53A SPECIFICATION SECTION NO. (COVER ONLY ONE SECTION WITH. OF SPECIFICATION SHEET, ONLY NO. (Type, size, model number, etc.)
|
|
- Gwendolyn Darleen Bishop
- 5 years ago
- Views:
Transcription
1 TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE FOR APPROVAL (READ INSTRUCTION ON THE REVERSE SIDE PRIOR TO INITIATING THIS FORM) 1. REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (THIS SECTION TO BE INITIATED BY THE CONTRACTOR) FROM DATE CONTRACT NO. December 9, 2011 N D-1781 (0005) SLONE ASSOCIATES TO TRANSMITTAL NO. Theodore Packowski ENS, CEC, USN, ROICC Charleston NEW SUBMITTAL VIA PREVIOUS TRANSMITTAL NO. (If any) RESUBMITTAL 53A SPECIFICATION SECTION NO. (COVER ONLY ONE SECTION WITH PROJECT TITLE AND LOCATION EACH TRANSMITTAL) Structural Repairs to TC Dock, Naval Weapons Station, Charleston,SC ADDITIONAL ENCLOSURES TO ADDITIONAL COPIES TO 53B MFG. OR CONTR. Y & D ROICC CAT. OR CURVE, NO. Y & D DRAWING USE ITEM DESCRIPTION OF ITEM SUBMITTED DRAWING OR OF SPECIFICATION SHEET, ONLY NO. (Type, size, model number, etc.) BROCHURE NO. COPIES PAR. NO. PLATE, OR ACTION (See instruction No.7) FILE NO. CODE a. b. c. d. e. f. g. 1 Revised Phase 1, 2, and 4 Concrete Pile Order List for Approval Comments: NAME AND SIGNATURE OF CONTRACTOR Chris Boyce ll. ROICC ACTION (THIS SECTION WILL BE USED BY THE APPROVING AUTHORITY ONLY) ACTION CODES: THE FOLLOWING ACTION CODES ARE GIVE TO ITEMS SUBMITTED: (A code letter will be inserted for each item in column g, section I, above) A - APPROVED AS SUBMITTED. C - APPROVED, EXCEPT AS NOTED ON DRAWINGS. E - DISAPPROVED. REFER TO ATTACHED SHEET. RESUBMISSION REQUIRED SEE ATTACHED SHEET B - APPROVED, EXCEPT AS NOTED ON DRAWINGS. RESUBMISSION NOT REQUIRED. D - WILL BE RETURNED BY SEPARATE CORRESPONDENCE NOTE: Approval of items does not relieve the contractor from complying with all the requirements of the contract plans and specifications. ENCLOSURES RETURNED (List by Item No.) NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE 6ND-SOUTHDIV (Rev. 5/70) SHEET 1 OF 1
2
3
4
5
6
7
8
9
10 TC Dock Precast Concrete Pile Order List for Phase I, II and IV Phase I Required Length of Order PSC PSC Pile Pile Required Available Required Pile Item Location Cross Grid Location Type of Pile Loading Condtn. Section (LF) Length (PSC (LF) Qty of pile (EA) Qty of pile Qty of Pile at site (EA) (EA) Lable/ Make Remarks 1 Between B/C Plumb Tension MK6 With HP 12x53 Stinger 2 Between C/D Batter Phase II Required Length of Order PSC Actual PSC Pile Pile Required Available Required Pile Item Location Cross Grid Location Type of Pile Loading Condtn. Section (LF) Length (PSC (LF) Qty of pile (EA) Qty of pile Qty of Pile at site (EA) (EA) Lable/ Make Remarks 1 Between 77.5 B/C Plumb Tension MK1 With HP 12x53 Stinger 2 Between 77.5 C/D Batter MK2 3 Between 86.5 A/B, B/C, E/F & F/G Plumb MK1 4 Between 88.5 A/B, B/C, E/F & F/G Plumb MK1 5 Between 90.5 A/B & B/C Plumb MK1 5 Between 90.5 E/F Plumb Tension MK1 With HP 12x53 Stinger 6 Between 90.5 F/G