Capital Investment Plan

Size: px
Start display at page:

Download "Capital Investment Plan"

Transcription

1 Capital Investment Plan ROCKY MOUNTAIN REGION FY

2 TABLE OF CONTENTS 1 INTRODUCTION COLORADO RIVER STORAGE PROJECT (CRSP) PROGRAM OVERVIEW CRSP FY08 Accomplishments and Notable Events CRSP FY09 Planned Activities CRSP Program Summary Budget CRSP TEN-YEAR BUDGET PROJECTIONS PICK SLOAN OVERVIEW Pick Sloan FY08 Accomplishments and Notable Events Pick Sloan FY09 Planned Activities Pick Sloan Program Summary Budget PICK SLOAN TEN-YEAR BUDGET PROJECTIONS JOINT POWER SYSTEM PROJECTS Joint CRSP & Pick Sloan FY08 Accomplishments and Notable Events Joint CRSP & Pick Sloan FY09 Planned Activities RMR SUCCESS INDICATORS CUSTOMER COMMENTS... 43

3 1 INTRODUCTION Western Area Power Administration (Western) is committed to providing, operating and maintaining a reliable transmission system. The capital investment program plays an important role in Western s ability to provide cost effective, reliable power delivery to our customers. The Rocky Mountain Region (RMR) Capital Investment Program Plan (Plan) includes both Colorado River Storage Project (CRSP) and Pick Sloan (PS) ten year capital programs. The purpose of the Plan is intended to provide a mechanism for customer collaboration, and to clearly describe challenges, goals, strategies, and measurements for the Plan. The Plan contains general information on the creation and maintenance of the capital investment program, the current ten year plan, and goals, challenges, strategies and success indicators for the capital program. The Plan is revised annually in response to changes in funding levels, unforeseen problems with the transmission system, mandates or regulations, and new contractual obligations. When changes to the Plan are made to accommodate higher priority projects, existing projects are reduced in scope, delayed, or deleted. The Plan is segregated into the CRSP and Pick Sloan power systems. Within each power system, the Plan is divided into the following six major program areas: Transmission Line Improvements and Replacements Substation Improvements and Replacements Communication System Improvements and Replacements Control, Protection and Metering Improvements and Replacements Mobile Equipment Replacements Programmatic Improvements and Replacement Operation Consolidation Program: Western s recent strategic planning resulted in plans to implement consolidation of operations for two of Western s balancing authorities (BA) which reside within the Western Electricity Coordinating Council (WECC) footprint. Under an Operations Consolidation Program (OCP) the two operations centers located at Phoenix, AZ (Desert Southwest Region s Western Area Lower Colorado WALC) and Loveland, CO (Rocky Mountain Region s Western Area Colorado/Missouri WACM) would align functions, use common tools and develop an integrated Supervisory Control and Data Acquisition (SCADA) system. Benefits would include optimization of resources to develop and maintain the operations systems and minimize the resources required to maintain North American Reliability Corporation (NERC) - 3 -

4 and WECC Standards along with a reduction in the number of required audits and assessments. This program would also eliminate the requirement for additional investment and maintenance of the two existing Alternate Control Centers (ACCs), at Coolidge, AZ (for Desert Southwest Region [DSW]) and Cheyenne, WY (for RMR) as the two balancing authorities would serve as backup control centers for each other. 4

5 5

6 2 COLORADO RIVER STORAGE PROJECT (CRSP) PROGRAM OVERVIEW This section will summarize information about major accomplishments and project plans for the next several years. The information addresses major accomplishments of the prior fiscal year, planned projects for the current fiscal year and significant changes to the Plan since its last publication. FY08 saw incredible activity regarding power transformers for RMR s CRSP system. Western successfully installed and energized four new transformers at Flaming Gorge, Great Cut and Animas Substations. Unfortunately, two major transformer failures also occurred during the year. Shiprock KU1A and Hayden KZ1A both failed catastrophically within a four month period. The next couple of years will continue to see significant activity for replacing failed and overloading transformers. 2.1 CRSP FY08 Accomplishments and Notable Events Animas-La Plata Project. One of the earmarks to the FY05 Energy and Water Development Appropriation Act was funding for the facilities Western will construct as part of the Animas-La Plata Project. In FY08 Western constructed a new Animas River Durango 115-kV transmission line circuit and the Animas River Substation to provide power to the Bureau of Reclamation s Durango Pumping Plant. Western s facilities were energized in May Flaming Gorge Transformer KY2A Uprate. The project scope was to replace an existing 100 MVA 230/138kV transformer with a 250 MVA unit to address transformer overloading problems. On March 11, 2008, Western successfully energized the new transformer. Great Cut Transformer KX1A replacement. The project scope was to replace the failed Great Cut transformer KX1A. In April 2008 Western successfully energized the new transformer. Great Cut Substation is part of the Dolores Project Power System. Hayden Transformer KZ1A failure. On April 9, 2008, Hayden (HDN) Transformer KZ1A failed catastrophically causing the tank to rupture, spilling oil, breaking an arrestor and causing significant internal damage to the transformer. During the same incident, a shunt reactor also failed and suffered significant damage. HDN KZ1A was placed in service in July 1964 and was about 44 years old at the time of the failure. With the loss of HDN KZ1A, HDN KZ2A was taken out a service to avoid overloading conditions. Also, the loss of HDN KZ1A negatively impacted the constrained paths TOT1A and TOT5 Total Transfer Capability (TTC). TOT1A 6

7 was reduced from 650MW to 520MW. Western s share of TOT1A reduction was 89MW. TOT5 was reduced from 1680MW to 1520MW. Western s share of TOT5 reduction was 160MW. The impacts to the constrained paths and loss of circuit continuity from the Hayden 230-kV to 138-kV buses were projected to cost Western in excess of $250,000 to possibly millions of dollars per month. After analyzing its limited options, Western chose to relocate the Flaming Gorge (FGE) transformer KZ2B to Hayden in place of the failed unit. FGE KZ2B is a 100MVA unit. This option was viable because Western recently completed a project at FGE to replace transformer KY2A with a new 250MVA unit. The new FGE KY2A unit is large enough to meet all loading requirements at FGE and created the ability to remove FGE KZ2B (100 MVA) without impacting operations at FGE. In June 2008, Western energized the relocated FGE KZ2B at Hayden. HDN KZ2A was closed back in parallel. Additionally, the TOT1A rating increased to 600MW and, the TOT5 rating increased back to the 1680MW rating. Shiprock Transformer KU1A Failure. On July 30, 2008, Shiprock (SHR) Transformer KU1A failed catastrophically causing the tank to rupture, spilling oil and causing significant internal damage to the transformer. The cause of the failure appears to be a failed 345-kV bushing. The transformer had a significant amount of power scheduled across it. There were schedules totaling 604 MW in one direction and 356 MW in the other. It was scheduled over the rating in each direction, though the net of the schedules was under its 300 MW rating. Most of the customers that had schedules across SHR KU1A have made alternate arrangements. After evaluating its options, Western chose to relocate the Pinnacle Peak (PPK) transformer KU3A to SHR in place of the failed unit and purchase a new transformer to replace PPK KU3A. PPK KU3A is a 600MVA unit. This option was viable because Western has three 600MVA units at PPK. With the recent drought conditions and lower generation levels, two transformers at PPK are expected to be sufficient until Western can replace PPK KU3A with a new unit. Blue Mesa Poncha OPGW installation. In FY08 Western received funding from the Federal 2GHz Replacement Fund. One of the projects targeted for use of this funding was the installation of fiber optical ground wire (OPGW) on Western s transmission lines between Blue Mesa Switchyard and Poncha Substation. Installation of the fiber avoided the replacement of several radios between the two facilities. Western designed and awarded a construction 7

8 contract for the installation of the OPGW. The contractor completed the installation of the OPGW on October 27, CRSP Communication Facility Projects. Progress continued to replace the analog microwave system with a new digital system. Paths between Methodist Mountain, Granite Peak, Mt Elbert, Malta, Pinion, Big Mesa, North Gunnision and Skito communication sites were replaced. A study to install new voice over IP phone systems throughout the region will be completed in early FY09. This will be used to guide replacement of RMR phone systems throughout the region over the next five years. 2.2 CRSP FY09 Planned Activities Hayden KZ1A replacement. Western will attempt to rebuild the failed transformer Hayden (HDN) KZ1A. In FY08 Western solicited for the rebuild of this transformer. Only one bid for $3M was received. This is about 50% more than the price of a new transformer. Western feels changes to the specifications and a different procurement approach may yield more vendors bidding and better quotes. Therefore, Western is making one more attempt to rebuild HDN KZ1A. If this doesn t produce favorable results, the next step is to order a new unit. Shiprock KU1A replacement. Western intends to award a construction contract for the relocation and installation of the Pinnacle Peak (PPK) KU3A at Shiprock (SHR). This project is in design. Western is targeting completion of this project by the summer of Shiprock KU2A addition: Western and Tri-State are planning a joint project to install a second 345/230kV 600 MW transformer at Shiprock Substation. This project will improve reliability at Shiprock by having parallel 345/230kV 600MW transformers. Western and Tri-State will share capacity between the 345-kV and 230-kV buses. Since the final scope of the project is not completed, cost estimates have not been prepared to include this project in the detailed spreadsheet. Hayden-Kremmling OPGW installation. Western intends to utilize Federal 2GHz Replacement Funds for the installation of OPGW from Kremmling to Hayden Substations. Western will design and award a construction contract by the 2 nd quarter of FY09 with construction completion by the 4 th quarter of FY09. Weld transformer additions. The project requirement is to increase Western s transformation at Weld Substation to 350MVA. This can either be accomplished by replacing the existing 150MVA transformer KV1A with a 350MVA unit or adding a new 200MVA transformer in parallel to KV1A. 8

