oil Handling System and the Secondary Oil Handling system. The Primary Oil Handling System consists of all equipment associated with oil treatment and storage; Chemical Electric Treater (NBK-3300), Oil Storage Tank (ABJ-1250), Over Flow Oil Tank (ABJ-1260) and the manually operated bottoms pump on each tank. The Secondary Oil Handling System includes the components involved in sending the oil down the pipeline; the LACT Pumps (PBA-2030/2040), LACT Skid, Pipeline Pumps (PAX-2220/2210/2140/2150) and the Departing Oil Pipeline (KAH-7030). Primary Oil Handling System: Oil discharged from the Oil Separators is dumped to the Chemical Electric Treater. Water separated from the oil is dumped to the Water Skimmer (MBM-1060). Oil discharged from the Treater flows to the Oil Storage Tank. Once a sufficient level has accumulated in the Storage Tank, the Secondary Oil Handling System is activated to ship the oil down the Departing Oil Pipeline. The Overflow Oil Tank is common with the Oil Storage Tank and handles excess input. A manually operated pump is installed at each tank to circulate the tank bottom back to the Chemical Electric Treater. Secondary Oil Treating System: When the Secondary Oil Handling System receives a run signal, the LACT Pumps (PBA-2030/2040) send the oil through the LACT Skid to the suction of the Pipeline pumps (PAX-2220/2140/2210/2150). The Pipeline Pumps discharge to the Departing Oil Pipeline (KAH-7030). The pipeline is protected from overpressure by a PSH and PSV on each of the Pipeline Pumps. 6 Departing Oil Pipeline (KAH-7030) Segment No carries oil away from HI 376 A to Amoco. The line is 6 and has a maximum allowable operating pressure (MAOP) of 2160 psig. Rev: 0 Date: 11/11/11 Page 1 of 8 HI A-376 A
2 PRIMARY OIL HANDLING SYSTEM: A. PRE-STARTUP PROCEDURES NOTICE: Refer to Preliminary Considerations in SECTION 3, PART A before beginning any start-up procedures. 1. Verify that all vent and drain valves on the primary system pressurized components are closed a. Chemical Electric Treater, NBK Verify that all drain valves and non-process vents on the primary system atmospheric components are closed a. Oil Storage Tank, ABJ-1250 b. Overflow Oil Tank, ABJ Verify manual valves are open or closed as necessary to correctly direct flow through the primary system components a. Inputs open from Separator oil dumps to the Chemical Electric Treater b. Chemical Electric Treater water dump lined up to the Water Skimmer c. Chemical Electric Treater oil outlet lined up to the Oil Storage Tank 4. Verify that all liquid level controllers, pressure controllers and control valves are in service and ready for flow a. Chemical Electric Treater, NBK-3300 Oil outlet LC/LCV Water dump LC/LCVs Pad gas inlet PCV Pad gas relief PCVs 5. Verify primary atmospheric component outlets/pumps are ready for service (if necessary) NOTICE: If the facility start-up is performed before pre-startup or start-up procedures are completed for the Secondary Oil Handling System, you must monitor the level in the Good Oil Tank to ensure the Secondary Oil Handling System is in-service before the pipeline pump run signal comes on. Rev: 0 Date: 11/11/11 Page 2 of 8 HI A-376 A
3 PRIMARY OIL HANDLING SYSTEM: B. START-UP PROCEDURES 1. Oil Storage Oil Tank, ABJ-1250 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Oil Storage Tank Group relay on the MCP c. Monitor and place safety devices in service as they clear device must be continuously monitored at all times while the safety 2. Over Flow Oil Tank, ABJ-1260 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Overflow Oil Tank Group relay on the MCP c. Monitor and place safety devices in service as they clear device must be continuously monitored at all times while the safety 3. Chemical Electric Treater, NBK-3300 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Chem. Elect. Treater Group #1 relay on the MCP c. Pull to reset the Chem. Elect. Treater Group #2 relay on the MCP d. Reset the breaker in the MCC for the electrostatic grids e. Reset BS&W on alarm side f. Monitor and place safety devices in service as they clear device must be continuously monitored at all times while the safety Rev: 0 Date: 11/11/11 Page 3 of 8 HI A-376 A
4 4. Continue to monitor any bypassed safety devices and reset as they come in service 5. Continue facility start-up REFER TO: SECTION 3, PART B (step 10) 6. Continue to monitor any bypassed safety devices and reset as they come in service 7. Monitor the level in the Oil Storage Tank 8. Monitor the level in the Over Flow Oil Tank 9. Ensure Secondary Oil handling system is in-service before level reaches start setting Rev: 0 Date: 11/11/11 Page 4 of 8 HI A-376 A
