1 June 18, 2018 Mrs. Nancy Cole Administrator Village of Eidelweiss 1680 Conway RD Madison, NH Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com RE: 30,000 Gallon tanks (3) Locus: 20 Reinach Place (2) 99 Oak Ridge RD (1) Madison, NH Dear Mrs. Cole Summary: Mass tank inspection and services has completed internal inspections of the 3 underground storage tanks referenced above. All tanks are in potable water service. The thickness data, along with other test parameters is provided in the field inspection reports included herein. 20 Reinach Place: Both underground storage tanks located at 20 Reinach Place have a diameter of 10 feet 6 inches and length of 46 feet. Structural Deficiency Tank 1: STI SP131, Standard for Inspection, Repair, and Modification of Shop Fabricated Underground Tanks for Storage of Flammable and Combustible Liquids, Section 8.2, Structural Deficiency Limits states that a tank does not qualify for repair if the tank shell has an inward dent with a cross measurement greater than the radius of the tank head or which protrudes into the tank greater than 1 inch for every 1 foot of tank radius. Located at the middle weld seam of Tank 1, or third seam from the manway, is a large inward dent which measures 101 inches across and protrudes 18 inches into the tank. The total diameter of the tank head is 10 feet, 6 inches, making the radius 5 feet, 3

2 inches, the damage to the tank is not repairable as the cross measurement of the dent is 101 inches, and protrudes 18 inches into the tank. Structural Deficiency Tank 2: Tank 2, located inside the building at 20 Reinach Place, shows 3 indentations to the shell. 2 of which meet failure criteria under STI SP131, Section 8.2, Structural Deficiency Limits. The largest of these indentations measures 48 inches across, protrudes 12 inches into the tank, and is indicated at right by the red arrow. The other indentation, meeting failure criteria, is located at the bottom of the front shell course. This indentation measures 45 inches across and protrudes 6 inches into the tank. The third indentation is located at the rear shell course, measures 41 inches across and protrudes 4 inches into the tank and does not meet failure criteria. Recommendation for continued service: Both tanks, located at 20 Reinach Place, are not recommended for continued service as the damage to the shell is so extensive it does not meet the criteria for repair under STI SP 131 Sec Oak Ridge RD: The underground storage tank located at 99 Oak Ridge RD is in potable water service, has a diameter of 10 feet 6 inches and a length of 48 feet. All plate seams are of lap joint construction and are welded internally and externally. Foundation: The foundation to the tank is compromised, showing significant cracks indicated at right by the red arrows.

3 Coatings: External: The coating to the exposed portion of the tank shows moderate failure and subsequent minor corrosion along the foundation to shell interface, and spot failures with minor surface rust across the flat portion of the head. Internal: The internal coating of the tank has failed across over 75% of the surface. Moderate corrosion is shown across the interior surface with localized areas of pitting measuring inch at the deepest. Leaving over 50% of total wall thickness remaining and does not require repair by welding under SP131 Sec. 9.1-b. One such pit is indicated at right by the yellow arrow. Recommendation for continued service: This tank, located at 99 Oak Ridge RD is recommended for continued service with action items. Action Item 1: Repair the cracks to the foundation by re-grouting with similar material. Action item 2: To arrest the active corrosion to the interior, the tank should be abrasively blasted and coated with an NSF Certified liner. Recommendation: The front head and adjoining exposed shell portion should be abrasively blasted and recoated to arrest the corrosion to these areas. I look forward to speaking with you further regarding this project, please feel free to reach me at my office should you have any questions. Sincerely, Andrew Alfone Certified Tank Inspector

4 Manufacturer INSPECTION DATE(s): 11/7/2017 COMPANY NAME: Clean Harbors Environmental Services TANK ADDRESS: 1 Hill Ave, Braintree, MA CONTACT: David Medina INSPECTOR NAME(s): Andrew Alfone Tank Information Identification Number Date of Fabrication Design Standard Service / Product Capacity Diameter Height (shell length) Material of Construction Double Wall or Single Wall? Aboveground or Underground? Visual Inspection Declivity Spalling, Cracking Settlement Other Nameplate Signage Emergency Vent Vent Pipe Fill Pipe Level Gauge Nozzles Derived from nameplate or tank characteristics The ID # of the Tank assigned by client Derived from nameplate, plans or interview Derived from nameplate or plans Type of fluid stored Inspection Form Key Derived from nameplate, plans or field measurement Measured across the tank bottom from outside shell to outside shell. Measured from tank bottom to top of shell wall not including top cap elevation. The material the tank is made of. Is the tank equipped with a secondary wall to act as a containment vessel? Is the tank classified as an AST or UST (10% Buried)? Criteria FOUNDATION The surface on which the tank bares. Pass Marginal Fail NA None TANK Is the tank level? Is the foundation cement crumbling or cracking to the peril of the tanks viability? Is the foundation sinking to the peril of the tank? Are there other concerns such as water damage etc.? Is nameplate on the tank: ID manufacturer, design standard & construction date? Are there signs which ID the tank's contents? Is there a vent on the AST compliant with UL 142, NFPA 30 & NFPA 1? Is the vent pipe adequately sized? Any blockage? Is the fill pipe adequately sized? Any blockage? Does the level gauge accurately display the fuel level of the primary tank? Visible from fillport? Are nozzles protected, welded, dry with no cracking? Interstice Leak Detection Operational? Is the equipment used to detect fluid in the space between the primary and secondary functional? Fluid in Interstice Leaks Staining Odor Grounded Supports/Saddles Anchor Points Internal Coating External Coating Welds Flange Face Internal Corrosion External Corrosion Shell Distortions, Deformations Pitting Dents, Gouges Spider Cracking Brittle Fracture General Condition Is there fluid in the space between the primary and secondary tanks? Are there any visible leaks at nozzles, pumps, conduits, tank shell? Is there staining anywhere that is tell tale of a recent event or current leak? Is there a product odor indicative of inadequate venting? Is tank grounded by being bolted to concrete and connected to piping? Are supports/saddles installed compliant with UL 142 and are there any failure indications? Are supports anchored to the foundation? Are there any coating failures? Is the condition of the paint such that it impacts on the tanks viability? Are there undercutting, cracking, penetration failure or other weld failures indicated? Is there corrosion or other defects that can impact the liquid tightness of the flange? Is there evidence of significant rust and corrosion? Is there evidence of significant rust and corrosion? Distortions that are tell tale of faulty vent, intense heat or design flaw? Does significant pitting exist? Has the tank been hit, dropped or is there other denting indicative of inadequate venting? Is there any type of cracking especially small clustered cracking at stress points? Does the tank design render it susceptible to brittle fracture? What was the general condition of the tank? The ultrasonic thickness survey was conducted with a 2012 Panametrics MODEL 38DL PLUS ULTRASONIC THICKNESS GAUGE as seen below. Acceptable for continued service Line item is absent or in poor condition and repair or replacement is suggested Line item is absent or in poor condition and requires repair or replacement; and may effect continued service condition Line item is not applicable to subject tank Line item is not present or there are no indications Field Inspection Form.xlsx

