The physical boundaries of Zone 3 and transmission facilities located in Zone 3 are shown in Figure ZS 24.

Size: px
Start display at page:

Download "The physical boundaries of Zone 3 and transmission facilities located in Zone 3 are shown in Figure ZS 24."

Transcription

1 September 00 0 Year Assessment overview includes the Wisconsin counties of: Columbia Crawford (southern portion) Dane Dodge Grant Green Iowa Lafayette Jefferson Richland Rock Sauk Walworth and Winnebago, Ill. (northern portion) The physical boundaries of and transmission facilities located in are shown in Figure ZS 4. Land use in is a mix of rural, urban and agricultural. The major population centers are the Madison metropolitan area and the Janesville/Beloit area. typically experiences peak demands during the summer months. Manufacturing, food processing, state government and institutional loads are among the largest electricity users in the zone. Demographics The population of the counties in grew at an annual rate of.0 percent from 000 to 00. The highest growth rate of.5 percent per year and the largest increase in population of 70,00 occurred in Dane County. Population in is projected to grow at. percent annually for the 00 to 00 period. From 00 to 00, Dane County is projected to realize the largest increase in population (8,00) and is projected to have the highest growth rate of.5 percent. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS

2 September 00 0 Year Assessment During the same period, the annual employment growth rate was 0.9 percent. The highest growth rate (.4 percent) and the largest increase in employment (5,000) occurred in Dane County. Employment in is projected to grow at. percent annually between 00 and 00. Dane County is projected to realize the largest increase in employment of over 6,000 and Sauk County the highest growth rate of.6 percent. Employment Population Annual Growth Rate Annual Growth Rate Dane, WI.4 Sauk, WI.6 Dane, WI.5 Dane, WI.5 Total Increase Total Increase ,09,444,076 8,57 Dane, WI 5,05 Dane, WI 6,9 Dane, WI 70,87 Dane, WI 8,6 environmental considerations covers the south central and southwestern portions of Wisconsin and the Illinois county of Winnebago. The ecological landscapes in this zone vary from Southeast Glacial Plains in the east through the Central Sand Hills area to areas that are part of the Southwest Savanna and Western Coulee and Ridges landscapes in the west. The eastern portions of the zone generally are level to gently rolling terrain, while the western areas are characterized by the ridges and valleys of the driftless area. The northern and western portions of this zone are located in the Lower Wisconsin River Drainage Basin, and the Mississippi River forms the zone s western boundary. Other portions of this zone are located in the Grant Platte, Sugar River Pecatonica, Upper and Lower Rock and Fox Illinois drainage basins. Horicon Marsh National Wildlife Refuge is located in the northeast part of the zone, and the Upper Mississippi River Wildlife and Fish Refuge is located along the zone s western edge. The Baraboo Hills are located in the north central portion of the zone. The Lower Wisconsin River State Riverway also is found in this zone. electricity demand and generation The coincident peak load forecasts for for 0, 05, 00 and 05 are shown in Table ZS 0. Existing generation, along with proposed generation based on projected inservice year, also are shown. The resultant capacity margins, with or without the proposed generation, are shown as well. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS

3 September 00 0 Year Assessment The table shows that load is projected to grow at roughly. percent annually from 0 through 00. Comparing load with generation (at maximum output) within the zone indicates that has more generation than peak load during peak load periods. However, actual operating experience indicates that during most load periods, is a net importer of power. transmission system issues Key transmission facilities in include: Columbia North Madison 45 kv lines, Columbia Rockdale 45 kv line, Paddock Rockdale 45 kv line (in service spring 00), Paddock Wempletown 45 kv line, Rockdale Wempletown 45 kv line, and 8 kv facilities from the Nelson Dewey Power Plant, around the Madison area, and in the northwest and southeast portions of. Key system performance issues in include: Existing contingency thermal overloads on the Fitchburg Royster 69 kv line, Low voltages and line overloads on the 69 kv system in Monroe area in 0, Contingency low voltage issues on the Sheepskin Bass Creek Brodhead 69 kv line in the 0 timeframe, The 0 Rockdale Cardinal 45 kv line project is planned to address thermal constraints and low voltage issues in Madison area, The West Middleton Stage Coach 69 kv line requires higher capacity under contingency conditions in 05, Intact system 8 and 69 kv low voltages in Jefferson and Dane Counties are an emerging issue in 05 and beyond, Insufficient 69 kv line capacity in Walworth County in 06, Low voltages and line overloads on the 69 kv system in the Dam Heights area, The existing Hillman 8/69 kv transformer potentially overloads in 08 under single contingency in the Dairyland Power system, and Even with some new 8 kv capacitor bank installation in 0, the North Madison Columbia 45 kv double circuit line outage could cause severe low voltage limitations in 00 timeframe. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS

4 September 00 0 Year Assessment 0 study results Refer to Table ZS and Figure ZS 9 Summary of key findings Short term operation procedures are required to address the Fitchburg Royster 69 kv line overload problems before a permanent transmission project can be implemented, Maintaining reliability of service to load in and around the Madison area requires that system reinforcements be implemented in the near term. Longer term, a 45 kv source on the west side of Madison will be required, With little or no generation running at Concord Substation, low voltages are observed under both system intact and single contingency conditions. Economic benefit analysis may be performed to evaluate whether new transmission projects can be justified, and Significant load growth in the Rock and Green Counties, along with the mismatch of load to generation in the area, could result in the Monroe area 69 kv network being subjected to unacceptably low voltages and thermal overloads under both normal and contingency conditions in the summer of 0. Rebuilding the 69 kv line Y from Brodhead to South Monroe will address these issues. In response to some single contingency low voltage problems in, a total of 6 MVAR of capacitor banks distributed among the Sheepskin, Lamar, and Spring Green substations was deemed to be the most feasible solutions in the 00 0 timeframe. There were a number of facility overloads and several facilities near their emergency ratings in in 00 0 timeframe. Many projects are either planned or proposed to address these near term thermal problems by As a result, ATC proposes to uprate four 69 kv lines and two 69 kv substation terminals. Historically, import capability from Illinois has been severely limited for loss of the Wempletown Paddock 45 kv line (ATC/Commonwealth Edison facility). This limitation has been addressed to some degree by installing a second 45 kv line between Illinois (Wempletown Substation) and south central Wisconsin (Paddock Substation). However, the underlying 8 kv transmission system in the Janesville area and to the north still poses limitations for transfers into the Madison area. To help address this, ATC proposed the first transmission project within the Midwest Independent System Operator (MISO) footprint driven by economics. This project, the Paddock Rockdale 45 kv transmission line, significantly reduces congestion and enhances import capability into and ATC as a whole. In spring 00, this project was successfully implemented. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 4

5 September 00 0 Year Assessment Two other major 8 kv line projects in are in service. One is the North Madison Huiskamp 8 kv line project; the other is the Oak Ridge Verona 8 kv line project. The North Madison Huiskamp 8 kv line project addresses thermal overloads for outages of the Dane Waunakee, Blount Ruskin or West Middleton Pheasant Branch 69 kv lines or the North Madison 8/69 kv transformer. The Oak Ridge Verona project also addresses several line overloads and low voltages in southern Dane and Green counties. Along with the Oak Ridge Verona 8 kv line project, the Verona Sun Valley tap portion of the Y 9 69 kv line will be rebuilt due to existing condition issues and the potential of thermal overload. The Concord 8 kv bus voltage is approaching the voltage limit under intact system conditions. Additionally, an outage of the Hartford St. Lawrence 8 kv line causes marginal bus voltages at Rubicon and Butler Ridge. An outage of the Jefferson Crawfish River 8 kv line causes marginal bus voltages at Crawfish River and Concord. Redispatching generation at Concord does improve the area voltage. An economic benefits analysis found it was more economical to run Concord generation than to install capacitors for voltage support. This was true until 06 when capacitor banks and/or generation would be necessary to provide voltage support. Studies have indicated the potential for severe low voltage limitations in Dane County area for the loss of North Madison Columbia double circuit tower. To address these issues in the near term, one.66 MVAR 8 kv Femrite capacitor bank and one.66 MVAR 8 kv Kegonsa capacitor bank have been proposed. Also in Dane County, the Fitchburg, Cross County, Oak Ridge and Pleasant View 8 kv buses have marginal system intact voltages. The Femrite and Kegonsa capacitor bank projects will also improve these system intact low voltage limitations. The Fitchburg to Royster 69 kv line is susceptible to thermal overloads and the area experiences low voltages at Syene, Nine Springs, and Pflaum for loss of either end of the line. A package of projects was proposed to address these issues. It includes uprating the Fitchburg Nine Springs 69 kv and Royster Pflaum 69 kv lines, moving the AGA load to the Royster Femrite 69 kv line and installing two 6. MVAR, 69 kv capacitor banks at the Nine Springs Substation. Prior to the implementation of these projects, a short term operation procedure including potential load bridging is available. The short term operation procedure will be evaluated each year until the transmission projects are implemented. ATC and the city of Madison have proposed to bury part of the two Blount Ruskin 69 kv overhead lines underground. This project will be completed by 0. Significant load growth in the Rock and Green Counties, along with the mismatch of load to generation in the area, will result in unacceptably low voltages in the Monroe area. Under several single contingency conditions, thermal overloads also arise on the Y 69 kv line SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 5

6 September 00 0 Year Assessment sections Brodhead Spring Grove Blacksmith South Monroe. The planned solution to address these issues is to rebuild the Brodhead South Monroe 69 kv line (Y ) using 8 kv construction standards and initially operate the line at 69 kv. The western portion of Jefferson County and the eastern portion of Dane County have also experienced high residential, commercial, and industrial load growth. Much of the area is served by the Rockdale Substation. Studies conducted by indicate that unacceptable voltages could be experienced in the Academy, Boxelder, London, Cambridge, Lakehead, and Jefferson Substation areas with the outage of any segment of the Rockdale Boxelder or Rockdale Jefferson 8 kv lines. In order to provide reliable service to the area, a new Jefferson Tyranena (Lake Mills) Stony Brook 8 kv line was recently placed in service. We currently mitigate several of the identified 8 kv low voltages through remote control of the 8/69 kv transformers in the affected areas. In certain instances, transformer load tap changers are adjusted to bring the 8 kv contingency voltages above the planning criteria limits while maintaining the 69 kv bus voltages above criteria limits. This is a balancing act, and as loads continue to grow the process will no longer be effective. Projects whose Need date precedes the In service date Uprate McCue Lamar 69 kv line The potential for single contingency low voltage problems in the Lamar area and an overload of the McCue Lamar 69 kv line were observed in the 009 summer peak model. Considering reasonable project lead times, the 00 in service date was chosen for this provisional project of uprating the McCue Lamar line and installing capacitor banks at Lamar. In the interim, dispatching Sheepskin generation could be one possible mitigation to address these constraints. Projects whose In service date precedes the Need date As a result of in service date flexibility and corresponding alignment/synergies with other ATC non planning project needs, the following projects will be in service prior to the need date. Additionally, the projects listed below are asterisked in the Annual Project Tables. Uprate X Colley Road Marine 8 kv terminals o This project only requires terminal upgrades at Colley Road substation. It has been included in the 00 ATC System Protection and Maintenance upgrade project at Colley Road. Uprate Y 6 Sheepskin Dana 69 kv line to 95 MVA o This project only requires terminal upgrades at Sheepskin substation. It has been included in the 00 ATC System Protection and Maintenance upgrade project at Sheepskin. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 6