5 SECONDARY OIL HANDLING SYSTEM: C. PRE-STARTUP PROCEDURES 1. Verify all vent and drain valves in all system components are closed a. LACT Pumps, PBA-2030/2040 b. LACT Skid c. Pipeline Pumps, PAX-2220/2140/2210/2150 d. Departing Oil Pipeline, KAH Verify that all liquid level controllers, pressure controllers and control valves are in-service and prepared for flow a. Run Signal at Oil Storage Tank b. Pipeline Pumps suction PCV 3. Verify manual valves are open or closed as necessary to correctly direct flow through the Secondary Oil Handling System a. Oil outlet from the Oil Storage Tank lined up to the LACT Pumps suction b. Flow passes through the LACT Skid to the suction of the Pipeline Pumps c. Discharge from the Pipeline Pumps is lined up to the Departing Oil Pipeline Rev: 0 Date: 11/11/11 Page 5 of 8 HI A-376 A
6 SECONDARY OIL HANDLING SYSTEM: D. START-UP PROCEDURES 1. 6 Departing Oil Pipeline, KAH-7030 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Oil Pipeline relay on the MCP c. Monitor and place safety devices in service as they clear device mst be continuously monitored at all times while the safety 2. Electric Pipeline Pumps, PAX-2140/2210/2150 a. Verify the desired Pipeline Pump(s) are selected to On at the local control station b. Verify that no safety devices are bypassed beyond those that must c. Pull to reset the relay for the desired Pipeline Pump(s) on the MCP d. Monitor and place safety devices in service as they clear device mst be continuously monitored at all times while the safety 3. Gas Pipeline Pump, PAX-2220 a. Check all fluid levels b. Manually open starting air to Pipeline pump] c. Hold the Pull to Run relay on Pipeline Pump panel d. Verify the fuel shutdown is reset e. Pull the Pull to Start relay, holding the Pull to Run relay until all shutdown s on panel clear f. Manually close starting sir to pipeline pump Rev: 0 Date: 11/11/11 Page 6 of 8 HI A-376 A
7 4. LACT Pumps and LACT Skid a. Verify the desired pump and meter are selected at the LACT Panel b. Verify that no safety devices are bypassed beyond those that must c. Pull to reset the LACT Pump Group relay on the MCP d. Monitor and place safety devices in service as they clear device mst be continuously monitored at all times while the safety 5. Verify that the Secondary Oil Handling System operates as required when level in Oil Storage Tank reaches pump start setting 6. Immediately begin using Normal Operating Procedures to continue to monitoring system REFER TO: SECTION 5, PART E Rev: 0 Date: 11/11/11 Page 7 of 8 HI A-376 A
8 E. SHUT-DOWN PROCEDURES NOTICE: Refer to Preliminary Considerations in SECTION 4, PART A before beginning any shut-down procedures. 1. The Treater and/or Oil Storage/Over Flow Tanks require a process shut-in REFER TO: SECTION 4 (Facility Shutdown Procedure) 2. If necessary, manually activate the pump run signal at the Oil Storage Tank to pump down the level in the tank before shut-down of the Secondary Oil Handling System NOTICE: Shut-down of the Secondary Oil Handling System will cause a level to accumulate in the Oil Storage Tank. The system must be returned to service before a high level or additional shutdowns will be required. 3. To shutdown the Secondary Oil Handling System, push to close the following relays at the MCP to shut-down the system components: a. Push to close the LACT Pump Group relay on the MCP b. Push to close the relays for the Pipeline Pump(s) on the MCP c. Push to close the Oil Pipeline relay on the MCP 4. Close manual valves as necessary to further isolate individual system components 5. Open manual bleed valves as necessary to bleed down components WARNING: Use appropriate fluid collection when draining components. NOTICE: If shut-down was performed as preparation for maintenance work, or if the cause of the shutdown requires corrective action/repair, continue with Lock Out/Tag Out (LO/TO) Procedures REFER TO: Fieldwood Safe Work Practices for LO/TO (Section D Chapter 5) (can be found on the Fieldwood SEMS Portal) Rev: 0 Date: 11/11/11 Page 8 of 8 HI A-376 A
POWER GENERATION SYSTEMS
POWER GENERATION SYSTEMS The Power Generation Systems on HI 595 CF&D consist of three Waukesha 7042 gas driven generators and two diesel driven generators. Two of the three Gas Generators must run to provide
More informationLACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31
LACT MEASUREMENT Prepared By: Ken A. Steward. P.E. Linco-Electromatic, Inc. 4580 West Wall Street Midland, Texas 79703 The Operation of L.A.C.T. Units The simplest approach to the understanding of the
More informationBOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL
BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL IMPORTANT These instructions are intended as a guide for the Installing Contractor and as a reference for the Operator, Owner and Serviceman. RETAIN
More informationDESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS
DESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS INTRODUCTION The two most common methods of measuring the volume of petroleum liquids are tank gauging and liquid metering. The problems associated with
More informationSecondary Coolant 301
Secondary Coolant 301 Instructor Rusty Walker Hill PHOENIX Learning Center Secondary Coolant 301 Start-Up Procedures Secondary Coolant 301 Objectives Describe the initial startup procedures for a medium
More informationMOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Acceptance Inspection Date of Review / / BLD20 - Project Address: Project Name: Numbers following worksheet comments represent an NFPA
More informationInspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8
, Chapter 8 as amended by CCR, Title 19 Page 1 of 8 Address: City: Date of Pump Test: Shaft Orientation: Horizontal Vertical Annual Fire Pump Test Results Number of pumps at this location: If multiple
More informationThe Filling Procedure
The Filling Procedure Model(s): ECO Series What is needed! 1. Pump 2. 3 water hoses with metric adapters (found on the chiller pump) 3. Glycol (Premixed 37% of KKT Protect) 4. Hand tools 5. Pressure gauge
More informationPIPELINES (Last update - February 2004)
PIPELINES (Last update - February 2004) Note: 1. The PINC s L-102 through L-143 address DOI regulated offshore pipelines, only. 2. During pipeline inspections, the API RP 14C SAC reference must be verified
More informationBOSS 107 SEPARATOR SYSTEM INSTALLATION & APPLICATION MANUAL
Website: www.recoveredenergy.com Email: oilwatersales@recoveredenergy.com BOSS 107 SEPARATOR SYSTEM INSTALLATION & APPLICATION MANUAL BOSS 2.2T/107 BOSS 5T/107 BOSS 11T/107 BOSS 25T/107 BOSS 45T/107 Installation
More informationStartup and Operation of SEE-THRU Nuclear Power Plant for Student Performance MP-SEE-THRU-01 Rev. 018
Student Operating Procedure Millstone Station Startup and Operation of SEE-THRU Nuclear Power Plant for Student Performance Approval Date: 01/12/2011 Effective Date: 01/12/2011 TABLE OF CONTENTS 1. PURPOSE...3
More informationOryx Midstream Services - LACT and Measurement Manual
1.00 General... 2 1.01 Scope... 2 1.02 Codes and Standards Requirements... 2 2.00 Design... 2 2.01 General... 2 3.00 Products... 4 3.01 Hydraulic Assembly... 4 3.02 Charge pump and motor... 4 3.03 Basic
More informationFire Water Utility 2002 Training Manual Raw Water Storage Area
Effective: 10/21/11 Page 1 of 17 Rev. by J. Shively Fire Water Utility 2002 Training Manual Raw Water Storage Area Document Revision Change Table Revision Number Revision Description Revised By Revision
More informationLease Automatic Custody Transfer
Lease Automatic Custody Transfer Angus Manufactured LACT Units Updated 19-Dec-01, Slide 2 LACT Unit Requirements Are used for the automatic unattended measurement of crude oil. Accurately measure the quantity
More informationUD SERIES COMPRESSORS
UD SERIES COMPRESSORS INDUSTRIAL AIR COMPRESSOR 40-400 HP UPDRAFT MODELS Electric Motor - 460/575/3/60 standard (208/230/3/60 optional on most models) Motor Starter - 460 volt, full voltage magnetic starter
More informationCASH VALVE K SERIES BACK PRESSURE VALVES
High capacity angle bypass regulators or back pressure control valves with models for pressures to 1500 psig (103.4 barg) and capacities to 200 gallons per minute (757 l/min.) FEATURES GENERAL APPLICATION
More informationSEASONAL MAINTENANCE CHECKLISTS Johnson Controls
SPRING CHECK LIST ABSORPTION CHILLERS Check starter and control panel. Leak test. Check hand valve diaphragms and replace as required. Check operation of purge unit. Change oil in the purge pump. Lubricate
More informationTypes 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators
Instruction Manual Form 5116 Types 1808 and 1808A July 2010 Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators! Warning Failure to follow these instructions or to properly install
More informationTECHNICAL PAPER 1002 FT. WORTH, TEXAS REPORT X ORDER
I. REFERENCE: 1 30 [1] Snow Engineering Co. Drawing 80504 Sheet 21, Hydraulic Schematic [2] Snow Engineering Co. Drawing 60445, Sheet 21 Control Logic Flow Chart [3] Snow Engineering Co. Drawing 80577,
More informationStarting up hydraulic systems
General / Installation A hydraulic system that operates economically, safely, and trouble-free requires careful planning, as well as proper installation and start-up. Conscientious maintenance has a considerable
More informationThis document describes the commissioning checklist procedures for the Capstone MicroTurbine systems.