5 INSPECTION DATE(s): May 14, 2018 COMPANY NAME: Eidelweiss TANK ADDRESS: 99 Oak Ridge RD, Madison, NH CONTACT: Nancy Cole INSPECTOR NAME(s): M. Jensen, A. Alfone, J. Caisse Tank Information Identification Number Manufacturer Reinach Place Tank 1 (outside) Mass Engineering Date of Fabrication 1970 Design Standard Service / Product Capacity Diameter Height (shell length) Material of Construction Double Wall or Single Wall? Unknown Potable Water 30,000 Gallons 10 ft 6 inches 48 feet Carbon Steel Single Aboveground or Underground? Underground Visual Inspection Comments Pass Marginal Fail NA None FOUNDATION Declivity Spalling, Cracking Settlement Other TANK Nameplate Signage Emergency Vent Vent Pipe Size 4 inch Fill Pipe Size Level Gauge Nozzles Interstice Leak Detection Operational? Fluid in Interstice Leaks Staining Odor Grounded Supports/Saddles Anchor Points Internal Coating Complete failure of the internal coating External Coating Minor failures at the exposed portion of the shell and head Welds Flange Face Internal Corrosion Moderate widespread corrosion External Corrosion Minor widespread corrosion at the exposed portion Shell Distortions, Deformations Large Deformation at middle seam Pitting Minor pitting to the interior shell surfaces Dents, Gouges 101 inch circuler indentaton at the middle seam. Spider Cracking Brittle Fracture General Condition The red arrow indicates a large inward dent at the middle (3 rd ) weld seam of the tank measuring 101 inches across and 20 inches deep. The 4 inch normal vent is equipped with a screen to prevent invasion of the tank by local flora and fauna. The vent shows no obstruction by foreign material. Field Inspection Form.xlsx

6 INSPECTION DATE(s): June 18, 2018 COMPANY NAME: Eidelweiss TANK ADDRESS: 99 Oak Ridge RD, Madison, NH CONTACT: Nancy Cole INSPECTOR NAME(s): A. Alfone, J. Fournier, J. Caisse Tank Information Identification Number Manufacturer Reinach Place Tank 2 (inside) Mass Engineering Date of Fabrication 1972 Design Standard Service / Product Capacity Diameter Height (shell length) Material of Construction Double Wall or Single Wall? Unknown Potable Water 30,000 Gallons 10 ft 6 inches 46 feet Carbon Steel Single Aboveground or Underground? Underground Visual Inspection Comments Pass Marginal Fail NA None FOUNDATION Declivity Spalling, Cracking Settlement Other TANK Nameplate Signage Emergency Vent Vent Pipe Size 4 inch Fill Pipe Size Level Gauge Nozzles Interstice Leak Detection Operational? Fluid in Interstice Leaks Staining Odor Grounded Supports/Saddles Anchor Points Internal Coating Complete failure of the internal coating External Coating Minor failures at the exposed portion of the shell and head Welds Flange Face Internal Corrosion Moderate widespread corrosion External Corrosion Minor widespread corrosion at the exposed portion Large deformations at the middle seam and both ends of Shell Distortions, Deformations the shell floor Pitting Minor pitting to the interior shell surface Dents, Gouges 48 inch circuler indentaton at the middle seam. Spider Cracking Brittle Fracture General Condition The red arrow indicates a large inward dent at the middle (3 rd ) weld seam of the tank measuring 48 inches across and protrudes 12 inches into the tank. The yellow arrow indicates a flat spot at the bottom of the front shell course which measures 45 inches across and protrudes 6 inches into the tank. Field Inspection Form.xlsx