7 September 00 0 Year Assessment Uprate Y 40 Gran Grae Boscobel 69 kv line to achieve a 99 MVA summer emergency rating o Asset Renewal initially identified 6 structures on the Gran Grae Boscobel line to be replaced due to various maintenance issues. Based on the Y 40 thermal rating analysis, it was determined that the additional scope for uprating the line from 00 degrees F to 00 degrees F would be to replace an additional 9 structures. It makes sense to combine this uprate with the previously identified maintenance project because these structures are very close to the previously identified poles. There are significant cost savings that can be obtained from performing the additional work as part of the maintenance project rather than completing the work as a separate future project. Y 8 Dane Lodi 69 kv line rebuild o A portion of the 69 kv Dane Dam Heights line will be rebuilt in the year 0 as a part of an asset renewal project that addresses first contingency overloads in the year 05. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 7

8 September 00 0 Year Assessment 05 study results Refer to Table ZS and Figure ZS 0 Summary of key findings Numerous low voltages and line overloads along with the potential for voltage collapse in the Madison area signal the need for another new 45 kv source on the west side of Madison, The Brick Church North Lake Geneva 69 kv line faces both thermal and low voltage issues, Load growth in Green County, west of Rock County and south of Dane County requires one additional 69 kv source into the area. Adding the Bass Creek 8/69 kv transformation will address a number of potential low voltage issues and transformer overloads. Due to 69 kv system load growth in Verona and Spring Green areas, the West Middleton Stage Coach 69 kv line requires higher capacity, and As load grows there is a potential for single contingency thermal overloads on the Dane Lodi 69 kv line. There were a number of facility overloads and several facilities near their emergency ratings in based on the 05 analysis. Several projects are either planned or proposed to address these near term thermal problems. As a result, ATC proposes to uprate three 69 kv lines and one 8 kv line. In addition, the remainder of Y 9 69 kv line from Sun Valley Tap to Oregon should be rebuilt due to pending condition concerns and future loading concerns dependent on clearances and load growth. In 009, ATC received the regulatory CPCN approval for the Rockdale West Middleton (Cardinal) 45 kv line project. This project will address line overloads and low voltage issues in Dane County and is planned to be in service in 0. Certain issues in southeastern are related to the 69 kv loop between North Lake Geneva and Brick Church. If one of the sources is out of service, low voltage will exist on that end of the line and thermal issues will exist on the other end. The 05 analysis found the Lake Geneva, South Lake Geneva, Katzenberg, and Twin Lakes 69 kv buses experienced unacceptable bus voltages with the North Lake Geneva Lake Geneva 69 kv line out of service. Likewise, an outage of the Brick Church Cobblestone 69 kv line will result in the Cobblestone 69 kv bus voltage dropping to near unacceptable levels. Thermal issues will occur on the same loop. The Cobblestone Zenda tap will exceed its summer emergency rating for an outage of North Lake Geneva Lake Geneva 69 kv line. The Katzenberg Zenda tap will approach its summer emergency rating for the same outage. The project to construct a 8 kv line between North Lake Geneva and South Lake Geneva and install a 8/69 kv transformer at South Lake Geneva can provide thermal SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 8

9 September 00 0 Year Assessment and voltage relief in the Lake Geneva area. The preliminary in service date is 06; however, it could be delayed if the study area load forecast change justifies such action. The Colley Road 8/69 kv transformer will approach its summer emergency rating for an outage of the Paddock 8/69 kv transformer by 05. The proposed project to install a 8/69 kv transformer at Bass Creek will resolve the thermal issues in the area for the foreseeable future. The Evansville and Brodhead areas are facing unacceptably low voltages under single contingency conditions. In addition, the North Monroe 8/69 kv transformer loading is approaching its summer normal rating under system intact conditions. In conjunction with the rebuild of line Y from Brodhead to South Monroe (0), a new Bass Creek 8/69 kv transformer and the Townline Road Bass Creek 8 kv line uprate in 0 will address these problems and provide an additional 69 kv source into Green and Rock Counties. These projects will also allow the delay of a new Brooklyn to Evansville 69 kv line project outside of ATC s 0 year planning horizon. A new project is created to uprate the West Middleton Stage Coach 69 kv line by 05. It will address potential line overload problems under several single contingency conditions. A LiDar survey and a thermal rating analysis will be conducted to determine the final scope of the project. Projects whose Need date precedes the In service date Rebuild the Y 9 Verona Oregon 69 kv line The need year is listed as 008. The in service year is 04. Distribution load shifting at Stoughton will eliminate potential system limitations in the timeframe. Bass Creek transformer and uprate Town Line Road Bass Creek 8 kv line X The need year is listed as 00. The in service year is 0. Mitigation measures for the potential 00 0 system limitations include installing a 5.7 MVAR distribution capacitor bank at the Union Townline 69 kv Substation (009) and upgrading the existing Sheepskin capacitor bank from 0.8 MVAR to 6. MVAR (00). Uprate Fitchburg Nine Springs and Royster Pflaum 69 kv lines, move AGA to the Femrite Royster 69 kv line and install Nine Springs capacitor bank The need year is listed as 006. The in service year is 0. Post contingency distribution load bridging will be utilized as an interim mitigation measure to alleviate potential singlecontingency thermal and voltage issues. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 9

10 September 00 0 Year Assessment 00 study results Refer to Table ZS and Figure ZS Summary of key findings Additional reactive power is needed throughout the, Load growth in the Lake Geneva area continues to cause severe single contingency thermal overloads and low voltages, Potential single contingency thermal overloads on the Kirkwood Artesian 8 kv line, The existing Hillman 8/69 kv transformer overloads under single contingency in the Dairyland Power system, The West Middleton (Cardinal) Blount 8 kv project is delayed from 07 to 00; the primary need driver is the outage of North Madison Columbia 45 kv double circuit line, Potential single contingency thermal overloads on the Gran Grae Boscobel 69 kv line will require system reinforcements, Thermal overloads call for reinforcement on the Y Colley Road Brick Church 69 kv line, Due to 69 kv system load growth in Green County, the North Monroe South Monroe 69 kv line requires higher capacity, Several projects were delayed due to lower load forecast in certain local area, and The new in service dates were determined considering not only the need dates identified in the 00 0 Year Assessment, but also the need dates identified in both the 008 and the 009 Assessments. In response to low voltages throughout, a significant amount of capacitor banks distributed at the Eden, Mazomanie, Concord, Brick Church, Sun Prairie, Dam Heights, North Monroe and Boscobel substations in the timeframe were deemed to be the preliminary solutions. There were a number of facility overloads and several facilities near their emergency ratings in based on the 00 analysis. Two 69 kv line uprate projects and two new 8/69 kv transformer projects (Hillman and Spring Green Substations) have been proposed to address these thermal problems. A new project was created to uprate the North Monroe South Monroe 69 kv line by 08. It will address potential line overload problems under several single contingency conditions. A LiDar survey and a thermal rating analysis will be conducted to determine the final scope of the project. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 0

11 September 00 0 Year Assessment Potential Kirkwood to Artesian line overloads and serious post contingency low voltages around the Reedsburg loop call for additional transmission reinforcements. The Lake Delton Birchwood 8 kv project in 00 will not only interconnect a new T D substation, but also address impending low voltages and overloads identified on the transmission system. In the 008 Assessment, the West Middleton 8/69 kv transformers and West Middleton Blackhawk 69 kv line were observed to be overloaded under single contingency conditions in the 07 timeframe. To address these thermal overloads, a Cardinal to Blount 8 kv line project was being considered. In conjunction with the Rockdale West Middleton (Cardinal) 45 kv line project (0), the Cardinal Blount 8 kv line could eliminate the thermal overload issues in the long term and provide additional transfer capability into downtown Madison. The status of this project was provisional for several reasons. o The West Middleton 8/69 kv transformer ratings need to be validated. o The in service date driver needs to be confirmed to determine whether the summer normal overloads can be mitigated by other means. o Project alternatives have not been thoroughly developed and evaluated. In 0, the existing West Middleton Substation will be divided into two separate adjacent substations behind the same fence as follows: West Middleton will remain as 69 kv, and Cardinal Substation will encompass 8 and 45 kv portions of the substation. Since the 008 Assessment, the West Middleton (Cardinal) 8/69 kv transformer ratings have been validated with higher ratings. In addition, with the new load forecasts utilized in the 009 and 00 Assessments, the original needs for the Cardinal Blount 8 kv project are sliding out of 0 year planning horizon. However, considering the potential severe low voltage problem under the Columbia North Madison 45 kv double circuit tower outage condition, as a potential long term solution, it was decided to keep the project in the project table as a provisional 00 project. It is provisional because the justification of the project needs to be confirmed and a project scope needs to be developed. Please note, due to a potential large T D project development in Madison area, the in service date for this project could be advanced. Significant load growth near the Lamar area causes numerous system constraints. Near term solutions have been developed:. Uprating Stoughton Substation terminal equipment to achieve a 69 MVA summer emergency rating on Y 46 in Uprating the McCue Lamar section of the Y 6 to a minimum summer emergency rating of 5 MVA in 00.. Installing.45 MVAR 69 kv capacitor banks at Lamar Substation in 00. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS

12 September 00 0 Year Assessment However, these near term solutions will not be sufficient after approximately six years. Subsequently, a longer term plan will be developed and implemented before 07 to address the emerging McCue Lamar and Bass Creek Footville thermal overloads and voltage limitations at the Lamar Substation under single contingency conditions. A second 69 kv line from McCue to Lamar is currently being considered as a placeholder to resolve the issues in this area. The Y, Colley Road Brick Church 69 kv line faces both contingency thermal overloads and age and condition issues. With the proposed 06 North Lake Geneva South Lake Geneva 8 kv line project, the need for rebuilding Y can be delayed to the 08 timeframe. The delay provides planners additional time to develop the provisional Spring Valley Lake Geneva 8 kv project which may delay the Y project even further in time. Depending on the final scope of the Spring Valley Lake Geneva 8 kv project, ATC will revisit the in service date for the Y line rebuild project. Many of the issues in southeastern continue to be related to the 69 kv loop between North Lake Geneva and Brick Church. With one of the sources out of service, low voltage will exist on one end of the line and thermal issues on the other end. The 00 analysis found the Lake Geneva, South Lake Geneva, Katzenberg, and Twin Lakes 69 kv buses experienced low voltages under different contingency conditions. Likewise, an outage of the Brick Church Cobblestone 69 kv line will result in the Cobblestone, Zenda, Twin Lakes, and Katzenberg 69 kv buses to experience low voltages. The Brick Church transformer can expect to be heavily loaded for two contingencies. An outage of the North Lake Geneva 8/69 kv transformer or the North Lake Geneva Lake Geneva 69 kv line will cause the Brick Church transformer to load to exceed or approach its summer emergency rating. The proposed Lake Geneva project will resolve most of the voltage and thermal issues. As suggested above, a provisional project to construct a Spring Valley Lake Geneva 8 kv line is being considered to further strengthen this area in addition to providing network service to We Energies Spring Valley Substation. The Brick Church 8 kv bus can experience low voltages under various contingencies. The provisional project of 4.5 MVAR 8 kv capacitor banks and 8 MVAR 69 kv capacitor bank at Brick Church will address these issues. The Brick Church capacitors will be placed in service in 07. The Colley Road 8/69 kv transformer will exceed its summer emergency rating for an outage of the Paddock 8/69 kv transformer. The installation of a 8/69 kv transformer at Bass Creek should provide relief. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS

13 September 00 0 Year Assessment 05 study results Refer to Table ZS 4 and Figure ZS Summary of key findings Load growth in the Green, Grant, Dane and Rock County areas will drive the need for additional 8/69 kv transformer capacity and 69 kv line uprate, Several 69 kv lines in the West Middleton, Waunakee, East Towne and Sycamore area are approaching their summer emergency ratings under single contingency conditions, Many potential terminal, line uprates or line rebuild projects will be needed in the timeframe, System intact low voltages exist on the 8 kv system in Dane County and on the 8 kv system from Nelson Dewey to Kilbourn, Numerous low voltage limitations exist under single contingency conditions throughout, and Potential single contingency thermal overloads on the Columbia Portage 8 kv lines. The 05 results suggest that further study of, particularly around Dane, Green and Grant Counties, is needed to identify an appropriate long term solution for this area that may be required beyond the year 00. The West Middleton Timberlane 69 kv line will exceed its summer normal rating under system intact conditions. This issue may call for additional 8 kv outlet from West Middleton to its west. Jennings Switching Station DPC Gratiot Tap 69 kv line will exceed or approach its summer emergency rating for the loss of either North Monroe Idle Hour 69 kv line or North Monroe 8/69 kv transformer. The Boscobel Blue River Tap 69 kv line is also overloaded for a number of outages. A potential line uprate project will address the problem. To address thermal overloads, the rating of the Portage Trienda 8 kv line will need to be increased in 0. The Paddock 8/69 kv transformer will exceed its summer normal rating of 9MVA with the transmission system intact. An outage of the Colley Road transformer or the Colley Road Park Street / East Rockton 69 kv line causes the Paddock transformer to exceed or approach its summer emergency rating of 4 MVA. Similarly, an outage of the Paddock SEPTEMBER 00 REPORT ZONES & STUDY RESULTS

14 September 00 0 Year Assessment 8/69 kv transformer causes the Shaw East Rockton 69 kv line and Park Street Colley Road 69 kv line to exceed their summer emergency ratings. The Columbia Portage 8 kv line is overloaded for the loss of the other Columbia to Portage 8 kv line by 05. Adding a North Randolph 45/8 kv transformer is proposed to relieve these overloads. This project is also expected to provide needed voltage support for Dodge and Jefferson Counties. The provisional project of constructing a Hubbard East Beaver Dam 8 kv line will address not only several 69 kv thermal overloads, but also the low voltages in the Beaver Dam area for an outage of the North Randolph North Beaver Dam 8 kv line. This project was delayed from 06 to 00 as a result of reduced load growth in the area. Assessment of Steady State Compliance with NERC Standards The mitigation plans comprised of planned, proposed and provisional projects identified for in this Assessment will allow the ATC system in to meet the steady state portions of NERC standards TPL 00 and TPL 00 in each of the five years 0 05, and for the planning horizon. SEPTEMBER 00 REPORT ZONES & STUDY RESULTS 4

15 Figure ZS-9 Ontario Coon Valley Stoddard DPC Elroy Lyndon Station Lyndon Station Union CenterUnion Center Chaseburg Hillsboro Westby Wonewoc Hillsboro Wisconsin Dells Muni Finnegan Genoa La Farge Yuba Viola Lime Ridge Readstown De Soto Sauk Soldiers Grove DPC Bell Center Plain Steuben Blue River Avoca Boscobel Brisbois La Pointe Prairie du Chien Wauzeka Boscobel Muni Eastside King (king) Woodman Gran Grae Hillside Highland Fennimore Mount Hope Iowa Eden Montfort Cobb Patch Grove Bagley BloomingtonBloomington Grant Linden Livingston Lancaster Distribution Lancaster Lancaster Troy Mineral Point Rock Branch Rewey Mineral Point New Hollandale Potosi Cassville Pioneer(ALTE) Mcgregor (ALTE) Hillman Blanchardville Elmo Dickeyville Summit Lake (ALTW) Kieler Lafayette Benton Benton M I C H I G A N New London (ALTW) Argyle ZONE Modified: April 8, 00 Sheepskin Dana Corp Saunders Creek Evansville Muni DPC Shullsburg Shullsburg Shullsburg Gratiot Green Idle Hour Jennings Rd SW STA Browntown South Wayne REC Center Browntown Albany (ALTE) Monroe Monroe Central Rock Brodhead Footville Footville Brodhead Central Brodhead South South Monroe Blacksmith Spring Grove Brodhead SW STA Viking Janesville Traxler ZONE 5 Currently, ATC owns or operates transmission facilities in 50 Wisconsin counties and in 5 Michigan counties. Facilities include: * Approximately 945 miles of transmission lines * 96 wholly owned substations * 40 jointly owned substations * ATC offices in Madison, Cottage Grove, Pewaukee, De Pere, Wausau and Kingsford, MI High or Low Overloaded Facility Sussex Chenequa Oconomowoc Cooney Nashotah Cottonwood (WE) Hartland Summit Oconomowoc Lake Delafield Pewaukee Waukesha Dousman Sullivan Wales Waukesha Merrill Hills North Prairie Eagle Palmyra Mukwonago Mukwonago WhitewaterWhitewater Lakehead Delavan Bluff Creek East Troy Tibbits Sugar Creek Wilcox Parkview Sunrise Tripp Rd Waterford REC LaPrairie Marine Paddock REC Newark Cranston Northwest Beloit East Beloit Colley Rd Shirland Ave Beloit REC Bradford West Darien Scot Forge Delavan Air Liquide North Lake Geneva Williams Bay Williams Bay Brick Church Walworth Walworth Sharon Burlington Burlington Bristol (ALTE) Delavan Southwest Delavan Darien ClintonScot Forge Racine Lafayette Elkhorn Elkhorn Walworth Venture BOC Gasses Turtle Rock River Performance Criteria Exceeded and Other Constraints (00-0) PLANNING ZONE Merton Lac La Belle REC Harmony Milton Lawns McCue Badger Pump STA Bass Creek Brodhead North Orfordville Orfordville REC Orfordville Bark River Milton Russell Albany Concord SW YD REC Fulton LaMar Blackhawk SW YD (ALTE) Park Ave ZONE 4 Slinger Hartford Rubicon University (WE) Edgerton North Monroe Hazel Green W I S C O N S I N Hartford Butler Ridge Clyman Brooklyn New GlarusNew Glarus DPC Argyle DPC Gratiot Wiota Miner Hustisford Hustisford Reeseville St Lawrence Arthur Road North Madison De Forest Monticello DarlingtonDarlington Cuba City Cuba City Columbus Muni Washington Iron Ridge Dodge Lowell Glacier Deforest Monticello (ALTE) DPC LaMont DPC Platteville PotosiTennyson Columbus South Spring Brook Mayville Juneau Columbus (ALTE) Columbus Brooklyn Belmont Belmont Platteville Beaver Dam East Juneau Northside Horicon Horicon South Beaver Dam Fall River Hampden Evansville Nelson Dewey SW YD ZONE Dane ACEC Doylestown Arlington Dane Belleville Belleville Hollandale Blanchardville DPC Stoneman ZONE Arlington Lodi Beaver Dam ACEC Calamus Kewaskum Mayville Theresa Horicon Ind Park Hubbard Beaver Dam rd St Center St Doylestown Auburn Kekoskee Academy Okee Sauk City Rewey Glen Haven Cassville Rio Poynette Poynette Lodi Industrial Park Dam Heights Eagle View Lodi Prairie Du Sac Plant Milwaukee Valve Prairie Du Sac 9th St Tower Substation Sauk Prairie Sauk City Phillips St North Beaver Dam Rio Pumping Station Columbia BarabooMoore St Randolph Business Park North Side Bird St Division Street Yahara River Colorado Waterloo Sun Prairie Spring Green Mazomanie Arena Waunakee Watertown Lone Rock Centennial Park Stony Brook Sun Prairie Lakehead Waterloo Spring Green Huiskamp Burke Marshall Westport South Mazomanie Industrial Wick Drive Wyoming Valley Black EarthBlack Earth Boxelder Reiner Rd American Cross Plains East Towne Gaston Rd Pheasant Branch Ruskin Stage Coach SW STA Cross Plains Mendota Middleton Sprecher Cottage Grove Blount Cottage Grove Pleasant View Walnut GIS Johnson Creek Gateway Pflaum Lake Mills Madison Dane Jefferson AGA Gas Timberlane Tokay Deerfield London Wingra Monona McFarland Crawfish River West Towne Femrite Jefferson Fitchburg Cambridge Hooterville Syene Mount HorebMount Horeb Jefferson McFarland Barneveld Blue Mounds Cambridge Lakehead Cambridge Oak Ridge Colloday Point Kegonsa Cross Country Ridgeway Rockdale North East Mount Horeb Muni Lands End Verona Verona Rockdale Fitchburg Dodgeville Fort Atkinson Christiana Dodgeville North Stoughton Oregon Stoughton Stoughton Fort Atkinson Oregon Stoughton South Forward Stoughton East Boscobel Muni Boscobel Wauzeka Wyocena Caledonia (ALTE) Cambria Campbellsport Lomira Lone Rock Avoca MuscodaMuscoda Sanborn Butternut Brownsville ACEC Cambria North Randolph Fox Lake Fox Lake (ALTE) Cambria Randolph Pardeeville Merrimac Richland Crawford Pardeeville Manley Sand Columbia SW YD (ALTE) Island Baraboo Merrimac Eagle Blue River Portage Portage Ind Park Portage Badger Ordinance Works Pine River (ALTE) Bell Center Eastman North Freedom Loganville Loganville Richland CenterJames Olson Boaz Mount SterlingGays MillsGays Mills Lynxville Rock Springs Kirkwood Fond du Lac Waupun Hamilton St Trienda Lake Delton Fox Hills Richland Ferryville Seneca Birchwood Rock Springs Eden Forward Energy Center Friesland ACEC Lewiston Lake Delton Zobel Reedsburg Nishan Ironton Reedsburg Reedsburg Artesian Cazenovia Viroqua Alto Lakehead Portage Dell Creek Kilbourn La Valle Green Lake Oakfield Oakfield Waupun Main Waupun Wisconsin Dells Vernon Koch Oil Markesan Kingston M a r q u e t t e Endeavor ACEC Roslin Adams Juneau Wonewoc Mackford Prairie Endeavor DPC Lyndon Station Lake Geneva Lake Geneva South Lake Geneva Zenda Cobblestone Sharon Twin Lakes (ALTE) Katzenberg Twin Lakes Genoa City Existing Transmission Facilities.! * # * # ATC Office Location ATC Substation, Switchyard or Terminal Non-ATC Substation, Switchyard or Terminal A ATC Transmission Line (width = voltage) Non-ATC Transmission Line