Capstone Capstone Turbine Corporation 21211 Nordhoff Street Chatsworth CA 91311 USA Telephone: (818) 734-5300 Facsimile: (818) 734-5320 Website: www.microturbine.com Work Instructions Commissioning Checklist
More informationArch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide
Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide 8/28/00 TROUBLESHOOTER S GUIDE PROBLEM CAUSE SOLUTION Insufficient water flow to chlorinator Check water flow through Flow Controller
More informationALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.
ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. 1. Check log book for incomplete compliance for further operation. 2.
More informationMOONEY FLOWGRID SLAM SHUT REGULATORS
MOONEY FLOWGRID SLAM SHUT REGULATORS The Flowgrid Slam Shut Valve is an easy to maintain automatic shutoff device. 2 Dresser Mooney Flowgrid Slam Shut The Slam Shut is designed for use with a pressure
More informationSECTION 3.00 WARNING WARNING ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION
SECTION 3.00 ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION Be sure that the clutch, circuit breaker, or other main power transmission device is disconnected. Generators develop voltage as soon as the
More informationEMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) H4DOTC
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) H4DOTC SYSTEM OVERVIEW 1. System Overview There are three emission control systems, which are as follows: Crankcase emission control system Exhaust emission
More informationGENCORE 5 FUEL CELL SYSTEM System Fundamentals
GENCORE 5 FUEL CELL SYSTEM System Fundamentals GenCore 5T48 GenCore 5B48 GenCore 5U48 GenCore 5T24 GenCore 5U120 Revision 1 December 1, 2004 GENCORE DESCRIPTION GenCore fuel cell systems are direct hydrogen
More informationY690A Series Pressure Reducing Regulators
Instruction Manual Form 5463 Y690A Series April 1999 Y690A Series Pressure Reducing Regulators Introduction Scope of Manual This manual provides instructions for installation, startup, maintenance, and
More informationSECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS
SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationNMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST
Date Documents Submitted: Log No.: File No.: Plan Examiner: Permit No.: Property Information Building Name: Building Address: Building Manager's Name: Building Manager's Phone: Fax: System Designer/Contractor
More informationHot-Tap Machines. Specification Sheet TBL Bulletin nº: SPECIFICATION FOR TBL-0322 TAPPING MACHINE Tapping Range 1 through 6
Bulletin nº: 2009.602.00 Specification Sheet TBL-0322 SPECIFICATION FOR TBL-0322 TAPPING MACHINE Tapping Range 1 through 6 Boring Bar Travel 32 (813 mm) Standard Auto Feed 0.006 per rev. (0.15 mm per rev.)
More informationPurging Air From Divider Block Lubrication Systems
FROST ENGINEERING SERVICE Purging Air From Lubrication Systems A D I V I S I O N O F G E C S E Y S A L E S & S E R V I C E DESCRIPTION Divider block lubrication systems operate correctly only when all
More informationType HSR Pressure Reducing Regulator for Residential, Commercial or Industrial Applications
Bulletin 71.1 D103087X012 Type HSR December 2017 Type HSR Pressure Reducing Regulator for Residential, Commercial or Industrial Applications High Capacity Compact Design P1524_1 High Capacity Internal
More informationof Fire Pump Assemblies
A.1.0 A.1.1 A.2.0 A.2.1 A.2.2 A.2.3 A.2.4 A.2.5 A.2.6 A.3.0 A.3.1 A.4.0 A.4.1 Report of Inspection, Testing & Maintenance System in service before conducting tasks Pertinent parties notified before conducting
More informationPackaged Design Day Tank Systems
Fuel Supply Systems Packaged Design Day Tank Systems for diesel/fuel oil application providing a reliable fuel source for diesel and turbine engine driven equipment and oil fired boilers model & accessory
More informationCheck Valves Check Valves are the simplest form of directional control valves, but they can also be used as pressure controls.