7 INSPECTION DATE(s): May 14, 2018 COMPANY NAME: Eidelweiss TANK ADDRESS: 99 Oak Ridge RD, Madison, NH CONTACT: Nancy Cole INSPECTOR NAME(s): M. Jensen, A. Alfone, J. Caisse Tank Information Identification Number Manufacturer Oak Ridge J.L. Clemmey Co. Inc. Date of Fabrication 1980 Design Standard Service / Product Capacity Diameter Height (shell length) Material of Construction Double Wall or Single Wall? Unknown Potable Water 30,000 gallons 10 feet 6 inches 48 feet Carbon Steel Single Aboveground or Underground?Underground Visual Inspection Comments Pass Marginal Fail NA None FOUNDATION Declivity Spalling, Cracking Cracking of the support wall is evident. Settlement Other Nameplate Signage TANK Emergency Vent Vent Pipe Size 8 inch nozzle is reduced to 3 inch PVC pipe Fill Pipe Size 2 inch Level Gauge Nozzles Interstice Leak Detection Operational? Fluid in Interstice Leaks Staining Odor Grounded Supports/Saddles Cracking of the support wall is evident. Anchor Points Internal Coating 75% Failure of the internal coating External Coating Minor failures at the exposed portion of the shell and head Welds Flange Face Internal Corrosion Moderate widespread corrosion External Corrosion Minor widespread corrosion at the exposed portion Shell Distortions, Deformations Pitting Minor pitting to the interior shell surface Dents, Gouges Spider Cracking Brittle Fracture General Condition The red arrow indicates evident and severe cracking of the structural support wall at the front of the tank. The interior shell wall of the UST show moderate corrosion and coating failure across approx. 75% of the surface. The exposed portion of the UST shows moderate coating failure and minor surface rust. Field Inspection Form.xlsx

8 Shell Plate Ultrasonic Thickness Survey Data Tank #1 data in thousandths of inch Asset Identification # 30k Shell Shell Shell Head Head Inspection Date 14-May Service Potable Water Date of Construction Asset Type Atmospheric UST Material of Construction Carbon Steel Length 48 feet Diameter 10 feet 6 inches Tank Capacity 30,000 gallons MAWP Atmospheric Next Inspection The ultrasonic thickness survey was conducted with a 2013 Panametrics MODEL 38DL PLUS ULTRASONIC THICKNESS GAUGE as seen right. The gauge was field calibrated on May 14, 9:30 hours using 0.25 and 0.5 inch Carbon Steel standard coupons. UT Tech; AA L I SNT TC Column Average Total Average Component Thickness Current Thinnest Measured Component Thickness Design Thickness Worst Case Metal Loss Number of Service Years Worst Case Shell Plate Corrosion Rate/Yr in inches Minimum Thickness Required Current shell thickness available for corrosion allowance inches Estimated Remaining Service Life of plate years The red arrows show pitting depth of and inch to the interior shell walls. Most likely causative factor of this localized corrosion/pitting is failed coating. The yellow arrows indicate the remaining coating present only at the roof, above the high water line. Failed coating at the shell invert exposes steel to product, exacerbating corrosion to these areas.

API 653 TANK INSPECTION, TANK MAINTENANCE, AND CAUSES OF TANK FAILURE

API 653 TANK INSPECTION, TANK MAINTENANCE, AND CAUSES OF TANK FAILURE API 653 TANK INSPECTION, TANK MAINTENANCE, AND CAUSES OF TANK FAILURE API 653 Tank Inspections Why Inspect Your Tanks? Prevent leaks into your secondary containment or to groundwater (if you do not have

More information

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2015 edition of, to the 2015 International Fire Code (). Please note that

More information

Understanding the Inspection Process for Owners and Operators

Understanding the Inspection Process for Owners and Operators Underground Storage Tanks (UST s) Metal Integrity and Lining Inspections Understanding the Inspection Process for Owners and Operators Presented By: Robert L. McChan II General Manager/Senior Project Manager/Steel

More information

Nurse Tank Inspection Report Instructions (DOT-SP Special Permit)

Nurse Tank Inspection Report Instructions (DOT-SP Special Permit) Nurse Tank Inspection Report Instructions (DOT-SP 13554 Special Permit) Following numbers correspond to each box on the Nurse Tank Inspection Report form. 1. PREVIOUS NTIP NUMBER Insert the previous NTIP

More information

Sandhill Diesel Storage Tank at Pump Station

Sandhill Diesel Storage Tank at Pump Station Mechanical Integrity Report for the Sandhill Diesel Storage Tank at Pump Station at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 9 October 2012 Prepared by: George E. Matthews,

More information

D J A INSPECTION SERVICES, INC. Storage Tank Management & Inspection

D J A INSPECTION SERVICES, INC. Storage Tank Management & Inspection D J A INSPECTION SERVICES, INC. Storage Tank Management & Inspection 814-676-3663 P. O. Box 384 Reno, PA 16343 661-363-5453 P. O. Box 544 Edison, CA 93220 PORT OIL PORTLAND, CT Tank #5 Date of Out - of

More information

Pressure Vessel Assessment Report

Pressure Vessel Assessment Report Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899

More information

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2008 edition of NFPA 30A, and the 2006 International Fire Code (IFC). Please

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER KADENA AIR BASE AIR FORCE INSTRUCTION 23-204 KADENA AIR BASE Supplement 30 MAY 2013 Certified Current, 8 June 2017 Material Management ORGANIZATIONAL FUEL TANKS COMPLIANCE WITH

More information

Ultrasonic Thickness Measurements Shipboard Manuals Condition Surveys Ship Studies

Ultrasonic Thickness Measurements Shipboard Manuals Condition Surveys Ship Studies Page 1 of 8 Vessels Name: Place & Date of inspection: Pre-Purchase Survey Documentation / Bridge Completed Not Found Not Given Priority General Particulars Time Charter Description (if available on board)

More information

Nurse Tank Inspection Report Instructions

Nurse Tank Inspection Report Instructions SAMPLE Nurse Tank Inspection Report Instructions Locate the Worksheet provided in each NTIP Inspection Kit and record the data from your test/inspections using the following instructions. Insert an X

