Relative Power Factor Correction costs
|
|
- Christiana Shelton
- 5 years ago
- Views:
Transcription
1 SSG REF: S026 Friday 19 th October 2007 TO: John Gleadow Senior Adviser Transmission Electricity Commission FROM: David Hume Ranil de Silva System Studies Group NZ Ltd Relative Power Factor Correction costs 1. Introduction In this report we compare the costs of installing HV grid connected capacitors on the transmission system versus LV power factor correction capacitors on the distribution system. Our study is based on the premise that the demand is in a region that requires voltage support to meet the peak load (this situation currently exists in the Upper North Island and Upper South Island). We assume that any dynamic reactive support is installed on the transmission system and that the overall demand power factor is to be corrected to unity by either : a) Installing HV grid connected capacitors close to the GXP b) Installing LV power factor correction capacitors within the distribution network close to the demand Page 1 of 5
2 2. Simplified Model Figure 1 shows the simplified model we have used to represent the distribution network connected to the transmission system. The transmission system at 220 kv or 110 kv feeds the 33 kv distribution system via supply transformers. The distribution system is represented as a lumped impedance feeding a lumped demand of 100 MW peak and 62 MW average at 11 kv. The HV grid capacitors are connected to the 220 kv or 110 kv bus whilst the LV power factor correction capacitors are connected to the 11 kv bus. (We do not consider power factor correction at lower voltages such as 240 V). We have assumed that the supply transformers and distribution network have a lumped resistance of pu (relative to the peak demand). This value of resistance is based on a review of distribution loss factors published by Orion Cost Assumptions We have assumed a long run marginal cost for losses at $100 / MWh. We have assumed that grid connected capacitors will cost about $16,480 / MVAR for a dual bus connected capacitor at 220 kv or 110 kv. This is based on 2006 ODV information published by Transpower with a CPI of 3% 2. We have assumed that distribution power factor correction capacitors will cost about $34,690 / MVAR for switched 11 kv zone substation capacitors. This is based on 2004 ODV information published by Vector with a CPI of 3% 3. 1 Distribution Loss Factors (applying from 1 October 1999, text updated 1 February 2007), Orion New Zealand Limited Report of the Optimized Deprival Valuation of Transpower s System Fixed Assets as at 30 June 2006, Transpower New Zealand Limited, November Vector Optimized Deprival Valuation - Auckland, Wellington, and Lichfield Electricity Networks, Vector Limited, 31 March Page 2 of 5
3 Figure 1. Simplified Model for Distribution Network Transmission System 220 kv or 110 kv bus Grid Connected Capacitors Supply Transformers 33 kv bus Lumped distribution network and transformers 11 kv bus Power Factor Correction Capacitors Lumped Demand 100 MW Peak 62 MW Average pf Page 3 of 5
4 4. Analysis To gain an appreciation for the difference in correcting power factor on either the LV or HV networks we compare the annualized cost of each, including benefits associated with reduction in distribution losses. Our example assumes the system in Figure 1 with a lumped demand of 100 MW peak and 62 MW average on the lumped LV network with a demand power factor ranging from 0.95 to The distribution resistance has been estimated from average distribution loss factors supplied by Orion 1. Figure 2 shows the annualized costs for correcting peak demand power factor to unity. HV capacitors generally tend to be about half the total cost of LV capacitors, but on the other hand correcting power factor on the LV network appears to have significant loss benefits. For example, if the demand on our simplified network has a power factor of 0.97 lagging at peak then, from Figure 2, the annualized cost of capacitors to correct power factor to unity on the HV network would be around $40,000 and on the LV network around $80, However, LV correction would also provide an annual loss benefit of $165,000 giving a total annual benefit of $85,000 for LV correction. Figure 2 also indicates that there is an economic benefit in correcting LV power factor to about 0.99 even if there is no requirement to support transmission. Note that correcting power factor on both the HV and LV networks improves the losses in the transmission grid but that these benefits are common to both the HV and LV compensation options and are therefore not taken into account. 4 With lower power factors the total current is greater than 1 pu, while with unity power factor the current is 1 pu. Hence, the losses, defined by I 2 R are higher with lower power factors, improving to unity. 5 Assuming a Capital Recovery Factor (CRF) of 0.1. Page 4 of 5