Batter MK3 7 Between 96.5 A/B, B/C, E/F & F/G Plumb MK2 8 Between 98.5 A/B, B/C, E/F & F/G Plumb MK2 9 Between A/B, B/C Plumb MK2 10 Between E/F Plumb Tension MK2 No Striger 11 Between F/G Batter MK3 Phase IV Required Length of Order PSC Actual PSC Pile Pile Required Available Required Pile Item Location Cross Grid Location Type of Pile Loading Condtn. Section (LF) Length (PSC (LF) Qty of pile (EA) Qty of pile Qty of Pile at site (EA) (EA) Lable/ Make Remarks 1 Between 6.5 B/C Plumb Tension MK4 With HP 12x53 Stinger 2 Between 6.5 C/D Batter MK4 3 Between 22.5 B/C Plumb Tension MK4 With HP 12x53 Stinger 4 Between 22.5 C/D Batter MK4 5 Between 26.5 A/B, B/C, E/F & F/G Plumb MK3 7 Between 28.5 A/B, B/C, E/F & F/G Plumb MK3 8 Between 30.5 A/B, B/C, E/F & F/G Plumb MK3 9 Between 31.5 B/C Plumb Tension MK3 With HP 12x53 Stinger 10 Between 31.5 C/D Batter MK4 11 Between 35.5 B/C Plumb Tension MK3 With HP 12x53 Stinger 12 Between 35.5 C/D Batter MK4 Item Pile Order Summary Description Phase I Piles (EA) Phase II Piles (EA) Phase IV Piles (EA) Total Piles (EA) Pile Length (LF) 1 Mark Mark Mark Mark Mark Total Number of Piles 46 EA
OF SPECIFICATION SHEET, ONLY NO. (Type, size, model number, etc.) FILE NO. CODE d. e. f. g.
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE FOR APPROVAL (READ INSTRUCTION ON THE REVERSE SIDE PRIOR TO INITIATING THIS FORM) 1. REQUEST
More informationPROJECT TITLE AND LOCATION Structural Repairs to TC Dock, Naval Weapons Station, Charleston,SC
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE FOR APPROVAL (READ INSTRUCTION ON THE REVERSE SIDE PRIOR TO INITIATING THIS FORM) 1. REQUEST
More informationPROJECT TITLE AND LOCATION Structural Repairs to TC Dock, Naval Weapons Station, Charleston,SC
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE FOR APPROVAL (READ INSTRUCTION ON THE REVERSE SIDE PRIOR TO INITIATING THIS FORM) 1. REQUEST
More informationSubmittal Transmittal
Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 9/12/2011 Reference
More informationSECTION GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
SECTION 22 05 12 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section
More informationD. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:
SECTION 16211 - ELECTRICITY METERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending
More informationSubmittal. Holder Construction Company. Reviewed. Reviewed as Noted. Rejected. 1. Updates per Bulletin #4
Holder Construction Company 230 Peachtree Street NW, Suite 1250 Atlanta, GA 30303 Submittal Project Telephone #404.688.6233 Project Name: Submittal Number: Submittal Description: Submittal Review Date:
More informationDEP7007CC Compliance Certification
Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit
More information12-SDMS-02 REV. 05 ( )
12-SDMS-02 REV. 05 (22-05-2018) SPECIFICATION FOR LUGS AND CONNECTORS FOR LOW-VOLTAGE & MEDIUM-VOLTAGE DISTRIBUTION SYSTEM Saudi Electricity Company 1. SCOPE... 3 2. CROSS REFERENCES TO OTHER SEC STANDARDS...
