1 2016 INTEGRATED TRANSMISSION PLAN SCHEDULES SEPTEMBER 2016

2 Contents 1 Expenditure overview Summary of all capital and operating expenditure 2 Base capital expenditure Capital expenditure by asset class 3 Base capital expenditure deliverables Deliverables by asset class 4 Operating expenditure Operating expenditure by category 5 Major capital expendtiure approved projects Forecast expenditure for approved major projects 6 Major capital expenditure outputs Project outputs for approved major projects 7 Major capital expenditure under development Timing and expenditure estimates for major projects under development 8 Output measures Service targets 2

3 Expenditure overview This schedule presents an overview of all forecast expenditure during regulatory control period two and three ( and ). All figures are presented in real terms using 2015/16 prices. For capital expenditure (capex) we present the value of assets to be commissioned (rather than expenditure amounts) and include the forecast cost of interest during construction. This approach is consistent with the way our base capex allowances are set. Base capex excludes major projects and listed projects. Major projects are enhancement and development (E&D) projects with a value in excess of $20 million. Listed projects are large reconductoring projects. Major capex schedules provide further information on the total cost of approved major projects and projects under development. Capital expenditure value, 2015/16 prices value, 2015/16 prices ($m) Major capex approved Major capex under development major project capex Listed capex under development Grid R&R 1 transmission lines Grid R&R 1 AC stations Grid R&R 1 secondary assets Grid R&R 1 HVDC Grid R&R 1 other Grid E&D ICT Business support Base Capex , ,263.2 Indicative target savings 3 (30.0) (62.0) (69.0) (1.0) (15.3) (177.3) listed and base capex , ,300.0 capex (major, listed and base) , ,424.6 Operating expenditure ($m) 2015/16 prices 2015/16 prices RCP Grid maintenance projects Grid routine maintenance ICT grid ICT business support Corporate operating expenditure , , Replacement and refurbishment 2 Enhancement and development 3 Indicative target for base and listed projects in 3

4 Base capital expenditure deliverables This schedule presents forecast base capex deliverable during broken down by asset class. The schedule compares forecasts between our 2015 ITP and our 2016 update. Deliverables refers to standard 'units' delivered under each portfolio. We only present deliverables for replacement and refurbishment (R&R) portfolios with relatively uniform unit costs. Base capex deliverables 2015 ITP 2016 ITP Asset class and portfolio Sub-class Units TL Tower and poles Tower Towers (replaced) TL Tower and poles Pole Poles (replaced) TL Tower and poles Paint Towers (painted) , ,556 TL Foundation Foundation Foundations (refurbished) TL Foundation Grillage Grillages (refurbished) , ,881 TL Condutors and insulators Conductor - - TL Condutors and insulators Insulators Insulators (replaced) 940 1,453 1,386 1,257 1,362 6, ,450 1,352 1,395 6,025 TL Condutors and insulators Access - - ACS Outdoor 33kV switchyards Outdoor to indoor conversion Conversion to indoor switchyard ACS Outdoor circuit breakers Outdoor circuit breakers Circuit breakers (replaced/new) ACS Indoor switchgear Indoor switchgear - - ACS Power transformers Power transformers Power transformers (replaced/new) ACS Buildings and grounds Buildings and grounds - - ACS Buildings and grounds Buildings and seismic - - ACS Reactive power Dynamic reactive power - - ACS Power cables Capacitors and reactors - - ACS Power cables Power cables - - ACS Primary equipment Structures and buswork - - ACS Primary equipment Instrument transformers Instrument transformers (replaced/new) ACS Primary equipment Disconnectors and Earth switches Disconnectors (replaced/new) ACS Primary equipment Other station equipment - - SA Substation management systems Substation management systems 1 Remote terminal and clocks, HMI (replaced/new) SA Secondary systems Metering Transient fault recorders (replaced/new) SA Secondary systems Bus protection Buszone and coupler protection (replaced/new) SA Secondary systems Line protection Line protection scheme (replaced/new) SA Secondary systems Transformer protection Transformer protection scheme (replaced/new) SA Secondary systems Batteries and DC systems Battery / charger (replaced/new) SA Secondary systems Feeder protection Feeder protection scheme (replaced/new) We have presented substation management systems deliverables as modified through the evaluation process. 4

