1 OIL HANDLING SYSTEMS Oil is treated and stored at HI 376 A before it is pumped through a LACT unit to the Departing Oil Pipeline. The Oil Handling System is composed of the Primary Oil Handling System and the Secondary Oil Handling system. The Primary Oil Handling System consists of all equipment associated with oil treatment and storage; Chemical Electric Treater (NBK-3300), Oil Storage Tank (ABJ-1250), Over Flow Oil Tank (ABJ-1260) and the manually operated bottoms pump on each tank. The Secondary Oil Handling System includes the components involved in sending the oil down the pipeline; the LACT Pumps (PBA-2030/2040), LACT Skid, Pipeline Pumps (PAX-2220/2210/2140/2150) and the Departing Oil Pipeline (KAH-7030). Primary Oil Handling System: Oil discharged from the Oil Separators is dumped to the Chemical Electric Treater. Water separated from the oil is dumped to the Water Skimmer (MBM-1060). Oil discharged from the Treater flows to the Oil Storage Tank. Once a sufficient level has accumulated in the Storage Tank, the Secondary Oil Handling System is activated to ship the oil down the Departing Oil Pipeline. The Overflow Oil Tank is common with the Oil Storage Tank and handles excess input. A manually operated pump is installed at each tank to circulate the tank bottom back to the Chemical Electric Treater. Secondary Oil Treating System: When the Secondary Oil Handling System receives a run signal, the LACT Pumps (PBA-2030/2040) send the oil through the LACT Skid to the suction of the Pipeline pumps (PAX-2220/2140/2210/2150). The Pipeline Pumps discharge to the Departing Oil Pipeline (KAH-7030). The pipeline is protected from overpressure by a PSH and PSV on each of the Pipeline Pumps. 6 Departing Oil Pipeline (KAH-7030) Segment No carries oil away from HI 376 A to Amoco. The line is 6 and has a maximum allowable operating pressure (MAOP) of 2160 psig. Rev: 0 Date: 11/11/11 Page 1 of 8 HI A-376 A

2 PRIMARY OIL HANDLING SYSTEM: A. PRE-STARTUP PROCEDURES NOTICE: Refer to Preliminary Considerations in SECTION 3, PART A before beginning any start-up procedures. 1. Verify that all vent and drain valves on the primary system pressurized components are closed a. Chemical Electric Treater, NBK Verify that all drain valves and non-process vents on the primary system atmospheric components are closed a. Oil Storage Tank, ABJ-1250 b. Overflow Oil Tank, ABJ Verify manual valves are open or closed as necessary to correctly direct flow through the primary system components a. Inputs open from Separator oil dumps to the Chemical Electric Treater b. Chemical Electric Treater water dump lined up to the Water Skimmer c. Chemical Electric Treater oil outlet lined up to the Oil Storage Tank 4. Verify that all liquid level controllers, pressure controllers and control valves are in service and ready for flow a. Chemical Electric Treater, NBK-3300 Oil outlet LC/LCV Water dump LC/LCVs Pad gas inlet PCV Pad gas relief PCVs 5. Verify primary atmospheric component outlets/pumps are ready for service (if necessary) NOTICE: If the facility start-up is performed before pre-startup or start-up procedures are completed for the Secondary Oil Handling System, you must monitor the level in the Good Oil Tank to ensure the Secondary Oil Handling System is in-service before the pipeline pump run signal comes on. Rev: 0 Date: 11/11/11 Page 2 of 8 HI A-376 A

3 PRIMARY OIL HANDLING SYSTEM: B. START-UP PROCEDURES 1. Oil Storage Oil Tank, ABJ-1250 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Oil Storage Tank Group relay on the MCP c. Monitor and place safety devices in service as they clear device must be continuously monitored at all times while the safety 2. Over Flow Oil Tank, ABJ-1260 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Overflow Oil Tank Group relay on the MCP c. Monitor and place safety devices in service as they clear device must be continuously monitored at all times while the safety 3. Chemical Electric Treater, NBK-3300 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Chem. Elect. Treater Group #1 relay on the MCP c. Pull to reset the Chem. Elect. Treater Group #2 relay on the MCP d. Reset the breaker in the MCC for the electrostatic grids e. Reset BS&W on alarm side f. Monitor and place safety devices in service as they clear device must be continuously monitored at all times while the safety Rev: 0 Date: 11/11/11 Page 3 of 8 HI A-376 A

4 4. Continue to monitor any bypassed safety devices and reset as they come in service 5. Continue facility start-up REFER TO: SECTION 3, PART B (step 10) 6. Continue to monitor any bypassed safety devices and reset as they come in service 7. Monitor the level in the Oil Storage Tank 8. Monitor the level in the Over Flow Oil Tank 9. Ensure Secondary Oil handling system is in-service before level reaches start setting Rev: 0 Date: 11/11/11 Page 4 of 8 HI A-376 A