More informationDavis Energy Group, Inc. 123 C Street Davis CA Phone
LEED for Homes Quality Assurance Process Inc. January 2015, Inc. 123 C Street Davis CA 95616 Phone 530.753.1100 Table of Contents Quality Assurance Goals 1 Provider Responsibilities 1 Quality Assurance
More informationProject Title. Project Detail
Project Title : Noise Level measurement during Inspection of Transport Air Compressor at Atlas Copco works with suitable correction factors to meet 85 db (A) at 1 meter distance in free field condition
More informationSUBJECT: Single Engine Service Bulletin SB Revision 1: Cosmetic Window Repair
Revision Transmittal TO: Cessna Distributors, Single Engine Service Stations SUBJECT: Single Engine Service Bulletin Revision 1: Cosmetic Window Repair REASON FOR REVISION To revise the Compliance section
More informationDownloaded from
December 20, 1989 TO SUPERSEDE W-F-408D 30 March 1984 FEDERAL SPECIFICATION FITTINGS FOR CONDUIT, METAL, RIGID (THICK-WALL AND THIN-WALL (EMT) TYPE) This specification is approved by the Commissioner.
More informationIMO. REVIEW OF MARPOL ANNEX VI AND THE NO x TECHNICAL CODE. Proposal to harmonize a record book of engine parameters
INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON BULK LIQUIDS AND GASES 11th session Agenda item 5 BLG 11/5/7 12 January 2007 Original: ENGLISH REVIEW OF MARPOL VI AND THE NO x TECHNICAL CODE
More informationRenewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group
Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...
More informationREVISIONS LTR DESCRIPTION DATE APPROVED
REVISIONS LTR DESCRIPTION DTE PPROVED Change CGE code from 037Z3 to 16236 and e-mail address for comments. Removed approved sources requirements. 4 June 2008. bdouni Prepared in accordance with SME Y14.100
More informationNET METERING APPLICATION
NET METERING APPLICATION This form must be filled out completely and submitted to the City of Geneva Electric Division before a customer s renewable energy facility can be interconnected with City s distribution
More informationSTANDBY EMERGENCY CNG/LPG GENERATOR
SECTION 16620 STANDBY EMERGENCY CNG/LPG GENERATOR PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Compressed natural gas (CNG) or liquefied petroleum gas (LPG) powered standby emergency generators. B.
More informationCONSTRUCTION & DEMOLITION (C&D) RECYCLING APPLICATION COMMERCIAL RECYCLING SERVICE PROVIDER
CONSTRUCTION & DEMOLITION (C&D) RECYCLING APPLICATION COMMERCIAL RECYCLING SERVICE PROVIDER The Construction & Demolition Recycling Permit allows removal of recyclable materials from construction sites
More informationPublic Works Right of Way Permit Application
Public Works Right of Way Permit Application City and County of Denver Public Works Permit Operations 2000 West 3rd Avenue, Room 107 Denver, CO 80223-1027 Telephone: (303) 446-3469 www.denvergov.com Application
More informationInstructions for Completing Oncor s Interconnection Application For Solar PV Projects
Instructions for Completing Oncor s Interconnection Application For Solar PV Projects Program Year 2009 Take a Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company s commitment
More informationRenewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group
Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...
More informationCORRIGENDUM # 1. Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM15118
CORRIGENDUM # Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM8 Sr. No. Description Clause/ Para/ Section Amendment/Addition/Modification/Deletion Comemrcial
More informationGeneral Specifications
General Specifications Bid # 2372 Fire Hydrants Water Resource Department The contract period for these items is for 1 full year beginning the effective date of the awarded contract, December 1, 2012 to
More informationFLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES
FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES SPECIFICATION #01 TYPE I AMBULANCE 2 WHEEL DRIVE 4 WHEEL DRIVE OPTIONAL (DIESEL ENGINE, DUAL REAR WHEEL,
More informationTune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.
Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up
More informationSouthern California Public Power Authority (SCPPA) Request for Information (RFI) Battery Energy Storage System (BESS)
Southern California Public Power Authority (SCPPA) Request for Information (RFI) Battery Energy Storage System (BESS) August 1, 2016 A. BACKGROUND The Los Angeles Board of Water and Power Commissioners
More informationTEST REPORT IEC Luminaires Part 2: Particular requirements: Section Two Recessed luminaires
Test Report issued under the responsibility of www.nemko.com Report Reference No.... : 220130 Date of issue... : 2012-09-13 Total number of pages... 6 TEST REPORT IEC 60598-2-2 Luminaires Part 2: Particular
More information#04017A: Special Policy - Tail Lamps/Stop Lamps - (Aug 6, 2004)
Page 1 of 9 2004 Chevrolet TrailBlazer - 4WD Bravada, Envoy, Rainier, TrailBlazer (VIN S/T) Service Manual Campaigns Special Policy #04017A: Special Policy - Tail Lamps/Stop Lamps - (Aug 6, 2004) Subject:
More informationRevision Transmittal Sheet
2 APPROVED WHITE IN LEARJET 31 RT 31-32-24 Revision Transmittal Sheet This page transmits Revision 1 to No. 31-32-24, Main Landing Gear Torque Link Replacement. Rework: No rework is required for aircraft
More informationSECTION CENTRIFUGAL HVAC FANS
SECTION 233416 - CENTRIFUGAL HVAC FANS 1. PART 1 GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationApplication for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and
Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section 7-207.1 and 7-207.2 APPLICABILITY The Public Service Commission of Maryland ( Commission
More informationProduct Information Packet SUM HP,1725RPM,3PH,60HZ,180TY,TENV,FOOTLES
Product Information Packet SUM70504-4 5HP,1725RPM,3PH,60HZ,180TY,TENV,FOOTLES Copyright All product information within this document is subject to ABB Motors and Mechanical Inc. copyright protection, unless
More informationBID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT
BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT The County of Hancock, Maine is seeking bids from qualified firms for the purchase and installation of at least a 20KW backup generator
More information5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS
Summary Description 5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS This chapter of the U.S. EPR Final Safety Analysis Report (FSAR) is incorporated by reference with supplements as identified in the
More informationMOBILITY ASSISTANCE PROGRAM
Supports the mobility needs of Lexus owners and/or family members with physical disabilities. PROGRAM ELEMENTS INCLUDE: Lexus Mobility Assistance Provides new or wheelchair-accessible converted Lexus retail
More informationNPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links
Version:- 7.0 Date of Issue:- July 2017 Page 1 of 19 NPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links 1. Purpose The purpose of this document is to detail
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 836 GREY-IRON AND DUCTILE-IRON FITTINGS
ITEM NO. 836 GREY-IRON AND DUCTILE-IRON FITTINGS 836.1 DESCRIPTION: This item shall consist of grey-iron and ductile-iron fittings installation and adjustment installed in accordance with these specifications
More informationSECTION GENERAL-SERVICE AIR COMPRESSOR PART 1 - GENERAL
13686.00 GENERAL SERVICE AIR COMPRESSOR 221519-1 SECTION 22 1519 - GENERAL-SERVICE AIR COMPRESSOR 1.1 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of the Contract, including General
More informationELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING
Building and Safety Division Policy and Procedure No. A093015 Effective Date January 1, 2017 ELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING GENERAL REQUIREMENTS A. System size is 30
More informationSECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS
SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationLong Combination Vehicle (LCV) Exemption Permit Application
This application considers ALL National Safety Code (NSC) vehicles registered to your company that travel into, through or from Alberta and ALL drivers who operate those NSC vehicles, including those that
More informationFHEZ10A24 FHEZ10A24 - CEC 24" EZ EXIT EM T-Grid
- CEC 24" EZ EXIT EM T-Grid Universal mounting allows for installation with all types of T-Grid Universal Input 20-277VAC High Lumen Output EM Solution; Powered by FHSCP EM driver Integrated Test Switch
More informationCal Pacific Airmotive, Inc.