5 Operating expenditure This schedule presents forecast operating expenditure during and. The schedule compares forecasts between our 2015 ITP and our 2016 update. All figures are presented in real terms using 2015/16 prices. Operating expenditure ($m) 2015 ITP 2015/16 prices 2016 ITP 2015/16 prices Opex category Sub-category Grid Maintenance projects AC stations All assets Grid Maintenance projects transmission lines All assets Grid Maintenance projects HVDC All assets Grid Maintenance projects other All assets Grid Routine maintenance transmission lines Preventive Grid Routine maintenance transmission lines Corrective Grid Routine maintenance transmission lines Predictive Grid Routine maintenance transmission lines Non maintenance Grid Routine maintenance transmission lines Management services fee Grid Routine maintenance transmission lines Operating Grid Routine maintenance transmission lines Utilities Grid Routine maintenance AC stations Preventive Grid Routine maintenance AC stations Corrective Grid Routine maintenance AC stations Predictive Grid Routine maintenance AC stations Non maintenance Grid Routine maintenance AC stations Management services fee Grid Routine maintenance AC stations Operating Grid Routine maintenance AC stations Utilities Grid Routine maintenance HVDC Preventive Grid Routine maintenance HVDC Corrective Grid Routine maintenance HVDC Predictive Grid Routine maintenance HVDC Non maintenance Grid Routine maintenance HVDC Management services fee Grid Routine maintenance HVDC Operating Grid Routine maintenance HVDC Utilities Grid Routine maintenance training Training grid ICT Grid Asset management ICT Grid Transmission systems ICT Grid Telecommunication services ICT Grid Network services ICT Business support Corporate services ICT Business support Shared services ICT Business support Security services ICT Corporate Corporate Departmental Corporate Corporate Investigations Corporate Corporate Insurance Corporate Corporate Ancillary services Corporate Corporate Demand response platform corporate operating expenditure , , , ,

6 Major capital expenditure approved projects This schedule presents forecast major capex and listed projects during and, broken down by project. The schedule compares forecasts between our 2015 ITP and our 2016 update. All figures are presented in real terms using 2015/16 prices. We present the value of assets to be commissioned (rather than expenditure amounts) and include the forecast cost of interest during construction. Major projects are E&D projects with a value in excess of $20 million. Listed projects are large reconductoring projects. Project ($m) value, 2015/16 prices RPC Bunnythorpe Haywards A and B reconductoring Clutha Upper Waitaki Lines Project HVDC Upgrade North Island Grid Upgrade Project (NIGUP) North Auckland and Northland Grid Upgrade Project (NAaN) Upper North Island Dynamic Reactive Support (UNIDRS) Lower South Island Reliability Other approved major capex (approved projects) Brunswick Stratford B reconductoring Bunnythorpe Wilton A reconductoring (BPE JFD section) Bunnythorpe Wilton A reconductoring (WIL JFD section) Central Park Wilton B reconductoring Oteranga Bay Haywards A reconductoring listed projects capex Bunnythorpe Haywards A and B reconductoring Lower North Island Transmission Build Provision Pakuranga-Whakamaru Series Compensation Waitaki Valley Upper North Island Generation Decommissioning Reactive Support VARC Lower North Island Transmission Build South Waikato 110kV Transmission Capacity major capex (unapproved projects) major and listed project capex Note: There have been no new major project approvals between the 2015 ITP and the 2016 update ITP value, 2015/16 prices RPC2 value, 2015/16 prices RPC ITP 6