16 Figure ZS-0 Stoddard Chaseburg Hillsboro Westby Hillsboro Wonewoc Juneau Wonewoc DPC Lyndon Station Adams Wisconsin Dells Muni Finnegan Wisconsin Dells Vernon Zobel Reedsburg Nishan Ironton Reedsburg Reedsburg Artesian Cazenovia Yuba Viola De Soto Sauk Soldiers Grove DPC Bell Center Crawford Blue River Boscobel Brisbois La Pointe Wauzeka Boscobel Muni Eastside King (king) Woodman Gran Grae Hillside Prairie du Chien Fennimore Mount Hope Patch Grove Bagley BloomingtonBloomington Grant Lancaster Distribution Lancaster Lancaster Glen Haven Cassville Potosi Nelson Dewey SW YD Cassville Pioneer(ALTE) Mcgregor (ALTE) Hillman PotosiTennyson Summit Lake (ALTW) Kieler M I C H I G A N Okee Arlington Lodi Juneau Columbus Hampden Columbus South Columbus (ALTE) Columbus Muni Currently, ATC owns or operates transmission facilities in 50 Wisconsin counties and in 5 Michigan counties. Facilities include: * Approximately 945 miles of transmission lines * 96 wholly owned substations * 40 jointly owned substations * ATC offices in Madison, Cottage Grove, Pewaukee, De Pere, Wausau and Kingsford, MI Butler Ridge Hartford Slinger North Madison De Forest Cuba City Monticello Lafayette Benton Benton DarlingtonDarlington DPC Gratiot Wiota Miner Milton Russell DPC Shullsburg Shullsburg Shullsburg Gratiot DPC Argyle Argyle North Monroe Green Jennings Rd SW STA Browntown South Wayne REC Center Albany Browntown Idle Hour Monroe Monroe Central Albany (ALTE) Rock Brodhead FootvilleFootville Orfordville Brodhead North Orfordville REC Orfordville Brodhead Central Brodhead South South Monroe Blacksmith Spring Grove Hazel Green Bass Creek Brodhead SW STA Milton Lawns McCue Viking Janesville PLANNING ZONE High or Low Overloaded Facility Waterford REC Harmony Traxler Tibbits Sugar Creek Wilcox Parkview Sunrise Venture Tripp Rd Badger Pump STA REC LaPrairie BOC Gasses Turtle Rock River Marine Paddock REC Newark Cranston Northwest Beloit East Beloit Colley Rd Shirland Ave Beloit Performance Criteria Exceeded and Other Constraints (0-05) ZONE 4 St Lawrence Arthur Road Hartford Rubicon Clyman Reeseville West Bend Washington Hustisford Hustisford Lowell Glacier Iron Ridge Academy Arlington Spring Brook Mayville Beaver Dam East Juneau Northside Horicon Horicon South Beaver Dam Fall River Kewaskum Mayville Theresa Deforest Dane Dane ACEC Doylestown Poynette Beaver Dam ACEC Calamus Kekoskee Horicon Ind Park Hubbard Beaver Dam rd St Center St Blackhawk SW YD (ALTE) Park Ave REC Shaw East Rockton W I S C O N S I N Modified: April 7, 00 Poynette Dodge Doylestown Monticello (ALTE) Cuba City New London (ALTW) ZONE 5 Rio Auburn Lone Rock Avoca DPC LaMont DPC Platteville Dickeyville ZONE Troy Lodi Industrial Park Dam Heights Eagle View Lodi Prairie Du Sac Plant Milwaukee Valve Prairie Du Sac 9th St Tower Substation Sauk Prairie Sauk City Phillips St Sauk City BelmontBelmont Platteville Elmo ZONE Rio Pumping Station Evansville DPC Stoneman ZONE Wyocena Columbia BarabooMoore St Randolph North Beaver Dam Campbellsport Lomira Business Park North Side Bird St Division Street Yahara River Colorado Waterloo Sun Prairie Spring Green Mazomanie Avoca Arena Waunakee Watertown Concord SW YD Lone Rock Centennial Park Bark River Stony Brook Sun Prairie Lakehead Waterloo Spring Green Huiskamp Burke Marshall Sussex Westport South Mazomanie Industrial Wick Drive Wyoming Valley Merton Lac La Belle Black EarthBlack Earth Boxelder Reiner Rd Sussex American Chenequa East Towne Gaston Rd Cottonwood (WE) OconomowocCooney Nashotah Pheasant Branch Ruskin Cross PlainsCross Plains Hartland Mendota Middleton Duplainville Sprecher Cottage Grove Oconomowoc Lake Summit Blount Pleasant View Walnut GIS Cottage Grove Johnson Creek Delafield Gateway Pflaum Lake Mills Stage Coach SW STA Pewaukee Madison Dane Jefferson AGA Gas London Tokay Timberlane Deerfield Waukesha Wingra Highland McFarland Crawfish River Waukesha Waukesha West Towne Femrite Jefferson Fitchburg Lakehead Cambridge Dousman Hooterville Syene Merrill Hills Mount Horeb Sullivan Wales McFarland Mount Horeb Barneveld Blue Mounds Jefferson Cambridge Oak Ridge Colloday Point Kegonsa Iowa Ridgeway Cross Country Cambridge Rockdale North East Mount Horeb Muni Lands End Verona Verona Eden Rockdale Fitchburg Dodgeville Montfort Cobb Fort Atkinson Christiana Dodgeville North Stoughton North Prairie Oregon Stoughton Stoughton Fort Atkinson Oregon Stoughton South Linden Big Bend Forward Livingston Stoughton East Eagle Palmyra Mukwonago Mukwonago New Hollandale Brooklyn University (WE) Mineral Point Rock Branch BellevilleBelleville Hollandale Mineral Point Rewey Dana Corp Brooklyn Sheepskin Saunders Creek WhitewaterWhitewater Rewey Blanchardville Edgerton Lakehead Delavan New GlarusNew Glarus Blanchardville Bluff Creek East Troy Evansville Muni REC Fulton LaMar Boscobel Muni Boscobel Wauzeka Plain MuscodaMuscoda Blue River Steuben Manley Sand Cambria Pardeeville Butternut Brownsville ACEC Cambria North Randolph Fox Lake Fox Lake (ALTE) Cambria Randolph Sanborn Merrimac Richland Eagle Pardeeville Caledonia (ALTE) Merrimac Fond du Lac Waupun Hamilton St Trienda Columbia SW YD (ALTE) Island Baraboo Badger Ordinance Works Pine River (ALTE) Bell Center Eastman North Freedom LoganvilleLoganville Richland Center James Olson Boaz Mount SterlingGays MillsGays Mills Lynxville Rock Springs Kirkwood Forward Energy Center Friesland Portage Portage Ind Park Portage Lake Delton Fox Hills Richland Ferryville Seneca Birchwood Rock Springs Lime Ridge Readstown ACEC Lewiston Lake Delton La Valle La Farge Viroqua Alto Waupun Main Waupun Green Lake Lakehead Portage Dell Creek Kilbourn Genoa ACEC Roslin M a r q u e t t e Endeavor Walworth REC Bradford West Darien Scot Forge Air Liquide Bristol (ALTE) Delavan Southwest Delavan Delavan North Lake Geneva Williams Bay Williams Bay Brick Church Walworth Sharon Burlington Burlington ElkhornElkhorn Darien ClintonScot Forge Rochester Racine Lafayette Walworth Lake Geneva Lake Geneva South Lake Geneva Zenda Cobblestone Sharon Twin Lakes (ALTE) Katzenberg Genoa City Twin Lakes Existing Transmission Facilities ATC Office Location ATC Substation, Switchyard or Terminal Non-ATC Substation, Switchyard or Terminal Generation ATC Transmission Line (width = voltage) Non-ATC Transmission Line

17 Figure ZS- Stoddard Chaseburg Hillsboro Westby Hillsboro Wonewoc Wonewoc Juneau DPC Lyndon Station Adams Wisconsin Dells Muni Finnegan Wisconsin Dells Vernon Zobel Reedsburg Nishan Ironton Reedsburg Reedsburg Artesian Cazenovia Yuba Viola Lime Ridge Readstown De Soto Sauk Soldiers Grove Lynxville DPC Bell Center Boscobel Muni Boscobel Boscobel Brisbois La Pointe Boscobel Muni Eastside King (king) Woodman Gran Grae Hillside Prairie du Chien Fennimore Mount Hope Patch Grove Bagley BloomingtonBloomington Grant Lancaster Distribution Lancaster Lancaster Glen Haven Cassville Potosi Nelson Dewey SW YD Cassville Pioneer(ALTE) Mcgregor (ALTE) Hillman PotosiTennyson Summit Lake (ALTW) Kieler M I C H I G A N Arlington Arlington Columbus Hampden Columbus South Columbus (ALTE) Currently, ATC owns or operates transmission facilities in 50 Wisconsin counties and in 5 Michigan counties. Facilities include: * Approximately 945 miles of transmission lines * 96 wholly owned substations * 40 jointly owned substations * ATC offices in Madison, Cottage Grove, Pewaukee, De Pere, Wausau and Kingsford, MI St Lawrence Arthur Road Hustisford Hartford Butler Ridge Hartford Rubicon Clyman Reeseville West Bend Washington Iron Ridge Hustisford Lowell Glacier Slinger North Madison De Forest Cuba City Benton DarlingtonDarlington DPC Gratiot Wiota Hazel Green Miner Russell Monticello Lafayette Benton Milton Monticello (ALTE) DPC Shullsburg Shullsburg Shullsburg Gratiot DPC Argyle Argyle North Monroe Green Jennings Rd SW STA Browntown South Wayne REC Center Albany Browntown Idle Hour Monroe Monroe Central Albany (ALTE) Rock Brodhead FootvilleFootville Brodhead North Orfordville REC Orfordville Brodhead Central Brodhead South South Monroe Blacksmith Brodhead SW STA Janesville Bass Creek Orfordville Spring Grove Milton Lawns McCue Viking Traxler Tibbits Sugar Creek Wilcox Parkview Sunrise Venture Tripp Rd Badger Pump STA REC LaPrairie BOC Gasses Turtle Rock River Marine Paddock REC Newark Cranston Northwest Beloit East Beloit Colley Rd Shirland Ave Beloit PLANNING ZONE High or Low Overloaded Facility Waterford REC Harmony Performance Criteria Exceeded and Other Constraints (05-00) ZONE 4 Juneau Northside Horicon Horicon South Beaver Dam Juneau Columbus Muni Spring Brook Mayville Beaver Dam East Deforest Dane Dane Beaver Dam Fall River Kewaskum Mayville Theresa Academy Okee Lodi ACEC Doylestown Kekoskee Horicon Ind Park Hubbard Beaver Dam rd St Center St ACEC Calamus Doylestown Poynette Poynette Dodge Blackhawk SW YD (ALTE) Park Ave REC Shaw East Rockton W I S C O N S I N Modified: April 7, 00 Rio Auburn Lone Rock Avoca Cuba City New London (ALTW) ZONE 5 Troy DPC LaMont DPC Platteville Dickeyville ZONE Richland Lodi Industrial Park Dam Heights Eagle View Lodi Prairie Du Sac Plant Milwaukee Valve Prairie Du Sac 9th St Tower Substation Sauk Prairie Sauk City Phillips St Sauk City BelmontBelmont Platteville Elmo ZONE Rio Pumping Station Evansville DPC Stoneman ZONE Wyocena Columbia BarabooMoore St Randolph North Beaver Dam Campbellsport Lomira Business Park North Side Bird St Division Street Yahara River Colorado Waterloo Sun Prairie Spring Green Mazomanie Avoca Arena Waunakee Watertown Concord SW YD Lone Rock Centennial Park Bark River Stony Brook Sun Prairie Lakehead Waterloo Spring Green Huiskamp Burke Marshall Sussex Westport South Mazomanie Industrial Wick Drive Wyoming Valley Merton Lac La Belle Black EarthBlack Earth Boxelder Reiner Rd Sussex American Chenequa East Towne Gaston Rd Cottonwood (WE) OconomowocCooney Nashotah Pheasant Branch Ruskin Cross PlainsCross Plains Hartland Mendota Middleton Duplainville Sprecher Cottage Grove Oconomowoc Lake Summit Blount Pleasant View Walnut GIS Cottage Grove Johnson Creek Delafield Gateway Pflaum Lake Mills Stage Coach SW STA Pewaukee Madison Dane Jefferson AGA Gas London Tokay Timberlane Deerfield Waukesha Wingra Highland McFarland Crawfish River Waukesha Waukesha West Towne Femrite Jefferson Fitchburg Lakehead Cambridge Dousman Hooterville Syene Merrill Hills Mount Horeb Sullivan Wales McFarland Mount Horeb Barneveld Blue Mounds Jefferson Cambridge Oak Ridge Colloday Point Kegonsa Iowa Ridgeway Cross Country Cambridge Rockdale North East Mount Horeb Muni Lands End Verona Verona Eden Rockdale Fitchburg Dodgeville Montfort Cobb Fort Atkinson Christiana Dodgeville North Stoughton North Prairie Oregon Stoughton Stoughton Fort Atkinson Oregon Stoughton South Linden Big Bend Forward Livingston Stoughton East Eagle Palmyra Mukwonago Mukwonago New Hollandale Brooklyn University (WE) Mineral Point Rock Branch BellevilleBelleville Hollandale Mineral Point Rewey Dana Corp Brooklyn Sheepskin Saunders Creek WhitewaterWhitewater Rewey Blanchardville Edgerton Lakehead Delavan New GlarusNew Glarus Blanchardville Bluff Creek East Troy Evansville Muni REC Fulton LaMar Blue River Wauzeka Manley Sand Cambria Pardeeville Butternut Brownsville ACEC Cambria North Randolph Fox Lake Fox Lake (ALTE) Cambria Randolph Sanborn Merrimac Plain MuscodaMuscoda Blue River Steuben Pardeeville Caledonia (ALTE) Merrimac Eagle Crawford Wauzeka North Freedom LoganvilleLoganville Fond du Lac Waupun Hamilton St Trienda Columbia SW YD (ALTE) Island Baraboo Badger Ordinance Works Pine River (ALTE) Bell Center Eastman Rock Springs Kirkwood Rock Springs Forward Energy Center Friesland Portage Portage Ind Park Portage Lake Delton Fox Hills Richland Center James Olson Boaz Mount SterlingGays MillsGays Mills Seneca Birchwood Richland Ferryville ACEC Lewiston Lake Delton La Valle La Farge Viroqua Alto Waupun Main Waupun Green Lake Lakehead Portage Dell Creek Kilbourn Genoa ACEC Roslin M a r q u e t t e Endeavor Walworth REC Bradford West Darien Scot Forge Air Liquide Bristol (ALTE) Delavan Southwest Delavan Delavan North Lake Geneva Williams Bay Williams Bay Brick Church Walworth Sharon Burlington Burlington ElkhornElkhorn Darien ClintonScot Forge Rochester Racine Lafayette Walworth Lake Geneva Lake Geneva South Lake Geneva Zenda Cobblestone Sharon Twin Lakes (ALTE) Katzenberg Genoa City Twin Lakes Existing Transmission Facilities ATC Office Location ATC Substation, Switchyard or Terminal Non-ATC Substation, Switchyard or Terminal Generation ATC Transmission Line (width = voltage) Non-ATC Transmission Line