5 SECONDARY OIL HANDLING SYSTEM: C. PRE-STARTUP PROCEDURES 1. Verify all vent and drain valves in all system components are closed a. LACT Pumps, PBA-2030/2040 b. LACT Skid c. Pipeline Pumps, PAX-2220/2140/2210/2150 d. Departing Oil Pipeline, KAH Verify that all liquid level controllers, pressure controllers and control valves are in-service and prepared for flow a. Run Signal at Oil Storage Tank b. Pipeline Pumps suction PCV 3. Verify manual valves are open or closed as necessary to correctly direct flow through the Secondary Oil Handling System a. Oil outlet from the Oil Storage Tank lined up to the LACT Pumps suction b. Flow passes through the LACT Skid to the suction of the Pipeline Pumps c. Discharge from the Pipeline Pumps is lined up to the Departing Oil Pipeline Rev: 0 Date: 11/11/11 Page 5 of 8 HI A-376 A

6 SECONDARY OIL HANDLING SYSTEM: D. START-UP PROCEDURES 1. 6 Departing Oil Pipeline, KAH-7030 a. Verify that no safety devices are bypassed beyond those that must b. Pull to reset the Oil Pipeline relay on the MCP c. Monitor and place safety devices in service as they clear device mst be continuously monitored at all times while the safety 2. Electric Pipeline Pumps, PAX-2140/2210/2150 a. Verify the desired Pipeline Pump(s) are selected to On at the local control station b. Verify that no safety devices are bypassed beyond those that must c. Pull to reset the relay for the desired Pipeline Pump(s) on the MCP d. Monitor and place safety devices in service as they clear device mst be continuously monitored at all times while the safety 3. Gas Pipeline Pump, PAX-2220 a. Check all fluid levels b. Manually open starting air to Pipeline pump] c. Hold the Pull to Run relay on Pipeline Pump panel d. Verify the fuel shutdown is reset e. Pull the Pull to Start relay, holding the Pull to Run relay until all shutdown s on panel clear f. Manually close starting sir to pipeline pump Rev: 0 Date: 11/11/11 Page 6 of 8 HI A-376 A

7 4. LACT Pumps and LACT Skid a. Verify the desired pump and meter are selected at the LACT Panel b. Verify that no safety devices are bypassed beyond those that must c. Pull to reset the LACT Pump Group relay on the MCP d. Monitor and place safety devices in service as they clear device mst be continuously monitored at all times while the safety 5. Verify that the Secondary Oil Handling System operates as required when level in Oil Storage Tank reaches pump start setting 6. Immediately begin using Normal Operating Procedures to continue to monitoring system REFER TO: SECTION 5, PART E Rev: 0 Date: 11/11/11 Page 7 of 8 HI A-376 A

8 E. SHUT-DOWN PROCEDURES NOTICE: Refer to Preliminary Considerations in SECTION 4, PART A before beginning any shut-down procedures. 1. The Treater and/or Oil Storage/Over Flow Tanks require a process shut-in REFER TO: SECTION 4 (Facility Shutdown Procedure) 2. If necessary, manually activate the pump run signal at the Oil Storage Tank to pump down the level in the tank before shut-down of the Secondary Oil Handling System NOTICE: Shut-down of the Secondary Oil Handling System will cause a level to accumulate in the Oil Storage Tank. The system must be returned to service before a high level or additional shutdowns will be required. 3. To shutdown the Secondary Oil Handling System, push to close the following relays at the MCP to shut-down the system components: a. Push to close the LACT Pump Group relay on the MCP b. Push to close the relays for the Pipeline Pump(s) on the MCP c. Push to close the Oil Pipeline relay on the MCP 4. Close manual valves as necessary to further isolate individual system components 5. Open manual bleed valves as necessary to bleed down components WARNING: Use appropriate fluid collection when draining components. NOTICE: If shut-down was performed as preparation for maintenance work, or if the cause of the shutdown requires corrective action/repair, continue with Lock Out/Tag Out (LO/TO) Procedures REFER TO: Fieldwood Safe Work Practices for LO/TO (Section D Chapter 5) (can be found on the Fieldwood SEMS Portal) Rev: 0 Date: 11/11/11 Page 8 of 8 HI A-376 A

POWER GENERATION SYSTEMS

POWER GENERATION SYSTEMS POWER GENERATION SYSTEMS The Power Generation Systems on HI 595 CF&D consist of three Waukesha 7042 gas driven generators and two diesel driven generators. Two of the three Gas Generators must run to provide

More information

LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31

LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31 LACT MEASUREMENT Prepared By: Ken A. Steward. P.E. Linco-Electromatic, Inc. 4580 West Wall Street Midland, Texas 79703 The Operation of L.A.C.T. Units The simplest approach to the understanding of the

More information

BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL

BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL IMPORTANT These instructions are intended as a guide for the Installing Contractor and as a reference for the Operator, Owner and Serviceman. RETAIN

More information

DESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS

DESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS DESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS INTRODUCTION The two most common methods of measuring the volume of petroleum liquids are tank gauging and liquid metering. The problems associated with

More information

Secondary Coolant 301

Secondary Coolant 301 Secondary Coolant 301 Instructor Rusty Walker Hill PHOENIX Learning Center Secondary Coolant 301 Start-Up Procedures Secondary Coolant 301 Objectives Describe the initial startup procedures for a medium

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Acceptance Inspection Date of Review / / BLD20 - Project Address: Project Name: Numbers following worksheet comments represent an NFPA