Check Valves Check Valves are the simplest form of directional control valves, but they can also be used as pressure controls. Standard Check Valve The standard check valve permits free flow in one direction
More informationOperators Manual ECO-AIR-IVS Internal Valve Actuation System
2534-A Shell Road Georgetown, TX 78628 www.parafour.com 512-626-4099 Operators Manual ECO-AIR-IVS Internal Valve Actuation System Ver 1.0 Warnings:!! This device is electrically operated and should only
More informationINSTALLATION, OPERATION AND MAINTENANCE MANUAL
INSTALLATION, OPERATION AND MAINTENANCE MANUAL SAFETY RELIEF VALVES Revision: 30 June 2004 TOSACA,S.A. INSTALLATION, OPERATION AND MAINTENANCE MANUAL June-04 pag.1 TABLE OF CONTENTS 1. General 2. Description
More informationANSI Z50.1. Safety Standards
ANSI Z50.1. Safety Standards 5. Dry Ingredient Handling Equipment 5.1 General Requirements 5.1.1 Whenever a dry ingredient handling system is of such size that the beginning of its operation is remote
More informationTo ensure proper installation, digital pictures with contact information to before startup.
Check List for Optimal Filter Performance? There should be no back-pressure on the flush line. A 1 valve should have a 2 waste line, and 2 valve should have a 3 waste line. Do not use rubber hosing or
More informationC-SERIES 3516 Compression Package
Proven Quality and Reliability, Delivered Fast Key Benefits Faster to Gas Revenue Typically deliverd in 10 to 14 weeks without compromising quality, performance or configurability, so you can get your
More informationEJECTORS GENERAL OPERATION & MAINTENANCE MANUAL
EJECTORS GENERAL OPERATION & MAINTENANCE MANUAL The information contained in this manual was current at the time of printing. The most current versions of all Hydro Instruments manuals can be found on
More informationCOMPRESSOR STATION OPERATIONS
CONTENTS FIGURES AND TABLES... viii PREFACE... xi ACKNOWLEDGEMENTS... xiii CHAPTER 1. INTRODUCTION... 1 Scope and Outline... 1 Types of Stations... 2 Production Stations... 2 Storage Stations... 3 Transmission
More informationGenerator, Unit Hydrogen, Seal Oil, Stator Coolant, Demin Water Plant Operations Training Huntly Power Station: Units 1-4 Assessment ID: 8014, 8012, 8009, 8015, 8016 NZQA Unit Standard: 17413 Assessment
More informationY690A Series Pressure Reducing Regulators
Instruction Manual Form 5463 Y690A Series February 2009 Y690A Series Pressure Reducing Regulators! Warning Fisher regulators must be installed, operated, and maintained in accordance with federal, state,
More informationUniversity of Houston Master Construction Specifications Insert Project Name
SECTION 23 30 00 - HVAC PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical
More informationExercise 3-1. Basic Hydraulic Circuit EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Complete hydraulic circuit
Exercise 3-1 Basic Hydraulic Circuit EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the hydraulic schematic and components of the nacelle trainer. You will identify
More informationProperty of American Airlines
Vestergaard - VTS ON 1973 (1-4) American Airlines CHAPTER OPERATING MANUAL 2.1 OPERATING THE VTS In this chapter, we will go through operation of the VTS point by point. When appropriate, references will
More informationNECO Pumping Systems
INSTALLATION OPERATION & MAINTENANCE INSTRUCTIONS For Your NECO Pumping Systems PACKAGED CIRCULATING SYSTEM THIS COMPLETELY ASSEMBLED, TESTED, PACKAGED CIRCULATING SYSTEM IS OF THE HIGHEST QUALITY AND
More informationP445 Series Electronic Lube Oil Control
FANs 125, 121 s Section P Product/Technical Bulletin P445 Issue Date 0100 P445 Series Electronic Lube Oil The P445 Series Electronic Lube Oil is designed for use on refrigeration compressors equipped with
More informationSection 3 Technical Information
Section 3 Technical Information In this Module: Engine identification Modes of operation Battery charging and heat manage operation Service and repair procedures Maintenance requirements Engine Identification
More informationType 310A-32A Pressure Reducing Regulator
Bulletin 71.2 D102066X012 Type 310A February 2017 Type 310A-32A Pressure Reducing Regulator Figure 1. Type 310A Regulator with Type 32A Pilot Introduction The Type 310A pilot-operated high-pressure regulator
More informationHTX-HTH SEPARATORS I&O MANUAL
INSTALLATION OPERATIONS AND MAINTENANCE HTX-HTH SEPARATORS I&O MANUAL 1365 N. Clovis Avenue Fresno, California 93727 (559) 255-1601 www.lakos.com LS-714B (Rev. 11/17) TABLE OF CONTENTS Table of Contents...