7 Major capital expenditure outputs This schedule presents approved outputs and estimated commissioning dates for major capex projects. Projects Outputs Commissioning date Bunnythorpe Haywards A and B reconductoring Replace the existing conductors on the Bunnythorpe Haywards A and B lines with Zebra ACSR conductor rated to operate at 75 C Clutha Upper WaitakiLines Project HVDC Convert the Roxburgh to Clyde section of the Roxburgh Twizel A 220 kv line to duplex conductor configuration. Convert the Aviemore to Waitaki section of the Aviemore Livingstone A 220 kv line to a duplex conductor configuration. Convert the Waitaki to Livingstone section of the Aviemore Livingstone A 220 kv line to a duplex conductor configuration. Convert the Roxburgh to Livingstone section of the Roxburgh Islington A 220 kv line to a duplex conductor configuration. Convert the Aviemore Benmore A 220 kv line to a duplex conductor configuration. Thermally upgrading the Cromwell Twizel section of the Roxburgh Twizel A 220 kv line to a 75 C rating. Procure, construct and commission a new thyristor-based 700 MW pole and associated equipment (Converters, condensers, new control systems, transformers, etc.) at Haywards and Benmore. Increase the link capacity to 1200 MW. On hold Not being progressed Defect liability period NIGUP Procure, construct and commission a 220 kv switching station in the vicinity of Drury and upgrade the 220 kv Otahuhu Whakamaru C line. Procure, construct and commission 350 Mvar of new static reactive plant at Otahuhu substation. Procure, construct and commission a new double circuit, steel lattice tower, overhead transmission line from a new substation near the existing Whakamaru substation to a new transition substation in the vicinity of the South Auckland urban boundary, which is capable of 220 kv operation and future 400 kv operation. Procure, construct and commission two underground cables from the new transition station in the vicinity of the South Auckland urban boundary to Pakuranga Substation. Procure, construct and commission the necessary substation/transition station facilities near the existing Whakamaru substation, a transition station in the vicinity of the South Auckland urban boundary and Pakuranga substation. Convert and connect the existing 110 kv Otahuhu Pakuranga line to 220 kv operation. Dismantle the existing 110 kv Arapuni to Pakuranga transmission line. Acquisition of designations, consents and easements to allow for future upgrade to 400 kv operation NAaN Procure, construct and commission a 220 kv connection between Pakuranga and Penrose substations that has a winter cyclic rating of around 600 MVA. Procure, construct and commission a 220 kv connection between Penrose substation, Hobson Street substation, Wairau Street substation and Albany substation that has a winter cyclic rating of around 600 MVA. Procure, construct and commission substation facilities at Pakuranga, Penrose and Albany substations to facilitate the above connections. Procure, construct and commission substation/grid exit point facilities at Vector's Hobson Street and Wairau zone substations to facilitate the above connections. 220 kv Bus Zone protection at Penrose. Defect liability period Lower South Island Reliability Replace the existing 220/110 kv interconnecting transformers at Roxburgh and Invercargill. Install appropriate shunt capacitors to support voltage. Install special protection schemes on the 220 kv network to manage security of supply during low inflows into Manapouri. Install special protection schemes as an interim measure on the 110 kv network until the new build is complete. Tee off both circuits of the 220 kv North Makarewa Three Mile Hill A line, build a 2 km double circuit line from Gore substation and connect to two new 220/110 kv interconnecting transformers UNIDRS Install and commission two STATCOMs at Marsden and Penrose. Implement demand-side initiatives in the upper North Island. Install system monitoring equipment in the upper North Island. Implement demand side initiatives in the upper North Island. Install and commission a reactive power controller for the upper North Island region. Enhance the System Operator's dynamic stability analysis software (TSAT) Cancelled Other approved Residual work post commissioning for the following major capital projects: - UNIDRS - Wairakei Whakamaru C - Autosynch points - Kawerau generation export enhancement - Blenheim Stoke - Otahuhu diversity Substation gantry works at Hawera to facilitate capacity upgrade of the Wanganui Stratford A line (Wanganui Stratford A reconductoring)

8 Major capital expenditure projects under development This schedule presents potential major and listed capex projects that we have identified and are investigating. For major projects, we provide a reference to the Transmission Planning Report, and/or the latest information available on our website, with further information on investment need. Listed projects were identified through the process. For each project we provide an estimate of total capex, and estimates of key milestone dates. All information is subject to change as we progress our analysis and as external factors such as demand and generation evolve over time. Projects Key issues being addressed reference Capital expenditure $m (commissioned value, 2015/16 prices, estimate) $m Consultation period Date of submission for approval Construction date Commissioning date Central Park Wilton B reconductoring TP.FL TL Conductors and Insulators Fleet Strategy:Section Bunnythorpe Wilton A reconductoring (WIL JFD section) TP.FL TL Conductors and Insulators Fleet Strategy:Section Oteranga Bay Haywards A reconductoring (Churton Park section) TP.FL TL Conductors and Insulators Fleet Strategy:Section Brunswick Stratford B reconductoring TP.FL TL Conductors and Insulators Fleet Strategy:Section TBC* TBC* Bunnythorpe Wilton A reconductoring (BPE JFD section) TP.FL TL Conductors and Insulators Fleet Strategy:Section TBC* TBC* Waikato and Upper North Island Voltage Management Investigation (listed as Upper North Island Generation Decommissioning Reactive Support) For the latest information see and This project may incorporate Pakuranga-Whakamaru Series Compensation. Also see Transmission Planning Report 2015 Section 6.3, 6.4 but the links above provide more recent analysis Notes: * These values are to be confirmed (TBC) but submission is considered to be unlikely pre The following projects have funding approved under our E & D base capex portfolio but have the potential, after further investigation, to exceed the base capex project threshold (i.e. $20m) and turn into major capital expenditure projects: Otahuhu Wiri Transmission Capacity See North Taranaki Transmission Capacity See We plan to review the need and timing of other projects that may result in future changes to this table. These include: HVDC Stage 3 (expansion to 1,400 MW) See Transmission Planning Report 2015 Section Upper South Island Grid Upgrade Stage 2 Dynamic See Transmission Planning Report 2015 Section 6.5.5, 6.6, 6.7 Additional generation in the Wairakei Ring and Taranaki requiring See Transmission Planning Report 2015 Section 6.2.5, 6.3, 6.4 grid capacity. Waitaki Valley See Transmission Planning Report 2015 Section ,