More information

Inspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8

Inspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8 , Chapter 8 as amended by CCR, Title 19 Page 1 of 8 Address: City: Date of Pump Test: Shaft Orientation: Horizontal Vertical Annual Fire Pump Test Results Number of pumps at this location: If multiple

More information

The Filling Procedure

The Filling Procedure The Filling Procedure Model(s): ECO Series What is needed! 1. Pump 2. 3 water hoses with metric adapters (found on the chiller pump) 3. Glycol (Premixed 37% of KKT Protect) 4. Hand tools 5. Pressure gauge

More information

PIPELINES (Last update - February 2004)

PIPELINES (Last update - February 2004) PIPELINES (Last update - February 2004) Note: 1. The PINC s L-102 through L-143 address DOI regulated offshore pipelines, only. 2. During pipeline inspections, the API RP 14C SAC reference must be verified

More information

BOSS 107 SEPARATOR SYSTEM INSTALLATION & APPLICATION MANUAL

BOSS 107 SEPARATOR SYSTEM INSTALLATION & APPLICATION MANUAL Website: www.recoveredenergy.com Email: oilwatersales@recoveredenergy.com BOSS 107 SEPARATOR SYSTEM INSTALLATION & APPLICATION MANUAL BOSS 2.2T/107 BOSS 5T/107 BOSS 11T/107 BOSS 25T/107 BOSS 45T/107 Installation

More information

Startup and Operation of SEE-THRU Nuclear Power Plant for Student Performance MP-SEE-THRU-01 Rev. 018

Startup and Operation of SEE-THRU Nuclear Power Plant for Student Performance MP-SEE-THRU-01 Rev. 018 Student Operating Procedure Millstone Station Startup and Operation of SEE-THRU Nuclear Power Plant for Student Performance Approval Date: 01/12/2011 Effective Date: 01/12/2011 TABLE OF CONTENTS 1. PURPOSE...3

More information

Oryx Midstream Services - LACT and Measurement Manual

Oryx Midstream Services - LACT and Measurement Manual 1.00 General... 2 1.01 Scope... 2 1.02 Codes and Standards Requirements... 2 2.00 Design... 2 2.01 General... 2 3.00 Products... 4 3.01 Hydraulic Assembly... 4 3.02 Charge pump and motor... 4 3.03 Basic

More information

Fire Water Utility 2002 Training Manual Raw Water Storage Area

Fire Water Utility 2002 Training Manual Raw Water Storage Area Effective: 10/21/11 Page 1 of 17 Rev. by J. Shively Fire Water Utility 2002 Training Manual Raw Water Storage Area Document Revision Change Table Revision Number Revision Description Revised By Revision

More information

Lease Automatic Custody Transfer

Lease Automatic Custody Transfer Lease Automatic Custody Transfer Angus Manufactured LACT Units Updated 19-Dec-01, Slide 2 LACT Unit Requirements Are used for the automatic unattended measurement of crude oil. Accurately measure the quantity

More information

UD SERIES COMPRESSORS

UD SERIES COMPRESSORS UD SERIES COMPRESSORS INDUSTRIAL AIR COMPRESSOR 40-400 HP UPDRAFT MODELS Electric Motor - 460/575/3/60 standard (208/230/3/60 optional on most models) Motor Starter - 460 volt, full voltage magnetic starter

More information

CASH VALVE K SERIES BACK PRESSURE VALVES

CASH VALVE K SERIES BACK PRESSURE VALVES High capacity angle bypass regulators or back pressure control valves with models for pressures to 1500 psig (103.4 barg) and capacities to 200 gallons per minute (757 l/min.) FEATURES GENERAL APPLICATION

More information

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls SPRING CHECK LIST ABSORPTION CHILLERS Check starter and control panel. Leak test. Check hand valve diaphragms and replace as required. Check operation of purge unit. Change oil in the purge pump. Lubricate

More information

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators Instruction Manual Form 5116 Types 1808 and 1808A July 2010 Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators! Warning Failure to follow these instructions or to properly install

More information

TECHNICAL PAPER 1002 FT. WORTH, TEXAS REPORT X ORDER

TECHNICAL PAPER 1002 FT. WORTH, TEXAS REPORT X ORDER I. REFERENCE: 1 30 [1] Snow Engineering Co. Drawing 80504 Sheet 21, Hydraulic Schematic [2] Snow Engineering Co. Drawing 60445, Sheet 21 Control Logic Flow Chart [3] Snow Engineering Co. Drawing 80577,

More information

Starting up hydraulic systems

Starting up hydraulic systems General / Installation A hydraulic system that operates economically, safely, and trouble-free requires careful planning, as well as proper installation and start-up. Conscientious maintenance has a considerable

More information

This document describes the commissioning checklist procedures for the Capstone MicroTurbine systems.

This document describes the commissioning checklist procedures for the Capstone MicroTurbine systems. Capstone Capstone Turbine Corporation 21211 Nordhoff Street Chatsworth CA 91311 USA Telephone: (818) 734-5300 Facsimile: (818) 734-5320 Website: www.microturbine.com Work Instructions Commissioning Checklist

More information

Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide

Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide 8/28/00 TROUBLESHOOTER S GUIDE PROBLEM CAUSE SOLUTION Insufficient water flow to chlorinator Check water flow through Flow Controller

More information

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. 1. Check log book for incomplete compliance for further operation. 2.