More informationMedium and high pressure pumps
Screw pumps Medium and high pressure pumps Installation and Start-up Instruction This instruction is valid for all standard high pressure pumps: E4, D4 and D6 Contents Page Pump identification 2 Installation
More informationrev0 INSTALLATION & OPERATION MANUAL DUAL FLUID CIRCULATING HEATING SYSTEM FOR HAZARDOUS LOCATIONS MODEL OCSE
216329-000 rev0 INSTALLATION & OPERATION MANUAL DUAL FLUID CIRCULATING HEATING SYSTEM FOR HAZARDOUS LOCATIONS MODEL OCSE IDENTIFYING YOUR SYSTEM IOM216329-000 The HOTSTART heating system is designed to
More informationRequirements for Dispensing of Compressed Natural Gas. Yvonne Espinoza, PE Austin Fire Department Engineering Services
Requirements for Dispensing of Compressed Natural Gas Yvonne Espinoza, PE Austin Fire Department Engineering Services Course Overview Enforcement of code requirements Application of code requirements Hazard
More informationMinuteman Vertical Pumps
Description: Condensate Pumps Type: Vertical Centrifugal Pumps Horsepower: /3 to /2 HP GPM: 0 to 37 PSIG: 0-35 Overview: vertical pumps are the workhorse of the NES pumps product offering. All minuteman
More informationFact File 59 Extinguishing systems
Fact File 59 Extinguishing systems Foam Inductors: Guidelines on their selection, use and maintenance Foam Inductors: Guidelines on their selection, use and maintenance INTRODUCTION... 3 HOW INDUCTORS
More information6540 Orientation B&SVRR 6540 Orientation Page 1 8/11/2009
6540 Orientation B&SVRR 6540 Orientation Page 1 CONTROLS AT ENGINEMAN'S POSITION 4. Operating Switches 6. Throttle 7. Reverse Lever 5. Headlight Dimming 18. Alerter Reset Button B&SVRR 6540 Orientation
More informationLocation of Hydraulic Components SMCS
Unfiled Notes Page 1 Service Information System Monday, May 09, 2016 1:42 PM Systems Operation D6T Track-Type Tractor Hydraulic System Media Number -KENR5129-04 Publication Date -01/08/2014 Date Updated
More informationBASIC FOAM FIREFIGHTING OPERATIONS Red and Green Systems
BASIC FOAM FIREFIGHTING OPERATIONS Red and Green Systems Page 730.60 Each of the Red and Green Foam Systems consists of one 3000 gallon foam concentrate storage tank, two foam concentrate pumps, a balanced
More informationNote: The engine may start, but you may still have high leakoff within the high-pressure fuel system. NOTICE
Introduction There have been isolated occurrences of excessive fuel leakage past the electronic unit injectors on some engines. Accelerated wear on the delivery valve results in an increased leak rate.
More informationDCP Midstream Contractor Covered Task List Last updated 7/11/2018
001 Provide Security for Pipeline Facilities 195.436 Oral 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 009 Movement and/or Relocation of Liquid Pipelines 195.424 011 Inspect,
More informationPilot-Operated Regulators
Fisher Controls Instruction Manual Type 1098-EGR & 1098H-EGR Pilot-Operated Regulators R May 1987 Form 5084 Contents Introduction................................... 2 Scope of Manual..............................
More informationOIL-FREE, ROTARY SCREW AIR COMPRESSORS Two-stage, Air-cooled and Water-cooled Fixed Speed or VFD
OIL-FREE, ROTARY SCREW AIR COMPRESSORS Two-stage, Air-cooled and Water-cooled Fixed Speed or VFD 40-500 HP 170-2400 SCFM 40-150 PSIG www.knw-series.com High Quality, Quiet and Energy Efficient Both compression
More informationType EZR Relief Valve or Backpressure Regulator
Instruction Manual Form 5476 Type EZR Relief May 2012 Type EZR Relief Valve or Backpressure Regulator Introduction Scope of the Manual W7347 This instruction manual provides installation, startup, shutdown,
More informationthe TYCOON Series Natural Gas Engine Driven / Electric Motor Driven
the TYCOON Series Natural Gas Engine Driven / Electric Motor Driven The Perfect Solution for Natural Gas Emissions High Reliability. Big Returns. Capturing natural gas emissions from oil field stock tanks