18 Figure ZS- Stoddard Chaseburg Hillsboro Westby Wonewoc Hillsboro Juneau Wonewoc DPC Lyndon Station Adams Wisconsin Dells Muni Finnegan Wisconsin Dells La Farge Genoa Vernon Yuba Viola De Soto Sauk Soldiers Grove DPC Bell Center Plain Troy Crawford Steuben Blue River Lone Rock Avoca Avoca Lone Rock Spring Green Boscobel Boscobel Muni Eastside King (king) Wauzeka Woodman Wauzeka Brisbois Spring Green Wyoming Valley Boscobel Muni Boscobel Gran Grae Hillside Highland Prairie du Chien Fennimore Mount Hope Iowa Eden Montfort Lands End Dodgeville Cobb Bagley BloomingtonBloomington Grant Lancaster Distribution Lancaster Mazomanie Industrial Wick Drive Black EarthBlack Earth Mineral Point Nelson Dewey SW YD Cassville Hillman PotosiTennyson Dickeyville Summit Lake (ALTW) Kieler Hazel Green W I S C O N S I N ZONE ZONE Modified: April 7, 00 DarlingtonDarlington DPC Gratiot Wiota Miner DPC Shullsburg Shullsburg Shullsburg Columbus Muni Sun Prairie Sun Prairie South Reiner Rd Waterloo Lakehead Waterloo Marshall Gratiot Argyle Oregon Stoughton Stoughton South Brooklyn Stoughton Currently, ATC owns or operates transmission facilities in 50 Wisconsin counties and in 5 Michigan counties. Facilities include: * Approximately 945 miles of transmission lines * 96 wholly owned substations * 40 jointly owned substations * ATC offices in Madison, Cottage Grove, Pewaukee, De Pere, Wausau and Kingsford, MI Watertown Jennings Rd SW STA Browntown South Wayne Browntown Idle Hour Monroe Monroe Central Hartford Concord SW YD Slinger FootvilleFootville Brodhead North Orfordville REC Orfordville Brodhead Central Brodhead South South Monroe Blacksmith Brodhead SW STA Waukesha Wales Pewaukee Waukesha Waukesha Merrill Hills Big Bend Eagle Palmyra Bluff Creek Mukwonago Mukwonago East Troy Milton Lawns McCue Viking Janesville Waterford REC Harmony Traxler Tibbits Sugar Creek Wilcox Parkview Sunrise Venture Tripp Rd Badger Pump STA REC LaPrairie BOC Gasses Turtle Rock River Blackhawk SW YD (ALTE) Park Ave REC Shaw East Rockton Overloaded Facility Duplainville WhitewaterWhitewater Paddock REC Newark Cranston Northwest Beloit East Beloit Colley Rd Shirland Ave Beloit High or Low Hartland North Prairie Lakehead Delavan Marine PLANNING ZONE Sussex Delafield Dousman Sullivan Sussex Cottonwood (WE) Milton Bass Creek Orfordville Spring Grove Summit Oconomowoc Lake REC Fulton LaMar REC Center Brodhead Chenequa OconomowocCooney Nashotah University (WE) Dana Corp Saunders Creek Russell Rock Merton Lac La Belle Stoughton East Evansville Muni Albany (ALTE) Bark River Fort Atkinson Sheepskin Albany Green Butler Ridge Fort Atkinson Edgerton North Monroe Hartford Rubicon Boxelder Christiana North Stoughton New GlarusNew Glarus DPC Argyle St Lawrence Arthur Road Hustisford Clyman Reeseville West Bend Washington Iron Ridge Hustisford Lowell Stony Brook Performance Criteria Exceeded and Other Constraints (00-05) ZONE 4 ZONE 5 Benton Benton New London (ALTW) M I C H I G A N Lafayette Columbus (ALTE) Glacier Business Park Monticello Cuba City Cuba City Columbus South Monticello (ALTE) DPC LaMont DPC Platteville Bird St Brooklyn BelmontBelmont Platteville Juneau Rockdale BellevilleBelleville Hollandale Blanchardville Elmo ZONE North Side Division Street Yahara River Colorado Waunakee Centennial Park Huiskamp Burke Westport Oregon New Hollandale Rewey Pioneer(ALTE) Mcgregor (ALTE) Juneau Northside Horicon Horicon South Beaver Dam Deforest North Madison De Forest Evansville Potosi Columbus Hampden Dane Forward Blanchardville DPC Stoneman Beaver Dam Fall River Arlington Arlington Dane ACEC Doylestown Spring Brook Mayville Beaver Dam East Horicon Ind Park Hubbard Beaver Dam rd St Center St ACEC Calamus Kewaskum Mayville Theresa Academy Okee Lodi Dodge Doylestown Fitchburg Glen Haven Cassville Rio Auburn Kekoskee American East Towne Gaston Rd Pheasant Branch Ruskin Cross PlainsCross Plains Mendota Middleton Sprecher Cottage Grove Blount Pleasant View Walnut GIS Cottage Grove Johnson Creek Gateway Pflaum Lake Mills Stage Coach SW STA Madison Dane Jefferson AGA Gas London Tokay Timberlane Deerfield Wingra McFarland Crawfish River West Towne Femrite Jefferson Fitchburg Lakehead Cambridge Hooterville Syene Mount Horeb McFarland Mount Horeb Barneveld Blue Mounds Jefferson Cambridge Oak Ridge Colloday Point Kegonsa Ridgeway Cross Country Cambridge Rockdale North East Mount Horeb Muni Verona Verona Mineral Point Rock Branch Rewey Lancaster Mazomanie Arena Linden Livingston Rio Pumping Station Campbellsport Lomira Randolph North Beaver Dam Poynette Poynette Dodgeville Patch Grove Wyocena Columbia BarabooMoore St Lodi Industrial Park Dam Heights Eagle View Lodi Prairie Du Sac Plant Milwaukee Valve Prairie Du Sac 9th St Tower Substation Sauk Prairie Sauk City Phillips St Sauk City Richland MuscodaMuscoda Manley Sand Cambria Pardeeville Butternut Brownsville ACEC Cambria North Randolph Fox Lake Fox Lake (ALTE) Cambria Randolph Sanborn Merrimac Eagle Blue River Pardeeville Caledonia (ALTE) Merrimac Fond du Lac Waupun Hamilton St Trienda Columbia SW YD (ALTE) Island Baraboo Badger Ordinance Works Pine River (ALTE) Bell Center Eastman La Pointe North Freedom LoganvilleLoganville Richland Center James Olson Boaz Mount SterlingGays MillsGays Mills Lynxville Rock Springs Kirkwood Forward Energy Center Friesland Portage Portage Ind Park Portage Lake Delton Fox Hills Richland Ferryville Seneca Birchwood Rock Springs Lime Ridge Readstown ACEC Lewiston Lake Delton Zobel Reedsburg Nishan Ironton Reedsburg Reedsburg Artesian Cazenovia Viroqua Alto Waupun Main Waupun Green Lake Lakehead Portage Dell Creek Kilbourn La Valle ACEC Roslin M a r q u e t t e Endeavor Walworth REC Bradford West Darien Scot Forge Air Liquide Bristol (ALTE) Delavan Southwest Delavan Delavan North Lake Geneva Williams Bay Williams Bay Brick Church Walworth Sharon Burlington Burlington ElkhornElkhorn Darien ClintonScot Forge Rochester Racine Lafayette Walworth Lake Geneva Lake Geneva South Lake Geneva Zenda Cobblestone Sharon Twin Lakes (ALTE) Katzenberg Genoa City Twin Lakes Existing Transmission Facilities ATC Office Location ATC Substation, Switchyard or Terminal Non-ATC Substation, Switchyard or Terminal Generation ATC Transmission Line (width = voltage) Non-ATC Transmission Line