9 Output measures This schedule presents service targets and associated financial incentive settings for the period. Service targets Category/ circuits Measure/ ref Long term target Target/Forecast Cap Collar Incentive rate $000 15/16 performance Number of sites Number of unplanned interruptions Average duration (minutes) of unplanned interruptions Duration (minutes) of P90 unplanned interruptions Asset performance measures HVDC availability % HVAC availability % High Priority GP1A Important GP1B Standard GP1C Generator GP1D N-security GP1E High Priority GP2A Important GP2B Standard GP2C Generator GP2D N-security GP2E High Priority GP3A Important GP3B Standard GP3C Generator GP3D N-security GP3E AP , Selected circuits AP * ,

3 Existing National Grid

3 Existing National Grid 3 Existing National Grid 3.1 Introduction 3.2 Load and generation 3.1 Introduction This chapter provides an overview of New Zealand s existing National Grid as at 28 February 2012 with respect to load

More information

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied - SSF Update December 2017 Summary of Changes This table only mentions SSF chapters that were updated. All other SSF chapters were checked and confirmed as still being uptodate. SSF Section Location of Change

More information

Submission for Tactical Transmission Upgrade Approval

Submission for Tactical Transmission Upgrade Approval Submission for Tactical Transmission Upgrade Approval April 2005 Electricity Commission Submission Tactical Transmission Projects April 05 1 Executive Summary Transpower seeks approval from the Electricity

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

TEN YEAR FORECAST OF FAULT LEVELS SEPTEMBER 2016

TEN YEAR FORECAST OF FAULT LEVELS SEPTEMBER 2016 TEN YEAR FORECAST OF FAULT LEVELS SEPTEMBER 2016 Introduction This publication presents an update to the ten year forecast fault levels report. The Connection Code contained in Schedule 8 to the Benchmark

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

EFFECT OF SOLAR PV ON TRANSIENT STABILITY OF THE NEW ZEALAND POWER SYSTEM

EFFECT OF SOLAR PV ON TRANSIENT STABILITY OF THE NEW ZEALAND POWER SYSTEM EFFECT OF SOLAR PV ON TRANSIENT STABILITY OF THE NEW ZEALAND POWER SYSTEM DECEMBER 2017 TECHNICAL REPORT Table of Contents Table of Contents EXECUTIVE SUMMARY... VIII 1 INTRODUCTION...1 1.1 Programme

More information

MVDC PLUS Managing the future grid

MVDC PLUS Managing the future grid MVDC PLUS Managing the future grid Bridge the distance How should we connect Islands, platforms, and remote areas? Connecting weak or unstable grids How will we integrate and stabilize grids? Reduce footprint

More information

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

Schedules 1 to 4, Lot B: Extension of the Lessos Substation 1.0 LIGHTNING ARRESTORS 1.1 ZNO lightning arrester, 192 kv rated voltage, 10 ka nominal discharge current 2.0 CAPACITIVE VOLTAGE TRANSFORMER ea. 45 2.1 220 kv capacitive voltage transformer 220/ 3 / 0.11/

More information

Wind Generators Evolving Technology

Wind Generators Evolving Technology Wind Generators Evolving Technology Transmission Advisory Group Ray Brown Transmission Manager - Meridian Energy April 2008 Overview of Presentation 3 Different Wind Farms 3 Different Technologies Te Apiti

More information

TRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID.

TRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID. A GUIDE TO TRANSPOWER 2009 TRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID. Contents 01 Introduction 02 System Operator 24/7

More information

The Energy Queensland Group Notice of no non-network options

The Energy Queensland Group Notice of no non-network options The Energy Queensland Group Notice of no non-network options 24 September 2018 MCE Mount Crosby East Establish new substation to replace Mount Crosby Substation (SSMTC) Page 1 of 1 DISCLAIMER While care

More information

UNI Generation Decommissioning Report

UNI Generation Decommissioning Report UNI Generation Decommissioning Report APPENDIX 1: Upper North Island Dynamic Reactive Support - Need Analysis March 2016 Report No: Prepared By: Group Manager: NP622 Si Kuok Ting NIKKI NEWHAM File: Contents

More information

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation Intentionally left blank F1 Description and Functional Specifications of Proposed

More information

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011 EPRI HVDC Research John Chan, Ram Adapa, Bernie Clairmont & Gary Sibilant, EPRI EPRI HVDC & FACTS Conference August 30, 2011 Presentation Contents 1. Team Members 2. Research Program Objective & Scope

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

Solutions for Smart Transmission Panel Session

Solutions for Smart Transmission Panel Session October 22, 2013 CIGRE Grid of The Future Symposium Solutions for Smart Transmission Panel Session Gary Rackliffe, VP Smart Grids North America Smarter Grids Integration of OT and IT Distribution Analytics

More information

ABB Wind Power Solution

ABB Wind Power Solution Feng Li, Wind ISI, CNABB, November, 2016 ABB Wind Power Solution November 13, 2016 Slide 1 ABB deliveries from A to Z into the wind industry Wind power generation, transmission and integration, control

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

NRECA Cooperative Research Network. Modern Grid Initiative Southeast Summit August 10, 2006 Nashville, TN

NRECA Cooperative Research Network. Modern Grid Initiative Southeast Summit August 10, 2006 Nashville, TN NRECA Cooperative Research Network Modern Grid Initiative Southeast Summit August 10, 2006 Nashville, TN Electric Cooperatives... 864 distribution, 66 G&Ts in 47 states 5% of power supply 43% of distribution

More information

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) February 2013 Contents I. Introduction 1 II. Status of Electricity Supply and Demand 2 1. Electricity Demand 2 2. Electricity

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Relative Power Factor Correction costs

Relative Power Factor Correction costs SSG REF: S026 Friday 19 th October 2007 TO: John Gleadow Senior Adviser Transmission Electricity Commission FROM: David Hume Ranil de Silva System Studies Group NZ Ltd Relative Power Factor Correction

More information

ABB in Wind &Integration of renewables

ABB in Wind &Integration of renewables TEIJO KÄRNÄ, RM/ DEC 20 2017 ABB in Wind &Integration of renewables Making renewable energy real Wind Landscape Generation-Transmission-Distribution-Control January 12, 2018 Slide 2 Challenges of renewable

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

Targeted Application of STATCOM Technology in the Distribution Zone

Targeted Application of STATCOM Technology in the Distribution Zone Targeted Application of STATCOM Technology in the Distribution Zone Christopher J. Lee Senior Power Controls Design Engineer Electrical Distribution Division Mitsubishi Electric Power Products Electric

More information

/14 QUALITY PERFORMANCE REPORT. QUALITY PERFORMANCE REPORT 2013/14

/14 QUALITY PERFORMANCE REPORT.  QUALITY PERFORMANCE REPORT 2013/14 QUALITY PERFORMANCE REPORT 213/14 www.transpower.co.nz QUALITY PERFORMANCE REPORT 213 /14 Contents Contents... 1 Highlights... 2 From the Chief Executive... 3 1 Management and Operation of Transpower s

More information

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM 1 1 The Latest in the MIT Future of Studies Recognizing the growing importance of energy issues and MIT s role as an honest broker, MIT faculty have undertaken a series of in-depth multidisciplinary studies.

More information

Figures obtained from schedules by line of business - see highlighted numbers on each schedule

Figures obtained from schedules by line of business - see highlighted numbers on each schedule Summary of Forecast Dismantling Costs by LOB Dismantling Projections ($ million) F2004 F2005 F2006 Distribution $9 $10 $12 Generation 3 3 3 Transmission 5 5 5 $17 $18 $19 Figures obtained from schedules

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

Refurbishment & Upgrade of the Celilo HVdc Converter Station

Refurbishment & Upgrade of the Celilo HVdc Converter Station 1 Refurbishment & Upgrade of the Celilo HVdc Converter Station Mark A Reynolds, PE Sr. Project Manager, POWER Engineers mark.reynolds@powereng.com Karl A Mitsch, P.E. Sr. Project Manager USDOE Bonneville

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic November 04, 2013 2013 RTEP Baseline Analysis Update 11/04/2013 AE Transmission Zone Cost Change for B2354 Install second 230/69kV transformer and 230kV circuit

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Electric vehicles demand forecast. Erwan Hemery and Bruce Smith