More information

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS Presented by: Joyce A. Rizzo President JD2 Environmental, Inc. 800 East Washington Street West Chester, PA 19380 www.jd2env.com

More information

ARI 300 Tank Car and Underframe Structural Inspection Bulletin

ARI 300 Tank Car and Underframe Structural Inspection Bulletin Overview The information contained in this inspection bulletin fundamentally explains the inspection, test and acceptance criteria for the structural integrity of the ARI 300 design stub sill series of

More information

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS BH TANK A Division Of American Tank Co., Inc. Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS American Tank Co., Inc. P.O. Box 340 Windsor CA 95492 www.bhtank.com

More information

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3 BUREAU OF STANDARDS Effective Date: 8/19/2016 Section No. 4 Version: 1.2 Procedure No. 3 TITLE: LP Gas Bulk Plant Final Inspection PURPOSE: This document details the procedures used to conduct a Final

More information

SECTION FUEL-OIL DISTRIBUTION (APPLIES TO FUEL TANKS FOR GENERATORS)

SECTION FUEL-OIL DISTRIBUTION (APPLIES TO FUEL TANKS FOR GENERATORS) SECTION 02554 - FUEL-OIL DISTRIBUTION (APPLIES TO FUEL TANKS FOR GENERATORS) 1.1 SUMMARY A. Storage tanks, fuel oil, tank accessories, piping, valves, and specialties for fuel-oil distribution inside and

More information

Dalchully, Laggan PH20 1BU, UK T: +44 (0) E: W:

Dalchully, Laggan PH20 1BU, UK T: +44 (0) E: W: Dalchully, Laggan PH20 1BU, UK T: +44 (0) 1528 544 201 E: angus@adac-structures.co.uk W: www.adac-structures.co.uk Location map for various sites Job name: Condition report into foundations of various

More information

EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA

EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA FOR DEWBERRY CONSULTANTS, LLC FAIRFAX, VIRGINIA November 9 and 10, 2016 Page

More information

PEI/RP Recommended Practices for Installation of Bulk Storage Plants

PEI/RP Recommended Practices for Installation of Bulk Storage Plants PEI/RP800-08 Recommended Practices for Installation of Bulk Storage Plants Recommended Practices for Installation of Bulk Storage Plants CONTENTS Foreword...iii. SECTIONS 1. Introduction Page 1.1 Background...1

More information

Understanding the Colorado Annual Compliance Package. William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety

Understanding the Colorado Annual Compliance Package. William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety Understanding the Colorado Annual Compliance Package William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety Overview Required Documentation: UST / AST Annual Compliance Package Release

More information

PENNSYLVANIA ABOVE GROUND STORAGE TANKS

PENNSYLVANIA ABOVE GROUND STORAGE TANKS PENNSYLVANIA ABOVE GROUND STORAGE TANKS GZA GeoEnvironmental Inc. by Jeffrey Knepper, LRS, CPG July 27, 2017 PA CODE Chapter 245. Administration of the Storage Tank & Spill Prevention Program AST Definition

More information

Cathodic Protection for AST s. Why is Cathodic Protection Important?

Cathodic Protection for AST s. Why is Cathodic Protection Important? Cathodic Protection for AST s Presented by: James T. Lary Corrpro Companies, inc. 1055 West Smith Road Medina, Ohio 44256 jlary@corrpro.com 330-241-6615 Why is Cathodic Protection Important? Preserve Assets

More information

DILLARD S TEST PROTOCOL FOR DILR US LUGGAGE (V26)

DILLARD S TEST PROTOCOL FOR DILR US LUGGAGE (V26) Test Date: Reviewed By/Date: SUPPLEMENTAL PROTOCOLS DILLARD S TEST PROTOCOL FOR 1 The sample shall be reviewed against the requirements of California Proposition 65 to determine if additional testing or

More information

SPCC Marina Inspection Update Oklahoma Marina Association Inspector Tom McKay

SPCC Marina Inspection Update Oklahoma Marina Association Inspector Tom McKay SPCC Marina Inspection Update - 2018 Oklahoma Marina Association Inspector Tom McKay Recent Compliance Assistance Documents 40 CFR 112 Final & Most Recent Regulation (7/1/15) Latest SPCC Inspection Checklists

More information

ANNUAL UST SYSTEM INSPECTION CHECKLIST

ANNUAL UST SYSTEM INSPECTION CHECKLIST APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date

More information

Field-Erected AST Secondary Containment Options. Mott-Smith Consulting Group, LLC

Field-Erected AST Secondary Containment Options. Mott-Smith Consulting Group, LLC Field-Erected AST Secondary Containment Options Mott-Smith Consulting Group, LLC Marshall T. Mott-Smith, President Mott-Smith Consulting Group, LLC National Technical Expert and Regulatory Liaison, AET

More information

SPCC Regulation Integrity and Leak Testing Methods

SPCC Regulation Integrity and Leak Testing Methods SPCC Regulation Integrity and Leak Testing Methods NISTM New England December 3 rd, 2015 Founded in 1988, Tanknology has grown to become one of the largest testing and inspection service companies in the

More information

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc.