19 Figure ZS-4 8 Y- Hazel Green Brodhead SW STA REC Newark SW STR Shirland Ave SW STR Dickinson (ALTE) 85 X- REC Clinton SW STR Sharon SW STR Clinton SW STR (ALTE) X-4 67 CGS G 4 64 Y-5 Brick Church Sharon X X X REC Greendale LaPrairie X79 X-79 9 Franklin 86 X- 00 X-9 X-5 Root River 86 Oak Creek X- 4 Y- Enzyme BioSystems Raymond Colley Rd 4 XNX-5 E4 East Beloit Park Ave X-4 Dickinson (ALTE) Y-5 East Union Rockton Grove Janesville / Beloit Area Air Liquide Tap Air Liquide Paris 4 K E N O S H A South Lake Geneva 4 Y- Lake Geneva Zenda 50 Silver Lake Y-5-ALE Zenda SW STR 75 Paddock Lake 0 Cobblestone 4 Sharon 8 50 Brookdale Tap 6 REC Shaw Walworth Walworth X- X- 99 Shirland Ave Williams Bay Fontana-onGeneva Lake Y SA UG 4 80 X- X-44 Y- East Beloit Williams Bay SW STR West Darien NWH G6 KANG8 North Lake Geneva X-55 X-4 4 Darien X L-CYP X- 80 X- Southwest Delavan Clinton (ALTE) Beloit X-5 4 Park Ave 40 Delavan X-79 Williams Bay X- Blackhawk SW YD (ALTE) X-79 REC Bradford 79 6L 4 X-96 Y- RU BG 465 G-W HA JEFG5 JEFG5 X-69 Y-79 X-9 X-4 X-4 Northwest Paddock Beloit X-5 Northwest Beloit Y- Tap Colt 54 Industries W- 9 Spring Grove X-79 8Tichigan I L L I N O I S Elkhorn 4 4rd St Term 87K6 654 Elkhorn X-8 Delavan Turtle Town Line Y4 Rd (ALTE) X-5 Y-7 W A L W O R T H 45 Colt Industries R A C I Bristol (ALTE) REC LaPrairie Beloit Burlington 9 Rock X79 River BOC Gasses North Lake Geneva Tap Y- 67 X-8 X-8 W- 4 W- 0 Blacksmith Blacksmith SW STR Y-0 New London (ALTW) X- Y5 8 R O C K Browntown South Wayne Brodhead Muni SW STR X Lafayette Burlington Sunrise X-9 Venture Y-7 Monroe Central Janesville General SW YD X-4 X- Browntown South Monroe Sugar Creek Lincoln Venture Marine 778K5 Cranston Blackhawk SW YD (ALTE) Tibbits West Milwaukee West Allis Rock Turtle Town X-7 4 River Line XRd (ALTE) 79 6 Rochester 9 Janesville Tripp Rd Orfordville Waterford 9 W- Wilcox 8 Y- REC Orfordville Orfordville SW STR Bluff Creek 89 X-7 Y87 Monroe Central SW STR Brodhead South Badger Pump STA Lakehead Delavan Tap East Troy Y- 5 Monroe Y-55 Shullsburg 8 YBrodhead North X- REC Harmony SW STR McCue X-6 Badger Pump STA Tap 0 X-79 Shullsburg 6 N- Bass Creek 69 Jennings Rd SW STA DPC Shullsburg Miner X- X- North Monroe Parker High School SW STR 4 44 Valley (WE) Branch Northwest Beloit Paddock Y-7 X X- Benton REC Center REC Center Tap X- Summit Lake (ALTW) X-49 Y-4 DPC Gratiot Cuba City South SW STR Albany Footville X-49 X-49 DPC Gratiot SW STR Cuba City G R E E N Argyle Darlington Darlington L A F A Y E T T E DPC Argyle Milton X- 4 Russell 59 DPC LaMont 6 Y-04 4 Monticello (ALTE) Y-5 X-4 Hillman Kieler Monticello Monticello SW STR Belmont Tennyson Potosi I O W A Fulton SW STR Y-6 REC Fulton X-9 Evansville Union Townline SW STR Y-09 DPC Platteville Tap Y-65 X-5 DPC Platteville Lakehead Delavan 65 5 West Junction Y St Martins BOC Gasses L- ER G7 Walker 6 Cassville X-5 Whitewater Evansville Muni Belmont Mcgregor (ALTE) Dana Corp SW STR 54 Mukwonago 505 Everett Park 484 Hill Muskego Big Bend Whitewater R O C K Y Pioneer(ALTE) X Platteville DPC Stoneman X-5 New Glarus 6 Edgerton Haymarket Square X-9 96th St Brookdale X Edgewood K6 67 Mukwonago 59 University (WE) Y Brooklyn Brooklyn 4 Eagle Palmyra W A U K E S H A Dana Corp Blanchardville Moorland New Berlin 54 Y- Glen Haven E Q- Y- 7 87K6 995 Tripp Rd North Prairie Y- 8 Nelson Dewey SW YD 8 Sheepskin Arcadian Merrill Hills Fort Atkinson Wauwatosa Center 79 Sunrise 8th St Janesville 6 504O Connor Y50 YD General SW Stoughton Rewey 6 X- Cassville Belleville Belleville Wales Fort Atkinson X- 4X- 4 Bluemound Lancaster 6 X- Hollandale 9 Jefferson Sullivan 4 Elm Grove Lancaster Y- Lancaster Distribution Rock Branch Mineral Mineral Point SW Point STR 8 Janesville 8 YWaukesha Waukesha Y0 Bloomington 6 X- Y Forward SW STR 70 Butler Traxler Tosa Brookfield Pewaukee Dousman X- Y-5 Forward Livingston Jefferson North Stoughton Muni SW STR Oregon Viking Duplainville 4 6 Range Line Dist X- Sidney Term Milton Custer Lawns Term Wilcox Parkview Fiebrantz Butler 90 Pewaukee J E F F E R S O N 0 Y- Bloomington Oregon Y-4 Bagley 9 Linden G R A N T Lakehead Cambridge Rockdale X- 6 X- Kegonsa Cottonwood (WE) 55 Crawfish River Granville Y- Patch Grove Dodgeville 0 X-9 Lakehead Cambridge 66 Tap 66 Cambridge Cambridge SW STR Cambridge X-8 65 X-59 XRockdale Christiana G-CHR 6 X-7 Y-8 Verona 6 Y- Oak Ridge X8 Colloday 858 Point Y- 9 Montfort Dodgeville Sun Valley Sw Str Y-5 Cobb Y-6 McFarland Cottage Grove X- Eden Mount Horeb Fitchburg 694 London SW STR McCue Tamarack River Hills REC Harmony Milwaukee Menomonee Falls Mill Rd Verona London Y-4 6 Y-4 Lands End North East Mount Horeb Muni McFarland Fitchburg Syene 8 57 Fennimore 8 Ridgeway I O W A Mount Horeb Lake Mills Sussex Sussex 465 Oconomowoc Lake Nashotah Summit Delafield Deerfield AGA Gas Fen Oak Merton 4 Lannon Chenequa Oconomowoc Cooney 66 Hooterville 7 X- Cross Country L Gaston Rd Sprecher 75 Milton Thiensville LaMar 68th St 5066 X-9 Blue Mounds Monona Nine Springs Wingra 9 66 Bark River Cottage Grove Pflaum Tokay East Campus Madison La Pointe Barneveld Royster Walnut Blount GIS 94 8 X D A N E Y- Towne 8 Y- Highland Mount Hope Y6 8 X-5 W- 7 Y Pleasant View West Gran Grae Shorewood Hills Reiner Rd Sprecher Tap 80 Gateway Concord SW YD 4 90 Mequon Swan Timberlane Blackhawk (MGE) Germantown SW YD W West Timberlane SW STR Middleton Y-6 Pheasant Branch 86 X Wauzeka DPC Prairie Du Chien X- King (king) Sycamore SW YD Maple Bluff Middleton Burke Tap G-DPV 7 Cross Plains Fulton Russell Stony Brook BOEG6 BOEG6 JEF G5 Marshall 6 0 Y- Watertown 9 Waterloo 5 FG JE 6 Y- Black Earth SW STR East Towne Y-4 0 American Black Earth Boscobel Muni Eastside Woodman Burke Huiskamp Westport X-85 Wyoming Valley Colorado X Boscobel Waunakee X-85 Arena Eastman Wick Drive 5875 Arena 67 X- Y-70 Spring Green Token Creek Waunakee Industrial Park 9 X- X- 7 Mazomanie Sun Bird St Tap Prairie Mequon Y- 6 Germantown REC 5 Bird St Yahara River X Spring Green Division Street Lone Rock Avoca 59 Cedarburg South 66 Muscoda Y- 4 Blue River North Side Waunakee Muni SW STR Y- Y- 79 Muscoda Blue River Avoca SW STR 60 Y-7 Grafton 60 Cedarburg W A S H I N G T O N Business Park Colloday Point W- 4 Blue River SW STR Lone Rock Avoca Hampden SW STR 74 Jackson Maple (WE) X-6 Steuben Muscoda Muni Distrib SW STR Y-04 De Forest X- 60 Y- 6 Y-4 9 C R A W F O R D Y-85 Dane Y- 6 Deforest Saukville X-90 Rubicon BG RU 6 90 North Madison 45/8 kv North Madison Dane BG RU Neosho Reeseville Sauk City Phillips St Lynxville Sauk Prairie Y-4 Plain Eagle X87 Bell Center DPC Prairie Du Brisbois Chien SW STR Lodi SW STR Prairie Du Sac 9th St Clyman Columbus South Lodi Okee SW STR Dam Heights South Tap Tower St Tap Hampden Y-7 Tower Substation C O L U M B I A Lodi DPC Bell Center Lodi Industrial Park X-6 Y-8 X8 Gays Mills Dam Heights North Tap 4 UG SA Edgerton Saunders Creek 8 5 Y Y6 Pine River (ALTE) 858 X Oak Ridge Slinger Butler Ridge Charter Steel 8 85 Hartford 4 75 X- Y-6 X-5 X5 X-70 X-5 X7 Y-5 Y-6 4 X-7 X-7 X6 X7 Y-05 Lowell 6 Charter Steel Sw Str Fitchburg Hartford 5 FG HT BG RU Gays Mills SW STR Lodi Ind Park SW STR Fitchburg Pleasant Valley 80 Hustisford Columbus Arlington 8 8 Syene 694 Verona Y 60 Arlington SW STR Arlington 88 Iron Ridge Cross Country Hustisford Okee James Olson 7 Gays Mills Mount Sterling Fall River Fall River Academy Richland Center Boaz y-69 Fall River SW STR Poynette SW STR McFarland 8 Poynette Merrimac SW STR Madison Nine Newburg Springs Glacier Juneau Northside Juneau Fredonia ACEC Doylestown SW STR Poynette Merrimac Ferryville Y-69 West Barton Bend Horicon Juneau Industrial Sw Str Wingra South Beaver Dam Monona L- SE C ACEC Calamus 57 AGA Gas Pflaum Fredonia Hubbard 69 5 West Towne O Z A Royster U K E E Blount Doylestown Merrimac R I C H L A N D Horicon Ind Park Y- 4 Y- 0 W6 75 Tokay Random Lake Gateway Spring Brook Beaver Dam East East Campus Rio 4 Y X- D O D G E Beaver Dam 7 Rio Pumping Station Mayville Walnut GIS Kewaskum Shorewood Hills Random Lake Auburn Pleasant View Mayville Mendota Ruskin Blackhawk (MGE) Baraboo 4 Kekoskee 6 Y-5 9 Island 46 Wyocena SW STR X Sycamore SW YD 8 Middleton North Beaver Dam Y-65 L- CO L Creek SW STR S A U K Wyocena Manley Sand Loganville 54 Soldiers Grove Moore Skillet St Randolph W- 5 Y- 8 North Freedom Loganville 8 Island Kirkwood Tap Pardeeville Columbia SW YD (ALTE) Baraboo 6 Didion SW STR ACEC Cambria SW STR Sanborn Randolph Tap X- Rock Rock Springs Springs Readstown De Soto Lake Delton SW STR 44 Y- Lime Ridge X Y- X Pardeeville 0 X- Rock Springs SW STR Cambria Pardeeville SW STR Fox Lake 7 X-4 Maple Bluff Y- Pheasant G-Branch BT B5 Holland 86 X Y 6 Artesian 80 5 Portage X-6 North Randolph S H E B O Y G A N X-5 ACEC Friesland X-6 X-6 X- Reedsburg ACEC Cambria Portage Hamilton St Ind Trienda Park Hamilton St SW STR X- 9 Portage Y- 0 X-6 7 Zobel Reedsburg Cazenovia Friesland East Towne D A N E Campbellsport Ironton X- Reedsburg Nishan Butternut 84 Viroqua X-6 8 Brownsville 9 Adell Lakehead Portage 49 Westport Y-4 X-7 5 L A C 7 69 Birchwood Koch Oil SW STR Waupun D U B5 BT G- Loch Mirror X-7 Lakehead Portage Sw Str 9 X-6 8 F O N D Madison Area Forward Energy Center Y-5 Waupun Tap Lyndon American Cascade Huiskamp 54 7 V E R N O N Yuba Alto Alto SW STR Wisconsin Dells 0 YDell Creek X-7 8 La Valle 56 L A K E 44 Wonewoc Y-64 La Farge G R E E N ACEC Roslin SW STR Waldo 654 ACEC Roslin Y58 Hillsboro Endeavor A D A M S RUBG DPC Lyndon STA SW STR Wonewoc Hillsboro Westby J U N E A U Y- 0 Oakfield X-0 Union Center Y0 Endeavor Sw Str 9 X- Chaseburg Hillsboro Tap 00 Y- 6 Eden Kingston M A R Q U E T T E Y- 7 7 Union Center Twin Lakes (ALTE) Spring Valley (WE) Twin Lakes Katzenberg Park Ave Tap REC Shaw I L L I N O I S T r a n s m i s s i o n Electric Transmission and Related Facilities Transmission Facilities Substation or Switching Yard Tap or Switching Structure Transmission Line Voltage and Type 69 kv Underground < 50 kv 69 kv 69 kv Double Circuit 5 kv 5 kv Double Circuit 8 kv 8 kv Double Circuit 6 kv 6 kv Double Circuit 5 kv 0 kv 0 kv Double Circuit 6 kv 45 kv 45 kv Double Circuit Generation ATC Office Location Non-ATC 69 kv 8 kv Underground N e t w o r k a n d P L A N N I N G Y-5 East Rockton SW STR S u b s t a t i o n s Z O N E ZONE M I C H I G A N 88 kv W I S C O N S I N ZONE ZONE 4 Miles 45 kv Non-Op Underground Mixed voltage double circuit lines drawn with each line color corresponding to the appropriate voltage Airport, Airfield or Helicopter Landing Area Tap or Switching Structure G:\WORKSPACE\ArcMap Templates\ Maps\.mxd Modified: May 0, 00 Revised May ZONE ZONE 5 Currently, ATC owns or operates transmission facilities in 50 Wisconsin counties and in 5 Michigan counties. Facilities include: * Approximately 950 miles of transmission lines * 96 wholly owned substations * 40 jointly owned substations * ATC offices in Madison, Cottage Grove, Pewaukee, De Pere, Wausau and Kingsford, MI The information presented in this map document represent the most current and accurate georeferenced compilation of ATC owned and operated transmission facilities available - some facility locations may be approximate. This map is advisory and intended for reference purposes only. Please direct any revisions or corrections to ATC Asset Applications and GIS Group. Base Map Information: ATC, PSCW, MiDNR, WDNR