Electric vehicles demand forecast. Erwan Hemery and Bruce Smith Electric vehicles demand forecast Erwan Hemery and Bruce Smith Friday 9 th February Introduction Growing interest in Electric Vehicles (EVs) International developments EVs included in the SoO scenarios

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Transmission Problem Areas. Bulk power transfer over long distances Transmission Limitations/Bottlenecks have one or more of the following:

Transmission Problem Areas. Bulk power transfer over long distances Transmission Limitations/Bottlenecks have one or more of the following: Transmission Problem Areas Bulk power transfer over long distances Transmission Limitations/Bottlenecks have one or more of the following:» Steady-state stability limits» Transient stability limits» Power

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

Utility Distribution Planning 101

Utility Distribution Planning 101 Utility Distribution Planning 101 Michael Coddington, National Renewable Energy Laboratory Webinar for National Association of State Utility Consumer Advocates June 5, 2018 1 Webinar Overview Overview

More information

Substation Lightning Protection. Document Number: 1-11-FR-11

Substation Lightning Protection. Document Number: 1-11-FR-11 Substation Lightning Protection Document Number: 1-11-FR-11 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-11 Substation Lightning Protection Asset

More information

Powerco CPP Portfolio Overview Document

Powerco CPP Portfolio Overview Document Putaruru-Tirau Cable Powerco CPP Portfolio Overview Document Portfolio Name Expenditure Class Expenditure Category Putaruru-Tirau Cable Capex Growth & Security As at Date 12 June 2017 Expenditure Forecast

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

CHAPTER 8 - GAS AND ELECTRICITY TRANSMISSION COMPARATIVE CASE STUDY

CHAPTER 8 - GAS AND ELECTRICITY TRANSMISSION COMPARATIVE CASE STUDY CHAPTER 8 - AS AND ELECTRICITY TRANSMISSION COMPARATIVE CASE STUDY Summary This chapter presents a cost analysis of building gas and electricity transmission infrastructure to support a 1,000 MW combined-cycle

More information

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT 14 TH MARCH 2008 TABLE OF CONTENTS Page 1 Introduction...1 2 Charging Methodology Objectives...3 3 Connection Charging Methodology...4 4

More information

PREPARED DIRECT TESTIMONY

PREPARED DIRECT TESTIMONY Application No.: A.0-04- Exhibit No.: SDG&E-4 Witness: William V. Torre In the Matter of San Diego Gas & Electric Company s Application for Authorization to (1) to Participate in the Steam Generator Replacement

More information

Designated Entity Pre-Qualification Materials. Exelon Corporation

Designated Entity Pre-Qualification Materials. Exelon Corporation Designated Entity Pre-Qualification Materials By Exelon Corporation On behalf of its affiliates Baltimore Gas and Electric Company, Commonwealth Edison Company, PECO Energy Company and Exelon Transmission

More information

SUBSTATION DESIGN TRAINING

SUBSTATION DESIGN TRAINING 2017 SUBSTATION DESIGN TRAINING ADVANCE ELECTRICAL DESIGN & ENGINEERING INSITUTE (Registered under MSME& An ISO 9001:2008 CERTIFIED) Training Centre: Advance Group of Institutions C-1, Second Floor Near

More information

EH2741 Communication and Control in Electric Power Systems Lecture 3. Lars Nordström Course map

EH2741 Communication and Control in Electric Power Systems Lecture 3. Lars Nordström Course map EH2741 Communication and Control in Electric Power Systems Lecture 3 Lars Nordström larsn@ics.kth.se 1 Course map 2 1 Outline 1. Repeating Power System Control 2. Power System Topologies Transmission Grids

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Enabling the power of wind. Competence and expertise for wind power customers

Enabling the power of wind. Competence and expertise for wind power customers Enabling the power of wind Competence and expertise for wind power customers This is Rising demand for energy and its impact on the environment are the defining challenges of this century. is tackling

More information

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

Offshore Wind Connections HVDC for Offshore Grids

Offshore Wind Connections HVDC for Offshore Grids Michael Bahrman P.E., Grid Systems, UWIG Technical Workshop, Maui, October 2011 Offshore Wind Connections HVDC for Offshore Grids October 18, 2011 Slide 1 HVDC for Offshore Grids Topics Offshore wind market

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

Energy from Waste Grid Connections

Energy from Waste Grid Connections Energy from Waste Grid Connections Catherine Cleary Grid Connection Lead TNEI Services catherine.cleary@tnei.co.uk 0161 233 4839 Overview Introduction to the UK Electricity Network Key Grid Connection