More information

MOONEY FLOWGRID SLAM SHUT REGULATORS

MOONEY FLOWGRID SLAM SHUT REGULATORS MOONEY FLOWGRID SLAM SHUT REGULATORS The Flowgrid Slam Shut Valve is an easy to maintain automatic shutoff device. 2 Dresser Mooney Flowgrid Slam Shut The Slam Shut is designed for use with a pressure

More information

SECTION 3.00 WARNING WARNING ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION

SECTION 3.00 WARNING WARNING ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION SECTION 3.00 ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION Be sure that the clutch, circuit breaker, or other main power transmission device is disconnected. Generators develop voltage as soon as the

More information

EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) H4DOTC

EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) H4DOTC EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) H4DOTC SYSTEM OVERVIEW 1. System Overview There are three emission control systems, which are as follows: Crankcase emission control system Exhaust emission

More information

GENCORE 5 FUEL CELL SYSTEM System Fundamentals

GENCORE 5 FUEL CELL SYSTEM System Fundamentals GENCORE 5 FUEL CELL SYSTEM System Fundamentals GenCore 5T48 GenCore 5B48 GenCore 5U48 GenCore 5T24 GenCore 5U120 Revision 1 December 1, 2004 GENCORE DESCRIPTION GenCore fuel cell systems are direct hydrogen

More information

Y690A Series Pressure Reducing Regulators

Y690A Series Pressure Reducing Regulators Instruction Manual Form 5463 Y690A Series April 1999 Y690A Series Pressure Reducing Regulators Introduction Scope of Manual This manual provides instructions for installation, startup, maintenance, and

More information

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST

NMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST Date Documents Submitted: Log No.: File No.: Plan Examiner: Permit No.: Property Information Building Name: Building Address: Building Manager's Name: Building Manager's Phone: Fax: System Designer/Contractor

More information

Hot-Tap Machines. Specification Sheet TBL Bulletin nº: SPECIFICATION FOR TBL-0322 TAPPING MACHINE Tapping Range 1 through 6

Hot-Tap Machines. Specification Sheet TBL Bulletin nº: SPECIFICATION FOR TBL-0322 TAPPING MACHINE Tapping Range 1 through 6 Bulletin nº: 2009.602.00 Specification Sheet TBL-0322 SPECIFICATION FOR TBL-0322 TAPPING MACHINE Tapping Range 1 through 6 Boring Bar Travel 32 (813 mm) Standard Auto Feed 0.006 per rev. (0.15 mm per rev.)

More information

Purging Air From Divider Block Lubrication Systems

Purging Air From Divider Block Lubrication Systems FROST ENGINEERING SERVICE Purging Air From Lubrication Systems A D I V I S I O N O F G E C S E Y S A L E S & S E R V I C E DESCRIPTION Divider block lubrication systems operate correctly only when all

More information

Type HSR Pressure Reducing Regulator for Residential, Commercial or Industrial Applications

Type HSR Pressure Reducing Regulator for Residential, Commercial or Industrial Applications Bulletin 71.1 D103087X012 Type HSR December 2017 Type HSR Pressure Reducing Regulator for Residential, Commercial or Industrial Applications High Capacity Compact Design P1524_1 High Capacity Internal

More information

of Fire Pump Assemblies

of Fire Pump Assemblies A.1.0 A.1.1 A.2.0 A.2.1 A.2.2 A.2.3 A.2.4 A.2.5 A.2.6 A.3.0 A.3.1 A.4.0 A.4.1 Report of Inspection, Testing & Maintenance System in service before conducting tasks Pertinent parties notified before conducting

More information

Packaged Design Day Tank Systems

Packaged Design Day Tank Systems Fuel Supply Systems Packaged Design Day Tank Systems for diesel/fuel oil application providing a reliable fuel source for diesel and turbine engine driven equipment and oil fired boilers model & accessory

More information

Check Valves Check Valves are the simplest form of directional control valves, but they can also be used as pressure controls.

Check Valves Check Valves are the simplest form of directional control valves, but they can also be used as pressure controls. Check Valves Check Valves are the simplest form of directional control valves, but they can also be used as pressure controls. Standard Check Valve The standard check valve permits free flow in one direction

More information

Operators Manual ECO-AIR-IVS Internal Valve Actuation System

Operators Manual ECO-AIR-IVS Internal Valve Actuation System 2534-A Shell Road Georgetown, TX 78628 www.parafour.com 512-626-4099 Operators Manual ECO-AIR-IVS Internal Valve Actuation System Ver 1.0 Warnings:!! This device is electrically operated and should only

More information

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL INSTALLATION, OPERATION AND MAINTENANCE MANUAL SAFETY RELIEF VALVES Revision: 30 June 2004 TOSACA,S.A. INSTALLATION, OPERATION AND MAINTENANCE MANUAL June-04 pag.1 TABLE OF CONTENTS 1. General 2. Description

More information

ANSI Z50.1. Safety Standards

ANSI Z50.1. Safety Standards ANSI Z50.1. Safety Standards 5. Dry Ingredient Handling Equipment 5.1 General Requirements 5.1.1 Whenever a dry ingredient handling system is of such size that the beginning of its operation is remote

More information

To ensure proper installation, digital pictures with contact information to before startup.