5 Figure 2. Annualized Costs for HV and LV Unity Power Correction (To Supply 100 MW Peak Demand) Costs (NZ$000/year) LV Power Factor Cost of LV Capacitors to Correct to Unity PF Loss Benefit from LV Correction Cost of HV Capacitors to Correct to Unity PF Total LV Correction Cost (LV Capacitor Cost + Loss Benefit) 5. Summary The results of our simplified analysis suggest that if demand power factor correction is required to support transmission then it is more economic to correct power factor to unity on the LV distribution network rather than the HV transmission grid. This is because the lower cost of HV capacitors are outweighed by the reduced losses associated with LV capacitors. Furthermore, the results suggest that there is an economic benefit in correcting LV power factor to about 0.99 even if there is no requirement to support transmission. Note that this is a simplified preliminary analysis and SSG would welcome comment on our assumptions and methodology. Page 5 of 5
Feasibility Study Report
Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014
More information3 Existing National Grid
3 Existing National Grid 3.1 Introduction 3.2 Load and generation 3.1 Introduction This chapter provides an overview of New Zealand s existing National Grid as at 28 February 2012 with respect to load
More informationFeasibility Study Report
Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019
More informationABB POWER SYSTEMS CONSULTING
ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February
More informationFeasibility Study Report
Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility
More informationGeorgia Transmission Corporation Georgia Systems Operations Corporation
Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia
More informationGalapagos San Cristobal Wind Project. VOLT/VAR Optimization Report. Prepared by the General Secretariat
Galapagos San Cristobal Wind Project VOLT/VAR Optimization Report Prepared by the General Secretariat May 2015 Foreword The GSEP 2.4 MW Wind Park and its Hybrid control system was commissioned in October
More informationEC Forum on Model Approaches to Distribution Pricing. June 2009
EC Forum on Model Approaches to Distribution Pricing June 2009 Session Explain Aurora UoS Pricing and fit with the Retail Model Approach Discuss how we transitioned a Demand tariff structure to Aurora
More information15 Nelson-Marlborough Regional Plan
15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant
More informationOperational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks
Operational Planning Study Report RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Report No. T&S Planning 2013-062 British Columbia Hydro and Power Authority British Columbia Hydro and
More informationSSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -
SSF Update December 2017 Summary of Changes This table only mentions SSF chapters that were updated. All other SSF chapters were checked and confirmed as still being uptodate. SSF Section Location of Change
More informationDraft Guideline for the connection of smallscale inverter based distributed generation. EEA Asset Management Forum 22 June 2016 Dr Richard Strahan
Draft Guideline for the connection of smallscale inverter based distributed generation EEA Asset Management Forum 22 June 2016 Dr Richard Strahan Outline 1. Introduction and Issues to Address 2. Methodology
More informationGroup 3: Pricing from 1 April 2018 and load management
Group 3: Pricing from 1 April 2018 and load management This document is intended to provide background to Network Tasman s Group 3 pricing, in particular the Regional Coincident Peak Demand (RCPD) price,
More informationFinal Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description
Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing
More informationNew 115 kv Disconnect Switches at Bloomsburg MTS
115 kv Line tap from C9 to Bloomsburg MTS & New Bus Tie Switch CAA ID Number: 2007-EX353 Final Draft ASSESSMENT SUMMARY 1. GENERAL DESCRIPTION Norfolk TS and Bloomsburg MTS are supplied by a single 115
More informationTargeted Application of STATCOM Technology in the Distribution Zone
Targeted Application of STATCOM Technology in the Distribution Zone Christopher J. Lee Senior Power Controls Design Engineer Electrical Distribution Division Mitsubishi Electric Power Products Electric
More information15 Nelson-Marlborough Regional Plan
15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant
More informationTransmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting
Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid
More informationTransmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015
No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the
More information100 MW Wind Generation Project
A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility
More informationElectricity Transmission network charging
Electricity Transmission network charging An introductory guide January 2018 All users of the GB electricity transmission system pay network charges in some way. Generators pay to use the network to transport
More informationExperience on Technical Solutions for Grid Integration of Offshore Windfarms
Experience on Technical Solutions for Grid Integration of Offshore Windfarms Liangzhong Yao Programme Manager AREVA T&D Technology Centre 18 June 2007, DTI Conference Centre, London Agenda The 90MW Barrow
More informationTRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID.