More information

S C ELECTRIC EUROPE LTD. Excellence Through Innovation. Harnessing the Wind. November 2011 Descriptive Bulletin E

S C ELECTRIC EUROPE LTD. Excellence Through Innovation. Harnessing the Wind. November 2011 Descriptive Bulletin E S C ELECTRIC EUROPE LTD. Excellence Through Innovation Harnessing the Wind November 2011 Descriptive Bulletin 2000-42E Introduction Founded in 1911, S&C Electric Company is a global provider of equipment

More information

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress March 06, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake City, UT 84103-1114 Subject: Report Pacific Gas and Electric

More information

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders Reasonableness Test: Salisbury Substation 11kV Feeders DISCLAIMER The purpose of this document is to inform customers, Interested Parties,

More information

Overview Gas Insulated Switchgear Modular and flexible, kV. ABB Group April 17, 2009 Slide 1

Overview Gas Insulated Switchgear Modular and flexible, kV. ABB Group April 17, 2009 Slide 1 Overview Gas Insulated Switchgear Modular and flexible, 52-1100kV April 17, 2009 Slide 1 Tradition and Innovation Milestones from more than 40 Years of Experience Pioneer & Leader in GIS-Technology 1956

More information

ELG4125: Flexible AC Transmission Systems (FACTS)

ELG4125: Flexible AC Transmission Systems (FACTS) ELG4125: Flexible AC Transmission Systems (FACTS) The philosophy of FACTS is to use power electronics for controlling power flow in a transmission network, thus allowing the transmission line to be loaded

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

3AP1 DTC for 145 and 245 kv

3AP1 DTC for 145 and 245 kv The Hybrid Solution 3AP1 DTC for 145 and 245 kv siemens.com/answers Solutions for switchgears and substations fully encapsulated h y b r i d Grade of encapsulation partly encapsulated not encapsulated

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic July 26, 2016 Reliability Analysis Update MetEd Transmission Zone N-1 First Energy Planning Criteria (FERC Form 715): The North Boyertown West Boyertown 69 kv is

More information

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202 Transmission and Distribution Substation Projects Operating Company: Entergy Gulf States - Texas Customer: PID # 202 Funding Project Number: F4PPGS0386 Facility Study for PID # 202: Study for 146 MW Revision

More information

Overview Gas Insulated Switchgear Modular and flexible, kV. ABB Group May 15, 2013 Slide 1

Overview Gas Insulated Switchgear Modular and flexible, kV. ABB Group May 15, 2013 Slide 1 Overview Gas Insulated Switchgear Modular and flexible, 52-1100kV May 15, 2013 Slide 1 Tradition and Innovation Milestones from more than 40 Years of Experience Pioneer & Leader in GIS-Technology 1956

More information

ROBERTO BERNACCHI, GLOBAL PRODUCT MANAGER, 16 JUNE 2018 New power infrastructure concept for greener container terminals Creating Stronger, Smarter

ROBERTO BERNACCHI, GLOBAL PRODUCT MANAGER, 16 JUNE 2018 New power infrastructure concept for greener container terminals Creating Stronger, Smarter ROBERTO BERNACCHI, GLOBAL PRODUCT MANAGER, 16 JUNE 2018 New power infrastructure concept for greener container terminals Creating Stronger, Smarter and Greener port grids 1 greener Stronger, smarter and

More information

Q0044 interconnection at

Q0044 interconnection at Generation Interconnection Feasibility Study Report for Q0044 interconnection at Utah County Utah on PacifiCorp s Transmission System (138 kv Transmission System) September 15, 2004 Page 1 1.0 Description

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

Non-network solutions

Non-network solutions Non-network solutions EDPR Customer Forum 24 April 2018 Agenda 1. What are non-network solutions and why are we interested? 2. Summary of solutions have we implemented to date 3. Where the key opportunities

More information

Reliability Analysis Update

Reliability Analysis Update Reliability Analysis Update Transmission Expansion Advisory Committee September 15, 2016 2016 RTEP Window #3 Anticipated Scope and Timeline Anticipated 2016 RTEP Window #3 Anticipated 2016 RTEP Window

More information

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011 Network ENMAX Power Corporation Network Planning & Design November 4, 2011 ENMAX Fast Facts Service area of 1,044 square kilometers 1,738MVA Peak load (2009) Transmission System 266 km overhead 15km underground

More information

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative ABB HVDC Slide 1 ABB Five global divisions Power Products Power Systems