More informationGENERAL PUMPA member of the Interpump Group
FEATURES Innovative drive design eliminates need for auxiliary hydraulic drive HWB Series Hydraulic Drive - Triplex Plunger Pump HWB2512 & HWB2112 Forged brass manifold No scheduled maintenance required
More informationType 644 and 645 Differential Pressure Pump Governors
Instruction Manual 644 and 645 Pump Governors Type 644 and 645 Differential Pressure Pump Governors Introduction Scope of Manual This instruction manual provides information on installation, adjustment,
More informationAP1000 European 7. Instrumentation and Controls Design Control Document
7.3 Engineered Safety Features AP1000 provides instrumentation and controls to sense accident situations and initiate engineered safety features (ESF). The occurrence of a limiting fault, such as a loss
More informationElectronic Metering Pump
Electronic Metering Pump Pressure (PSI) Pressure (BAR) Pulsafeeder Expertise Technology is the key to delivering responsible products to the markets that we serve. Leading the way in the development of
More informationAPP pump instruction APP 21-43
MAKING MODERN LIVING POSSIBLE Instruction APP pump instruction APP 21-43 ro-solutions.com Table of Contents 1. Identification...2 2. System design...3 2.1 Open-ended systems with direct water supply....3
More informationANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS
Before installation these instructions must be fully read and understood TABLE OF CONTENTS 1. General valve description and start-up... 1 2. Main valve maintenance... 1 3. Pilot maintenance... 5 4. Pilot
More informationService Manual for Battery Control Center
Service Manual for Battery Control Center P/N 82 E0071 00 (Ref. 81 1317) June, 1999 Battery Control Box Operation Charging Circuit This function charges the coach battery from the engine alternator while
More informationVFC-5 to VFC-500 FLO-COATER
VFC-5 to VFC-500 FLO-COATER OPERATION INSTRUCTIONS Page -1- CONTENTS PAGE NUMBER System Description... 2 Flo-Coater Description... 4 Operation of a Flo-Coater... 8 Selective Operator Control... 9 Operating
More informationSouthern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018
007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing 195.412(b) 201 Abnormal Operating Conditions Related to Welding on Pipelines 192.225
More information245 W. Roosevelt Road Building 12, Suite 83 West Chicago, IL
45 W. Roosevelt Road Building, Suite 83 West Chicago, IL 6085 800-33-448 www.aquamarkboosters.com AM-Q, AM-80V- & AM-80V-3 AM-00V & AM-50V Installation, Operation & Maintenance Manual AquaMark models:
More informationE Series CE Approved Intermittent Pilot Ignition Control
Installation Instructions Issue Date January 11, 2013 E Series CE Approved Intermittent Pilot Ignition Control Application The E Series CE Approved Intermittent Pilot Ignition Control is a safety control
More informationAutomatic Changeover Medical Manifold Installation, Operation and Maintenance Manual
Automatic Changeover Medical Manifold Installation, Operation and Maintenance Manual Andersen Medical Gas 12 Place Lafitte Madisonville, LA 70447 http://www.themedicalgas.com 1-866-288-3783 Model Number:
More informationCENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.
CENTRIFUGAL CHILLER Annual Inspection Refrigerant Circuit Check and record refrigerant level Inspect for leak results Calculate refrigerant lass and report to the customer. Repair minor leaks as required
More informationBOSS 107 Separator System Installation Manual
Website: www.recoveredenergy.com Email: oilwatersales@recoveredenergy.com BOSS 107 Separator System Installation Manual BOSS 2.2T/107 BOSS 11T/107 BOSS 5T/107 BOSS 25T/107 1 BOSS 45T/107 Contents 1. Unpacking
More informationSubmittal. Front View Side View
RBHO Horizontal Low Profile Concealed Free Return Submittal FCU-RBHO-1.0 07-25-18 Top View (Drain Pan Omitted) Bottom View Front View Side View Left hand unit shown. All dimensions are inches [millimeters].