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc. The Implementation of a Storage Facility Inspection Program Presented By: John R. Rueckel PCA Engineering, Inc. Storage Facility Inspection Why implement an inspection program? Regulatory Requirements

More information

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total Atmos Energy 2017 2017 DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total CORROSION Hazardous Main 61 10 24 13 15 5 148 2 1 279 Non-Hazardous Main 160 156 93 46 155 64 728

More information

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-302-B

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-302-B State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-302-B Standing Loss Control Vapor Recovery System for New Installations of Aboveground Storage Tanks WHEREAS, the California Air Resources Board

More information

Triton. Wet Barrel Ductile Iron. Fire Hydrants. Reliable Connections. operation / Maintenance manual. Inspection and Installation 2

Triton. Wet Barrel Ductile Iron. Fire Hydrants. Reliable Connections. operation / Maintenance manual. Inspection and Installation 2 operation / Maintenance manual MUELLER TAble of contents PAGE Triton Inspection and Installation 2 Installation and Testing 3 Wet Barrel Ductile Iron Maintenance Instructions 4 Parts 5 Notes 6-7 Fire Hydrants

More information

INTEGRITY INSPECTION OF ABOVE GROUND STORAGE TANKS. Frank Maitland, PE QUENSE LLC 136 Edgemere Avenue West Hartford, CT

INTEGRITY INSPECTION OF ABOVE GROUND STORAGE TANKS. Frank Maitland, PE QUENSE LLC 136 Edgemere Avenue West Hartford, CT ABSTRACT INTEGRITY INSPECTION OF ABOVE GROUND STORAGE TANKS Frank Maitland, PE QUENSE LLC 136 Edgemere Avenue West Hartford, CT 06110 860-232-8505 40 CFR 112.7 requires integrity inspection of containers

More information

Storage Tank Risk Management Solutions Leak

Storage Tank Risk Management Solutions Leak Storage Tank Risk Management Solutions Leak Prevention and Tank Integrity Inspections for ASTs Brian Pine ATC Group Services NISTM 8th Annual Pennsylvania Storage Tank Conference 1 2 ATC GROUP SERVICES

More information

GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887

GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887 GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 December 31,2.012 Mr. Charles Aspinwall Town

More information

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext. UNDERGROUND STORAGE TANK SYSTEM INSTALLATION/UPGRADE SUPPLEMENT For use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire (CFC); Chapter 6.7, Health

More information

Underground Storage Tank Annual Compliance Inspection (Revised 1/2015)

Underground Storage Tank Annual Compliance Inspection (Revised 1/2015) Colorado Department of Labor and Employment Division of Oil and Public Safety Compliance Section 633 17 th Street, Suite 500 Denver, CO 80202-3610 Phone: 303-318-8525 Fax: 303-318-8518 Email: cdle_oil_inspection@state.co.us

More information

Thermal Wraps. GT Exhaust Accessories Installation and Operation Manual. Rev. A. Copyright 2012 GT Exhaust, Inc. All Rights Reserved

Thermal Wraps. GT Exhaust Accessories Installation and Operation Manual. Rev. A. Copyright 2012 GT Exhaust, Inc. All Rights Reserved Thermal Wraps GT Exhaust Accessories Installation and Operation Manual Rev. A Copyright 2012 GT Exhaust, Inc. All Rights Reserved Published: December 20, 2012 NOTICE The instructions herein must be expressly

More information

Lorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA

Lorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA Lorri Grainawi Steel Tank Institute PA NISTM April 25, 2013 Harrisburg, PA PEI/RP1200-12 ------------------------------------------------------ 1. Introduction 2. Definitions 3. Safety 4. Tank Secondary

More information

Water Storage Systems

Water Storage Systems Water Storage Systems Water Storage Tanks Types: Gravity or Elevated Ground Storage Hydropneumatic Water Storage Tanks Ground Storage Hydropneumatic Elevated Storage 1 Diurnal Flow Pattern Peak Demand

More information

Spill Prevention Report Lift Station 1A. Prepared By:

Spill Prevention Report Lift Station 1A. Prepared By: Spill Prevention Report Lift Station 1A Prepared By: Contents 1) Purpose... 3 2) General Information... 3 3) Report Certification and Approval... 3 4) Facility Description... 4 5) Summary and Leaks, Spills

More information

SECTION VEHICLE FUEL DISPENSING EQUIPMENT

SECTION VEHICLE FUEL DISPENSING EQUIPMENT SECTION 23 10 13 PART 1 GENERAL 1.01 SUMMARY A. Provide vehicle fuel storage and dispensing equipment, including but not necessarily limited to: 1. Two compartment above ground gasoline and diesel tank.

More information

Compressed Natural Gas Vehicle Fuel System Inspection Guidance

Compressed Natural Gas Vehicle Fuel System Inspection Guidance Prepared by NGVAmerica Technology & Development Committee Fuel System Inspection Working Group Compressed Natural Gas Vehicle Fuel System Inspection Guidance Disclaimer LEGAL NOTICE: NGVAmerica makes great

More information

NEC 2011 Code Changes

NEC 2011 Code Changes NEC 2011 Code Changes Articles 280.21-300.50 CHANGES FROM 2008 TO 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1kV III. Connecting Surge Arresters 280.21 Connection

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS R913 FRP COMPOSITE STEEL UNDERGROUND STORAGE TANKS INSTALLATION INSTRUCTIONS February 2017 1.0 EXCAVATION AND BEDDING 1.1 The bottom of the excavation shall be covered with a minimum of 12 inches (305

More information

What Makes a Tank Worthy of an STI Label. Wayne Geyer, STI/SPFA September 16, 2013 Denver, Colorado

What Makes a Tank Worthy of an STI Label. Wayne Geyer, STI/SPFA September 16, 2013 Denver, Colorado What Makes a Tank Worthy of an STI Label Wayne Geyer, STI/SPFA September 16, 2013 Denver, Colorado Who and What is STI/SPFA? Association of 180 fabricating and affiliate companies of steel construction

More information

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS COVERED Conduct Cathodic Protection Surveys 1 Annual surveys are conducted for each operator s pipeline system that is under cathodic protection to ensure that the protection is adequate. This task is