ATC Planning Zone 3 Generation Integration Screening Study. December, 2018

ATC Planning Zone 3 Generation Integration Screening Study. December, 2018 Page 1 ATC Planning Zone 3 Generation Integration Screening Study December, 2018 ATC voluntarily performed a high level, steady-state screening of transmission facilities in ATC Planning Zone 3, which

More information

Section III STATUS OF PROJECTS. Table III-1 Projects Completed Since September Year Assessment

Section III STATUS OF PROJECTS. Table III-1 Projects Completed Since September Year Assessment Section III STATUS OF PROJECTS This section identifies transmission projects that were completed in 200, are under construction or are in the approval stage. This section also provides a list of projects

More information

Appendix B. Summary of Changes to the Year Assessment

Appendix B. Summary of Changes to the Year Assessment Appendix B Summary of Changes to the 2003 10- Assessment For the below tables, the following color-coding scheme was utilized for indicating what type of change has been made to the 10- Assessment from

More information

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009 State Regulatory Affairs and Local Relations Update ATC Customer Meeting November 19, 2009 Project Certification Steve Parker Manager State Regulatory Affairs CA/CPCN Applications (Filed/Ordered/Under

More information

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- -- ATC 20 10-Year Asessment Project List Project ACEC Dellwood Substation: Install line breakers to sectionalize Y- 146 20*** 20 1 T-D interconnection Planned A 7741 Zone 2 switching initiative ASAP*** 20

More information

MTEP14 West SPM #2. ATC, DPC, XEL Project Review. April 2, 2014

MTEP14 West SPM #2. ATC, DPC, XEL Project Review. April 2, 2014 MTEP14 West SPM #2 ATC, DPC, XEL Project Review April 2, 2014 MISO West Region AMERICAN TRANSMISSION COMPANY, LLC 2 Project Count ATC A in MTEP14 Project Summary 30 Projects by type 25 20 15 10 5 Other

More information

Utility Provider Phone Number Additional Direction and Notes

Utility Provider Phone Number Additional Direction and Notes Adams-Columbia Electric Cooperative (800) 831-8629 Algoma Utility Commission (920) 487-5556 Arcadia Electric & Water Utility (608) 323-3359 Ext. 23 Argyle Municipal Electric & Water Utility (608) 543-3335

More information

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition TC 208 0- ssessment Network Project List 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 Sherman Street SS, DIC - Replace High Side Circuit Switcher 208*** 208 T-D Interconnection Proposed targeted 8 372

More information

Wisconsin FDIC Insured Institutions Profitability First Quarter 2017

Wisconsin FDIC Insured Institutions Profitability First Quarter 2017 Wisconsin FDIC Insured Institutions Profitability First Quarter 2017 Data compiled by: Tom Kosanda 630.820.2265 Tom@BankersBenefits.com Data distributed by:» FDIC Quarterly Data used as the source material.»

More information

Highly Constrained Elements Within ATC Footprint

Highly Constrained Elements Within ATC Footprint Highly Constrained Elements Within ATC Footprint Feb. 21, 2008 Presented by Dale Burmester Compiled by ATC Economic Planning Team: Tom Dagenais, Todd Tadych, Arash Ghodsian, Chris Hagman Solutions to Market

More information

Wisconsin FDIC Insured Institutions Assets Quality First Quarter 2017

Wisconsin FDIC Insured Institutions Assets Quality First Quarter 2017 Wisconsin FDIC Insured Institutions Quality First 2017 Data compiled by: Data compiled by: Tom Kosanda 630.820.2265 Tom@BankersBenefits.com Data distributed by:» FDIC ly Data used as the source material.»

More information

Year Over Year Unemployment Rates Decline Or Hold Steady In All 12 Wisconsin Metro Areas For 58 th Consecutive Month

Year Over Year Unemployment Rates Decline Or Hold Steady In All 12 Wisconsin Metro Areas For 58 th Consecutive Month Department of Workforce Development Secretary s Office 201 E. Washington Avenue P.O. Box 7946 Madison, WI 53707 Telephone: (608) 266-3131 Fax: (608) 266-1784 Email: sec@dwd.wisconsin.gov Scott Walker,

More information

Copyright 2012, Bankers Benefits, Inc. Do not reproduce or forward. For update or copies please

Copyright 2012, Bankers Benefits, Inc. Do not reproduce or forward. For update or copies please nd Copyright 2012, Bankers Benefits, Inc. Do not reproduce or forward. For update or copies please e-mail info@bankersbenefits.com. (630) 820- BANK Quality performing Asset Total ++ Total (Tier 1 + ) Banks

More information

Ventis Group (630) 820-BANK

Ventis Group (630) 820-BANK Copy Right 2010, Bankers Benefits, Inc. Do not reproduce or forward. For update or copies please e-mail. Ventis Group (630) 820-BANK ++ NPA/ ( + ) Evergreen State Bank Stoughton WI 246.5 2.3 7.4 9.6 5,730

More information

Ventis Group (630) 820- BANK

Ventis Group (630) 820- BANK nd Copy Right 2010, Bankers Benefits, Inc. Do not reproduce or forward. For update or copies please e-mail. Ventis Group (630) 820- BANK Bank Quality Report, 6-30-2010 performing Quality + AbbyBank Abbotsford

More information

Wisconsin Local Employment & Unemployment Estimates Released

Wisconsin Local Employment & Unemployment Estimates Released Department of Workforce Development Secretary s Office 201 E. Washington Avenue P.O. Box 7946 Madison, WI 53707 Telephone: (608) 266-3131 Fax: (608) 266-1784 Email: sec@dwd.wisconsin.gov Scott Walker,

More information

SUMMARY REPORT. 10 Year Transmission System Assessment

SUMMARY REPORT. 10 Year Transmission System Assessment 2018 SUMMARY REPORT 10 Year Transmission System Assessment Agility, flexibility needed to plan for Long term transmission planning has always been a complex undertaking, but it was relatively consistent

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

7.7 Southeast Zone. Transmission Projects Report Section 7: Needs

7.7 Southeast Zone. Transmission Projects Report Section 7: Needs 7.7 Southeast Zone The following table provides a list of transmission needs identified in the Southeast Zone and the map on the following page shows the location of each item in the table. Southeast Zone

More information

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN Twin Cities Minnesota Zone Meeting Xcel Energy May 11, 2005 Bloomington, MN Overview of Presentation Xcel Energy Projects: Aldrich to St Louis Park 115 kv line Eden Prairie to Edina 115 kv line Eden Prairie

More information

Wisconsin Housing Statistics

Wisconsin Housing Statistics Wisconsin Housing Statistics Monthly Year-to-Date Dec 2018 Dec 2017 % Change Jan-Dec 2018 Jan-Dec 2017 % Change Unit Sales 4,980 5,728-13.1% 82,760 84,594-2.2% Median Price $179,000 $170,000 +5.3% $184,000

More information

AMERICAN TRANSMISSION COMPANY

AMERICAN TRANSMISSION COMPANY AMERICAN TRANSMISSION COMPANY UPDATE 2003 10-YEAR TRANSMISSION SYSTEM ASSESSMENT March 2004 Table of Contents Page No. Executive Summary...1 Section I ATC s Public Planning Process...5 Introduction...5

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Summary Report. September The Future Grid. 10-Year Transmission System Assessment.

Summary Report. September The Future Grid. 10-Year Transmission System Assessment. Summary Report September 2012 he Future Grid 10-Year ransmission System Assessment www.atc10yearplan.com Regional and inter-regional planning achieves results ransmission investments solve problems, save

More information

South Dakota 890 Study

South Dakota 890 Study South Dakota 890 Study September 16, 2011 South Dakota 890 Study Presentation of 890 Study results from 2011 Includes WAPA suggested system improvements and timelines Stakeholder Feedback Questions? 2

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

VERMONT ELECTRIC POWER COMPANY (VELCO)

VERMONT ELECTRIC POWER COMPANY (VELCO) TRANSMISSION PROJECTS: AT A GLANCE Vermont Electric Power Company (VELCO) VERMONT ELECTRIC POWER COMPANY (VELCO) VELCO was formed in 1956 when local utilities joined together to create the nation s first

More information

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Local Transmission Plan. October 11, 2013 Revised August 25, 2014 Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

WHEDA. Wisconsin Standard Multifamily Tax Subsidy Project Estimated Maximum Income and Rent Limits. Effective April 1, 2018

WHEDA. Wisconsin Standard Multifamily Tax Subsidy Project Estimated Maximum Income and Rent Limits. Effective April 1, 2018 di, WHEDA Wisconsin Standard Multifamily Tax Subsidy Project Estimated Maximum Income and Rent Limits Estimated Maximum Family Income Limits at 30% of HUD Estimated 2018 County Median Income Brown 16,290

More information

Minnesota Biennial Transmission. Zone Meeting 8

Minnesota Biennial Transmission. Zone Meeting 8 Minnesota Biennial Transmission Plan Zone Meeting 8 Today s Agenda Purpose of meeting Transmission What is it? How it works? Why improve it? System and Zone Overview Deficiencies Improvement Alternatives

More information

APPENDIX F: Project Need and Description

APPENDIX F: Project Need and Description APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was

More information

Region NC. Page 1 of 6. Total Salt. Total Salt. Salt. Total Salt. Total LM per Anti- Icing. Lane. Total Clear- Total Thaw- Total Sand.