More informationThis manual presents installation, servicing, troubleshooting, and maintenance for M PUMPS CM MAG-M SERIES Information that may be required regarding
Installation, Operating, Maintenance & Safety Instruction for M PUMPS CM MAG-M SERIES Centrifugal light Mag-Drive pumps (CM MAG-M06/1/2/3/4) This manual presents installation, servicing, troubleshooting,
More informationHALLMARK INDUSTRIES INC
Performance Part No. HP. CONVERTIBLE JET PUMP USER S MANUAL GPH of Water @ Total Discharge Pressure of 40 psi Max. Pressure Max suction (shallow well) Max Suction (deep well) Max GPM (@0 head) Max Discharge
More informationINSTRUCTIONS FOR INSTALLING AND OPERATING THE UNIVERSAL AUTOSYNC MODEL ASPSS DUAL COMPRESSOR SEQUENCER CONSOLE S/N 1638 AND ABOVE
COMPRESSOR 1 EMERGENCY SHUTDOWN OFF POWER ON COMP LOADED COM PRESSOR OPERATING HOURS SYSTEM PRESSURE COMPRESSOR 2 EMERGENCY SHUTDOWN OFF POWER ON COMP LOADED COM PRESSOR OPERATING HOURS LEAD/LAG CONTROL
More informationSCROLL - AIR COOLED PACKAGED & SPLIT SYSTEM ICE CHILLERS
SCROLL - AIR COOLED PACKAGED & SPLIT SYSTEM ICE CHILLERS 1 to 40 Nominal Tons Rev-01 TABLE OF CONTENTS Page: Description 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Product Nomenclature Air Cooled Chiller
More informationTorque Converter, Transmission Pump, Screen And Filter
Page 13 of 27 Transmission Hydraulic System In Forward (Engine Running - Type 2 & 3 Control Valve Shown) (4) Transmission control valve. (5) Neutralizer valve. (6) Neutralizer solenoid. (7) Flow control
More informationHydrostatic Power Train
Chapter Hydrostatic Power Train Specifications................................................................. -3 Test Specifications........................................................ -3 Repair
More informationAPP S pumps APP S / APP S / APP S 21-38
MAKING MODERN LIVING POSSIBLE Instruction APP S 2.0-3.5 / APP S 5.1-9.0 / APP S 21-38 ro-solutions.com Instruction Table of Contents 1. Identification...2 2. System design...3 2.1 Open system design...3
More informationOPERATING MANUAL LIQUID RING VACUUM PUMPS AND COMPRESSORS
(Rev. 2.0_10-2010) INTEGRATIVE NOTES to OPERATING MANUAL LIQUID RING VACUUM PUMPS AND COMPRESSORS for Systems type HYDROPACK INTRODUCTION These instructions are for the installers and maintenance personnel
More informationPrecision Air Drilling Services Equipment Information & Specifications
Equipment Information & Specifications Joy Super Booster Specifications Joy WB-12 5000 Specifications Page 2 of 10 Table of Contents Joy Super Booster Specifications... 2 Joy WB-12 5000 Specifications...
More informationG3 GEMINI INTELLIFRESH BREWER
G3 GEMINI INTELLIFRESH BREWER TROUBLESHOOTING GUIDE GEMTIF10A1000 G3 Twin 1.5 Gallon Satellite Brewer with IntelliFresh GEMSIF10A1000 G3 Single 1.5 Gallon Satellite Brewer with IntelliFresh BREWER PARTS
More informationFisher 644 and 645 Differential Pressure Pump Governors
Instruction Manual 644 and 645 Pump Governors Fisher 644 and 645 Differential Pressure Pump Governors Contents Introduction... 1 Scope of Manual... 1 Description... 1 Specifications... 2 Educational Services...
More informationApplication Engineering
Application Engineering February, 2009 Copeland Digital Compressor Controller Introduction The Digital Compressor Controller is the electronics interface between the Copeland Scroll Digital Compressor
More informationInstallation, Operation, and Maintenance Manual Outdoor Glycol Feed System JWOP /055/100
Installation, Operation, and Maintenance Manual Outdoor Glycol Feed System JWOP-53-030/055/100 Rev. 1 3/21/11 K.G. Type - John Wood #JWOP-53-030/055/100, Outdoor Glycol Feed System Capacity 30/55/100 Gallons
More informationDual Expanding Plug Valve MADE IN THE USA
Dual Expanding Plug Valve MADE IN THE USA WESTERN VALVE - DOUBLE BLOCK AND BLEED Facility Located in Bakersfield California Western Valve, Inc. was established in 1991. What started out as a valve repair
More informationAPIN STEAM GENERATOR SPECIFICATION
Imagination, hope & will Ave. Bolivia 1122- Lima 01, PERU Off. (511) 717-3724 Plant (511) 715-8866 edgargerber@tecnologperu.com - www.tecnologperu.com APIN STEAM GENERATOR SPECIFICATION 0.0 GENERAL 0.1
More informationGeo-Prime Tank U.S. Patent Number 8,544,282
www.geo-flo.com Geothermal and Hydronics Specialists Installation, Operating, and Maintenance Manual Part # 3487 Rev. 03JUL2014 Geo-Prime Tank U.S. Patent Number 8,544,282 Geo-Flo Products Corporation
More informationVission 20/20 Retrofit Instructions
Vission 20/20 Retrofit Instructions Table of Contents Sections Page.0 General Information... 3 2.0 Vission 20/20 Retrofit Instructions... 4 2. Removal... 4 2.2 Installation... 5 3.0 Field Wiring Instructions...
More informationCompact LTC Oil Filtration System Manual
INSTRUCTION MANUAL Compact LTC Oil Filtration System Manual COMPACT LTC OFS-MANUAL 1.4 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. TABLE OF CONTENTS General System Description