More information

SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY

SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY GUIDANCE NOTE No. 60 SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY 1. Introduction The Solvents Industry Association has issued this Guidance Note because of the specific

More information

YOUR SPCC PROGRAM: A CHECK UP

YOUR SPCC PROGRAM: A CHECK UP YOUR SPCC PROGRAM: A CHECK UP Avoid Common Issues Seen with SPCC Programs Amy M. Reed, P.E. SAFETY MOMENT PEDESTRIAN/RUNNER SAFETY Stay on the sidewalk where sidewalks are provided it s the law! If you

More information

Farm & Residential Tanks Angle skids

Farm & Residential Tanks Angle skids Farm & Residential Tanks Angle skids Multi-purpose, convenient, and economical fuel storage Each tank tested to ensure quality Engineered for strength and dependability Made with U.S. steel Tank listed

More information

First Quality Solutions

First Quality Solutions First Quality Solutions Turbine Inspection Reports www.firstqualitysolutions.org VISUAL EXAMINATION REPORT Customer: Sample Turbine Outage PO: 104568912 Report No: S1 Component: Turbine Components WO:

More information

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated

More information

Steel USTs: History and Trends. Wayne Geyer, STI/SPFA August 1, 2013

Steel USTs: History and Trends. Wayne Geyer, STI/SPFA August 1, 2013 Steel USTs: History and Trends Wayne Geyer, STI/SPFA August 1, 2013 Who and What is STI/SPFA? Association of 180 fabricating and affiliate companies of steel construction products shopfab tanks, field

More information

Report for CSP Joint Venture Click to edit Master text styles Second level Third level. Fifth level

Report for CSP Joint Venture Click to edit Master text styles Second level Third level. Fifth level Report for CSP Joint Venture Click to edit Master text styles Second level Third level Out of service examination, ultrasonic thickness Fourth survey and level paint evaluation for tanks T221 & T222 Fifth

More information

04/08/2017. What Are The Environmental Regulatory Requirements/Programs Related To Aboveground Storage Tanks That I Have To Comply With?

04/08/2017. What Are The Environmental Regulatory Requirements/Programs Related To Aboveground Storage Tanks That I Have To Comply With? What Are The Environmental Regulatory Requirements/Programs Related To Aboveground Storage Tanks That I Have To Comply With? Outline for Today s Discussion AST Regulations/Laws/Codes Typical AST Requirements

More information

CODE 10 OECD STANDARD CODE FOR THE OFFICIAL TESTING OF FALLING OBJECT PROTECTIVE STRUCTURES ON AGRICULTURAL AND FORESTRY TRACTORS

CODE 10 OECD STANDARD CODE FOR THE OFFICIAL TESTING OF FALLING OBJECT PROTECTIVE STRUCTURES ON AGRICULTURAL AND FORESTRY TRACTORS CODE 10 OECD STANDARD CODE FOR THE OFFICIAL TESTING OF FALLING OBJECT PROTECTIVE STRUCTURES ON AGRICULTURAL AND FORESTRY TRACTORS 1 TABLE OF CONTENTS INTRODUCTION... 3 1. DEFINITIONS... 3 1.1 Agricultural

More information

Underground Oil Storage Tanks Annual Inspection Report

Underground Oil Storage Tanks Annual Inspection Report Underground Oil Storage Tanks Annual Inspection Report Rev 3/26/2018 Form Instructions To Installers and Inspectors: This electronic document (the overall workbook and each individual inspection worksheet)

More information

Urea Reactor Height Extension to Increase Capacity

Urea Reactor Height Extension to Increase Capacity Technical Paper June 2014 Urea Reactor Height Extension to Increase Capacity Hermann Kernberger Schoeller-Bleckmann Nitec GmbH (SBN), Austria Bob Edmondson Yara Belle Plaine, Canada Summary A discussion

More information

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing 195.412(b) 201 Abnormal Operating Conditions Related to Welding on Pipelines 192.225

More information

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Providing Quality Technical Services to the Coating Industry. 60,000 Gallon Elevated Water Storage Tank

Providing Quality Technical Services to the Coating Industry.   60,000 Gallon Elevated Water Storage Tank P.O. Box 801357 Santa Clarita, CA 91380-2316 Toll free: 877.274.2422 Fax: 661.775.7628 www.csiservices.biz Providing Quality Technical Services to the Coating Industry Via E-mail Mr. Rob Rush City of Clovis

More information

Greer Steel, Inc. Product Catalog. Fairbanks, AK Anchorage, AK Lakewood, WA 1

Greer Steel, Inc. Product Catalog. Fairbanks, AK Anchorage, AK Lakewood, WA  1 Greer Steel, Inc. Product Catalog Fairbanks, AK Anchorage, AK Lakewood, WA www.greersteelinc.com 1 PAGE NO. OBROUNDS UL/NON UL 3 OBROUND ACCESSORY KIT 4 ABOVE GROUND CYLINDRICAL UL/NON UL 6 RECTANGLE AND

More information

PORSCHE CLUB OF AMERICA - INLAND NORTHWEST REGION. OWNER and Declaration

PORSCHE CLUB OF AMERICA - INLAND NORTHWEST REGION. OWNER and Declaration PORSCHE CLUB OF AMERICA - INLAND NORTHWEST REGION Driver Education Technical Inspection Program Pre-Event Inspection Welcome to our 2018 Driving Season. This inspection shall be completed within 30 days

More information

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018 003 Test Breakout Tank Overfill Protective 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective 195.428 Oral 005 Repair Breakout Tank Overfill Protective 195.428 006 Inspection of Breakout

More information

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE BENNETT CNG DISPENSER MAINTENANCE SCHEDULE Serial #: DIN #: Company Name: CAUTION: Only trained personnel may work on dispensers. CAUTION: The emergency shut off valve if installed must be closed. CAUTION:

More information

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

Inspector's Initials: Tank Owner or Agent Signature: Title: Date: STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS 4 TH Floor, L & C Tower 401 Church Street Nashville, TN 37243-1541 UST OPERATIONS INSPECTION Mo /Day

More information

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E.