To ensure proper installation,  digital pictures with contact information to before startup. Check List for Optimal Filter Performance? There should be no back-pressure on the flush line. A 1 valve should have a 2 waste line, and 2 valve should have a 3 waste line. Do not use rubber hosing or

More information

C-SERIES 3516 Compression Package

C-SERIES 3516 Compression Package Proven Quality and Reliability, Delivered Fast Key Benefits Faster to Gas Revenue Typically deliverd in 10 to 14 weeks without compromising quality, performance or configurability, so you can get your

More information

EJECTORS GENERAL OPERATION & MAINTENANCE MANUAL

EJECTORS GENERAL OPERATION & MAINTENANCE MANUAL EJECTORS GENERAL OPERATION & MAINTENANCE MANUAL The information contained in this manual was current at the time of printing. The most current versions of all Hydro Instruments manuals can be found on

More information

COMPRESSOR STATION OPERATIONS

COMPRESSOR STATION OPERATIONS CONTENTS FIGURES AND TABLES... viii PREFACE... xi ACKNOWLEDGEMENTS... xiii CHAPTER 1. INTRODUCTION... 1 Scope and Outline... 1 Types of Stations... 2 Production Stations... 2 Storage Stations... 3 Transmission

More information

Generator, Unit Hydrogen, Seal Oil, Stator Coolant, Demin Water Plant Operations Training Huntly Power Station: Units 1-4 Assessment ID: 8014, 8012, 8009, 8015, 8016 NZQA Unit Standard: 17413 Assessment

More information

Y690A Series Pressure Reducing Regulators

Y690A Series Pressure Reducing Regulators Instruction Manual Form 5463 Y690A Series February 2009 Y690A Series Pressure Reducing Regulators! Warning Fisher regulators must be installed, operated, and maintained in accordance with federal, state,

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 30 00 - HVAC PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical

More information

Exercise 3-1. Basic Hydraulic Circuit EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Complete hydraulic circuit

Exercise 3-1. Basic Hydraulic Circuit EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Complete hydraulic circuit Exercise 3-1 Basic Hydraulic Circuit EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the hydraulic schematic and components of the nacelle trainer. You will identify

More information

Property of American Airlines

Property of American Airlines Vestergaard - VTS ON 1973 (1-4) American Airlines CHAPTER OPERATING MANUAL 2.1 OPERATING THE VTS In this chapter, we will go through operation of the VTS point by point. When appropriate, references will

More information

NECO Pumping Systems

NECO Pumping Systems INSTALLATION OPERATION & MAINTENANCE INSTRUCTIONS For Your NECO Pumping Systems PACKAGED CIRCULATING SYSTEM THIS COMPLETELY ASSEMBLED, TESTED, PACKAGED CIRCULATING SYSTEM IS OF THE HIGHEST QUALITY AND

More information

P445 Series Electronic Lube Oil Control

P445 Series Electronic Lube Oil Control FANs 125, 121 s Section P Product/Technical Bulletin P445 Issue Date 0100 P445 Series Electronic Lube Oil The P445 Series Electronic Lube Oil is designed for use on refrigeration compressors equipped with

More information

Section 3 Technical Information

Section 3 Technical Information Section 3 Technical Information In this Module: Engine identification Modes of operation Battery charging and heat manage operation Service and repair procedures Maintenance requirements Engine Identification

More information

Type 310A-32A Pressure Reducing Regulator

Type 310A-32A Pressure Reducing Regulator Bulletin 71.2 D102066X012 Type 310A February 2017 Type 310A-32A Pressure Reducing Regulator Figure 1. Type 310A Regulator with Type 32A Pilot Introduction The Type 310A pilot-operated high-pressure regulator

More information

HTX-HTH SEPARATORS I&O MANUAL

HTX-HTH SEPARATORS I&O MANUAL INSTALLATION OPERATIONS AND MAINTENANCE HTX-HTH SEPARATORS I&O MANUAL 1365 N. Clovis Avenue Fresno, California 93727 (559) 255-1601 www.lakos.com LS-714B (Rev. 11/17) TABLE OF CONTENTS Table of Contents...

More information

Medium and high pressure pumps

Medium and high pressure pumps Screw pumps Medium and high pressure pumps Installation and Start-up Instruction This instruction is valid for all standard high pressure pumps: E4, D4 and D6 Contents Page Pump identification 2 Installation

More information

rev0 INSTALLATION & OPERATION MANUAL DUAL FLUID CIRCULATING HEATING SYSTEM FOR HAZARDOUS LOCATIONS MODEL OCSE

rev0 INSTALLATION & OPERATION MANUAL DUAL FLUID CIRCULATING HEATING SYSTEM FOR HAZARDOUS LOCATIONS MODEL OCSE 216329-000 rev0 INSTALLATION & OPERATION MANUAL DUAL FLUID CIRCULATING HEATING SYSTEM FOR HAZARDOUS LOCATIONS MODEL OCSE IDENTIFYING YOUR SYSTEM IOM216329-000 The HOTSTART heating system is designed to

More information

Requirements for Dispensing of Compressed Natural Gas. Yvonne Espinoza, PE Austin Fire Department Engineering Services