More information

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

2018 Annual Progress Report to WECC Pacific Gas and Electric Company 2018 Annual Progress Report to WECC Pacific Gas and Electric Company Waiver of Significant Transmission Project Status Table 1 and 2 update the planned transmission and generation projects, respectively,

More information

Max value Max life Range from. ($000) (Years) Pole Type

Max value Max life Range from. ($000) (Years) Pole Type Draft Handbook Vector Asset Description 1 Unit Maximum Maximum Life Max value Max life Max Asset Life Max Asset Life Range from Submitters Max Asset Life ($000) SUBTRANSMISSION Concrete Wood Concrete Wood

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

BROCHURE. End-to-end microgrid solutions From consulting and advisory services to design and implementation

BROCHURE. End-to-end microgrid solutions From consulting and advisory services to design and implementation BROCHURE End-to-end microgrid solutions From consulting and advisory services to design and implementation 2 B R O C H U R E E N D -TO - E N D M I C R O G R I D S O LU T I O N S Global trends in grid transformation

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective 2 Storage: the DNO perspective Context to the storage boom Smarter Network Storage: What have we achieved?

More information

Transmission Expansion Advisory Committee

Transmission Expansion Advisory Committee Transmission Expansion Advisory Committee March 6, 2014 1 2014 RTEP Update 2 2014 RTEP Update Initial 2019 Summer base case and corresponding machine list update complete PJM staff has been reviewing and

More information

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

Experience on Technical Solutions for Grid Integration of Offshore Windfarms Experience on Technical Solutions for Grid Integration of Offshore Windfarms Liangzhong Yao Programme Manager AREVA T&D Technology Centre 18 June 2007, DTI Conference Centre, London Agenda The 90MW Barrow

More information

Microgrid solutions Delivering resilient power anywhere at any time

Microgrid solutions Delivering resilient power anywhere at any time Microgrid solutions Delivering resilient power anywhere at any time 2 3 Innovative and flexible solutions for today s energy challenges The global energy and grid transformation is creating multiple challenges

More information

Power Conversion System for ESS 100 kw to 30 MW Bi-directional Inverters

Power Conversion System for ESS 100 kw to 30 MW Bi-directional Inverters Power Conversion System for ESS 100 kw to 30 MW Bi-directional Inverters Energy Storage Solutions Power Conversion Systems With more than 125 years experience in power engineering and over a decade of

More information

Technology Roadmap for zzzzzzzzz Grid Automation

Technology Roadmap for zzzzzzzzz Grid Automation IEEE Nashville Chapter Technology Roadmap for zzzzzzzzz Grid Automation November 2010 2010 by R. W. Beck, An SAIC Company. All Rights Reserved. Projected Expenditures 2010-2030 Substation Transmission

More information

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016 New Transmission Line April 1, 2016 The enclosed information is proprietary to PSE&G and is provided solely for your use. It should not be copied, reproduced, or shared with others without PSE&G s prior

More information

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee - Southern. August 19, 2011 Sub Regional RTEP Committee - Southern August 19, 2011 2011 RTEP Analysis Summary 2010 2015 Project Updates 2016 Analysis NERC Category A, B NERC Category C (N-1-1 in progress) Load Deliverability Generator

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

OTAHUHU-MANGERE-ROSKILL- HEPBURN ROAD 110 KV CIRCUITS

OTAHUHU-MANGERE-ROSKILL- HEPBURN ROAD 110 KV CIRCUITS NORTH AUCKLAND AND NORTHLAND GRID UPGRADE PROJECT ATTACHMENT J OTAHUHU-MANGERE-ROSKILL- HEPBURN ROAD 110 KV CIRCUITS UPGRADE WITH HIGH TEMPERATURE LOW SAG CONDUCTOR September 2007 Contents 1 INTRODUCTION

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

Building a 21 st Century Electric Grid. February 23, 2018

Building a 21 st Century Electric Grid. February 23, 2018 Building a 21 st Century Electric Grid February 23, 2018 1 DTE strives to provide customers with a 21 st century electric grid that is safe, highly reliable, affordable and accessible 2 Our investment

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment For NPCC Governmental / Regulatory Affairs Advisory Group May 21 st, 2009 ON IT Executive Summary Engineers from Con

More information

Generation Interconnection Facilities Study For

Generation Interconnection Facilities Study For Generation Interconnection Facilities Study For Prepared for: Prepared by: SCE&G Transmission Planning May 27, 2015 TABLE OF CONTENTS General Discussion... Page 3 Generator Interconnection Specifications...

More information