Cal Pacific Airmotive, Inc. Title: Inspection of Flight Control System Mandatory Service Bulletin North American Aviation P-51B, P-51C, P-51D, P-51K, F-51D, F-51K S.B. No. P51-001 Revision: 0 Issue Date
More informationThree (3) New Ford Fusion Sedans Bid No Notice to Bidders
CITY OF SAN LEANDRO INVITATION FOR BIDS SUBMIT BID TO: City of San Leandro Purchasing Department 835 East 14th Street San Leandro, CA 94577 FOR FURTHER INFORMATION CONTACT: Julie Jenkins Purchasing Agent
More informationSan Antonio, Texas 78222
1.01 3 EA Pump Removal $1,125.00 $3,375.00 1.02 3 EA Pump Installation $1,200.00 $3,600.00 1.03 1 EA Downhole Video Survey $2,000.00 $2,000.00 1.04 1 EA Geophysical Logging $2,500.00 $2,500.00 2.01 50
More informationNew Jersey Motor Vehicle Commission
P.O. Box 170 Trenton, New Jersey 08666-0170 (609) 292-6500 ext. 5014 Chris Christie Governor Kim Guadagno Lt. Governor Raymond P. Martinez Chairman and Chief Administrator Announcement All Initial Business
More informationECP4409T-4 100HP,1190RPM,3PH,60HZ,444T,A44064M,TEFC
Product Information Packet ECP4409T-4 00HP,90RPM,3PH,60HZ,444T,A44064M,TEFC Copyright All product information within this document is subject to Baldor Electric Company copyright protection, unless otherwise
More informationFuels Safety Division. Propane Code Adoption Document Amendment
Fuels Safety Division Ref. No.: Rev. No.: FS-201-12 1 Propane Code Adoption Document Amendment Date: December 1, 2012 Date: IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c.
More informationCOUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT
COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT RESIDENTIAL ELECTRIC VEHICLE (EV) CHARGER GUIDELINES Mike Lara Director The purpose of this guideline is to assist permit applicants in streamlining the
More informationCompatibility Between Electric Trains and Electrification Systems
Compatibility Between Electric Trains and Electrification Systems Synopsis Process for managing change that affects the compatibility between electric trains and electrification systems Submitted by Signatures
More informationNYS Commercial Solar Interconnection Workshop & Roundtable. Thomas V. Higgins Lead Technical Support Consultant - 9/29/2016
NYS Commercial Solar Interconnection Workshop & Roundtable Thomas V. Higgins Lead Technical Support Consultant - 9/29/2016 NYSIR what is it? The NYSIR is the New York State Standardized Interconnection
More informationMaryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)
Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Interconnection Customer Contact Information Name: Address: Alternative Contact Information
More informationLaboratory Evaluation Report for: Laboratory Faucet Backflow Preventer
American Society of Sanitary Engineering Seal (Certification) Program Laboratory Evaluation Report for: Laboratory Faucet Backflow Preventer Tested under ASSE Standard 1035 Revised: April, 2008 Laboratory
More information56-SDMS-07 REV. 01 SPECIFICATIONS FOR
56-SDMS-07 REV. 01 SPECIFICATIONS FOR UNIT SUBSTATIONS UP TO 36 kv ALUMINUM TRANSFORMER ALUMINUM BUS BARS LVDP This specification is property of SEC and subject to change or modification without any notice
More informationSHARP HEALTH PLAN POLICY AND PROCEDURE Product Line (check all that apply):
SHARP HEALTH PLAN POLICY AND PROCEDURE Product Line (check all that apply): Title: Provider Dispute Resolution Overview Division(s): Administration, Finance and Operations Group HMO Individual HMO PPO
More informationImplementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E
1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of
More informationWEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA Fax FEE: $75.00 (Up to 200 S.F.)
WEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA 19320 610 380-8200 Fax 610 384-4934 FEE: $75.00 (Up to 200 S.F.) PERMIT NO. ZONING PERMIT APPLICATION FOR TOOL SHED/MINOR ACCESSORY BUILDING
More informationWorker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal
Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal TABLE OF CONTENTS SECTION TITLE PAGE 1.0 DATE AND TIME OF INCIDENT 4 2.0 NAME & ADDRESS OF PRINCIPAL PARTIES 4 2.1 Employer
More informationEligible Renewable Generation (ERG) Application INSTRUCTIONS
INSTRUCTIONS THIS DOCUMENT CONTAINS: ERG Application INSTRUCTIONS ERG Application INFORMATION ERG Application FORM ERG Application CHECKLIST Please read the INSTRUCTIONS and INFORMATION before completing
More informationSolar Net Metering and Billing FAQ
Information Title Solar Net Metering Sheet and Billing FAQ If you ve recently had your solar meters installed or purchased a home with existing solar, you likely have questions. We want to help so we ve
More informationLaboratory Evaluation Report for: Backflow Preventer for Beverage Dispensing Equipment
American Society of Sanitary Engineering Seal (Certification) Program Laboratory Evaluation Report for: Backflow Preventer for Beverage Dispensing Equipment Tested under ASSE Standard 1022 ASSE: 2003 ANSI:
More informationMECHANICAL AND ELECTRICAL COORDINATION SECTION MECHANICAL AND ELECTRICAL COORDINATION PART 1 - GENERAL
13686.00 MECHANICAL AND ELECTRICAL COORDINATION 230002-1 SECTION 230002 MECHANICAL AND ELECTRICAL COORDINATION 1.1 WORK INCLUDED PART 1 - GENERAL A. Work Included in This Section: Materials, equipment,
More informationSERVICE BULLETIN REVISION TRANSMITTAL
REVISION TRANSMITTAL This sheet transmits Revision 1 to, which: A. Adds HDWR kit to the MATERIAL INFORMATION section. NOTE: This revision replaces the original issue of in its entirety. REVISION COMPLIANCE
More informationThe following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin
The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.
More informationCERTIFICATE OF COMPLIANCE
FM Approvals 1151 Boston Providence Turnpike P.O. Box 9102 Norwood, MA 02062 USA T: 781 762 4300 F: 781-762-9375 www.fmapprovals.com CERTIFICATE OF COMPLIANCE HAZARDOUS (CLASSIFIED) LOCATION ELECTRICAL
More informationLetter of Attestation
FF01 Letter of Attestation Master Contract: 162842 Report: 1662646 Project: 1662646 Class No. 7861-37 CSA International has completed the following custom testing for Ferraz Shawmut Inc. 374 Merrimac St.
More informationCERTIFICATE OF COMPLIANCE
FM Approvals 1151 Boston Providence Turnpike P.O. Box 9102 Norwood, MA 02062 USA T: 781 762 4300 F: 781-762-9375 www.fmapprovals.com CERTIFICATE OF COMPLIANCE HAZARDOUS (CLASSIFIED) LOCATION ELECTRICAL
More informationIGNITION INTERLOCK SERVICE CENTER RENEWAL LICENSE
TRAFFIC SAFETY DIVISION APPLICATION FOR IGNITION INTERLOCK SERVICE CENTER RENEWAL LICENSE INSTRUCTIONS FOR COMPLETING THIS APPLICATION PLEASE: complete this application on your computer using the TAB key
More informationCITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS
CITY OF FONTANA HANDBOOK ON RESIDENTIAL APPROACH CONSTRUCTION PERMITS GENERAL INFORMATION A driveway approach is an area, construction or improvement between the roadway of a public street and private
More informationThe attached pre-qualification application should be submitted with your bid, in a separate sealed envelope.