9 Weld Substation was constructed in 1974 and is a jointly owned facility with Xcel Energy (formerly Public Service of Colorado.) Each entity owns, operates and maintains a 230-kV switchyard, a 115-kV switchyard and a 230/115kV 150MV Autotransformer. The switchyards for each entity are connected through bus ties. The two 150MVA transformers are operated in parallel. Western s transformer KV1A was installed in System planning studies show that the loss of one of the Weld transformers causes the remaining transformer to severely overload. The underlying 115-kV system is no longer adequate to serve the loads in the area without both of the Weld transformers operating in parallel to provide connection to the 230-kV system from the Ault and Fort St. Vrain Substations. This project is needed for reliability of the transmission system in northeastern Colorado. NERC requires that N-1 overload contingencies be mitigated. The Foothills Planning Group commissioned a joint study of the system in and around Weld in mid-2008 to determine the best approach for this transformer issue and the re-build of the 115-kV system between Boyd and Weld. The study report is to be published in early Following that study report, Western will initiate and develop a final scope for the project. Western intends to order a transformer for Weld in FY10. Summary of Interconnection and Transmission Requests for the CRSP Transmission System. RMR received numerous interconnection and transmission requests for the CRSP transmission system. The majority of these requests are for proposed wind generation projects. A snap shot at this time includes four transmission requests totaling 1200MW and three interconnection requests totaling 700MW which are currently active in the queue. Major Communication Fiber Project. Over the past five years, RMR has completed the installation of a joint microwave ring with Tri-State and Xcel that covers the central portion of Colorado in the CRSP service territory. In planning for the future, it has been determined that the capacity of the current system will be exhausted in the next 5-10 years. In addition, replacement with new microwave will not provide for the projected capacity needs. RMR has embarked on a program to install a fiber optic ring on the transmission lines between Loveland, Craig, Montrose and Colorado Springs. A total of 900 miles of fiber is needed. Approximately 400 miles is either installed, funded or will be provided via fiber sharing by our partners. Of the remaining 500 miles, 40 miles had been added to the 10 year plan in previous budget cycles. In this version of RMR s10 year Capital Plan, Western added the remaining 460 miles of fiber either as joint projects or by obtaining rights on partners' 9

10 fiber systems. The Hayden-Craig-Rifle, Rifle-Curecanti, Blue Mesa -Montrose and Poncha-Midway fiber projects are now shown in the 10 year plan as 50/50 joint projects in support of this continued fiber build out. CRSP Communication Facility Projects. Over the past five years, RMR has completed the installation of all microwave spurs in the CRSP service territory. As part of RMR's out-year planning, replacement of this microwave is now planned starting in FY18, consistent with the expected year life expectancy of microwave systems Craig Maintenance Facility. This project will remodel Western s maintenance office at Craig, Colorado to bring it up to current safety codes. Other Equipment Replacement Efforts. The other items identified in the Plan are routine maintenance activities such as replacing obsolete and worn out substation equipment, purchase of supplies to repair and replace damage to transmission lines, and specialized equipment for the crews to accomplish maintenance of the system. Recent load testing of substation and communication site backup battery banks has identified an unusually high rate of failures in the newer valve regulated cells. Several of these sites are scheduled for replacement in FY09. 10

11 2.3 CRSP Program Summary Budget The following spreadsheet summarizes Western s CRSP capital program budget estimates by major program area. 11

12 CRSP Revised: 3/12/2009 Rocky Mountain Region Capital Projects Ten Year Plan Total Costs (x1000) FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 T-Line Improvements and Replacements Substation Improvements and Replacements 5,092 4,760 3,075 1,050 1,600 1,450 1,450 Communication System Improvements and Replacements 3,715 1,860 2,075 9,415 4,965 4, Substation Control, Protection, and Metering Mobile and Heavy Equipment Replacements FY Buildings and Programmatic Investments Actuals 723 1, Total 7,749 10,231 8,433 7,069 12,790 8,459 8,082 4,072 FY2008 CIP Plan Totals 7,785 4,647 7,995 7,798 3,935 4,078 3,969 3,914 Western-only Costs (x1000) CRSP T-Line Improvements and Replacements Substation Improvements and Replacements 5,000 4,730 3,075 1,050 1,600 1,450 1,450 Communication System Improvements and Replacements 815 1,285 2,000 4,895 3,345 3, Substation Control, Protection, and Metering Mobile and Heavy Equipment Replacements FY Buildings and Programmatic Investments Actuals 723 1, Total 4,344 7,239 7,828 6,994 8,270 6,839 6,342 4,072 FY2008 CIP Plan Totals 4,663 4,247 7,355 6,473 3,935 4,078 3,969 3,914

13 2.4 CRSP TEN-YEAR BUDGET PROJECTIONS The following spreadsheets list Western s capital budget estimates by project and by fiscal year. By request of the Colorado River Energy Distributors Association, we have also included Western DSW s CRSP projects in the spreadsheets. 13

14 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR CRSP Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT FY09 FY10 FY11 FY12 FY13 PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL Transmission Lines Line Equipment Replacements - General (CRSP) CRSPVMF Animas-Laplata Project - Complete CRSPWC0 8,850 8,850 Gore Pass-Hayden - 138kV Uprate CRSPVMF T-Line SubTotal 450 9,238 9, Substations Substation Test Equipment (CRSP) CRSPVMF , Battery and Charger Replacements (CRSP) CRSPVMF , CCVT, PT, & CT Replacements (CRSP) CRSPVMF Substation Disconnect Switch Replacements (CRSP) CRSPVMF Surge Arrester Replacements (CRSP) CRSPVMF Misc. Substation Elect. Equip. Replace. (CRSP) CRSPVMF , Transformer Monitors (CRSP) CRSPVMF Archer 115kV Switch Replacements CRSPVMF Archer 230kV Switch Replacement CRSPVMF Ault 492 Rebuild CRSPVMF Ault Station Service CRSPVMF Circuit Breaker Analyzers - WCMO CRSPVMF Collbran 362 Replacement LLCOVMF Curecanti 1082 Breaker Replacement CRSPVMF Curecanti Black Start MOD CRSPVMF Hayden Station Service CRSPVMF Hayden KZ1A Transformer Replacement CRSPVMF 2, ,061 2,300 2, Rifle 282, 382 Replacement CRSPVMF Shiprock KU1A Transformer Replacement CRSPVMF 1,000 1,000 1,000 1,000 Shiprock KU3A Transformer Gas Monitors CRSPVMF Shiprock KU3B Transformer Gas Monitors CRSPVMF Vernal 1372 Replacement CRSPVMF Vernal 1872 Replacement CRSPVMF Vernal 2172 Replacement CRSPVMF Waterflow Substation ti - Line Relays & CCVTs on San Juan Line CRSPVMF Weld 230 upgrades (AU-WLD 230kV #1&2 thermal upgrade) CRSPVMF Weld 230/115kV Transformer Additions CRSPWCF 6,000 6, ,700 3,700 2,200 2,200 Ault 3124,3224 Reactor Breaker Replacement - Complete CRSPVMF Flaming Gorge KY2A Replacement - Complete CRSPVMF 4,320 4,320 Great Cut Replace Transformer KXIA - Complete CRSPVMF 1,865 1,865 Shiprock 3262 Replacement - Cancelled CRSPVMF Shiprock 3362 Replacement - Cancelled CRSPVMF Shiprock 3462 Replacement - Cancelled CRSPVMF Vernal 1576 Replacement - Complete CRSPVMF Vernal 1672 Replacement - Complete CRSPVMF Substation SubTotal 22,937 7,668 32,055 5, ,092 4, ,760 3,075 3,075 1, ,110 1, ,650 Communications Communications Test Equipment (CRSP) CRSPVMF Big Mesa - Poncha 2 Gig MW Replacement with Fiber CRSPT&R 400 3,094 3, Buffalo Pass MW Building Replacement CRSPVMF Central PMOC Communications Loop CRSPVMF Comm Battery/Charger Replacements CRSPVMF Comm Generator Replacements CRSPVMF CRSP/WCMO Spurs (MDR8000/LEDR Replacement) CRSPVMF 1,800 2,400 Digital Crossconnect Replacements e CRSPVMF Erie-Loveland-Cheyenne I-25 Fiber CRSPVMF ,500 2, ,000 2,500 Fiber Multiplexers (CRSP) CRSPVMF , Field Phone Switch Replacements CRSPVMF Grouse Comm Building Replacement CRSPVMF Hayden-Craig-Rifle OPGW CRSPVMF 5,040 5, ,470 2,520 4,990 Hayden-Kremmling OPGW CRSPT&R ,500 2,500 2,500 Magnetic-Fontenelle MDR8000 Replacement CRSPVMF 2,200 2,200 Misc. Communications Facilities Replacement (CRSP) CRSPVMF , Mobile Radio Infrastructure Replacements CRSPVMF Mobile Radio Replacements CRSPVMF 0.5 1,000 1, Montrose - Blue Mesa OPGW CRSPVMF , , Montrose IP Phone Switch Replacement CRSPVMF Montrose to Mexican Hat MW Replacement CRSPVMF 1,700 1, New Mobile Radio Sites (STK, MNK, ANM, AKH) CRSPVMF PMOC Phone Switch Replacement CRSPVMF PMOC Voice Recorder Replacement CRSPVMF Poncha-Midway OPGW CRSPVMF 3,480 3, Raspberry Creek Communication Building Replacement CRSPVMF Rifle-Curecanti OPGW CRSPVMF 3,240 3, ,570 1,620 3,190 Shiprock-Moncisco-Gallegos Microwave CRSPVMF Telco Channel Bank Replacements CRSPVMF Communications SubTotal 32,785 3,195 36, ,900 3,715 1, ,860 2, ,075 4,895 4,520 9,415 3,345 1,620 4,965 1 of 4