Requirements for Dispensing of Compressed Natural Gas. Yvonne Espinoza, PE Austin Fire Department Engineering Services Requirements for Dispensing of Compressed Natural Gas Yvonne Espinoza, PE Austin Fire Department Engineering Services Course Overview Enforcement of code requirements Application of code requirements Hazard

More information

Minuteman Vertical Pumps

Minuteman Vertical Pumps Description: Condensate Pumps Type: Vertical Centrifugal Pumps Horsepower: /3 to /2 HP GPM: 0 to 37 PSIG: 0-35 Overview: vertical pumps are the workhorse of the NES pumps product offering. All minuteman

More information

Fact File 59 Extinguishing systems

Fact File 59 Extinguishing systems Fact File 59 Extinguishing systems Foam Inductors: Guidelines on their selection, use and maintenance Foam Inductors: Guidelines on their selection, use and maintenance INTRODUCTION... 3 HOW INDUCTORS

More information

6540 Orientation B&SVRR 6540 Orientation Page 1 8/11/2009

6540 Orientation B&SVRR 6540 Orientation Page 1 8/11/2009 6540 Orientation B&SVRR 6540 Orientation Page 1 CONTROLS AT ENGINEMAN'S POSITION 4. Operating Switches 6. Throttle 7. Reverse Lever 5. Headlight Dimming 18. Alerter Reset Button B&SVRR 6540 Orientation

More information

Location of Hydraulic Components SMCS

Location of Hydraulic Components SMCS Unfiled Notes Page 1 Service Information System Monday, May 09, 2016 1:42 PM Systems Operation D6T Track-Type Tractor Hydraulic System Media Number -KENR5129-04 Publication Date -01/08/2014 Date Updated

More information

BASIC FOAM FIREFIGHTING OPERATIONS Red and Green Systems

BASIC FOAM FIREFIGHTING OPERATIONS Red and Green Systems BASIC FOAM FIREFIGHTING OPERATIONS Red and Green Systems Page 730.60 Each of the Red and Green Foam Systems consists of one 3000 gallon foam concentrate storage tank, two foam concentrate pumps, a balanced

More information

Note: The engine may start, but you may still have high leakoff within the high-pressure fuel system. NOTICE

Note: The engine may start, but you may still have high leakoff within the high-pressure fuel system. NOTICE Introduction There have been isolated occurrences of excessive fuel leakage past the electronic unit injectors on some engines. Accelerated wear on the delivery valve results in an increased leak rate.

More information

DCP Midstream Contractor Covered Task List Last updated 7/11/2018

DCP Midstream Contractor Covered Task List Last updated 7/11/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 009 Movement and/or Relocation of Liquid Pipelines 195.424 011 Inspect,

More information

Pilot-Operated Regulators

Pilot-Operated Regulators Fisher Controls Instruction Manual Type 1098-EGR & 1098H-EGR Pilot-Operated Regulators R May 1987 Form 5084 Contents Introduction................................... 2 Scope of Manual..............................

More information

OIL-FREE, ROTARY SCREW AIR COMPRESSORS Two-stage, Air-cooled and Water-cooled Fixed Speed or VFD

OIL-FREE, ROTARY SCREW AIR COMPRESSORS Two-stage, Air-cooled and Water-cooled Fixed Speed or VFD OIL-FREE, ROTARY SCREW AIR COMPRESSORS Two-stage, Air-cooled and Water-cooled Fixed Speed or VFD 40-500 HP 170-2400 SCFM 40-150 PSIG www.knw-series.com High Quality, Quiet and Energy Efficient Both compression

More information

Type EZR Relief Valve or Backpressure Regulator

Type EZR Relief Valve or Backpressure Regulator Instruction Manual Form 5476 Type EZR Relief May 2012 Type EZR Relief Valve or Backpressure Regulator Introduction Scope of the Manual W7347 This instruction manual provides installation, startup, shutdown,

More information

the TYCOON Series Natural Gas Engine Driven / Electric Motor Driven

the TYCOON Series Natural Gas Engine Driven / Electric Motor Driven the TYCOON Series Natural Gas Engine Driven / Electric Motor Driven The Perfect Solution for Natural Gas Emissions High Reliability. Big Returns. Capturing natural gas emissions from oil field stock tanks

More information

GENERAL PUMPA member of the Interpump Group

GENERAL PUMPA member of the Interpump Group FEATURES Innovative drive design eliminates need for auxiliary hydraulic drive HWB Series Hydraulic Drive - Triplex Plunger Pump HWB2512 & HWB2112 Forged brass manifold No scheduled maintenance required

More information

Type 644 and 645 Differential Pressure Pump Governors

Type 644 and 645 Differential Pressure Pump Governors Instruction Manual 644 and 645 Pump Governors Type 644 and 645 Differential Pressure Pump Governors Introduction Scope of Manual This instruction manual provides information on installation, adjustment,

More information

AP1000 European 7. Instrumentation and Controls Design Control Document

AP1000 European 7. Instrumentation and Controls Design Control Document 7.3 Engineered Safety Features AP1000 provides instrumentation and controls to sense accident situations and initiate engineered safety features (ESF). The occurrence of a limiting fault, such as a loss