A GUIDE TO TRANSPOWER 2009 TRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID. Contents 01 Introduction 02 System Operator 24/7
More informationEvaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection
Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection B. Bagen, D. Jacobson, G. Lane and H. M. Turanli Manitoba
More informationReactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018
1 Reactive Power Compensation for Solar Power Plants Andy Leon IEEE PES Chicago Chapter December 12 th, 2018 2 Objectives Refresh the basics of reactive power from a generator s perspective Regulatory
More informationrectification of poor power factor
power factor correction I E rectification of poor power factor Some states require operation at only 0.8 power factor which cause series losses of 36% over unity power factor. This paper sets out to detail
More informationMYPD3 tariff restructuring plan use-of-system charges. Brochure
MYPD3 tariff restructuring plan use-of-system charges Brochure November 2012 Use-of-system charges for MYPD3 Page 1 PART 1: ESKOM REVENUE REQUIREMENT Introduction The current Multi-Year Price Determination
More informationIntroduction to Charging: Which Parties Pay Which Charges?
Introduction to Charging: Which Parties Pay Which Charges? Information I National Grid Last Updated December 2015 Connection Charging - The cost of sole use assets required to connect to the transmission
More informationElectrical Handbook Fault Calculations Using The Mva Method
Electrical Handbook Fault Calculations Using The Mva Method In the power systems analysis field of electrical engineering, a per-unit system is the Calculations are simplified because quantities expressed
More informationWind Generators Evolving Technology
Wind Generators Evolving Technology Transmission Advisory Group Ray Brown Transmission Manager - Meridian Energy April 2008 Overview of Presentation 3 Different Wind Farms 3 Different Technologies Te Apiti
More informationDynamic Reactive Power Control for Wind Power Plants
Dynamic Reactive Power Control for Wind Power Plants Ernst Camm, Charles Edwards, Ken Mattern, Stephen Williams S&C Electric Company, 6601 N. Ridge Blvd, Chicago IL 60626 USA ecamm@sandc.com, cedwards@sandc.om,
More informationABB Wind Power Solution
Feng Li, Wind ISI, CNABB, November, 2016 ABB Wind Power Solution November 13, 2016 Slide 1 ABB deliveries from A to Z into the wind industry Wind power generation, transmission and integration, control
More informationSystem Impact Study Report
Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS
More informationPES Cook Islands KEMA Grid Study Final Report
Integrating PV Solar and Wind generation with the TAU electric system Te Aponga Uira O Tumu-Te_Varovaro Contents 1. Executive summary... 2 2. Introduction... 5 2.1 Proposed wind turbine sites... 6 2.2
More informationDeploying Power Flow Control to Improve the Flexibility of Utilities Subject to Rate Freezes and Other Regulatory Restrictions
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Deploying Power Flow Control to Improve the Flexibility of Utilities Subject to Rate
More informationInterconnection System Impact Study Report Request # GI
Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010
More informationECE 740. Optimal Power Flow
ECE 740 Optimal Power Flow 1 ED vs OPF Economic Dispatch (ED) ignores the effect the dispatch has on the loading on transmission lines and on bus voltages. OPF couples the ED calculation with power flow
More informationMIPSYCON 2014 Can a Grid be Smart without Communications? A Look at an Integrated Volt Var Control (IVVC) Implementation
MIPSYCON 2014 Can a Grid be Smart without Communications? A Look at an Integrated Volt Var Control (IVVC) Implementation David Aldrich Beckwith Electric Company Goals Flatten voltage profile across entire
More informationSmarter Network Storage UK first multi-purpose application of grid scale storage. Dr. Panos Papadopoulos, PhD, CEng
Smarter Network Storage UK first multi-purpose application of grid scale storage Dr. Panos Papadopoulos, PhD, CEng UK Power Networks GENERATION TRANSMISSION DISTRIBUTION SUPPLY INDUSTRIAL COMMERCIAL RESIDENTIAL
More informationPLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION
PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH
More informationABB November 16, 2016 Slide 1
Xuemei Wang, Power Quality Center, Xi an ABB Capacitor Company Ltd, November, 2016 ABB Power World 2016 Power Quality Solution in Distribution Net Work ABB November 16, 2016 Slide 1 Power Quality Basic
More information1. Thank you for the opportunity to comment on the Low Emissions Economy Issues Paper ( Issues Paper ).