15 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR CRSP Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT FY09 FY10 FY11 FY12 FY13 PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL Control, Protection and Metering Protective Relay Replacements (CRSP) CRSPVMF 6,710 7, Test Equipment Replacements (CRSP) CRSPVMF CPM SubTotal 7,510 8, Mobile & Heavy Equipment Misc Heavy Equipment Replacements (CRSP) CRSPVMF , Cheyenne Bucket Truck CRSPVMF Front End Loader - Montrose CRSPVMF Skid Steer Loader - Montrose CRSPVMF PMOC - Replace Large Productions Copier CRSPVMF Western Colorado - Engine Generator, 350 kw - Cancelled CRSPVMF Mobile & Heavy Equipment SubTotal 4,151 4, Programmatic Improvements Small Facility Projects (RRADS - CRPS) CRSPVMF 2,675 3, E-Scheduling/E-Tagging (CRSP) CRSPVMF IT General Support Systems (CRSP) CRSPVMF Operations Center Map Board Replacement CRSPVMF 31% Montrose Cooling Tower Replacement CRSPVMF Montrose Card Reader Replacement CRSPVMF SCADA Upgrades (CRSP) CRSPVMF 31% Shiprock Substation Access Road Rebuild CRSPVMF Craig Maintenance Facility CRSPVMF Maintenance Data Integration CRSPVMF 33% Operation Consolidation Program (CRSP) CRSPVMF 33% OCP SCADA (CRSP) CRSPVMF 33% OCP Comm (CRSP) CRSPVMF 33% OCP IT (CRSP) CRSPVMF 33% WIN Router - Complete CRSPVMF Power Marketing Op Center HVAC Replcmt (Computer Room) - Complete CRSPVMF 33% Alt. Control Center Relocation - (CRSP) - Cancelled CRSPWCF 31% Programmatic Improvements SubTotal 5,758 6, ,073 1, RMR FY09 CRSP CIP Grand Total 73,591 20,101 97,507 7,239 2,992 10,231 7, ,433 6, ,069 8,270 4,580 12,850 6,839 1,670 8,509 RMR FY08 CRSP CIP Totals 43,126 43,126 4, ,647 7, ,955 6,473 1,325 7,798 3,935 3,935 4,078 4,078 2 of 4

16 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR CRSP Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL Transmission Lines Line Equipment Replacements - General (CRSP) CRSPVMF Animas-Laplata Project - Complete CRSPWC0 8,850 8,850 Gore Pass-Hayden - 138kV Uprate CRSPVMF T-Line SubTotal 450 9,238 9,738 Substations Substation Test Equipment (CRSP) CRSPVMF ,150 Battery and Charger Replacements (CRSP) CRSPVMF ,300 CCVT, PT, & CT Replacements (CRSP) CRSPVMF Substation Disconnect Switch Replacements (CRSP) CRSPVMF Surge Arrester Replacements (CRSP) CRSPVMF Misc. Substation Elect. Equip. Replace. (CRSP) CRSPVMF ,400 Transformer Monitors (CRSP) CRSPVMF Archer 115kV Switch Replacements CRSPVMF Archer 230kV Switch Replacement CRSPVMF Ault 492 Rebuild CRSPVMF Ault Station Service CRSPVMF Circuit Breaker Analyzers - WCMO CRSPVMF Collbran 362 Replacement LLCOVMF Curecanti 1082 Breaker Replacement CRSPVMF Curecanti Black Start MOD CRSPVMF Hayden Station Service CRSPVMF Hayden KZ1A Transformer Replacement CRSPVMF 2, ,061 Rifle 282, 382 Replacement CRSPVMF Shiprock KU1A Transformer Replacement CRSPVMF 1,000 1,000 Shiprock KU3A Transformer Gas Monitors CRSPVMF Shiprock KU3B Transformer Gas Monitors CRSPVMF Vernal 1372 Replacement CRSPVMF Vernal 1872 Replacement CRSPVMF Vernal 2172 Replacement CRSPVMF Waterflow Substation ti - Line Relays & CCVTs on San Juan Line CRSPVMF Weld 230 upgrades (AU-WLD 230kV #1&2 thermal upgrade) CRSPVMF Weld 230/115kV Transformer Additions CRSPWCF 6,000 6,000 Ault 3124,3224 Reactor Breaker Replacement - Complete CRSPVMF Flaming Gorge KY2A Replacement - Complete CRSPVMF 4,320 4,320 Great Cut Replace Transformer KXIA - Complete CRSPVMF 1,865 1,865 Shiprock 3262 Replacement - Cancelled CRSPVMF Shiprock 3362 Replacement - Cancelled CRSPVMF Shiprock 3462 Replacement - Cancelled CRSPVMF Vernal 1576 Replacement - Complete CRSPVMF Vernal 1672 Replacement - Complete CRSPVMF Substation SubTotal 22,937 7,668 32,055 Communications Communications Test Equipment (CRSP) CRSPVMF Big Mesa - Poncha 2 Gig MW Replacement with Fiber CRSPT&R 400 3,094 3,494 Buffalo Pass MW Building Replacement CRSPVMF Central PMOC Communications Loop CRSPVMF Comm Battery/Charger Replacements CRSPVMF Comm Generator Replacements CRSPVMF CRSP/WCMO Spurs (MDR8000/LEDR Replacement) CRSPVMF 1,800 2,400 Digital Crossconnect Replacements e CRSPVMF Erie-Loveland-Cheyenne I-25 Fiber CRSPVMF ,500 2,500 Fiber Multiplexers (CRSP) CRSPVMF ,500 Field Phone Switch Replacements CRSPVMF Grouse Comm Building Replacement CRSPVMF Hayden-Craig-Rifle OPGW CRSPVMF 5,040 5,040 Hayden-Kremmling OPGW CRSPT&R ,500 Magnetic-Fontenelle MDR8000 Replacement CRSPVMF 2,200 2,200 Misc. Communications Facilities Replacement (CRSP) CRSPVMF ,000 Mobile Radio Infrastructure Replacements CRSPVMF Mobile Radio Replacements CRSPVMF 0.5 1,000 1,000 Montrose - Blue Mesa OPGW CRSPVMF ,350 Montrose IP Phone Switch Replacement CRSPVMF Montrose to Mexican Hat MW Replacement CRSPVMF 1,700 1,700 New Mobile Radio Sites (STK, MNK, ANM, AKH) CRSPVMF PMOC Phone Switch Replacement CRSPVMF PMOC Voice Recorder Replacement CRSPVMF Poncha-Midway OPGW CRSPVMF 3,480 3,480 Raspberry Creek Communication Building Replacement CRSPVMF Rifle-Curecanti OPGW CRSPVMF 3,240 3,240 Shiprock-Moncisco-Gallegos Microwave CRSPVMF Telco Channel Bank Replacements CRSPVMF Communications SubTotal 32,785 3,195 36,680 FY14 FY15 FY16 FY17 FY18 W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL ,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1, ,450 1,450 1,450 1,450 1,450 1,450 1,450 1,450 1,450 1, ,690 1,740 3,430 2,200 2,200 3,115 1,740 4, ,200 1, ,000 3,000 3 of 4

17 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR CRSP Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL Control, Protection and Metering Protective Relay Replacements (CRSP) CRSPVMF 6,710 7,400 Test Equipment Replacements (CRSP) CRSPVMF CPM SubTotal 7,510 8,300 Mobile & Heavy Equipment Misc Heavy Equipment Replacements (CRSP) CRSPVMF ,050 Cheyenne Bucket Truck CRSPVMF Front End Loader - Montrose CRSPVMF Skid Steer Loader - Montrose CRSPVMF PMOC - Replace Large Productions Copier CRSPVMF FY14 FY15 FY16 FY17 FY18 W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL Western Colorado - Engine Generator, 350 kw - Cancelled CRSPVMF Mobile & Heavy Equipment SubTotal 4,151 4,651 Programmatic Improvements Small Facility Projects (RRADS - CRPS) CRSPVMF 2,675 3,000 E-Scheduling/E-Tagging (CRSP) CRSPVMF IT General Support Systems (CRSP) CRSPVMF Operations Center Map Board Replacement CRSPVMF 31% Montrose Cooling Tower Replacement CRSPVMF Montrose Card Reader Replacement CRSPVMF SCADA Upgrades (CRSP) CRSPVMF 31% Shiprock Substation Access Road Rebuild CRSPVMF Craig Maintenance Facility CRSPVMF Maintenance Data Integration CRSPVMF 33% Operation Consolidation Program (CRSP) CRSPVMF 33% OCP SCADA (CRSP) CRSPVMF 33% OCP Comm (CRSP) CRSPVMF 33% OCP IT (CRSP) CRSPVMF 33% WIN Router - Complete CRSPVMF Power Marketing Op Center HVAC Replcmt (Computer Room) - Complete CRSPVMF 33% Alt. Control Center Relocation - (CRSP) - Cancelled CRSPWCF 31% Programmatic Improvements SubTotal 5,758 6,083 RMR FY09 CRSP CIP Grand Total 73,591 20,101 97,507 RMR FY08 CRSP CIP Totals 43,126 43, ,342 1,740 8,082 4,072 4,072 4,315 4,315 3,915 3,915 6,115 6,115 3,969 3,969 3,914 3,914 3,615 3,615 3,215 3,215 4 of 4

18 3 PICK SLOAN OVERVIEW This section will summarize information about major accomplishments and project plans for the next several years. The information addresses major accomplishments of the prior fiscal year, planned projects for the current fiscal year and significant changes to the Plan since its last publication. In FY08 Western completed the construction of two large transmission rebuild projects; Cheyenne-Miracle Mile and the Beaver Creek-Hoyt. Western also awarded the Ault-Cheyenne rebuild project. Design continued on all the new 230-kV substations required along the Ault-Miracle Mile 230-kV line. 3.1 Pick Sloan FY08 Accomplishments and Notable Events Eastern Plains Transmission Project. Western canceled preparation of an Environmental Impact Statement (EIS) on a proposal by Western to participate with Tri-State Generation and Transmission Association, Incorporated (Tri-State), in the construction of the Eastern Plains Transmission Project (EPTP). Western issued a Notice of Intent to prepare an EIS for the EPTP in the Federal Register on August 2, 2006, and conducted 10 public scoping meetings throughout the project area from August 28 through September 14, Additional public meetings were held in February 2007, and in June Western canceled the preparation of the EIS due to anticipated changes in the EPTP scope of work. If Western decides to participate in the re-defined EPTP, a National Environmental Policy Act review will be initiated at that time. Tri-State may continue with development of the EPTP. Ault-Cheyenne-Miracle Mile Transmission Line Rebuilds. For the past several years, RMR has been developing a series of projects to rebuild the Cheyenne-Miracle Mile and Ault-Cheyenne 115-kV lines. The result of the projects will be a new Ault-Miracle Mile 230-kV line and a rebuilt Ault-Cheyenne 115-kV line. In addition to the transmission line projects, several associated substation projects at Ault, Miracle Mile, Cheyenne and Snowy Range are required. Cheyenne-Miracle Mile 115-kV. In FY08 Western completed the construction of the 140 mile Cheyenne-Miracle Mile rebuild project. The line was energized in August Background: In FY04 Western began plans to rebuild this transmission line in southern Wyoming to 230-kV specifications. In FY06, Western awarded a construction contract. In FY07, tasks included acquiring necessary ROW easements and continuing construction. 18