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E. FISC Puget Sound Manchester Fuel Department Glenn E. Schmitt, P.E. Environmental Director Fleet and Industrial Supply Center Puget Sound Maintenance, Leak Detection in Large Underground Storage Tanks Ready.

More information

Yukon Oil Inspection Survey Results and Recommendations

Yukon Oil Inspection Survey Results and Recommendations Yukon Oil Inspection Survey Results and Recommendations CSA B139-04 Installation Code for Oil-Burning Equipment 1 Agenda 1. Inspection Survey Results 2. Solutions to the problems identified Your participation

More information

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 104 Non-destructive Testing (Other than testing of

More information

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018 007 Operate Valves 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 201 Abnormal Operating Conditions Related to Welding on Pipelines 195.452(h) 192.225 192.227 192.715 192.717

More information

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Environmental Standard Operating Procedure (ESOP)

Environmental Standard Operating Procedure (ESOP) Environmental Standard Operating Procedure (ESOP) Originating Office: Natural Resources Environmental Affairs (NREA) Office File Name: AST-ESOP Revision: 24 January 2017 Prepared By: NREA Subject Matter

More information

Monthly Walkthrough Inspections

Monthly Walkthrough Inspections This form must be used to document the monthly walkthrough inspections. Only complete the sections that apply to your facility. Inspect the applicable items below for your site. If an item is not applicable,

More information

Testing Requirements for UST s and AST s. By Mark Lindsey June 27 th, 2013

Testing Requirements for UST s and AST s. By Mark Lindsey June 27 th, 2013 Testing Requirements for UST s and AST s. By Mark Lindsey June 27 th, 2013 http://www.tanknology.com/ Testing Requirements for UST s and AST s UST Testing Requirements: Owner/Operator must maintain on

More information

of Fire Pump Assemblies

of Fire Pump Assemblies A.1.0 A.1.1 A.2.0 A.2.1 A.2.2 A.2.3 A.2.4 A.2.5 A.2.6 A.3.0 A.3.1 A.4.0 A.4.1 Report of Inspection, Testing & Maintenance System in service before conducting tasks Pertinent parties notified before conducting

More information

Airworthiness Directive Schedule

Airworthiness Directive Schedule Airworthiness Directive Schedule Aeroplanes 29 May 2008 Notes 1. This AD schedule is applicable to aircraft (formally Taylorcraft 2000 LLC and Harvey & Vera Patrick Foundation Inc. etc.), manufactured

More information

INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD

INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD More Info at Open Access Database www.ndt.net/?id=18479 INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD ABSTRACT J.L. Fisher, G. Light, Jim Crane, Albert Parvin, Southwest Research Institute,

More information

Appendix I. Deicer Storage Tank Manual

Appendix I. Deicer Storage Tank Manual Appendix I Deicer Storage Tank Manual TABLE OF CONTENTS 1. PLASTIC TANK OVERVIEW... 2 2. PURCHASING DEICER TANKS... 2 3. SITING AND INSTALLING DEICER TANKS... 3 3.1. SITING AND INSTALLATION BMPS... 4 3.2.

More information

DILLARD'S INC TEST PROTOCOL FOR DILL USA- (V22) HANDBAG (CHILDREN)

DILLARD'S INC TEST PROTOCOL FOR DILL USA- (V22) HANDBAG (CHILDREN) By/Date: Page 1 of 6 SCOPE: This protocol is applicable for testing of handbag for children. SUPPLEENTAY POTOCOL Note: Additional cost, sample size and TAT may be required if testing to 1 or more supplemental

More information

BUREAU OF UNDERGROUND STORAGE TANK REGULATIONS RELEASE PREVENTION SECTION

BUREAU OF UNDERGROUND STORAGE TANK REGULATIONS RELEASE PREVENTION SECTION BUREAU OF UNDERGROUND STORAGE TANK REGULATIONS RELEASE PREVENTION SECTION Page 3 Federal law requires the Division of State Fire Marshal, Bureau of Underground Storage Tank Regulations (BUSTR) to inspect

More information

APPENDIX D: SPCC REQUIREMENTS OVERVIEW

APPENDIX D: SPCC REQUIREMENTS OVERVIEW SPCC Requirements Overview APPENDIX D: SPCC REQUIREMENTS OVERVIEW Preface. The following appendix contains an overview of SPCC requirements, presented both in matrices or timetables, and in a succinct

More information

BAMBI BUCKET (ALL MODELS) QUICK REPAIR GUIDE 2014 VERSION B

BAMBI BUCKET (ALL MODELS) QUICK REPAIR GUIDE 2014 VERSION B BAMBI BUCKET (ALL MODELS) QUICK REPAIR GUIDE 2014 VERSION B BAMBI BUCKET REPAIR QUICK GUIDE - Version B Issue Date: June 2014 PLEASE READ BEFORE USING. SEI INDUSTRIES LTD. 7400 Wilson Avenue Delta, B.C.