BL098-17 October 9, 2017 INSPECTION, MAINTENANCE AND REPAIR OF HOISTS AND CRANES ON AN ANNUAL CONTRACT ADDENDUM #1 BL098-17 The following should be added to the above-referenced bid. The attached pre-qualification
More informationAirworthiness Directive
Airworthiness Directive AD No.: 2018-0255 Issued: 27 November 2018 EASA AD No.: 2018-0255 Note: This Airworthiness Directive (AD) is issued by EASA, acting in accordance with Regulation (EU) 2018/1139
More informationControlling the Speed of Tilting Trains Through Curves
Controlling the Speed of Tilting Trains Through Curves Synopsis This document mandates the means by which Tilting Trains may be operated at higher speeds than nontilting trains around curves. Signatures
More informationTEST METHOD D6121 L-37 Load Evaluation VERSION CONDUCTED FOR: I = Invalid N = Results cannot be interpreted(refer to comment section)
Load Evaluation VERSION CONDUCTED FOR: V = Valid I = Invalid N = Results cannot be interpreted(refer to comment section) NR = Non-Reference Test Oil RO = Reference Oil Result Test Stand: Date Completed:
More informationThe Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.
FORM WCCL-PC3 WCCL TEST STAND APPROVAL PROCEDURE AND CHECKLIST AHRI CERTIFICATION PROGRAM FOR WATER-COOLED WATER CHILLING AND HEAT PUMP WATER-HEATING (WCCL) PACKAGES WCCL Participant: Date of Inspection:
More informationNotification of a Proposal to issue a Certification Memorandum. Approved Model List Changes
Notification of a Proposal to issue a Certification Memorandum Approved Model List Changes EASA Proposed CM No.: Proposed CM 21.A-E Issue 01 issued 02 October 2017 Regulatory requirement(s): 21.A.57, 21.A.61,
More informationROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE
ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE In this Section: Overview Evaluation of Initial Requests Rollover Request Competing Request Competing Examples 1.0 OVERVIEW Pursuant to Section 2.2
More informationDate of hosting on website: 30 th August 2018 Last date for comment: 14 th September 2018
Date of hosting on website: 30 th August 2018 Last date for comment: 14 th September 2018 CHECK LIST FOR PREPARING AMENDMENT TO AUTOMOTIVE INDUSTRY STANDARD (AIS) Amd. 02 to AIS-123 Part 1 SR. PARTICULARS
More informationVolume 1 Series 2200 Specification for Road Works. Clause Title Page
PARAPETS Contents Clause Title Page 2201 General... 2 2202 Vehicle... 2 2203 Anchorages and Attachment Systems for Vehicle... 2 2204 Amendments and Additions to BS 6779... 3 2205 Protection Against Corrosion...
More informationEngine/Module Repair Requirements /
AIR CHINA TECHNICS Engine/Module Repair Requirements / ERR No. PW4K7277110901R0 Engine Type Engine S/N Executive Base Prepared By Checked By Approved By PW4056-3 P727711 Ameco 2009-6-1 EWR PW4K7277110901R0
More informationINSTRUCTIONS FOR CONTINUED AIRWORTHINESS FAA-STC SE8987SW. Proposal to Increase Lycoming O-320-E2A Engine Power Rating from 150 hp to 160 hp
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS FAA-STC SE8987SW Proposal to Increase Lycoming O-320-E2A Engine Power Rating from 150 hp to 160 hp Drawing 2663 Notice This document must be referenced on Block
More informationEV Charging Station Submittal Requirements
EV Charging Station Submittal Requirements To obtain a permit for an Electric Vehicle Charging Station, please provide the following: Plan and details of the charging system installation o Print applicable
More informationThis is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"
This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced
More informationSUBJECT: ELECTRICAL POWER SYSTEM UNIT AND ROTORCRAFT FLIGHT MANUAL TEMPORARY REVISION, CANCELLATION OF
MODEL AFFECTED: 505 ALERT SERVICE BULLETIN 505-17-03 PSL 7000000247 28 November 2017 Revision A, 14 February 2018 Revision B, 6 March 2018 Revision C, 18 September 2018 SUBJECT: ELECTRICAL POWER SYSTEM