19 Ault-Cheyenne 230/115-kV Transmission Line Rebuild Project. Western plans to rebuild this transmission line as a double circuit 230-kV, with one circuit to be operated at 115-kV to minimize impacts to existing customers along the line. In FY08 Western completed the design and award of the construction contract for this project. Additionally, Western and Tri-State entered into a joint participation agreement for the rebuild of this line. Construction is scheduled to begin in December The planned in-service date is December Ault, Miracle Mile, Snowy Range and Cheyenne 230-kV additions. The Ault, Miracle Mile, Snowy Range and Cheyenne 230-kV additions projects will add the necessary 230-kV facilities and transformation for the Ault-Miracle Mile 230-kV line. These projects began in FY07 with planning and design activities. Design activities continued through FY08. Western intends to award construction contracts for all four substations in the 1 st quarter of FY09. Also, in FY08 Western adjusted the order for two Miracle Mile 230/115-kV transformers to accommodate a scope change for the addition of 60 MVAR of shunt reactance needed for voltage control at the substation. The planned in-service date for each substation is May Beaver Creek-Hoyt Transmission Line Rebuild. In FY08 Western successfully completed construction of this project. On November 5, 2007, the line was energized and put into service. Background: To avoid a reduction in the TTC of TOT3, Western developed a project to rebuild the existing 32.4-mile line at 230-kV. Additionally, Western and Tri-State entered into a joint participation agreement for the rebuild of this transmission line as a double circuit 230-kV transmission line. In FY06 Western awarded the construction contract. Erie Hoyt Transmission Line Rebuild. In FY08 Western completed the design field data collection, and began design for the rebuild of this project. The Erie Hoyt rebuild project is a continuation of the Beaver Creek Hoyt transmission line rebuild project and is covered under the same joint participation agreement with Tri-State. Granby Pumping Plant (GPP)-Windy Gap 69-kV Rebuild. Western continues to proceed with the Environmental Impact Statement for this project. Western plans to complete the environmental clearance in FY09. The in service date for the Project is late in FY11. Lovell Yellowtail 115-kV #1 & 2 rebuilds (Phase 1). This project is to rebuild Western s 115-kV lines across the National Parks Service s Big Horn National Recreation Area. Historically, Western has had difficulty obtaining access to these lines, limiting the maintenance of these lines which has 19

20 caused them to deteriorate to the point that Western is concerned about their reliability. Western has begun the process to rebuild these lines. FY08 saw activities on the environmental clearance, design and field data. Torrington Substation KY2A Addition. Western designed and awarded a construction contract for the addition of KY2A. The transformer was delivered September 5, In service date is planned for spring of FY09. Background: Western and the City of Torrington entered into an agreement to add a parallel transformer in Western s Torrington Substation. Load forecasts show significant new loads being served from Torrington Substation which will exceed the rating of the existing transformer. This project will add a second 115/34.5-kV transformer in parallel to meet the new loads. Western is participating in this project since this additional transformer will serve as an integral link between the 115-kV system and the future 69-kV system being developed as part of the Platte Valley Voltage Conversion Project. Western purchased the transformer in FY07. Kremmling-Windy Gap OPGW installation. In FY08 Western received funding from the Federal 2GHz Replacement Fund. One of the projects targeted for use of this funding was the installation OPGW on Western s transmission lines between Kremmling and Windy Gap Substations. Installation of the fiber avoided the replacement of several radios serving between the two facilities. Western designed and awarded a construction contract for the installation of the OPGW. The contractor completed the installation of the OPGW on October 27, Timnath Black Hollow transmission line rebuild. Western and Platte River Power Authority (PRPA) have a joint participation agreement for the rebuild of transmission lines in the vicinity of Fort Collins, Colorado. In FY08 PRPA completed the rebuild of the 4.5 mile Timnath Black Hollow transmission line to 230-kv specifications. Wray Substation. On October 31, 2008, Tri-State energized the second feed into Western s Wray Substation. This line was part of a joint project between Western and Tri-State to improve reliability to Wray Substation. Wray Substation had been served from a radial feed on Western s transmission system; therefore, Western was not able to adequately perform line maintenance without causing an outage to the substation. The project improves substation reliability for Y-W Electric Association and the City of Wray. Western constructed the substation additions needed for the second feed, and Tri-State constructed the line which tapped off a nearby Tri-State 115-kV line. Western and Tri-State are each responsible for 50 percent of the total project cost. Communication Facility Projects. Progress continued in replacing the analog microwave system with a new digital system. In FY08, analog 20

21 microwave radios were replaced with digital radios at Chadron Hill, Wayside, Merino, Akron Hill, Otis, Haxtun, Frenchman Creek and Julesburg Hill. A new fiber optic system was brought online between Loveland, Flatiron, Bald Mountain, Estes, Marys Lake, East Portal, West Portal and Granby. 3.2 Pick Sloan FY09 Planned Activities Ault-Cheyenne-Miracle Mile Transmission Line Rebuilds Ault-Cheyenne 230/115-kVTransmission Line Rebuild Project. In FY09, Western will continue to acquire any necessary ROW easements, and begin construction of the project. Construction is scheduled to start in December The planned in-service date is December Ault, Miracle Mile, Snowy Range and Cheyenne 230-kV additions. FY09 activities for the Ault, Miracle Mile, Snowy Range and Cheyenne 230-kV addition projects will include awarding of the construction contracts, ordering of all remaining government furnished equipment and commencement of construction. Also this year, delivery of four 230/115- kv 200MW transformers will occur. The planned in service dates for all four substations is May Ault 230/115kV Transformer Addition. This is a new project at Ault Substation to add a 230/115-kV, 200MW transformer with the associated breaker terminals. This project was included as part of the scope of the joint partnership agreement between Western and Tri-State on the Ault-Cheyenne transmission rebuild. In FY09 Western will begin the planning and design for this project and order the transformer. Ault-Black Hollow Reconductor. This project was also included as part of the scope of the joint partnership agreement between Western and Tri-State on the Ault-Cheyenne transmission rebuild. In FY09 Western will begin the planning and design for this project. 21

22 Front Range Transmission Improvement Projects. In 2003, Western developed a comprehensive plan to systematically rebuild numerous 115-kV lines in Northern Colorado s Front Range. The plan for these projects has been further defined each year. FY08 saw completion of the Beaver Creek-Hoyt, and Timnath-Black Hollow transmission lines. FY09 will see the construction of the Erie-Hoyt transmission line. Western will also continue planning the rebuild of the Boyd-Weld transmission line corridor. 22

23 Central Wyoming Transmission Improvement Projects. Western is initiating a series of projects to systematically rebuild its 115-kV transmission lines in central Wyoming called the Central Wyoming Transmission Improvement Projects (CWTIP). The projects will address both the deteriorating physical conditions and system overloading conditions which exist for the targeted lines. The transmission lines proposed to be rebuilt and upgraded are: Alcova-Miracle Mile East Alcova-Miracle Mile West Alcova-Casper North Alcova-Casper South Casper-Dave Johnston section of Casper-Glendo North Casper PACE-Dave Johnston section of Casper PACE-Glendo South Currently, the scope of the CWTIP includes rebuilding approximately 156 miles of existing 115-kV wood structure transmission lines from Western s Miracle Mile Substation to near the Dave Johnston Power Plant Switchyard. The rebuild would include upgrade to 230-kV construction with wood 23

24 structures. Western intends to continue operating at 115-kV for the foreseeable future. Excluded from the Project scope are approximately 13 miles of both the Casper-Glendo North and Casper PACE Glendo South which were previously rebuilt in 1989 as 230-kV double circuit on single pole steel structures. Western s Maintenance Office has indicated that the conditions of these lines (along with the Lovell-Yellowtail 115-kV lines) are among the worst in RMR. This assessment is backed up by the results of annual wood pole testing and treatment program. Several of the line segments have rejected structure rates exceeding 10%. All the lines contain numerous stubbed poles. These lines are also beginning to show up in system studies as overloading for certain system configurations. These lines were built with 397 ACSR conductors. Western feels the lines can not be reconductored due to the age and condition of the structures; and because of the increased loading a larger conductor would add. In FY09, Western will begin the planning and the environmental processes. Field data, design and ROW acquisition will begin in late FY10. The first construction contract is planned for FY11. The six projects will be rebuilt over a series of four to eight years depending upon funding and other RMR priorities. 24

25 Virginia Smith Converter Station (Sidney Converter Station). The Sidney Converter Station is a back-to-back, 200MW converter station capable of bidirectional power flow between the western and eastern electrical interconnections and has been in service approximately twenty-one years. Siemens of Germany designed, manufactured and constructed the converter station based on a fifteen year life span. Technical and replacement parts support from Siemens has deteriorated significantly in recent years. The Sidney Converter Station has suffered significant long term outages in 2008 due to weather, component age and system conditions. Western has stock piled spare parts with the intention of operating the converter station for approximately nine more years (thirty year life span). A project has been initiated within the Capital Investment Program Plan to explore future options for the converter station. Western plans to start discussions with customers in 2009 about the future of the station. Technology and ratings options as well as operational and rate impacts related to the possible replacement of the Sidney Converter Station will be investigated. Lovell-Yellowtail #1 & kV rebuilds (Phase 1). In FY09 Western intends to complete the environmental clearance and will begin design of the 25