20 September 2017 Low-emissions economy inquiry New Zealand Productivity Commission PO Box 8036 The Terrace Wellington 6143 info@productivity.govt.nz Dear Commission members, Re: Orion submission on Low
More informationRate Impact of Net Metering. Jason Keyes & Joseph Wiedman Interstate Renewable Energy Council April 6, 2010
Rate Impact of Net Metering Jason Keyes & Joseph Wiedman Interstate Renewable Energy Council April 6, 2010 1 Scope Impact of net metering on utility rates for customers without distributed generation Proposes
More informationThe North Carolina solar experience: high penetration of utility-scale DER on the distribution system
1 The North Carolina solar experience: high penetration of utility-scale DER on the distribution system John W. Gajda, P.E. Duke Energy IEEE PES Working Group on Distributed Resources Integration 2 High
More informationGuideline for Parallel Grid Exit Point Connection 28/10/2010
Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND
More informationMILLIGAN SOLAR PROJECT
February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission
More informationFeasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation
Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT
More information2016 Load & Capacity Data Report
Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness
More informationReliability-related matters from the GREEN Grid project
Security and Reliability Council Reliability-related matters from the GREEN Grid project 5 October 2016 Note: This paper has been prepared for the purpose of the Security and Reliability Council (SRC).
More informationSmart Grid Implementation Strategies. Ray Gogel February 2010
Smart Grid Implementation Strategies Ray Gogel February 2010 Agenda Smart Grid What is it? Some Implementation Strategies SmartGridCity 2 Smart Grid? Edison vs. the 21 st Century One Directional Grid vs.
More informationRenewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd
Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd Power Systems Project and Consultancy Services (PCS) Ltd
More informationSPIDER Modeling Sub-Group DER Modeling, CAISO Experience
SPIDER Modeling Sub-Group DER Modeling, CAISO Experience Irina Green, Modeling Sub-Group Chair Regional Transmission Senior Advisor, California ISO NERC SPIDER Work Group Meeting, January 2019 Presentation
More informationPJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008
PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral
More informationUpdated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers
Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,
More informationElectrification Asset Usage Charge. Presentation to TESG. Matt Skinner, Development Manager 11 th March 2013
Electrification Asset Usage Charge Presentation to TESG Matt Skinner, Development Manager 11 th March 2013 1 Background Purpose of the charge The Electrification Asset Usage Charge (EAUC) is designed to
More informationTransmission Planning using Production Cost Simulation & Power Flow Analysis
ABB Transmission Planning using Production Cost Simulation & Power Flow Analysis Jinxiang Zhu, Ph.D. Senior Principal, ABB Power Consulting ABB Group January 16, 2018 Slide 1 Power System Studies TECHNICAL
More informationPower Purchase and Grid Connection Procedures
Building Your Biogas System Workshop and Grid Connection Procedures Aidan Foss. amfoss@ieee.org ANF Energy Solutions DG grid connection specialists No project ownership Current projects Biogas 21 Landfill
More informationGrid code Compliance and Renewable Energy Projects. Mick Barlow, Business Development Director, S&C Electric, United Kingdom
Grid code Compliance and Renewable Energy Projects Mick Barlow, Business Development Director, S&C Electric, United Kingdom Why Grid Codes? Permit the development of and operation of an efficient and economical
More informationSmarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective
Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective 2 Storage: the DNO perspective Context to the storage boom Smarter Network Storage: What have we achieved?