More information

Electronic Metering Pump

Electronic Metering Pump Electronic Metering Pump Pressure (PSI) Pressure (BAR) Pulsafeeder Expertise Technology is the key to delivering responsible products to the markets that we serve. Leading the way in the development of

More information

APP pump instruction APP 21-43

APP pump instruction APP 21-43 MAKING MODERN LIVING POSSIBLE Instruction APP pump instruction APP 21-43 ro-solutions.com Table of Contents 1. Identification...2 2. System design...3 2.1 Open-ended systems with direct water supply....3

More information

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood TABLE OF CONTENTS 1. General valve description and start-up... 1 2. Main valve maintenance... 1 3. Pilot maintenance... 5 4. Pilot

More information

Service Manual for Battery Control Center

Service Manual for Battery Control Center Service Manual for Battery Control Center P/N 82 E0071 00 (Ref. 81 1317) June, 1999 Battery Control Box Operation Charging Circuit This function charges the coach battery from the engine alternator while

More information

VFC-5 to VFC-500 FLO-COATER

VFC-5 to VFC-500 FLO-COATER VFC-5 to VFC-500 FLO-COATER OPERATION INSTRUCTIONS Page -1- CONTENTS PAGE NUMBER System Description... 2 Flo-Coater Description... 4 Operation of a Flo-Coater... 8 Selective Operator Control... 9 Operating

More information

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing 195.412(b) 201 Abnormal Operating Conditions Related to Welding on Pipelines 192.225

More information

245 W. Roosevelt Road Building 12, Suite 83 West Chicago, IL

245 W. Roosevelt Road Building 12, Suite 83 West Chicago, IL 45 W. Roosevelt Road Building, Suite 83 West Chicago, IL 6085 800-33-448 www.aquamarkboosters.com AM-Q, AM-80V- & AM-80V-3 AM-00V & AM-50V Installation, Operation & Maintenance Manual AquaMark models:

More information

E Series CE Approved Intermittent Pilot Ignition Control

E Series CE Approved Intermittent Pilot Ignition Control Installation Instructions Issue Date January 11, 2013 E Series CE Approved Intermittent Pilot Ignition Control Application The E Series CE Approved Intermittent Pilot Ignition Control is a safety control

More information

Automatic Changeover Medical Manifold Installation, Operation and Maintenance Manual

Automatic Changeover Medical Manifold Installation, Operation and Maintenance Manual Automatic Changeover Medical Manifold Installation, Operation and Maintenance Manual Andersen Medical Gas 12 Place Lafitte Madisonville, LA 70447 http://www.themedicalgas.com 1-866-288-3783 Model Number:

More information

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis. CENTRIFUGAL CHILLER Annual Inspection Refrigerant Circuit Check and record refrigerant level Inspect for leak results Calculate refrigerant lass and report to the customer. Repair minor leaks as required

More information

BOSS 107 Separator System Installation Manual

BOSS 107 Separator System Installation Manual Website: www.recoveredenergy.com Email: oilwatersales@recoveredenergy.com BOSS 107 Separator System Installation Manual BOSS 2.2T/107 BOSS 11T/107 BOSS 5T/107 BOSS 25T/107 1 BOSS 45T/107 Contents 1. Unpacking

More information

Submittal. Front View Side View

Submittal. Front View Side View RBHO Horizontal Low Profile Concealed Free Return Submittal FCU-RBHO-1.0 07-25-18 Top View (Drain Pan Omitted) Bottom View Front View Side View Left hand unit shown. All dimensions are inches [millimeters].

More information

This manual presents installation, servicing, troubleshooting, and maintenance for M PUMPS CM MAG-M SERIES Information that may be required regarding

This manual presents installation, servicing, troubleshooting, and maintenance for M PUMPS CM MAG-M SERIES Information that may be required regarding Installation, Operating, Maintenance & Safety Instruction for M PUMPS CM MAG-M SERIES Centrifugal light Mag-Drive pumps (CM MAG-M06/1/2/3/4) This manual presents installation, servicing, troubleshooting,

More information

HALLMARK INDUSTRIES INC

HALLMARK INDUSTRIES INC Performance Part No. HP. CONVERTIBLE JET PUMP USER S MANUAL GPH of Water @ Total Discharge Pressure of 40 psi Max. Pressure Max suction (shallow well) Max Suction (deep well) Max GPM (@0 head) Max Discharge

More information

INSTRUCTIONS FOR INSTALLING AND OPERATING THE UNIVERSAL AUTOSYNC MODEL ASPSS DUAL COMPRESSOR SEQUENCER CONSOLE S/N 1638 AND ABOVE

INSTRUCTIONS FOR INSTALLING AND OPERATING THE UNIVERSAL AUTOSYNC MODEL ASPSS DUAL COMPRESSOR SEQUENCER CONSOLE S/N 1638 AND ABOVE COMPRESSOR 1 EMERGENCY SHUTDOWN OFF POWER ON COMP LOADED COM PRESSOR OPERATING HOURS SYSTEM PRESSURE COMPRESSOR 2 EMERGENCY SHUTDOWN OFF POWER ON COMP LOADED COM PRESSOR OPERATING HOURS LEAD/LAG CONTROL