26 project. In FY10 Western will award a construction contract for the rebuild of Phase 1. Granby Pumping Plant (GPP)-Windy Gap 69-kV Rebuild. The project will rebuild the 70-year old 69-kV line from GPP to Windy Gap as well as add a new 138-kV line on new double circuit 138-kV constructed structures. A 138/69-kV transformer will be added within the GPP switchyard. The project is a joint effort among Tri-State, Northern Colorado Water Conservancy District, and Western. Work on the environmental impact statement will continue. This project is to ensure system reliability in the event of a loss of the Adams Tunnel Cable circuit. The projected in-service date for this project is late FY11. Willoby Switchyard 115-kV. Western and Tri-State plan to execute the contract for this project in FY09. Environmental work, field data collection, land acquisition and design work are planned activities for FY09. This project is to construct the Willoby Switchyard at the site of the present Prospect Valley Tap. The project will provide additional voltage support and reliability for the future Boomerang Tap delivery off Western's Kiowa Creek-Weld 115-kV line. The scheduled in-service date is mid FY10. Torrington Substation KY2A Addition. Planned tasks for FY09 include completion of construction. This project will add a second 115/34.5-kV transformer in parallel to meet increasing loads. Western will participate in this project since this additional transformer will serve as an integral link between the 115-kV system and the future 69-kV system being developed as part of the Platte Valley Voltage Conversion Project. The scheduled inservice date is 2 nd quarter of FY09. Arrow Substation interconnection at Archer: Western and Tri-State are jointly planning a project that would interconnect the LRS-Story 345-kV line to Archer Substation near Cheyenne, WY. The initial project scope includes construction of Arrow Substation to sectionalize the LRS-Story 345-kV line near Archer Substation; install 345/230kV transformation at Arrow; rebuild Western s Archer-Cheyenne 115-kV lines to 230-kV; install a second 230/115kV transformer at Cheyenne; and install several 230-kV bays additions at both Archer and Cheyenne. The project scope is yet not fully developed; therefore, this project is not included in the detailed spread sheets. Communication Facility Projects. The replacement of analog microwave radio links will be completed and all traffic will be moved onto the new backbone system by the end of FY09. The central backbone communications ring between Loveland and Cheyenne will be replaced in FY This will upgrade this key segment of the region s communication system to a mostly fiber, high capacity system. 26

27 A study to install new voice over IP phone systems throughout the region will be completed in early FY09. This will be used to guide replacement of RMR phone systems throughout the region, starting at the region s PMOC facility in Loveland. Other Equipment Replacement Efforts. The other items identified in the Plan are routine maintenance activities such as replacing obsolete and wornout substation equipment, purchase of supplies to repair and replace damage to transmission lines, and specialized equipment for the crews to accomplish maintenance of the system. Power transformers will be replaced at Ogallala (FY10) and Garland Substations (FY09). Recent load testing of substation and communication site backup battery banks has identified an unusually high rate of failures in the newer valve regulated cells. Several of these sites are scheduled for replacement in FY09. Summary of Interconnection and Transmission Requests for the LAP Transmission system. RMR has received numerous interconnection and transmission requests for the LAP Transmission system. The majority of these requests are for proposed wind generation projects. A snap shot at this time includes 27 transmission requests totaling 1699MW and 21 interconnection requests totaling 2324MW which are currently active in the queue. 3.3 Pick Sloan Program Summary Budget The following spreadsheet summarizes Western s Pick Sloan capital program budget estimates by major program area. 27

28 Revised: 3/12/3009 Rocky Mountain Region Capital Projects Ten Year Plan Total Costs (x1000) FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 Pick Sloan T-Line Improvements and Replacements 54,771 26,160 31,175 11,575 10,875 13,045 12,905 Substation Improvements and Replacements 20,236 13,910 4,800 7,460 6,455 7,835 1,690 Communication System Improvements and Replacements 2,423 1,165 2,605 11,175 5,375 5,305 4,305 Substation Control, Protection, and Metering 1, Mobile and Heavy Equipment Replacements FY Buildings and Programmatic Investments Actuals 854 1, , Total 33,864 79,779 44,029 40,584 32,920 24,752 27,935 20,722 FY2008 CIP Plan Totals 40,122 68,755 47,087 44,315 28,195 24,775 33,944 26,016 Western-only Costs (x1000) Pick Sloan T-Line Improvements and Replacements 9,861 14,160 16,175 11,075 10,875 13,045 12,905 Substation Improvements and Replacements 14,586 7,600 4,405 7,460 6,455 7,835 1,690 Communication System Improvements and Replacements 1,523 1,165 2,030 4,915 3,540 3,505 2,905 Substation Control, Protection, and Metering 1, Mobile and Heavy Equipment Replacements FY Buildings and Programmatic Investments Actuals 854 1, , Total 20,577 28,319 25,719 24,614 26,160 22,917 26,135 19,322 FY2008 CIP Plan Totals 32,649 25,155 27,427 28,095 26,995 24,700 33,944 26,016 Network Upgrades 3,

29 3.4 PICK SLOAN TEN-YEAR BUDGET PROJECTIONS The following spreadsheets list Western s capital budget estimates by project and by fiscal year. 29

30 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR Pick Sloan Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT FY09 FY10 FY11 FY12 FY13 PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL Transmission Lines Line Equipment Replacements - General (PS) Ault-Black Hollow Reconductor PSWCF Cheyenne-Ault 230kV T-line Upgrade PSWCF 19,200 8,417 27,617 19,200 19,200 Alcova - Miracle Mile West 115-kV rebuild PSWCF 9,200 9, ,775 7, Alcova - Miracle Mile East 115-kV rebuild PSWCF 9,285 9, Alcova - Casper North 115-kV rebuild PSWCF 10,830 10, Alcova - Casper South 115-kV rebuild PSWCF 11,575 11, ,120 9, Casper - Glendo North 115-kV rebuild PSWCF 10,675 10,675 Casper - Glendo South 115-kV rebuild PSWCF 11,385 11, ,825 8,825 East Morrill Tap-Wildcat 34.5-kV line PSWCF 1,295 1, Erie-Hoyt 230-kV Upgrade PSWCF 36, ,566 6,400 21,000 27,400 2,400 7,100 9,500 Flatiron-Valley 230kV Upgrade PSWCF 14,305 14,305 Gore Pass-Muddy Pass Line Reroute (Wolford Mtn-Red Dirt Creek) Granby Pump Plant-Windy Gap 69-kV rebuild PSWCF 11,250 1,517 12,767 1,750 4,000 5,750 1,500 4,000 5,500 Lovell-Yellowtail #1 & #2 T-line Rebuilds Phase 1 (NPS) PSWCF 16, , ,250 8,250 7,500 7,500 Lovell-Yellowtail #1 & #2 T-line Rebuilds Phase 2 PSWCF 36,110 36,110 Weld-Boyd 230-kV Upgrade PST&R 16,500 16, ,000 15, Wildcat-Sievers 69-kV line PSWCF 3,625 3, Beaver Creek - Hoyt 230-kV Upgrade - Complete PSWCF 22,300 22,300 Central WY Transmission Improvements - Created seperate project PSWCF Cheyenne-Miracle Mile 230kV T-Line Upgrade - Complete PSWCF 39,898 39,898 Eastern Plains Transmission Project - On Hold PSWCF Gering-Gering Valley 34.5-kV T-Line - EXPENSED Timnath - Black Hollow 230-kV Upgrade - Complete PSWCF 2,126 2,126 T-Line SubTotal 219,806 75, ,714 9,861 44,910 54,771 14,160 12,000 26,160 16,175 15,000 31,175 11, ,575 10,875 10,875 Substations Battery and Charger Replacements (PS) 1,150 1, CCVT, PT, & CT Replacement (PS) Misc. Substation Elect. Equipm. Replace. (PS) 5,400 6, Transformer Monitors (PS) 880 1, Substation Test Equipment (PS) Substation Disconnect Switch Replacements (PS) Alcova 462, 662, 862, 1062 Replacement Alliance Control Building Ault 230-kV additions (AU-MM 230) PSWCF 1, ,418 1,330 1,330 Ault 230/115-kV xfmr additions PSWCF 8,000 8, ,250 3,000 1,000 4,000 5,000 Cheyenne 230-kV additions PSWCF 4,610 3,695 8,305 4,360 4, Cheyenne 2nd 230/115kV transformer additions PSWCF 4,455 4,455 2,785 2,785 1,450 1,450 Flatiron Switch Replacements Fort Morgan West 15MVAR shunt capacitors PSWCF 1,000 1, Frenchman Creek Shunt Capacitor Banks PSWCF 1,100 1, ,000 1,000 Garland KZ1A Replacement Garland 324 Breaker Replacement Granby Pumping Plant Transformer Modifications Limestone 34.5-kV additions 50 1,214 1, Lingle Substation 69kV additions PSWCF 4,465 4, ,400 1,400 Lusk Rural - Podolak Improvements Lusk KX1A Transformer Replacement Miracle Mile 230-kV additions (AU-MM 230) PSWCF 3,110 5,000 8,110 2,860 2, North Platte (FC, S, K) Interrupter Switches 1,000 1, Ogallala a a Transformer modifications o Ralston 122, 222, 322 Breaker Replacement Sidney Converter Station Replacement PSWCF Sidney Shunt Capacitor Banks PSWCF 1,100 1, ,000 1,000 Snowy Range Substation 230-kV (Laramie) PSWCF 3,605 3,339 6,944 3,355 3, Snowy Range 2nd 230/115kV transformer additions PSWCF 4,335 4,335 2,785 2,785 1,320 1,320 Torrington Substation KY2A addition PSWCF 100 2,155 2, Torrington Substation 69-kV additions PSWCF 5,170 5, ,175 1,175 Wildhorse Creek Substation - 90MW wind (2005-G1 & 2007-T1) PSNET 3, ,059 3,000 3, Willoby Switchyard 115-kV PSWCF 4, , ,900 1,500 4, Willow Creek KZ2A Replacement Beaver Creek 230-kV additions (BC-EE 230-kV) - ON HOLD PSWCF Big George Substation - 69-kV Modifications - Complete PST&R Happy Jack 30 MW Wind (2004-G1) - Complete PSNET Haxtun KY1A Transformer Replacement -- Complete Lovell 566 Circuit Breaker Replacement - Cancelled Medicine Bow - 40MW wind (2007-T5) - Cancelled PST&R Raderville 115KV Switch Upgrade - Complete Substations SubTotal 66,366 18,902 86,428 14,586 5,650 20,236 7,600 6,310 13,910 4, ,800 7,460 7,460 6,455 6,455 1 of 6