More informationSupplemental Report on the NCTPC Collaborative Transmission Plan
Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for
More informationIndicative Gas Transportation Charges from 1 April 2012 for East of England, London, North West and West Midlands Distribution Networks
National Grid House Warwick Technology Park Gallows Hill, Warwick CV34 6DA National Gas Emergency Service - 0800 111 999* (24hrs) *calls will be recorded and may be monitored Indicative Gas Transportation
More information2016 INTEGRATED TRANSMISSION PLAN SCHEDULES SEPTEMBER 2016
2016 INTEGRATED TRANSMISSION PLAN SCHEDULES SEPTEMBER 2016 Contents 1 Expenditure overview Summary of all capital and operating expenditure 2 Base capital expenditure Capital expenditure by asset class
More informationLocal Transmission Plan. October 11, 2013 Revised August 25, 2014
Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated
More informationP.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)
P.O BOX 429, NUKU ALOFA, Tel: (676) 27-390 Fax: (676) 23-047 Email: jvanbrink@tongapower.to 22 October 2012 Lord Dalgety Electricity Commission Tu atakilangi Nuku alofa Dear Lord Dalgety Compliance Reporting
More informationANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV
ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV September 2017 1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Andreas Falk, Ancillary services
More informationEvaluating Losses in Electrical Equipment Focus on Transmission Utilities. CNY Engineering Expo 2016 Syracuse, New York Arthur C. Depoian P.E.
Evaluating Losses in Electrical Equipment Focus on Transmission Utilities CNY Engineering Expo 2016 Syracuse, New York Arthur C. Depoian P.E. Contents Introduction Present Value of ongoing energy costs
More informationUnderpinning Research Power Electronics in Distribution Networks
Power Electronics in Distribution Networks Thomas Frost Power Electronics Centre Imperial Open Day, July 2015 Overview Introduction Low Carbon Technologies Growth Drivers for PE in distribution systems
More information11. Electrical energy tariff rating
799 11. Electrical energy tariff rating 800 11. ELECTRICAL ENERGY TARIFF RATING There is no universal system for billing electrical energy. Each country generally adopts its own method, taking into account
More informationEssential Reliability Services From PV Plants
Essential Reliability Services From PV Plants Mahesh Morjaria, Ph. D. VP, PV Systems Enabling a world powered by reliable, affordable solar electricity. Utility-Scale PV Plants Support Grid Stability &
More informationAccidental Islanding of Distribution Systems with Multiple Distributed Generation Units of Various Technologies
CIGRÉ-EPRI Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS Boston, MA, October 20-22, 2013 http : //www.cigre.org Accidental Islanding of Distribution Systems with Multiple Distributed Generation
More informationDUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY
DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION
More informationPower System Economics and Market Modeling
Power System Economics and Market Modeling M5: Security Constrained Optimal Power Flow 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com
More informationIntroduction to PowerWorld Simulator: Interface and Common Tools
Introduction to PowerWorld Simulator: Interface and Common Tools I10: Introduction to Contingency Analysis 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com
More informationGrid Management Voltage Control Distribution Grid Voltage Regulation with DER. Michael Sheehan, P.E. IREC Pacific Northwest Solar Partnership
Grid Management Voltage Control Distribution Grid Voltage Regulation with DER Michael Sheehan, P.E. IREC Pacific Northwest Solar Partnership Overview of Grid Management Distribution Voltage Control Grid
More informationDynamic Reactive Power Control. By V. R. Kanetkar Full Time Consultant Technical Services at Veretiv Energy Private Limited Thane (West)
Dynamic Reactive Power Control By V. R. Kanetkar Full Time Consultant Technical Services at Veretiv Energy Private Limited Thane (West) Acknowledgement The author acknowledges with deep gratitude the experience
More informationINSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT
INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT Prof. Chandrashekhar Sakode 1, Vicky R. Khode 2, Harshal R. Malokar 3, Sanket S. Hate 4, Vinay H. Nasre 5, Ashish
More informationTransWest Express Project
TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company
More informationCUSTOMER/ TWIN ARROWS PROJECT
A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset
More informationAPPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation
APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation Intentionally left blank F1 Description and Functional Specifications of Proposed
More informationFebruary 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
California Independent System Operator Corporation February 10, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationPRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES
PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES 1 PRESENTATION OUTLINE Generation System Demand Outlook Existing Generation Resources Transmission System National Interconnected
More informationMONTHLY NEW RESIDENTIAL SALES, APRIL 2017
FOR RELEASE AT 10:00 AM EDT, TUESDAY, MAY 23, MONTHLY NEW RESIDENTIAL SALES, APRIL Release Number: CB17-80 May 23, - The U.S. Census Bureau and the U.S. Department of Housing and Urban Development jointly
More informationElectrical Transmission System Analysis EE 456 project. Team Members Abdulaziz Almarzouqi Hamzah Abeer
Electrical Transmission System Analysis EE 456 project Team Members Abdulaziz Almarzouqi Hamzah Abeer Due December 14, 2012 Changes: 1. 134MW Wind added 2. N-1 Contingency limits changed to.95-1.05 3.
More informationDunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study
` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...
More informationThe Isle of Gigha Flow Battery Project
The Isle of Gigha Flow Battery Project S D Wilson and J N Baker, EA Technology J Samuel, Renewable Energy Dynamics Technology. Presentation to All-Energy 2014, Aberdeen, Thursday 22 nd May 2014. Content
More informationNYCA LOLE Violations (Methods D and E )
Proposals for Cost Allocation of Regulated Reliability Solutions Associated with NYCA LOLE Violations (Methods D and E ) Presented by Jerry Ancona National Grid For Discussion by NYISO Electric System
More informationSYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company
SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This
More informationGenerator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood
Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents
More informationElectricity Network pricing schedule. Module 15 Effective April 1, 2011 for Electricity line charges. Version
Electricity Network pricing schedule Module 15 Effective April 1, 2011 for Electricity line charges Version 2011.1 Contents Section 1: Pricing Schedules...3 1.1 Wellington electricity Network line charges...3
More informationOuter Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)
Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving
More informationkvah Billing - Frequently Asked Questions (FAQs)
kvah Billing - Frequently Asked Questions (FAQs) 1. What is kvah billing? a. Electrical Energy has two components viz. Active Energy (kwh) and Reactive Energy (kvarh). Vector sum of these two components
More informationInterconnection System Impact Study Final Report February 19, 2018
Interconnection System Impact Study Final Report February 19, 2018 Generator Interconnection Request No. TI-17-0225 248.4 MW (Alternate Project Output of 217.35 MW) Wind Energy Generating Facility In Goshen
More informationPOWER FACTOR IMPROVEMENT CONCEPT FOR LARGE MOTORS
POWER FACTOR IMPROVEMENT CONCEPT FOR LARGE MOTORS POWERFLOW TECHNOLOGIES Inc 4031 FAIRVIEW ST, Burlington,Ontario, CANADA, L7L-2A4 905-336 2686, www.powerflowtechnologies.com 1 POWER FACTOR REQUIREMENTS
More informationEFFECT OF SOLAR PV ON VOLTAGE MANAGEMENT IN NEW ZEALAND
EFFECT OF SOLAR PV ON VOLTAGE MANAGEMENT IN NEW ZEALAND DECEMBER 2017 TECHNICAL REPORT Table of Contents Table of Contents EXECUTIVE SUMMARY... VIII 1 INTRODUCTION...1 1.1 Programme Overview...1 1.2 The
More informationEPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011
EPRI HVDC Research John Chan, Ram Adapa, Bernie Clairmont & Gary Sibilant, EPRI EPRI HVDC & FACTS Conference August 30, 2011 Presentation Contents 1. Team Members 2. Research Program Objective & Scope
More informationWashington Clean Energy Fund (CEF) II OPALCO Community Solar and Energy Storage on Decatur Island
Washington Clean Energy Fund (CEF) II OPALCO Community Solar and Energy Storage on Decatur Island Patrick Balducci Chief Economist Other team members: Vish Viswanathan, Jan Alam, Alasdair Crawford, Kendall
More informationUnrestricted. Air Core Reactor Applications Current Limiting Reactors
Unrestricted Air Core Reactor Applications Current Limiting Reactors Faults on Electrical System - Basic Concepts Three major concerns arise from this scenario: 1- The mechanical stresses on the transformer
More informationNETSSWorks Software: An Extended AC Optimal Power Flow (AC XOPF) For Managing Available System Resources
NETSSWorks Software: An Extended AC Optimal Power Flow (AC XOPF) For Managing Available System Resources Marija Ilic milic@netssinc.com and Jeffrey Lang jeffrey.lang@netssinc.com Principal NETSS Consultants
More informationCompliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa
Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa Content Introduction Overview of Categories for Grid Connection of
More informationElectricity Transmission Infrastructure Development in New England
Electricity Transmission Infrastructure Development in New England NPCC Governmental/Regulatory Affairs Advisory Group Paul G. Afonso March 4, 2008 Transmission Infrastructure is Playing An Increasingly
More information