Region NC. Page 1 of 6. Total Salt. Total Salt. Salt. Total Salt. Total LM per Anti- Icing. Lane. Total Clear- Total Thaw- Total Sand. NC per Hours Hours Mat'l Equip Labor Cost to ADAMS 193.2 95.64 76.0 13 28 14 11 4,318 3,474 844 18.0 0 0 76 1147.0 338.0 $1,676 $440 $340 $2,455 $473,350 0.19 IRON 249.56 163.59 192.0 0 47 16 10 7,308

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

R=Right, L=Left, C=Continue, S=Straight, BL= Bear Left, Super 8, 518 Borg Rd Delavan, WI. BR=Bear Right, SS=Stop sign, T=T intersection, Start 6:00 AM

R=Right, L=Left, C=Continue, S=Straight, BL= Bear Left, Super 8, 518 Borg Rd Delavan, WI. BR=Bear Right, SS=Stop sign, T=T intersection, Start 6:00 AM The Swiss Miss 600k R=Right, L=Left, C=Continue, S=Straight, BL= Bear Left, Super 8, 518 Borg Rd Delavan, WI BR=Bear Right, SS=Stop sign, T=T intersection, Start 6:00 AM us=unsigned Section 1 Section 2

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

Transmission Expansion Advisory Committee

Transmission Expansion Advisory Committee Transmission Expansion Advisory Committee March 6, 2014 1 2014 RTEP Update 2 2014 RTEP Update Initial 2019 Summer base case and corresponding machine list update complete PJM staff has been reviewing and

More information

Region NC. Page 1 of 6. Total Salt. Total Salt. Severity Index. Total Salt. Salt. Total Sand. Total Clear- Total Thaw- Lane.

Region NC. Page 1 of 6. Total Salt. Total Salt. Severity Index. Total Salt. Salt. Total Sand. Total Clear- Total Thaw- Lane. Notes: 1) Costs shown in table are estimated and do not include the 4.44% Administrative Costs; 2) Material Costs includes,, and other Deicing and icing Agents; 3) Equipment Costs are based on $60 per

More information

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving

More information

RENEWABLE ENERGY SUMMIT 2019

RENEWABLE ENERGY SUMMIT 2019 RENEWABLE ENERGY SUMMIT 2019 Scaling Up for the Job Ahead 01.17.2019 Monona Terrace and Convention Center Madison, WI SUMMIT Champions Lunch Sponsors SUMMIT Partners Supporting our keynote & panel sessions

More information

Western Area Power Administration

Western Area Power Administration 2014/15 Integrated System (IS) 890 Local Planning Stakeholder Meeting #2 Western Area Power Administration Upper Great Plains Region Transmission Planning Stakeholder Meeting Wednesday, December 10 th,

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Key to Status Fields in the Project List

Key to Status Fields in the Project List Key to Fields in the Project List Load Growth Interconnection Economic Reliability Concept Proposed Planned Under Construction In Cancelled N/A Backstop Too early TO Update Base case Increasing load served

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

Sub Regional RTEP Committee - Southern

Sub Regional RTEP Committee - Southern Sub Regional RTEP Committee - Southern March 03, 2011 www.pjm.com 2010 RTEP Analysis Summary Review of ongoing projects Stakeholder request 2015 Analysis Update Review of NOVA Reliability Deficiencies

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

North Oregon Coast Area Study. Adam Lint

North Oregon Coast Area Study. Adam Lint North Oregon Coast Area Study Adam Lint PAGE 2 North Oregon Coast System Overview - Clatsop Study Covers: Transmission Switching Stations (Clatsop District): Astoria Lewis and Clark 115 kv Distribution

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic March 23, 2018 First Review Baseline Reliability and Supplemental Projects 2 AEC Transmission Zone: Supplemental Project 69/12kV Wenonah Substation Retire/Bypass

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

MTEP13 SPM #2- Central Region. March 25, 2013

MTEP13 SPM #2- Central Region. March 25, 2013 MTEP13 SPM #2- Central Region Ameren Missouri March 25, 2013 Ameren Missouri Project Review Central Region: Ameren Missouri Ameren Missouri has a total of 10 project proposals that are recommended for

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

May 11, Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box Lansing, MI 48909

May 11, Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box Lansing, MI 48909 Amy C. Monopoli Counsel Regulatory & Legislative Phone: 774-452-4227 amonopoli@itctransco.com May 11, 2017 Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway

More information

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

2018 Annual Progress Report to WECC Pacific Gas and Electric Company 2018 Annual Progress Report to WECC Pacific Gas and Electric Company Waiver of Significant Transmission Project Status Table 1 and 2 update the planned transmission and generation projects, respectively,

More information

ATTACHMENT Y STUDY REPORT

ATTACHMENT Y STUDY REPORT Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

Tri-State December 2013 Board Meeting

Tri-State December 2013 Board Meeting 1 For more information Tri-State webpage: www.tristategt.org click Operations then Transmission Planning (http://www.tristategt.org/transmissionplanning/puc3627_trans missionprojects.cfm) Email: (transmissionplanning@tristategt.org)

More information

Wisconsin Multifamily Tax Subsidy Project Housing and Economic Recovery Act (HERA Special) Income and Rent Limits

Wisconsin Multifamily Tax Subsidy Project Housing and Economic Recovery Act (HERA Special) Income and Rent Limits Housing and Economic Recovery Act (HERA Special) Income and Rent Limits Income Limits * Housing and Economic Recovery Act (HERA Special) Income Limits for 2013 at 30% Family Size: ONE TWO THREE FOUR FIVE

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities Impacts of MISO DPP-2016-February (West, ATC, MI, South) 1. MISO generators studied: Projects on PJM Facilities Net MW size (Summer) Net MW size (Winter) Service DPP Project Type Region Fuel Type POI J432

More information

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives Addendum San Juan Major Project Tri-State Generation and Transmission Association Power System Planning December, 2008

More information

West Station-West Cañon 115 kv Transmission Project

West Station-West Cañon 115 kv Transmission Project West Station-West Cañon 115 kv Transmission Project Project Sponsor: Additional Project Participants: Project Description: Black Hills Colorado Electric New 115 kv line from West Station to West Cañon

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

ERCOT Independent Review of Houston Import RPG Project

ERCOT Independent Review of Houston Import RPG Project ERCOT Independent Review of Houston Import RPG Project ERCOT System Planning 2014 Electric Reliability Council of Texas, Inc. ERCOT Regional Planning ERCOT Independent Review of Houston Import Project

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Sub-Regional RTEP Committee PJM South

Sub-Regional RTEP Committee PJM South Sub-Regional RTEP Committee PJM South SRRTEP - South December 1, 2016 www.pjm.com PJM Baseline Project B2185 Update Problem: NERC Category B Violation (DVP Analysis) The 2017 summer base case indicates

More information

SECTION 1 DESCRIPTION OF THE PROPOSED PROJECT

SECTION 1 DESCRIPTION OF THE PROPOSED PROJECT SECTION 1 DESCRIPTION OF THE PROPOSED PROJECT Supplemental Municipal Consultation Filing The Interstate Reliability Project 1. DESCRIPTION OF THE PROPOSED PROJECT The Connecticut Light and Power Company

More information

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC

More information

Year in Review - Solar

Year in Review - Solar Year in Review - Solar Meet the Class of 2017 Michael Vickerman RENEW Wisconsin January 18, 2018 Year Solar PV Growth in Wisconsin Cumulative capacity Rate of increase 2015 25 MW 25% 2016 42 MW 68% 2017

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

Minnesota Biennial Transmission. Zone Meeting 8

Minnesota Biennial Transmission. Zone Meeting 8 Minnesota Biennial Transmission Plan Zone Meeting 8 Today s Agenda Purpose of meeting Transmission What is it? How it works? Why improve it? System and Zone Overview Deficiencies Improvement Alternatives

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review

Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review US Army Corps of Engineers Norfolk District Regulatory Office Received by: RLS Date: Feb 11, 2016 TOPICS Project Purpose, Need, Timeline

More information

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress March 06, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake City, UT 84103-1114 Subject: Report Pacific Gas and Electric

More information

Local Transmission Plan. Rev. 1: April 2018

Local Transmission Plan. Rev. 1: April 2018 Local Transmission Plan Rev. 1: April 2018 1 Central Hudson s Service Territory Own & Operate approximately 610 miles of 69 kv, 115 kv & 345 kv transmission lines and three 345 kv substations 2 Central

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Pacific Gas and Electric Company s 2013 Annual Progress Report

Pacific Gas and Electric Company s 2013 Annual Progress Report March 14, 2013 Mr. David Franklin Chair, WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake

More information

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G PJM Sub Regional RTEP Committee Mid-Atlantic January 22, 2016 Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G PSE&G System Characteristics New Jersey utility characterized by densely populated

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

AMERICAN ELECTRIC POWER (AEP)

AMERICAN ELECTRIC POWER (AEP) AMERICAN ELECTRIC POWER (AEP) Company Background: AEP is one of the largest electric utilities in the United States, delivering electricity to more than five million customers in 11 states. AEP s service

More information

METRO TRANSIT a n n ua l re p o r t. madison, wisconsin // mymetrobus.com

METRO TRANSIT a n n ua l re p o r t. madison, wisconsin // mymetrobus.com METRO TRANSIT 2016 a n n ua l re p o r t madison, wisconsin // mymetrobus.com metro transit In 2016, Metro Transit took steps to address capacity issues both on and off the road. Off the road, Metro began

More information

SERTP rd Quarter Meeting

SERTP rd Quarter Meeting 2014 SERTP SERTP 2014 3 rd Quarter Meeting 2 nd RPSG Meeting September 30 th, 2014 APC Headquarters Birmingham, AL 2014 SERTP Process Information The SERTP process is a transmission planning process. Please

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

welcome to the BC Hydro community open house

welcome to the BC Hydro community open house welcome to the BC Hydro community open house Dawson Creek/ Chetwynd Area Transmission ProjecT Open House welcome Dawson Creek/Chetwynd Area Transmission Project (DCAT) The purpose of this open house is

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

The Long-Range Transmission Plan

The Long-Range Transmission Plan The Long-Range Transmission Plan 2015 2025 Matt Koenig Presentation to ESPWG / TPAS October 29 th, 2015 Long-Range Transmission Plan Driver of the Plan is to maintain local reliability 10-year planning

More information

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study ` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Proposed New Construction for

Proposed New Construction for Tri-State Generation and Transmission Association, Inc. Colorado PUC E-Filings System Proposed New Construction for 2016 2019 Colorado PUC Rule 3206 Application April 28, 2016 TABLE OF CONTENTS A) Projects

More information

Wisconsin Public Power Directory

Wisconsin Public Power Directory Wisconsin Public Power Directory January 2019 What is public power? Simply put, public power is community power. That means the decisions about how the electric utility is run are made by people who live

More information

Reliability Analysis Update

Reliability Analysis Update Reliability Analysis Update Transmission Expansion Advisory Committee October 11, 2018 Proposal Window Exclusion Definitions The following definitions explain the basis for excluding flowgates and/or projects

More information