31 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR Pick Sloan Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT FY09 FY10 FY11 FY12 FY13 PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL Communications Communications Test Equipment (PS) Misc. Communications Facilities Replacement (PS) Fiber Multiplex Equipment (PS) Air Force Microwave Upgrades Archer MW Communication Building Replacement Archer-Stegall OPGW 2,400 2, Bald Mountain Generator Replacement Beaver Creek - Sterling OPGW 1,350 1, , Beaver Creek Comm Tower Brush Phone Switch Replacement Brush to Julesburg Mic Replacements 1,200 Casper Phone Switch Replacement Casper to Cody Backbone Mic Replacements 2,000 2,000 Central PMOC Communications Loop (80/20 Split) 80% Cheyenne Maintenance Mic Replacement Comm Battery/Charger Replacements 67% 1,000 1, Comm Generator Replacements 50% Digital Crossconnect Replacements 50% Erie-Longmont NW OPGW Erie-Loveland-Cheyenne I-25 Fiber 67% 5,000 5,000 1,000 4,000 5,000 Fiber Multiplexers (PS) 1,500 1, Field Phone Switch Replacements 50% Flatiron-Horsetooth Tap OPGW PSWCF Flatiron-Longmont NW OPGW Gering-Stegall OPGW Kremmling - Grouse Mtn 2 Gig MW Replacement with Fiber PST&R 200 1,015 1, Limon-Big Sandy-Beaver Creek OPGW 2,800 2,800 LRS-DJ OPGW 2,400 2, ,200 Mobile Radio Infrastructure Replacements 50% Mobile Radio Replacements 50% 1,000 1, Morrill to Wayside Mic Replacements 600 New Mobile Radio Sites (STK, MNK, ANM, AKH) 25% Nortel Microwave Replacements 1,500 1, PMOC Phone Switch Replacement PMOC Voice Recorder Replacement PS/ECMO Spurs (MDR8000/LEDR Replacement) 1,800 2,700 Sidney Converter Phone Switch Replacement Sidney-Gering OPGW 2,800 2, ,350 1,400 2,750 Stegall-LRS OPGW 2,000 2, ,000 1,950 Sterling - Sidney OPGW 1,450 1, , Telco Channel Bank Replacements 50% Valley-Boyd OPGW Weldona Generator Replacement Yellowtail-Yellowtail(PACE)Fiber Comm System Network Management System - cancelled Merino Communication Building Replacement - Cancelled Merino Generator Replacement - Cancelled PST&R Communications SubTotal 37,178 1,056 40,984 1, ,423 1,165 1,165 2, ,605 4,915 6,260 11,175 3,540 1,835 5,375 Control, Protection and Metering Protective Relay Replacements (PS) 6,850 7, Test Equipment Replacements (PS) Casper/Cheyenne Boundary Metering Master Estes Control System Replacement Kremmling Control System Replacement Sidney (TS) Relay Replacements RTU Replacements, Alliance and Stegall Substations CPM SubTotal 8, ,167 1,090 1, of 6

32 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR Pick Sloan Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT FY09 FY10 FY11 FY12 FY13 PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL Mobile and Heavy Equipment Misc Heavy Equipment Replacements (PS) 3,000 3,600 Brush Dump Truck Replacement Cheyenne Oil Tanker Cheyenne Manlift, 85' - (replace 51928) Cody Substation Crew Tool Trailers Cody Line Bucket Truck Cody Line Digger Truck Cody Truck/Tractor Gering Line Bucket Truck Gering Line Digger Truck Bob Cat - Loveland (replacement) RMR Mobile transformer Productions Copiers (CDY, CAS, LVD) Mobile & Heavy Equipment SubTotal 5,955 6, Programmatic Improvements Small Facility Projects (RRADS - PS) 2,500 2, Casper Storage Building E-Scheduling/E-Tagging (PS) 69% IT General Support Systems (PS) 69% Operations Center Map Board Replacement 69% Power Billing System Phase 3 50% Power Marketing Op Center HVAC Replcmt (Computer Room) 67% SCADA Upgrades (PS) 69% BOR SCADA Consolidation Maintenance Data Integration 67% Operation Consolidation Program (PS) 67% OCP SCADA (PS) 67% OCP Comm (PS) 67% OCP IT (PS) 67% , Alt. Control Center Relocation - (PS) - Cancelled PSWCF 69% Programmatic Improvements SubTotal 6, , ,354 1, ,170 1, RMR/DSW Operations Consolidation FY09 PS CIP Grand Total 343,971 96, ,852 28,319 51,460 79,779 25,719 18,310 44,029 24,614 15,970 40,584 26,160 6,760 32,920 22,917 1,835 24,752 FY08 PS CIP Totals 25,155 43,600 68,755 27,427 19,660 47,087 28,095 16,220 44,315 26,995 1,200 28,195 24, ,775 3 of 6

33 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR Pick Sloan Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL Transmission Lines Line Equipment Replacements - General (PS) Ault-Black Hollow Reconductor PSWCF Cheyenne-Ault 230kV T-line Upgrade PSWCF 19,200 8,417 27,617 Alcova - Miracle Mile West 115-kV rebuild PSWCF 9,200 9,200 Alcova - Miracle Mile East 115-kV rebuild PSWCF 9,285 9,285 Alcova - Casper North 115-kV rebuild PSWCF 10,830 10,830 Alcova - Casper South 115-kV rebuild PSWCF 11,575 11,575 Casper - Glendo North 115-kV rebuild PSWCF 10,675 10,675 Casper - Glendo South 115-kV rebuild PSWCF 11,385 11,385 East Morrill Tap-Wildcat 34.5-kV line PSWCF 1,295 1,295 Erie-Hoyt 230-kV Upgrade PSWCF 36, ,566 Flatiron-Valley 230kV Upgrade PSWCF 14,305 14,305 Gore Pass-Muddy Pass Line Reroute (Wolford Mtn-Red Dirt Creek) Granby Pump Plant-Windy Gap 69-kV rebuild PSWCF 11,250 1,517 12,767 Lovell-Yellowtail #1 & #2 T-line Rebuilds Phase 1 (NPS) PSWCF 16, ,351 Lovell-Yellowtail #1 & #2 T-line Rebuilds Phase 2 PSWCF 36,110 36,110 Weld-Boyd 230-kV Upgrade PST&R 16,500 16,500 Wildcat-Sievers 69-kV line PSWCF 3,625 3,625 FY14 FY15 FY16 FY17 FY18 W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL ,775 7, ,680 9, ,250 9, ,750 6,750 6,750 6, ,000 1,000 10,500 10,500 16,500 16,500 8,000 8,000 2,725 2, Beaver Creek - Hoyt 230-kV Upgrade - Complete PSWCF 22,300 22,300 Central WY Transmission Improvements - Created seperate project PSWCF Cheyenne-Miracle Mile 230kV T-Line Upgrade - Complete PSWCF 39,898 39,898 Eastern Plains Transmission Project - On Hold PSWCF Gering-Gering Valley 34.5-kV T-Line - EXPENSED Timnath - Black Hollow 230-kV Upgrade - Complete PSWCF 2,126 2,126 T-Line SubTotal 219,806 75, ,714 13,045 13,045 12,905 12,905 20,550 20,550 23,950 23,950 14,800 14,800 Substations Battery and Charger Replacements (PS) 1,150 1,250 CCVT, PT, & CT Replacement (PS) Misc. Substation Elect. Equipm. Replace. (PS) 5,400 6,100 Transformer Monitors (PS) 880 1,000 Substation Test Equipment (PS) Substation Disconnect Switch Replacements (PS) Alcova 462, 662, 862, 1062 Replacement Alliance Control Building Ault 230-kV additions (AU-MM 230) PSWCF 1, ,418 Ault 230/115-kV xfmr additions PSWCF 8,000 8,000 Cheyenne 230-kV additions PSWCF 4,610 3,695 8,305 Cheyenne 2nd 230/115kV transformer additions PSWCF 4,455 4,455 Flatiron Switch Replacements Fort Morgan West 15MVAR shunt capacitors PSWCF 1,000 1,000 Frenchman Creek Shunt Capacitor Banks PSWCF 1,100 1,100 Garland KZ1A Replacement Garland 324 Breaker Replacement Granby Pumping Plant Transformer Modifications Limestone 34.5-kV additions 50 1,214 1,264 Lingle Substation 69kV additions PSWCF 4,465 4,465 Lusk Rural - Podolak Improvements Lusk KX1A Transformer Replacement Miracle Mile 230-kV additions (AU-MM 230) PSWCF 3,110 5,000 8,110 North Platte (FC, S, K) Interrupter Switches 1,000 1,000 Ogallala a a Transformer modifications o Ralston 122, 222, 322 Breaker Replacement Sidney Converter Station Replacement PSWCF Sidney Shunt Capacitor Banks PSWCF 1,100 1,100 Snowy Range Substation 230-kV (Laramie) PSWCF 3,605 3,339 6,944 Snowy Range 2nd 230/115kV transformer additions PSWCF 4,335 4,335 Torrington Substation KY2A addition PSWCF 100 2,155 2,255 Torrington Substation 69-kV additions PSWCF 5,170 5,170 Wildhorse Creek Substation - 90MW wind (2005-G1 & 2007-T1) PSNET 3, ,059 Willoby Switchyard 115-kV PSWCF 4, ,006 Willow Creek KZ2A Replacement ,725 2, ,550 3, Beaver Creek 230-kV additions (BC-EE 230-kV) - ON HOLD PSWCF Big George Substation - 69-kV Modifications - Complete PST&R Happy Jack 30 MW Wind (2004-G1) - Complete PSNET Haxtun KY1A Transformer Replacement -- Complete Lovell 566 Circuit Breaker Replacement - Cancelled Medicine Bow - 40MW wind (2007-T5) - Cancelled PST&R Raderville 115KV Switch Upgrade - Complete Substations SubTotal 66,366 18,902 86,428 7,835 7,835 1,690 1,690 1,160 1,160 1,410 1,410 1,410 1,410 4 of 6