More information

SCROLL - AIR COOLED PACKAGED & SPLIT SYSTEM ICE CHILLERS

SCROLL - AIR COOLED PACKAGED & SPLIT SYSTEM ICE CHILLERS SCROLL - AIR COOLED PACKAGED & SPLIT SYSTEM ICE CHILLERS 1 to 40 Nominal Tons Rev-01 TABLE OF CONTENTS Page: Description 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Product Nomenclature Air Cooled Chiller

More information

Torque Converter, Transmission Pump, Screen And Filter

Torque Converter, Transmission Pump, Screen And Filter Page 13 of 27 Transmission Hydraulic System In Forward (Engine Running - Type 2 & 3 Control Valve Shown) (4) Transmission control valve. (5) Neutralizer valve. (6) Neutralizer solenoid. (7) Flow control

More information

Hydrostatic Power Train

Hydrostatic Power Train Chapter Hydrostatic Power Train Specifications................................................................. -3 Test Specifications........................................................ -3 Repair

More information

APP S pumps APP S / APP S / APP S 21-38

APP S pumps APP S / APP S / APP S 21-38 MAKING MODERN LIVING POSSIBLE Instruction APP S 2.0-3.5 / APP S 5.1-9.0 / APP S 21-38 ro-solutions.com Instruction Table of Contents 1. Identification...2 2. System design...3 2.1 Open system design...3

More information

OPERATING MANUAL LIQUID RING VACUUM PUMPS AND COMPRESSORS

OPERATING MANUAL LIQUID RING VACUUM PUMPS AND COMPRESSORS (Rev. 2.0_10-2010) INTEGRATIVE NOTES to OPERATING MANUAL LIQUID RING VACUUM PUMPS AND COMPRESSORS for Systems type HYDROPACK INTRODUCTION These instructions are for the installers and maintenance personnel

More information

Precision Air Drilling Services Equipment Information & Specifications

Precision Air Drilling Services Equipment Information & Specifications Equipment Information & Specifications Joy Super Booster Specifications Joy WB-12 5000 Specifications Page 2 of 10 Table of Contents Joy Super Booster Specifications... 2 Joy WB-12 5000 Specifications...

More information

G3 GEMINI INTELLIFRESH BREWER

G3 GEMINI INTELLIFRESH BREWER G3 GEMINI INTELLIFRESH BREWER TROUBLESHOOTING GUIDE GEMTIF10A1000 G3 Twin 1.5 Gallon Satellite Brewer with IntelliFresh GEMSIF10A1000 G3 Single 1.5 Gallon Satellite Brewer with IntelliFresh BREWER PARTS

More information

Fisher 644 and 645 Differential Pressure Pump Governors

Fisher 644 and 645 Differential Pressure Pump Governors Instruction Manual 644 and 645 Pump Governors Fisher 644 and 645 Differential Pressure Pump Governors Contents Introduction... 1 Scope of Manual... 1 Description... 1 Specifications... 2 Educational Services...

More information

Application Engineering

Application Engineering Application Engineering February, 2009 Copeland Digital Compressor Controller Introduction The Digital Compressor Controller is the electronics interface between the Copeland Scroll Digital Compressor

More information

Installation, Operation, and Maintenance Manual Outdoor Glycol Feed System JWOP /055/100

Installation, Operation, and Maintenance Manual Outdoor Glycol Feed System JWOP /055/100 Installation, Operation, and Maintenance Manual Outdoor Glycol Feed System JWOP-53-030/055/100 Rev. 1 3/21/11 K.G. Type - John Wood #JWOP-53-030/055/100, Outdoor Glycol Feed System Capacity 30/55/100 Gallons

More information

Dual Expanding Plug Valve MADE IN THE USA

Dual Expanding Plug Valve MADE IN THE USA Dual Expanding Plug Valve MADE IN THE USA WESTERN VALVE - DOUBLE BLOCK AND BLEED Facility Located in Bakersfield California Western Valve, Inc. was established in 1991. What started out as a valve repair

More information

APIN STEAM GENERATOR SPECIFICATION

APIN STEAM GENERATOR SPECIFICATION Imagination, hope & will Ave. Bolivia 1122- Lima 01, PERU Off. (511) 717-3724 Plant (511) 715-8866 edgargerber@tecnologperu.com - www.tecnologperu.com APIN STEAM GENERATOR SPECIFICATION 0.0 GENERAL 0.1

More information

Geo-Prime Tank U.S. Patent Number 8,544,282

Geo-Prime Tank U.S. Patent Number 8,544,282 www.geo-flo.com Geothermal and Hydronics Specialists Installation, Operating, and Maintenance Manual Part # 3487 Rev. 03JUL2014 Geo-Prime Tank U.S. Patent Number 8,544,282 Geo-Flo Products Corporation

More information

Vission 20/20 Retrofit Instructions

Vission 20/20 Retrofit Instructions Vission 20/20 Retrofit Instructions Table of Contents Sections Page.0 General Information... 3 2.0 Vission 20/20 Retrofit Instructions... 4 2. Removal... 4 2.2 Installation... 5 3.0 Field Wiring Instructions...

More information

Compact LTC Oil Filtration System Manual

Compact LTC Oil Filtration System Manual INSTRUCTION MANUAL Compact LTC Oil Filtration System Manual COMPACT LTC OFS-MANUAL 1.4 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. TABLE OF CONTENTS General System Description

More information