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationSECTION AXIAL HVAC FANS
SECTION 233413 - AXIAL HVAC FANS 1. PART 1 GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationExpedited Permitting Process for Electric Vehicle Charging Stations
Expedited Permitting Process for Electric Vehicle Charging Stations BPC-062 Purpose: This document provides all of the needed links to forms and checklists necessary to utilize Permit Sonoma s Expedited
More informationGPP3380 G.M. F27LF 180V DC 83 RPM CAT# GPP3380
Product Information Packet GPP3380 G.M. F27LF 180V DC 83 RPM CAT# GPP3380 Copyright All product information within this document is subject to Baldor Electric Company copyright protection, unless otherwise
More informationA HP,1785RPM,3PH,60HZ,449TDZ,A44140M,TE
Product Information Packet A44-0876-3096 350HP,1785RPM,3PH,60HZ,449TDZ,A44140M,TE Copyright All product information within this document is subject to Baldor Electric Company copyright protection, unless
More informationTrain Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001
Train Safety Systems Synopsis This document defines the requirements for train safety systems to enable safe operation of trains on Railtrack controlled infrastructure. Signatures removed from electronic
More informationNovember 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
November 16, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ANR Pipeline Company 717 Texas Street, Suite 2400 Houston, Texas 77002-2761
More informationAppendix A Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling
Appendix A 075-18 Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling INTENT JEA is soliciting proposals for industrial services to remove & dispose
More informationSERVICE LETTER. COMPLIANCE DISCRETIONARY. This service letter should be accomplished at a scheduled Check 1, Check 2, or HSI. LABOR HOURS KEY WORD
Citation SERVICE LETTER SL525C-71-01 TITLE POWER PLANT - TRANSMITTAL OF WILLIAMS INTERNATIONAL SERVICE BULLETIN ENGINE OIL BREATHER TUBE ASSEMBLY & FRONT BYPASS DUCT RH BOSS ASSEMBLY INSTALL EFFECTIVITY
More informationRef No: N Date: December 7, Fuseholder Assemblies No. 2. Call us today! See Attachment 1 for Effective Dates.
Ref No: N07-094 Date: December 7, 2007 Fuseholder Assemblies No. 2 See Attachment 1 for Effective Dates. Call us today! We can help you stay on top of changes that will affect your Certification! 1-866-797-4272
More informationINSTRUCTIONS FOR CONTINUED AIRWORTHINESS FAA-STC SE8987SW. Proposal to Increase Lycoming E2A Engine Power Rating from 150 hpto 160 hp
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS FAA-STC SE8987SW Proposal to Increase Lycoming 0-320-E2A Engine Power Rating from 150 hpto 160 hp Drawing 2663 Notice This document must be referenced on Block
More informationAGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 102: Regulation No. 103
21 March 1997 AGREEMENT CONCERNING THE ADOPTION OF UNIFORM TECHNICAL PRESCRIPTIONS FOR WHEELED VEHICLES, EQUIPMENT AND PARTS WHICH CAN BE FITTED AND/OR BE USED ON WHEELED VEHICLES AND THE CONDITIONS FOR
More informationVEHICLE MAINTENANCE PROGRAM
VEHICLE MAINTENANCE PROGRAM Prepared by: SCOTT PARTRIDGE Transportation Manager Version: 5.05.14 Effective Date: 5 MAY 2014 The undersigned has read, understands and agrees to comply with the information
More informationForm UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00
Massachusetts Department of Environmental Protection Underground Storage Tank Program Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00 Forward completed form to:
More informationBEFORE THE FLORIDA PUBLIC SERVICE COMMISSION
BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In Re: Petition by Duke Energy Florida, LLC, for Approval of Modifications to the Approved Standby Generation Tariff and Program Participation Standards Docket
More information