34 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR Pick Sloan Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL Communications Communications Test Equipment (PS) Misc. Communications Facilities Replacement (PS) Fiber Multiplex Equipment (PS) Air Force Microwave Upgrades Archer MW Communication Building Replacement Archer-Stegall OPGW 2,400 2,400 Bald Mountain Generator Replacement Beaver Creek - Sterling OPGW 1,350 1,350 Beaver Creek Comm Tower Brush Phone Switch Replacement Brush to Julesburg Mic Replacements 1,200 Casper Phone Switch Replacement Casper to Cody Backbone Mic Replacements 2,000 2,000 Central PMOC Communications Loop (80/20 Split) 80% Cheyenne Maintenance Mic Replacement Comm Battery/Charger Replacements 67% 1,000 1,000 Comm Generator Replacements 50% Digital Crossconnect Replacements 50% Erie-Longmont NW OPGW Erie-Loveland-Cheyenne I-25 Fiber 67% 5,000 5,000 Fiber Multiplexers (PS) 1,500 1,500 Field Phone Switch Replacements 50% Flatiron-Horsetooth Tap OPGW PSWCF Flatiron-Longmont NW OPGW Gering-Stegall OPGW Kremmling - Grouse Mtn 2 Gig MW Replacement with Fiber PST&R 200 1,015 1,215 Limon-Big Sandy-Beaver Creek OPGW 2,800 2,800 LRS-DJ OPGW 2,400 2,400 Mobile Radio Infrastructure Replacements 50% Mobile Radio Replacements 50% 1,000 1,000 Morrill to Wayside Mic Replacements 600 New Mobile Radio Sites (STK, MNK, ANM, AKH) 25% Nortel Microwave Replacements 1,500 1,500 PMOC Phone Switch Replacement PMOC Voice Recorder Replacement PS/ECMO Spurs (MDR8000/LEDR Replacement) 1,800 2,700 Sidney Converter Phone Switch Replacement Sidney-Gering OPGW 2,800 2,800 Stegall-LRS OPGW 2,000 2,000 Sterling - Sidney OPGW 1,450 1,450 Telco Channel Bank Replacements 50% Valley-Boyd OPGW Weldona Generator Replacement Yellowtail-Yellowtail(PACE)Fiber FY14 FY15 FY16 FY17 FY18 W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL ,150 1,200 2,350 1,000 1,000 1,000 1, ,350 1,400 2, , Comm System Network Management System - cancelled Merino Communication Building Replacement - Cancelled Merino Generator Replacement - Cancelled PST&R Communications SubTotal 37,178 1,056 40,984 Control, Protection and Metering Protective Relay Replacements (PS) 6,850 7,540 Test Equipment Replacements (PS) Casper/Cheyenne Boundary Metering Master Estes Control System Replacement Kremmling Control System Replacement Sidney (TS) Relay Replacements RTU Replacements, Alliance and Stegall Substations 3,505 1,800 5,305 2,905 1,400 4,305 1, ,030 1, ,665 1,130 1, CPM SubTotal 8, , of 6

35 3/12/2009 Yellow Highlight = New Project to list Red Text = Change from previous version Blue Text = will be removed from list Green Highlight = Annual Equipment Replacement Programs W Total = Western Only Costs O Total = Trust and Joint Participation Costs FY Total = Sum of W Total and O Total MPS Split = Multiple Power System Cost Split. RMR Pick Sloan Capital Investment Plan FY09-FY18 Detail Fund MPS Estimate Actuals thru PROJECT PROJECT Power Sys Split FY09-FY18 end of FY08 TOTAL Mobile and Heavy Equipment Misc Heavy Equipment Replacements (PS) 3,000 3,600 Brush Dump Truck Replacement Cheyenne Oil Tanker Cheyenne Manlift, 85' - (replace 51928) Cody Substation Crew Tool Trailers Cody Line Bucket Truck Cody Line Digger Truck Cody Truck/Tractor Gering Line Bucket Truck Gering Line Digger Truck Bob Cat - Loveland (replacement) RMR Mobile transformer Productions Copiers (CDY, CAS, LVD) Mobile & Heavy Equipment SubTotal 5,955 6,555 Programmatic Improvements Small Facility Projects (RRADS - PS) 2,500 2,825 Casper Storage Building E-Scheduling/E-Tagging (PS) 69% IT General Support Systems (PS) 69% Operations Center Map Board Replacement 69% Power Billing System Phase 3 50% Power Marketing Op Center HVAC Replcmt (Computer Room) 67% SCADA Upgrades (PS) 69% BOR SCADA Consolidation Maintenance Data Integration 67% Operation Consolidation Program (PS) 67% OCP SCADA (PS) 67% OCP Comm (PS) 67% OCP IT (PS) 67% ,201 FY14 FY15 FY16 FY17 FY18 W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL W Total O Total FY TOTAL Alt. Control Center Relocation - (PS) - Cancelled PSWCF 69% Programmatic Improvements SubTotal 6, , RMR/DSW Operations Consolidation FY09 PS CIP Grand Total 343,971 96, ,852 FY08 PS CIP Totals 26,135 1,800 27,935 19,322 1,400 20,722 25, ,455 28, ,740 19,055 19,055 33,944 33,944 26,016 26,016 27,175 27,175 27,575 27,575 6 of 6

36 4 JOINT POWER SYSTEM PROJECTS 4.1 Joint CRSP & Pick Sloan FY08 Accomplishments and Notable Events Operations Consolidation Program. RMR and DSW began initial planning of the Operations Consolidation Program. 4.2 Joint CRSP & Pick Sloan FY09 Planned Activities Operations Consolidation Program. RMR, DSW and CRSP Management Center are currently finalizing the scope of the Operations Consolidation Program (OCP). Preliminary Project estimates were based upon the draft scope for the OCP. Western will continue to refine Project estimates as the OCP scope is finalized. Western is hopeful to finalize the OCP scope in January 2009, then establish baseline Project cost estimates and schedules by the spring of 2009 for inclusion of the OCP in Western s FY11 budget formulation cycle. The 10 year budget projections for both CRSP and Pick Sloan will include budget lines items for OCP broken into three categories; OCP SCADA, OCP Comm and OCP IT. Please note the estimates for OCP are still preliminary and may change in both value and allocation between the power systems. Also, the costs shown in RMR s 10 year Capital Investment Plan are RMR s portion of the capital costs of the Project and are not the total Project costs. RMR Alternate Control Center Relocation: Within the scope of the OCP, the RMR and DSW operation centers will become each other s backup centers. RMR cancelled its project to relocate the Cheyenne ACC and will direct this funding to OCP related projects. 36

37 5 RMR SUCCESS INDICATORS The goal of Western s Plan is to assure the most cost-effective use of available capital resources to assure long-term electric system reliability and availability. The following sections summarize the inventory of major power system equipment and indicators for measuring the success of our capital program. Facilities Western operates and maintains an extensive system of interconnected substations, transmission lines, and communication sites. The Region owns and operates 118 substations in the states of Wyoming, Nebraska, Colorado, New Mexico, and Utah. The substations comprise the majority of the maintained equipment in the Region, including 460 high voltage circuit breakers and 121 power transformers. The substations are interconnected by 5,286 miles of transmission lines operating at voltages between 12,500 and 345,000 volts. The majority of the transmission lines (3,324 miles) were built using wood pole structures, with the remainder (1,962 miles) being of steel structure construction. The breakdown of line miles by voltage and predominant structure type is shown below: Voltage Miles of Wood Miles of Steel Total 345-kV kV 127 1,434 1, kV kV 2, , kV <69-kV Total 3,324 1,962 5,286 The electrical system is operated from the Loveland Control Center by means of an extensive communications network consisting of microwave, radio, and fiber optic links. The links are connected through 142 Western-owned communications sites. 37

38 Indicators We can measure the success of our efforts in several ways: Leading Indicators. Measurable activities that result in positive outcomes are considered to be leading indicators. For example, increasing the amount of resources allocated to preventative maintenance activities on equipment should result in a reduction of critical equipment failures. Similarly, increasing the amount of resources allocated to equipment improvement and replacement activities should result in fewer equipment-related outages. The following chart shows Western s percentage allocation of craft labor for preventative maintenance and equipment replacement activities over the last eight years as compared to other activities. 38

39 Lagging Indicators. The ultimate goal of the Capital Investment Program is to assure electric system reliability. Therefore, the result of an effective program should be fewer power outages due to equipment failures. Since the results of a poorly maintained or managed power system would not be apparent for several years, equipment outage rates tend to be a lagging performance indicator. The following chart shows the annual number of outages in the control system due to all causes including weather, equipment failures, and human error. 39

40 Financial Indicators. Western has identified two financial measures that reflect a cost-effective investment program: 1) Net Plant Investment (NPI); and 2) Rate Impact. A flat or declining NPI is an indicator of a deteriorating system; therefore Western does not believe that it is possible to maintain proper system reliability under current load and generation growth conditions without increasing its NPl. However, Western also considers the impact on the transmission rate and the firm electric service rate of increasing the NPI too rapidly, which results in an unacceptable growth in the rate. As the following graphs indicate, Western s proposed CIP plan seeks to successfully balance these issues. The FY 2009 CIP Plan results in an average annual growth rate in NPI for the LAP system of approximately 2.57% from 2009 through The following graph shows the projected increase year by year in the NPI as a result of the projects contained in the FY 2009 CIP Plan. 40

41 LAP Transmission Rate Impacts. The projected transmission rate for FY 2010 FY 2018 for the FY 2009 CIP Plan results in an average rate increase of approximately 4.71% per year. In determining the projected transmission rate, Western used the CIP Plan to determine an estimated Annual Transmission Revenue Requirement and divided that by the projected load each year. The expected load was estimated by using the FY 2007 actual load and applying an average load growth rate of 2% per year to calculate the estimated network load growth plus other known and measurable changes. 41

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting MEETING AGENDA Western Area Power Administration Rocky Mountain Region Transmission Planning Stakeholder Meeting Western s RMR Regional Office 5555 East Crossroads Boulevard, Loveland, CO 80538 June 23,