More information

Coordination with the Spill Prevention, Control, and Countermeasures Plan

Coordination with the Spill Prevention, Control, and Countermeasures Plan 1.0 Introduction Purpose of Plan This plan covers Petroleum Storage Tanks (PSTs) and Petroleum, Oil, & Lubricants (POL) storage, under the responsibility of Fort Gordon located in the City of Augusta,

More information

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Noble Energy Contractor Covered Task List Last updated 2/20/2019 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Earthsafe Systems, Inc. Emergency Power Fuel Systems Recommended System Standard

Earthsafe Systems, Inc. Emergency Power Fuel Systems Recommended System Standard Copyright 2008 Earthsafe Systems, Inc. This information is provided to consulting engineers and prospective customers for the purpose of specifying Earthsafe Emergency Power Fuel Systems. Reproduction

More information

Sunoco, Inc Market Street LL Philadelphia, PA June 29, 2006

Sunoco, Inc Market Street LL Philadelphia, PA June 29, 2006 ORIGINAL : 2532 Sunoco, Inc. 1735 Market Street LL Philadelphia, PA 19103-7583 June 29, 2006 Environmental Quality Board Rachel Carson State Office Building 400 Market St. - 15 th floor Harrisburg, PA

More information

AST REGISTRATION PIPE INSPECTION PE REQUIREMENTS. David D. Bradeson, P.E. Chemung Contracting Corporation

AST REGISTRATION PIPE INSPECTION PE REQUIREMENTS. David D. Bradeson, P.E. Chemung Contracting Corporation AST REGISTRATION PIPE INSPECTION PE REQUIREMENTS David D. Bradeson, P.E. Chemung Contracting Corporation AST REGISTRATION REQUIRED 9 VAC 25-91-20 Part II individual tank of 660 gal. or greater or aggregate

More information

ACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE

ACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE ACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE hvgrid-tech designs and manufactures high voltage cable accessories for all types of cable systems, ranging from 69 kv to

More information

Series Base mounted pump. Installation and operating instructions

Series Base mounted pump. Installation and operating instructions Series 4030 Installation and File No: 40.80 Date: june 25, 2015 Supersedes: 40.80 Date: october 10, 2009 contents General 4 Inspection 4 Installation - Series 4030 base mounted Pump 4 1.0 Location 4 2.0

More information

Requirements for Dispensing of Compressed Natural Gas. Yvonne Espinoza, PE Austin Fire Department Engineering Services

Requirements for Dispensing of Compressed Natural Gas. Yvonne Espinoza, PE Austin Fire Department Engineering Services Requirements for Dispensing of Compressed Natural Gas Yvonne Espinoza, PE Austin Fire Department Engineering Services Course Overview Enforcement of code requirements Application of code requirements Hazard

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Intelligent Flow Measurement Your Sole Source for Badger Differential Producers Worldwide 6 Blackstone Valley Place, Lincoln RI 02865-1162 Ph: 401 334 1170 Fx: 401 334 1173 Em: solutions@wyattflow. Installation,

More information

New UST Installation Inspection Checklist

New UST Installation Inspection Checklist Nebraska State Fire Marshal Fuels Division - FLST Section 246 South 14 TH Street - Lincoln, NE 68508-1804 (402) 471-9466 New UST Installation Inspection Checklist (Petroleum or Hazardous Substances) Inspection

More information

Defender Series. Overfill Prevention Valve. Automatic Shutoff for USTs. Installation, Operation and Maintenance Series

Defender Series. Overfill Prevention Valve. Automatic Shutoff for USTs. Installation, Operation and Maintenance Series Defender Series Overfill Prevention Valve Automatic Shutoff for USTs Installation, Operation and Maintenance 708-590 Series For use in 4" gravity-fill applications only 25-370 Gallons per Minute flow Compatible

More information

SP91S Trunk Floor. Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0

SP91S Trunk Floor. Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0 Uniform Procedures For Collision Repair SP91S Trunk Floor Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0 1. Description This procedure describes the repair and complete or partial

More information

IMPORTANT INFORMATION FOLLOW ALL INSTRUCTIONS

IMPORTANT INFORMATION FOLLOW ALL INSTRUCTIONS IMPORTANT INFORMATION FOLLOW ALL INSTRUCTIONS INSTALLATION INSTRUCTIONS FOR ATI 1000 STORAGE TANK www.atlantictankinnovations.com ATI 1000 STORAGE TANK (ATI 1000) Atlantic Tank Innovations (ATI) 21 Adamant

More information

.4 Emergency and normal vents and terminations. .1 CAN/CSA-B139-09, Installation Code for Oil Burning Equipment.

.4 Emergency and normal vents and terminations. .1 CAN/CSA-B139-09, Installation Code for Oil Burning Equipment. Shoal Lake Intake Fuel Storage and Delivery System Rehabilitation Page 1 of 10 1. GENERAL 1.1 Scope.1 The following statement generally describes the scope of work covered by this Section. All tank volumes

More information

7. Protection System Testing

7. Protection System Testing MANUAL FOR INSTALLATION AND MONITORING OF UNDERGROUND STORAGE TANKS WITH FACTORY INSTALLED ANODES 1. SCOPE Manufactured by: Granby Industries 1020 André-Liné Granby, Québec, Canada, J2J 1J9. Telephone:

More information

Cylindrical Silencers

Cylindrical Silencers Cylindrical Silencers A200 Series and 300 Series Installation and Operation Manual Rev. B (c) Copyright 2012, GT Exhaust, Inc. All Rights Reserved Published: April 30, 2012 NOTICE The instructions herein

More information

Generator Fire Safety: Generator assemblies should be located outside the building.

Generator Fire Safety: Generator assemblies should be located outside the building. SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building

More information

TransCanada US Contractor Covered Task List Last updated 9/27/2018

TransCanada US Contractor Covered Task List Last updated 9/27/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information