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources Customer Name Basin Electric Cheyenne Power and Light City of Fort Morgan & Estimated Maximum Resource MW Point of Receipt Delivering Party & Voltage Antelope Valley 2 Yellowtail Basin Electric 115 kv

More information

Tri-State December 2013 Board Meeting

Tri-State December 2013 Board Meeting 1 For more information Tri-State webpage: www.tristategt.org click Operations then Transmission Planning (http://www.tristategt.org/transmissionplanning/puc3627_trans missionprojects.cfm) Email: (transmissionplanning@tristategt.org)

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting MEETING AGENDA Western Area Power Administration Rocky Mountain Region Transmission Planning Stakeholder Meeting Western s RMR Regional Office 5555 East Crossroads Boulevard, Loveland, CO 80538 December

More information

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010 FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009

More information

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado System Impact Study T-2007-3 Final.doc System Impact Study Report Request # T-2007-3 900 MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado Executive Summary PSCo Transmission

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Proposed New Construction for

Proposed New Construction for Tri-State Generation and Transmission Association, Inc. Colorado PUC E-Filings System Proposed New Construction for 2016 2019 Colorado PUC Rule 3206 Application April 28, 2016 TABLE OF CONTENTS A) Projects

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives Addendum San Juan Major Project Tri-State Generation and Transmission Association Power System Planning December, 2008

More information

West Station-West Cañon 115 kv Transmission Project

West Station-West Cañon 115 kv Transmission Project West Station-West Cañon 115 kv Transmission Project Project Sponsor: Additional Project Participants: Project Description: Black Hills Colorado Electric New 115 kv line from West Station to West Cañon

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

Q0044 interconnection at

Q0044 interconnection at Generation Interconnection Feasibility Study Report for Q0044 interconnection at Utah County Utah on PacifiCorp s Transmission System (138 kv Transmission System) September 15, 2004 Page 1 1.0 Description

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment PSCo 10-Year Transmission Plan/20-Year Scenario Assessment May 2009 This report contains transmission planning data that may be conceptual in nature and is subject to change. The transmission projects

More information

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) Submitted to TOT1A Stakeholders and TOT1A Interconnected Utilities And Western Electricity Coordinating Council June 6, 2013

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-12-0217 8 MW Hydropower Generating Facility POI on the Dallas Creek to South Canal 115kV Line in SW Colorado FINAL REPORT February

More information

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5 ALANNA GILLIS ACTING COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660 4700 BC TOLL

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007 High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM-2006-02) Interconnection Facility Study Final Report November 2, 2007 Prepared by: Public Service Company of New Mexico Electric Services

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions. March 8, 2013 David Franklin Chair, Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 MHanson@idahopower.com (208) 388-2253 Enoch Davies Western Electricity Coordinating

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

Designated Entity Pre-Qualification Materials. Exelon Corporation

Designated Entity Pre-Qualification Materials. Exelon Corporation Designated Entity Pre-Qualification Materials By Exelon Corporation On behalf of its affiliates Baltimore Gas and Electric Company, Commonwealth Edison Company, PECO Energy Company and Exelon Transmission

More information

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran System Impact Study_50 MVA Load Interconnnection Request Near Collbran.doc Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran PSCo Transmission

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

APPENDIX F: Project Need and Description

APPENDIX F: Project Need and Description APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was

More information

Generation Interconnection Facilities Study For

Generation Interconnection Facilities Study For Generation Interconnection Facilities Study For Prepared for: Prepared by: SCE&G Transmission Planning May 27, 2015 TABLE OF CONTENTS General Discussion... Page 3 Generator Interconnection Specifications...

More information

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Sub Regional RTEP Committee Western Region ATSI

Sub Regional RTEP Committee Western Region ATSI Sub Regional RTEP Committee Western Region ATSI February 20, 2019 1 ATSI Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider these

More information

March 7, Subject: Southern California Edison 2011 Annual Progress Report

March 7, Subject: Southern California Edison 2011 Annual Progress Report March 7, 2011 Mr. Kyle Kohne Mr. Kent Bolton Chair, WECC Technical Studies Subcommittee WECC Technical Staff Bonneville Power Administration University of Utah Research Park P.O. Box 61409 615 Arapeen

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

2015 Grid of the Future Symposium

2015 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,

More information

Sub-Regional RTEP Committee PJM South

Sub-Regional RTEP Committee PJM South Sub-Regional RTEP Committee PJM South SRRTEP - South December 1, 2016 www.pjm.com PJM Baseline Project B2185 Update Problem: NERC Category B Violation (DVP Analysis) The 2017 summer base case indicates

More information

Western Area Power Administration

Western Area Power Administration 2014/15 Integrated System (IS) 890 Local Planning Stakeholder Meeting #2 Western Area Power Administration Upper Great Plains Region Transmission Planning Stakeholder Meeting Wednesday, December 10 th,

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED

GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED DATE: June 28, 2011 STAFF: Brian Janonis Brian Moeck, PRPA Pre-taped staff presentation: none WORK SESSION ITEM FORT COLLINS CITY COUNCIL SUBJECT FOR DISCUSSION Electric Transmission Update. EXECUTIVE

More information

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G PJM Sub Regional RTEP Committee Mid-Atlantic January 22, 2016 Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G PSE&G System Characteristics New Jersey utility characterized by densely populated

More information

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1 Energy Division P.O. Box 937 333 E. Barioni Blvd. Imperial, CA 92251 www.iid.com March 18, 2014 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Senior Power System Consultant Avista System

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

Modernising the Great Western railway

Modernising the Great Western railway Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Four Corners Queue Transmission Interconnection Study

Four Corners Queue Transmission Interconnection Study Four Corners Queue Transmission Interconnection Study Facility Study Results By Arizona Public Service Company Transmission Planning & Interconnection Development March 22, 2016 Version 1 FACILITIES STUDY

More information

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014 Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder

More information

South Dakota 890 Study

South Dakota 890 Study South Dakota 890 Study September 16, 2011 South Dakota 890 Study Presentation of 890 Study results from 2011 Includes WAPA suggested system improvements and timelines Stakeholder Feedback Questions? 2

More information

U.S. System Summary: ARIZONA/SOUTHWEST

U.S. System Summary: ARIZONA/SOUTHWEST U.S. System Summary: ARIZONA/SOUTHWEST Arizona/Southwest High-Speed Rail System (Source: Texas A&M Transportation Institute) The Arizona/Southwest high-speed rail system described in this summary groups

More information

PREPARED DIRECT TESTIMONY

PREPARED DIRECT TESTIMONY Application No.: A.0-04- Exhibit No.: SDG&E-4 Witness: William V. Torre In the Matter of San Diego Gas & Electric Company s Application for Authorization to (1) to Participate in the Steam Generator Replacement

More information

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016 Public Service Company of Colorado Transmission Projects Status CCPG May 5, 2016 1 Transmission Ownership Colorado 2016 Transmission Planning Drivers Load Service / Near-Term (1-5 years) TPL Studies (5

More information

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014 1 BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada IEEE PES Meeting July 2014 General BC Hydro Overview Crown Corporation Serving about 95% of province and 1.9 million customers

More information

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates Capital and Strategic Planning Committee Item III - A May 10, 2018 FY2018 Third Quarter Capital Program Updates Page 4 of 44 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Local Transmission Plan. October 11, 2013 Revised August 25, 2014 Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated

More information

Western NY Public Policy Transmission Planning Report

Western NY Public Policy Transmission Planning Report Western NY Public Policy Transmission Planning Report Dawei Fan Supervisor, Public Policy and Interregional Planning Business Issues Committee September 12, 2017 Operating Committee September 15, 2017

More information

SECTION 1 DESCRIPTION OF THE PROPOSED PROJECT

SECTION 1 DESCRIPTION OF THE PROPOSED PROJECT SECTION 1 DESCRIPTION OF THE PROPOSED PROJECT Supplemental Municipal Consultation Filing The Interstate Reliability Project 1. DESCRIPTION OF THE PROPOSED PROJECT The Connecticut Light and Power Company

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE September 7, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE PURPOSE To update Council on Kamloops

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (JULY 2015) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic July 26, 2016 Reliability Analysis Update MetEd Transmission Zone N-1 First Energy Planning Criteria (FERC Form 715): The North Boyertown West Boyertown 69 kv is

More information

PUD ELECTRIC SYSTEM INTERCONNECTION

PUD ELECTRIC SYSTEM INTERCONNECTION APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2015 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., SGC

More information

North Oregon Coast Area Study. Adam Lint

North Oregon Coast Area Study. Adam Lint North Oregon Coast Area Study Adam Lint PAGE 2 North Oregon Coast System Overview - Clatsop Study Covers: Transmission Switching Stations (Clatsop District): Astoria Lewis and Clark 115 kv Distribution

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

congestion management program

congestion management program congestion management program 2550 Rail Vehicle Program March 2012 11-0319tr 2010 lacmta Q U A R T E R LY P R O J E C T S TAT U S R E P O R T 255O RAIL VEHICLE PROGRAM QUARTERLY PROJECT STATUS REPORT THE

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee - Southern. August 19, 2011 Sub Regional RTEP Committee - Southern August 19, 2011 2011 RTEP Analysis Summary 2010 2015 Project Updates 2016 Analysis NERC Category A, B NERC Category C (N-1-1 in progress) Load Deliverability Generator

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

City of Grand Island

City of Grand Island City of Grand Island Tuesday, May 25, 2010 Council Session Item G10 #2010-139 - Approving Bid Award for Substation Power Transformers Staff Contact: Gary R. Mader City of Grand Island City Council Council

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

7000 Series Railcar Program Overview

7000 Series Railcar Program Overview Finance, Administration and Oversight Committee Information Item IV-B November 6, 2008 7000 Series Railcar Program Overview Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis Terry Blackwell Page 1 of 5 Education 1977 North Carolina State University BS, Electrical Engineering Power Systems emphasis Professional Qualifications 1977 PE-Professional Engineer Business Experience

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (OCTOBER 2016) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving

More information

TransWest Express Project

TransWest Express Project TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company

More information